SMART-Signal Phase II: Arterial Offset Optimization Using Archived High-Resolution Traffic Signal Data

Size: px
Start display at page:

Download "SMART-Signal Phase II: Arterial Offset Optimization Using Archived High-Resolution Traffic Signal Data"

Transcription

1 SMART-Sgnal Phase II: Arteral Offset Optmzaton Usng Archved Hgh-Resoluton Traffc Sgnal Data Fnal Report Prepared by: Henry X. Lu Heng Hu Department of Cvl Engneerng Unversty of Mnnesota CTS 13-19

2 Techncal Report Documentaton Page 1. Report No Recpents Accesson No. CTS Ttle and Subttle 5. Report Date SMART-Sgnal Phase II: Arteral Offset Optmzaton Usng Aprl 213 Archved Hgh-Resoluton Traffc Sgnal Data Author(s) 8. Performng Organzaton Report No. Henry X. Lu and Heng Hu 9. Performng Organzaton Name and Address 1. Project/Task/Work Unt No. Department of Cvl Engneerng CTS Project #291 Unversty of Mnnesota 5 Pllsbury Drve Mnneapols, MN Contract (C) or Grant (G) No. 12. Sponsorng Organzaton Name and Address 13. Type of Report and Perod Covered Intellgent Transportaton Systems Insttute Center for Transportaton Studes Unversty of Mnnesota 2 Transportaton and Safety Buldng 511 Washngton Ave. SE Mnneapols, MN Fnal Report 14. Sponsorng Agency Code 15. Supplementary Notes Abstract (Lmt: 25 words) Tradtonally, offset optmzaton for coordnated traffc sgnals s based on average travel tmes between ntersectons and average traffc volumes at each ntersecton, wthout consderaton of the stochastc nature of feld traffc. Usng the archved hgh-resoluton traffc sgnal data, n ths project, we developed a data-drven arteral offset optmzaton model that wll address two well-known problems wth vehcle-actuated sgnal coordnaton: the early return to green problem and the uncertan ntersecton queue length problem. To account for the early return to green problem, we ntroduce the concept of condtonal dstrbuton of the green start tmes for the coordnated phase. To handle the uncertanty of ntersecton queue length, we adopt a scenaro-based approach that generates optmzaton results usng a seres of traffc-demand scenaros as the nput to the offset optmzaton model. Both the condtonal dstrbutons of the green start tmes and traffc demand scenaros can be obtaned from the archved hgh-resoluton traffc sgnal data. Under dfferent traffc condtons, queues formed by sde-street and man-street traffc are explctly consdered n the dervaton of ntersecton delay. The objectve of ths model s to mnmze total delay for the man coordnated drecton and at the same tme t consders the performance of the opposte drecton. Due to model complexty, a genetc algorthm s adopted to obtan the optmal soluton. We test the performance of the optmzed offsets not only n a smulated envronment but also n the feld. Results from both experments show that the proposed model can reduce travel delay of coordnated drecton sgnfcantly wthout compromsng the performance of the opposte approach. 17. Document Analyss/Descrptors 18. Avalablty Statement Traffc sgnals, Offsets (Traffc sgnal tmng), Optmzaton, Genetc algorthms, Archved hgh-resoluton traffc sgnal data No restrctons. Document avalable from: Natonal Techncal Informaton Servces, Alexandra, Vrgna Securty Class (ths report) 2. Securty Class (ths page) 21. No. of Pages 22. Prce Unclassfed Unclassfed 37

3 SMART-Sgnal Phase II: Arteral Offset Optmzaton Usng Archved Hgh-Resoluton Traffc Sgnal Data Fnal Report Prepared by: Henry X. Lu Heng Hu Department of Cvl Engneerng Unversty of Mnnesota Aprl 213 Publshed by: Intellgent Transportaton Systems Insttute Center for Transportaton Studes Unversty of Mnnesota 2 Transportaton and Safety Buldng 511 Washngton Avenue SE Mnneapols, Mnnesota The contents of ths report reflect the vews of the authors, who are responsble for the facts and the accuracy of the nformaton presented heren. Ths document s dssemnated under the sponsorshp of the Department of Transportaton Unversty Transportaton Centers Program, n the nterest of nformaton exchange. The U.S. Government assumes no lablty for the contents or use thereof. Ths report does not necessarly reflect the offcal vews or polces of the Unversty of Mnnesota. The authors, the Unversty of Mnnesota, and the U.S. Government do not endorse products or manufacturers. Any trade or manufacturers names that may appear heren do so solely because they are consdered essental to ths report.

4 Acknowledgments The authors wsh to acknowledge those who made ths research possble. The study was funded by the Intellgent Transportaton Systems (ITS) Insttute, a program of the Unversty of Mnnesota s Center for Transportaton Studes (CTS). Addtonal fnancal support was provded by the Unted States Department of Transportaton Research and Innovatve Technologes Admnstraton (RITA). The authors also would lke to thank Mr. Steve Msgen and hs staff from the Mnnesota Department of Transportaton for ther support on the feld mplementaton of the SMART (Systematc Montorng of Arteral Road Traffc)-Sgnal system. Dr. Henry Lu and the Unversty of Mnnesota have equty and royalty nterests n SMART- Sgnal Technologes, Inc., a Mnnesota-based prvate company whch may commercally beneft from the results of ths research. These relatonshps have been revewed and managed by the Unversty of Mnnesota n accordance wth ts Conflcts of Interests polces.

5 Table of Contents Chapter 1. Introducton... 1 Chapter 2. Hgh-Resoluton Traffc Sgnal Data Condtonal Dstrbuton of Green Start Tmes Traffc Scenaros... 6 Chapter 3. Model Formulaton Scenaro-Based Offset Optmzaton Delay Calculaton... 1 Chapter 4. Soluton Method and Optmzaton Results Chapter 5. Evaluaton Usng a Smulaton Model Chapter 6. Feld Evaluaton Chapter 7. Conclusons and Future Research References... 29

6 Lst of Fgures Fgure 2.1: Installaton of SMART-Sgnal system on TH55, Golden Valley, MN (Source: Google Maps) Fgure 2.2: Dstrbuton of green start tme of Phase 2 (Coordnated phase) n local clock, TH 55 & Boone Ave, 7: AM ~ 9: AM, 6/15/29 ~ 6/26/29 1 weekdays Fgure 2.3: Dual-rng control dagram of ntersecton TH 55 & Boone Ave durng weekday AM peaks Fgure 2.4: Dual Rng Control dagram of an example ntersecton Fgure 2.5: Phase 2 (Eastbound through) green start tme vs. assocated number of actuatons, TH 55 & Boone Ave, 6/15/29 ~ 6/26/29 1 weekdays Fgure 2.6: Condtonal dstrbutons of Phase 2 (EB) green start tme PG ( 1,2 n 1,2 ), (Left) n 1,2 =6 (Rght) n 1,2 =9, TH 55 & Boone Ave, 6/15/29 ~ 6/26/29 1 weekdays Fgure 2.7: Boundary nput volumes and turnng percentages Fgure 3.1: Queung process between two ntersectons when d Fgure 3.2: Queung process between two ntersectons when d c c g, d g <, d Fgure 4.1: GA results for each generaton Fgure 4.2: Coordnaton result for both feld and optmzed offsets Fgure 5.1: VISSIM network for test corrdor Fgure 5.2: Comparson of dstrbuton of coordnated green start between smulaton model and the feld Fgure 5.3: Smulaton result of travel delay based on dfferent offset settngs Fgure 6.1: Estmated EB queue length based on dfferent offset settngs Lst of Tables Table 4.1: Parameters for GA Table 5.1: Eastbound and Westbound average delay comparson Table 6.1: Eastbound and Westbound nput volume (7:AM~9:AM) comparson between 9/3/29 and 9/14/ Table 6.2: Sde street nput volume (7:AM~9:AM) comparson between 9/3/29 and 9/14/ Table 6.3: Eastbound and Westbound average delay comparson between 9/3/29 and 9/14/

7 Executve Summary Tradtonally, offset optmzaton for coordnated traffc sgnals s based on average travel tmes between ntersectons and average traffc volumes at each ntersecton, wthout consderaton of the stochastc nature of feld traffc. Usng the hgh-resoluton traffc sgnal data collected by the SMART (Systematc Montorng of Arteral Road Traffc)-Sgnal system, n ths project, we developed a data-drven arteral offset optmzaton model. The proposed model addresses two well-known problems wth vehcle-actuated sgnal coordnaton: the early return to green problem and the uncertan ntersecton queue length problem. To account for the early return to green problem, we ntroduce the concept of condtonal dstrbuton of the green start tmes for the coordnated phase. To handle the uncertanty of ntersecton queue length, we adopt a scenaro-based approach that generates optmzaton results usng a seres of traffc demand scenaros as the nput to the offset optmzaton model. Both the condtonal dstrbutons of the green start tmes and traffcdemand scenaros can be obtaned from the archved hgh-resoluton traffc sgnal data. Under dfferent traffc condtons, queues formed by sde-street and man-street traffc are explctly consdered n the dervaton of ntersecton delay. The objectve of ths offset optmzaton model s to mnmze total delay for the man coordnated drecton and at the same tme t consders the performance of the opposte drecton. Due to the model complexty, a genetc algorthm s adopted to obtan the optmal soluton. We took sx ntersectons along the TH55 n Mnneapols, MN as the study ste and ths corrdor has a total length of 1.83 mles wth a speed lmt of 55 MPH. Ten weekdays hgh-resoluton traffc sgnal data durng the mornng peak hours from 6/15/29 to 6/26/29 was utlzed to generate the optmal offsets. We mplemented the optmzed offset values n both VISSIM smulaton model and the feld sgnal controllers. Both test results ndcate that the model can reduce travel delay of coordnated drecton sgnfcantly wthout compromsng the performance of the opposte approach. In practce, we envson that our optmzaton program can be utlzed perodcally (for example, every few weeks) to optmze system performance usng the archved data durng that perod.

