Actual Amount (US$) Process Status. Pending Interventions.

Similar documents
Sri Lanka Strategic Cities Development Project (P130548)

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Procurement Plan for ETLP (P156590)

Prior Review Thresholds

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

PROCUREMENT PLAN (Textual Part)

Procurement Plan for Eth Expressway Project ( P148850)

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Procurement Plan for Project of Integrated Urban and Tourism Development

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

PPA PROCUREMENT PLAN (Textual Part)

Prior Review Thresholds

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PPA PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

GEF Procurement Plan (WARFP LIBERIA)

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Consultants: firms Consultants: individuals

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Sample Procurement Plan

Sample Procurement Plan

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. I. General

Implementation Status & Results Belize Municipal Development (P111928)

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

PROCUREMENT PLAN (Textual Part)

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

The World Bank Metro Colombo Urban Development Project (P122735)

PROCUREMENT PLAN (Textual Part)

Procurement. International Competitive Bidding;

Urban Productive Safety Net Project (UPSNP) Procurement Plan

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Sample Procurement Plan

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)

PROCUREMENT PLAN (Textual Part)

The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.

Sample Procurement Plan

RESTRUCTURING PAPER ON A PROPOSED PROJECT RESTRUCTURING LK WATER SUPPLY AND SANITATION IMPROVEMENT PROJECT APPROVED ON JUNE 24, 2015

Implementation Status & Results Senegal Dakar Diamniadio Toll Highway (P087304)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

Procurement Plan National Community Driven Development Project Department of Rural Development

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

Implementation Status & Results China CN Integrated Economic Development of Small Towns (P118597)

Procurement Plan. I. General

Reserve Forecast Details

procurement Plan I. General

Implementation Status & Results Chad Urban Development Project (P072030)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 4

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Land Administration and Cadastre

PE Cusco Transport Improvement Project (P132505) Procurement Plan

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Proposed Scope of Work Village of Farmingdale Downtown Farmingdale BOA Step 2 BOA Nomination Study / Draft Generic Environmental Impact Statement

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Procurement Plan. I. General

Implementation Status & Results Mekong Mekong Integrated Water Resources Management (P104806)

STATUS OF PROJECTS IN EXECUTION FY09 SOPE

The World Bank Cities and Climate Change (P123201)

The World Bank Transport Connectivity and Asset Management Project (P132833)

Sample Procurement Plan

Bishkek City Development Agency. Urban Planning Bishkek

Implementation Status & Results Chad Urban Development Project (P072030)

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Implementation Status & Results Central African Republic CF-Support to Vulnerable Groups Community Development Project (P111679)

Transcription:

