Risk Assessment of Adjacent Structures due to Bored Tunneling for Changi Airport Line

Size: px
Start display at page:

Download "Risk Assessment of Adjacent Structures due to Bored Tunneling for Changi Airport Line"

Transcription

1 Risk Assessment of Adjacent Structures due to Bored Tunneling for Changi Airport Line C.C. Ng, G.V.R. Raju, Kenny, P.A. Lim Maunsell Consultant Pte. Ltd., Singapore B.S. Kumar Nishimatsu Construction Co., Ltd.., Singapore ABSTRACT: This paper discusses an Observational Method used in the construction of the Changi Airport Line (CAL) tunnels to minimize ground movement and thus risk of damage to adjacent structures. The twin tunnels, which measure 6.13m in external diameter and are each 3.5km long, are the longest in Singapore. These bored tunnels were driven through 3 different soil conditions: at the interface between Kallang Formation and completely weathered Old Alluvium (OA), entirely within completely weathered OA, and entirely within fresh to slightly weathered OA (Brown or Blue Sandstone). An extensive instrumentation program was used to monitor the surrounding ground movement and the response of the existing structures. This paper presents the theoretical predictions, monitoring data and the damage assessment of the adjacent structures. 1 INTRODUCTION The proposed Changi Airport Line (CAL) is a Mass Rapid Transit (MRT) system that will link the Changi Airport to the existing MRT network, which comprises both elevated and underground sections. The bored tunnel section of CAL, which forms part of Contract 53, is approximately 3.5km long and consists of twin 6.13m in external diameter tunnels with a center-to-center spacing of approximately 15m. These bored tunnels are the longest in Singapore and driven in the most precise way ever. The tunnels alignment passes beneath the existing drainage reserve of a canal, the Pan-Island Expressway, and along the line of the western perimeter of the airport. Other structures in the vicinity of the bored tunnels are JTC Business Park, SASCO Bridge, Yan Kit pond (storm water reservoir) and sluice gates, Changi Airport Runway One and a Taxiway. A location plan showing the route of the bored tunnel alignment is given in Figure 1. The construction of an underground tunnel is associated with a change in the state of stress in the ground and with corresponding strains and displacements. Ground surface settlements due to tunneling occur as a result of relief of the stresses existing in the ground before excavation commences. This stress relief, together with the flexure of the tunnel lining causes radial convergence of the support system. The inward convergence of the tunnel is accompanied by settlement of the ground surface. Besides, the ground surface settlement may also arise due to additional face loss caused by tunnel over-break. As the bored tunneling passed under some existing structures, it was necessary to assess the behaviour of the surrounding ground movements and the response of adjacent structures during and after tunnel driving. The real ground response due to bored tunneling quite often differs from that of the prediction during design stage. In order to rationalize the differences between predicted and real ground response, extensive field measurements were implemented to monitor the ground movements and response of adjacent structures during and after tunneling. An Observational method (Figure 2) was

2 employed to check and modify the original design based on the interpretation of the monitoring results (Sakurai, 1999) in order to minimize ground movement. Figure 1. Location plan of C53 bored tunnel alignment Start Exploration Design No Construction Field Measurement Back Analysis Modification of Design/ Construction Methods No Identification of Mechanical Model and Constant Assessment of Stability and Design/Construction Method Yes End of Construction Yes Stop Figure 2. Observational Method in Geotechnical Engineering Projects (after Sakurai, 1999) 2 GROUND CONDITIONS The regional geology of the ground along the bored tunnels can be described locally as the Kallang Formation underlain by a very thick bed of Old Alluvium, in which its crust has been subjected to

