GOLD CACHE INC. (CLIENT #407356) GOLD CACHE PROPERTY

Size: px
Start display at page:

Download "GOLD CACHE INC. (CLIENT #407356) GOLD CACHE PROPERTY"

Transcription

1 PROVINCIAL RECORDING OFFICE - SUDBURY RECEIVED MAY A.M. P.M. REPORT ON 2015 EXPLORATION FOR GOLD CACHE INC.? e (CLIENT #407356) GOLD CACHE PROPERTY DAWSON ROAD LOTS AND HORNE TOWNSHIP NTS 53A/12 UTM COORDINATES MAP DATUM NAD E / N THUNDER BAY MINING DIVISION Prepared by Terry Yahn May 2016

2 INTRODUCTION We have focused our work this day within claim (16 claim block) to explore high potential areas for exploration work. Past assay results in this zone have encouraged us to continue to sample the area. Within the boundaries of this claim are Pillow Lava extrusions which extend to the west and southwest. This entire area consists of bands of mineralization with most gold findings in the quartz veins of Mafic rock. The Gold Cache Project contains 5 properties with 53 Claim units. It is situated 80 kms west of the city of Thunder Bay on Hwy 11/17, at Shabaqua. Highway access is available to this property. PROJECT HISTORY This block of claims, staked starting in 1994, once contained 93 mining units in 28 contiguous mining claims straddling the Dawson Road Lots and Horne Township, with one claim in Laurie Township. One of the main features of the property is the caldera-like structure covering approximately one third of the claim block. During the past twenty-one years, the Shabaqua area has become one of the most active areas for mineral exploration in Northwestern Ontario. Much of the recent staking activity radiated from this structure. The subject property (in part) triggered the regional staking frenzy in It was surrounded by quality exploration companies, three of which obtained land positions on both sides of the subject property. Over twenty-five publicly traded companies swarmed into this "emerging gold camp", which is now referred to by the industry as the "Matawin Gold Belt". During 1996 and 1997 considerable line cutting and geophysical surveys were conducted by most of the companies in the area. In 1997 several of the companies conducted diamond drill programs, with at least 12 holes drilled resulting and results up to.300 oz/t. Au. Expectations for the area remain high.

3 More robust exploration continued in the late 90's and right up to Although it had slowed down somewhat from its previous pace, the work simply became more concentrated (targeted) and results continued to improve. Assays in the range of.400 oz/t to oz/t were now being found in the key properties. In 2001 thru to 2015 work performed on nearby claims continued to yield good results with additional assays in the oz/t range. There has been another bump in activity during 2004/06 with additional mining companies taking over some claims and actively testing the area. Almost 70 % of the area has now been re-staked and encircles our existing claims.

4 WORK PERFORMED During the week of October 5th we were on site three days. October 5th, 7th and 8th, and again on October 15, During these days we worked within claim which is covered in this report. We used two backhoes. The small John Deere was used on the 5th and 7th (Mechanical problems on Oct 6th). The larger backhoe (with the hammer attachment) from Bruno's Contracting was on site but was without an operator until October 8th. This is reflected in the rental invoice from Bruno's Contracting (Thunder Bay) Limited where we had deducted previous usage costs of their machine for work done on TB The work of October 8th is the only cost included in this report. Our purpose on these days was to re-visit trenches from several years ago and determine targets for expanded Pits for better sampling. Our new Exploration Permit allows us more aggressive sample taking. As mentioned, we utilized two backhoes: 1. A PC228 equipped with a pneumatic hammer and 2. A John Deere for clearing and the removal of overburden. The smaller backhoe put in longer days to complete preparation work. The two pit sites selected were small but we believed had the most potential. We had to enlarge the target area around the old pits in order to be more selective where the larger backhoe with the pneumatic hammer would work. The rock face in the pits were tiered and that meant that we could cut back into the rock for better samples instead of digging deeper holes. Samples on an adjoining claim to the north ( ) brought gold assays of up to g/t had been found by tracking low level assays to better ground and that is what we will continue to do. We know the potential of the area but our previous work, which included the removal of surface soil and taking samples by channel cutting with a rock saw, was not sufficient (in this area) to give us representative gold values.

5 DAILY LOG FOR THIS PROJECT Target rocks The primary rock type in this area of the claim is Mafic with fine grains like a Basalt, but moves towards a Rhyolite with courser grains in some sections. In both cases we are looking for target rock similar to other gold bearing assays where there was an abundance of quartz infused in the rock or by way of small spider veins throughout. We are looking for larger forming Pyrite cubes within those samples. In some cases, larger "smoky" quartz veins were visible. MONDAY OCTOBER 5, 2015 TERRY YAHN, BILL YAHN (One truck/vehicle, one ATV, Rock Saw, rock hammers, safety vests and supplies, GPS, compass, pen flare with bear bangers) SMALLER JOHN DEERE BACKHOE SCOTT TIMMINS (NOT AVAILABLE THIS DAY - LARGE PC228 BACKHOE WITH PNEUMATIC HAMMER - FROM BRUNO'S CONTRACTING (THUNDER BAY) LIMITED) Weather: Cloudy with chance of morning rain. Pit was a small test pit that we opened up as part of previous assessment work. We the ability, under our Exploration Permit PR we were now able to expand that pit with the use of better equipment. The large backhoe was on site but without an operator until Oct 8th. This allowed us time to use the small John Deere Backhoe to prepare these areas for him. We started by extending the pit in various directions to see how the rock ran. It dropped off quickly to the west but then started to rise. The ridge that was uncovered gave us another path to follow southward until it again began to come upward. It was a long process with only using the one backhoe but the smaller bucket also gave us a better look at the uncovered rock because it was able to clean it off better. It was able to brake off rock from any ridges that it uncovered. Bill and I viewed and examined exposed rock when it was safe to do so. We took turns supervising the backhoe operation while the other looked for another area to work on the next day (which got delayed until Wednesday, Oct 7th, due to a flat tire).

