Forecasters meeting. The ALADIN consortium: goals and work practices. P. Termonia. Ankara, October 2014

Size: px
Start display at page:

Download "Forecasters meeting. The ALADIN consortium: goals and work practices. P. Termonia. Ankara, October 2014"

Transcription

1 Forecasters meeting The ALADIN consortium: goals and work practices P. Termonia Ankara, October 2014

2 Outline The ALADIN consortium: what, why, goal? Link with HIRLAM The model(s): code and configurations From science to operations Verification and validation The goal of this meeting: a portfolio write a paper?

3 Current governance

4 13 Q3 13 Q1 12 Q3 12 Q1 11 Q3 11 Q1 10 Q3 10 Q1 09 Q3 09 Q1 08 Q3 08 Q1 07 Q3 07 Q1 06 Q3 06 Q1 05 Q3 05 Q1 04 Q3 04 Q1 03 Q3 03 Q1 02 Q3 02 Q1 01 Q3 01 Q1 00 Q3 00 Q1 99 Q3 99 Q1 98 Q3 98 Q1 97 Q3 97 Q1 96 Q3 96 Q1 95 Q3 95 Q1 94 Q Q Q3 93 Q1 92 Q3 92 Q1 91 Q3 91 Q1 Person.Month Total participation in the ALADIN project Evolution of the quarterly manpower 300 DEPORTED-ALAT DEPORTED LACE/PRAGUE-ALAT LACE/PRAGUE TOULOUSE-ALAT TOULOUSE Yearly average Quarter 4

5 Participation in the ALADIN project in 2013 Breakdown of the person.months by country BULGARIA 2% ALGERIA 1% PORTUGAL 2% POLAND 3% TUNISIA 3% TURKEY 2% SLOVENIA 3% MOROCCO 2% ROMANIA 2% FRANCE 46% CROATIA 3% SLOVAKIA 2% AUSTRIA 6% HUNGARY 3% BELGIUM 10% CZECH REP 9% 5

6 6

7 Strategy meeting 2011 investment in code design/development/maintenance; the replacement of the old ISBA scheme by SURFEX; collaboration; external funding; and to launch an effort to define our users and to coordinate a project on addressing the end user requirements.

8 Convergence with HIRLAM

9 Previous GA, Tunis, relevant for this meeting The GA approved and asked the ALADIN PM to come back and report on the forecasters meeting at the next GA. The Task Force recommended that, for the next few years, the two consortia should focus onactions that would bring convergence on system/maintenance to fruition. It also recommended to look at ways that would facilitate minimal convergence at governance level, keeping within the bounds of option 1. The two remaining options could be discussed later on a next programme phase. The GA agreed on going toward a common governance, but not for the next MoUs. The GA agreed on common meetings (HAC/PAC as in May 2013, next Council/GA). The GA asked the Task Force (the ALADIN, HIRLAM and LACE PMs, the chairpersons of HAC, PAC and CSSI) to set clear directives for the renewal of MoUs, considering still two separate MoUs. The Task Force should identify which points should be addressed in the common parts (to be presented and discussed at the next joint HAC/PAC meeting) and reported at the next GA/Council).

10 Code and model configurations 10

11 11

12 ALADIN PAC: roadmap needed for the code development to be concretized at the next ALADIN GA(/HIRLAM Council) Dynamical core: Scalability/effici ency Physicsdynamics coupling Localized A grid Unstructured grids Radiation Turbulence HFS? Microphysics/clouds? Surface NOT FINALIZED, TO BE CONSOLIDATED FOR THE GA/COUNCIL IN DECEMEBER!!! Data assimilation MoU MoU5 To be discussed with CSSI 12

13 National model domains in the ALADIN consortium 13

14 Convection permitting vs. convection resolving The current system is built on the mesoscale model is the ALADIN model. A decade ago the resolutions started to enter the domain of the convection permitting scales (roughly below 5 km). Two approaches were followed with the ALADIN and HIRLAM consortia: Convection is (sufficiently well) resolved at 2.5 km so that we do not need to parameterize it, This led to the AROME model based on the ALADIN NH dynamics with the meso-nh physics, developed in the past by Météo France, Seity et al. (2011). Convection should be parametrized in the gray zone. This led to a multiscale parameterization of deep convection, the so-called 3MT scheme, see Gerard and Geleyn (2005), and Gerard et al. (2009). This leads to the ALARO model. Now we start exchanging parameterizations from one model to the other: AROME and ALARO can be seen as configurations of one system, HARMONIE. 14

15 Increasing the resolution : Prototype AROME 1.3km at Météo France AROME1.3kmL90 AROME2.5kmL90 HRV observation AROME2.5kmL90 Courtesy Yann Seity, see talk of F. Bouyssel during this meeting for more details

16 Toward 1-km resolution

17 Multi-scale behavior of the prognostic deep convection in the ALARO model with the 3MT scheme Courtesy L. Gerard: Gerard and Geleyn (2005), Gerard (2007), Gerard et al. (2009) 17

18 Verification/validation? Very mutlifaceted One can distinguish various aspects: Scientific validation Code sanity checks Meterological validations Operational quality control (at home) Each of them should be addressed, BUT at what level? 18

19 LAM EPS WE ARE PRODUCING EXTRA SKILL ON TOP OF ECMWF! We have different EPS systems running: GLAMEPS and LAEF (not time to give details) A novel score: Potential Continously Ranked Economic Value (CREV) relative to (sample) climatology of ECEPS (black full line), GLAMEPS (red dashed line), GLAMEPS-LAEF (green dotted line) and ECEPS-GLAMEPS-LAEF (blue dash dotted line) for bias corrected T2m and S10m (run = 12h, lead time = 42h). Smet, G., P. Termonia and A. Deckmyn, 2012: Added economic value of limited area multi-eps weather forecasting applications Tellus, A, 64, 18901