3 CP1 CP2 deep weathering in its geologic past. Thus the ground condition generally comprises of the following strata with increasing depth from ground level: Fill/Reclamation Fill Kallang Formation (KF) (not always present) Old Alluvium (OA) Formation The KF occurs as infill in the valleys of the underlying OA. This formation can be classified as a cohesionless material comprising loose to medium dense silty gravelly sands and a soft cohesive material comprising peaty/marine clay. The thick deposit of OA also exhibits a distinct weathering profile, which can be classified into: Residual soil: Firm to stiff sandy clay and clayey sand Completely Weathered Old Alluvium (CWOA): Dense to very dense sand and gravel with occasional lenses of stiff to hard silty clays Fresh to slightly weathered Old Alluvium (Sandstones): Coarse grained Brown or Blue Sandstones Mudstones: Pale greenish brown layers of mudstones The geotechnical properties of the above soil types are summarized in Table 1. The tunnel axis levels typically fall below1 to 2m below the existing ground level and the tunnels generally traverse the OA. However at some sections of the tunnel drives (eg. CH and 98+8) the KF extends to the tunnel level. The assessed geology of the ground along the tunnel drives is indicated in Figure 3. The ground water table was fairly constant throughout the drive. It could be considered to be fairly high, generally less than 5m below ground surface. XILIN AVENUE EXPO STATION ORIGINAL TOPOGRAPHY APPROX. POSITION DRAINAGE RESERVE CANAL APPROXIMATE POSITION AND ELEVATION OF OLD TOPOGRAPHY HOLDING POND SASCO TAXIWAY APPROX POSITION OF OLD COASTLINE RUNWAY 1 TAXI WAY APRON AIRPORT STATION RL 12. RL 11. RL 1. RL 9. RL 8. RL 7. RL 7. CH CH 94 + CH CH 95 + CH CH 96 + CH CH 97 + CH CH 98 + CH CH 99 + CH CH FILL K.F.C. C.W.O.A. RECLAMATION K.F. SAND OLD ALLUVIUM (BLUE SANDSTONE) RESIDUAL SOIL (O.A) OLD ALLUVIUM (BROWN SANDSTONE) STATION Figure 3. Interpreted geotechnical profile along tunnel drives

4 Table 1. Summary of geotechnical properties Soil type Density c u c' φ' E mv Permeability c v c c c z N (Mg/m 3 ) (kpa) (MN/m 2) (m 2 /MN) (m/s) (m 2 /year) Reclamation Fill 2. 1(W) X <4 5(CPT) Fill (UU) (5-79) (29 ο 33 ο ) X 1-7 to 8.6 (3-6) 5(CPT) 3 o (2c u) 6.5 X 1-9 Kallang Formation Cohsive Soils (FVT) 22 o (UU) 13(small strain) 25(CPT) 2c u Cohesionless Soil X 1-8 to <4 22.6(small strain) 1-9 Old Alluvium Residual Soil (UU) 3 o X (1-3) 1-2(CPT) 6(small strain) Completely Weather 2. 25(UU) * 31.5 o 1 (5-9) (UU) (Not typical) 41.6(small strain) 4X1-6 Brown Sand Stone (UCT) 59 (CD) 39 o E=45 UCS (PMT) to N> (PMT) c u =2 φ u = 35(UU) Mud Stones (UCT) 67 (CU) 53 o E=74UCS (LAB) (PMT) E=14UCS (PMT) Blue Sand Stones (UCT) 2 35 o E=65UCS (LAB).13 5 X <1 125(PMT) (CU) (CU) c u =12 E=6 UCS (PMT) φ u = 3(UU) 35(small strain) (very low) 3 BORED TUNNEL The 6.13m external diameter bored tunnels were driven by a TBM with the option of open or close face modes. The bored tunnels commenced from a portal in the cut and cover section at approximately CH and driven towards Changi Airport Station. The tunnels were being constructed using bolted 1.4m wide, 25mm thick precast reinforced concrete lining segments. Each ring was formed by 5 segments and 1 key. There are 12 cross-passage between the tunnels. The cross-passages were constructed by hand-mining method using steel frame and timber lagging. The approximate opening size for the cross-passage is 3m in diameter. 4 INSTRUMENTATION & MONITORING A comprehensive instrumentation and monitoring program was implemented for Contract 53. The monitoring scheme comprises of both ground and adjacent structure monitoring. The ground monitoring for the tunnel drives was conducted over 5 Greenfield sites (GFS) at approximately CH. 95+8, 96+5, , and These 5 GFS can generally be categorized into 3 types of different ground conditions, which the tunnels traversed through: Type 1 (GFS1) where tunnels were driven through interface between CWOA and KF Type 2 (GFS 2 & 5) where tunnels were entirely within CWOA with overlying KF Type 3 (GFS 3 & 4) where tunnels were entirely within Brown or Blue Sandstones without overlying KF The instrumentation across at the GFS consists of arrays of settlement markers, piezometers, in-place inclinometers and magnetic extensometers. A typical instrumentation layout plan at the Greenfield site and a typical cross-section are shown in Figures 4 and 5 respectively. Besides ground monitoring, monitoring of adjacent structures was also carried out, which included settlement markers on walls and column tiltmeters, to ensure the stability of the structures. Only ground monitoring results are presented in this paper. The monitoring data was used to revise the initial prediction of settlement trough for damage assessments.