8 Chapter 1. Introducton Offset settngs are crtcal to the performance of traffc sgnal system operated n a coordnated mode. Over the years many computerzed programs have been developed for sgnal offset optmzaton, usng average traffc volume at ntersectons and average travel tmes between ntersectons. Based on the objectves of the optmzaton process, these programs can be dvded nto two groups. One group ams to maxmze the bandwdth and progresson along arterals, such as MAXBAND (Lttle et al., 1981) and PASSER II (TTI, 29), and the other group attempts to mnmze system delay and number of stops, such as TRANSYT-7F(Wallace et al., 1984) and Synchro (Traffcware, 21). In more detal, MAXBAND maxmzes weghted combnaton of bandwdths gven cycle length and splts. It allows users to nput a queue clearance tme for each approach, but the queung process s not consdered nsde the model. PASSER II maxmzes the bandwdth effcency based on pre-calculated splts. Traffc performance measures are estmated usng determnstc models. TRANSYT-7F s a macroscopc determnstc optmzaton model whch mnmzes a performance ndex, defned as a weghted combnaton of system delay and stops. It models traffc n platoons usng a platoon dsperson algorthm and consders queung process by estmatng arrval and dschargng flow second by second. MAXBAND, PASSER II and TRANSYT-7F can all be consdered as determnstc models because they only use average traffc volumes as optmzaton nputs. Traffc flow fluctuatons are not consdered n these models. As argued by Heydecker (1987), the degree of varablty of traffc flows and sgnals has a sgnfcant mpact on the outcome of sgnal optmzaton, n that usng the average flows may ncur consderable addtonal delay, compared wth the tmng obtaned by takng ths varablty nto account. In order to accommodate traffc varatons, Synchro optmzes sgnal tmng by averagng results of fve volume scenaros (1, 3, 5, 7 and 9 percentles), whch assumes the user-nput volumes are the means of random varables wth Posson dstrbuton. However, these scenaros are arbtrarly assumed and they may not be consstent wth actual traffc condtons n the feld. As ndcated by Abbas et al. (21), exstng offset optmzaton models for vehcle-actuated coordnated traffc sgnals fals to address two mportant ssues: (1) the early return to green problem because of the traffc flow varatons on non-coordnated approaches, (2) the varaton of watng queue lengths at coordnated drectons. Over the years, a number of research studes on offset optmzaton have attempted to address these two problems from dfferent perspectves. To mtgate the early-return-to-green problem, Skabardons (1996) developed several alternatve procedures to modfy controller yeld ponts and phase force-offs usng ether the average spare green tmes or the average duraton of the green tmes for the actuated phases. Shoup and Bullock (1999) developed an offlne procedure to optmze offsets, assumng the avalablty of travel tmes between ntersectons from vehcle re-dentfcaton technologes. Abbas et al. (21) developed a real-tme offset transtonng algorthm for coordnated traffc sgnals. The algorthm uses a greedy approach to search for the optmal offset by movng the green wndow to nclude more vehcles that can pass durng green tme. Gettman et al. (27) proposed a real-tme control algorthm to adjust ntersecton offsets n a coordnated traffc sgnal system, based on the sgnal phase and detector data from the last several cycles. Usng the archved sgnal status data, Yn et al. (27) presented an offlne offset refner, whch addresses the problem of uncertan green starts and ends n the determnaton of offsets. More recently, based on hgh resoluton controller data, Day et al. (21) ntroduced the Purdue Coordnaton 1

9 Dagram (PCD) to assess arteral coordnaton and Bullock et al. (211) evaluated the performance of dfferent offset optmzaton objectve functons. However, none of the prevous studes have addressed the two problems dentfed above smultaneously, whch could lead to suboptmal solutons. These two problems are ntertwned together, as traffc demand varatons wll lead to uncertan green start tmes, and uncertan green start tmes wll result n stochastc length of watng queues even wth determnstc demands. The two problems, therefore, need to be consdered smultaneously. In ths project, we propose a data-drven approach to optmze offsets for vehcle-actuated coordnated traffc sgnals, usng the massve amount of sgnal status and vehcle actuaton data collected from the feld. The proposed model s ntended to serve as an off-lne offset fne-tunng tool, whch optmzes the offsets after montorng the traffc condton n the feld for a certan perod of tme. The proposed approach, for the frst tme, addresses the two problems of vehcleactuated traffc sgnal coordnaton smultaneously. To account for the early return to green problem, for the coordnated phase, we ntroduce the concept of condtonal probablty of the green start tmes, whch can be obtaned from the archved hgh-resoluton traffc sgnal data. To handle the uncertanty of ntersecton queue length, we adopt a scenaro-based optmzaton approach, whch uses a seres of traffc demand scenaros obtaned from the archved data as the model nput. The objectve of ths model s to mnmze total delay for the man coordnated drecton and at the same tme consders the performance of the opposte drecton. We test the performance of the optmzed offsets not only n a smulated envronment but also n the feld. Results from both experments show that the proposed model can reduce travel delay of coordnated drecton wthout compromsng the performance of the opposte drecton. In practce, we envson that our optmzaton program can be utlzed perodcally (for example, every a few weeks) to optmze system performance usng the archved data durng that perod. The remander of the report s organzed as follows. In Chapter 2, we present the hgh-resoluton traffc sgnal data and ntroduce two mportant concepts: the condtonal dstrbuton of green start tmes and the traffc demand scenaros. In Chapter 3, the scenaro-based offset optmzaton model s presented. The soluton method and optmzaton results are gven n Chapter 4. The smulaton and feld tests are descrbed n Chapter 5 and Chapter 6, respectvely. Conclusons and further research drectons are ncluded n Chapter 7. 2

10 Chapter 2. Hgh-Resoluton Traffc Sgnal Data The proposed offset optmzaton model s based on the traffc data collected by the SMART (Systematc Montorng of Arteral Road Traffc)-Sgnal system (Lu and Ma, 29, Lu, et al. 29). The system s an ntegrated data collecton, storage, and analyss system whch can contnuously collect and archve hgh resoluton event-based traffc sgnal data ncludng every vehcle-detector actuaton and every sgnal phase change. Sx ntersectons along the TH55 n Mnneapols, MN were chosen as the study ste, as shown n Fgure 2.1. Ths corrdor has a total length of 1.83 mles wth a speed lmt of 55 MPH. The sx ntersectons are operated n a vehcle-actuated coordnated mode durng weekday s mornng peak (7:AM ~ 9: AM) and afternoon peak (3:3 PM ~ 5:3 PM), wth a cycle length of 18 seconds. The coordnaton favors east bound (phase 2) traffc n the mornng peak and west bound (phase 6) traffc n the afternoon. Ten weekdays data durng mornng peak hours from 6/15/29 to 6/26/29 were used n ths project. Fgure 2.1: Installaton of SMART-Sgnal system on TH55, Golden Valley, MN (Source: Google Maps). 2.1 Condtonal Dstrbuton of Green Start Tmes As mentoned above, the SMART-Sgnal system archves every sgnal change and detector actuaton at sgnalzed ntersectons. Fgure 2.2 presents an example dstrbuton of green start tmes of the coordnated phase (Phase 2) n the local controller clock at the ntersecton of TH55 & Boone Ave. Fgure 2.3 shows the correspondng dual-rng control dagram, whch has 8 phases. Based on the settngs, phase 2 and phase 6 are desgnated coordnated phases and a cycle starts at the tme when phases 3 and 8 begn. Under dfferent traffc condtons, the noncoordnated phases may be termnated due to gap-out or max-out, or at ts force-off pont. It can even be skpped f there s no vehcle actuaton for a partcular phase. Any unused green tme from the non-coordnated phases would be added to the coordnated phases (.e. phase 2 and phase 6), whch makes the coordnated green start earler,.e. the so-called early return to green problem. In ths case, the duraton tme of phase 3 and phase 4 would determne the green start tme of phase 2, as can be seen from Fgure 2.3. The mnmum splt length for phase 3 and phase 4 are 12 seconds and 16 seconds, respectvely, and ther maxmum splts are 15 seconds and 26 seconds. One pedestran phase s assocated wth phase 4, whch has a Walkng tme of 7 seconds and a Flashng Don t Walk tme of 3 seconds. Snce the assgned pedestran phase s longer than the duraton of assocated phase 4, f there s a pedestran call, t wll extend the phase 4 green beyond ts orgnal maxmum. As a result, the green start tme dstrbuton n Fgure 2.2 s clearly dvded nto three groups, as ndcated by the red numbers. In group 1, ether phase 3 or phase 4 s skpped, whch makes phase 2 green start tme smaller than the 3

11 summaton of two mnmum splt lengths ( = 28 seconds); In group 2, both phases are actve n the cycle and the total spt length vares from ts mnmum to maxmum ( = 41 seconds); In part 3, there s at least one pedestran call n the cycle whch makes coordnated phase 2 starts later than usual Probablty (%) Local cycle second Fgure 2.2: Dstrbuton of green start tme of Phase 2 (Coordnated phase) n local clock, TH 55 & Boone Ave, 7: AM ~ 9: AM, 6/15/29 ~ 6/26/29 1 weekdays. Cycle start Rng 1 P2:114 s P1:25 s P3:15 s P4:26 s Rng 2 P5:17 s P6:122 s P8:18 s P7:23 s Barrer Barrer Barrer Fgure 2.3: Dual-rng control dagram of ntersecton TH 55 & Boone Ave durng weekday AM peaks. As shown above, at vehcle-actuated ntersectons, sgnal tmngs vary from cycle to cycle under dfferent actuaton patterns and the early return to green problem of coordnated phases exst due to varous reasons. The green start tme of each coordnated phase s very much dependent on the vehcle actuatons of non-coordnated phases. To represent ths relatonshp, an assocated number of vehcle actuatons, n p, for coordnated phase p of ntersecton, s ntroduced. Wthout loss of generalty, a four-leg and 8-phase ntersecton s taken as an example. Intersecton layout and correspondng dual-rng control dagram are shown n Fgure 2.4. The numbers n the layout ndcate dfferent phases (phase 2 and phase 6 are coordnated phases here) and the red arrows ndcate dfferent movng drectons. Accordng to the dual rng control logc, dfferent rngs can only go across the barrers at the same tme. Specfcally, phase 3 and phase 8 should start at the same tme and phase 4 and phase 7 should end at the same tme. As a result, the non-coordnated phase n one rng wth less vehcle actuatons, whch s supposed to end earler, may be extended by the phases n the other rng wth more vehcle actuatons. 4

12 Cycle start Rng 1 Rng Barrer Barrer Barrer Fgure 2.4: Dual Rng Control dagram of an example ntersecton. Assume the number of actuatons for a partcular phase n each cycle s equal to the cycle nput volume of that phase, whch s usually the case for sde streets because they have stop-bar detectors n place. The calculaton of n p, can be shown n Equaton 2.1, where N p, s the cycle nput volume for phase p of ntersecton. It states that the assocated number of vehcle actuatons of phase 2 s equal to the larger values between N +,3 N and N + N,4,7,8 ; for phase 6, the assocated number of vehcle actuatons s equal to the larger values between N +,3 N and,4 N +,7 N plus the number of actuatons of phase 5 ( N,8,5 ). Note that phase 1 s not consdered when calculatng the assocated number of vehcle actuatons for phase 2, because the laggng phase after the coordnated phase usually has a fxed length of duraton. n,2 =max(n,3 +N,,4 N +N ),7,8 Equaton 2.1 n,6 =max(n,3 +N,,4 N + N ) + N,7,8,5 It s ntutve that the larger the n p, s, the later the green phase of the coordnated phase p tends to start. Takng dfferent arrval and actuaton profles of non-coordnated phases nto consderaton, the green start tme of coordnated phase p can be dfferent even f n p, s the same. Therefore, for coordnated phase p, gven ts assocated number of actuatons n p,, we can get the dstrbuton of green start tme G p,. Note that, the ntroducton of the condtonal dstrbuton P( Gp, n p, ) s specfcally desgned to accommodate the early return to green problem for the coordnated phases. Even f the nput volumes are the same, actual sgnal tmngs may stll vary and the varaton s consstent wth feld results, snce all the dstrbutons are derved from feld data. For example, Fgure 2.5 categorzes the green start tmes of coordnated phase 2 at the ntersecton TH 55 & Boone Ave accordng to the assocated number of actuatons n 1,2. The data ponts are clearly dvded nto three groups, as dscussed before. One can see that, wthn each group, as the assocated number of actuatons n 1,2 ncreases, the green start tme of phase 2 tends to be later. Therefore, dfferent values of assocated number of vehcle actuatons wll lead to dfferent dstrbutons of green start tme. The two plots n Fgure 2.6 show the condtonal 5