6 WEDNESDAY OCTOBER 07, 2015 TERRY YAHN, BILL YAHN (One truck/vehicle, one ATV, Rock Saw, rock hammers, safety vests and supplies, GPS, compass, pen flare with bear bangers) SMALLER JOHN DEERE BACKHOE SCOTT TIMMINS (NOT AVAILABLE THIS DAY - LARGE PC228 BACKHOE WITH PNEUMATIC HAMMER - FROM BRUNO'S CONTRACTING (THUNDER BAY) LIMITED) Weather: Cool. Rain remains in forecast. On this day we moved our operation to Pit which was approximately 250 meters to the southeast of Monday's work. The work progressed as with Mondays schedule, however, this pit dropped steeply from the outcrop before it recovered and rose again to the south. This made it very difficult for the smaller backhoe. More time was spend moving debris off to the sides of the pit. We were very satisfied with the work he was able to accomplish in preparation for Thursdays work. Bill and I viewed and examined exposed rock when it was safe to do so. We took turns supervising the backhoe operation while the other looked at other outcrops in the area. THURSDAY OCTOBER 08, 2015 TERRY YAHN, BILL YAHN (One truck/vehicle, one ATV, Rock Saw, rock hammers, safety vests and supplies, GPS, compass, pen flare with bear bangers) LARGE PC228 BACKHOE WITH PNEUMATIC HAMMER BRUNO'S CONT. Weather: Light rain most of the day The small backhoe was no longer available to us, but the operator had prepared the two target sites on Monday and Wednesday. Since the large backhoe was only available to us for the day (was being moved out that evening) we made plans to work on both Pits and to get the most out of the machine time. The large backhoe had to work harder at removing some the surplus rock from its working area because it had to use the Pneumatic hammer attachment as a claw.

7 This was especially true with pit which was much deeper. We supervised the work of the backhoe at all times but continued to trade off in order to also traverse the immediate area for future examination. The rock in the area seemed fairly consistent however as we looked for areas of change. THURSDAY OCTOBER 15, 2015 TERRY YAHN, BILL YAHN (One truck/vehicle, one ATV, Rock Saw, rock hammerst safety vests and supplies, GPS, compass, pen flare with bear bangers) Weather: Cool in the morning but sunny that afternoon We had not had an opportunity to sample on the 8th while work was being done. Rain that was forecasted would clean off both pits and so when we got back out to the property we were able to see more. After a week Bill and I returned to sample the two sites. GPS CO-ORDINATES (NAD 83 DATUM USED) UTM ZONE 16U PIT # TAG # EASTING NORTHING

8 Pit (2015) (picture taken part way through the process) Located on Claim this area is in the center of the claim. The area was relatively flat but in the location of the pit the bedrock rose heading west and looked like it dropped slightly near the bush line. We removed a substantial amount of overburden in order to expose several meters of rock. The pit was eventually expanded and exposed to a 13 x 13 meter area. From the south end, it rose to 2 meters at the north end. About half was there was a north-south running ridge that got excavated. From the ridge the rock dropped by 2-3 meters. To the east the rock slowly tapered downward. The work had involved clearing the area with a small John Deere Backhoe and then, using the Pneumatic Hammer attachment on the Large backhoe, cutting back into the surface to give us up to a meter of exposure to new rock. At the time of sampling water was still present in the bottom of the excavated area. The rock contains a high quantity of quartz infused into the rock. Pyrite was present (photos are included with CD provided). We took three samples (447236, and ) from the ridge, eastern slope and from the southwest corner where the rock begins to move upward. Final assays did not give us the high assays we had hoped for but were consistent with mineralization associated with lava formations. Assay Tag (Picture taken) A full ICP ASSAY REPORT dated November 24, 2015 is attached Gold (Au) less than.005 ppm Aluminum (Al) 1.73 `)/0 Calcium (Ca) 2.48 % Iron (Fe) 2.51 % Magnesium (Mg).68 % Manganese (Mn) 441 ppm Phosphorus (P) <100 ppm Titanium (Ti) 1532 ppm

9 Assay Tag (Picture taken) A full ICP ASSAY REPORT dated November 24, 2015 is attached Gold (Au) Less than.005 ppm Aluminum (Al) 3.70 % Calcium (Ca) 3.97 % Iron (Fe) 5.92 % Magnesium (Mg) 2.09 % Manganese (Mn) 1031 ppm Phosphorus (P) 178 ppm Titanium (Ti) 3244 ppm Assay Tag (Picture taken) A full ICP ASSAY REPORT dated November 24, 2015 is attached Gold (Au) less than.005 ppm Aluminum (Al) 4.05 % Calcium (Ca) 6.98 % Iron (Fe) 5.23 % Magnesium (Mg) 1.56 % Manganese (Mn) 1167 ppm Phosphorus (P) 160 ppm Titanium (Ti) 2330 ppm

10 Pit (2015) (picture taken) Located on Claim this area is approximately 250 meters southeast of and is an outcrop about 50 meters north of the access trail. As with Pit the work involved clearing the area with a small John Deere Backhoe and then, using the Pneumatic Hammer attachment on the Large backhoe, cutting back into the surface to give us up to a meter of exposure to new rock. The pit area is 7 meters wide at the top (north) end and 12 meters long. Several meters of rock broken from the wall face. We took only one sample (#447239) from an area near the bottom of the pit, from the ridge line created by the hammering into the pit wall. We looked at the total area of the pit but chose only one sample at this time. We believed that the sample represented the best of the choices available and its assay results would determine if further sampling was desired. Although the assays were consistent with lava formations, we found a higher concentration of Iron and Titanium in this sample compared to samples from Pit The rock is infused with quartz and with pockets of pyrite (photos are included with CD provided). Assay 'Tag (Picture taken) A full ICP ASSAY REPORT dated November 24, 2015 is attached Gold (Au) Less than.005 ppm Aluminum (Al) 3.33 A Calcium (Ca) 2.35 % Iron (Fe) 7.84 % Magnesium (Mg) 2.45 % Manganese (Mn) 1052 ppm Phosphorus (P) 670 ppm Titanium (Ti) 8297 ppm

11 People and Days Worked October 2015 Physical: Supervising, traversing, cleaning, sampling. Terry Yahn 4 Oct 5, 7, 8, 15 Bill Yahn 4 Oct 5, 7, 8, 15 Total 8 days.

12 SUMMARY AND CONCLUSIONS We have already gone a long way in determining the potential for gold in the Shabaqua area. Zone formations from our primary claim (TB ) have developed a pattern which we will continue to expose and sample on all claims we hold in the area. The work done in this report covers claim #TB Any reasonable assays in this area would go a long way in proving the commercial value of the entire area. However, our assay results on this occasion did not have a showing for Gold, which is our target mineral. This area has a similar mineral composition to, but have not yet yielded the high gold assay values found in, our adjacent claim to the north. We will continue to track and sample in this area as more and more ground is reached and assayed.