5 Figure 4. Typical instrumentation plans at the greenfield site Figure 5. Typical instrumentation arrays at the greenfield site 5 ESTIMATION OF SETTLEMENT TROUGH PARAMETERS FROM GREENFIELD SITES The settlement data from the GFS was used to define the geometry of the settlement troughs needed to assess the likely damage to the adjacent structures. The prediction of Greenfield settlements due to the construction of a single bored tunnel were outlined by Peck (1969), O Reilly and New (1982) and extended by New and O Reilly (1991). Considerable observations on a number of tunneling projects demonstrated that the ground surface settlements are usually in the form of Gaussian Distribution Curves. These curves can be defined in terms of the Equivalent Face Losses (EFL) and the Trough Width Parameters (K). EFL value, which is defined by volume of ground loss in terms of percentage of tunnel face area, is governed by the nature of surrounding soil conditions, including the ground water conditions and influenced by the methods of construction and workmanship. K value is an empirical parameter, which is a function of the horizontal distance from the tunnel centerline to the point of inflection on the settlement trough, depth of the tunnel axis below the ground surface and external diameter of the tunnels. The settlement troughs for twin tunnels were obtained by superimposing the predicted ground settlement trough for each tunnel acting independently. This approach is conservative for tunnels where the clear separation is more than one tunnel diameter. In the back calculation for the EFL and K values

6 for the 3 different types of soil conditions, theoretical Gaussian settlement trough was iteratively fitted around the monitoring data at the GFS by adjusting the EFL and K values. These EFL and K values were subsequently used to define the settlement troughs at the sections with adjacent structures mentioned above for damage assessments. The monitoring data, characteristic EFL and K values of the ground surface settlement troughs in the 3 different types of soil conditions which the tunnels traversed through are summarized in Table 2. The following sections describe in detail the monitoring data and the back calculated EFL and K values of the ground settlement at the 3 different types of soil conditions. Table 2. Monitoring data and characteristic EFL & K values for 3 types of ground conditions Type of ground conditions Description Tunneling through interface between CWOA and KF Tunneling entirely in CWOA with overlying KF Tunneling entirely in Brown or Blue Sandstones without overlying KF GFS 1 2 & 5 3 & 4 Chainage(s) to to to to to Maximum Ground Surface Settlement 85mm 7mm 6mm Maximum Lateral Ground Movement 45mm 5mm 3mm Ground Water Table Unchanged Unchanged Unchanged EFL 4.5%.22 to.4%.15 to.25% K Type 1 (GFS 1 at approx. CH. 95+8) The monitoring data: settlement markers and inclinometer, as well as the theoretical Gaussian surface settlement trough at GFS 1 are shown in Figure 6. At this GFS, tunnels were driven through interface between CWOA and KF. The monitoring data shown in Figure 6 was recorded 2 weeks after both tunnels were driven through this monitoring site. Distance (m) Measured settlement data -4 4 Fill Theoretical Settlement Trough (EFL = 5.5%, K =.5) Depth to axis of tunnel = 17m Settlement (mm) Depth (m) CWOA KFC Center to Center Spacing = 15m Tunnel External Diameter = 6.126m OA -3 East bound GFS EB W B West bound Figure 6. Settlement Trough and inclinometer reading at GFS 1 (CH to CH ) Large settlements (above 3mm) occurred after the westbound tunnel was driven through this monitoring zone. This is because there was an unexpected abrupt change in the ground at the tunnel level