13 dstrbutons when n 1,2 = 6 and n 1,2 = 9 respectvely. We can see that there are two dfferent dstrbuton patterns. When n 1,2 = 6, the green start tme are almost evenly dstrbuted among 36, 39 and 42 seconds; however, when n 1,2 = 9, 6% of the tme, phase 2 green would start at 42 seconds. Smlarly, condtonal dstrbutons can be generated for phase 6 and also for other ntersectons. Fgure 2.5: Phase 2 (Eastbound through) green start tme vs. assocated number of actuatons, TH 55 & Boone Ave, 6/15/29 ~ 6/26/29 1 weekdays. Probablty (%) Green start tme (Sec) Probablty (%) Green start tme (Sec) Fgure 2.6: Condtonal dstrbutons of Phase 2 (EB) green start tme PG ( 1,2 n 1,2), (Left) n 1,2 =6 (Rght) n 1,2 =9, TH 55 & Boone Ave, 6/15/29 ~ 6/26/29 1 weekdays. 2.2 Traffc Scenaros Based on the hgh-resoluton traffc sgnal data, traffc demands at the boundary of the arteral and turnng percentages at each ntersecton can also be obtaned. As shown n Fgure 2.7, nput volume of drecton d at ntersecton s denoted by N,d ( =1,2,..., I, d = Eastbound, Westbound, Northbound or Southbound) and correspondng turnng percentages are denoted by x ϕ,d ( x = Left, Rght, Through). Wthout loss of generalty, we assume the arteral s coordnated 6

14 n the east-west drecton. To deal wth the uncertanty of traffc demand, a set of traffc scenaros S = {1,2,..., J} s ntroduced. Each scenaro j S s a vector of boundary nput volumes N, N,..., ϕ, ϕ,... T, wth a probablty of ( j) ( j) L ( j) R ( j) and turnng percentages,.e. ( 1, EB 1, SB 1, EB 1, EB ) ( j) occurrence p. In general, the more scenaros we consder, the more robust the optmzaton results wll be. But that wll nevtably ncrease the complexty of the problem. Accordng to Mulvey et al. (1995), a relatvely small number of scenaros can stll generate near-optmal results. In practce, the number of scenaros consdered n the optmzaton model s constraned by the avalablty of dataset, avalable computatonal capablty and etc, so users can choose the most sutable number of scenaros accordngly. In ths project, 1 weekdays mornng peak (7: AM ~ 9: AM) data s utlzed and every 15 mnutes nterval s consdered as one traffc scenaro. In total, there are 8 scenaros. Wthn each scenaro j S, the boundary nput volumes ( j) x ( j) Nd, and turnng percentages ϕd, are assumed to be stable and the values are set as the averages over all cycles wthn the 15-mnute nterval. N 1,SB N 2,SB N I, SB N 1,EB ϕ x 1, EB ϕ x 1, SB x x ϕ I, SB ϕ 2, SB Inter. 1 Inter. 2 Inter. I ϕ ϕ x 1, WB x 2, EB ϕ x 2, WB... ϕ x I, EB ϕ x I, WB N I, WB ϕ x 1, NB ϕ x 2, NB ϕ x I, NB N 1,NB N 2,NB N I, NB Fgure 2.7: Boundary nput volumes and turnng percentages. Gven a scenaro j S, the cycle nput volumes for ntermedate lnks can be calculated by Equaton 2.2 and Equaton 2.3. It s easy to fnd out that eastbound cycle nput volume of ntersecton +1 s the summaton of volumes of three movements at ntersecton (eastbound through, southbound left and northbound rght), as shown n Equaton 2.2. Smlarly, westbound cycle nput volume of ntersecton -1 s calculated by Equaton 2.3. By applyng Equaton 2.2 and Equaton 2.3 to each ntersecton, the cycle volume of each movement becomes known. N + = N ϕ + N ϕ + N ϕ Equaton 2.2 N = N + N + N Equaton 2.3 ( j) ( j) T ( j) ( j) L ( j) ( j) R ( j) 1, EB, EB, EB, SB, SB, NB, NB ( j) ( j) T ( j) ( j) R ( j) ( j) L ( j) 1, WB, WB ϕ, WB, SB ϕ, SB, NB ϕ, NB 7

15 8

16 Chapter 3. Model Formulaton 3.1 Scenaro-Based Offset Optmzaton To account for the stochastc nature of feld traffc, a data-drven optmzaton model s developed n ths project to generate arteral offsets. As dscussed n the prevous secton, based on the hgh-resoluton traffc sgnal data, condtonal dstrbutons of green start tme P and traffc scenaros S can be derved, whch wll be the model nputs n ths project. In general, the optmzaton model can be represented by Equaton 3.1, where the objectve s to mnmze the total travel delay D of coordnated drectons. O s the vector of ntersecton offsets (decson varables) and Ω s the feasble set of O. mn DOPS (,, ) st.. O Ω Equaton 3.1 Gven a traffc scenaro j S, snce the cycle volume for each movement can be calculated, the assocated number of vehcle actuatons, denoted by n ( j) p,, can be generated for the coordnated phases of each ntersecton. Then, gven a feasble offset O Ω, the expectaton of travel delay for coordnated phase p under scenaro j, denoted by E(D ( j) p ( O )), can be calculated by Equaton 3.2. Note that, the condtonal dstrbuton of green start tme for the coordnated phase at ntersecton s assumed to be ndependent wth that at ntersecton +1. Ths assumpton s reasonable because the green start tme of coordnated phase at each ntersecton s determned by the correspondng vehcle actuatons of non-coordnated phases and t s reasonable to assume they are ndependent. E D O E D O E D O = 1 = 1 ( ( ) I 1 1 ) ( ) I j j ( ) ( ( j ) p = p, ( ) = p, ( )) I 1 = 1 x y ( j) ( j) (, + 1,, ) ( p, p, p, ) ( + 1, p + 1, p + 1, p ) = D o o x y P G = x n = n P G = y n = n Equaton 3.2 Here O represents the offset vector [o1, o2,...,o I ] and D(.) refers to the determnstc delay calculaton model between two adjacent ntersectons gven sgnal tmngs (.e. offsets and green start tmes for coordnated phases) and traffc scenaro, whch wll be ntroduced n the next secton. The best soluton for arteral coordnaton would optmze the performance of two major drectons at the same tme. However, n most cases, the two drectons cannot acheve optmalty smultaneously and there s always a trade-off between the two. In ths project, a weghtng term α [,1] s ntroduced to represent the mportance of the mnor coordnated drecton and the ( j) ( j) weghted delay for both drectons s calculated by Equaton 3.3, where Dp ( O)and Dp' ( O) are the travel delays for major and mnor coordnated drectons respectvely. 9

17 ( p ) α ( p' ) ( j ) ( j ) ( j D O α E D O E D ) O ( ) = (1 ) ( ) + ( ) Equaton 3.3 Gven an ntersecton offset settngo, we can calculate the correspondng arteral delay seres D (1) (O), D (2) (O),..., D ( J ) (O) for dfferent scenaros. Let D (1) (O), D (O),..., D (2) ( J ) (O) be the descendng order of the seres,.e., D ( (1) O ) D (O),..., D (2) ( J ) (O). Obvously, the larger the value of D s, the worse the arteral performance wll be. In practce, motorsts and engneers may have dfferent opnons about these scenaros and therefore a trmmng factor β [,1] s ntroduced. The value of β represents the fracton of scenaros that wll not be consdered and the number of scenaros left after trmmng s J = β J(1 β) + β. If β =, there s no trmmng ( J β = J ) and all the scenaros are consdered; However, f β =1, J β =1, only the worst scenaro D (1) ( O)wll be consdered. Therefore, the measure of arteral delay gven 1 J β ntersecton offset settngo can be formulated as D ( ( k ) O ) and D J β k =1 ( k ) ( O )s the k -th largest delay value. The general form of the scenaro-based offset optmzaton model s shown n Equaton 3.4 and the determnstc delay calculaton model wll be ntroduced n the next secton. Note that, under transformed tme coordnates (.e. shfted accordng to the free flow travel tme from the frst ntersecton), ntersecton offsets vary from c /2to c /2, where c s the common cycle length. J β 1 mn D( k )( O) J β k = 1 st.. O Ω, c c Ω= [ o1, o2,..., oi]: o, 2 2 Equaton Delay Calculaton In ths project, the delays caused by man street and sde street traffc are specfcally consdered n the delay calculaton model, as wll be descrbed n ths secton. Gven ntersecton sgnal tmngs (.e. offsets and green start tmes for coordnated phases) and traffc scenaro (.e. traffc demand for each approach), the calculaton of delays for coordnated drectons becomes a determnstc problem. Snce the red tme duratons of coordnated phases have drect assocaton wth the calculaton of travel delay for coordnated drectons, green start tmes G p, are frst converted nto red tme duratons r p,.n the delay calculaton model. The calculaton for one coordnated drecton s frst consdered snce the calculaton for the opposte drecton can follow the same way. In the followng, we take the eastbound (a coordnated drecton) as an example and for smplcty purpose the subscrpt p s omtted. At each ntersecton, cycle nput volumes to the downstream ntersecton can be separated nto two parts. One s dscharged from sde streets when coordnated phase s red, denoted by W s ; the 1

18 other s dscharged from man street when coordnated phase s green, denoted by W m. For example, for eastbound traffc, W s L R m s equal to N, SB ϕ, SB + N, NB ϕ, NB and W s equal to N ϕ. Assume vehcles are unformly arrved durng red and green perod of the T, EB, EB coordnated phase and they are evenly dstrbuted at downstream lanes, the arrval flow rate per lane to downstream ntersecton n these two perods can be calculated by Equaton 3.5, where q and q (veh/sec/lane) are the arrval flow rate per lane to downstream ntersecton formed by s m sde street traffc (durng the red tme of the coordnated phase) and man street traffc (durng the green tme of the coordnated phase) respectvely, and z s number of lanes at downstream lnk. s s q = W / r / z m m q = W /( c r)/ z Equaton 3.5 In the delay calculaton model, tme coordnate of each ntersecton s shfted accordng to the free flow travel tme from the frst ntersecton. Vehcle trajectory then becomes a vertcal lne n the tme-space dagram f there s no stop or delay (see Fgure 3.1 and Fgure 3.2 ). Assume the offset reference pont s the green end (or red start) of correspondng coordnated phase. Two varables d c and d g are ntroduced to represent the tme dfference of cycle starts and green starts between ntersecton and downstream ntersecton +1 under the transformed tme coordnates. The defnton s shown n Equaton 3.6, where o s the offset value and r s the red duraton tme of coordnated phase at ntersecton. Based on the sgn of d c, the delay calculaton process s dvded nto two cases. d = o o c + 1 d = o + r o r g Equaton 3.6 1) c d In ths case the upstream red lght for the coordnated phase starts earler than that of the downstream ntersecton (See Fgure 3.1). Dependng on the start tme of the downstream green lght, vehcles dscharged from upstream sde streets wth an arrval rate q s may cause a queue at the downstream ntersecton; After the upstream ntersecton turns green, downstream ntersecton wll have arrval vehcles from upstream coordnated phase wth a rate of q m. Under dfferent values of d g and arrval flows, ths porton of vehcles may or may not cause a queue at downstream. For example, f d g, as shown n Fgure 3.1, upstream green starts earler than downstream and part of the upstream man street flow wll defntely cause a queue at downstream; f d g <, downstream green starts earler than upstream, so the queue may be cleared before the arrval of upstream man street vehcles. If t q s used to represent the porton of green at ntersecton wthn whch dscharged vehcles wll cause a queue at downstream and 11