13 ATTACHMENTS SCHEDULE 1 Gold Assay report from Accurassay Lab. Dated Dec 16th, 2015 SCHEDULE 2 Full ICP Assay report from Accurassay Lab. Dated Dec 16th, 2015 SCHEDULE 3 Invoice from Bruno's Contracting (Thunder Bay) Limited PC228 Backhoe with Pneumatic hammer (Oct 8th day totals used) SCHEDULE 4 Invoice from Scott Timmins John Deere backhoe SCHEDULE 5 Drawing of Pit # (2015) SCHEDULE 6 Drawing of Pit # (2015) SCHEDULE 7 Map showing contiguous claims for Gold Cache SCHEDULE 8 Garmin MapSource showing location of Pits on Claim SCHEDULE 9 Invoice from Accurassay Lab. Dated Dec 15th, 2015 (photos are included with CD provided)

(CLIENT #407356) GOLD CACHE PROPERTY

(CLIENT #407356) GOLD CACHE PROPERTY Received:804524 Oct 2205 03:8Pm P005 0/27/205 4:56 807-475-24 MMNG RECORDERTBAY PAGE 05/32 REPORT ON 205 EXPLORATON FOR GOLD CACHE NC. (CLENT #407356) GOLD CACHE PROPERTY DAWSON ROAD LOTS AND HORNE TOWNSHP

More information

Early Exploration Plan Activity Information

Early Exploration Plan Activity Information Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of

More information

Feb :16Pm t

Feb :16Pm t Assay for Mining Claim Feb 16 2016 06:16Pm 25663t PROVINCIAL RECORiING OFFICE - SUDBU Y RECEIVED FEB 1 7 2016 After the spring of 2014, the snow would not co-operate. It would not develop a crusted top

More information

Early Exploration Permit Activity Information

Early Exploration Permit Activity Information Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater

More information

Montgomery Bedrock Geology 21d-Gowganda Formation: conglomerate, sandstone, siltstone, argillite

Montgomery Bedrock Geology 21d-Gowganda Formation: conglomerate, sandstone, siltstone, argillite Work Report 2014 Trenching Montgomery Township G-3303 Claim #4259384,4245818 Sault Ste. Marie Mining Division Michael & Yvon Gagne Montgomery Copper Property 1 P a g e 2 P a g e Montgomery Bedrock Geology

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

PROJECT AREA CON LAKE. MAP No. G-22 - CASTLEWOOD LAKE AREA DISTRICT OF THUNDER BAY OP90-372

PROJECT AREA CON LAKE. MAP No. G-22 - CASTLEWOOD LAKE AREA DISTRICT OF THUNDER BAY OP90-372 42E13NE888I 63.5922 CASTLEWOOD LAKE 010 PROJECT AREA CON LAKE MAP No. G-22 - CASTLEWOOD LAKE AREA DISTRICT OF THUNDER BAY OP90-372 TECHNICAL REPORT FINAL SUBMISSION M. NELSON CLAIM BLOCK OP90-372 #1 TRENCH

More information

Magnetic Field and VLF Surveys on the Shining Tree Property. Claims: , , , , , , , ,

Magnetic Field and VLF Surveys on the Shining Tree Property. Claims: , , , , , , , , December 29, 2014 NTS: 041P11 Magnetic Field and VLF Surveys on the Shining Tree Property Claims: 1203361, 4251801, 4251803, 4251805, 4263067, 4263068, 4270940, 4270436, 4276740 Churchill and Asquith Townships

More information

DiaMine Exploration Inc. Pickle Lake Option Property

DiaMine Exploration Inc. Pickle Lake Option Property DiaMine Exploration Inc. Pickle Lake Option Property Rock Sampling Program and Field Observations Claims 4249174, 4249175, 4249176 and 4249177, Kapkichi Lake Area (G-2081) And Claims 4249178, 4249179 and

More information

%+ '$# $) %, %*$ " $ $ ' %' !()'-!" %( %"%! " *'+ - % %$! $)! " $)!" !$ ' "! )( ! $ '%& ')- % % "!#( (( ((# $) ' ) ((* & *# ' % %"*# ( !!

%+ '$# $) %, %*$  $ $ ' %' !()'-! %( %%!  *'+ - % %$! $)!  $)! !$ ' ! )( ! $ '%& ')- % % !#( (( ((# $) ' ) ((* & *# ' % %*# ( !! 001L/14/0218 First Year Assessment Report of Prospecting, Rock and Stream Sediment Sampling On Licence 18880M, NTS 1L/14 Burin Peninsula Newfoundland and Labrador Submitted by: Keith Kelloway Work year:

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

LUCKY BEN MINE PROJECT SEPTEMBER 2018 UPDATE

LUCKY BEN MINE PROJECT SEPTEMBER 2018 UPDATE LUCKY BEN MINE PROJECT SEPTEMBER 2018 UPDATE During the first week of July 2018 work was completed by our Geologist, Richard Morris, and support personnel to stake the Lucky Ben vein structure at surface

More information

Project 81. Drill Ready Geophysical Targets & Trends. Timmins-Cochrane Northern Ontario Canada

Project 81. Drill Ready Geophysical Targets & Trends. Timmins-Cochrane Northern Ontario Canada Project 81 Drill Ready Geophysical Targets & Trends Timmins-Cochrane Northern Ontario Canada FORWARD-LOOKING STATEMENT Certain statements contained in this presentation that are forwardlooking in nature

More information

Report of Gridding and Magnetic Surveys. On the. Munro Property. Munro and Beatty Townships, Ontario. Larder Lake Mining Division

Report of Gridding and Magnetic Surveys. On the. Munro Property. Munro and Beatty Townships, Ontario. Larder Lake Mining Division Report of Gridding and Magnetic Surveys On the Munro Property Munro and Beatty Townships, Ontario Larder Lake Mining Division Claims: 39 4244 For Big Red Diamond Corporation October 3, 2 Timmins, Ontario

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

PATRICIA EILEEN KUKKEE (CLIENT #393213)

PATRICIA EILEEN KUKKEE (CLIENT #393213) REPORT ON 2003 EXPLORATION 2 Q ON THE PATRICIA EILEEN KUKKEE (CLIENT #393213) GOLD CACHE PROPERTY DAWSON ROAD LOTS NTS 53A/12 UTM COORDINATES 0287000E l 5385000N THUNDER BAY MINING DIVISION Prepared by

More information

SECOND and THIRD YEAR ASSESSMENT REPORT PROSPECTING LICENCE M, ROCK CUT PROPERTY, NTS 1N/12, NEWFOUNDLAND. ROY FRENCH (licence holder )