7 from OA to KF. The TBM driving parameters such as face pressure and the grout pressure used in OA had to be adjusted for driving in such soft and loose soils. During this process, the continued presence of the loose soils resulted in the large immediate ground settlements. When these driving parameters were adjusted for the subsequent tunnel drives, the settlements above the tunnels were limited to about 55mm above fluvial deposits to 85mm above marine clay deposits. Hence, the large settlement initially recorded above the westbound tunnel was treated as non-representative of actual settlement trough due to tunneling in such ground and this monitoring data is not shown in Figure 6. The maximum lateral ground movement was 45mm and there was no significant change in ground water table. Based on the monitoring data for the subsequent tunnel driving through this site, the critical EFL and K values at this site are 4.5% and.5 respectively. These are assumed as parameters defining the settlement trough where tunnels are driven through the interface between CWOA and KF. 5.2 Type 2 (GFS 2 at approx. CH and GFS 5 at approx. CH ) The monitoring data: settlement markers and inclinometer, as well as the theoretical Gaussian surface settlement troughs at GFS 2 and 5 are shown in Figures 7 and 8 respectively. At these 2 GFS, the tunnel driving was entirely in CWOA, but with some KF, ranging from 2 to 6m, overlying the CWOA above the tunnels. The monitoring data shown in Figures 7 and 8 was recorded 2 weeks after both tunnels were driven through these monitoring sites. The maximum ground surface settlement was about 4mm above KF of 2m thick and 7mm above KF of 6m thick. There was no significant change in ground water table. The maximum lateral ground movement was about 5mm. The EFL values at these 2 GFS range from.22% to.4% at location where the thickness of KF overlying the CWOA ranges from 2 to 6m. The K value at these 2 GFS is.3. These are assumed as parameters defining the settlement trough for tunneling entirely through the CWOA with overlying KF above the tunnels. Distance (m) Measured settlement data 4 Fill Theoretical Settlement Trough (EFL =.25%, K =.3) Settlement (mm) Depth to axis of tunnel = 19.65m Depth (m) CWOA KF Center to Center Spacing = 15m Tunnel External Diameter = 6.126m 28 OA East bound GFS EB W B West bound Fi 6 S l h d I li di GFS 2 Figure 7. Settlement Trough and inclinometer reading at GFS 2 (CH to CH.96+65)

8 Distance (m) Monitoring data Fill Settlement (mm) Theoretical Settlement Trough (EFL =.25%, K =.3) Depth to axis of tunnel = 19.75m Depth (m) Brown Sandstones Center to Center Spacing = 15m Tunnel External Diameter = 6.126m East bound GFS 28 Blue Sandstones EB W B West bound Figure 8. Settlement Trough and inclinometer reading at GFS 5 (CH to CH ) 5.3 Type 3 (GFS 3 at approx. CH and GFS 4 at approx. CH ) The monitoring data: settlement markers and inclinometer, as well as the theoretical Gaussian surface settlement troughs at GFS 3 and 4 are shown in Figures 9 and 1. At these 2 GFS, the tunnel driving was entirely in Brown or Blue Sandstones without any KF above the tunnels. The monitoring data shown in Figures 9 and 1 was recorded 2 weeks after both tunnels were driven through this monitoring site. Distance (m) Theoretical Settlement Trough (EFL =.15%, K =.3) Settlement (mm) Monitoring data Depth to axis of tunnel = 2.25m Depth (m) Brown Sandstones Center to Center Spacing = 15m Tunnel External Diameter = 6.126m Blue Sandstones -16 East bound GFS EB W B West bound Figure 9. Settlement Trough and inclinometer reading at GFS 3 (CH to CH )