19 q d +1 (Veh/sec) s the dschargng rate of ntersecton +1, the followng flow conservaton equaton holds. ( r d) q + tq = ( t d ) q + Equaton 3.7 c s q m q g d 1 t q can be calculated by solvng Equaton 3.7. t q = when upstream man street flow does not cause a queue at downstream. Snce t q cannot be negatve, ( r d ) q + d q = c s g d q + 1 max, d m q+ 1 q t Equaton 3.8 The frst vehcle from coordnated phase of ntersecton whch has no delay at downstream wll have the trajectory of CC ' n Fgure 3.1. Note that h represents the jammed space headway n the fgure. The area of the shadowed trangle DEF dvded by h represents the total delay (Veh.Sec) of all the vehcles dscharged from coordnated phase of ntersecton n one cycle. The delay D can be calculated by Equaton 3.9. Note that the area of the trangle may be zero f the upstream man street traffc does not cause a queue at downstream. ( r d ) q d DE FG q D = Ar( DEF)/ h = = 2h 2 c s g m q + d q t + 1 ( ) Equaton 3.9 A' C' B' c o +1 r + 1 Intersecton +1 s q h D E G d q h + 1 m q h d c F o r d g t q Intersecton A c C B c g Fgure 3.1: Queung process between two ntersectons when d, d. 2) c d < 12

20 In ths case, upstream red of the coordnated phase starts later than the downstream ntersecton. Vehcles dscharged at the end of green of upstream ntersecton wll cause a resdual queue at downstream and the queung curve s shown as HJ n Fgure 3.2. After upstream coordnated phase turns red, vehcles from upstream sde streets wll keep ncreasng the downstream queue wth an arrval rate of q s. After upstream coordnated phase turns green, downstream ntersecton wll have arrval vehcles from upstream coordnated phase wth a rate of q m (Veh/sec). If d g, as shown n Fgure 3.2, upstream man street flow wll cause a queue at downstream; f d g <, upstream man street vehcles may or may not cause a queue at downstream dependng on the arrval flow rate. Accordng to flow conservaton, Equaton 3.1 holds. d q + rq + t q = ( t d ) q + Equaton 3.1 c m s q m q g d 1 t q can be derved from Equaton 3.1 and t q = when upstream man street flow does not cause a queue at downstream. Therefore, t q can be represented by d q + rq + d q = c m s g d q + 1 max, d m q+ 1 q t Equaton 3.11 The total delay of the man street traffc ncludes two parts, trapezum HIKJ and trangle DEF, as shown n the shadowed area n Fgure 3.2. HIKJ represents the delay caused by resdual vehcles dscharged at the end of green of upstream coordnated phase and DEF s the delay caused by new arrval man street traffc. Note that the area of DEF could be zero f downstream queue s cleared before upstream man street vehcles arrve. D = Ar( HIKJ )/ h + Ar( DEF)/ h rq + ( d q ) g c m c m 2 d d [ r+ 1+ ( r + d )] [ dq ] + [ dq ] / q = s c m g q m + d tq q 1 ( ) Equaton

21 A' C' B' r + 1 o +1 c Intersecton +1 m q H h J I K s q h D m q h E G q d + 1 h Intersecton d c r A d g t q F C B o c c g Fgure 3.2: Queung process between two ntersectons when d <, d. Based on the analyss above, the travel delay for coordnated phases between each two adjacent ntersectons can be calculated accordngly gven ntersecton sgnal tmngs and traffc scenaro. Therefore, the scenaro-based offset optmzaton model s complete by takng the determnstc delay calculaton model nto Equaton

22 Chapter 4. Soluton Method and Optmzaton Results Snce the feasble regon of ntersecton offsets,.e. Ω, s a closed convex set (see Equaton 3.4) and the objectve functon s contnuous and bounded wthn ths regon, an optmal soluton to the problem must exst. Due to the complexty of the objectve functon, Genetc Algorthm (GA) s adopted to solve the problem. GA s a soluton algorthm whch mmcs natural selecton process. Frst, a populaton of solutons (chromosomes) s generated accordng to a creaton rule, typcally, n a random fashon. And then, the algorthm modfes the populaton of ndvdual solutons repeatedly. At each step, dependng on chromosome ftness, the algorthm selects chromosomes at random from the current populaton to be parents and every two parent chromosomes wll produce two new offsprng chromosomes based on a cross-over rule. The process repeats tself untl certan stoppng crtera s met, at whch tme the best soluton remans n the populaton become the fnal solutono *. In ths project, 1 weekdays (6/15/29 ~ 6/26/29) mornng peak (7:AM ~ 9: AM) data of 6 ntersectons along the TH55 were chosen to generate the optmal offsets. In the GA solvng process, snce we can take the frst ntersecton as the master ntersecton wth an offset of, each chromosome would have the length of 5, where each gene ndcates the offset value of correspondng ntersecton. For the sake of smplcty, we take β =, whch means there s no trmmng ( J β = J ) and we consder all traffc scenaros. The weghtng term α s assgned a value.1, meanng that 1 percent of weght has been assgned to the performance of mnor drecton n our objectve functon. Usng a GA toolbox n Matlab wth followng parameters shown n Table 4.1, a soluton can be acheved after about 3 generatons for the offset optmzaton of the sx ntersectons on TH55. Table 4.1: Parameters for GA. Populaton Scalng Elte Crossove Crossover Mutaton Mutaton Sze Functon Count r Fracton Functon Functon Rate 4 Rank 2.8 Two pont Unform.1 Fgure 4.1 shows the GA results at each generaton, where the star * shows the mean functon value among all ndvduals at correspondng generaton and. represents the functon value of the best-ftted ndvdual. Fnally, the program generates the offset result {, -21.4, -21, -2.9, , -21.2} for sx ntersectons from Boone Ave. to TH1 respectvely, comparng wth the feld offset settng {, -24.9, -21.6, 4.6, -2.5, -11.9} under the transformed tme coordnates. The fnal optmzed offset values appled to controllers are {, 8, 25, 47, 79, 114} and ths offset settng generates a weghted total cycle delay of 34 (Veh.Sec), comparng wth 638 (Veh.Sec) under the feld offset settng. 15

23 1 9 Best ftness Mean ftness Ftness value Generaton Fgure 4.1: GA results for each generaton. Fgure 4.2 shows the coordnaton result for both feld and optmzed offset settng n the tmespace dagram under the transformed tme coordnates. The two fgures on the left hand sde show the feld coordnaton for both phase 2 and phase 6 and the two on the rght show the optmzed result. The arrows show the traffc drecton for correspondng phases. Snce orgnal feld offsets were already optmzed by Synchro (the metropoltan dstrct of Mnnesota Department of Transportaton retmes ts traffc sgnals on all major arterals every 36 months or less), the generated offset values are very smlar wth the feld ones. Major changes happen to Glenwood (4 th ntersecton) and TH1 (6 th ntersecton) wth a 25.5 and 9.3 seconds reducton respectvely. It s hard to drectly tell the dfference from the coordnaton fgure, but as we wll demonstrate n the next secton, the optmzed offset wll further mprove the performance of the coordnated phase (eastbound of TH55) and wthout deteroraton of the performance of the opposte drecton (westbound of TH55). 16

24 Fgure 4.2: Coordnaton result for both feld and optmzed offsets. 17

25 18

26 Chapter 5. Evaluaton Usng a Smulaton Model In order to verfy the performance of the offset results generated by the proposed model, a test network was bult n VISSIM, as shown n Fgure 5.1. Dfferent traffc scenaros generated from the feld data set were coded n the network, and sgnal controller s parameters, such as mnmum green, maxmum green and vehcle extenson, were all confgured accordng to the feld settngs. The smulaton model was well calbrated n order to reveal the real traffc condton n the feld. Fgure 5.2 compares the dstrbuton of coordnated green start tme between smulaton and feld. The red columns represent the real dstrbuton from the feld whle the blue columns show the smulaton results. As one can see, smulaton results match wth feld results very well at each ntersecton. Fgure 5.1: VISSIM network for test corrdor. Probablty (%) Boone EB Local cycle second Probablty (%) Boone WB real data smulaton result Local cycle second Probablty (%) Wnnetka EB Local cycle second Probablty (%) Wnnetka WB Local cycle second 19

27 Probablty (%) Rhode EB Local cycle second Probablty (%) Rhode WB Local cycle second Probablty (%) Glenwood EB Local cycle second Probablty (%) Glenwood WB Local cycle second Probablty (%) Douglas EB Local cycle second Probablty (%) Douglas WB Local cycle second Probablty (%) TH1 EB Local cycle second Probablty (%) TH1 WB Local cycle second Fgure 5.2: Comparson of dstrbuton of coordnated green start between smulaton model and the feld. The smulaton was run for 2 tmes usng 2 dfferent random seeds. In order to compare the performance, both the offset settng n the feld and the one generated by the optmzaton model were tested n the VISSIM network and we output the average delay of vehcles traversng both eastbound and westbound. The result s shown n Fgure 5.3 and Table 5.1. As we can see, the 2

28 optmzed offset result dd mprove the performance of east bound traffc,.e. reduce travel delay by 13.9% on average. And at the same tme, t dd not make the westbound traffc worse. In order to test the statstc sgnfcance of ths mprovement of eastbound, a pared t-test has been done to the two sets of travel tmes,.e. under orgnal offsets and under optmzed offsets. The null hypothess s that the two data sets come from dstrbutons wth the equal means. It turns out that we can reject the hypothess wth a p value E-17 at the 5% sgnfcance level, whch means the travel delay mprovement s sgnfcant. Delay (Sec) Eastbound Smulaton Runs Optmzed offset Orgnal offset Delay (Sec) Westbound Smulaton Runs Optmzed offset Orgnal Offset Fgure 5.3: Smulaton result of travel delay based on dfferent offset settngs. Table 5.1: Eastbound and Westbound average delay comparson. Eastbound Average Delay (Sec) Westbound Average Delay (Sec) Orgnal Offset Optmzed Offset Change % % 21