SECOND and THIRD YEAR ASSESSMENT REPORT PROSPECTING LICENCE M, ROCK CUT PROPERTY, NTS 1N/12, NEWFOUNDLAND. ROY FRENCH (licence holder ) SECOND and THIRD YEAR ASSESSMENT REPORT Of PROSPECTING On LICENCE 013704M, ROCK CUT PROPERTY, NTS 1N/12, NEWFOUNDLAND. By ROY FRENCH (licence holder ) Work Conducted: Sept. 17, 2008 Nov. 03, 2009 Total

More information

Press Release Azimut and Partners announce Drilling Results from Eleonore South Gold Property, James Bay region, Quebec

Press Release Azimut and Partners announce Drilling Results from Eleonore South Gold Property, James Bay region, Quebec For immediate release December 17, 2018 Symbol: AZM. TSX Venture Press Release Azimut and Partners announce Drilling Results from Eleonore South Gold Property, James Bay region, Quebec Longueuil, Quebec

More information

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT

AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT NEWS RELEASE November 29, 2016 AUGUSTINE VENTURES ANNOUNCES HIGH GRADE GOLD BEARING TENSION VEINS IN THE HANGING WALL OF THE SURLUGA DEPOSIT Toronto, Ontario November 29, 2016 - The Manager, Red Pine Exploration

More information

Uncovering The Riches of the Abitibi Greenstone Belt of Canada

Uncovering The Riches of the Abitibi Greenstone Belt of Canada 1 TSX.V: ALZ June 2016 Uncovering The Riches of the Abitibi Greenstone Belt of Canada The Haultain Gold Discovery The Abitibi Greenstone Belt & Gold 170+ million oz of gold produced to date from more than

More information

Reports Initial Assays of 0.69 g/t Au over 27 Metres including 1.09 g/t Au over 9 Metres

Reports Initial Assays of 0.69 g/t Au over 27 Metres including 1.09 g/t Au over 9 Metres Reports Initial Assays of 0.69 g/t Au over 27 Metres including 1.09 g/t Au over 9 Metres Guyana Goldstrike Inc. (GYA.V) reported more assay results from Trench TTR-18-7 at the Toucan Ridge area on its

More information

RECEIVED NOV 0 9 Z011 REPORT OF SAMPLING PROGRAM FOR INTERNATIONAL EXPLORERS & PROSPECTOR INC. CARSCALLEN TOWNSHIP PORCUPINE MINING DIVISION

RECEIVED NOV 0 9 Z011 REPORT OF SAMPLING PROGRAM FOR INTERNATIONAL EXPLORERS & PROSPECTOR INC. CARSCALLEN TOWNSHIP PORCUPINE MINING DIVISION 2. 4989 9 REPORT OF SAMPLNG PROGRAM FOR NTERNATONAL EXPLORERS & PROSPECTOR NC. CARSCALLEN TOWNSHP PORCUPNE MNNG DVSON RECEVED NOV 0 9 Z011 Qli08CNC& ASSESSMENT Of Submitted By Lionel Bonhomme November

More information

July Exploring for Canadian Gold in the Rainy River District of Ontario

July Exploring for Canadian Gold in the Rainy River District of Ontario July 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements Some of the statements in this document may be deemed to be "forward-looking statements". All statements

More information

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT

MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT MMV-TSX.V MNRLF-OTCQX News Release NR 2018 06 May 3, 2018 MINERAL MOUNTAIN CONFIRMS PROOF OF CONCEPT IN THE HOMESTAKE GOLD BELT STANDBY DRILLING RESULTS HAS IDENTIFIED A CLASSIC HOMESTAKE-STYLE, ALTERED

More information

Keels Venure Inc. Re: Assessment Report for 6735M, 8289M & 10280M Grouped to M

Keels Venure Inc. Re: Assessment Report for 6735M, 8289M & 10280M Grouped to M Keels Venure Inc. April 10, 2011 Mr. Jim Hinchey, P. Geo. Department of Natural Resources P.O. Box 8700 St. John s, NL A1B 4J6 Re: Assessment Report for 6735M, 8289M & 10280M Grouped to 011690M Dear Jim,

More information

PROSPECTING REPORT THE WALLACE CLAIM OMENICA MINING DIVISION. 54" x6" 3.d d. for. Reako Exlorat ions Ltd. Wallace Rev. C.G.

PROSPECTING REPORT THE WALLACE CLAIM OMENICA MINING DIVISION. 54 x6 3.d d. for. Reako Exlorat ions Ltd. Wallace Rev. C.G. PROSPECTING REPORT ON THE WALLACE CLAIM OMENICA MINING DIVISION 54"44 14 1x6" 3.d d by David A. Howard P.Eng. for Reako Exlorat ions Ltd. Claim Locat ion Wallace Rev. C.G. #1560 Dome Mountain Area 9 3

More information

MARKET UPDATE ON URANIUM AND GOLD PROJECTS

MARKET UPDATE ON URANIUM AND GOLD PROJECTS ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence

More information

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp

Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp Marathon Announces Discovery of New High-Grade Gold Zone in Marathon Area and Sprite Zone Drilling Results, Valentine Lake Gold Camp TORONTO, ON October 8, 2014 - Marathon Gold Corporation ( Marathon or

More information

GROWTH OPTIMIZATION INNOVATION PEOPLE

GROWTH OPTIMIZATION INNOVATION PEOPLE Bulgaria Brownfields Exploration: Krumovgrad DPM Exploration April 3, 2015 Kupel North GROWTH OPTIMIZATION INNOVATION PEOPLE Forward Looking Statements This presentation contains forward looking information

More information

Simplified exploration work report

Simplified exploration work report Simplified exploration work report Work Report of exploration and examination of outcrops of rock and boulders Report on stripping and excavating work of $ 5 000 or less.(section 81 of regulation) Report

More information

for the Greenwood Mining Division, B.C. NTS 82E/7W 29' W, Longitude 118' 53' N Prepared by D. Dylan Watt, B.Sc.

for the Greenwood Mining Division, B.C. NTS 82E/7W 29' W, Longitude 118' 53' N Prepared by D. Dylan Watt, B.Sc. for the FltE NO: u VOLT 1, VOLT 2, VOLT 3, & VOLT 4 CLAIMS Greenwood Mining Division, B.C. NTS 82E/7W Latitude 49' 29' W, Longitude 118' 53' N Prepared by D. Dylan Watt, B.Sc. #309-1996 Trutch Street Vancouver,

More information

SEDEX MINING CORPORATION LTD.

