1 25 th Annual Louisiana Remote Sensing and GIS Workshop Baton Rouge, 2009 Watershed Analysis Using Remote Sensing and GPS Warren L. Kron, Jr. Quang Tran Baton Rouge City-Parish Planning Commission José E. Villalobos-Enciso Louisiana State University April 15 th, 2009
2 Presentation Outline Objectives Data Availability Methodology Watershed delineation Post Processing Expected Results Conclusions
3 Objectives Implement the integrated micro-watershed management approach in the EBRP Environmental Planning Process Continue with the Hydrologic Modeling to Mitigate the Nonpoint Source Pollution in Urban Watersheds Focus on Stormwater Management
4 Data Availability 10 water quality subsegments (LDEQ) 369 consolidated subwatersheds (LSU)
5 Data Availability Stormwater Best Management Practices Source: LSU and City-Parish Planning Commission
6 Data Availability EBRP Two (2) Foot Contours ELEVATION_CONTOUR_LINE CNTR_TYP_D ELEVATION CONTOUR_ID GEOMETRY_sk INTER =X4H INTER =X4H INDEX =X4HI INTER =X4HI INTER =X4HI INTER =X4H INTER =X4Hia INDEX =X4Hi INTER =X4Hi Record: 1 of Source: U.S. Army Corps of Engineers (2001)
7 Data Availability EBRP Digital Elevation Model Source: U.S. Army Corps of Engineers, 2001 USGS DEM
8 Data Availability EBRP consolidated sub-watersheds, stream network, and DEM Source: LSU (2007) and U.S. Army Corps of Engineers (2006)
9 Methodology Data Collection Watershed delineation Slope and Soils analysis Computation of geomorphic parameters Multivariable Analysis to account for both the spatial covariance among watershed characteristics and land use Determination of hydrological homogeneous regions, using the watershed characteristics through both ordination and classification Establishment of Watershed-BMP clusters
10 Watershed delineation There are inconsistencies between USACE stream network, LSU watersheds, and GeoMedia Grid analysis stream network A weekly field survey with the DPW has been initiated to verify the correct stream segments
11 Watershed delineation Grid Analysis Compiled with Fieldwork 2006 Aerials fieldverified
12 Watershed delineation Recent Land Developments 1998 Aerials 2005 Aerials
13 Watershed delineation Field Surveys GeoMedia OnDemand used to create metadatabase containing point features for field collection To make the field work more efficient, only the southwestern portion of EBRP was exported Attributes collected include: Event ID, Vegetation, Watershed, Left and Right Bank, Deposition, Quality Indicators, Flow type, Flow direction, and other comments GPS Unit (Trimble GeoXH 2008 with Zephyr antennae) providing sub-meter accuracy Digital Camera to provide visual recordation of the site
14 Post Processing Import field data to GeoMedia desktop GIS QA/QC steps to ensure data integrity Develop Google Mash-up webpage
15 Post Processing Google maps: EBRP Stream & Watershed Survey
16 Post Processing After Parish-wide Stream Surveys are Complete Redigitize stream network based on data collected in the field Re-run analysis of stream network using GeoMedia Grid to correct watershed boundaries Smooth watershed boundaries into continuous lines for more accurate representation on the base map Discontinuous watershed boundaries
17 Expected Results Methodology to contrast Storm Management Plan (water quality impact, and drainage studies) Guideline to target BMP s to specific watershed cluster Encouragement to utilize natural topography and vegetated waterways to convey runoff Principles to regulate impervious areas (e. g. rooftops, sidewalks, plazas, parking lots, drives) Method to analyze detention volumes Information to promote increment of runoff water residence time on site Localize potential areas for detention ponds and constructed wetlands
18 Further Development Contribute information to the establishment of a comprehensive Stormwater Management Plan Promote Green Infrastructure urban forestry, green roofs, wetlands, and vegetated swales Regulate impervious areas rooftops, sidewalks, plazas, parking lots, and driveways Promote complementary solutions porous pavement, rain barrels, retention basins, and treatment facilities Provide information to examine Rainfall and Design Storm Data, Detention Volumes and Peak discharge rates Provide spatial data to avoid the segmentation and isolation of ecosystems and their natural resources Estimate time of stormwater runoff
19 Conclusions EBRP consolidated subwatershed study provides a basis for the modeling work and a watershed-based framework for addressing runoff-related problems and BMP opportunities Provides more information to improve the Environmental Planning Process Supplies detailed information to the National Hydrologic Database Bayou Duplantier watershed