29 22

30 Chapter 6. Feld Evaluaton The optmzed offset values were mplemented to the 6 ntersectons n the feld for mornng peak hours (7:AM~9:AM) on 9/14/29. In order to compare the performance measures before and after the feld mplementaton, two days wth smlar volume nputs need to be chosen. After examnng 1 days before and after, 9/3/29 was selected as the baselne day wth orgnal offset settng to compare wth 9/14/29. Table 6.1 shows the comparson of Eastbound and Westbound (major drecton) nput volume durng two hours peak perod and Table 6.2 shows the comparson for sde street nput volumes. As we can see, the two major drectons nput volumes for the two days are very smlar and the day wth optmzed offset (9/14/29) carres a lttle hgher traffc. For sde streets, these dfferences of nput volumes are also wthn acceptable ranges. Table 6.1: Eastbound and Westbound nput volume (7:AM~9:AM) comparson between 9/3/29 and 9/14/29. Eastbound Input Volume Westbound Input Volume 9/3/29 (Orgnal offset) 9/14/29 (Optmzed offset) % % Change Percentage Table 6.2: Sde street nput volume (7:AM~9:AM) comparson between 9/3/29 and 9/14/29. Boone Wnnetka Rhode Glenwood Douglas TH 1 9/3/29 (Orgnal offset) 9/14/29 (Optmzed offset) Change Percentage Southbound % Northbound % Southbound % Northbound % Southbound % Northbound -* - - Southbound Northbound % Southbound % Northbound % Southbound % Northbound % *: T ntersecton, not applcable 23

31 Based on the hgh resoluton data collected by the SMART-Sgnal system, ntersecton queue length for each cycle at each of the ntersectons were estmated usng the algorthm developed by Lu, et al. (29). In order to compare the performance of the 6-ntersecton corrdor before and after the mplementaton of the optmzed offsets, arteral travel tmes for both drectons were also calculated as part of the SMART-Sgnal system based on the vrtual probe algorthm developed by Lu and Ma (29). Note the queue length estmaton algorthm and the arteral travel tme estmaton algorthms mplemented as part of the SMART-Sgnal system has been tested and evaluated n the past and t s currently n operaton on a number of ntersectons n Mnnesota and Calforna (for more nformaton on the SMART-Sgnal mplementaton, please see dotapp4.dot.state.mn.us/smartsgnal). Snce we only have 6 ntersectons, performance n between s what we are nterested n. Therefore, travel tme between stop lne of Boone and stop lne of TH1 s taken as an ndcator of corrdor performance. Table 6.3 compares the calculated travel delays of both eastbound (from stop lne of Boone to stop lne of TH1) and westbound (from stop lne of TH1 to stop lne of Boone) based on dfferent offset settngs. As we can see, both eastbound and westbound travel delays are substantally reduced after the offset adjustment. On average, the eastbound travel delay wth orgnal offset (9/3/29) s seconds and t decreases to 1.14 seconds after optmzaton (9/14/29), whch s a 15.3% reducton. For westbound, average travel delay wth orgnal offset s seconds and t decreases to 7.84 seconds after optmzaton, whch ndcates a 9.7% reducton. Consderng that the orgnal offset settng was already optmzed, the mprovement s sgnfcant. One may notce that the absolute values of eastbound and westbound average delays are dfferent wth the values from smulaton as lsted n Table 5.1, because the actual demand and actuaton profles n the feld cannot be the same wth the ones n smulaton. Fgure 6.1 also compares the estmated eastbound queue length profles durng the one hour perod at ntersectons 4 and 6 (where the major changes to offset happen) under dfferent offset settngs. One can fnd out that, n general, the optmzed offset generates shorter queue lengths than the orgnal offset. Therefore, the optmzed offset outperforms the orgnal offset not only n smulaton but also n realstc feld mplementaton. Table 6.3: Eastbound and Westbound average delay comparson between 9/3/29 and 9/14/29. Eastbound Average Delay (Sec) Westbound Average Delay (Sec) 9/3/29 (Orgnal) 9/14/29 (Optmzed) Change Percentage % % 24

32 Queue Length (ft) Intersecton 4 EB Orgnal offset Optmzed offset :22:5 7:29:17 7:36:29 7:43:41 7:5:53 7:58:5 8:5:17 Tme Queue Length (ft) 5 Intersecton 6 EB Orgnal offset 4 Optmzed offset :19:12 7:26:24 7:33:36 7:4:48 7:48: 7:55:12 8:2:24 8:9:36 8:16:48 Tme Fgure 6.1: Estmated EB queue length based on dfferent offset settngs. 25

33 26

34 Chapter 7. Conclusons and Future Research In ths project, we propose an nnovatve approach for arteral offset optmzaton based on the large amount of hgh-resoluton feld traffc data. The model solves the two well-known problems wth actuated sgnals: (1) the early return to green problem for coordnated phases and (2) the uncertanty problem of queue szes formed at ntersectons. To account for the two problems, we ntroduce the concepts of condtonal dstrbuton of the green start tmes and traffc demand scenaros, both of whch can be obtaned from the hgh-resoluton traffc dataset. We explctly consder the queues formed by sde-street and man-street traffc under dfferent stuatons. The objectve of ths model s to mnmze total delay for one coordnated drecton and at the same tme take the performance of the other drecton nto consderaton. Because of the complexty of the objectve functon, the problem s solved by the Genetc Algorthm. We mplemented our optmzed offset values to both VISSIM smulaton model and the feld sgnal controllers. Both test results ndcate that the model successfully optmzes the offsets along the sgnalzed arterals. It mproves the performance of the corrdor sgnfcantly. Lookng forward, we envson that our optmzaton program can be utlzed perodcally (for example, every a few weeks) to optmze system performance usng the archved data durng that perod. In the state-of-the-art practce, for most of the traffc management agences, sgnal retmng s only conducted once every 3 to 5 years because t nvolves largely manual processes. But t s commonly understood that traffc delay ncreases 3-5% per year smply due to the fact that the tmng plans are not kept up to date. For many resource-lmted agences, t would be desrable to replace the labor-ntensve sgnal re-tmng process wth algorthms for automated or sem-automated updatng of the sgnal parameter settngs. The avalablty of the massve amount of hgh-resoluton traffc sgnal data has made ths possble. Although our offset optmzaton s movng one step further along ths drecton, t should be extended to nclude other sgnal control parameters such as green splts. We leave these topcs for future studes. 27

Traffic Signal Timing: Basic Principles. Development of a Traffic Signal Phasing and Timing Plan. Two Phase and Three Phase Signal Operation

Traffic Signal Timing: Basic Principles. Development of a Traffic Signal Phasing and Timing Plan. Two Phase and Three Phase Signal Operation Traffc Sgnal Tmng: Basc Prncples 2 types of sgnals Pre-tmed Traffc actuated Objectves of sgnal tmng Reduce average delay of all vehcles Reduce probablty of accdents by mnmzng possble conflct ponts Objectves

More information

Module 3 LOSSY IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur

Module 3 LOSSY IMAGE COMPRESSION SYSTEMS. Version 2 ECE IIT, Kharagpur Module 3 LOSSY IMAGE COMPRESSION SYSTEMS Verson ECE IIT, Kharagpur Lesson 6 Theory of Quantzaton Verson ECE IIT, Kharagpur Instructonal Objectves At the end of ths lesson, the students should be able to:

More information

Statistics for Economics & Business

Statistics for Economics & Business Statstcs for Economcs & Busness Smple Lnear Regresson Learnng Objectves In ths chapter, you learn: How to use regresson analyss to predct the value of a dependent varable based on an ndependent varable

More information

Department of Quantitative Methods & Information Systems. Time Series and Their Components QMIS 320. Chapter 6

Department of Quantitative Methods & Information Systems. Time Series and Their Components QMIS 320. Chapter 6 Department of Quanttatve Methods & Informaton Systems Tme Seres and Ther Components QMIS 30 Chapter 6 Fall 00 Dr. Mohammad Zanal These sldes were modfed from ther orgnal source for educatonal purpose only.

More information

Negative Binomial Regression

Negative Binomial Regression STATGRAPHICS Rev. 9/16/2013 Negatve Bnomal Regresson Summary... 1 Data Input... 3 Statstcal Model... 3 Analyss Summary... 4 Analyss Optons... 7 Plot of Ftted Model... 8 Observed Versus Predcted... 10 Predctons...

More information

Comparison of Regression Lines

Comparison of Regression Lines STATGRAPHICS Rev. 9/13/2013 Comparson of Regresson Lnes Summary... 1 Data Input... 3 Analyss Summary... 4 Plot of Ftted Model... 6 Condtonal Sums of Squares... 6 Analyss Optons... 7 Forecasts... 8 Confdence

More information

Temperature. Chapter Heat Engine

Temperature. Chapter Heat Engine Chapter 3 Temperature In prevous chapters of these notes we ntroduced the Prncple of Maxmum ntropy as a technque for estmatng probablty dstrbutons consstent wth constrants. In Chapter 9 we dscussed the

More information

A Robust Method for Calculating the Correlation Coefficient

A Robust Method for Calculating the Correlation Coefficient A Robust Method for Calculatng the Correlaton Coeffcent E.B. Nven and C. V. Deutsch Relatonshps between prmary and secondary data are frequently quantfed usng the correlaton coeffcent; however, the tradtonal

More information

Answers Problem Set 2 Chem 314A Williamsen Spring 2000

Answers Problem Set 2 Chem 314A Williamsen Spring 2000 Answers Problem Set Chem 314A Wllamsen Sprng 000 1) Gve me the followng crtcal values from the statstcal tables. a) z-statstc,-sded test, 99.7% confdence lmt ±3 b) t-statstc (Case I), 1-sded test, 95%

More information

Kernel Methods and SVMs Extension

Kernel Methods and SVMs Extension Kernel Methods and SVMs Extenson The purpose of ths document s to revew materal covered n Machne Learnng 1 Supervsed Learnng regardng support vector machnes (SVMs). Ths document also provdes a general

More information

The Study of Teaching-learning-based Optimization Algorithm

The Study of Teaching-learning-based Optimization Algorithm Advanced Scence and Technology Letters Vol. (AST 06), pp.05- http://dx.do.org/0.57/astl.06. The Study of Teachng-learnng-based Optmzaton Algorthm u Sun, Yan fu, Lele Kong, Haolang Q,, Helongang Insttute

More information

Department of Statistics University of Toronto STA305H1S / 1004 HS Design and Analysis of Experiments Term Test - Winter Solution

Department of Statistics University of Toronto STA305H1S / 1004 HS Design and Analysis of Experiments Term Test - Winter Solution Department of Statstcs Unversty of Toronto STA35HS / HS Desgn and Analyss of Experments Term Test - Wnter - Soluton February, Last Name: Frst Name: Student Number: Instructons: Tme: hours. Ads: a non-programmable

More information

Week3, Chapter 4. Position and Displacement. Motion in Two Dimensions. Instantaneous Velocity. Average Velocity

Week3, Chapter 4. Position and Displacement. Motion in Two Dimensions. Instantaneous Velocity. Average Velocity Week3, Chapter 4 Moton n Two Dmensons Lecture Quz A partcle confned to moton along the x axs moves wth constant acceleraton from x =.0 m to x = 8.0 m durng a 1-s tme nterval. The velocty of the partcle

More information

Module 9. Lecture 6. Duality in Assignment Problems

Module 9. Lecture 6. Duality in Assignment Problems Module 9 1 Lecture 6 Dualty n Assgnment Problems In ths lecture we attempt to answer few other mportant questons posed n earler lecture for (AP) and see how some of them can be explaned through the concept

More information

Linear Approximation with Regularization and Moving Least Squares

Linear Approximation with Regularization and Moving Least Squares Lnear Approxmaton wth Regularzaton and Movng Least Squares Igor Grešovn May 007 Revson 4.6 (Revson : March 004). 5 4 3 0.5 3 3.5 4 Contents: Lnear Fttng...4. Weghted Least Squares n Functon Approxmaton...