SEDEX MINING CORPORATION LTD. P.O. Box 219, 14579 Government Road, Larder Lake, Ontario, Canada, P0K 1L0 Telephone: +1 705.643.2345 Facsimile: +1 705.643.2191 Email: katrine@larder.ca www.explorationservices.ca SEDEX MINING CORPORATION

More information

REPORT ON DIAMOND DRILLING SUBSTITUTION EAST PROPERTY CLAIMS AND HEBERT TOWNSHIP ONTARIO, CANADA

REPORT ON DIAMOND DRILLING SUBSTITUTION EAST PROPERTY CLAIMS AND HEBERT TOWNSHIP ONTARIO, CANADA REPORT ON DIAMOND DRILLING SUBSTITUTION EAST PROPERTY CLAIMS 1248920 AND 1248921 HEBERT TOWNSHIP ONTARIO, CANADA Adroit Resources Inc. Suite #610-1111 Melville Street Vancouver, British Columbia, Canada

More information

Yellowknife Gold Project

Yellowknife Gold Project Yellowknife Gold Project This presentation contains forward-looking statements within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, that address

More information

SOUTHWEST & NORTHWEST EXPLORATION PROJECTS BINGHAM CANYON MINING DISTRICT

SOUTHWEST & NORTHWEST EXPLORATION PROJECTS BINGHAM CANYON MINING DISTRICT SOUTHWEST & NORTHWEST EXPLORATION PROJECTS BINGHAM CANYON MINING DISTRICT SALT LAKE AND TOOELE COUNTIES, UTAH SUMMARY FRIDAY, MARCH 20, 2009 1 Tooele County Salt Lake County GOOGLE EARTH September, 2006

More information

West Georgia Street, Vancouver, BC, V6E 3V7 Phone: / Fax: NEWS RELEASE October 11, 2017

West Georgia Street, Vancouver, BC, V6E 3V7 Phone: / Fax: NEWS RELEASE October 11, 2017 1305 1090 West Georgia Street, Vancouver, BC, V6E 3V7 Phone: +1 604 685 9316 / Fax: +1 604 683 1585 NEWS RELEASE October 11, 2017 MAWSON DISCOVERS NEW HIGH-GRADE GOLD IN MULTIPLE OUTCROPS AT EAST ROMPAS

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

Drilling highlights include:

Drilling highlights include: Toro Gold Ltd Trafalgar Court Admiral Park Guernsey GY1 3EL News Release: 10 th July 2018, Guernsey Mako Mine, Senegal Exploration Drilling Update Toro Gold ( Toro Gold or the Company ) is pleased to provide

More information

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project

Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project Canadian Gold Miner Grab Sample Returns 29.5 Grams per tonne Gold from South Kirkland Project Sudbury, July 27, 2017 Canadian Gold Miner Corp ( CGM, the Company) and Transition Metals Corp. (XTM TSX.V,

More information

Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories

Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories October 13, 2017 Summary of Rover Metals Geologic Mapping Program at the Up Town Gold Project, Northwest Territories Vancouver, British Columbia, Canada - Rover Metals Corp., Rover, is pleased to provide

More information

PROSPECTING Survey Over the AULD PROPERTY Auld Township, Ontario

PROSPECTING Survey Over the AULD PROPERTY Auld Township, Ontario PO Box 219, 14579 Government Road, Larder Lake, Ontario, P0K 1L0, Canada Phone (705) 643-2345 Fax (705) 643-2191 www.cxsltd.com PROSPECTING Survey Over the AULD PROPERTY C Jason Ploeger, B.Sc, P.Geo August

More information

PROSPECTING REPORT. Broken Hill Property. EVENT # TENURE # Tenure Name: Broken Hill. New Westminster Mining Division Map 092H

PROSPECTING REPORT. Broken Hill Property. EVENT # TENURE # Tenure Name: Broken Hill. New Westminster Mining Division Map 092H 2009-2010 PROSPECTING REPORT Broken Hill Property EVENT # 4514071 TENURE # 600988 Tenure Name: Broken Hill New Westminster Mining Division Map 092H Central Coordinate Reference 121 24 26.2 W Longitude

More information

Large Epithermal Quartz Veins Found in Outcrop at Shot Rock, Nova Scotia; Dozens of Large Angular Boulders Suggest Extensive System

Large Epithermal Quartz Veins Found in Outcrop at Shot Rock, Nova Scotia; Dozens of Large Angular Boulders Suggest Extensive System Large Epithermal Quartz Veins Found in Outcrop at Shot Rock, Nova Scotia; Dozens of Large Angular Boulders Suggest Extensive System Ottawa, Ontario (November 7, 2018) - Northern Shield Resources Inc. ("Northern

More information

McVicar Lake Gold Property Lang Lake Greenstone Belt Ontario. Argo Gold Inc. (ARQ)

McVicar Lake Gold Property Lang Lake Greenstone Belt Ontario. Argo Gold Inc. (ARQ) McVicar Lake Gold Property Lang Lake Greenstone Belt Ontario Argo Gold Inc. (ARQ) Forward Looking Statements This presentation may contain forward-looking statements that involve a number of risks and

More information

In the past century, prospectors discovered

In the past century, prospectors discovered FEATURE Instrumentation GDD Inc. s Beep Map Is prospecting dead? By Edwin Gaucher, Eng., Ph.D. and Pierre Gaucher, Eng., MBA In the past century, prospectors discovered many mines while examining shorelines

More information

H/16/2065

H/16/2065 2015-02-06 2012-02-21 012H/16/2065 TENTH YEAR ASSESSMENT REPORT OF SITE VISIT AND POLISHING TESTS ON LIC. # 19491m BAIE VERTE PENINSULA, NL NTS 12H/16 BY NATHANIEL NOEL MSc. FOR E. MICHELE NOEL MINERAL

More information

Table 1: Summary details of samples collected on surface at Bucks claims Sample ID. Sample Description

Table 1: Summary details of samples collected on surface at Bucks claims Sample ID. Sample Description ARTISANAL GOLD ACTIVITY OPENS UP NEW GOLD REEF AT SURFACE Artisanal activity, which began three months ago in the vicinity of the historic Bucks Mine, has continued to expose high grade gold mineralisation

More information

Appendix K: Field Photographs

Appendix K: Field Photographs Campbell, M. D.; Lee, Roger W.; M. David Campbell (2017), "Gold and Other Metals in the Cao Ram Area, Doi Bu District, Hoa Binh Region, Southwest of Hanoi, Vietnam," J Geol Geosci, Vol.1, pp.1-38. Appendix