20 Questions and Comments? City of Baton Rouge Parish of East Baton Rouge Planning Commission G.I.S. Division (225) Warren L. Kron, Jr., GIS Senior Analyst Quang Tran, GIS Analyst, Project Development Section José E. Villalobos-Enciso, Doctoral Candidate, LSU
Section 4: Model Development and Application
Section 4: Model Development and Application The hydrologic model for the Wissahickon Act 167 study was built using GIS layers of land use, hydrologic soil groups, terrain and orthophotography. Within
More informationIJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY
IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY Use of Digital Elevation Model to compute Storm Water Drainage Network Manisha Desai *1, Dr. J. N. Patel 2 *1 Ph. D. Student of
More informationSWAMP GIS: A spatial decision support system for predicting and treating stormwater runoff. Michael G. Wing 1 * and Derek Godwin
Journal of Spatial Hydrology Vol. 11, No. 2 Fall 2011 SWAMP GIS: A spatial decision support system for predicting and treating stormwater runoff Michael G. Wing 1 * and Derek Godwin Abstract SWAMP GIS
More informationSTREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT
STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology
More informationWELCOME Lake Wabukayne OPEN HOUSE
WELCOME Lake Wabukayne Sediment Removal Project OPEN HOUSE We are here to: Update you, the community, on recent developments and activities at Lake Wabukayne Present the preferred alternative and receive
More informationStormwater Guidelines and Case Studies. CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610)
Stormwater Guidelines and Case Studies CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Goals and Challenges for Manual State Stormwater Policy More Widespread
More informationAN ASSESSMENT OF THE IMPACT OF RETENTION PONDS
AN ASSESSMENT OF THE IMPACT OF RETENTION PONDS FOR SEDIMENT TRAPPING IN THE ADA CREEK AND LONGWOOD COVE USING REMOTELY SENSED DATA AND GIS ANALYSIS Sudhanshu Sekhar Panda Associate Professor, GIS/Env.
More informationCAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY
CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY Chad A. Whaley, Department of Earth Sciences, University of South Alabama, MobileAL, 36688. E-MAIL: caw408@jaguar1.usouthal.edu The ultimate goal of this
More informationDr. S.SURIYA. Assistant professor. Department of Civil Engineering. B. S. Abdur Rahman University. Chennai
Hydrograph simulation for a rural watershed using SCS curve number and Geographic Information System Dr. S.SURIYA Assistant professor Department of Civil Engineering B. S. Abdur Rahman University Chennai
More informationAnalysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method
Analysis of Road Sediment Accumulation to Monumental Creek using the GRAIP Method Introduction (from http://www.neng.usu.edu/cee/faculty/dtarb/graip/#over): The Geomorphologic Road Analysis and Inventory
More informationMS4: MAPPING CHALLENGES. Mike Towle Associate Planner, WestCOG
MS4: MAPPING CHALLENGES Mike Towle Associate Planner, WestCOG mtowle@westcog.org Please contact or attribute author before using any images or data from this presentation Overview I. Theory and background
More informationARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS
ARTICLE 5 (PART 2) DETENTION VOLUME EXAMPLE PROBLEMS Example 5.7 Simple (Detention Nomograph) Example 5.8 Offsite and Unrestricted Areas (HEC-HMS) Example 5.9 Ponds in Series w/ Tailwater (HEC-HMS) Example
More informationUrban Erosion Potential Risk Mapping with GIS
Urban Erosion Potential Risk Mapping with GIS ESRI Water Conference San Diego, CA Jan 29-Feb 1, 2018 Dr. Randy Dymond, PE, F.ASCE, D.WRE Co-investigators: Amanda Weikmann, MS Student Dr. Clay Hodges, PE
More informationNear Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data. Jennifer Hadley 22 April 2003
Near Real-Time Runoff Estimation Using Spatially Distributed Radar Rainfall Data Jennifer Hadley 22 April 2003 Introduction Water availability has become a major issue in Texas in the last several years,
More informationHydrology and Hydraulics Design Report. Background Summary
To: National Park Services Montezuma Castle National Monument Richard Goepfrich, Facility Manager From: Multicultural Technical Engineers Date: Tuesday - February 13, 2018 Subject: 30% Hydrology and Hydraulics
More informationGRAPEVINE LAKE MODELING & WATERSHED CHARACTERISTICS
GRAPEVINE LAKE MODELING & WATERSHED CHARACTERISTICS Photo Credit: Lake Grapevine Boat Ramps Nash Mock GIS in Water Resources Fall 2016 Table of Contents Figures and Tables... 2 Introduction... 3 Objectives...