More information

Winter 2008 CS567 Stochastic Linear/Integer Programming Guest Lecturer: Xu, Huan

Winter 2008 CS567 Stochastic Linear/Integer Programming Guest Lecturer: Xu, Huan Wnter 2008 CS567 Stochastc Lnear/Integer Programmng Guest Lecturer: Xu, Huan Class 2: More Modelng Examples 1 Capacty Expanson Capacty expanson models optmal choces of the tmng and levels of nvestments

More information

2E Pattern Recognition Solutions to Introduction to Pattern Recognition, Chapter 2: Bayesian pattern classification

2E Pattern Recognition Solutions to Introduction to Pattern Recognition, Chapter 2: Bayesian pattern classification E395 - Pattern Recognton Solutons to Introducton to Pattern Recognton, Chapter : Bayesan pattern classfcaton Preface Ths document s a soluton manual for selected exercses from Introducton to Pattern Recognton

More information

2016 Wiley. Study Session 2: Ethical and Professional Standards Application

2016 Wiley. Study Session 2: Ethical and Professional Standards Application 6 Wley Study Sesson : Ethcal and Professonal Standards Applcaton LESSON : CORRECTION ANALYSIS Readng 9: Correlaton and Regresson LOS 9a: Calculate and nterpret a sample covarance and a sample correlaton

More information

Resource Allocation with a Budget Constraint for Computing Independent Tasks in the Cloud

Resource Allocation with a Budget Constraint for Computing Independent Tasks in the Cloud Resource Allocaton wth a Budget Constrant for Computng Independent Tasks n the Cloud Wemng Sh and Bo Hong School of Electrcal and Computer Engneerng Georga Insttute of Technology, USA 2nd IEEE Internatonal

More information

Psychology 282 Lecture #24 Outline Regression Diagnostics: Outliers

Psychology 282 Lecture #24 Outline Regression Diagnostics: Outliers Psychology 282 Lecture #24 Outlne Regresson Dagnostcs: Outlers In an earler lecture we studed the statstcal assumptons underlyng the regresson model, ncludng the followng ponts: Formal statement of assumptons.

More information

x = , so that calculated

x = , so that calculated Stat 4, secton Sngle Factor ANOVA notes by Tm Plachowsk n chapter 8 we conducted hypothess tests n whch we compared a sngle sample s mean or proporton to some hypotheszed value Chapter 9 expanded ths to

More information

4 Analysis of Variance (ANOVA) 5 ANOVA. 5.1 Introduction. 5.2 Fixed Effects ANOVA

4 Analysis of Variance (ANOVA) 5 ANOVA. 5.1 Introduction. 5.2 Fixed Effects ANOVA 4 Analyss of Varance (ANOVA) 5 ANOVA 51 Introducton ANOVA ANOVA s a way to estmate and test the means of multple populatons We wll start wth one-way ANOVA If the populatons ncluded n the study are selected

More information

Lecture 12: Discrete Laplacian

Lecture 12: Discrete Laplacian Lecture 12: Dscrete Laplacan Scrbe: Tanye Lu Our goal s to come up wth a dscrete verson of Laplacan operator for trangulated surfaces, so that we can use t n practce to solve related problems We are mostly

More information

Design and Optimization of Fuzzy Controller for Inverse Pendulum System Using Genetic Algorithm

Design and Optimization of Fuzzy Controller for Inverse Pendulum System Using Genetic Algorithm Desgn and Optmzaton of Fuzzy Controller for Inverse Pendulum System Usng Genetc Algorthm H. Mehraban A. Ashoor Unversty of Tehran Unversty of Tehran h.mehraban@ece.ut.ac.r a.ashoor@ece.ut.ac.r Abstract:

More information

Chapter - 2. Distribution System Power Flow Analysis

Chapter - 2. Distribution System Power Flow Analysis Chapter - 2 Dstrbuton System Power Flow Analyss CHAPTER - 2 Radal Dstrbuton System Load Flow 2.1 Introducton Load flow s an mportant tool [66] for analyzng electrcal power system network performance. Load

More information

En Route Traffic Optimization to Reduce Environmental Impact

En Route Traffic Optimization to Reduce Environmental Impact En Route Traffc Optmzaton to Reduce Envronmental Impact John-Paul Clarke Assocate Professor of Aerospace Engneerng Drector of the Ar Transportaton Laboratory Georga Insttute of Technology Outlne 1. Introducton

More information

3.1 Expectation of Functions of Several Random Variables. )' be a k-dimensional discrete or continuous random vector, with joint PMF p (, E X E X1 E X

3.1 Expectation of Functions of Several Random Variables. )' be a k-dimensional discrete or continuous random vector, with joint PMF p (, E X E X1 E X Statstcs 1: Probablty Theory II 37 3 EPECTATION OF SEVERAL RANDOM VARIABLES As n Probablty Theory I, the nterest n most stuatons les not on the actual dstrbuton of a random vector, but rather on a number

More information

ANSWERS. Problem 1. and the moment generating function (mgf) by. defined for any real t. Use this to show that E( U) var( U)

ANSWERS. Problem 1. and the moment generating function (mgf) by. defined for any real t. Use this to show that E( U) var( U) Econ 413 Exam 13 H ANSWERS Settet er nndelt 9 deloppgaver, A,B,C, som alle anbefales å telle lkt for å gøre det ltt lettere å stå. Svar er gtt . Unfortunately, there s a prntng error n the hnt of

More information

Uncertainty in measurements of power and energy on power networks

Uncertainty in measurements of power and energy on power networks Uncertanty n measurements of power and energy on power networks E. Manov, N. Kolev Department of Measurement and Instrumentaton, Techncal Unversty Sofa, bul. Klment Ohrdsk No8, bl., 000 Sofa, Bulgara Tel./fax:

More information

Problem Set 9 Solutions

Problem Set 9 Solutions Desgn and Analyss of Algorthms May 4, 2015 Massachusetts Insttute of Technology 6.046J/18.410J Profs. Erk Demane, Srn Devadas, and Nancy Lynch Problem Set 9 Solutons Problem Set 9 Solutons Ths problem

More information

Chapter 13: Multiple Regression

Chapter 13: Multiple Regression Chapter 13: Multple Regresson 13.1 Developng the multple-regresson Model The general model can be descrbed as: It smplfes for two ndependent varables: The sample ft parameter b 0, b 1, and b are used to

More information

Copyright 2017 by Taylor Enterprises, Inc., All Rights Reserved. Adjusted Control Limits for P Charts. Dr. Wayne A. Taylor

Copyright 2017 by Taylor Enterprises, Inc., All Rights Reserved. Adjusted Control Limits for P Charts. Dr. Wayne A. Taylor Taylor Enterprses, Inc. Control Lmts for P Charts Copyrght 2017 by Taylor Enterprses, Inc., All Rghts Reserved. Control Lmts for P Charts Dr. Wayne A. Taylor Abstract: P charts are used for count data

More information

4DVAR, according to the name, is a four-dimensional variational method.

4DVAR, according to the name, is a four-dimensional variational method. 4D-Varatonal Data Assmlaton (4D-Var) 4DVAR, accordng to the name, s a four-dmensonal varatonal method. 4D-Var s actually a drect generalzaton of 3D-Var to handle observatons that are dstrbuted n tme. The

More information

Statistics II Final Exam 26/6/18

Statistics II Final Exam 26/6/18 Statstcs II Fnal Exam 26/6/18 Academc Year 2017/18 Solutons Exam duraton: 2 h 30 mn 1. (3 ponts) A town hall s conductng a study to determne the amount of leftover food produced by the restaurants n the

More information

Structure and Drive Paul A. Jensen Copyright July 20, 2003

Structure and Drive Paul A. Jensen Copyright July 20, 2003 Structure and Drve Paul A. Jensen Copyrght July 20, 2003 A system s made up of several operatons wth flow passng between them. The structure of the system descrbes the flow paths from nputs to outputs.

More information

Using the estimated penetrances to determine the range of the underlying genetic model in casecontrol

Using the estimated penetrances to determine the range of the underlying genetic model in casecontrol Georgetown Unversty From the SelectedWorks of Mark J Meyer 8 Usng the estmated penetrances to determne the range of the underlyng genetc model n casecontrol desgn Mark J Meyer Neal Jeffres Gang Zheng Avalable

More information

Assortment Optimization under MNL

Assortment Optimization under MNL Assortment Optmzaton under MNL Haotan Song Aprl 30, 2017 1 Introducton The assortment optmzaton problem ams to fnd the revenue-maxmzng assortment of products to offer when the prces of products are fxed.

More information

ANSWERS CHAPTER 9. TIO 9.2: If the values are the same, the difference is 0, therefore the null hypothesis cannot be rejected.

ANSWERS CHAPTER 9. TIO 9.2: If the values are the same, the difference is 0, therefore the null hypothesis cannot be rejected. ANSWERS CHAPTER 9 THINK IT OVER thnk t over TIO 9.: χ 2 k = ( f e ) = 0 e Breakng the equaton down: the test statstc for the ch-squared dstrbuton s equal to the sum over all categores of the expected frequency

More information

Feature Selection: Part 1

Feature Selection: Part 1 CSE 546: Machne Learnng Lecture 5 Feature Selecton: Part 1 Instructor: Sham Kakade 1 Regresson n the hgh dmensonal settng How do we learn when the number of features d s greater than the sample sze n?

More information

Topic- 11 The Analysis of Variance

Topic- 11 The Analysis of Variance Topc- 11 The Analyss of Varance Expermental Desgn The samplng plan or expermental desgn determnes the way that a sample s selected. In an observatonal study, the expermenter observes data that already

More information

Lecture 10 Support Vector Machines II

Lecture 10 Support Vector Machines II Lecture 10 Support Vector Machnes II 22 February 2016 Taylor B. Arnold Yale Statstcs STAT 365/665 1/28 Notes: Problem 3 s posted and due ths upcomng Frday There was an early bug n the fake-test data; fxed

More information

Lecture 4. Instructor: Haipeng Luo

Lecture 4. Instructor: Haipeng Luo Lecture 4 Instructor: Hapeng Luo In the followng lectures, we focus on the expert problem and study more adaptve algorthms. Although Hedge s proven to be worst-case optmal, one may wonder how well t would

More information

Introduction to Vapor/Liquid Equilibrium, part 2. Raoult s Law:

Introduction to Vapor/Liquid Equilibrium, part 2. Raoult s Law: CE304, Sprng 2004 Lecture 4 Introducton to Vapor/Lqud Equlbrum, part 2 Raoult s Law: The smplest model that allows us do VLE calculatons s obtaned when we assume that the vapor phase s an deal gas, and

More information

Topic 23 - Randomized Complete Block Designs (RCBD)

Topic 23 - Randomized Complete Block Designs (RCBD) Topc 3 ANOVA (III) 3-1 Topc 3 - Randomzed Complete Block Desgns (RCBD) Defn: A Randomzed Complete Block Desgn s a varant of the completely randomzed desgn (CRD) that we recently learned. In ths desgn,

More information

Homework Assignment 3 Due in class, Thursday October 15

Homework Assignment 3 Due in class, Thursday October 15 Homework Assgnment 3 Due n class, Thursday October 15 SDS 383C Statstcal Modelng I 1 Rdge regresson and Lasso 1. Get the Prostrate cancer data from http://statweb.stanford.edu/~tbs/elemstatlearn/ datasets/prostate.data.