20 From science to operations summarized on 1 sheet activity Scientific research Algorithms (scalability/ efficiency) Scientific validation ALADIN governance CSSI CSSI phasing + sanity check MF + CSSI + ACNA porting ACNA Meteorological (local) validation LTMs New demands END USERS Link with Actions HIRLAM undertaken Common work No stimulus plan needed Add-hoc Action on discussions ACRANEB2; during the Physic-dynamics ASM/workshop interaction; HARP common code Close link with the HIRLAM system PL HARMONIE system (Ankara action) Different governanc es: split repsonsibili ties, but common tools

21 Tools (for quality control): APMT, HARP, HARMONIE system tools

22 From science to operational validations in a scientific paper: R. Hamdi, D. Degrauwe, A. Duerinckx, J. Cedilnik, V. Costa, T. Dalkilic, K. Essaouini, M. Jerczynki, F. Kocaman, L. Kullmann, J.-F. Mahfouf, F. Meier, M. Sassi, S. Schneider, F. Vãňa, and P. Termonia, 2014: Evaluating the performance of SURFEXv5 as a new land surface scheme for the ALADINcy36 and ALARO-0 models, Geosci. Model Dev., 7,

23 Primary goal for this meeting: Collect cases

24 Operational tests of the CE flooing case in 2013 ALARO5-AUSTRIA IFS / ECMWF COSMO-EU (DWD) UTC UTC UTC

25 Operational high resolution vs. global (IFS, ECMWF)

26 For this week This meeting itself is an experiment (let us try to set a good precedent) We will be comparing apples with pears which is difficult and a priori pointless, but Together we produce extra skill w.r.t. ECMWF. Can operational forecasting move to convection-permitting EPS? The aim is to create a portfolio with cases that can be used by each of the ALADIN members to extract information to Address the needs and to make convincing cases for their end users and decision makers This could be done in the form of folders (which each memebr should finance by themselves) The case will be catalogued and may steer research As a secondary goal, we could keep in the back of our mind to aim at writing a scientific paper in for instance GMD (see the paper on SURFEX)

7.1 Discussion common meeting. P. Termonia FROM SCIENCE TO OPERATIONS

7.1 Discussion common meeting. P. Termonia FROM SCIENCE TO OPERATIONS 7.1 Discussion common meeting P. Termonia FROM SCIENCE TO OPERATIONS MANDATE GA 2013 (minutes) Merge: historical review since last GA Last year GA: not go for a merge at the next MoUs, but make preparations

More information

Météo-France NWP developments and AROME

Météo-France NWP developments and AROME Météo-France NWP developments and AROME F. Bouttier & collaborators - CNRM/GMAP, Météo-France bouttier@meteo.fr - Bratislava, June 2005 General NWP strategy ARPEGE/ALADIN MF progress & plans AROME progress

More information

Austria (ZAMG) Implementation and development of AROME. Upgrade ALADIN-LAEF. Research on land surface data assimilation, e.g. ASCAT.

Austria (ZAMG) Implementation and development of AROME. Upgrade ALADIN-LAEF. Research on land surface data assimilation, e.g. ASCAT. Austria (ZAMG) Implementation and development of AROME Upgrade ALADIN-LAEF Research on land surface data assimilation, e.g. ASCAT. Belgium (RMI) Multi-scale behavior of ALARO-0 for extreme summer precipitation

More information

Tour d'aladin. Piet Termonia ALADIN GA 9-10/1/2016

Tour d'aladin. Piet Termonia ALADIN GA 9-10/1/2016 Tour d'aladin Piet Termonia ALADIN GA 9-10/1/2016 ALADIN Strategy 2008-2017 Key deliverables: 4.2.1. Model configurations: The deliverable of the ALADIN cooperation is a set of four atmospheric model configurations

More information

Bio diversity and sustainable development. In European NWP

Bio diversity and sustainable development. In European NWP Bio diversity and sustainable development In European NWP ALADIN Consortium and development needs Some facts: We are network and so development is organized as such: We need good rules to be able to work

More information

Multiscale performance of the ALARO-0 model for simulating extreme summer precipitation climatology in Belgium

Multiscale performance of the ALARO-0 model for simulating extreme summer precipitation climatology in Belgium Multiscale performance of the ALARO-0 model for simulating extreme summer precipitation climatology in Belgium Rozemien De Troch 1,2, Rafiq Hamdi 1, Hans Van de Vyver 1, Jean-François Geleyn 2,3, Piet

More information

Tour d ALADIN.

Tour d ALADIN. Tour d ALADIN http://www.umr-cnrm.fr/aladin/ 22nd General Assembly, Krakow, 21 Nov. 2017 1- First results of the implementation of surface data Assimilation system «CANARI» on the Algerian HPC Model: ALADIN

More information

LAM-EPS activities in RC LACE

LAM-EPS activities in RC LACE LAM-EPS activities in RC LACE Martin Belluš with contributions of M. Szűcs, M. Dian, Ch. Wittmann, F. Weidle, Y. Wang, C. Wastl, S. Taşcu, R. Pomaga and E. Keresturi 1 Overview of activities (since last

More information

Progress on the CORE programme on DA

Progress on the CORE programme on DA Progress on the CORE programme on DA http://www.umr-cnrm.fr/aladin/ Joint 28th ALADIN Workshop & HIRLAM All Staff Meeting 2018 15th ALADIN PAC meeting, 22 May 2018 16-20/04/2018, Toulouse, France On the

More information

Actual coordination activities within C-SRNWP

Actual coordination activities within C-SRNWP Actual coordination activities within C-SRNWP Balázs Szintai with inputs from many of you... Outline News from EUMETNET OPERA and NWP SRNWP support for EUCOS (Obs-SET) BUFR migration Extension of the ECMWF