Page 1 PROCUREMENT PLAN Sri Lanka : Sri Lanka Strategic Cities Development Project General Information Country: Sri Lanka Banks Approval Date of the Original Plan: 2016-08-24 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-01-18 Project ID: P130548 GPN Date: Project Name: Sri Lanka Strategic Cities Development Project Loan / Credit No:, Executing Agency(ies): Ministry of Megapolis and Western Development WORKS SCDP/WB/WK/KD/01 / Rehabilitation and Construction of Dharmasoka Mawatha (B 550) from 0 000 km to 3 390 km (Including Buwelikada Sharp Bend) at Urban Support Bids Open - International Amount Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / N 6,250,000.00 4,977,900.66 Signed 2016-04-28 2016-06-15 SCDP/WB/WK/KD/02 / Rehabilitation and Construction of Katugastota - Madawala - Bambaralla (B 205) Road Section from Katugastota to Madawala (from 0 000 km to 6 250 km), Madawala - Digana (B 256) Road (from 0 000 km to 8 100 km) SCDP/WB/WK/KD/07 / Rehabilitation of Meda Ela (Lot 01 & Lot 02_( in District) SCDP/WB/WK/KD/14 / Rehabilitation & Construction of Silt Traps (5 Nos) SCDP/WB/WK/KD/13 / Rehabilitation of Heelpankadura & Rajapihilla SCDP/WB/WK/GL/10 / Desilting & Cleaning of Moda Ela, Kepu Ela & Parana Ela in GMC Area SCDP/WB/WK/KD/08 / Rehabilitation of George E. De Silva Park SCDP/WB/WK/KD/03 / Lakeside Walkability Improvements Urban Bids Open - International N 16,500,000.00 11,053,826.68 Signed 2016-04-28 2016-06-15 Support Urban Bids N 4,100,000.00 4,320,241.49 Signed 2016-04-28 2016-06-29 Support 1,835,000.00 0.00 Bids 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2017-02-11 400,000.00 0.00 Bids 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2016-10-13 Direct Direct 21,000.00 0.00 2016-09-23 2016-09-23 2016-09-23 2016-09-23 Under 1,100,000.00 0.00 Bids 2016-12-30 2017-01-04 2017-01-27 2017-02-24 2017-03-18 2017-04-22 2018-04-22 3,100,000.00 0.00 Bids 2016-12-30 2017-01-30 2017-02-27 2017-03-21 2017-04-25 2018-04-25 SCDP/WB/WK/KD/17 / Improvements to Municiple Car Park Roof Top Bids 4,100,000.00 0.00 2016-12-30 2017-03-03 2017-03-31 2017-04-21 2017-06-20 2018-12-12 SCDP/WB/WK/KD/18 / Improvements to Tomlin Park in KMC area SCDP/WB/WK/GL/07 / Reconstruction of Kahaduwawatta SCDP/WB/WK/KD/06 / Rehabilitation of Gatabe Intake & Water Treatment Plant SCDP/WB/WK/GL/02 / Rehabilitation of Moragoda Ela Main Canal & Temple Bypass SCDP/WB/WK/KD/11 / Construction of 3 Nos Ground Reservoirs- Dangolla,Heerassagala Lower & Heerassagala Middle for Water Supply SCDP/WB/WK/KD/09 / Rehabilitation of Arthur's Seat Viewing Deck SCDP/WB/WK/GL/04 / Reconstruction of Kanampitiya SCDP/WB/WK/GL/01 / Reconstruction of Beligaha Bids Bids Bids Bids Open - International Bids Bids Bids Bids 330,000.00 0.00 2017-01-16 2017-02-26 2017-03-26 2017-04-17 2017-05-23 2018-05-23 500,000.00 0.00 2016-09-11 2016-09-11 2016-10-09 2016-10-30 2016-12-06 2017-12-06 6,100,000.00 0.00 2016-09-11 2016-09-11 2016-10-09 2016-11-20 2017-02-13 2019-02-13 7,200,000.00 0.00 Under Review 2016-09-11 2016-09-11 2016-09-12 2016-10-12 2016-12-27 2019-06-15 1,540,000.00 942,195.68 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-10-14 Under 2014-12-11 2015-01-16 2015-02-20 540,000.00 0.00 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-10-24 407,000.00 0.00 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-11-01 370,000.00 0.00 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-09-18 2016-10-26 SCDP/WB/WK/KD/10 / Transmission Mains-WTP to Heerassagala and along Heerassagala Road Bids 2,230,000.00 1,019,269.74 Under 2016-09-18 2014-12-11 2016-09-18 2016-09-18 2015-01-16 2016-09-18 2015-02-20 2016-09-18 2017-09-18 losure Authorized