More information

Probe Metals Continues to Expand Gold Zones At Val-d Or East

Probe Metals Continues to Expand Gold Zones At Val-d Or East NEWS RELEASE 02/2018 Symbol: TSX-V: PRB Shares Issued: 93,914,742 Highlights: Probe Metals Continues to Expand Gold Zones At Val-d Or East New Beliveau Deposit resource expansion drilling to the West returned

More information

Yukon Presentation. January 2015

Yukon Presentation. January 2015 Yukon Presentation January 2015 Disclaimer This presentation contains forward looking statements. All statements, other than statements of historical fact, included herein, including without limitation,

More information

Rockstar Gold Property Goudreau-Dog Lake Area, Wawa, Ontario. Argo Gold Inc. (ARQ)

Rockstar Gold Property Goudreau-Dog Lake Area, Wawa, Ontario. Argo Gold Inc. (ARQ) Rockstar Gold Property Goudreau-Dog Lake Area, Wawa, Ontario Argo Gold Inc. (ARQ) Location Map, Rockstar Gold Property Land Tenure, Rockstar Gold Property Regional Geology Michipicoten Greenstone Belt

More information

Report on Exploratory Drilling. Prospecting Claim Nos and

Report on Exploratory Drilling. Prospecting Claim Nos and Report on Exploratory Drilling Prospecting Claim Nos. 4212342 and 4212343 Glamorgan Township, Lot 34, Concession IV: Southern Ontario Mining Division Exploratory Drilling Program Site Work: November 11-17,2008

More information

Advancing High Grade Gold Assets in Red Lake, Ontario

Advancing High Grade Gold Assets in Red Lake, Ontario Advancing High Grade Gold Assets in Red Lake, Ontario Forward Looking Statement Except for historical information contained herein, this presentation may contain forward-looking statements including but

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

Technical Report. On the. Owl Claim(s) Date: Jan. 17, Claim # Written By Lucas Handley. Claim Owner

Technical Report. On the. Owl Claim(s) Date: Jan. 17, Claim # Written By Lucas Handley. Claim Owner Technical Report On the Owl Claim(s) Date: Jan. 17, 2011 Claim # 837846 838049 838242 859407 Written By Lucas Handley Claim Owner Intro The 4 claims covered in this report cover what was mostly historically

More information

Prospecting Report 'S Office i DB Property, B.C. -J Negro Creek Nelson Mining District NTS 82F.050. Operator: Kootenay Gold Inc.

Prospecting Report 'S Office i DB Property, B.C. -J Negro Creek Nelson Mining District NTS 82F.050. Operator: Kootenay Gold Inc. . '.' I"' i9 12 Prospecting Report 'S Office i DB Property, B.C. -J Negro Creek Nelson Mining District NTS 82F.050 Operator: Kootenay Gold Inc. Owner: Darlene Lavoie Work Performed Summer of 2007 Report

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres NEWS RELEASE 07/2017 Symbol: TSX-V: PRB Shares Issued: 93,328,938 Probe Metals Confirms Continuity of Gold Mineralization on its Val-d Or East Project And Increases 2017 Drill Program to 75,000 metres

More information

Mishi Lake Gold Property Mishibishu Lake Area, Wawa

Mishi Lake Gold Property Mishibishu Lake Area, Wawa Mishi Lake Gold Property Mishibishu Lake Area, Wawa Location, Accessibility, Infrastructure and Local Resources The property is located 40 km west of Wawa, Ontario, in the Mishibishu Lake Area, Sault Ste.

More information

John A. Wakeford Noranda Exploration Co., Ltd, November 4, 1980 rinnnins, Ontario

John A. Wakeford Noranda Exploration Co., Ltd, November 4, 1980 rinnnins, Ontario 42CC1NEfc4e9 801101 ECHUM 010 " ' i-^y&sg?' '.. -.r. K;VW\\:.!^-*.]-^--'^-r-r^Pj^Q..-. ;,: v 1,;-'-,..- ^^-^^^^ysr-r^ijjfiv^jj. v -." ". '. ' "i - '' '. '':.;': s.'.ilv'., p...--'*l r-j@tw IP ^vt'.'v*:-^

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service f you need accessible formats or communications supports please contact us Nous tenons à améliorer l accessibilité des services à la clientèle

More information

FIRST YEAR ASSESSMENT REPORT PROSPECTING LICENCE 16512M MARYSTOWN AREA, BURIN PENINSULA NTS 1M/3

FIRST YEAR ASSESSMENT REPORT PROSPECTING LICENCE 16512M MARYSTOWN AREA, BURIN PENINSULA NTS 1M/3 FIRST YEAR ASSESSMENT REPORT OF PROSPECTING ON LICENCE 16512M MARYSTOWN AREA, BURIN PENINSULA NTS 1M/3 BY NATHANIEL NOEL MSc. FOR E. MICHELE NOEL MINERAL LICENCES: 16512 M WORK CONDUCTED: MID-SEPTEMBER

More information

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15.

Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over 15. NEWS RELEASE 10/2018 Symbol: TSX-V: PRB Shares Issued: 110,584,945 Probe Metals Continues to Intersect Significant Gold Mineralization in Expansion Drilling at Val-d Or East, including 4.1 g/t Gold Over

More information

IBI CORPORATION. GOLD and OTHER MINERAL EXPLORATION IN UGANDA

IBI CORPORATION. GOLD and OTHER MINERAL EXPLORATION IN UGANDA IBI CORPORATION GOLD and OTHER MINERAL EXPLORATION IN UGANDA In the last two years, gold has taken on a renewed glitter, with a significant run-up in price. This aspect has obviously created the current

More information

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24.

102 metres strike length averaging 32.62g/t Gold extends overall surface vein sampling to date to 726 metres strike length averaging 24. ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 8 th February 2012 Old Pirate Phase 4 Longitudinal Trenching Results for veins on the Western Limb Lodes 102 metres strike length averaging 32.62g/t Gold extends

More information

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program

Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program Pershing Gold Extends High-Grade Mineralization through Step-Out Drilling in Phase 1 and Initiates Phase 2 Drilling Program LAKEWOOD, Colo., November 9, 2016 (PR NEWSWIRE) Pershing Gold Corporation (NASDAQ:PGLC)

More information

Technical Report. Geochemical Sampling of Raymond Creek on Vancouver Island. Victoria Mining District 092C 15. UTM Co-ordinates N E

Technical Report. Geochemical Sampling of Raymond Creek on Vancouver Island. Victoria Mining District 092C 15. UTM Co-ordinates N E Technical Report Geochemical Sampling of Raymond Creek on Vancouver Island Victoria Mining District 092C 15 UTM Co-ordinates 5414044N 389836E Owner of Claims is Dean Arbic(133434) Report Written by Dean

More information

City of Six Project. Gold Mining Property in Downieville, CA. 60 Acres of Claims. Estimated Resource of over 8,800 ounces of Gold

City of Six Project. Gold Mining Property in Downieville, CA. 60 Acres of Claims. Estimated Resource of over 8,800 ounces of Gold City of Six Project Gold Mining Property in Downieville, CA 60 Acres of Claims Estimated Resource of over 8,800 ounces of Gold Adjoining the famous Ruby Mine Property Located on a Rich Tertiary Channel

More information

RE~ORT ON. J.F.V. MILLAR, P. Eng. GEOCHEMICAL SURVEY TIMBASKET AND MOGUL MINERAL CLAIMS. Kinbasket Lake, B. C. 51 degrees 118 degrees N.E.