9 Distance (m) Settlement (mm) Theoretical Settlement Trough (EFL =.4%, K =.3) Monitoring data Depth to axis of tunnel = 2m Depth (m) KF Fill CWOA Center to Center Spacing = 15m Tunnel External Diameter = 6.126m Brown Sandstones East bound GFS EB WB West bound Figure 1. Settlement Trough and inclinometer reading at GFS 4 (CH to CH.97+61) The maximum ground surface settlement was about 6mm. The maximum lateral ground movement was 3mm and there was no significant change in ground water table. The EFL at these 2 GFS range from.15% to.25% and the K value is.3. These are assumed as parameters defining the settlement trough for tunneling entirely through the Brown or Blue Sandstones. 6 DAMAGE ASSESSMENT OF ADJACENT STRUCTURES The assessment of the potential damage to the structures along CAL tunnels is based largely on the works of Burland and Wroth (1974), Boscardin and Cording (1989), Burland (1995) and Mair, Taylor and Burland (1996). The classification into various categories of damage is based on the limiting tensile strains on the subsided ground surface and those experienced by the structure. The damage categories based on the work by Burland et al. (1977) is shown in Table 3. Table 3. Category of damage (after Burland et al., 1977) Category of Damage Normal Degree of Severity Damage Type Description of Typical Damage Negligible Aesthetic Hairline cracks less than about.1mm. 1 Very Slight Aesthetic Fine cracks, which are easily treated during normal decoration. 2 Slight Aesthetic Cracks easily filled. Re-decoration probably required. Recurrent cracks can be masked by suitable linings. 3 Moderate Serviceability The cracks require some opening up and can be patched by a mason. Repainting of external brickwork and possibility a small amount of brickwork to be replaced. 4 Severe Serviceability Extensive repair work involving breaking out and replacing sections of walls, especially over doors and windows. 5 Very Severe Stability This requires a major repair job involving partial or complete rebuilding.

10 The risk analysis consists of evaluating the ground settlements due to the construction of bored tunnel and determination of the angular distortion and critical tensile strain experienced by the buildings due to the ground settlements. Hence, settlement troughs need to be predicted when adjacent structures, which could be adversely affected, required to be assessed for possible damage. Damage assessment had been done for the following adjacent structures: SASCO Bridge (approx. CH to 97+2) Yan Kit Pond (storm water reservoir)/ sluice gates (approx. CH 97+9 to 98+) Airport Structures Runway One and Taxiway (approx. CH.98+5 to 98+7) The above damage assessments are based on the assumption that the ground and the structure settle by the same amount and primarily based on the approach used for masonry structure where the structure stiffness is ignored. At the design stage, conservative values of EFL and K were used for damage assessment of the above adjacent structures based on the soil descriptions and the past experience on similar ground conditions. These assessments were then reassessed based on the available GFS monitoring data. The risk assessment was repeated using EFL of 1% and 4.5% for the Yan Kit Pond/sluice gates, and using EFL of 3% and 4.5% for Airport Runway and Taxiway, and.4% for SASCO Bridge. The damage categories of these structures are shown in Table 4. For Airport Runway, Taxiway and Yan Kit Pond/sluice gates, higher values of ground loss were used for the OA, as compared to GFS monitoring data. This was necessary to cover the likely variation in ground loss between the open and closed modes of the TBM operation and possibility of soft soil pockets beneath the structures. It could be seen from Table 4 that the most critical damage category predicted for any of the structures assessed is Category 3 (Moderate), which can be described as aesthetic to serviceability damage, due to typical crack widths ranging from 5 to 15mm. The cracks can be easily filled and recurrent cracks can be masked by suitable linings. However, no structural damage is expected. The predicted worst damage categories for Yan Kit Pond/sluice gates and Airport Taxiway are Moderate, which exceed the Slight category as per the particular specifications for Contract 53. The risk category predictions for the sluice gates shown in Table 4 should be interpreted with caution. The risk assessment is primarily based on the approach used for masonry structures, which in a strict sense is not suitable for the sluice gates. In the case of masonry structure, cracks of the size predicted can easily be filled. But in the case of the sluice gates, the possible adverse effects on the canal barrage mechanism of the sluice gates were difficult to predict, and difficult to repair if damage did occur. If the EFL value reaches 4.5% due to the presence of pockets of KF extending to the tunnel level, the function of the sluice gates as canal barrage may be adversely affected as the differential settlements may cause jamming of the gates in the sliding grooves. Hence, it was decided to adopt higher standard of control at this location in order to limit the severity of damage to the sluice gates. It was proposed to increase the depth of the tunnel at this location so that adequate firm ground cover is available between the tunnel crown and the gates to minimise differential settlements. For the Airport Runway and Taxiways, the settlements due to tunneling are not expected to cause any damage even when the face loss reaches 4.5% at location where there is pockets of soft soils extending up to the tunnel level. This is because the thick taxiway structure will help to flatten the settlement trough, hence reduce the differential settlements. The maximum settlement monitored at Airport Runway and Taxiway were 5mm and 6mm respectively. These values are well below the limit in the particular specifications. The SASCO Bridge is supported on deep foundations in good ground. The settlement of the ground due to tunneling in the vicinity (7 to 8m away from the piles) is not expected to increase the moments in the piles. Excessive settlements of the piles are unlikely because the toes of the piles are below the invert level of the tunnels. Table 4. Risk categories for adjacent structures