Page 2 SCDP/WB/WK/GL/06 / Reconstruction of Millidduwa Bids 330,000.00 0.00 2016-12-30 2017-01-04 2017-02-15 2017-03-17 2017-04-21 2017-10-18 SCDP/WB/WK/KD/12 / Rehabilitation of Dunumadalawa Water Treatment Plant Bids 1,970,000.00 3,182,670.69 Under 2016-09-19 2016-09-19 2016-09-19 2016-03-15 2016-09-19 2016-05-10 2016-09-19 2017-03-18 SCDP/WB/WK/GL/11 / Rehabilitation of Moda Ela, Kapu Ela & 07 nos. Of Cross Drains in Bids 1,071,000.00 0.00 2016-10-13 2016-11-24 2016-12-22 2017-01-15 2017-02-19 2018-02-19 SCDP/WB/WK/KD/19 / Renovation of Asset Management Office at Municiple Council Limited 100,000.00 0.00 2016-10-14 2016-12-09 2017-02-07 SCDP/WB/WK/KD/05 / Rehabilitation of underground storm water drainage Bids Open - International Y 7,000,000.00 0.00 2016-09-20 2016-09-20 2016-10-25 2016-09-20 2017-01-09 2017-01-25 2017-04-11 2019-04-11 SCDP/WB/WK/GL/05 / Reconstruction of Samagi Watta Bids 323,100.00 0.00 2016-09-19 2016-09-19 2016-09-19 2016-09-19 2016-09-19 2016-10-24 GOODS Amount Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / SCDP/WB/GD/16 / of Machinery & Equipment for Operation & Maintanence -KMC Bids Open - International 600,000.00 0.00 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2017-04-06 SCDP/WB/GD/19 / of Machinery & Equipment for Operation & Maintanence of Irrigation Department- Bids 550,000.00 0.00 2016-09-20 2016-09-20 2016-09-20 2016-09-20 2016-10-17 2017-04-15 NON CONSULTING SERVICES Amount Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / SCDP/WB/NC/26 / Borehole Investigation Work for Three s Over Moragoda canal in Direct Direct 17,250.00 0.00 2016-09-01 2016-09-06 2016-10-11 2017-04-09 SCDP/WB/JF/NC/01 / Urban 15,000.00 0.00 2016-09-26 2016-10-03 2016-12-02 SCDP/WB/JF/NC/02 / Soil Investigation work for Urban 8,000.00 0.00 2016-09-26 2016-09-26 2016-11-25 SCDP/WB/JF/NC/03 / Improvements to Jaffna to Moolai section of Jaffna Ponnalai Point Pedro Road (AB21) Urban 15,000.00 0.00 SCDP/WB/JF/NC/04 / Soil Investigation work for Improvements to Jaffna to Moolai section of Jaffna Ponnalai Point Pedro Road (AB21)(15.km) Urban 8,000.00 0.00 2016-09-27 2016-10-18 2016-12-17 SCDP/WB/JF/NC/05 / Cross section Survey and road reservation marking along Kodikamam to Point Pedro section of Puloly-Kodikamam- Kachchai Road (AB Urban 15,000.00 0.00 2016-10-02 2016-10-02 2016-12-01 SCDP/WB/JF/NC/06 / Surveying work for Land Acquisition of Urban 23,000.00 0.00 SCDP/WB/JF/NC/07 / Surveying work of Ponds, Urban streets, Public places & Recreational parks in Jaffna City Region Urban 1,000,000.00 0.00 SCDP/WB/NC/08 / Benkelman Beam Deflection (BBD) Survey, Test pit investigation and Laboratary Tests for Pavement Design of Katugastota-Madawala- Digana Road 7,000.00 0.00 2016-10-03 2016-10-31 2016-11-30