More information

Dijana Klarić RC LACE Program Manager

Dijana Klarić RC LACE Program Manager Dijana Klarić RC LACE Program Manager www.rclace.eu 10-13 October 2011 33rd EWGLAM, Tallinn, Estonia 1 2011 report LACE Projects () 3y summary 2011 R&D highlights ~ 2012 plans LACE future ALARO phy 5km

More information

LAM-EPS activities in LACE

LAM-EPS activities in LACE LAM-EPS activities in LACE Martin Belluš with contributions of A. Trojáková, M. Szűcs, Ch. Wittmann, F. Weidle, Y. Wang, C. Wastl, S. Taşcu, J. Cedilnik and E. Keresturi AROME-EPS STOCHASTIC ALADIN-LAEF

More information

Progress Report. Data Manager Activity. Regional Cooperation for Limited Area Modeling in Central Europe. Prepared by: Period: Date:

Progress Report. Data Manager Activity. Regional Cooperation for Limited Area Modeling in Central Europe. Prepared by: Period: Date: ` Data Manager Activity Progress Report Prepared by: Period: Date: Data Manager Alena Trojáková 01/2015-12/2015 26/02/2015 1 Progress summary The core of RC LACE Data Manager (DM) activity has been the

More information

project Gergely Bölöni based on inputs from many of you GIE/EIG EUMETNET, Registered Number RPM Bruxelles

project Gergely Bölöni based on inputs from many of you GIE/EIG EUMETNET, Registered Number RPM Bruxelles Status of the EUMETNET C-SRNWP project Gergely Bölöni based on inputs from many of you Outline OPERA and NWP SRNWP support for EUCOS (Obs-SET) SRNWP data pool Global Lake Data Base Extension of the ECMWF

More information

Summary of activities with SURFEX data assimilation at Météo-France. Jean-François MAHFOUF CNRM/GMAP/OBS

Summary of activities with SURFEX data assimilation at Météo-France. Jean-François MAHFOUF CNRM/GMAP/OBS Summary of activities with SURFEX data assimilation at Météo-France Jean-François MAHFOUF CNRM/GMAP/OBS Outline Status at Météo-France in 2008 Developments undertaken during 2009-2011 : Extended Kalman

More information

LAMEPS activities at the Hungarian Meteorological Service. Hungarian Meteorological Service

LAMEPS activities at the Hungarian Meteorological Service. Hungarian Meteorological Service LAMEPS activities at the Hungarian Meteorological Service Edit Hágel Presented by András Horányi Hungarian Meteorological Service 1 2 Outline of the talk Motivation and background Sensitivity experiments

More information

Introduction : Scientific context : SRNWP Expert Team on Surface Processes (model and data assimilation) Draft of a workplan for

Introduction : Scientific context : SRNWP Expert Team on Surface Processes (model and data assimilation) Draft of a workplan for SRNWP Expert Team on Surface Processes (model and data assimilation) Draft of a workplan for 2008-2009 Revised version (05 September 2008) Introduction : The Expert Team on Surface Processes will focus

More information

RC-LACE STEERING COMMITTEE

RC-LACE STEERING COMMITTEE RC-LACE STEERING COMMITTEE 20 TH MEETING, PRAGUE, 11-12 TH MARCH 2013 PARTICIPANTS: Jozef Vivoda (JV) Christoph Wittmann (CW) Tomislav Kovacic (TK) Radmila Brozkova (RB) Gergely Bölöni (GB) Doina Banciu

More information

ALARO-0 at the RMI. Alex, Daan, Geert, Josette, Luc, Olivier, Rafiq, Piet( s first operational talk)

ALARO-0 at the RMI. Alex, Daan, Geert, Josette, Luc, Olivier, Rafiq, Piet( s first operational talk) ALARO-0 at the RMI Alex, Daan, Geert, Josette, Luc, Olivier, Rafiq, Piet( s first operational talk) Operational use of Alaro-0 0 at RMIB The model (cy35t1) is run 4 times a day, at: 1. Resolution 4km (square

More information

LACE Data assimilation activities EWGLAM meeting 2016

LACE Data assimilation activities EWGLAM meeting 2016 LACE Data assimilation activities EWGLAM meeting 2016 Mate Mile and many LACE DA colleagues LACE data assimilation systems dx OI+ 1.2 2.5 OI+OI+ 4 OI+ Blend OI+ VAR OI VAR CAN PACK OI+ OI+ OI Blending

More information

Weather Forecasting Models in Met Éireann. Eoin Whelan UCD Seminar 3 rd April 2012

Weather Forecasting Models in Met Éireann. Eoin Whelan UCD Seminar 3 rd April 2012 Weather Forecasting Models in Met Éireann Eoin Whelan UCD Seminar 3 rd April 2012 Overview Background HIRLAM Models Local Implementation Verification Development work Background Met Éireann Dept of the

More information

Status of AROME news since Bratislava '05

Status of AROME news since Bratislava '05 Status of AROME news since Bratislava '05 based on contributions from CNRM GMAP & GMME teams,lab. Aérologie, aladinists 1. System & workforce 2. Model & software 3. Assimilation 4. The Future 1 1. Multiscale

More information

Validation of 2-meters temperature forecast at cold observed conditions by different NWP models

Validation of 2-meters temperature forecast at cold observed conditions by different NWP models Validation of 2-meters temperature forecast at cold observed conditions by different NWP models Evgeny Atlaskin Finnish Meteorological Institute / Russian State Hydrometeorological University OUTLINE Background