11 Structure Predictions based on monitoring data Max. settlement (mm) Risk Category *2 Predictions for 4.5% EFL for the case of KF at tunnel level Max. settlement (mm) Risk Category *2 Allowable values in particular specifications Max. settlement (mm) Risk Category *2 Monitoring data Max. settlement *1 (mm) SASCO Bridge (Ch m) (EFL=.4%, K=.3) Yan Kit Pond/sluice gates (Ch m) (EFL=1%, K=.45) Airport Runway One (Ch. 98+5m) (EFL=.4%, K=.3) Airport Taxiway (Ch. 98+7m) 52 (EFL=3%, K=.45) *1 Based on greenfield settlements assuming that the ground and the structure settle by the same amount. *2 Structure stiffness is ignored. 7 DAMAGE MITIGATION MEASURES Mitigation measures such as changing the mode of driving and lowering the vertical alignment of the tunnel was successfully implemented to minimize the ground movement, especially for the Yan Kit Pond/sluice gates structure. These mitigation measures were used to minimize risk identified from Observational Method. Lowering of the original tunnels vertical alignment at Yan Kit Pond/sluice gates had been proposed to minimize ground movement and thus structures damage and was accepted by Land Transport Authority (LTA). This lowering of the vertical alignments of eastbound and westbound tunnels are shown in Figure 11. Figure 11. Lowering of the vertical alignments of eastbound & westbound tunnels After the lowering of the tunnels vertical alignment, the maximum settlement monitored at the Yan Kit Pond/sluice gates was 4mm. The EFL and K values obtained by iteratively fitting a Gaussian settlement trough on the monitored data at this site were.3% and.45 respectively. As a result, the damage category of the Yan Kit Pond/sluice gate was improved from Very Slight to Negligible, which is within the limit of the particular specifications.