Page 3 SCDP/WB/NC/09 / Surveying works required for Flood Mitigations Designs at Moda Ela, Moragoda Ela & Moda Ela Cross Drains 46,000.00 0.00 2016-09-28 2016-09-28 2017-03-27 SCDP/WB/NC/17 / Surveying work required for Land Aquisition at balance Moragoda Ela Cross drains,moda Ela, Moda Ela Cross drains, Kapu Ela, Kapu Ela cross drains and retention areas of Moda Ela 2,000.00 0.00 2016-09-28 2016-09-28 2016-10-12 SCDP/WB/NC/18 / Surveying work required for Land Aquisition at balance Moragoda Ela Cross drains,moda Ela, Moda Ela Cross drains, Kapu Ela, Kapu Ela cross drains and retention areas of Moda Ela 14,000.00 0.00 2016-10-03 2016-10-03 2016-11-02 SCDP/WB/NC/19 / Surveying work for Detailed land Survey of Rampart Walkway at Fort 3,000.00 0.00 2016-09-28 2016-09-28 2016-10-28 SCDP/WB/NC/20 / Collection of Data for the consultant of PT/TM for the City of 30,000.00 0.00 2016-09-28 2016-09-28 2016-09-28 SCDP/WB/NC/21 / Topographical & Detailed Survey of selected areas in under Urban Upgrading 285,000.00 0.00 2016-09-28 2016-09-28 2016-10-28 SCDP/WB/NC/22 / Surveying work for Detailed Land Survey of Ocean Pathway at 21,000.00 0.00 SCDP/WB/NC/23 / Analytical Services for Sediment & water quality analysis at selected locations along Meda Ela in 2,000.00 0.00 SCDP/WB/NC/24 / Soil investigation Work for the Construction of Bus Parking Facility at Nuwarawela Land in 10,000.00 0.00 SCDP/WB/NC/25 / Soil investigation Work for Sludge Drying Bed to Dunumadalawa Water Treatment Plant in 3,000.00 0.00 CONSULTING FIRMS Contract Type Amount Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Proposals / Minutes Proposal Negotiated Contract SCDP: CS/09 / Consultancy Services for Down Town Upgrading of City Urban Support Open - International N 1,100,000.00 1,001,616.36 Terminated 2015-05-24 2015-06-01 SCDP/WB/CS/12 / Consultancy Services for Public Transport Design and Operations Management and Strategic Traffic Demand Management & Design Plan Urban Support Open - International N 538,000.00 531,166.98 Signed 2015-05-25 2015-06-10 SCDP/WB/CS/21 / CONSULTANCY SERVICES FOR CONSTRUCTION SUPERVISION AND CONTRACT ADMINISTRATION OF REHABILITATION OF MEDA ELA IN KANDY Urban Least Cost Open - International N 700,000.00 225,421.45 Signed 2015-10-14 2016-01-04 2016-03-29 2016-03-29 2016-04-30 2016-06-09 2016-05-16 2016-06-22 2016-05-16 Support SCDP/WB/CS/31 / Consultancy Services for conducting an IEE for proposed Kaluwella new canal in GMC area 0.00 27,500.00 2016-09-01 2016-09-02 2016-10-16 2016-11-13 2016-12-13 2017-01-17 2017-02-21 2018-02-21 SCDP/WB/CS/23 / Consultancy Services for Design of Multi Model Transport Terminal Open - International 1,034,000.00 0.00 Under Review 2016-09-12 2016-09-12 2016-09-28 2016-10-26 2016-11-25 2016-12-30 2017-02-03 2018-02-03 SCDP/WB/JF/CS/06 / Consultancy Services for Preparation of Master Plan for Storm Water Drainage System of Jaffna City and Preparation of ity Investment Plan Urban Open - International 600,000.00 0.00 Under Review 2016-09-13 2016-09-13 2016-10-11 2016-11-10 2016-11-25 2016-12-28 2017-01-25 2018-01-25 SCDP/WB/CS/21 / Consultancy for Construction Supervision of Rehabilitation of Meda Ela Least Cost Open - International 700,000.00 0.00 Under Review 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2017-03-21