More information

Status, plans & interactions of AROME

Status, plans & interactions of AROME Status, plans & interactions of AROME Objectives and constraints Status Latest plans Méso-NH and HIRLAM aspects The ALADIN/AROME transition problem: a small institute s point of view? Why AROME? ALADIN

More information

Deutscher Wetterdienst

Deutscher Wetterdienst Deutscher Wetterdienst Limited-area ensembles: finer grids & shorter lead times Susanne Theis COSMO-DE-EPS project leader Deutscher Wetterdienst Thank You Neill Bowler et al. (UK Met Office) Andras Horányi

More information

LAM-EPS activities in RC LACE

LAM-EPS activities in RC LACE LAM-EPS activities in RC LACE Martin Belluš with contributions of M. Imrišek, Ch. Wittmann, C. Wastl, I. O. Plenković, M. Szűcs and E. Keresturi RC LACE Predictability Area - two main subjects: AROME-EPS

More information

Probabilistic Weather Prediction

Probabilistic Weather Prediction Probabilistic Weather Prediction George C. Craig Meteorological Institute Ludwig-Maximilians-Universität, Munich and DLR Institute for Atmospheric Physics Oberpfaffenhofen Summary (Hagedorn 2009) Nothing

More information

Austria. AROME-RUC for Nowcasting Assimilation of RADAR and MODE-S data AROME-EPS on demand

Austria. AROME-RUC for Nowcasting Assimilation of RADAR and MODE-S data AROME-EPS on demand Austria AROME-RUC for Nowcasting Assimilation of RADAR and MODE-S data AROME-EPS on demand Belgium Perturbation-updraughtparameterization for ALARO-1 CORDEX participation Croatia Operational suite uses

More information

MÉRA: Met Éireann ReAnalysis Global Shortwave Radiation

MÉRA: Met Éireann ReAnalysis Global Shortwave Radiation MÉRA: Met Éireann ReAnalysis Global Shortwave Radiation Emily Gleeson, Met Éireann Kristian Pagh Nielsen, DMI Eoin Whelan, Met Éireann Special thanks to the ALADIN- HIRLAM consortium Some facts about MÉRA

More information

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC

LAM EPS and TIGGE LAM. Tiziana Paccagnella ARPA-SIMC DRIHMS_meeting Genova 14 October 2010 Tiziana Paccagnella ARPA-SIMC Ensemble Prediction Ensemble prediction is based on the knowledge of the chaotic behaviour of the atmosphere and on the awareness of

More information

What s new for ARPEGE/ALADIN since Utrecht 2009?

What s new for ARPEGE/ALADIN since Utrecht 2009? What s new for ARPEGE/ALADIN since Utrecht 2009? E. Bazile with contributions from GMAP/OBS and GMAP/PROC ASM HIRLAM ALADIN 12-16 April, 2010 Krakow Outline QPF performance of ARPEGE/ALADIN with the new

More information

SENSITIVITY STUDY FOR SZEGED, HUNGARY USING THE SURFEX/TEB SCHEME COUPLED TO ALARO

SENSITIVITY STUDY FOR SZEGED, HUNGARY USING THE SURFEX/TEB SCHEME COUPLED TO ALARO SENSITIVITY STUDY FOR SZEGED, HUNGARY USING THE SURFEX/TEB SCHEME COUPLED TO ALARO Report from the Flat-Rate Stay at the Royal Meteorological Institute, Brussels, Belgium 11.03.2015 01.04.2015 Gabriella

More information

Validation of HARMONIE 36h1.3

Validation of HARMONIE 36h1.3 Validation of HARMONIE 36h1.3 Xiaohua Yang, Ulf Andrae, Trygve Aspelien, Ole Vignes, Lisa Bengtsson, Sami Niemela, Bjarne S. Andersen, Wim de Rooy, Shiyu Zhuang, Magnus Lindskog, Niels W. Nielsen Introduction

More information

ALADIN / HIRLAM 23 rd Workshop / All-Staff Meeting 2013

ALADIN / HIRLAM 23 rd Workshop / All-Staff Meeting 2013 AGENDA (15/04/13) ALADIN / HIRLAM 23 rd Workshop / All-Staff Meeting 2013 Hotel Hilton Reykjavik Nordica, Reykjavik, 15-19 April, 2013 Monday 15 Main room ~85p Tuesday 16 Main room ~85p Wednesday 17 Main

More information

ICON. Limited-area mode (ICON-LAM) and updated verification results. Günther Zängl, on behalf of the ICON development team

ICON. Limited-area mode (ICON-LAM) and updated verification results. Günther Zängl, on behalf of the ICON development team ICON Limited-area mode (ICON-LAM) and updated verification results Günther Zängl, on behalf of the ICON development team COSMO General Meeting, Offenbach, 07.09.2016 Outline Status of limited-area-mode

More information

Status of the SRNWP-EPS II Project

Status of the SRNWP-EPS II Project Status of the SRNWP-EPS II Project José A. García-Moya 1, Chiara Marsigli 2 and Francesca Marcucci 3 (1) Spanish Meteorological Agency AEMET, Spain (2) Arpae Emilia-Romagna - Hydro-Meteo-Climate Service

More information

HARMONIE physics plans Laura Rontu, FMI

HARMONIE physics plans Laura Rontu, FMI HARMONIE physics plans Laura Rontu, FMI with contributions by Imanol Guerrero, Timo Vihma and others ALARO working days 13-15 June 2012 Ljubljana A FEW STRATEGIC COMMENTS Towards scale-adaptive, cross-package

More information

Report of the Scientific Project Manager

Report of the Scientific Project Manager Report of the Scientific Project Manager G. Doms, DWD, 4th COSMO General Meeting, Warsaw, Poland Status of the LM LM Version 2.13 (18 January 2002) - Option for use of Wind profiler/rass reports - Adjustments

