2 Issue : 4 Rev. : Date : 21/9/211 Page 2 CHANGE RECORDS ISSUE DATE CHANGE RECORDS AUTHOR 1 11/2/4 Initial issue. 2 21/2/7 Update according to Optical Vacuum TRB MoM MSG.ASC.SA.MN.2483 P4, 5 : TR ref added P13 : Clarified P18 : Reference to TRS added P19 : Updated wrt TR ref PA2 : TR ref added +Update following MDU-2 integration in place of MDU /6/211 Update according to MSG-3 de-storage and launch campaign specification [AD5] 4 21/9/211 Update to answer ESA/EUM comments of MSG3 IST2 TRB, see MSG.ASC.SA.MN.3227 All rights reserved, 27, Thales Alenia Space K-EN

3 Issue : 4 Rev. : Date : 21/9/211 Page 3 TABLE OF CONTENT 1. ACRONYMS TEST OBJECTIVES TEST REFERENCE TEST REQUIREMENT SHEET TEST PROCEDURES TEST REPORTS APPLICABLE & REFERENCE DOCUMENTS APPLICABLE DOCUMENTS REFERENCE DOCUMENTS TEST ENVIRONMENT AND SATELLITE CONFIGURATION TEST ENVIRONMENT GROUND SUPPORT EQUIPMENT SATELLITE CONFIGURATION SEVIRI CONFIGURATION SEVIRI hardware configuration SEVIRI Operational configuration TEST EVALUATION (INTEGRATION, IST1, IST2) ELECTRICAL INTEGRATION TM/TC CROSS-CHECK IMAGING CHAIN BEHAVIOUR MECHANISM FUNCTIONAL BEHAVIOUR POWER SELECTION DEVICE THERMAL CONTROL LINES SEVIRI OPERATIONAL SEQUENCE LAUNCH LOCKING DEVICE MDU INTEGRATION AND VALIDATION AFTER EXCHANGE (NCR 145) ELECTRICAL INTEGRATION TM / TC CROSS CHECK IMAGING CHAIN BEHAVIOUR IMAGE DATA ANALYSIS (EMC) PU REPAIR AND RE-INTEGRATION (NCR 182) TEST EVALUATION FOLLOWING THE LONG TERM STORAGE (IST2) TM/TC CROSS-CHECK LAUNCH LOCKING DEVICE THERMAL CONTROL LINES POWER SELECTION DEVICE SEVIRI OPERATIONAL SEQUENCE All rights reserved, 27, Thales Alenia Space K-EN

4 Issue : 4 Rev. : Date : 21/9/211 Page IMAGE DATA ANALYSIS (EMC) CONCLUSION TESTS PERFORMED UP TO THE LONG TERM STORAGE CONCLUSION FOR THE TESTS PERFORMED DURING THE DE-STORAGE CAMPAIGN APPENDIX 1.1 : SEVIRI ELECTRICAL AND FUNCTIONAL TEST SUMMARY (TESTS PERFORMED UP TO THE LONG TERM STORAGE)... 1 APPENDIX 1.2: SEVIRI ELECTRICAL AND FUNCTIONAL TEST SUMMARY (TESTS PERFORMED DURING THE DE-STORAGE TEST CAMPAIGN)... 3 APPENDIX 2 : SEVIRI IMAGE DATA SETTING & PROCESSED FILES... 5 TELECOMMAND EFFECT BETWEEN SETTINGS #2 AND #4 ON NOMINAL... 8 APPENDIX 3.1 : GLOBAL TEST DEFINITION AND RESULTS (TESTS PERFORMED UP TO THE LONG TERM STORAGE)... 1 APPENDIX 3.2: GLOBAL TEST DEFINITION AND RESULTS (TESTS PERFORMED DURING THE DE-STORAGE TEST CAMPAIGN) APPENDIX 4 : MECHANISM TEST FRAME DEFINITION All rights reserved, 27, Thales Alenia Space K-EN

5 Issue : 4 Rev. : Date : 21/9/211 Page 5 1. ACRONYMS ACR CALU CDMU CTS DHSS EMC EPS FA FCU LLD MCP MDU NCR OBDH PSD PU REM RCC RTS RTU SEVIRI S/C SOL AIT Change Request Calibration Unit Central Data Management unit Clear To Send Data Handling Sub-System ElectroMagnetic Compatibility Electrical Power Sub-System Fiche d anomalie (Internal NCR) Functional Control Unit Launch Locking Device Mission Communication Payload Main Detection Unit Non Conformance Report On Board Data Handling Power Selection Device Preamplifier Unit Refocusing Mechanism Remote Control Core Ready to send Remote Terminal Unit Spinning Enhanced Visible and InfraRed Imager Spacecraft Start Of Line All rights reserved, 27, Thales Alenia Space K-EN

6 Issue : 4 Rev. : Date : 21/9/211 Page 6 2. TEST OBJECTIVES This evaluation report presents a synthesis of test results obtained at satellite level: during the SEVIRI FM3 integration and the electrical & functional tests throughout the overall satellite FM3 test sequence before the Short Term Storage, refer to chapter 6, MDU FM3 exchange by FM2 and integration (NCR 145), refer to chapter 7, PU repair and re-integration (NCR 182), refer to chapter 8, during the electrical & functional tests throughout the overall satellite FM3 de-storage sequence after the long term storage, refer to chapter 9. The purpose of these tests performed at S/C level is : to validate the SEVIRI electrical functions / operations, as well as the image data transmission at satellite level to monitor the good health of the instrument All rights reserved, 27, Thales Alenia Space K-EN

7 Issue : 4 Rev. : Date : 21/9/211 Page 7 3. TEST REFERENCE This test campaign is based on the requirements established in SEVIRI electrical and functional Test Requirement Sheet (AD1). This document is the baseline for defining the associated test plan and test procedures which reflect the requirements, establish the feasibility of the request and integrate also specific AIT constraints TEST REQUIREMENT SHEET SEVIRI FM3 integration and electrical & functional tests throughout the overall satellite FM3 test sequence before the Short Term Storage. TRS Title Related procedure SEVELEC 1 SEVIRI integration test : isolation and continuity MI1 SEVELEC 2 SEVIRI integration test : critical SEVIRI signal I/F N/A for FM SEVELEC 3 TM/TC cross-check MI2 SEVELEC 4 Configuration and operational mode behaviour (*) SEVELEC 5 Launch locking device (LLD) MI17 SEVELEC 6 Scan motion behaviour MI12 SEVELEC 7 Refocusing mechanism behaviour MI12 SEVELEC 8 Calibration unit behaviour MI12 SEVELEC 9 Thermal control lines MI14 SEVELEC 1 Power selection device MI13 SEVELEC 11 Protocol, auxiliary data transfer, S/L-band Xcheck MI3 SEVELEC 12 Science data transfer MI3 SEVELEC 13 Image parameters behaviour MI3 SEVELEC 14 SEVIRI flight operational sequence MI15 SEVELEC 15 SEVIRI backup function (=DH12) MS9 SEVELEC 16 Temperature monitoring (=DH16) MS12 SEVELEC 17 SEVIRI good health monitoring (=DH22) (**) Table 3.1 All rights reserved, 27, Thales Alenia Space K-EN

8 Issue : 4 Rev. : Date : 21/9/211 Page 8 (*) SEVELEC4 is covered by proper execution of the other tests, mainly SEVELEC3/6-9/14: refer to TRR for FM1 complementary IST (MSG-ASC-SA-MN-1542 dated 25/11/99) (**) SEVELEC17/DH22 have been covered during DHSW independent software validation process (see SVVP/AT ref: MSG.ASC.SA.CM.716). MDU FM3 exchange by FM2 and integration (NCR 145) TRS Title Related procedure SEVELEC 3 TM/TC cross-check MI2 SEVELEC 11 Protocol, auxiliary data transfer, S/L-band Xcheck MI3 SEVELEC 12 Science data transfer MI3 SEVELEC 13 Image parameters behaviour MI3 Table 3.2 PU repair and re-integration (NCR 182) TRS Title Related procedure SEVELEC 3 TM/TC cross-check MI2 SEVELEC 11 Protocol, auxiliary data transfer, S/L-band Xcheck MI3 SEVELEC 12 Science data transfer MI3 SEVELEC 13 Image parameters behaviour MI3 Table 3.3 Satellite FM3 de-storage sequence The following list summarises the different tests to be performed in the frame of the MSG-3 de-storage campaign according to AD5. TRS Title Related procedure SEVELEC 3 TM/TC cross-check MI2 SEVELEC 5 Launch locking device (LLD) MI17 SEVELEC 9 Thermal control lines MI14 SEVELEC 1 Power selection device MI13 SEVELEC 14 SEVIRI flight operational sequence MI15 Table 3.4 All rights reserved, 27, Thales Alenia Space K-EN

9 Issue : 4 Rev. : Date : 21/9/211 Page TEST PROCEDURES SEVIRI FM3 integration and electrical & functional tests throughout the overall satellite FM3 test sequence before the Short Term Storage. Procedure Title Document reference Related TR MI 1 Integration MSG.ASC.SA.TP.117 FM3.53 MI 2 TM/TC cross-check MSG.ASC.SA.TP.118 FM3.54 FM3.122 MI 3 Image data MSG.ASC.SA.TP.119 FM3.55 MI 12 Mechanical actuation test MSG.ASC.SA.TP.121 FM3.111 MI 13 PSD test MSG.ASC.SA.TP.122 FM3.16 FM3.225 FM3.324 MI 14 Heater test MSG.ASC.SA.TP.123 FM3.126 FM3.44 MI 15 Global test MSG.ASC.SA.TP.124 FM3.112 FM3.439 MI 17 LLD test MSG.ASC.SA.TP.131 FM3.86 FM3.224 FM3.34 FM MS 9 SEVIRI backup function MSG.ASC.SA.TP.849 FM3.447 MS 12 Payload Off mode test MSG.ASC.SA.TP.852 FM3.456 Table 3.5 MDU re-integration. Procedure Title Document reference Related TR MI 1 Integration : MDU only MSG.ASC.SA.TP.117 FM3.618 MI 2 TM/TC cross-check MSG.ASC.SA.TP.118 FM3.617 MI 3 Image data MSG.ASC.SA.TP.119 FM3.616 MS 38 EMC MSG.ASC.SA.TP.121 FM3.667 Table 3.6 OW26 (LLD release in Redundant side) closure before LTS All rights reserved, 27, Thales Alenia Space K-EN

10 Issue : 4 Rev. : Date : 21/9/211 Page 1 PU repair and re-integration (NCR 182) Procedure Title Document reference Related TR MI 2 TM/TC cross-check MSG.ASC.SA.TP.118 FM3.736 MI3 Image data MSG.ASC.SA.TP.119 FM3.737 Table 3.7 Satellite FM3 de-storage sequence Procedure Title Document reference Related TR MI 2 TM/TC cross-check MSG.ASC.SA.TP.118 FM3.822 MS 38 Image Data analysis (EMC) MSG.ASC.SA.TP.121 FM3.14 MI 13 PSD test MSG.ASC.SA.TP.122 FM3.834 MI 14 Thermal control lines MSG.ASC.SA.TP.123 FM3.835 FM3.924 MI 15 Global test MSG.ASC.SA.TP.124 FM3.837 MI 17 LLD test MSG.ASC.SA.TP.131 FM3.836 FM3.85 Table 3.8 All rights reserved, 27, Thales Alenia Space K-EN