Page 4 SCDP/WB/CS/09 / Consultancy Services for Design of Urban Upgrading interventions in City 0.00 Open - International 1,100,000.00 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-11-22 SCDP/WB/CS/10 / Consultancy Services for Design of Urban Upgrading interventions in City 0.00 Open - International 1,100,000.00 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2017-04-26 SCDP/WB/CS/12 / Public transport Design & Operations Mgt. plan and Strategic Traffic Demand Mgt. and Design Plan for the city of Open - International 538,000.00 0.00 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2016-09-22 2017-06-10 SCDP/WB/CS/25 / Consultancy Services for conducting an IEE for proposed improvements for the existing water treatment system in Least Cost 23,000.00 0.00 2016-10-02 2016-10-02 2016-10-02 2016-10-02 2016-10-02 2016-10-02 2016-10-02 2016-10-02 SCDP/WB/CS/18 / Consultancy Supervision & Contract Administration of Urban Upgrading of Municipal Car Park Roof Top, George E. De Silva Park, Lakeside Walkability Improvements and Tomlin Park Projects in City Open - International 1,138,000.00 0.00 Under Review 2016-12-05 2016-12-05 2017-01-12 2017-02-13 2017-03-15 2017-04-19 2017-05-24 2018-05-24 SCDP/WB/CS/28 / Consultancy Supervision & Contract Administration of under Ground Drainage Tunnel Rehabilitaion in Open - International 385,000.00 0.00 Under Review 2016-08-31 2016-09-01 2016-10-15 2016-11-12 2017-01-30 2017-03-13 2017-03-30 2018-03-30 SCDP/WB/CS/29 / Consultancy Supervision & Contract Administration of Moragoda Ela Main Canal & Temple Bypass Least Cost Open - International 538,000.00 0.00 Under Review 2016-09-01 2016-09-02 2016-10-16 2016-11-13 2016-12-13 2017-01-17 2017-02-21 2017-08-20 SCDP/WB/CS/14 / Consultancy Supervision of Roads in Least Cost 1,200,000.00 0.00 Under Review 2016-09-20 2016-10-11 2016-10-11 2016-10-11 2016-10-11 2016-10-11 2016-10-11 2017-04-09 SCDP/WB/JF/CS/05 / consultancy Services for Detailed Design & Construction Supervision of Improvements to Public Parks & Urban Market Place in Sri Lanka Urban Open - International 700,000.00 0.00 2016-12-22 2017-01-12 2017-02-25 2017-03-25 2017-04-24 2017-05-29 2017-07-03 2018-07-03 SCDP/WB/CS/32 / Consultancy Services for social Impact assesment, preparation of RAP For the Construction of KMTT 34,000.00 0.00 2016-12-27 2016-12-27 2017-02-09 2017-03-09 2017-04-08 2017-05-13 2017-06-17 2018-06-17 SCDP/WB/CS/33 / Consultancy Services for Independent Monitoring and Review of Social Safeguards 0.00 517,000.00 2016-12-27 2017-01-17 2017-03-02 2017-03-30 2017-04-29 2017-06-03 2017-07-08 2020-07-07 INDIVIDUAL CONSULTANTS Contract Type Amount Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual SCDP/WB/CS/22 / Consultancy Services for Detailed Design and Tender Documentation of Drainage Tunnel Network in Urban Direct Direct N 800,000.00 580,940.08 Signed 2015-09-02 Support SCDP/WB/CS/22 / Consultancy Services for Design and Construction supervision of Under Ground Drainage Tunnel rehabilitation Direct Direct 800,000.00 0.00 2016-09-23 2016-09-23 2016-09-23 2016-09-23 SCDP/WB/CS/26 / Consultancy supervision ofarthur's Seat- Direct Direct 46,500.00 0.00 2016-09-23 2016-09-23 2016-09-23 2016-10-21 SCDP/WB/CS/16 / Consultancy for Design & Supervision of Slope Stability for Dharmasoka Mw. Direct Direct 216,000.00 0.00 2016-09-23 2016-09-23 2016-09-23 2018-07-29 SCDP/WB/JF/CS/04 / Consultancy Services for Ponds Rehabilitation in Jaffna City Region Direct Direct 14,400,000.00 0.00 Urban 2016-09-27 2016-09-27 2016-09-27 2018-09-14 SCDP/WB/CS/34 / Design Expert for Lighting of Rampart, Walkway and Underground Chambers of Fort in Limited 10,000.00 0.00

Page 5 SCDP/WB/CS/35 / Design Expert for Historic Fabric/Materials of Rampart, Walkway, Underground Chambers and Dutch Drainage System of Fort in Limited 10,000.00 0.00 SCDP/WB/CS/36 / Design Expert for Signage/Wayfinding & InteInterpretation Design of Rampart, Walkway and Underground Chambers of Fort in Limited 66,000.00 0.00 SCDP/WB/CS/30 / Consultancy Services for Design of Railway across Moda Ela in Direct Direct 24,000.00 0.00 2016-12-28 2016-12-28 2017-03-03 2017-08-30 SCDP/WB/CS/15 / Consultancy Services for Pavement Design of Katugastota-Madawala-Digana Road Direct Direct 385,000.00 0.00 Canceled 2017-03-01 2017-03-11 2017-05-15 2017-08-13 LK-MOMWD-4198-CS-CDS / Consultancy Services for pavement Design of Katugastota - Madawala- Digana Road Direct Direct 6,000.00 0.00 Canceled 2016-09-09 2016-09-19 2016-11-23 2017-05-22