More information

TIGGE-LAM archive development in the frame of GEOWOW. Richard Mladek (ECMWF)

TIGGE-LAM archive development in the frame of GEOWOW. Richard Mladek (ECMWF) TIGGE-LAM archive development in the frame of GEOWOW Richard Mladek (ECMWF) The group on Earth Observations (GEO) initiated the Global Earth Observation System of Systems (GEOSS) GEOWOW, short for GEOSS

More information

AMERICAN METEOROLOGICAL SOCIETY

AMERICAN METEOROLOGICAL SOCIETY AMERICAN METEOROLOGICAL SOCIETY Bulletin of the American Meteorological Society EARLY ONLINE RELEASE This is a preliminary PDF of the author-produced manuscript that has been peer-reviewed and accepted

More information

Application and verification of ECMWF products 2009

Application and verification of ECMWF products 2009 Application and verification of ECMWF products 2009 Hungarian Meteorological Service 1. Summary of major highlights The objective verification of ECMWF forecasts have been continued on all the time ranges

More information

Report on stay at ZAMG

Report on stay at ZAMG Report on stay at ZAMG Viena, Austria 13.05.2013 05.07.2013 Simona Tascu NMA, Romania Supervised by: Yong Wang and Theresa Gorgas Introduction The goal of the present stay was to develop and optimize the

More information

Perspectives on EPS at EUMETNET and at AEMET

Perspectives on EPS at EUMETNET and at AEMET Perspectives on EPS at EUMETNET and at AEMET Bartolomé Orfila 24th ALADIN Workshop & HIRLAM All Staff Meeting 7-11 April 2014, Romania OUTLINE What should be the content of the Project Proposal for the

More information

Report on the Joint SRNWP workshop on DA-EPS Bologna, March. Nils Gustafsson Alex Deckmyn.

Report on the Joint SRNWP workshop on DA-EPS Bologna, March. Nils Gustafsson Alex Deckmyn. Report on the Joint SRNWP workshop on DA-EPS Bologna, 22-24 March Nils Gustafsson Alex Deckmyn http://www.smr.arpa.emr.it/srnwp/ Purpose of the workshop On the one hand, data assimilation techniques require

More information

High resolution regional reanalysis over Ireland using the HARMONIE NWP model

High resolution regional reanalysis over Ireland using the HARMONIE NWP model High resolution regional reanalysis over Ireland using the HARMONIE NWP model Emily Gleeson, Eoin Whelan With thanks to John Hanley, Bing Li, Ray McGrath, Séamus Walsh, Motivation/Inspiration KNMI 5 year

More information

EUMETSAT. A global operational satellite agency at the heart of Europe. Presentation for the Spanish Industry Day Madrid, 15 March 2012

EUMETSAT. A global operational satellite agency at the heart of Europe. Presentation for the Spanish Industry Day Madrid, 15 March 2012 EUMETSAT A global operational satellite agency at the heart of Europe Presentation for the Spanish Industry Day Madrid, Angiolo Rolli EUMETSAT Director of Administration EUMETSAT objectives The primary

More information

Successes and challenges of a seamless development of physical parameterizations

Successes and challenges of a seamless development of physical parameterizations Successes and challenges of a seamless development of physical parameterizations F. Bouyssel, I. Beau, E. Bazile, Y. Bouteloup, J.F. Gueremy, J.M. Piriou, D. Pollack, R. Roehrig CNRM-GAME, Météo-France

More information

Application and verification of ECMWF products in Croatia

Application and verification of ECMWF products in Croatia Application and verification of ECMWF products in Croatia August 2008 1. Summary of major highlights At Croatian Met Service, ECMWF products are the major source of data used in the operational weather

More information

Application and verification of ECMWF products 2010

Application and verification of ECMWF products 2010 Application and verification of ECMWF products Hydrological and meteorological service of Croatia (DHMZ) Lovro Kalin. Summary of major highlights At DHMZ, ECMWF products are regarded as the major source

More information

Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the SILAM performances

Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the SILAM performances Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the SILAM performances December 2015 January 2016 February 2016 This document has been produced

More information

HIRLAM Management Group (HMG) ALADIN Committee for Scientific and System/Maintenance Issues (CSSI) Meeting

HIRLAM Management Group (HMG) ALADIN Committee for Scientific and System/Maintenance Issues (CSSI) Meeting HIRLAM Management Group (HMG) ALADIN Committee for Scientific and System/Maintenance Issues (CSSI) Meeting Brussels (Belgium), 6 th and 10 th April 2008 Minutes edited by Tilly Driesenaar and Martin Janousek

More information

The Canadian Regional Ensemble Prediction System (REPS)

The Canadian Regional Ensemble Prediction System (REPS) The Canadian Regional Ensemble Prediction System (REPS) M. Charron1, R. Frenette2, X. Li3, M. K. (Peter) Yau3 1. Recherche en prévision numérique atmosphérique 2. National Laboratory for Severe Weather

More information

Proceedings, International Snow Science Workshop, Banff, 2014

Proceedings, International Snow Science Workshop, Banff, 2014 SIMULATION OF THE ALPINE SNOWPACK USING METEOROLOGICAL FIELDS FROM A NON- HYDROSTATIC WEATHER FORECAST MODEL V. Vionnet 1, I. Etchevers 1, L. Auger 2, A. Colomb 3, L. Pfitzner 3, M. Lafaysse 1 and S. Morin

More information

METinfo Verification of Operational Weather Prediction Models December 2017 to February 2018 Mariken Homleid and Frank Thomas Tveter

METinfo Verification of Operational Weather Prediction Models December 2017 to February 2018 Mariken Homleid and Frank Thomas Tveter METinfo No. /8 ISSN 89-79X Meteorology Verification of Operational Weather Prediction Models December 7 to February 8 Mariken Homleid and Frank Thomas Tveter Photo: Jan Erik Haugen Contents Introduction

More information

METinfo Verification of Operational Weather Prediction Models June to August 2017 Mariken Homleid and Frank Thomas Tveter

METinfo Verification of Operational Weather Prediction Models June to August 2017 Mariken Homleid and Frank Thomas Tveter METinfo No. /7 ISSN 89-79X Meteorology Verification of Operational Weather Prediction Models June to August 7 Mariken Homleid and Frank Thomas Tveter Contents Introduction Models..............................................