11 Issue : 4 Rev. : Date : 21/9/211 Page TEST REPORTS SEVIRI FM3 integration and electrical & functional tests throughout the overall satellite FM3 test sequence before the Short Term Storage. Test report Title AIT phase Related TER FM3.53 Isolation and continuity Integration Here 6.1 FM3.54 TM/TC Xcheck Integration Here 6.2 FM3.122 TM/TC Xcheck re-test Integration Here 6.2 FM3.55 Image data validation Integration Here 6.3 FM3.86 Unlock SCAN with LLD activation IST1 Here 6.8 FM3.16 PSD test IST1 Here 6.5 FM3.111 Mechanical actuation IST1 Here 6.4 FM3.112 Global test IST1 Here 6.7 FM3.126 Heater test IST1 Here 6.6 FM3.224 LLD Locking for vibrations Vibrations Here 6.8 FM3.225 PSD selection for Vibrations Vibrations Here 6.5 FM3.324 PSD selection after Vibrations Vibrations Here 6.5 FM3.34 LLD Release after Vibrations Vibrations Here 6.8 FM3.439 Global test IST2 Here 6.7 FM3.44 Heater test IST2 Here 6.6 FM3.447 Backup function test IST2 (*) FM3.456 Payload Off mode test IST2 (*) FM3.755 LLD Locking / Release STO Refer to 6.8 (*) Refer to TER DHSS FM3 IST2 MSG.ASC.SA.RP.1736 MDU-2 re-integration Table 3.9 Test report Title AIT phase Related TER FM3.618 Isolation and continuity : MDU only Integration FM3.617 TM/TC Xcheck : MDU only Integration FM3.616 Image data validation Integration FM3.667 Reference test / EMC Integration Here Chapter 7 Table 3.1 All rights reserved, 27, Thales Alenia Space K-EN

12 Issue : 4 Rev. : Date : 21/9/211 Page 12 PU repair and re-integration (NCR 182) Test report Title AIT phase Related TER FM3.618 Isolation and continuity : MDU only Integration FM3.617 TM/TC Xcheck : MDU only Integration FM3.616 Image data validation Integration FM3.667 Reference test / EMC Integration Here Chapter 8 Table 3.11 Satellite FM3 de-storage sequence Test report Title AIT phase Related TER FM3.822 TM/TC cross-check (SEVELEC 3) FFT2 Here section 9.1 FM3.836 LLD (SEVELEC 5) FFT2 Here section 9.2 FM3.85 FM3.835 Thermal control lines (SEVELEC 9) FFT2 Here section 9.3 FM FM3.834 PSD test (SEVELEC 1) FFT2 Here section 9.4 FM3.837 SEVIRI global mechanism test (SEVELEC 14) FFT2 Here section 9.5 FM3.14 Image data analysis (EMC) FFT2 Here section 9.6 Table 3.12 All rights reserved, 27, Thales Alenia Space K-EN

13 Issue : 4 Rev. : Date : 21/9/211 Page APPLICABLE & REFERENCE DOCUMENTS 4.1. APPLICABLE DOCUMENTS AD1: SEVIRI electrical and functional test requirement sheet (TRS) MSG.ASC.SA.RS.963 Issue 2 AD2: SEVIRI requirement specification MSG.ASC.SE.RS.29 Issue 3 rev. A AD3: General design and construction requirements MSG.ASC.SA.RS.21 Issue 3 rev. B AD4: EMC/ESD specification MSG.ASC.SA.RS.22 Issue 5 rev. A AD5: MSG-3 de-storage and launch campaign specification MSG.ASC.SA.SP.2144 Issue REFERENCE DOCUMENTS [R1] [R2] [R3] [R4] [R5] [R6] [R7] SEVIRI Flight Operational Manual & operational procedure MSG.ASC.SA.MA.1264 Science data protocol specification MSG.ASC.SA.IF.368 DHSS test requirement sheet MSG.ASC.SA.SP.714 MSG critical signal verification test MSG.ASC.SA.SP.911 MSG standard electrical equipment integration test MSG.ASC.SA.SP.878 SEVIRI back-up function URD MSG.ASC.SU.RS.376 SEVIRI / DHSS science data compatibility test data package MSG.ASC.SE.TN.864 All rights reserved, 27, Thales Alenia Space K-EN

14 Issue : 4 Rev. : Date : 21/9/211 Page TEST ENVIRONMENT AND SATELLITE CONFIGURATION 5.1. TEST ENVIRONMENT The guideline for test definition was to propose some tests which do not require specific environment (darkness, temperature stability...) especially for detection chain (IR PC detectors). Therefore all the tests were performed at ambient temperature and in clean room (class 1 ) GROUND SUPPORT EQUIPMENT The OGSE was not necessary for the following tests. The EGSE was used for TM/TC exchange. Science data storage device and interpretation work station were used SATELLITE CONFIGURATION The following subsystems were already electrically & mechanically integrated in spacecraft: EPS (Electrical Power Subsystem) DHSS (Data Handling SubSystem) AOCS (Attitude and Orbit Control Subsystem). For these SEVIRI tests, the AOCS subsystem was requested in order to provide SOL signal SEVIRI CONFIGURATION SEVIRI hardware configuration SEVIRI was mounted on MSG platform. Relevant SEVIRI harness (Bashar, Systhar) have been integrated on S/C. Baffle and cooler covers were in place SEVIRI Operational configuration At S/C level SEVIRI has been operated in the different modes defined in SEVIRI specification. Different repeat cycles (including the baseline repeat cycle) have been used during the following tests in order to achieve the purpose of each test. All rights reserved, 27, Thales Alenia Space K-EN

15 Issue : 4 Rev. : Date : 21/9/211 Page TEST EVALUATION (INTEGRATION, IST1, IST2) ELECTRICAL INTEGRATION Test purpose The objectives of this test are to perform and validate the electrical integration of the SEVIRI units FCU, MDU, PU, brackets (FCPA & TSA) and associated harness (Systhar & Bashar). It corresponds to SEVELEC 1. FM3 test sequence The test has been realised according to the procedure MI1 in June 23. Verification of electrical integration, isolation and continuity has been performed according to MSG standard for electrical equipment ([R5] : TRS EEI1 & EEI2). Test name Pin allocation verification Continuity (between equipments and PCU star point) Heater & thermistance line resistance MDU/PU power line continuity Insulation (FCU/MDU pin wrt S/C star ground point) SYSTHAR/BASHAR connection MDU secondary power lines Sunshield/TSA/FPCA brackets connection Status NC2498 -> Table 6.1 Anomalies/out of specification The following anomaly has been raised during this test. NC 2498 : H61 J1 to J4 connectors not fixed on separation bracket when Main Platform was delivered from Manufacturing For MSG-3, Harness Unit 1 was for the first time delivered early enough to be assembled on Main Platform along with Harness Unit 3 and Harness Unit 4. Manufacturing department didn't apply completely CASA procedure for Harness Unit 1. For FM3, connections have been performed in the frame of the MI1. All rights reserved, 27, Thales Alenia Space K-EN

16 Issue : 4 Rev. : Date : 21/9/211 Page 16 Result synthesis All test results are detailed in test report MSG.TR.FM3.53 and are within success criteria. TRS/test procedure/software update Corrective action for FM4 towards manufacturing department has been taken to update the procedure for Harness Unit 1. Conclusion Electrical integration was performed successfully and SEVIRI was able to be operated. All rights reserved, 27, Thales Alenia Space K-EN

17 Issue : 4 Rev. : Date : 21/9/211 Page TM/TC CROSS-CHECK Test purpose The objective of this test was to cross-check all SEVIRI TM/TC types: analog (ANA & TH), AS16, DS16 multiplexed TM/TC. All these TM/TC are delivered through OBDH bus. This test shall be considered in two different ways: 1. to check the correct behaviour of all electrical TM/TC paths 2. to verify the addressing of TM/TC. This test fulfils the test requirement sheet SEVELEC 3. FM3 test sequence The test has been performed according to the procedure MI2 in July 23, with complementary test performed in September 23. Test sequence has been executed in order to check all the electrical paths of telecommand and telemetry and to verify correct TM/TC address. The following table provides a summary of the tests performed: DHSS FCU MDU/PU Test name N R N R N R Result file Final status Direct Nom Direct Red Sensor Nom NC2537 -> Sensor Red Heater Nom Heater Red Mechanism Nom Mechanism Red Various Nom Various Red NC2543 -> I/F FCU/MDU Nom NC2542 -> I/F FCU/MDU Red Monitoring Nom Monitoring Red Detection Nom Detection Red T a b l e 6. 2 All rights reserved, 27, Thales Alenia Space K-EN

18 Issue : 4 Rev. : Date : 21/9/211 Page 18 Anomalies/out of specification The following anomalies have been raised during these tests. NC 2537 : Incorrect value for TMs S1751K & S1761K The anomaly was due to an incorrect configuration of BB sensors relays during the Xcheck. As defined in the SEVIRI ADP, all relays should have been opened. Then, a re-test with a normal configuration has been done & showed that the TM and its related TC worked properly. NC 2542 : FCU Voltage S1975V out of Xcheck limit. This TM corresponds to a test value, of no use in orbit. The monitored value is equal to the value obtained at instrument level on FM3 (4.58 V). No anomaly, Xcheck enlarged accordingly. NC 2543 : Incorrect measured value for parameters S1677Z The anomaly was due to an incorrect configuration during test. It has been shown during the global test (MI15) that this TM and its associated TC worked properly on redundant sides of the FCU. Result synthesis All MI2 test results are included in test report ref MSG.TR.FM3.54 and re-test for NC 2537 in MSG.TR.FM Correct execution of TC & correct TM data demonstrate the two different purposes of this test : to check the correct commandability in accordance with Spacecraft TC list. to check the correct observability in accordance with Spacecraft TM list. TRS/test procedure/software update Anomalies raised during this test sequence led to : an update of the instrument test procedure before delivery in order to correct the actual SEVIRI relays configuration * Modules (optimisation in duration) Conclusion All hardware paths have been checked successfully. A limited number of TM/TC has been validated through this IST1 test. Nevertheless all SEVIRI TM/TC will be checked through all SEVIRI functional test except : 535S2M : General reset of MDU : default values 536S2M : Soft reset of MDU : values in RAM preserved 535S2M : Soft reset of MDU : values in RAM preserved + programmable chain configuration reset from RAM values. These TCs allow to reset the MDU after a failure or an unknown state. These TCs have been checked at unit level. And these TCs will be not used at FM S/C level for flight operation. Test has been declared successful. All rights reserved, 27, Thales Alenia Space K-EN

19 Issue : 4 Rev. : Date : 21/9/211 Page IMAGING CHAIN BEHAVIOUR Test purpose The objectives of these tests were divided in three different parts as follows :. a) to verify the Science data protocol. This corresponds to the test required in SEVELEC 11. b) to validate the Science data transfer. This corresponds to the test required in SEVELEC 12. c) to check image parameter behaviour. This corresponds to the test required in SEVELEC 13. FM3 test sequence These tests have been executed according to the procedure MI3 in July 23. The following test sequence has been implemented : S E V IR I in te g r a te d E P S, D H S S, A O C S in te g r a te d S E V E L E C 1 S E V E L E C 2 S E V E L E C 3 p a s s e d C o n f.1 P r o to c o l in itia lis a tio n v a lid a tio n C o n f.1 P ro to c o l v e rific a tio n C o n f.1 to C o n f.2 C o n f.1 Im a g e s e ttin g p a ra m e te rs v e r ific a tio n C o n f.1 Im a g e d a ta v a lid a tio n C o n f.2 P r o to c o l in itia lis a tio n v a lid a tio n C o n f.2 P r o to c o l v e rific a tio n C o n f.2 Im a g e d a ta v a lid a tio n C o n f.2 Im a g e s e ttin g p a r a m e te r s v e rific a tio n Figure 6-1 Test sequence flow chart Anomalies/out of specification None Result synthesis All test results are included in test report ref MSG.TR.FM3.55. It evidences the three different purposes of these tests : All rights reserved, 27, Thales Alenia Space K-EN

20 Issue : 4 Rev. : Date : 21/9/211 Page 2 a) Verification of Science data protocol. The extract of video channel values show the correct behaviour of the Science data protocol in accordance with the specification (ref R2) b) Validation of Science data transfer. The science data transfer is demonstrated through the capability to extract the raw data of each video channel: - existence of 16 image data packets - 15 first packets have a packet length of bytes - last packet has 9196 bytes packet length Nota: Packet length = data field size (in bytes) 1 Data field = data field header (SOL time+filler=8 bytes) + SEVIRI block c) Check of the image parameters behaviour. The check of image parameter has been performed through modification of video bias, offset or gain. It demonstrated the operability of the detection chains. Comparisons between nominal and redundant detection electronics have also been made and demonstrated the similarity of behaviour. TRS/test procedure/software update No TM/TC anomaly occurred during the execution of the test sequence. No update, neither of the procedure nor of the test sequence itself was deemed necessary. Conclusion The overall test was performed with successful results. All rights reserved, 27, Thales Alenia Space K-EN