More informationA GIS-based Approach to Watershed Analysis in Texas Author: Allison Guettner
Texas A&M University Zachry Department of Civil Engineering CVEN 658 Civil Engineering Applications of GIS Instructor: Dr. Francisco Olivera A GIS-based Approach to Watershed Analysis in Texas Author:
More informationCE 394K.3 GIS in Water Resources Midterm Quiz Fall There are 5 questions on this exam. Please do all 5. They are of equal credit.
Name: CE 394K.3 GIS in Water Resources Midterm Quiz Fall 2000 There are 5 questions on this exam. Please do all 5. They are of equal credit. 1. The ArcView Geographic Information System can display different
More information3.11 Floodplains Existing Conditions
Other stormwater control practices may be needed to mitigate water quality impacts. In addition to detention facilities, other practices such as vegetated basins/buffers, infiltration basins, and bioswales
More informationDetermination of Urban Runoff Using ILLUDAS and GIS
Texas A&M University Department of Civil Engineering Instructor: Dr. Francisco Olivera CVEN689 Applications of GIS to Civil Engineering Determination of Urban Runoff Using ILLUDAS and GIS Tae Jin Kim 03.
More informationREMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION
REMOTE SENSING AND GEOSPATIAL APPLICATIONS FOR WATERSHED DELINEATION Gaurav Savant (gaurav@engr.msstate.edu) Research Assistant, Department of Civil Engineering, Lei Wang (lw4@ra.msstate.edu) Research
More informationWaterborne Environmental, Inc., Leesburg, VA, USA 2. Syngenta Crop Protection, LLC, North America 3. Syngenta Crop Protection, Int.
Application of High Resolution Elevation Data (LiDAR) to Assess Natural and Anthropogenic Agricultural Features Affecting the Transport of Pesticides at Multiple Spatial Scales Josh Amos 1, Chris Holmes
More informationContinuing Education Associated with Maintaining CPESC and CESSWI Certification
Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program
More informationUrban Tree Canopy Assessment Purcellville, Virginia
GLOBAL ECOSYSTEM CENTER www.systemecology.org Urban Tree Canopy Assessment Purcellville, Virginia Table of Contents 1. Project Background 2. Project Goal 3. Assessment Procedure 4. Economic Benefits 5.