More information

Application and verification of ECMWF products 2017

Application and verification of ECMWF products 2017 Application and verification of ECMWF products 2017 Slovenian Environment Agency ARSO; A. Hrabar, J. Jerman, V. Hladnik 1. Summary of major highlights We started to validate some ECMWF parameters and other

More information

Technical Report on the Global Data Processing and Forecast System MAROC-METEO 2006 status

Technical Report on the Global Data Processing and Forecast System MAROC-METEO 2006 status Technical Report on the Global Data Processing and Forecast System MAROC-METEO 2006 status 1. Equipment in use at the centre - Information commutators on GTS are the TRANSMET computers (2servers, operating

More information

Seasonal Forecast for the area of the east Mediterranean, Products and Perspectives

Seasonal Forecast for the area of the east Mediterranean, Products and Perspectives Seasonal Forecast for the area of the east Mediterranean, Products and Perspectives Dr Kleanthis Nicolaides Senior Meteorological Officer Department of Meteorology The need for weather forecasts from where

More information

Overview of LACE data assimilation systems (with a certain regard) Contributions from many DA colleagues

Overview of LACE data assimilation systems (with a certain regard) Contributions from many DA colleagues Overview of LACE data assimilation systems (with a certain regard) Contributions from many DA colleagues Outline Data Assimilation in the ALADIN system LACE DA history The key elements of successful implementations

More information

Meteo-France operational land surface analysis for NWP: current status and perspectives

Meteo-France operational land surface analysis for NWP: current status and perspectives Meteo-France operational land surface analysis for NWP: current status and perspectives Camille Birman, Jean-François Mahfouf, Yann Seity, Eric Bazile, Françoise Taillefer, Zied Sassi, Nadia Fourrié, Vincent

More information

Application and verification of ECMWF products in Croatia - July 2007

Application and verification of ECMWF products in Croatia - July 2007 Application and verification of ECMWF products in Croatia - July 2007 By Lovro Kalin, Zoran Vakula and Josip Juras (Hydrological and Meteorological Service) 1. Summary of major highlights At Croatian Met

More information

Report of WG4 Meeting for COST ES0905 November 2011, Prague, Czech Republic

Report of WG4 Meeting for COST ES0905 November 2011, Prague, Czech Republic November 2011, Prague, Czech Republic COST Action ES0905: Basic Concepts for Convection Parameterisation in Weather Forecast and Climate Models WG4: Physics and Observations Meeting title: WG4: data verifications

More information

The Weather Research and

The Weather Research and The Weather Research and Forecasting (WRF) Model Y.V. Rama Rao India Meteorological Department New Delhi Preamble Weather Prediction an Initial value problem Hence, Earth Observing System (EOS) involving

More information

Improving Snow and Ice Albedo in Climate and NWP Models

Improving Snow and Ice Albedo in Climate and NWP Models Improving Snow and Ice Albedo in Climate and NWP Models Ruth Mottram Arctic and Climate Research Danish Meteorological Institute With Contributions from: Simon Gascoin, Peter Lang Langen, Pia Englyst Nielsen,

More information

OPERA: Operational Programme for the Exchange of Weather Radar Information

OPERA: Operational Programme for the Exchange of Weather Radar Information OPERA: Operational Programme for the Exchange of Weather Radar Information ALADIN-HIRLAM workshop, Toulouse Maud Martet 26-28 April 2016 OPERA: An EUMETNET Project EUMETNET: EIG of 31 European National

More information

LACE Working Group for Physics: Research progress summary from 2003

LACE Working Group for Physics: Research progress summary from 2003 LACE Working Group for Physics: Research progress summary from 2003 Thomas Haiden 17 December 2003 Contents 1 Introduction /Summary.......................................... 1 2 Progress in research topics.......................................

More information

Activities on model error at Météo- France

Activities on model error at Météo- France Activities on model error at Météo- France Philippe Arbogast, Marie Boisserie (CNRM-GAME, Toulouse) With contributions by I. Beau, H. Douville, F. Bouyssel, CH. Lac, D. Ricard, Y. Seity, R. Honnert, L.

More information

SPECIAL PROJECT PROGRESS REPORT

SPECIAL PROJECT PROGRESS REPORT SPECIAL PROJECT PROGRESS REPORT Progress Reports should be 2 to 10 pages in length, depending on importance of the project. All the following mandatory information needs to be provided. Reporting year

More information

State of the art of wind forecasting and planned improvements for NWP Helmut Frank (DWD), Malte Mülller (met.no), Clive Wilson (UKMO)

State of the art of wind forecasting and planned improvements for NWP Helmut Frank (DWD), Malte Mülller (met.no), Clive Wilson (UKMO) State of the art of wind forecasting and planned improvements for NWP Helmut Frank (DWD), Malte Mülller (met.no), Clive Wilson (UKMO) thanks to S. Bauernschubert, U. Blahak, S. Declair, A. Röpnack, C.