21 Issue : 4 Rev. : Date : 21/9/211 Page MECHANISM FUNCTIONAL BEHAVIOUR Test purpose The objectives of this test is to verify the commandability and monitoring of : 1. scan mirror motor 2. refocusing mechanism 3. calibration motor. This test corresponds to SEVELEC 6, SEVELEC 7, SEVELEC 8. FM3 test sequence These tests have been performed according to the procedure MI12 in September 23. The following test sequences have been followed. 1. Scan mirror motor : verification of Scanning, retrace & reference motion verification of limit switches behaviour monitoring of Scan position potentiometers. Note: it also includes validation of 2 TC s (reset) not tested at instrument level. 2. Refocusing mechanism : verification of direct, reverse and reference refocusing motion verification of limit switches behaviour. 3. Calu motor : verification of calibration motion task (from storage to calibration position : go & return) monitoring of limit switches. All these tests were performed with different SEVIRI configurations (nominal & redundant). These tasks were performed using FCU mode manager (specific «test frame») and directly through overriding commands. «Test frame» used during IST1 are included in Appendix 4. Anomalies/out of specification The following anomaly has been raised during these test. NC 291 : Limit Switch 3 incorrect status The anomaly was due to an incorrect configuration due to AIT module: Two consecutive TC have been sent for LS3 and LS4, with commanded arguments for respectively LS3 and LS4, but arguments derived from TM for the other LS. Tempo between the 2 TC is not long enough to ensure that when uploading the second TC, the first has already be returned through the TM. The command has been sent twice in order to change the status. No consequence at S/C level. Corrective action (longer tempo) has been implemented in module. Result synthesis All test results are included in test report MSG.TR.FM All rights reserved, 27, Thales Alenia Space K-EN

22 Issue : 4 Rev. : Date : 21/9/211 Page 22 According to this test report, correct execution of TC and correct TM data demonstrate the purposes of these tests : to check the correct behaviour of scan mirror motor to check the correct behaviour of refocusing mechanism to check the correct behaviour of calibration motor. TRS/test procedure/software update None. Conclusion Correct behaviour of mechanism was demonstrated through this test sequence. Tests were declared successful. All rights reserved, 27, Thales Alenia Space K-EN

23 Issue : 4 Rev. : Date : 21/9/211 Page POWER SELECTION DEVICE Test purpose The objective of this test is to check the correct commandability of PSD. It corresponds to test required through SEVELEC 1. FM3 test sequence These tests have been performed according to the procedure MI13 in September 23 and in October 23 for vibrations. Anomalies/out of specification None Result synthesis All test results are included in test report MSG.TR.FM3.16, 225 & 324, showing successful activation in nominal & redundant configuration. TRS/test procedure/software update None Conclusion The correct behaviour of SEVIRI PSD has been demonstrated through this test sequence. Test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

24 Issue : 4 Rev. : Date : 21/9/211 Page THERMAL CONTROL LINES Test purpose The objective of this test is to check the correct behaviour and the performances of SEVIRI thermal control lines. It shall be noted that decontamination lines verification performed through this test is limited to a functional check. Decontamination performances verification is not included in this test. It corresponds to test required through SEVELEC 9. FM3 test sequence The test has been performed according to the procedure MI14 in September 23 and in January 24. The following test sequence has been followed : Test purpose Nominal open loop heater lines Nominal closed loop heater lines Redundant open loop heater lines Redundant closed loop heater lines Anomalies/out of specification None Status Table 6.3 Result synthesis All test results are included in test report MSG.TR.FM3.126 and 44. The two purposes of this test have been fulfilled : a) Verification of switch ON/OFF SEVIRI heater lines b) Validation of heater lines behaviour. This has been check through initial and final heater lines current consumption measurement. TRS/test procedure/software update None Conclusion The correct behaviour of SEVIRI thermal control lines has been demonstrated through this test sequence. Test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

25 Issue : 4 Rev. : Date : 21/9/211 Page SEVIRI OPERATIONAL SEQUENCE Test purpose The objective to this test is to check the correct sequencing of all the SEVIRI functional tasks and validate the flight operational sequence. This test corresponds to SEVELEC 14. FM3 test sequence The test has been performed according to the procedure MI15 during IST1 in September 23 and during IST2 in January 24. It allowed to check the mechanism activations (scan & calibration) in a single frame. See also TER MSG.ASC.SA.RP.1682 for Global Test during Thermal Vacuum. Anomalies/out of specification None Result synthesis All test results are included in test report MSG.TR.FM3.112 (IST1) and 439 (IST2). An extract of a test performed with activation of mechanisms (scan and calibration) and functionalities (HRV image break, retrace profile) is presented in Appendix 3 and illustrates the good operability of the instrument within the satellite. TRS/test procedure/software update None Conclusion The correct functional behaviour of SEVIRI has been checked through this test, with activation of all mechanisms and functionalities, on both nominal and redundant configurations. Test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

26 Issue : 4 Rev. : Date : 21/9/211 Page LAUNCH LOCKING DEVICE Test purpose The objective of this test is to check the correct commandability of LLD. It corresponds to the test required through SEVELEC 5. FM3 test sequence The nominal lock process with LLD clamping has been performed by ASTRIUM during delivery (April 23) and during scan repositioning (May 23). The nominal release process with LLD unclamping has been performed according to procedure MI17 after delivery, integration in August 23. The nominal Locking process with LLD clamping has been performed according to procedure MI17 before vibrations in October 23. The nominal Release process with LLD unclamping has been performed according to procedure MI17 after vibrations. The redundant lock process with LLD clamping was performed through OW26 before long term storage, by playing MI17 procedure. The redundant release process with LLD unclamping was performed according to procedure MI17 right after clamping. Anomalies/out of specification None Result synthesis All test results are included in test report MSG.TR.FM3.86 for IST1, 224 & 34 before and after vibrations, showing successful release after delivery. On redundant side results are in MSG.TR.FM TRS/test procedure/software update None Conclusion The correct behaviour of SEVIRI LLD has been demonstrated through this test sequence and its operability validated by the vibrations. Test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

27 Issue : 4 Rev. : Date : 21/9/211 Page MDU INTEGRATION AND VALIDATION AFTER EXCHANGE (NCR 145) ELECTRICAL INTEGRATION FM3 test sequence The test has been realised according to the procedure MI1 during de-storage in September 25. The objective of this test was to re-perform the electrical integration of the MDU after exchange (following non conformance MSG ASC SA NC 145). Test name MDU / SYSTHAR connection MDU / BASHAR connection Status Anomalies/out of specification None Result synthesis All activities are detailed in test report MSG.TR.FM TRS/test procedure/software update None. Conclusion MDU Electrical integration was performed successfully. All rights reserved, 27, Thales Alenia Space K-EN

28 Issue : 4 Rev. : Date : 21/9/211 Page TM / TC CROSS CHECK FM3 test sequence The test has been performed according to the procedure MI2 during de-storage in September 25. It allowed to cross-check all SEVIRI TM/TC types after MDU exchange. The following table provides a summary of the tests performed. DHSS FCU MDU/PU Test name N R N R N R Final status I/F FCU/MDU Nom [1] I/F FCU/MDU Red [11] Monitoring Nom [21] Monitoring Red [22] Detection Nom [1] Detection Red [8] Anomalies/out of specification None. T a b l e 7. 1 Result synthesis All MI2 test results are included in test report MSG.TR.FM TRS/test procedure/software update None Conclusion All MDU hardware paths have been again checked successfully. Test has been declared successful. All rights reserved, 27, Thales Alenia Space K-EN

29 Issue : 4 Rev. : Date : 21/9/211 Page IMAGING CHAIN BEHAVIOUR FM3 test sequence These tests have been executed according to the procedure MI3 during de-storage in September 25. The objectives of these tests were to verify the Science data protocol, to validate the Science data transfer and to check image parameter behaviour after MDU exchange. Anomalies/out of specification None Result synthesis All test results are included in test report MSG.TR.FM The check of image parameter has been performed through modification of video bias, offset or gain. It demonstrated the operability of the detection chains (refer to tables included in appendix 2). Comparisons between nominal and redundant detection electronics have also been made and demonstrated the similarity of behaviour. TRS/test procedure/software update None. Conclusion The overall test was performed with successful results. Final consolidation of MDU and PU nominal behaviour was obtained during OVT2 in May 211, see the associated Test Evaluation Reports ref. MSG.ASC.SA.RP.2177 MSG-3 radiometric performances Test Evaluation Report. ref. MSG.ASC.SA.RP.2169 MSG-3 geometric performances Test Evaluation Report. All rights reserved, 27, Thales Alenia Space K-EN

30 Issue : 4 Rev. : Date : 21/9/211 Page IMAGE DATA ANALYSIS (EMC) This test has been run according to the procedure MS38 in August 26. All the results are included in test report MSG.TR.FM The objectives of this test (also called "EMC image") was to verify that SEVIRI data are correctly generated / transmitted through the video (at CDMU output) / the RF (at MCP output) links & to check the chains integrity after the storage period. This test has been performed in both converter synchronised and free running modes. The following table summarises the measurement dispersions toward the different acquisition modes before & after storage : Image data test before MSG-3 storage [with MDU-3] March 24 vis6 vis8 ir16 ir87 ir97 ir18 ir12 ir134 HRV CONF : 1 SYNCHRO FREE RUN CONF : 4 SYNCHRO FREE RUN Image data test before MSG-3 long term storage [with MDU-2 after repair] August 26 vis6 vis8 ir16 ir87 ir97 ir18 ir12 ir134 HRV CONF : 1 SYNCHRO FREE RUN CONF : 4 SYNCHRO FREE RUN (<1) (<1) (<3.3) (<7) (<24) (<3.75) (<3.8) (<61) (<2.4) Table 7.2 The measured noise is compliant for all channels w.r.t the specifications. No difference has been observed between the different modes at de-storage. It can be noted that the MDU swap from FM3 to FM2 is as expected due to its interchangeability (no modification of the performances). Meanwhile to the successful EMC results a NCR.ASC.182 / NC12162 has been raised. It appears that after detection chain settings upload 2 NOGO are raised on the IR8.7 bias mirror and detector telemetries on redundant side. However, unsaturated detection chains show that the settings have been applied correctly. After investigation and analysis through several MRB, it has been demonstrated that the anomaly was located within the PU unit (described in NCR.ASC.182). All rights reserved, 27, Thales Alenia Space K-EN

31 Issue : 4 Rev. : Date : 21/9/211 Page 31 Decision to dismount the unit has been taken in April 27. Investigation and repair activities were done in COMDEV premises. According to MSG-ASC-SA-RP-22 (page 3): Investigation and repair activities are described through NCR 182 and ComDev NCR 181 recordings. Unit was returned to TAS premises in October 28. Remounting, connections and validation were performed successfully as described in MSG ASC SA MN 314 and through TR FM3 736/737/739. Final consolidation of PU nominal behaviour was obtained during OVT2 in May 211, see the associated Test Evaluation Report ref. MSG.ASC.SA.RP All rights reserved, 27, Thales Alenia Space K-EN

32 Issue : 4 Rev. : Date : 21/9/211 Page PU REPAIR AND RE-INTEGRATION (NCR 182) Meanwhile to the successful results of the EMC done before short term storage (refer to chapter 6) a NCR 182 / NC12162 has been raised. It appears that after detection chain settings upload 2 NOGO are raised on the IR8.7 bias mirror and detector telemetries on redundant side. However, unsaturated detection chains show that the settings have been applied correctly. After investigation and analysis through several MRB, it has been demonstrated that the anomaly was located within the PU unit (described in NCR 182). Decision to dismount the unit has been taken in April 27. Investigation and repair activities were done in COMDEV premises. Investigation and repair activities are described through NCR 182 and ComDev NCR 181 recordings. Unit was returned to TAS premises in October 28. All activities foreseen as part of NCR 182 have been successfully completed, with no error as stated in MSG ASC SA MN 315. The NCR was kept open until completion of the OVT planned during the de-storage phase as the performances at cold operating temperature will allow full visibility on the good health of the chains. Final consolidation of PU nominal behaviour was obtained during OVT2 in May 211, see the associated Test Evaluation Report ref. MSG.ASC.SA.RP All rights reserved, 27, Thales Alenia Space K-EN