More information

Markov Chain Monte Carlo Lecture 6

Markov Chain Monte Carlo Lecture 6 where (x 1,..., x N ) X N, N s called the populaton sze, f(x) f (x) for at least one {1, 2,..., N}, and those dfferent from f(x) are called the tral dstrbutons n terms of mportance samplng. Dfferent ways

More information

Annexes. EC.1. Cycle-base move illustration. EC.2. Problem Instances

Annexes. EC.1. Cycle-base move illustration. EC.2. Problem Instances ec Annexes Ths Annex frst llustrates a cycle-based move n the dynamc-block generaton tabu search. It then dsplays the characterstcs of the nstance sets, followed by detaled results of the parametercalbraton

More information

Economics 130. Lecture 4 Simple Linear Regression Continued

Economics 130. Lecture 4 Simple Linear Regression Continued Economcs 130 Lecture 4 Contnued Readngs for Week 4 Text, Chapter and 3. We contnue wth addressng our second ssue + add n how we evaluate these relatonshps: Where do we get data to do ths analyss? How do

More information

ECE559VV Project Report

ECE559VV Project Report ECE559VV Project Report (Supplementary Notes Loc Xuan Bu I. MAX SUM-RATE SCHEDULING: THE UPLINK CASE We have seen (n the presentaton that, for downlnk (broadcast channels, the strategy maxmzng the sum-rate

More information

Joint Statistical Meetings - Biopharmaceutical Section

Joint Statistical Meetings - Biopharmaceutical Section Iteratve Ch-Square Test for Equvalence of Multple Treatment Groups Te-Hua Ng*, U.S. Food and Drug Admnstraton 1401 Rockvlle Pke, #200S, HFM-217, Rockvlle, MD 20852-1448 Key Words: Equvalence Testng; Actve

More information

/ n ) are compared. The logic is: if the two

/ n ) are compared. The logic is: if the two STAT C141, Sprng 2005 Lecture 13 Two sample tests One sample tests: examples of goodness of ft tests, where we are testng whether our data supports predctons. Two sample tests: called as tests of ndependence

More information

A Simple Inventory System

A Simple Inventory System A Smple Inventory System Lawrence M. Leems and Stephen K. Park, Dscrete-Event Smulaton: A Frst Course, Prentce Hall, 2006 Hu Chen Computer Scence Vrgna State Unversty Petersburg, Vrgna February 8, 2017

More information

STAT 3008 Applied Regression Analysis

STAT 3008 Applied Regression Analysis STAT 3008 Appled Regresson Analyss Tutoral : Smple Lnear Regresson LAI Chun He Department of Statstcs, The Chnese Unversty of Hong Kong 1 Model Assumpton To quantfy the relatonshp between two factors,

More information

Chapter 3 Describing Data Using Numerical Measures

Chapter 3 Describing Data Using Numerical Measures Chapter 3 Student Lecture Notes 3-1 Chapter 3 Descrbng Data Usng Numercal Measures Fall 2006 Fundamentals of Busness Statstcs 1 Chapter Goals To establsh the usefulness of summary measures of data. The

More information

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals

Simultaneous Optimization of Berth Allocation, Quay Crane Assignment and Quay Crane Scheduling Problems in Container Terminals Smultaneous Optmzaton of Berth Allocaton, Quay Crane Assgnment and Quay Crane Schedulng Problems n Contaner Termnals Necat Aras, Yavuz Türkoğulları, Z. Caner Taşkın, Kuban Altınel Abstract In ths work,

More information

Analysis of Queuing Delay in Multimedia Gateway Call Routing

Analysis of Queuing Delay in Multimedia Gateway Call Routing Analyss of Queung Delay n Multmeda ateway Call Routng Qwe Huang UTtarcom Inc, 33 Wood Ave. outh Iseln, NJ 08830, U..A Errol Lloyd Computer Informaton cences Department, Unv. of Delaware, Newark, DE 976,

More information

Simulated Power of the Discrete Cramér-von Mises Goodness-of-Fit Tests

Simulated Power of the Discrete Cramér-von Mises Goodness-of-Fit Tests Smulated of the Cramér-von Mses Goodness-of-Ft Tests Steele, M., Chaselng, J. and 3 Hurst, C. School of Mathematcal and Physcal Scences, James Cook Unversty, Australan School of Envronmental Studes, Grffth

More information

Comparison of the Population Variance Estimators. of 2-Parameter Exponential Distribution Based on. Multiple Criteria Decision Making Method

Comparison of the Population Variance Estimators. of 2-Parameter Exponential Distribution Based on. Multiple Criteria Decision Making Method Appled Mathematcal Scences, Vol. 7, 0, no. 47, 07-0 HIARI Ltd, www.m-hkar.com Comparson of the Populaton Varance Estmators of -Parameter Exponental Dstrbuton Based on Multple Crtera Decson Makng Method

More information

The optimal delay of the second test is therefore approximately 210 hours earlier than =2.

The optimal delay of the second test is therefore approximately 210 hours earlier than =2. THE IEC 61508 FORMULAS 223 The optmal delay of the second test s therefore approxmately 210 hours earler than =2. 8.4 The IEC 61508 Formulas IEC 61508-6 provdes approxmaton formulas for the PF for smple

More information

Correlation and Regression. Correlation 9.1. Correlation. Chapter 9

Correlation and Regression. Correlation 9.1. Correlation. Chapter 9 Chapter 9 Correlaton and Regresson 9. Correlaton Correlaton A correlaton s a relatonshp between two varables. The data can be represented b the ordered pars (, ) where s the ndependent (or eplanator) varable,

More information

Lecture Notes on Linear Regression

Lecture Notes on Linear Regression Lecture Notes on Lnear Regresson Feng L fl@sdueducn Shandong Unversty, Chna Lnear Regresson Problem In regresson problem, we am at predct a contnuous target value gven an nput feature vector We assume

More information

Chapter 11: Simple Linear Regression and Correlation

Chapter 11: Simple Linear Regression and Correlation Chapter 11: Smple Lnear Regresson and Correlaton 11-1 Emprcal Models 11-2 Smple Lnear Regresson 11-3 Propertes of the Least Squares Estmators 11-4 Hypothess Test n Smple Lnear Regresson 11-4.1 Use of t-tests

More information

Appendix B: Resampling Algorithms

Appendix B: Resampling Algorithms 407 Appendx B: Resamplng Algorthms A common problem of all partcle flters s the degeneracy of weghts, whch conssts of the unbounded ncrease of the varance of the mportance weghts ω [ ] of the partcles

More information

DETERMINATION OF UNCERTAINTY ASSOCIATED WITH QUANTIZATION ERRORS USING THE BAYESIAN APPROACH

DETERMINATION OF UNCERTAINTY ASSOCIATED WITH QUANTIZATION ERRORS USING THE BAYESIAN APPROACH Proceedngs, XVII IMEKO World Congress, June 7, 3, Dubrovn, Croata Proceedngs, XVII IMEKO World Congress, June 7, 3, Dubrovn, Croata TC XVII IMEKO World Congress Metrology n the 3rd Mllennum June 7, 3,

More information

Generalized Linear Methods

Generalized Linear Methods Generalzed Lnear Methods 1 Introducton In the Ensemble Methods the general dea s that usng a combnaton of several weak learner one could make a better learner. More formally, assume that we have a set

More information

Statistics for Business and Economics

Statistics for Business and Economics Statstcs for Busness and Economcs Chapter 11 Smple Regresson Copyrght 010 Pearson Educaton, Inc. Publshng as Prentce Hall Ch. 11-1 11.1 Overvew of Lnear Models n An equaton can be ft to show the best lnear

More information

Statistical Evaluation of WATFLOOD

Statistical Evaluation of WATFLOOD tatstcal Evaluaton of WATFLD By: Angela MacLean, Dept. of Cvl & Envronmental Engneerng, Unversty of Waterloo, n. ctober, 005 The statstcs program assocated wth WATFLD uses spl.csv fle that s produced wth

More information

The Second Anti-Mathima on Game Theory

The Second Anti-Mathima on Game Theory The Second Ant-Mathma on Game Theory Ath. Kehagas December 1 2006 1 Introducton In ths note we wll examne the noton of game equlbrum for three types of games 1. 2-player 2-acton zero-sum games 2. 2-player

More information

Uncertainty and auto-correlation in. Measurement

Uncertainty and auto-correlation in. Measurement Uncertanty and auto-correlaton n arxv:1707.03276v2 [physcs.data-an] 30 Dec 2017 Measurement Markus Schebl Federal Offce of Metrology and Surveyng (BEV), 1160 Venna, Austra E-mal: markus.schebl@bev.gv.at

More information

x i1 =1 for all i (the constant ).

x i1 =1 for all i (the constant ). Chapter 5 The Multple Regresson Model Consder an economc model where the dependent varable s a functon of K explanatory varables. The economc model has the form: y = f ( x,x,..., ) xk Approxmate ths by

More information

This column is a continuation of our previous column

This column is a continuation of our previous column Comparson of Goodness of Ft Statstcs for Lnear Regresson, Part II The authors contnue ther dscusson of the correlaton coeffcent n developng a calbraton for quanttatve analyss. Jerome Workman Jr. and Howard

More information

Maximizing Overlap of Large Primary Sampling Units in Repeated Sampling: A comparison of Ernst s Method with Ohlsson s Method

Maximizing Overlap of Large Primary Sampling Units in Repeated Sampling: A comparison of Ernst s Method with Ohlsson s Method Maxmzng Overlap of Large Prmary Samplng Unts n Repeated Samplng: A comparson of Ernst s Method wth Ohlsson s Method Red Rottach and Padrac Murphy 1 U.S. Census Bureau 4600 Slver Hll Road, Washngton DC

More information

MMA and GCMMA two methods for nonlinear optimization

MMA and GCMMA two methods for nonlinear optimization MMA and GCMMA two methods for nonlnear optmzaton Krster Svanberg Optmzaton and Systems Theory, KTH, Stockholm, Sweden. krlle@math.kth.se Ths note descrbes the algorthms used n the author s 2007 mplementatons

More information

Global Sensitivity. Tuesday 20 th February, 2018

Global Sensitivity. Tuesday 20 th February, 2018 Global Senstvty Tuesday 2 th February, 28 ) Local Senstvty Most senstvty analyses [] are based on local estmates of senstvty, typcally by expandng the response n a Taylor seres about some specfc values

More information

Turbulence classification of load data by the frequency and severity of wind gusts. Oscar Moñux, DEWI GmbH Kevin Bleibler, DEWI GmbH

Turbulence classification of load data by the frequency and severity of wind gusts. Oscar Moñux, DEWI GmbH Kevin Bleibler, DEWI GmbH Turbulence classfcaton of load data by the frequency and severty of wnd gusts Introducton Oscar Moñux, DEWI GmbH Kevn Blebler, DEWI GmbH Durng the wnd turbne developng process, one of the most mportant