RE~ORT ON. J.F.V. MILLAR, P. Eng. GEOCHEMICAL SURVEY TIMBASKET AND MOGUL MINERAL CLAIMS. Kinbasket Lake, B. C. 51 degrees 118 degrees N.E. RE~ORT ON GEOCHEMICAL SURVEY TIMBASKET AND MOGUL MINERAL CLAIMS Kinbasket Lake, B. C. 51 degrees 118 degrees N.E. J.F.V. MILLAR, P. Eng. Lease held by J.F.V. MILLAR Work done Sept. 22 - Oct. 3, 1967. REPORT

More information

13 March 2017 Georgian Mining Corporation Further drill results from Kvemo Bolnisi East Gold Discovery

13 March 2017 Georgian Mining Corporation Further drill results from Kvemo Bolnisi East Gold Discovery 13 March 2017 Georgian Mining Corporation Further drill results from Kvemo Bolnisi East Gold Discovery Georgian Mining Corporation ( GEO ) is pleased to announce results from the program to expand the

More information

National Instrument Technical Report

National Instrument Technical Report National Instrument 43-101Technical Report Pigeon River Property Hartington Township Ontario, Canada Thunder Bay Mining Division, NTS 42A4 Geology Updated Technical Report UTM: Zone 16, 277134m E, 5332229m

More information

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY

News Release No GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY November 19, 2018 TSX Venture Exchange Listed Frankfurt Exchange Listed News Release No. 303-2018 GOLD AND COPPER MINERALIZATION DISCOVERED DURING PHASE 2 EXPLORATION AT THE MCBRIDE PROPERTY Vancouver,

More information

ASSESSMENT REPORT TITLE PAGE AND SUMMARY

ASSESSMENT REPORT TITLE PAGE AND SUMMARY ASSESSMENT REPORT TITLE PAGE AND SUMMARY TITLE OF REPORT: 2016 Prospecting Report Sphynx Claim TOTAL COST: $167.56 AUTHOR(S): Giacomo Grassi SIGNATURE(S): NOTICE OF WORK PERMIT NUMBER(S)/DATE(S): STATEMENT

More information

EAST-WEST DRILL PROGRAM RESULTS

EAST-WEST DRILL PROGRAM RESULTS WWW.KNICK.CA TSX- V: KNX PRESS RELEASE For immediate release EAST-WEST 2016-2017 DRILL PROGRAM RESULTS Val-d Or, Quebec, June 6, 2017, Knick Exploration Inc. (TSX-V: KNX). Knick is pleased to present results

More information

Toronto, Canada March 4, 2013

Toronto, Canada March 4, 2013 NEWS RELEASE SAS REPORTS ADDITIONAL DRILLING RESULTS FOR THE HISLOP NORTH AND SMOKE DEEP ZONES AND SIGNIFICANT INITIAL RESULTS FROM THE HISLOP PIT COMPLEX AND NEW SEDIMENT ZONE AT THE HOLLOWAY MINE Hislop

More information

FACETED SNOW AND DEEP SLAB INSTABILITIES IN THE MARITIME CLIMATE OF THE CASCADES. Jon Andrews* Stevens Pass Ski Area

FACETED SNOW AND DEEP SLAB INSTABILITIES IN THE MARITIME CLIMATE OF THE CASCADES. Jon Andrews* Stevens Pass Ski Area FACETED SNOW AND DEEP SLAB INSTABILITIES IN THE MARITIME CLIMATE OF THE CASCADES Jon Andrews* Stevens Pass Ski Area ABSTRACT: Forecasting for deep slab instabilities in dense, deep snow can be tricky,

More information

April Exploring for Canadian Gold in the Rainy River District of Ontario

April Exploring for Canadian Gold in the Rainy River District of Ontario April 2013 Exploring for Canadian Gold in the Rainy River District of Ontario 1 Forward Looking Statements This presentation may contain forward-looking statements including but not limited to comments

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

Forward Looking Statements

Forward Looking Statements Forward Looking Statements Except for the statements of historical fact contained herein, certain information presented constitutes "forward-looking statements" within the meaning of the United States

More information

Prospecting Report on the Dynasty Jade Placer Dorthy Creek Claims

Prospecting Report on the Dynasty Jade Placer Dorthy Creek Claims Prospecting Report on the Dynasty Jade Placer Dorthy Creek Claims Claims 550004, 541288, 547670 Mining Division - Liard NTS or BCGS location 104J080 Latitude and longitude of geographic centre of work

More information

RECONNAISSANCE GEOCHEMICAL SURVEY

RECONNAISSANCE GEOCHEMICAL SURVEY RECONNAISSANCE GEOCHEMICAL SURVEY LEGAL, RITA, LOUISE FR. (CHAPLEAU GROUP) REVERTED CROWN GRANTS CHAPLEAU CREEK AREAJ, SLOC& MINING DIVISION 82 F/11W Lat: 49'44" Long: 117"22'W MINERAL RESOURCES BRANCH

More information

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V

MINERAL MOUNTAIN RESOURCES LTD. MMV.TSX-V MINERAL MOUNTAIN RESOURCES LTD. 201-1416 West 8 th Avenue Vancouver, B.C. V6H 1E1 T: 604-714-0111 F: 604-714-1119 MMV.TSX-V NEWS RELEASE March 3, 2011 No. 2011-04 MINERAL MOUNTAIN DRILLS 3.17 g/t OVER

More information

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX

OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX OSISKO INTERSECTS 36 g/t Au OVER 6.9 METRES AT LYNX (Toronto, September 18, 2017) Osisko Mining Inc. (OSK:TSX. "Osisko" or the "Corporation") is pleased to provide new results from the ongoing drill program