More information

HARMONIE at KNMI and future work HIRLAM-ALADIN meeting April 2013 Reyjavik, Iceland

HARMONIE at KNMI and future work HIRLAM-ALADIN meeting April 2013 Reyjavik, Iceland HARMONIE at KNMI and future work HIRLAM-ALADIN meeting 15-18 April 2013 Reyjavik, Iceland Jan Barkmeijer KNMI OUTLINE Harmonie suites at KNMI Experiences with new observation sets Projects with Harmonie

More information

Consortium for Small- Scale Modelling

Consortium for Small- Scale Modelling Consortium for Small- Scale Modelling Michał Ziemiański 37 th EWGLAM and 22 nd SRNWP meeting 5 October 2015, Belgrade COSMO Governance: General: New COSMO Science Plan was approved by the STC in March

More information

Application and verification of the ECMWF products Report 2007

Application and verification of the ECMWF products Report 2007 Application and verification of the ECMWF products Report 2007 National Meteorological Administration Romania 1. Summary of major highlights The medium range forecast activity within the National Meteorological

More information

THE OFFLINE VERSION OF SURFEX COUPLED TO THE

THE OFFLINE VERSION OF SURFEX COUPLED TO THE SURFEX@RMI THE OFFLINE VERSION OF SURFEX COUPLED TO THE OPERATIONAL ALADIN FORECAST OVER BELGIUM: A TOOL TO IMPROVE WINTER SCREEN TEMPERATURE Royal Meteorological Institute, Brussels, Belgium Corresponding

More information

How to shape future met-services: a seamless perspective

How to shape future met-services: a seamless perspective How to shape future met-services: a seamless perspective Paolo Ruti, Chief World Weather Research Division Sarah Jones, Chair Scientific Steering Committee Improving the skill big resources ECMWF s forecast

More information

Parameterization of Lakes in Numerical Weather Prediction models

Parameterization of Lakes in Numerical Weather Prediction models Parameterization of Lakes in Numerical Weather Prediction models Dmitri Mironov, Laura Rontu, Ekaterina Kurzeneva & 26 participants of the Lake12 workshop SRNWP-EWGLAM meeting Helsinki 8-11 October 2012

More information

I&CLC2000 in support to new policy initiatives (INSPIRE, GMES,..)

I&CLC2000 in support to new policy initiatives (INSPIRE, GMES,..) I&CLC2000 in support to new policy initiatives (INSPIRE, GMES,..) Manfred Grasserbauer, Director Joint Research Centre Institute for Environment and Sustainability 1 IMAGE 2000 European mosaic of satellite

More information

Impact of an improved Backgrund-error covariance matrix with AROME 3Dvar system over Tunisia

Impact of an improved Backgrund-error covariance matrix with AROME 3Dvar system over Tunisia Institut National de la Météorologie Joint 28th ALADIN Workshop & HIRLAM All Staff Meeting Impact of an improved Backgrund-error covariance matrix with AROME 3Dvar system over Tunisia Wafa KHALFAOUI *,

More information

Application and verification of ECMWF products 2016

Application and verification of ECMWF products 2016 Application and verification of ECMWF products 2016 Meteorological and Hydrological Service of Croatia Lovro Kalin and Zoran Vakula 1. Summary of major highlights At Meteorological and Hydrological Service

More information

The convection-permitting COSMO-DE-EPS and PEPS at DWD

The convection-permitting COSMO-DE-EPS and PEPS at DWD Deutscher Wetterdienst The convection-permitting COSMO-DE-EPS and PEPS at DWD Detlev Majewski based on Chr. Gebhardt, S. Theis, M. Paulat, M. Buchhold and M. Denhard Deutscher Wetterdienst The model COSMO-DE

More information

Regional Production, Quarterly report on the daily analyses and forecasts activities, and verification of the CHIMERE performances

Regional Production, Quarterly report on the daily analyses and forecasts activities, and verification of the CHIMERE performances ECMWF COPERNICUS REPORT Copernicus Atmosphere Monitoring Service Regional Production, Quarterly report on the daily analyses and forecasts activities, and verification of the CHIMERE performances September

More information

Predictability of precipitation determined by convection-permitting ensemble modeling

Predictability of precipitation determined by convection-permitting ensemble modeling Predictability of precipitation determined by convection-permitting ensemble modeling Christian Keil and George C.Craig Meteorologisches Institut, Ludwig-Maximilians-Universität, München Motivation 1.Predictability,

More information

About E-GVAP and the collaboration between geodesy and meteorology

About E-GVAP and the collaboration between geodesy and meteorology EIG EUMETNET GNSS Water Vapour Programme E-GVAP About E-GVAP and the collaboration between geodesy and meteorology Henrik Vedel, hev@dmi.dk, DMI and E-GVAP team Siebren de Haan, siebren.de.haan@knmi.nl

More information

Representing model uncertainty using multi-parametrisation methods

Representing model uncertainty using multi-parametrisation methods Representing model uncertainty using multi-parametrisation methods L.Descamps C.Labadie, A.Joly and E.Bazile CNRM/GMAP/RECYF 2/17 Outline Representation of model uncertainty in EPS The multi-parametrisation

More information

2014 HIGHLIGHTS. SHC Task 46 is a five-year collaborative project with the IEA SolarPACES Programme and the IEA Photovoltaic Power Systems Programme.