More informationFlood Hazard Inundation Mapping. Presentation. Flood Hazard Mapping
Flood Hazard Inundation Mapping Verne Schneider, James Verdin, and JeradBales U.S. Geological Survey Reston, VA Presentation Flood Hazard Mapping Requirements Practice in the United States Real Time Inundation
More informationStreamStats: Delivering Streamflow Information to the Public. By Kernell Ries
StreamStats: Delivering Streamflow Information to the Public By Kernell Ries U.S. Department of the Interior U.S. Geological Survey MD-DE-DC District 410-238-4317 kries@usgs.gov StreamStats Web Application
More informationChapter 10 - Sacramento Method Examples
Chapter 10 Sacramento Method Examples Introduction Overview This chapter presents two example problems to demonstrate the use of the Sacramento method. These example problems use the SACPRE and HEC-1 computer
More informationPierce Cedar Creek Institute GIS Development Final Report. Grand Valley State University
Pierce Cedar Creek Institute GIS Development Final Report Grand Valley State University Major Goals of Project The two primary goals of the project were to provide Matt VanPortfliet, GVSU student, the
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationRemote Sensing and GIS Applications for Hilly Watersheds SUBASHISA DUTTA DEPARTMENT OF CIVIL ENGINEERING IIT GUWAHATI
Remote Sensing and GIS Applications for Hilly Watersheds SUBASHISA DUTTA DEPARTMENT OF CIVIL ENGINEERING IIT GUWAHATI Deciding Alternative Land Use Options in a Watershed Using GIS Source: Anita Prakash
More informationDevelopment and Land Use Change in the Central Potomac River Watershed. Rebecca Posa. GIS for Water Resources, Fall 2014 University of Texas
Development and Land Use Change in the Central Potomac River Watershed Rebecca Posa GIS for Water Resources, Fall 2014 University of Texas December 5, 2014 Table of Contents I. Introduction and Motivation..4
More informationWatershed Delineation in GIS Environment Rasheed Saleem Abed Lecturer, Remote Sensing Centre, University of Mosul, Iraq
Watershed Delineation in GIS Environment Rasheed Saleem Abed Lecturer, Remote Sensing Centre, University of Mosul, Iraq Abstract: The management and protection of watershed areas is a major issue for human
More informationStatewide Topographic Mapping Program
Statewide Topographic Mapping Program February 28, 2018 www.dotd.la.gov Outline Purpose of the Statewide Topographic Mapping Program History Breakdown of R.S. 48:36 - Topographic Mapping Statewide Topographic
More informationUrban Mapping and Providing Partner Services Utilizing GIS Presenter: Josh Garver. GISP, Assistant Director;
Urban Mapping and Providing Partner Services Utilizing GIS Presenter: Josh Garver. GISP, Assistant Director; jgarver@franklinswcd.org What I d Like You to do: Think Spatially Look for Shapes Look for Patterns
More information1.1 What is Site Fingerprinting?
Site Fingerprinting Utilizing GIS/GPS Technology 1.1 What is Site Fingerprinting? Site fingerprinting is a planning tool used to design communities where protection of natural resources is the primary
More informationMISSOURI LiDAR Stakeholders Meeting
MISSOURI LiDAR Stakeholders Meeting East-West Gateway June 18, 2010 Tim Haithcoat Missouri GIO Enhanced Elevation Data What s different about it? Business requirements are changing.fast New data collection
More informationHYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED
HYDROLOGIC AND WATER RESOURCES EVALUATIONS FOR SG. LUI WATERSHED 1.0 Introduction The Sg. Lui watershed is the upper part of Langat River Basin, in the state of Selangor which located approximately 20
More informationSediment Trap. At multiple locations within the project site where sediment control is needed.
Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control
More informationDevelopment of Techniques to Quantify Effective Impervious Cover
R E S E A R C H R E P O R T Development of Techniques to Quantify Effective Impervious Cover Ben Janke John S. Gulliver St. Anthony Falls Laboratory Department of Civil Engineering Bruce N. Wilson Department
More informationBasin characteristics
Basin characteristics From hydrological processes at the point scale to hydrological processes throughout the space continuum: point scale à river basin The watershed characteristics (shape, length, topography,
More informationLouisiana Transportation Engineering Conference. Monday, February 12, 2007
Louisiana Transportation Engineering Conference Monday, February 12, 2007 Agenda Project Background Goal of EIS Why Use GIS? What is GIS? How used on this Project Other site selection tools I-69 Corridor
More informationModeling Post-Development Runoff and Channel Impacts from Hydromodification: Practical Tools for Hydromodification Assessment
Modeling Post-Development Runoff and Channel Impacts from Hydromodification: Practical Tools for Hydromodification Assessment Chris Bowles, Ph.D. Andy Collison, Ph.D. Matt Wickland, M.S. c.bowles@pwa-ltd.com
More informationImplementing a Thermal Urban Runoff Model (TURM)
20 Implementing a Thermal Urban Runoff Model (TURM) K.E. Arrington, J.M. Norman, A. Roa-Espinosa and S.J. Ventura An Erosion Control and Stormwater Management Ordinance was recently adopted in Dane County,
More informationGIS Techniques for Floodplain Delineation. Dean Djokic
GIS Techniques for Floodplain Delineation Dean Djokic (ddjokic@esri.com) Content What is a floodplain? How to get a floodplain? What can GIS do for floodplain modeling? Simple GIS techniques for floodplain
More informationDigital Elevation Models. Using elevation data in raster format in a GIS
Digital Elevation Models Using elevation data in raster format in a GIS What is a Digital Elevation Model (DEM)? Digital representation of topography Model based on scale of original data Commonly a raster
More informationComparative Analysis of Hurricane Vulnerability in New Orleans and Baton Rouge. Dr. Marc Levitan LSU Hurricane Center. April 2003
Comparative Analysis of Hurricane Vulnerability in New Orleans and Baton Rouge Dr. Marc Levitan LSU Hurricane Center April 2003 In order to compare hurricane vulnerability of facilities located in different
More informationAppendix C. Questionnaire Summary of Responses Geographic Information Systems
Appendix C Questionnaire Summary of Responses Geographic Information Systems 1. Is your agency using or planning use of GIS for: a. general mapping (e.g. highway routes, political boundaries, etc.) b.
More informationWatershed concepts for community environmental planning
Purpose and Objectives Watershed concepts for community environmental planning Dale Bruns, Wilkes University USDA Rural GIS Consortium May 2007 Provide background on basic concepts in watershed, stream,
More informationThe Road to Data in Baltimore
Creating a parcel level database from high resolution imagery By Austin Troy and Weiqi Zhou University of Vermont, Rubenstein School of Natural Resources State and local planning agencies are increasingly
More informationPONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks
PONDNET.WK1 - Flow and Phosphorus Routing in Pond Networks Version 2.1 - March 1989 William W. Walker, Jr. Ph.D., Environmental Engineer 1127 Lowell Road, Concord, Massachusetts 01742 508-369-8061 PONDNET.WK1
More informationENGRG Introduction to GIS
ENGRG 59910 Introduction to GIS Michael Piasecki March 17, 2014 Lecture 08: Terrain Analysis Outline: Terrain Analysis Earth Surface Representation Contour TIN Mass Points Digital Elevation Models Slope
More informationASFPM - Rapid Floodplain Mapping
ASFPM - Nicole Cominoli Hydraulic Engineer USACE - Omaha District mary.n.cominoli@usace.army.mil June 3, 2015 US Army Corps of Engineers Mitigation = Risk Informed Decisions 2 The National Flood Insurance
More informationCHAPTER V WATERSHED CHARACTERIZATION USING GIS
61 CHAPTER V WATERSHED CHARACTERIZATION USING GIS 5.1 GENERAL: In this chapter, introduction to watershed characterization and analysis has been presented in the first part. Methodology to compute important
More informationSummary Description Municipality of Anchorage. Anchorage Coastal Resource Atlas Project
Summary Description Municipality of Anchorage Anchorage Coastal Resource Atlas Project By: Thede Tobish, MOA Planner; and Charlie Barnwell, MOA GIS Manager Introduction Local governments often struggle
More informationTable 1 - Infiltration Rates
Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 14, 2017 File: 161413228/10 Attention: Mr. Michael Witmer, BES, MPA, MCIP, RPP City of Guelph 1 Carden Street Guelph ON N1H
More informationBushkill Creek 3 rd Street Dam Removal Analysis