More information

Agam Iron Sand Primary Report

Agam Iron Sand Primary Report Agam Iron Sand Primary Report Introduction Agam Regency in Western Sumatra, Republic of Indonesia has high potential for Iron Sand, which was known from the Dutch colonization era. Geologically, the location

More information

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property

Copper Lake Samples g/t Gold and g/t Gold from the Queen Alexandra Gold Mine Property Copper Lake Samples 45.00 g/t Gold and 17.50 g/t Gold from the Queen Alexandra Gold Mine Property Toronto, ON, December 13, 2018 Copper Lake Resources (TSX-V: CPL) is pleased to announce the results of

More information

Rooster Comb Ridge Cornice Incident

Rooster Comb Ridge Cornice Incident Rooster Comb Ridge Cornice Incident April 3, 2011 Date/time: Sunday, April 3, 2011 / ~12:45pm PDT Submitted by: Patty Morrison Stevens Pass Winter Resort Snow Safety; Mark Moore NWAC Place: High point

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

Reconnaissance. Of the. Denis mineral claims. Situated at Kilometer 844 of the Alaska Highway. Liard Mining Division. Northeastern British Columbia

Reconnaissance. Of the. Denis mineral claims. Situated at Kilometer 844 of the Alaska Highway. Liard Mining Division. Northeastern British Columbia Reconnaissance Of the Denis mineral claims Situated at Kilometer 844 of the Alaska Highway Liard Mining Division Northeastern British Columbia N.T.S. 94M.075 Latitude 59 42 25 Longitude 127 13 12 Field

More information

RECONNAISSANCE AND SOIL GEOCHEMICAL SAMPLING REPORT PORCUPINE MINING DIVISION ON CLAIM , LANGMUIR TOWNSHIP

RECONNAISSANCE AND SOIL GEOCHEMICAL SAMPLING REPORT PORCUPINE MINING DIVISION ON CLAIM , LANGMUIR TOWNSHIP RECONNAISSANCE AND SOIL GEOCHEMICAL SAMPLING REPORT ON CLAIM 1224499, LANGMUIR TOWNSHIP PORCUPINE MINING DIVISION CLM 1224499 NTS: 42A/06 Author: William Randall, P.Geo 1 Table of Contents Work Performed

More information

GEOLOGICAL MAPPING REPORT ON THE ASH MINERAL CLAIM OSOYOOS MINING DIVISION ASHNOLA RIVER MAP SHEET NTS M092,H019 MCBRIDE CREEK AREA, ASHNOLA RIVER,

GEOLOGICAL MAPPING REPORT ON THE ASH MINERAL CLAIM OSOYOOS MINING DIVISION ASHNOLA RIVER MAP SHEET NTS M092,H019 MCBRIDE CREEK AREA, ASHNOLA RIVER, GEOLOGICAL MAPPING REPORT ON THE ASH MINERAL CLAIM OSOYOOS MINING DIVISION ASHNOLA RIVER MAP SHEET NTS M092,H019 LATITUDE 49 o O6, LONGITUDE 120 o 22 MCBRIDE CREEK AREA, ASHNOLA RIVER, KEREMEOS, B.C. CANADA

More information

Total Magnetic Field and VLF Surveys on the Swayze Property. Claim Swayze Township. Porcupine Mining Division

Total Magnetic Field and VLF Surveys on the Swayze Property. Claim Swayze Township. Porcupine Mining Division 1 January, 016 NTS: 041 O 15 Total Magnetic Field and VLF Surveys on the Swayze Property Claim 475471 Swayze Township Porcupine Mining Division 380850E, 599450N UTM Z17N NAD83 Report Prepared for: 540

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

1 FILMED 1. FILE NO:!..rsrru -* -. GRAND TWO CLAIM

1 FILMED 1. FILE NO:!..rsrru -* -. GRAND TWO CLAIM FILE NO:!..rsrru -* -. GRAND TWO CLAIM REPORT ON 1993 ASSESSMENT WORK GRAND TWO CLAIM REC. NO. 301849 NELSON MINING DIVISION NTS MAP SHEET 82F6/W 49 25'51" NORTH 117 18'08" WEST 1 FILMED 1 AUTHOR: R. Jordan,

More information

Hope Brook gold mine, NL - Copper, then switched to gold

Hope Brook gold mine, NL - Copper, then switched to gold Chapter 12 : Mining in NL Defined as the extraction of valuable minerals from Earth from an ore body, vein, or seam. A mineral is any chemical substance arranged in some crystalline structure. - must have

More information

FOREST FIRE. News August 15, :00am. Great progress continues to be made extinguishing hot spots on Parry Sound Fire 033.

FOREST FIRE. News August 15, :00am. Great progress continues to be made extinguishing hot spots on Parry Sound Fire 033. FOREST FIRE News August 15, 2018 8:00am Parry Sound 33 Fire Update Great progress continues to be made extinguishing hot spots on Parry Sound Fire 033. Hot weather continues to hold on which has caused

More information

A GUIDE TO WRITING AN ASSESSMENT REPORT ON YOUR CLAIMS

A GUIDE TO WRITING AN ASSESSMENT REPORT ON YOUR CLAIMS A GUIDE TO WRITING AN ASSESSMENT REPORT ON YOUR CLAIMS PLEASE NOTE! In the following pages, suggestions and advice are in italics, under each heading. Use as a guideline only. Items in bold should be changed

More information

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us.

We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. We are committed to providing accessible customer service. If you need accessible formats or communications supports, please contact us. Nous tenons à améliorer l accessibilité des services à la clientèle.

More information

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS

STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m

More information

for the Greenwood Mining Division, B.C. NTS 82E/7W Latitude 49' 27' W, Longitude 118' 5 Prepared by a= D. Dylan Watt, B.Sc.

for the Greenwood Mining Division, B.C. NTS 82E/7W Latitude 49' 27' W, Longitude 118' 5 Prepared by a= D. Dylan Watt, B.Sc. t. b LOGnO: 37~ -08 m. ACTIO#: for the AMP AMP 2 AMP 3 t AMP 4 CLAIMS Greenwood Mining Division, B.C. NTS 82E/7W Latitude 49' 27' W, Longitude 8' 5 %E c,w zc *& a w Prepared by a= -4c. D. Dylan Watt, B.Sc.

More information

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone

Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone Page 1 of 6 a Pahtavaara Drill Program Intersects 32.8 G/T Gold Over 2.0M And 2.1 G/T Gold Over 18.0M In The Karoliina Zone Jan 11, 2017 Toronto, Ontario, Canada Listed: RUP-TSX-V January 10, 2017 Rupert

More information