2014 HIGHLIGHTS. SHC Task 46 is a five-year collaborative project with the IEA SolarPACES Programme and the IEA Photovoltaic Power Systems Programme. 2014 HIGHLIGHTS SHC Solar Resource Assessment and Forecasting THE ISSUE Knowledge of solar energy resources is critical when designing, building and operating successful solar water heating systems, concentrating

More information

Application and verification of ECMWF products 2012

Application and verification of ECMWF products 2012 Application and verification of ECMWF products 2012 National Meteorological Administration 1. Summary of major highlights The objective verification of all deterministic models forecasts in use have been

More information

Data assimilation in mesoscale modeling and numerical weather prediction Nils Gustafsson

Data assimilation in mesoscale modeling and numerical weather prediction Nils Gustafsson Data assimilation in mesoscale modeling and numerical weather prediction Nils Gustafsson Croatian USA Workshop on Mesometeorology June 2012 Perspective: What are the important issues for development of

More information

Operations Portugal (second half of 2010)

Operations Portugal (second half of 2010) Operations Portugal (second half of 2010) In the second half of 2010, important changes happened in the operational procedures, the main event being the operationalization of AROME for Madeira archipelago

More information

COntinuous Mesoscale Ensemble Prediction DMI. Henrik Feddersen, Xiaohua Yang, Kai Sattler, Bent Hansen Sass

COntinuous Mesoscale Ensemble Prediction DMI. Henrik Feddersen, Xiaohua Yang, Kai Sattler, Bent Hansen Sass COntinuous Mesoscale Ensemble Prediction System @ DMI Henrik Feddersen, Xiaohua Yang, Kai Sattler, Bent Hansen Sass Why short-range ensemble forecasting? Quantify uncertainty Precipitation Cloud cover

More information

OGC Meteorology and Oceanography Domain Working Group progress report

OGC Meteorology and Oceanography Domain Working Group progress report OGC Meteorology and Oceanography Domain Working Group progress report 2 nd Workshop on the use of GIS/OGC standards in meteorology Marie-Françoise Voidrot-Martinez, Chris Little Co-chairs OGC Met Ocean

More information

Simulation of heavy precipitation events with the COSMO model

Simulation of heavy precipitation events with the COSMO model LM User Seminar, 6 March 2007, Langen Federal Department of Home Affairs FDHA Federal Office of Meteorology and Climatology MeteoSwiss Simulation of heavy precipitation events with the COSMO model Silke

More information

Model verification and tools. C. Zingerle ZAMG

Model verification and tools. C. Zingerle ZAMG Model verification and tools C. Zingerle ZAMG Why verify? The three most important reasons to verify forecasts are: to monitor forecast quality - how accurate are the forecasts and are they improving over

More information

An Eye in the Sky EUMETSAT. Monitoring Weather, Climate and the Environment

An Eye in the Sky EUMETSAT. Monitoring Weather, Climate and the Environment An Eye in the Sky EUMETSAT Monitoring Weather, Climate and the Environment Slide: 1 Hazardous Weather Slide: 2 Hazardous Weather Slide: 3 Natural Disasters set off by severe weather Slide: 4 EUMETSAT Objectives...

More information

Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the ENSEMBLE performances

Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the ENSEMBLE performances Regional Production Quarterly report on the daily analyses and forecasts activities, and verification of the ENSEMBLE performances December 2015 January 2016 February 2016 Issued by: METEO-FRANCE Date:

More information

LATE REQUEST FOR A SPECIAL PROJECT

LATE REQUEST FOR A SPECIAL PROJECT LATE REQUEST FOR A SPECIAL PROJECT 2016 2018 MEMBER STATE: Italy Principal Investigator 1 : Affiliation: Address: E-mail: Other researchers: Project Title: Valerio Capecchi LaMMA Consortium - Environmental

More information

CNRM modelling strategy for MF NWP models

CNRM modelling strategy for MF NWP models CNRM modelling strategy for MF NWP models F. Bouttier and collaborators (CNRM/GMAP, CNRM/GMME, CNRM/GMGEC) Sept 2008 Aims and high-level constraints: scope for synergies MF's strategy for NWP models Examples

More information

Changes in the Arpège 4D-VAR and LAM 3D-VAR. C. Fischer With contributions by P. Brousseau, G. Kerdraon, J.-F. Mahfouf, T.

Changes in the Arpège 4D-VAR and LAM 3D-VAR. C. Fischer With contributions by P. Brousseau, G. Kerdraon, J.-F. Mahfouf, T. Changes in the Arpège 4D-VAR and LAM 3D-VAR C. Fischer With contributions by P. Brousseau, G. Kerdraon, J.-F. Mahfouf, T. Montmerle Content Arpège 4D-VAR Arome-France Other applications: Aladin Overseas,

More information

METinfo Verification of Operational Weather Prediction Models September to November 2016 Mariken Homleid and Frank Thomas Tveter

METinfo Verification of Operational Weather Prediction Models September to November 2016 Mariken Homleid and Frank Thomas Tveter METinfo No. /6 ISSN 89-79X Meteorology Verification of Operational Weather Prediction Models September to November 6 Mariken Homleid and Frank Thomas Tveter Photo: Jan Erik Haugen Contents Introduction

More information

EuroGeoSurveys & ASGMI The Geological Surveys of Europe and IberoAmerica

EuroGeoSurveys & ASGMI The Geological Surveys of Europe and IberoAmerica EuroGeoSurveys & ASGMI The Geological Surveys of Europe and IberoAmerica Geological Surveys, what role? Legal mandate for data & information: Research Collection Management Interpretation/transformation

More information

Investigating the urban climate characteristics of two Hungarian cities with SURFEX/TEB land surface model

Investigating the urban climate characteristics of two Hungarian cities with SURFEX/TEB land surface model Investigating the urban climate characteristics of two Hungarian cities with SURFEX/TEB land surface model Gabriella Zsebeházi Gabriella Zsebeházi and Gabriella Szépszó Hungarian Meteorological Service,

More information

Latest developments and performances in ARPEGE and ALADIN-France

Latest developments and performances in ARPEGE and ALADIN-France Latest developments and performances in ARPEGE and ALADIN-France François Bouyssel ( and many contributors ) CNRM-GAME, Météo-France 18th ALADIN / HIRLAM Workshop, Bruxelles, 7-10 April 2008 Plan Recent

More information