33 Issue : 4 Rev. : Date : 21/9/211 Page TEST EVALUATION FOLLOWING THE LONG TERM STORAGE (IST2) TM/TC CROSS-CHECK FM3 test sequence The test has been performed according to the procedure MI 2 in February 211. Test sequence has been executed in order to check all the electrical paths of telecommand and telemetry and to verify that TM/TC addresses are correct. Anomalies/out of specification One anomaly was raised during these tests. NC : Incorrect measured value for parameters S1924K During tests of Redundant SEVIRI, TM S1924K is measured 185,8 K whereas expected between 83,K and K. The TM remains strictly constant during the test. In the calibration table of the thermistor, 185,8 K corresponds to the raw signal value : it is nominal that at ambient the thermistor TM raw value is. The X-check module being generic for all MSG models, the upper limit (in K) shall be modified to take into account the max engineering value corresponding to raw value, respectively MSG3 : 185,8 K for MSG3, 181,29 K for MSG4. Consequently, the upper limit (in K) was modified with 186 K. This NC is closed. Result synthesis All MI 2 test results are included in the test report ref MSG.TR.FM Correct execution of TC & correct TM data demonstrate the two different purposes of this test : to check the correct commandability in accordance with Spacecraft TC list. to check the correct observability in accordance with Spacecraft TM list. TRS/test procedure/software update None Conclusion All hardware paths were checked successfully. The test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

34 Issue : 4 Rev. : Date : 21/9/211 Page LAUNCH LOCKING DEVICE FM3 test sequence The nominal Release process with LLD unclamping has been performed according to procedure MI17. The nominal Locking process with LLD clamping has been performed according to procedure MI17. Anomalies/out of specification NC 21758: The scan mechanism remained blocked during test after telecommand, because the PSD remained active (parameter S1917X closed) after the stop of MI13 (see NC 21756), played just before MI 17. The AIT module used in procedure MI17 was updated to check before actuating the scan mechanism that PSD is not active. The NC is closed. Result synthesis The test results are included in test report MSG.TR.FM3.836 showing successful release and the test report MSG.TR.FM3.85 showing successful return to the 45 (Launch Locking Position LLP+6). TRS/test procedure/software update None Conclusion The correct behaviour of SEVIRI LLD has been demonstrated through this test sequence. The test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

35 Issue : 4 Rev. : Date : 21/9/211 Page THERMAL CONTROL LINES FM3 test sequence The test was performed according to the procedure MI 14 in February 211(FFT2). The test sequence of MSG-TR-FM3-835 is the following : Test purpose Nominal open loop heater lines Nominal closed loop heater lines Redundant open loop heater lines Redundant closed loop heater lines Status Table 9.1 The test was performed in vacuum at the beginning of the Optical Vacuum Test (OVT2), on 2/5/211: the results are presented in the test report MSG-TR-FM Anomalies/out of specification None Result synthesis All test results are included in test reports MSG.TR.FM3.835 and.924. The two purposes of these tests were fulfilled : c) Verification of SEVIRI heater lines switch ON/OFF d) Validation of heater lines behaviour both in air and vacuum. SEVIRI thermistors health check was verified during OVT#2. This was checked through initial and final current consumption measurements of heater lines. TRS/test procedure/software update None Conclusion The correct behaviour of SEVIRI thermal control lines was demonstrated through this test sequence. The test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

36 Issue : 4 Rev. : Date : 21/9/211 Page POWER SELECTION DEVICE FM3 test sequence This test was performed according to the procedure MI 13 in February 211. Anomalies/out of specification NC 21755: TM S1945 V is higher than the upper limit of module IxxCFCNM: this appeared in FM3 IST 1 ( NC 3137), the monitoring was updated, but not the cross-check file. The corrective implemented action is to raise the voltage limit from.6 V to 1. V. The NC is closed. NC 21756: TM S1676Z in NoGo due to the AIT sequence which was stopped due to an out of limit voltage ( TM S1945 V, see NC 21755). After correction of module IxxCFCNM (for NC 21755), the MI 13 was played again to set the configuration Launch of SEVIRI with PSD activated. No problem of check TM (S1945V) or NOGO (S1676Z) appeared on OCOE monitoring. The NC is in closure. Result synthesis Test purpose Preparation PSD N test PSD R test PSD N and R for other tests Table 9.2 Status All test results are included in test report MSG.TR.FM3.834, showing the successful activation in nominal & redundant configuration. TRS/test procedure/software update None Conclusion The correct behaviour of SEVIRI PSD was demonstrated through this test sequence. The test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

37 Issue : 4 Rev. : Date : 21/9/211 Page SEVIRI OPERATIONAL SEQUENCE FM3 test sequence The test was performed according to the procedure MI15 during FFT2 in February 211. It allowed to check the mechanism activations (scan & calibration) in a single frame. Anomalies/out of specification NC 21777: In MI15 procedure, SEVIRI (successively Nominal then Redundant) passes from Stand-By mode to Configuration Mode. In Configuration Mode, the scan mechanism goes to L1 switch as reference, then to L the image first line, then in several defined positions: the contact on L1 switch is known to have a reproducibility of ± 2 lines. The difference (6 Ohms corresponding to 1 line) observed before/after the activation of the scan mechanism with the redundant SEVIRI is perfectly consistent with the reproducibility of ± 2 lines. It demonstrates that the behaviour of the scan mechanism is quite nominal. As a corrective action, MI15 procedure is modified to define better the success criteria, taking into account the known reproducibility of ± 2 lines of the contact on L1 switch. The NC is in correction (D2). Result synthesis All test results are included in test report MSG.TR.FM An extract of a test performed with activation of mechanisms (scan and calibration) and functionalities (HRV image break, retrace profile) is presented in Appendix 3 and illustrates the good operability of the instrument within the satellite. TRS/test procedure/software update As a corrective action of NC 21777, MI15 procedure is modified to define better the success criteria, observed before/after the activation of the scan mechanism. Conclusion The correct functional behaviour of SEVIRI has been checked through this test, with activation of all mechanisms and functionalities, on both nominal and redundant configurations. The test was declared successful. All rights reserved, 27, Thales Alenia Space K-EN

38 Issue : 4 Rev. : Date : 21/9/211 Page IMAGE DATA ANALYSIS (EMC) This test was run according to the procedure MS38 in July 211. All the results are included in the test report MSG.FM3.TR.14. The objectives of this test (also called "EMC image") are to verify that SEVIRI data are correctly generated / transmitted through the video (at CDMU output) / the RF (at MCP output) links & to check the chains integrity after the storage period. This test was performed in both converter synchronised and free running modes. The following table summarises the measurement dispersions for the different acquisition modes before & after storage : Image data, test before MSG-3 long term storage [with MDU-2 after repair] August 26 VIS.6 VIS.8 IR 1.6 IR 8.7 IR 9.7 IR 1.8 IR 12. IR 13.4 HRV CONF: 1 SYNCHRO FREE RUN CONF: 4 SYNCHRO FREE RUN Image data, test after MSG-3 long term storage [with MDU-2 after repair] July 211 VIS.6 VIS.8 IR 1.6 IR 8.7 IR 9.7 IR 1.8 IR 12. IR 13.4 HRV CONF: 1 SYNCHRO FREE RUN CONF: 4 SYNCHRO FREE RUN Requirement < 1 < 1 < 3.3 < 7 < 24 < 3.75 < 3.8 < 61 < 2.4 Table 9.3 We can see that: The measured noise is compliant for all channels w.r.t the specifications. No difference is observed between the different modes at de-storage. No difference is observed between before and after the long term storage. Final consolidation of PU nominal behaviour was obtained during OVT2 in May 211, see the associated Test Evaluation Report ref. MSG.ASC.SA.RP All rights reserved, 27, Thales Alenia Space K-EN

39 Issue : 4 Rev. : Date : 21/9/211 Page CONCLUSION 1.1. TESTS PERFORMED UP TO THE LONG TERM STORAGE All electrical & functional tests were performed without problem. Few anomalies were identified throughout the overall test campaign. They led to minor procedures & modules updates in order to correct all remaining misunderstanding wrt new team about SEVIRI operability. Most SEVIRI TM/TC were checked through this electrical and functional tests. SEVIRI electrical interfaces were verified and validated. SEVIRI behaviour (operability, configuration, links towards the S/C) was verified and fully validated. Additional testing due to MDU swap and MDU-2 integration was done successfully and the NCR is closed. All activities done in the frame of PU repair and re-integration have been successfully completed, with no error. As the performances at cold operating temperature will allow full visibility on the good health of the chains, the final consolidation of the PU nominal behaviour was obtained during OVT done in the frame of the de-storage phase in May 211. NCR 182 is closed CONCLUSION FOR THE TESTS PERFORMED DURING THE DE-STORAGE CAMPAIGN All electrical & functional tests of [AD5] were performed. Few anomalies were identified throughout the overall test campaign. They led to minor procedures & modules updates available both for MSG-3 and MSG-4. The SEVIRI TM/TC were checked through this test. SEVIRI electrical interfaces were verified and validated. SEVIRI behaviour (operability, configuration, links towards the S/C) was verified and fully validated, thus demonstrating the good health of SEVIRI after the long storage period and the de-storage operations. All rights reserved, 27, Thales Alenia Space K-EN

40 Issue : 4 Rev. : Date : 21/9/211 Page A-1 Appendix 1.1 : SEVIRI ELECTRICAL AND FUNCTIONAL TEST SUMMARY (Tests performed up to the Long Term Storage) TRS reference Procedure reference Anomalies NC ACR date First FM3 test sequence (as-run) test purpose Final status database context Other integration test sequence SEVELEC 1 MI /6/3 SEVIRI harness integration Isolation and continuity 378_1 SEVELEC 3 MI /7/3 12/9/3 SEVIRI ON/OFF configuration TM/TC cross-check 3717_1 SEVELEC 11 SEVELEC 12 SEVELEC 13 SEVELEC6 SEVELEC7 SEVELEC8 MI3 15/7/3 image data : - raw data protocol behaviour - SEVIRI packet transmission - SEVIRI packets content - detection parameters MI12 1/9/3 Mechanism activation test 1) scan mirror 2) refoc mirror 3) calu motor Nota: part of this test has been used with success for validation of electrical connections and image data behaviour - scan & retrace & ref. : - scan switch & pot.& reset : - refoc direct & reverse & ref. : - refoc switch : - calibration : 1215_1 3717_1 Validation of all mechanisms via MI15 All rights reserved, 27, Thales Alenia Space K-EN

41 Issue : 4 Rev. : Date : 21/9/211 Page A-2 SEVELEC 1 MI13 9/9/3 22/1/3 17/11/3 PSD test 3717_1 SEVELEC 9 MI14 17/9/3 21/1/4 Thermal control lines test - Switch on/off heater lines : - Consumption / behaviour : 3717_1 3113_1 SEVELEC 14 MI /9/3 21/1/4 Flight operation sequence Test performed during IST1:. 3113_1 SEVELEC 5 MI /8/3 2/1/3 17/11/3 xx/xx/xx LLD test Test performed during IST1 3717_1 3113_1 xxxxxx_xx Test performed also before/after each displacement of the satellite during AIT All rights reserved, 27, Thales Alenia Space K-EN