Bushkill Creek 3 rd Street Dam Removal Analysis HEC HMS Runoff and Routing Model Stephen Beavan, Melanie DeFazio, David Gold, Peter Mara and Dan Moran CE 421: Hydrology Fall 2010 December 15, 2010 Contents
More informationWhat s New in Topographic Information - USGS National Map
+ What s New in Topographic Information - USGS National Map SARGIS Workshop November 14, 2016 Rob Dollison, 703-648-5724 rdollison@usgs.gov + USGS 2 National Geospatial Program The National Geospatial
More informationThe effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention basin design
Scholars' Mine Masters Theses Student Theses and Dissertations Spring 2010 The effectiveness of the Natural Resource Conservation Service (NRCS) and Huff rainfall distribution methods for use in detention
More informationCity of Columbia BMP Manual. Detailed Unified Sizing Criteria Example Wet Pond Design
City of Columbia BMP Manual Detailed Unified Sizing Criteria Example Wet Pond Design April 17, 2013 Wet Pond Example: Unified Sizing Criteria Methodology Base Data Location: Rome, GA Site Drainage Area
More informationThe Refugia Concept: Using Watershed Analysis to Prioritize Salmonid Habitat for Conservation and Restoration
The Refugia Concept: Using Watershed Analysis to Prioritize Salmonid Habitat for Conservation and Restoration Christopher May Battelle & UW Cumulative Impacts of Urbanization Landscape Alterations Loss
More informationENGRG Introduction to GIS
ENGRG 59910 Introduction to GIS Michael Piasecki November 17, 2017 Lecture 11: Terrain Analysis Outline: Terrain Analysis Earth Surface Representation Contour TIN Mass Points Digital Elevation Models Slope
More informationTechnical Memorandum No
Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and
More informationYaneev Golombek, GISP. Merrick/McLaughlin. ESRI International User. July 9, Engineering Architecture Design-Build Surveying GeoSpatial Solutions
Yaneev Golombek, GISP GIS July Presentation 9, 2013 for Merrick/McLaughlin Conference Water ESRI International User July 9, 2013 Engineering Architecture Design-Build Surveying GeoSpatial Solutions Purpose
More informationLocal Flood Hazards. Click here for Real-time River Information
Local Flood Hazards Floods of the White River and Killbuck Creek are caused by runoff from general, and/or intense rainfall. Other areas of flooding concern are from the Boland Ditch and Pittsford Ditch.
More informationSatellite Imagery: A Crucial Resource in Stormwater Billing
Satellite Imagery: A Crucial Resource in Stormwater Billing May 10, 2007 Carl Stearns Engineering Technician Department of Public Works Stormwater Services Division Sean McKnight GIS Coordinator Department
More informationAPPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS
APPENDIX E GREATER SPRINGFIELD RELIABILTIY PROJECT DRAINAGE ANALYSIS FOR THE NEWGATE/PHELPS ROAD AND THE HATCHETT HILL ROAD AREAS New England East-West Solution (NEEWS) Greater Springfield Reliability
More informationTPDES: Soil, Erosion and Sedimentation Methods
SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common
More informationFLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS
FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS Md. Aminul Islam MEE07178 Supervisor: Prof. Kuniyoshi TAKEUCHI ABSTRACT Dhaka-Narayanganj-Demra (DND) Project is
More informationGIS feature extraction tools in diverse landscapes
CE 394K.3 GIS in Water Resources GIS feature extraction tools in diverse landscapes Final Project Anna G. Kladzyk M.S. Candidate, Expected 2015 Department of Environmental and Water Resources Engineering
More informationMAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL
Report No. K-TRAN: KU-03-1 FINAL REPORT MAPPING THE RAINFALL EVENT FOR STORMWATER QUALITY CONTROL C. Bryan Young The University of Kansas Lawrence, Kansas JULY 2006 K-TRAN A COOPERATIVE TRANSPORTATION
More information4. GIS Implementation of the TxDOT Hydrology Extensions
4. GIS Implementation of the TxDOT Hydrology Extensions A Geographic Information System (GIS) is a computer-assisted system for the capture, storage, retrieval, analysis and display of spatial data. It
More informationWeb (Java, ArcGIS Server [WebADF, flex, silverlight]) Mobile (ArcGIS Mobile, ArcPad, Windows Mobile) Deskt
GIS Services company in Lincoln, NE Custom GIS database design and build (for local, county, state and private corporations) Custom (ESRI and non-esri) application design and build in Java, C++, C#,.Net
More informationLOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY
FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED
More informationINTRODUCTION TO HEC-HMS
INTRODUCTION TO HEC-HMS Hydrologic Engineering Center- Hydrologic Modeling System US Army Corps of Engineers Hydrologic Engineering Center HEC-HMS Uses Schematics Enter properties: watershed, rivers (reaches),
More informationSacramento Area Hydrology Model (SAHM) Guidance Document. Clear Creek Solutions, Inc.