More information

COMPARISON OF SOME RELIABILITY CHARACTERISTICS BETWEEN REDUNDANT SYSTEMS REQUIRING SUPPORTING UNITS FOR THEIR OPERATIONS

COMPARISON OF SOME RELIABILITY CHARACTERISTICS BETWEEN REDUNDANT SYSTEMS REQUIRING SUPPORTING UNITS FOR THEIR OPERATIONS Avalable onlne at http://sck.org J. Math. Comput. Sc. 3 (3), No., 6-3 ISSN: 97-537 COMPARISON OF SOME RELIABILITY CHARACTERISTICS BETWEEN REDUNDANT SYSTEMS REQUIRING SUPPORTING UNITS FOR THEIR OPERATIONS

More information

Indeterminate pin-jointed frames (trusses)

Indeterminate pin-jointed frames (trusses) Indetermnate pn-jonted frames (trusses) Calculaton of member forces usng force method I. Statcal determnacy. The degree of freedom of any truss can be derved as: w= k d a =, where k s the number of all

More information

Lecture 6: Introduction to Linear Regression

Lecture 6: Introduction to Linear Regression Lecture 6: Introducton to Lnear Regresson An Manchakul amancha@jhsph.edu 24 Aprl 27 Lnear regresson: man dea Lnear regresson can be used to study an outcome as a lnear functon of a predctor Example: 6

More information

Supplementary Notes for Chapter 9 Mixture Thermodynamics

Supplementary Notes for Chapter 9 Mixture Thermodynamics Supplementary Notes for Chapter 9 Mxture Thermodynamcs Key ponts Nne major topcs of Chapter 9 are revewed below: 1. Notaton and operatonal equatons for mxtures 2. PVTN EOSs for mxtures 3. General effects

More information

Queueing Networks II Network Performance

Queueing Networks II Network Performance Queueng Networks II Network Performance Davd Tpper Assocate Professor Graduate Telecommuncatons and Networkng Program Unversty of Pttsburgh Sldes 6 Networks of Queues Many communcaton systems must be modeled

More information

Statistics for Managers Using Microsoft Excel/SPSS Chapter 13 The Simple Linear Regression Model and Correlation

Statistics for Managers Using Microsoft Excel/SPSS Chapter 13 The Simple Linear Regression Model and Correlation Statstcs for Managers Usng Mcrosoft Excel/SPSS Chapter 13 The Smple Lnear Regresson Model and Correlaton 1999 Prentce-Hall, Inc. Chap. 13-1 Chapter Topcs Types of Regresson Models Determnng the Smple Lnear

More information

Assignment 5. Simulation for Logistics. Monti, N.E. Yunita, T.

Assignment 5. Simulation for Logistics. Monti, N.E. Yunita, T. Assgnment 5 Smulaton for Logstcs Mont, N.E. Yunta, T. November 26, 2007 1. Smulaton Desgn The frst objectve of ths assgnment s to derve a 90% two-sded Confdence Interval (CI) for the average watng tme

More information

Physics 5153 Classical Mechanics. D Alembert s Principle and The Lagrangian-1

Physics 5153 Classical Mechanics. D Alembert s Principle and The Lagrangian-1 P. Guterrez Physcs 5153 Classcal Mechancs D Alembert s Prncple and The Lagrangan 1 Introducton The prncple of vrtual work provdes a method of solvng problems of statc equlbrum wthout havng to consder the

More information

DERIVATION OF THE PROBABILITY PLOT CORRELATION COEFFICIENT TEST STATISTICS FOR THE GENERALIZED LOGISTIC DISTRIBUTION

DERIVATION OF THE PROBABILITY PLOT CORRELATION COEFFICIENT TEST STATISTICS FOR THE GENERALIZED LOGISTIC DISTRIBUTION Internatonal Worshop ADVANCES IN STATISTICAL HYDROLOGY May 3-5, Taormna, Italy DERIVATION OF THE PROBABILITY PLOT CORRELATION COEFFICIENT TEST STATISTICS FOR THE GENERALIZED LOGISTIC DISTRIBUTION by Sooyoung

More information

Outline. Communication. Bellman Ford Algorithm. Bellman Ford Example. Bellman Ford Shortest Path [1]

Outline. Communication. Bellman Ford Algorithm. Bellman Ford Example. Bellman Ford Shortest Path [1] DYNAMIC SHORTEST PATH SEARCH AND SYNCHRONIZED TASK SWITCHING Jay Wagenpfel, Adran Trachte 2 Outlne Shortest Communcaton Path Searchng Bellmann Ford algorthm Algorthm for dynamc case Modfcatons to our algorthm

More information

Lecture 3 Stat102, Spring 2007

Lecture 3 Stat102, Spring 2007 Lecture 3 Stat0, Sprng 007 Chapter 3. 3.: Introducton to regresson analyss Lnear regresson as a descrptve technque The least-squares equatons Chapter 3.3 Samplng dstrbuton of b 0, b. Contnued n net lecture

More information

ECONOMICS 351*-A Mid-Term Exam -- Fall Term 2000 Page 1 of 13 pages. QUEEN'S UNIVERSITY AT KINGSTON Department of Economics

ECONOMICS 351*-A Mid-Term Exam -- Fall Term 2000 Page 1 of 13 pages. QUEEN'S UNIVERSITY AT KINGSTON Department of Economics ECOOMICS 35*-A Md-Term Exam -- Fall Term 000 Page of 3 pages QUEE'S UIVERSITY AT KIGSTO Department of Economcs ECOOMICS 35* - Secton A Introductory Econometrcs Fall Term 000 MID-TERM EAM ASWERS MG Abbott

More information

Basic Statistical Analysis and Yield Calculations

Basic Statistical Analysis and Yield Calculations October 17, 007 Basc Statstcal Analyss and Yeld Calculatons Dr. José Ernesto Rayas Sánchez 1 Outlne Sources of desgn-performance uncertanty Desgn and development processes Desgn for manufacturablty A general

More information

CHAPTER 5 NUMERICAL EVALUATION OF DYNAMIC RESPONSE

CHAPTER 5 NUMERICAL EVALUATION OF DYNAMIC RESPONSE CHAPTER 5 NUMERICAL EVALUATION OF DYNAMIC RESPONSE Analytcal soluton s usually not possble when exctaton vares arbtrarly wth tme or f the system s nonlnear. Such problems can be solved by numercal tmesteppng

More information

UNIVERSITY OF TORONTO Faculty of Arts and Science. December 2005 Examinations STA437H1F/STA1005HF. Duration - 3 hours

UNIVERSITY OF TORONTO Faculty of Arts and Science. December 2005 Examinations STA437H1F/STA1005HF. Duration - 3 hours UNIVERSITY OF TORONTO Faculty of Arts and Scence December 005 Examnatons STA47HF/STA005HF Duraton - hours AIDS ALLOWED: (to be suppled by the student) Non-programmable calculator One handwrtten 8.5'' x

More information

LINEAR REGRESSION ANALYSIS. MODULE IX Lecture Multicollinearity

LINEAR REGRESSION ANALYSIS. MODULE IX Lecture Multicollinearity LINEAR REGRESSION ANALYSIS MODULE IX Lecture - 30 Multcollnearty Dr. Shalabh Department of Mathematcs and Statstcs Indan Insttute of Technology Kanpur 2 Remedes for multcollnearty Varous technques have

More information

NUMERICAL DIFFERENTIATION

NUMERICAL DIFFERENTIATION NUMERICAL DIFFERENTIATION 1 Introducton Dfferentaton s a method to compute the rate at whch a dependent output y changes wth respect to the change n the ndependent nput x. Ths rate of change s called the

More information

Adiabatic Sorption of Ammonia-Water System and Depicting in p-t-x Diagram

Adiabatic Sorption of Ammonia-Water System and Depicting in p-t-x Diagram Adabatc Sorpton of Ammona-Water System and Depctng n p-t-x Dagram J. POSPISIL, Z. SKALA Faculty of Mechancal Engneerng Brno Unversty of Technology Techncka 2, Brno 61669 CZECH REPUBLIC Abstract: - Absorpton

More information

REAL-TIME DETERMINATION OF INDOOR CONTAMINANT SOURCE LOCATION AND STRENGTH, PART II: WITH TWO SENSORS. Beijing , China,

REAL-TIME DETERMINATION OF INDOOR CONTAMINANT SOURCE LOCATION AND STRENGTH, PART II: WITH TWO SENSORS. Beijing , China, REAL-TIME DETERMIATIO OF IDOOR COTAMIAT SOURCE LOCATIO AD STREGTH, PART II: WITH TWO SESORS Hao Ca,, Xantng L, Wedng Long 3 Department of Buldng Scence, School of Archtecture, Tsnghua Unversty Bejng 84,

More information

Credit Card Pricing and Impact of Adverse Selection

Credit Card Pricing and Impact of Adverse Selection Credt Card Prcng and Impact of Adverse Selecton Bo Huang and Lyn C. Thomas Unversty of Southampton Contents Background Aucton model of credt card solctaton - Errors n probablty of beng Good - Errors n

More information

Notes on Frequency Estimation in Data Streams

Notes on Frequency Estimation in Data Streams Notes on Frequency Estmaton n Data Streams In (one of) the data streamng model(s), the data s a sequence of arrvals a 1, a 2,..., a m of the form a j = (, v) where s the dentty of the tem and belongs to

More information

Bayesian predictive Configural Frequency Analysis

Bayesian predictive Configural Frequency Analysis Psychologcal Test and Assessment Modelng, Volume 54, 2012 (3), 285-292 Bayesan predctve Confgural Frequency Analyss Eduardo Gutérrez-Peña 1 Abstract Confgural Frequency Analyss s a method for cell-wse

More information

A PROBABILITY-DRIVEN SEARCH ALGORITHM FOR SOLVING MULTI-OBJECTIVE OPTIMIZATION PROBLEMS

A PROBABILITY-DRIVEN SEARCH ALGORITHM FOR SOLVING MULTI-OBJECTIVE OPTIMIZATION PROBLEMS HCMC Unversty of Pedagogy Thong Nguyen Huu et al. A PROBABILITY-DRIVEN SEARCH ALGORITHM FOR SOLVING MULTI-OBJECTIVE OPTIMIZATION PROBLEMS Thong Nguyen Huu and Hao Tran Van Department of mathematcs-nformaton,

More information

A LINEAR PROGRAM TO COMPARE MULTIPLE GROSS CREDIT LOSS FORECASTS. Dr. Derald E. Wentzien, Wesley College, (302) ,

A LINEAR PROGRAM TO COMPARE MULTIPLE GROSS CREDIT LOSS FORECASTS. Dr. Derald E. Wentzien, Wesley College, (302) , A LINEAR PROGRAM TO COMPARE MULTIPLE GROSS CREDIT LOSS FORECASTS Dr. Derald E. Wentzen, Wesley College, (302) 736-2574, wentzde@wesley.edu ABSTRACT A lnear programmng model s developed and used to compare

More information

Inductance Calculation for Conductors of Arbitrary Shape

Inductance Calculation for Conductors of Arbitrary Shape CRYO/02/028 Aprl 5, 2002 Inductance Calculaton for Conductors of Arbtrary Shape L. Bottura Dstrbuton: Internal Summary In ths note we descrbe a method for the numercal calculaton of nductances among conductors

More information