42 Issue : 4 Rev. : Date : 21/9/211 Page A-3 Appendix 1.2: SEVIRI ELECTRICAL AND FUNCTIONAL TEST SUMMARY (Tests performed during the de-storage test campaign) The listed test cases are the ones agreed to be run in the frame of the IST after MSG3 de-storage and according to MSG3 de-storage and launch campaign specification [AD5] TRS reference Procedure reference Anomalies NC ACR date FM3 test sequence (as-run) test purpose Final status database context Other integration test sequence SEVELEC 1 MI1 SEVIRI harness integration Isolation and continuity SEVELEC 3 MI SEVIRI ON/OFF configuration TM/TC cross-check Not played Database : Version 1.3 Contexte : MSG_FM3_ SEVELEC 11 SEVELEC 12 SEVELEC 13 MI3 image data : - raw data protocol behaviour - SEVIRI packet transmission - SEVIRI packets content - detection parameters Not played SEVELEC6 SEVELEC7 SEVELEC8 MI12 Mechanism activation test 1) scan mirror 2) refoc mirror 3) calu motor Not played All rights reserved, 27, Thales Alenia Space K-EN

43 Issue : 4 Rev. : Date : 21/9/211 Page A-4 SEVELEC 1 MI PSD test Database : Version 1.3 Contexte : MSG_FM3_ SEVELEC 9 MI14 None Thermal control lines test - Switch on/off heater lines : - Consumption / behaviour : Database : Version 1.3 Contexte : MSG_FM3_ SEVELEC 14 MI Flight operation sequence Database : Version 1.3 Contexte : MSG_FM3_ SEVELEC 5 MI LLD test Database : Version 1.3 Contexte : MSG_FM3_ (For TR FM3.836 and.85) Test performed also before/after each displacement of the satellite during AIT All rights reserved, 27, Thales Alenia Space K-EN

44 Issue : 4 Rev. : Date : 21/9/211 Page A-5 Appendix 2 : SEVIRI image data setting & Processed files In the following pages are presented : the synthesis tables showing the acquisition differences with respect to setting differences, in order to check if the modification send by TC had an impact on the output data. the differences between redundant and nominal configuration results for a similar setting. This annex has been updated according to new instrument configuration i.e. with data acquired with MDU FM2 instead of FM3. As a summary, it is shown that detection chain parameters are properly loaded onto nominal or redundant configuration. All rights reserved, 27, Thales Alenia Space K-EN

45 Issue : 4 Rev. : Date : 21/9/211 Page A-6 Processed test results : Telecommand effect between settings #1 and #2 on Nominal Chain n_det n_bias_det n_bias_mir n_fine_ n_coarse_ n_gain NO n p q Acquisition 1 Acquisition 2 Result _61-1 (1 lsb on mean due to q) _62-1 (1 lsb on mean due to q) _63-1 (1 lsb on mean due to q) _81-1 (1 lsb on mean due to q) _82-1 (1 lsb on mean due to q) _83-1 (1 lsb on mean due to q) _ (1 lsb on mean due to q) _ (1 lsb on mean due to q) _ (1 lsb on mean due to q) _391-1 (1 lsb on mean due to q) _392-1 (1 lsb on mean due to q) _393-1 (1 lsb on mean due to q) _621-1 (1 lsb on mean due to q) _622-1 (1 lsb on mean due to q) _623-1 (1 lsb on mean due to q) _731-1 (1 lsb on mean due to q) _732-1 (1 lsb on mean due to q) _733-1 (1 lsb on mean due to q) _ High Saturation _ _ High Saturation _ High Saturation _ High Saturation _ High Saturation _ (1 lsb on mean due to q plus lower noise due to n_gain) _ High Saturation _ (1 lsb on mean due to q plus lower noise due to n_gain) _ (1 lsb on mean due to q plus lower noise due to n_gain) _ (1 lsb on mean due to q plus lower noise due to n_gain) _ (1 lsb on mean due to q plus lower noise due to n_gain) _ (1 lsb on mean due to q plus lower noise due to n_gain) _ (1 lsb on mean due to q plus lower noise due to n_gain) _ (1 lsb on mean due to q plus lower noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) _HRV (1 lsb on mean due to q plus higher noise due to n_gain) De-saturation of all cold channels due to mirror bias correction and PU gain decrease; mean value evolution of warm channels due to MDU output gain correction, and evolution of the noise due to PU gain correction. All rights reserved, 27, Thales Alenia Space K-EN

46 Telecommand effect between settings #2 and #3 on Nominal Chain n_det n_bias_det n_bias_mir n_fine_ n_coarse_ n_gain NO n p q 61 _ _63 _ _82 _ _161 _ _163 _ _392 8 _ _ _ _ _ _ _ _ _ _ _ _ _ _181 6 _ _ _ _ _ _ _ _ _HRV1-5 1 _HRV2 _HRV3-5 1 _HRV4 _HRV5-5 1 _HRV6 _HRV7-5 1 _HRV8 _HRV9-5 1 Acquisition 2 Acquisition 3 High Saturation High Saturation High Saturation High Saturation High Saturation High Saturation High Saturation High Saturation Low Saturation Low Saturation High Saturation Low Saturation High Saturation Low Saturation Low Saturation Low Saturation Low Saturation Low Saturation Result (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (increase DOC due to n, 5 on mean due to q) (increase DOC due to n, 5 on mean due to q) (increase DOC due to n, 5 on mean due to q) (increase DOC due to n, 5 on mean due to q) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) (no change) (increase DOC due to n, 5 on mean due to q) Doc. n MSG.ASC.SA.RP.1727 Issue : 4 Rev. : Date : 21/9/211 Page A-7 Variation of PU coarse offset and MDU n and q gains : de-saturation effect observed on some IR chains due to PU correction, and mean value variation on warm chains due to MDU output gain correction. All rights reserved, 27, Thales Alenia Space K-EN

47 Issue : 4 Rev. : Date : 21/9/211 Page A-8 Telecommand effect between settings #2 and #4 on Nominal Chain n_det n_bias_det n_bias_mir n_fine_ n_coarse_ n_gain NO n p q Acquisition 2 Acquisition 4 Result _61 _62 _63 _81 _82 _83 _161 _162 _163 _391 _392 _393 _621 _622 _623 _731 _732 _733 _871 _872 _873 _971 _972 _973 _181 _182 _183 _121 _122 _123 _1341 _1342 _1343 _HRV1 _HRV2 _HRV3 _HRV4 _HRV5 _HRV6 _HRV7 _HRV8 _HRV No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) No change (5 lsb on mean) Variation of MDU numerical offset and p gain : mean value variation observed due to MDU offset correction. All rights reserved, 27, Thales Alenia Space K-EN

48 Issue : 4 Rev. : Date : 21/9/211 Page A-9 Telecommand effect between settings #2 and #5 on Nominal Chain n_det n_bias_det n_bias_mir n_fine_ n_coarse_ n_gain NO n p q Acquisition 2 Acquisition 5 Result _61 No change _62 No change _63 No change _81 No change _82 No change _83 No change _161 No change _162 No change _163 No change _391 No change _392 No change _393 No change _621 No change _622 No change _623 No change _731 No change _732 No change _733 No change _871-1 Low Saturation _872-1 _873-1 Low Saturation _971-1 _972-8 Low Saturation _973-1 _181-7 Low Saturation _182-1 High Saturation _183-5 Low Saturation _121-1 High Saturation _122-2 Low Saturation _123-1 High Saturation _ Low Saturation _ _ Low Saturation _HRV1 No change _HRV2 No change _HRV3 No change _HRV4 No change _HRV5 No change _HRV6 No change _HRV7 No change _HRV8 No change _HRV9 No change Variation of PU biases : saturation on IR PC chains. All rights reserved, 27, Thales Alenia Space K-EN

49 Issue : 4 Rev. : Date : 21/9/211 Page A-1 Appendix 3.1 : GLOBAL TEST DEFINITION AND RESULTS (Tests performed up to the Long Term Storage) The following data are extracted from MSG.TR.FM3.112 / 439, and reflect the results of a global test performed during IST1 & IST2. Operation parameters: Number of imaging lines N = 1249 Number of refocusing lines M = Refocusing direction Z = First calibration line NC1 = 1253 Last calibration line NC2 = 1257 CRS heater switch on line NCA = CRS heater switch off line NCB = Retrace start line NR = S1551X-Potentiometre 1 S1561X-Potentiometre Retrace first activation K1 = 5 Retrace first stop K2 = Retrace second activation K3 = 349 Retrace second stop K4 = Retrace third activation K5 = 4 HRV image break line NH = Repeat cycle length T = 165 S1551X S1561X Scan activation Scan Step counter S1571X -> > Block Time 75 -> > Refocusing activation CRS heater activation Calibration activation None* None* Calibration went from Storage position to Calibration position, and back to Storage. * Activation part of Thermal and Optical Vacuum sequence All rights reserved, 27, Thales Alenia Space K-EN

50 Issue : 4 Rev. : Date : 21/9/211 Page A-12 Appendix 3.2: GLOBAL TEST DEFINITION AND RESULTS (Tests performed during the destorage test campaign) The following data are extracted from MSG.TR.FM3.837 and reflect the results of a global test performed during IST2. 1- In nominal mode All rights reserved, 27, Thales Alenia Space K-EN

51 Issue : 4 Rev. : Date : 21/9/211 Page A-13 Figure 1-1 All rights reserved, 27, Thales Alenia Space K-EN

52 Issue : 4 Rev. : Date : 21/9/211 Page A In redundant mode: All rights reserved, 27, Thales Alenia Space K-EN

53 Issue : 4 Rev. : Date : 21/9/211 Page A-15 Figure 1-2 All rights reserved, 27, Thales Alenia Space K-EN

RESERVE THALES ALENIA SPACE CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR

RESERVE THALES ALENIA SPACE CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR ISSUE : 1 Page : 2/35 CHANGE RECORDS ISSUE DATE DESCRIPTION OF CHANGES AUTHOR 1 03/10/07 Initial issue (MTG-TAF-SA-RS-39) J. VIEILLOT 1 20/09/10 Updated version for kick off : L.OUCHET New reference (MTG-TAF-SA-SS-0039)

More information

Your Partner in Environment Monitoring

Your Partner in Environment Monitoring Your Partner in Environment Monitoring Radiation Environment in Space The ionizing radiation in space represents one of the most severe environmental loads to space hardware and can cause a large number

More information

Status of IASI FM2 on METOP-A. Carole Larigauderie (CNES), Laurence Buffet (CNES), Dominique Montero (Eumetsat), Patrick Astruc (TAS)

Status of IASI FM2 on METOP-A. Carole Larigauderie (CNES), Laurence Buffet (CNES), Dominique Montero (Eumetsat), Patrick Astruc (TAS) Status of IASI FM2 on METOP-A Carole Larigauderie (CNES), Laurence Buffet (CNES), Dominique Montero (Eumetsat), Patrick Astruc (TAS) Introduction This presentation is based on a common CNES/EUMETSAT work

More information

MISSION ENGINEERING SPACECRAFT DESIGN

MISSION ENGINEERING SPACECRAFT DESIGN MISSION ENGINEERING & SPACECRAFT DESIGN Alpbach 2007 - D.J.P. Moura - CNES MISSION ENGINEERING (1) OVERALL MISSION ENGINEERING IS A COMPLEX TASK SINCE AT THE BEGINNING THE PROBLEM IS GENERALLY BADLY EXPRESSED

More information

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil)

BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN. Jose Sergio Almeida INPE (Brazil) BUILDING LOW-COST NANO-SATELLITES: THE IMPORTANCE OF A PROPER ENVIRONMENTAL TESTS CAMPAIGN Jose Sergio Almeida INPE (Brazil) 1 st International Academy of Astronautics Latin American Symposium on Small

More information

ALCATEL SPACE PLASMA PROPULSION SUBSYSTEM QUALIFICATION STATUS

ALCATEL SPACE PLASMA PROPULSION SUBSYSTEM QUALIFICATION STATUS ALCATEL SPACE PLASMA PROPULSION SUBSYSTEM QUALIFICATION STATUS Pascal GARNERO, Olivier DULAU ALCATEL SPACE 100, Bd. du Midi, BP 99 06156 CANNES LA BOCCA Cedex FRANCE Contact : pascal.garnero@space.alcatel.fr,

More information

Orbital Orbital Chara Char cte act ristics eristics of the Helios of the Helio sy s s s y te st m Orbit : Low: Sun-synchronous: Quasi-polar: Phased:

Orbital Orbital Chara Char cte act ristics eristics of the Helios of the Helio sy s s s y te st m Orbit : Low: Sun-synchronous: Quasi-polar: Phased: Orbital Characteristics of the Helios system Orbit : Ë Low: suitable for High Resolution imagery. ËSun-synchronous: allows for regular illumination of the observed zones as the satellite always passes