Sacramento Area Hydrology Model (SAHM) Guidance Document Clear Creek Solutions, Inc. www.clearcreeksolutions.com ii To download the Sacramento Area Hydrology Model and the electronic version of this document,
More informationTHE HYDROLOGICAL MODELING OF THE USTUROI VALLEY - USING TWO MODELING PROGRAMS - WetSpa and HecRas
Carpth. J. of Earth and Environmental Sciences, 2006 Vol. 1, No. 1, p. 53-62 THE HYDROLOGICAL MODELING OF THE USTUROI VALLEY - USING TWO MODELING PROGRAMS - WetSpa and HecRas Ioana NAPRADEAN & Razvan CHIRA
More informationExtreme Phenomena in Dobrogea - Floods and Droughts
Extreme Phenomena in Dobrogea - Floods and Droughts PhD eng. Carmen Maftei Ovidius University of Constanta (Partner no 4) OUTLINES Introduction Study area Drought Floods Conclusion What is the problem?
More information9/12/2014 O V E RV I E W
K E E P I N G T H E N E W M I S S I O N R E AC H C L E A N T R A S H & F L O ATA B L E S B M P S T U D Y Russell Persyn, P.E., Ph.D. (SARA) Cris Parker, P.E., CFM (HDR) September 4, 2014 O V E RV I E W»
More informationTemplate for Sediment and Erosion Control Plan General Instructions. Section Instructions
Template for Sediment and Erosion Control Plan General Instructions Introduction: Soil erosion and sediment deposition from farmlands can contribute to degraded surface water quality. Sediment delivery
More informationThe following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference.
Main Street @ Coconut Creek DRI QUESTION 9 MAPS The following maps must be provided as a part of the ADA. The appropriate scale for each map should be determined at the pre application conference. Map
More informationGraduate Courses Meteorology / Atmospheric Science UNC Charlotte
Graduate Courses Meteorology / Atmospheric Science UNC Charlotte In order to inform prospective M.S. Earth Science students as to what graduate-level courses are offered across the broad disciplines of
More informationSuitable Applications Sediment traps should be considered for use:
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
More informationFlood Hazard Zone Modeling for Regulation Development
Flood Hazard Zone Modeling for Regulation Development By Greg Lang and Jared Erickson Pierce County GIS June 2003 Abstract The desire to blend current digital information with government permitting procedures,
More informationExisting NWS Flash Flood Guidance
Introduction The Flash Flood Potential Index (FFPI) incorporates physiographic characteristics of an individual drainage basin to determine its hydrologic response. In flash flood situations, the hydrologic
More informationApplication of high-resolution (10 m) DEM on Flood Disaster in 3D-GIS
Risk Analysis V: Simulation and Hazard Mitigation 263 Application of high-resolution (10 m) DEM on Flood Disaster in 3D-GIS M. Mori Department of Information and Computer Science, Kinki University, Japan
More informationContinuing Education Course #101 Drainage Design with WinTR-55
1 of 5 Continuing Education Course #101 Drainage Design with WinTR-55 1. WinTR-55 uses the Kinematic Wave method for calculating storm runoff rates and volumes. 2. According to the Velocity Method, the
More informationGROUND WATER/SURFACE WATER INTERACTIONS 1-3 AWRA SUMMER SPECIALTP CONFERENCE USING GIs TO MAP THE DEPTH TO SEDIMENT IN A POND
JULY.. GROUND WATER/SURFACE WATER INTERACTIONS 1-3 AWRA SUMMER SPECIALTP CONFERENCE 2002 USING GIs TO MAP THE DEPTH TO SEDIMENT IN A POND Frank P. Beck, Jr.', Patrick J. Clark2, Robert Ford' and Victor
More informationChapter 5 CALIBRATION AND VERIFICATION
Chapter 5 CALIBRATION AND VERIFICATION This chapter contains the calibration procedure and data used for the LSC existing conditions model. The goal of the calibration effort was to develop a hydraulic
More informationSTORMWATER REPORT FRITO LAY SUBDIVISION NO. 3
STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses
More informationRemote Sensing / GIS Conference. The Louisiana Proposed Elevation for the Nation Business Plan Components
Remote Sensing / GIS Conference 08 April 2008 The Louisiana Proposed Elevation for the Nation Business Plan Components David Gisclair, Louisiana Oil Spill Coordinators Office, Office of the Governor david.gisclair@la.gov
More informationVILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA
VILLAGE INFORMATION SYSTEM (V.I.S) FOR WATERSHED MANAGEMENT IN THE NORTH AHMADNAGAR DISTRICT, MAHARASHTRA Abstract: The drought prone zone in the Western Maharashtra is not in position to achieve the agricultural
More informationTechnical Drafting, Geographic Information Systems and Computer- Based Cartography
Technical Drafting, Geographic Information Systems and Computer- Based Cartography Project-Specific and Regional Resource Mapping Services Geographic Information Systems - Spatial Analysis Terrestrial
More informationCHAPTER VII FULLY DISTRIBUTED RAINFALL-RUNOFF MODEL USING GIS
80 CHAPTER VII FULLY DISTRIBUTED RAINFALL-RUNOFF MODEL USING GIS 7.1GENERAL This chapter is discussed in six parts. Introduction to Runoff estimation using fully Distributed model is discussed in first
More informationGeospatial Data, Services, and Products. National Surveying, mapping and geospatial conference
Geospatial Data, Services, and Products Federal Programs -- USDA NRCS National Surveying, mapping and geospatial conference March 15, 2016 NRCS Applications using Geosaptial Products & Services Field
More informationSTORMWATER MANAGEMENT COMPUTATIONS. Mount Prospect
STORMWATER MANAGEMENT COMPUTATIONS Mount Prospect MHG PROJECT No. 2011.173.11 November 6, 2014 Prepared for: Piney Meetinghouse Investments c/o Mr. Dennis Fling 14801 Clopper Road Boyds, MD 20841 (301)
More informationHydrologic and Hydraulic Analyses Using ArcGIS
Hydrologic and Hydraulic Analyses Using ArcGIS Two day training class Overview ArcGIS and Arc Hydro provide strong foundation for support of hydrologic and hydraulic (H&H) analyses. This two-day course
More informationFigure 0-18: Dendrogeomorphic analysis of streambank erosion and floodplain deposition (from Noe and others, 2015a)
Appendix 9A: Stream to River During the development of the Phase 6 Watershed Model, multiple methods for determining coefficients were often attempted. In some cases, the methods are averaged or otherwise
More informationChapter 6. Fundamentals of GIS-Based Data Analysis for Decision Support. Table 6.1. Spatial Data Transformations by Geospatial Data Types
Chapter 6 Fundamentals of GIS-Based Data Analysis for Decision Support FROM: Points Lines Polygons Fields Table 6.1. Spatial Data Transformations by Geospatial Data Types TO: Points Lines Polygons Fields
More informationManagement and Use of LiDAR-derived Information. Elizabeth Cook, GIS Specialist
Management and Use of LiDAR-derived Information Elizabeth Cook, GIS Specialist Advanced LiDAR Workshop March 15, 2012 50-100 gb/county Now What? Project Deliverables LAS mass point files, classification
More informationDistinct landscape features with important biologic, hydrologic, geomorphic, and biogeochemical functions.
1 Distinct landscape features with important biologic, hydrologic, geomorphic, and biogeochemical functions. Have distinguishing characteristics that include low slopes, well drained soils, intermittent
More information