More information

Cold Gas Thruster Qualification for FORMOSAT 5

Cold Gas Thruster Qualification for FORMOSAT 5 Cold Gas Thruster Qualification for FORMOSAT 5 By Hans-Peter HARMANN 1), Tammo ROMBACH 2) and Heiko DARTSCH 1) 1) AST Advanced Space Technologies GmbH, Stuhr, Germany 2) SpaceTech GmbH, Immenstaad, Germany

More information

The AEOLUS Mission - In Orbit Commissioning and Verification

The AEOLUS Mission - In Orbit Commissioning and Verification The AEOLUS Mission - In Orbit Commissioning and Verification ADM-Aeolus CAL/VAL Workshop, ESRIN P McGoldrick, J Brewster, J Marshall, F Fabre Airbus Defence and Space, UK and France 12 th February 2015

More information

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error

Anomaly Investigations. The following anomalies have occurred since Launch : SDPSS DPC4 error User Workshop ESRIN 2005 Anomaly Investigations The following anomalies have occurred since Launch : SDPSS DPC4 error Anomaly Investigations The following anomalies have occurred since Launch : SDPSS DPC4

More information

Figure 1. View of ALSAT-2A spacecraft

Figure 1. View of ALSAT-2A spacecraft ALSAT-2A TRANSFER AND FIRST YEAR OPERATIONS M. Kameche (1), A.H. Gicquel (2), D. Joalland (3) (1) CTS/ASAL, 1 Avenue de la Palestine, BP 13, Arzew 31200 Oran, Algérie, email:mo_kameche@netcourrier.com

More information

Final Presentation of Assessment Star Tracker for Asteroid Search. By Peter Davidsen

Final Presentation of Assessment Star Tracker for Asteroid Search. By Peter Davidsen Final Presentation of Assessment Star Tracker for Asteroid Search By Peter Davidsen Study Overview Study name: Assessment of Star Tracker use for Asteroid Search ESA contract: ESA contract 4000105591/12/NL/AF

More information

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft.

The time period while the spacecraft is in transit to lunar orbit shall be used to verify the functionality of the spacecraft. ASE 379L Group #2: Homework #4 James Carlson Due: Feb. 15, 2008 Henri Kjellberg Leah Olson Emily Svrcek Requirements The spacecraft shall be launched to Earth orbit using a launch vehicle selected by the

More information

TROPOMI. Sentinel 5 Precursor instrument for air quality and climate observations. R. Voors Dutch Space. ICSO, 11 October 2012

TROPOMI. Sentinel 5 Precursor instrument for air quality and climate observations. R. Voors Dutch Space. ICSO, 11 October 2012 TROPOMI Sentinel 5 Precursor instrument for air quality and climate observations R. Voors Dutch Space ICSO, 11 October 2012 Sentinel 5 precursor and the TROPOMI payload Climate and Air quality Precursor

More information

Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document Effective Date: February 14, 2006 Expiration Date: February 14, 2011 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

More information

CALIBRATION MECHANISM FOR INFRARED SPACE TELESCOPE. Patrice Kerhousse

CALIBRATION MECHANISM FOR INFRARED SPACE TELESCOPE. Patrice Kerhousse CALIBRATION MECHANISM FOR INFRARED SPACE TELESCOPE Patrice Kerhousse Alcatel space industries Boulevard du Midi, BP 99-06156 Cannes la Bocca Cedex Telephone : 33-(0)4-92-92-72-38 / Fax : 33-(0)4-92-92--20

More information

Motors Automation Energy Transmission & Distribution Coatings. Servo Drive SCA06 V1.5X. Addendum to the Programming Manual SCA06 V1.

Motors Automation Energy Transmission & Distribution Coatings. Servo Drive SCA06 V1.5X. Addendum to the Programming Manual SCA06 V1. Motors Automation Energy Transmission & Distribution Coatings Servo Drive SCA06 V1.5X SCA06 V1.4X Series: SCA06 Language: English Document Number: 10003604017 / 01 Software Version: V1.5X Publication Date:

More information

Update on the In-orbit Performances of GIOVE Clocks

Update on the In-orbit Performances of GIOVE Clocks Update on the In-orbit Performances of GIOVE Clocks Pierre Waller, Francisco Gonzalez, Stefano Binda, ESA/ESTEC Ilaria Sesia, Patrizia Tavella, INRiM Irene Hidalgo, Guillermo Tobias, GMV Abstract The Galileo

More information

Product Quality README file for GOME Level 1b version 5.1 dataset

Product Quality README file for GOME Level 1b version 5.1 dataset Product Quality README file for GOME Level 1b version 5.1 dataset Field Content Document Title Product Quality Readme file: GOME Level 1b version 5.1 dataset Reference ESA-EOPG-MOM-TN-13, issue 1.0, 15/06/2018

More information

The In-Orbit Commissioning of MSG-1

The In-Orbit Commissioning of MSG-1 Earth Observation The In-Orbit Commissioning of MSG-1 MSG Project Team, Earth Observation Projects Department, ESA Directorate of Earth Observation, ESTEC, Noordwijk, The Netherlands 80 esa bulletin 114

More information

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL

PROBA 1. F. Teston ESA/ESTEC D/TEC-EL PROBA 1 F. Teston ESA/ESTEC D/TEC-EL Frederic.Teston@esa.int PROBA 1 launch PROBA 1 has been launched on 21 October 2001 Orbital parameters: Altitude: 681-561 km Near polar (inclination of 97.9 ) Sun-synchronous

More information

ADM-Aeolus Science and Cal/Val Workshop

ADM-Aeolus Science and Cal/Val Workshop ADM-Aeolus Science and Cal/Val Workshop ESA ESRIN, Frascati, ITALY 10 13 February 2015 THE ALADIN INSTRUMENT AND ITS ON-GROUND CHARACTERISATION O. Lecrenier, F. Fabre, J. Lochard Airbus Defense & Space

More information

ESSE Payload Design. 1.2 Introduction to Space Missions

ESSE Payload Design. 1.2 Introduction to Space Missions ESSE4360 - Payload Design 1.2 Introduction to Space Missions Earth, Moon, Mars, and Beyond Department of Earth and Space Science and Engineering Room 255, Petrie Science and Engineering Building Tel: 416-736

More information

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION

THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION THE MICRO ADVANCED STELLAR COMPASS FOR ESA S PROBA 2 MISSION P.S. Jørgensen (1), J.L. Jørgensen (1), T. Denver (1), Pieter van den Braembuche (2) (1) Technical University of Denmark, Ørsted*DTU, Measurement

More information

November 3, 2014 Eric P. Smith JWST Program Office

November 3, 2014 Eric P. Smith JWST Program Office November 3, 014 Eric P. Smith JWST Program Office 1 SINCE LAST CAA MEETING... Completed of 3 recommended GAO schedule risk analyses for this year. Mutually agreed to drop 3 rd. Will perform cost-risk study

More information

Newsletter of the INTEGRAL Science Operations Centre

Newsletter of the INTEGRAL Science Operations Centre Newsletter of the INTEGRAL Science Operations Centre No. 4 January 2002 Foreword Christoph Winkler - Project Scientist Status of spacecraft and payload Astrid Orr - Operations Scientist During the past

More information

Progress in Testing of QM and FM HEMP Thruster Modules

Progress in Testing of QM and FM HEMP Thruster Modules Progress in Testing of QM and FM HEMP Thruster Modules IEPC-2013-274 Presented at the 33rd International Electric Propulsion Conference, The George Washington University Washington, D.C. USA A. Lazurenko

More information

Thomas Keating Ltd Station Mills, Daux Road Billingshurst, West Sussex RH14 9SH, UK

Thomas Keating Ltd Station Mills, Daux Road Billingshurst, West Sussex RH14 9SH, UK Thomas Keating Ltd Station Mills, Daux Road Billingshurst, West Sussex RH14 9SH, UK Tel: +44 (0)1403 782045 Fax: +44 (0)1403 785464 http://www.terahertz.co.uk/ Project Title JPL Load Customer Reference

More information

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team

Team X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team Team X Study Summary for ASMCS Theia Jet Propulsion Laboratory, California Institute of Technology with contributions from the Theia Team P. Douglas Lisman, NASA Jet Propulsion Laboratory David Spergel,

More information

Propellant Gauging Experience with Meteosat Second Generation S/C Fleet

Propellant Gauging Experience with Meteosat Second Generation S/C Fleet SpaceOps Conferences 28 May - 1 June 2018, 2018, Marseille, France 2018 SpaceOps Conference 10.2514/6.2018-2319 Propellant Gauging Experience with Meteosat Second Generation S/C Fleet C. Bihr 1, CLC Space

More information

BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings

BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings COSGC Space Research Symposium 2009 BOWSER Balloon Observatory for Wavelength and Spectral Emission Readings BOWSER 1 Mission Premise 4.3 km above sea level 402.3km above sea level BOWSER 2 Information

More information

ESWT 10 Mission Systems Design and Schedule

ESWT 10 Mission Systems Design and Schedule ESWT 10 Mission Systems Design and Schedule 1 EXoMars 2020 International Cooperation 2 Project industry organization ESA Inter-Agency agreement Steering coordination ROSCOSMOS ESA ExoM Project Project

More information

WFC3 TV2 Testing: UVIS-2 Dark Frames and Rates

WFC3 TV2 Testing: UVIS-2 Dark Frames and Rates Instrument Science Report WFC3 007-06 WFC3 TV Testing: UVIS- Dark Frames and Rates A.R. Martel November 0, 007 ABSTRACT WFC3 underwent its second thermal vacuum testing in the Space Environment Simulation

More information

NEW EUMETSAT POLAR SYSTEM ATTITUDE MONITORING SOFTWARE

NEW EUMETSAT POLAR SYSTEM ATTITUDE MONITORING SOFTWARE NEW EUMETSAT POLAR SYSTEM ATTITUDE MONITORING SOFTWARE Pablo García Sánchez (1), Antonio Pérez Cambriles (2), Jorge Eufrásio (3), Pier Luigi Righetti (4) (1) GMV Aerospace and Defence, S.A.U., Email: pgarcia@gmv.com,

More information

CIRiS: Compact Infrared Radiometer in Space LCPM, August 16, 2017 David Osterman PI, CIRiS Mission

CIRiS: Compact Infrared Radiometer in Space LCPM, August 16, 2017 David Osterman PI, CIRiS Mission 1 CIRiS: Compact Infrared Radiometer in Space LCPM, August 16, 2017 David Osterman PI, CIRiS Mission 8/15/201 7 Overview of the CIRiS instrument and mission The CIRiS instrument is a radiometric thermal

More information

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury

BepiColombo. Project and MPO Status. Comprehensive Explora1on of Planet Mercury BepiColombo Project and MPO Status Comprehensive Explora1on of Planet Mercury Joe Zender BepiColombo Deputy PS, ESA/ESTEC BepiColombo Previously: Ø Proba2 Science Coordinator, until 12/2013 Ø ProbaV, Project

More information

Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission

Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission MAVEN SCIENCE COMMUNITY WORKSHOP December 2 nd, 2012 1 Outline Science Goals Overview Accommodation on the Spacecraft Top Level Requirements Instrument

More information

Announcement of Opportunity AKARI (ASTRO-F)

Announcement of Opportunity AKARI (ASTRO-F) Announcement of Opportunity AKARI (ASTRO-F) CALL FOR OBSERVING PROPOSALS for the AKARI Post-Helium (phase 3) mission 2 nd year of Operations (October 2009 October 2010) Policies and procedures 27 May 2009

More information

Thermal Vacuum Test: Plans and Procedures

Thermal Vacuum Test: Plans and Procedures GLAST Large Area Telescope Gamma-ray Large Area Space Telescope Pre-Shipment Review Thermal Vacuum Test: Plans and Procedures Jesse Armiger Thermal Vacuum Test Director Thermal Vacuum Test Stanford Linear

More information

Thermal Design and Analysis of the BroadBand Radiometer. Oliver Poyntz-Wright (Rutherford Appleton Laboratory, United Kingdom)

Thermal Design and Analysis of the BroadBand Radiometer. Oliver Poyntz-Wright (Rutherford Appleton Laboratory, United Kingdom) 255 Appendix T Thermal Design and Analysis of the BroadBand Radiometer Oliver Poyntz-Wright (Rutherford Appleton Laboratory, United Kingdom) 256 Thermal Design and Analysis of the BroadBand Radiometer

More information

ISOCON-6. 24V AC or DC POWERED ISOLATING SIGNAL CONVERTER

ISOCON-6. 24V AC or DC POWERED ISOLATING SIGNAL CONVERTER ISOCON-6 24V AC or DC POWERED ISOLATING SIGNAL CONVERTER Whilst every effort has been taken to ensure the accuracy of this document, we accept no responsibility for damage, injury, loss or expense resulting

More information

The Challenge is to Define: System Engineering. System Engineering Components. Functional Requirements

The Challenge is to Define: System Engineering. System Engineering Components. Functional Requirements The Challenge is to Define: System Engineering What it is supposed to do How well it must do it It s constituant parts and how they play together We are not prepared for detail design, assembly and test

More information

Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document

Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document Effective Date: 01/11/2007 Expiration Date: 01/11/2012 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document December 19,

More information

DARE Mission and Spacecraft Overview

DARE Mission and Spacecraft Overview DARE Mission and Spacecraft Overview October 6, 2010 Lisa Hardaway, PhD Mike Weiss, Scott Mitchell, Susan Borutzki, John Iacometti, Grant Helling The information contained herein is the private property

More information

Low Complexity and Low Cost Electric Propulsion System for Telecom Satellites Based on HEMP Thruster Assembly

Low Complexity and Low Cost Electric Propulsion System for Telecom Satellites Based on HEMP Thruster Assembly Low Complexity and Low Cost Electric Propulsion System for Telecom Satellites Based on HEMP Thruster Assembly IEPC-2007-114 Presented at the 30 th International Electric Propulsion Conference, Florence,

More information

ADCSS 2017: Sodern presentation

ADCSS 2017: Sodern presentation ADCSS 2017: Sodern presentation 1 Agenda Star trackers road map: a wide range of products End of CCD star trackers: SED26 replaced by Horus as standalone multi mission star tracker Hydra maintained beyond

More information

HERSCHEL/UVCI ALIGNMENT PLAN

HERSCHEL/UVCI ALIGNMENT PLAN DIPARTIMENTO DI ASTRONOMIA E SCIENZA DELLO SPAZIO HERSCHEL/UVCI ALIGNMENT PLAN M. Romoli (a), G. Corti (a), F. Landini (a) (a) Dipartimento di Astronomia e Scienza dello Spazio, Università di Firenze (Italy)

More information

Reduction of the Response Time of Earth Observation Satellite Constellations using Inter-satellite Links

Reduction of the Response Time of Earth Observation Satellite Constellations using Inter-satellite Links Reduction of the Response Time of Earth Observation Satellite Constellations using Inter-satellite Links S. De Florio Data quality of Earth observation satellites is often evaluated in terms of short system

More information

The Ordering Code for various standard model Recorders with an AC supply and without any additional options are as follows:

The Ordering Code for various standard model Recorders with an AC supply and without any additional options are as follows: The basic PC software is supplied free with the recorder. There is an additional charge for the extensive Data Acquisition Software supplied with communication of RS-232/422/485 or Ethernet. The Ordering

More information

DS 300. Electronic Pressure Switch. with IO-Link interface. Stainless Steel Sensor. accuracy according to IEC 60770: 0.35 % FSO.

DS 300. Electronic Pressure Switch. with IO-Link interface. Stainless Steel Sensor. accuracy according to IEC 60770: 0.35 % FSO. DS 00 Electronic Pressure Switch with IO-Link interface Stainless Steel Sensor accuracy according to IEC 60770: 0.5 % FSO Nominal pressure from 0... 00 mbar up to 0... 600 bar Digital output signal IO-Link

More information

LISA Pathfinder measuring pico-meters and femto-newtons in space

LISA Pathfinder measuring pico-meters and femto-newtons in space LISA Pathfinder measuring pico-meters and femto-newtons in space M Hewitson for the LPF team Barcelona, February 15th 2012 Observing from Space 2 Observing from Space 2 Observing from Space Push down to

More information

Herschel Science/Instrument Planning and Scheduling. Jon Brumfitt (ESAC) SCIOPS September 2013

Herschel Science/Instrument Planning and Scheduling. Jon Brumfitt (ESAC) SCIOPS September 2013 Herschel Science/Instrument Planning and Scheduling Jon Brumfitt (ESAC) SCIOPS-2013 11 September 2013 Herschel Space Observatory Far infrared & sub-mm Telescope diameter Instruments Launch date End of

More information

Euclid Consortium EUCLID NISP INSTRUMENT PRESENTATION. EUCLID CONSORTIUM MEETING BOLOGNA 7&8 September 2011 Authors : NISP TEAM Page : 1

Euclid Consortium EUCLID NISP INSTRUMENT PRESENTATION. EUCLID CONSORTIUM MEETING BOLOGNA 7&8 September 2011 Authors : NISP TEAM Page : 1 EUCLID NISP INSTRUMENT PRESENTATION EUCLID CONSORTIUM MEETING BOLOGNA 7&8 September 2011 Authors : NISP TEAM Page : 1 AGENDA NISP TECHNICAL PRESENTATION and STATUS NISP PHOTOMETRY PRESENTATION NISP SPECTROMETRY

More information

ETS-Ⅷ Ion Engine and its Operation on Orbit

ETS-Ⅷ Ion Engine and its Operation on Orbit ETS-Ⅷ Ion Engine and its Operation on Orbit IEPC-2009-048 Presented at the 31st International Electric Propulsion Conference, University of Michigan Ann Arbor, Michigan USA Kenichi Kajiwara 1, Masafumi

More information

Satellite Position Determination of LEO Spacecraft

Satellite Position Determination of LEO Spacecraft Satellite Position Determination of LEO Spacecraft S.C.Rathnakara ISRO Satellite Centre 5 th September, 2007 International Committee on Global Navigation Satellite Systems(ICG) Things to follow Brief background

More information

ENVISAT - AATSR CYCLIC REPORT #88

ENVISAT - AATSR CYCLIC REPORT #88 ENVISAT - AATSR CYCLIC REPORT #88 START END DATE 22ND MARCH 2010 26TH APRIL 2010 TIME 21:59:29 21:59:29 ORBIT # 42138 42638 Extract from a Level 3 product showing the monthly average Dual View Sea Surface

More information

EUCLID M2 MIRROR MECHANISM

EUCLID M2 MIRROR MECHANISM EUCLID M2 MIRROR MECHANISM Aiala Artiagoitia (1), Carlos Compostizo (1), Laura Rivera (1) (1) SENER, Av. Zugazarte 56, 48930 Las Arenas (Bizkaia) Spain, Email: aiala.artiagoitia@sener.es ABSTRACT Euclid

More information

GOME-2 / Metop-B instrument, PPF and auxiliary-data change history

GOME-2 / Metop-B instrument, PPF and auxiliary-data change history GOME-2 / Metop-B instrument, PPF and auxiliary-data change Doc.No. : EUM/OPS-EPS/TEN/09/0616 Issue : v3c Date : 23 June 2015 EUMETSAT Am Kavalleriesand 31, D-64295 Darmstadt, Germany Tel: +49 6151 807-7

More information

Catapult tests for microgravity characterization of the MICROSCOPE accelerometers. Manuel Rodrigues On behalf ONERA & ZARM team

Catapult tests for microgravity characterization of the MICROSCOPE accelerometers. Manuel Rodrigues On behalf ONERA & ZARM team Catapult tests for microgravity characterization of the MICROSCOPE accelerometers Manuel Rodrigues mrodrig@onera.fr On behalf ONERA & ZARM team 1 Instrument Description SU sqm Sensor Unit (SU) = differential

More information

WISE Science Data System Single Frame Position Reconstruction Peer Review: Introduction and Overview

WISE Science Data System Single Frame Position Reconstruction Peer Review: Introduction and Overview WISE Science Data System Single Frame Position Reconstruction Peer Review: Introduction and Overview R. Cutri and the WSDC Team @ IPAC 1 Review Panel Rachel Akeson (IPAC/MSC) Gene Kopan (IPAC retired)

More information

STOCHASTIC APPROACH TO SPACECRAFT THERMAL CONTROL SUBSYSTEM

STOCHASTIC APPROACH TO SPACECRAFT THERMAL CONTROL SUBSYSTEM STOCHASTIC APPROACH TO SPACECRAFT THERMAL CONTROL SUBSYSTEM October 2001 1 Why? Scatter on physical parameters Thermo-optical properties Contact conductances Handling process Density Scatter on environment

More information

Remote Display Unit. Installers Handbook Copyright 2001 AirSense Technology Ltd. LM Remote Display Unit Installers Handbook Issue 1.

Remote Display Unit. Installers Handbook Copyright 2001 AirSense Technology Ltd. LM Remote Display Unit Installers Handbook Issue 1. Remote Display Unit Installers Handbook Copyright 2001 AirSense Technology Ltd AirSense, ClassiFire, FastLearn PipeCAD, SenseNET, Stratos-HSSD and Stratos-Quadra are trademarks. HSSD is a Registered Trademark.

More information

MSG system over view

MSG system over view MSG system over view 1 Introduction METEOSAT SECOND GENERATION Overview 2 MSG Missions and Services 3 The SEVIRI Instrument 4 The MSG Ground Segment 5 SAF Network 6 Conclusions METEOSAT SECOND GENERATION

More information

Angelika Dehn Rob Koopman 10 Years GOME on ERS-2 Workshop

Angelika Dehn Rob Koopman 10 Years GOME on ERS-2 Workshop Angelika Dehn (ADehn@serco.it), Rob Koopman (Rob.Koopman@esa.int), Overview I. ERS-2 Mission History 1. Mission Plan Highlights 2. GOME Special Operations II. GOME-1 Engineering Performance 1. Routine

More information

Status / Progress of the erosita X ray Observatory:

Status / Progress of the erosita X ray Observatory: Status / Progress of the erosita X ray Observatory: Vadim Burwitz, Max Planck Institut für extraterrestrische Physik On behalf of the erosita Team IACHEC #9, May 13, 2014, Airlie Center, Warrenton, Virginia,

More information

ENVISAT - AATSR CYCLIC REPORT #63

ENVISAT - AATSR CYCLIC REPORT #63 ENVISAT - AATSR CYCLIC REPORT #63 START END DATE 29 OCT 2007 03 DEC 2007 TIME 21:59:29 21:59:29 ORBIT # 29614 30114 Himalayas, 18 November 2007 Daytime visible image showing snow on the Western Himalayas.

More information

REFERENCE : DATE : 04/07/2013. ISSUE : 01 Page : 2/36 CHANGE RECORDS ISSUE DATE CHANGE RECORDS AUTHOR. 1 04/07/2013 Initial issue C.

REFERENCE : DATE : 04/07/2013. ISSUE : 01 Page : 2/36 CHANGE RECORDS ISSUE DATE CHANGE RECORDS AUTHOR. 1 04/07/2013 Initial issue C. ISSUE : 01 Page : 2/36 CHANGE RECORDS ISSUE DATE CHANGE RECORDS AUTHOR 1 04/07/2013 Initial issue C.Meuland ISSUE : 01 Page : 3/36 DISTRIBUTION LIST Company Name ESA KT OHB TAS ISSUE : 01 Page : 4/36 TABLE

More information

The Swarm Vector Field Magnetometer (VFM): instrument commissioning & performance assessment José M. G. Merayo

The Swarm Vector Field Magnetometer (VFM): instrument commissioning & performance assessment José M. G. Merayo instrument commissioning & performance assessment José M. G. Merayo DTU Space, Technical University of Denmark Division Measurement & Instrumentation Systems overview Fluxgate principle Amorphous magnetic

More information

5mm Silicon PIN Photodiode, T-1 3/4 PD333-3B/H0/L2

5mm Silicon PIN Photodiode, T-1 3/4 PD333-3B/H0/L2 Features Fast response time High photo sensitivity Small junction capacitance Pb free This product itself will remain within RoHS compliant version. Description is a high speed and high sensitive PIN photodiode

More information

3mm Photodiode PD204-6B

3mm Photodiode PD204-6B 3mm Photodiode Features Fast response time High photo sensitivity Small junction capacitance Pb free This product itself will remain within RoHS compliant version. Description is a high speed and high

More information

DISTRIBUTION LIST. Others original copies Name amount. Lens Research & Development 1x Uittenhout, J.M.M. 1x DOCUMENT CHANGE RECORD

DISTRIBUTION LIST. Others original copies Name amount. Lens Research & Development 1x Uittenhout, J.M.M. 1x DOCUMENT CHANGE RECORD 2 of 15 DISTRIBUTION LIST Others original copies Name amount Lens Research & Development 1x Uittenhout, J.M.M. 1x DOCUMENT CHANGE RECORD Issue Date Total pages Pages affected Brief description of change

More information

Mechanical and Thermal Design of XMM

Mechanical and Thermal Design of XMM r bulletin 100 december 1999 Mechanical and Thermal Design of XMM K. van Katwijk, T. van der Laan & D. Stramaccioni XMM Project, ESA Directorate for Scientific Programmes, ESTEC, Noordwijk, The Netherlands

More information

SAMPLE CANISTER CAPTURE MECHANISM FOR MSR: CONCEPT DESIGN AND TESTING RESULTS INCLUDING 0-G ENVIRONMENT

SAMPLE CANISTER CAPTURE MECHANISM FOR MSR: CONCEPT DESIGN AND TESTING RESULTS INCLUDING 0-G ENVIRONMENT SAMPLE CANISTER CAPTURE MECHANISM FOR MSR: CONCEPT DESIGN AND TESTING RESULTS INCLUDING 0-G ENVIRONMENT Authors: Riccardo Carta, Daniele Filippetto, Politecnico di Milano Co-authors: Prof. Michèle Lavagna,

More information

Sun Shield. Solar Paddle

Sun Shield. Solar Paddle The Institute of Space and Astronautical Science Report SP No.14, December 2000 Current Status of ASTRO-F By Hiroshi Murakami Λ (November 1, 2000) Abstract: The ASTRO-F is the second infrared astronomy

More information

Technical Data Sheet Silicon Planar PIN Photodiode

Technical Data Sheet Silicon Planar PIN Photodiode Technical Data Sheet Silicon Planar PIN Photodiode Features Daylight filter High sensitivity Low capacitance Short switching time Wide temperature range Small package Pb free The product itself will remain

More information

Attitude Determination and Control System Design for STU-2A Cubesat and In-Orbit Results

Attitude Determination and Control System Design for STU-2A Cubesat and In-Orbit Results 13 th Annual Summer CubeSat Developer s Workshop August 6-7, 2016, Logan, Utah Attitude Determination and Control System Design for STU-2A Cubesat and In-Orbit Results Presented by Shufan Wu Guowen Sun,

More information

RoHS. Versatile. X g. X 2 e

RoHS. Versatile. X g. X 2 e s IN8, - and The inclinometers of the IN8 series allow measuring inclinations in the range of ±85 or -dimensional inclinations up to 0. With their high robustness, their protection level up to max. IP9k

More information

Product manual. Mylos KNX Shutter actuator 2CSY1104C/S

Product manual. Mylos KNX Shutter actuator 2CSY1104C/S Product manual Mylos KNX Shutter actuator 2CSY1104C/S Contents Contents 1 Technical features... 3 1.1 Technical data... 3 1.2 Connection diagram... 4 2 Commissioning... 5 2.1 Parameters... 5 2.1.1 General...

More information

Aeolus ESA s Wind Lidar Mission: Objectives, Design & Status

Aeolus ESA s Wind Lidar Mission: Objectives, Design & Status Aeolus ESA s Wind Lidar Mission: Objectives, Design & Status Anne Grete Straume on behalf of Anders Elfving European Space Agency/ESTEC Working Group on Space-based Lidar Winds Boulder, 28/04/2015 Atmospheric

More information

Status of X-ray Astronomy Satellite Hitomi (ASTRO-H)

Status of X-ray Astronomy Satellite Hitomi (ASTRO-H) tatus of X-ray Astronomy atellite Hitomi (ATRO-H) April 15th, 2016 JAXA Time in this material is expressed in JT (Blank) 2 ontents of explanation today In the previous press briefings, JAXA has reported

More information

Grabber. Technical Manual

Grabber. Technical Manual Grabber 0 MHZ Analog Signal Digitizer Technical Manual 0 th Street, Davis, CA, USA Tel: 0--00 Fax: 0--0 Email: sales@tern.com http://www.tern.com COPYRIGHT Grabber, and A-Engine are trademarks of TERN,

More information

Technical Verification Satellite STARS for Tethered Space Robot

Technical Verification Satellite STARS for Tethered Space Robot Technical Verification Satellite STARS for Tethered Space Robot Masahiro Nohmi, Takeshi Yamamoto, and Akira Andatsu Kagawa University nohmi@eng.kagawa-u.ac.jp, s05g528@stmail.eng.kagawa-u.ac.jp, s06g452@stmail.eng.kagawa-u.ac.jp

More information

Test of the Qualification Model of UG electronics for the AMS TRD Gas System

Test of the Qualification Model of UG electronics for the AMS TRD Gas System Test of the Qualification Model of UG electronics for the AMS TRD Gas System Bruno Borgia, Alessandro Bartoloni, Francesca R. Spada April, 9 AMS Roma / rev. Contents Introduction. The UG-crate................................

More information

MODBUS Protocol for CS141 network card families

MODBUS Protocol for CS141 network card families Last update: 20/09/208 MODBUS Protocol for CS4 network card families Summary. MODBUS PROTOCOL... 2.. MODBUS COMMUNICATION PARAMETERS... 2.2. AVAILABLE MODBUS FUNCTION CODES... 2.3. EXCEPTION CODES... 3

More information

Space Frequency Coordination Group

Space Frequency Coordination Group Space Coordination Group THE SFCG Recommendation SFCG 32-2R1 COMMUNICATION FREQUENCY ALLOCATIONS AND SHARING IN THE LUNAR REGION CONSIDERING a. that a regional communication network at the Moon can be

More information

Calibration of MERIS on ENVISAT Status at End of 2002

Calibration of MERIS on ENVISAT Status at End of 2002 Calibration of MERIS on ENVISAT Status at End of 2002 Bourg L. a, Delwart S. b, Huot J-P. b a ACRI-ST, 260 route du Pin Montard, BP 234, 06904 Sophia-Antipolis Cedex, France b ESA/ESTEC, P.O. Box 299,

More information

BepiColombo Project Status. Presentation for MESSENGER Science Team Meeting Via-Skype, 27 th March 2015

BepiColombo Project Status. Presentation for MESSENGER Science Team Meeting Via-Skype, 27 th March 2015 BepiColombo Project Status Johannes.Benkhoff@esa.int Presentation for MESSENGER Science Team Meeting Via-Skype, 27 th March 2015 Project status The purpose of this presentation is to give an overview on

More information

VK2 volume flow controller Overview

VK2 volume flow controller Overview New option with sound attenuator Maintenance-free VK2 volume flow controller that operates without an auxiliary power supply, for ventilation and air conditioning systems. Adjustable on site. Outstanding

More information

HD2016. [ GB ] Weighing rain gauge. Rain PART OF G H M GROUP TELEMETRIE & AUTOMATION TELEMETRIE & AUTOMATION

HD2016. [ GB ] Weighing rain gauge. Rain PART OF G H M GROUP TELEMETRIE & AUTOMATION TELEMETRIE & AUTOMATION HD2016 [ GB ] Weighing rain gauge Rain PART OF G H M GROUP TELEMETRIE & AUTOMATION TELEMETRIE & AUTOMATION [ GB ] HD2016 Weighing rain gauge [ GB ] HD2016 is a rain gauge that detects the weight of the

More information

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager.

Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager. Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager. 1 -A - Introduction - Thank for your purchasing MITSUBISHI ELECTRIC MELPRO TM D Series Digital Protection

More information

IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM

IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM IMPLEMENTATION AND EXPERIENCE WITH LUMINOSITY LEVELLING WITH OFFSET BEAM F. Follin, D. Jacquet, CERN, Geneva, Switzerland Abstract The practice of luminosity levelling with an offset beam has been used

More information

QUANTUM CONCEPT. Swimming User s Manual

QUANTUM CONCEPT. Swimming User s Manual QUANTUM CONCEPT Swimming User s Manual 480.508.0 Version.4 Edition July 05 Documentation Updates Swiss Timing Ltd. reserves the right to make improvements in the products described in this documentation

More information

Alta FT-150: The Thruster for LISA Pathfinder and LISA/NGO Missions

Alta FT-150: The Thruster for LISA Pathfinder and LISA/NGO Missions 9 th LISA Symposium, Paris ASP Conference Series, Vol. 467 G. Auger, P. Binétruy and E. Plagnol, eds. c 2012 Astronomical Society of the Pacific Alta FT-150: The Thruster for LISA Pathfinder and LISA/NGO

More information

ABB i-bus KNX Analogue Input AE/A 2.1

ABB i-bus KNX Analogue Input AE/A 2.1 Product Manual ABB i-bus KNX Analogue Input AE/A 2.1 Intelligent Installation Systems This manual describes the functionality of Analogue Input AE/A 2.1. Subject to changes and errors excepted. Exclusion

More information

Diarad_Sovim DIARAD SOVIM. Edition : 1 Rev : 4. OBJECT OF THE DOCUMENT : Definition of the software interface for the DPU. M.Lombaerts S.

Diarad_Sovim DIARAD SOVIM. Edition : 1 Rev : 4. OBJECT OF THE DOCUMENT : Definition of the software interface for the DPU. M.Lombaerts S. DIARAD SOVIM Reference : SOVIM -IRM -DAT/C-0001 Edition : 1 Rev : 4 Definition of the functions of the DPU Diarad_Sovim OBJECT OF THE DOCUMENT : Definition of the software interface for the DPU Authors

More information

SC125MS. Data Sheet and Instruction Manual. ! Warning! Salem Controls Inc. Stepper Motor Driver. Last Updated 12/14/2004

SC125MS. Data Sheet and Instruction Manual. ! Warning! Salem Controls Inc. Stepper Motor Driver.   Last Updated 12/14/2004 SC125MS Stepper Motor Driver Salem Controls Inc. Last Updated 12/14/2004! Warning! Stepper motors and drivers use high current and voltages capable of causing severe injury. Do not operate this product

More information

Eutelsat practice & views on long term sustainability. COPUOS/SCST - LTS Workshop Vienna, 14 February 2013

Eutelsat practice & views on long term sustainability. COPUOS/SCST - LTS Workshop Vienna, 14 February 2013 Eutelsat practice & views on long term sustainability COPUOS/SCST - LTS Workshop Vienna, 14 February 2013 Introduction Introduction to Eutelsat Originally set up in 1977 as an intergovernmental organisation

More information

NICMOS Status and Plans

NICMOS Status and Plans 1997 HST Calibration Workshop Space Telescope Science Institute, 1997 S. Casertano, et al., eds. NICMOS Status and Plans Rodger I. Thompson Steward Observatory, University of Arizona, Tucson, AZ 85721

More information

HUYGENS MISSION AND PROJECT OVERVIEW

HUYGENS MISSION AND PROJECT OVERVIEW Annex HUYGENS MISSION AND PROJECT OVERVIEW Note: This overview is an introductory support to the HUYGENS Enquiry Board activities as defined by ESA Director General in his Board mandate letter. It is intentionaly

More information

March 4, 2013 Eric P. Smith JWST Program Office

March 4, 2013 Eric P. Smith JWST Program Office March 4, 2013 Eric P. Smith JWST Program Office 1 SIMPLIFIED SCHEDULE OTE = Optical Telescope Element OTIS = Optical Telescope + ISIM k months of project funded critical path (mission pacing) schedule

More information