12 8 CONCLUSIONS The following conclusions were drawn from the above findings: 1. The monitoring data at GFS provides a better understanding of the actual ground movements caused by bored tunneling in OA and KF. 2. Lowering of tunnels vertical alignment at Yan Kit Pond/sluice gates to give sufficient ground cover between the tunnels and the sluice gates has been proposed and accepted by the LTA. The damage category for the Yan Kit Pond/sluice gates was reduced from very slight to negligible by the proposed lowering of alignment. 3. The method of estimating the EFL and K values based on the theoretical Gaussian curves fitted on the monitoring data, appears to be appropriate for tunneling in the KF and OA. 4. EFL and K values of 4.5% and.5 are estimated to be the parameters defining the settlement trough where tunnels are driven through the interface between CWOA and KF. 5. EFL values ranging from.22% to.4% and K value of.3 are estimated to be the parameters defining the settlement trough for tunneling entirely through the CWOA with overlying KF of thickness ranging from 2 to 6m above the tunnels. 6. EFL values ranging from.15% to.25% and K value of.3 are estimated to be the parameters defining the settlement trough for tunneling entirely through Brown or Blue Sandstones without overlying KF. 7. The damage assessment method used for CAL was able to predict the response of the adjacent structures to tunneling induced ground movements satisfactorily. 9 REFERENCES 1. Boscardin M. D. and Cording E. J. (1989), Building Response to Excavation Induced Settlement, ASCE Journal of Geotechnical Engineering., Vol. 115, No. 1, January, pp Burland J. B. (1995), Assessment of Risk of Damage to Buildings due to Tunneling and Excavation, Proceedings of First International Conference on Earthquake Geotechnical Engineering, Tokyo, pp Burland J. B. and Wroth C. P. (1974). Settlement of Buildings and Associated Damage, Proceedings of Conference on Settlement of Structures, Pentech Press, London, England, pp Burland J. B., Broms B. B., ad de Mello V. F. B. (1977), Behaviour of Foundations and Structures, State of the Art Report, Proceedings of the 9 th International Conference on Soil Mechanics and Foundation Engineering, Tokyo, Japan, pp New B. M. and O Reilly M. P. (1991), Tunneling Induced Ground Movements: Predicting Their Magnitude and Effect, 4 th International Conference on Ground Movements and Structures, Cardiff. 6. O Reilly M. P. and New B. M. (1982), Settlements above tunnels in the United Kingdom Their Magnitude and Prediction, Tunneling 89, London, pp Peck R. B. (1969), Deep Excavations and Tunneling in Soft Ground, State of the Art Report, 7 th International Conference on Soil Mechanics and Foundation Engineering, Mexico City, State of the Art Volume, pp Mair R. J., Taylor R. N. and J. B. Burland (1996), Prediction of Ground Movements and Assessment of Risk of Building Damage due to Bored Tunneling, Geotechnical Aspects of Underground Construction in Soft Ground, Balkema, Rotterdam, pp Sakurai S. (1999), Interpretation of The Results of Displacement Measurements in Geotechnical Engineering Projects, Proceedings of the 5 th International Symposium on Field Measurements in Geomechanics, Singapore, pp

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

Ground settlement due to shield tunneling through gravelly soils in Hsinchu

Ground settlement due to shield tunneling through gravelly soils in Hsinchu Japanese Geotechnical Society Special Publication The 15th Asian Regional Conference on Soil Mechanics and Geotechnical Engineering Ground settlement due to shield tunneling through gravelly soils in Hsinchu

More information

NUMERICAL MODELLING OF THE BRUSNICE TUNNEL

NUMERICAL MODELLING OF THE BRUSNICE TUNNEL NUMERICAL MODELLING OF THE BRUSNICE TUNNEL Matouš Hilar 1, Jakub Nosek 2 1 D2 Consult Prague and FCE CTU, Zelený pruh 95/97, Prague 4, 140 00, Czech Republic 2 D2 Consult Prague, Zelený pruh 95/97, Prague

More information

Control of surface settlements with Earth pressure balance method (EPB) for Istanbul metro

Control of surface settlements with Earth pressure balance method (EPB) for Istanbul metro ATS11-02327 Control of surface settlements with Earth pressure balance method (EPB) for Istanbul metro Hamid Chakeri 1, Bahtiyar Ünver 2, Alireza Talebinejad 3 1 Phd student, Hacettepe University, Dept.

More information

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7.

CONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7. CONTENTS Page 1. GeneralsG 4 2. Field Investigation WorkG 4 3. Laboratory Testing Work--- 5 4. Surface Soil Description-- 7 Appendix A Borehole Location Plan 11 Soil Profile-- 15 Bore Logs--=---- 18 Appendix

More information

Distribution: Tonkin & Taylor Ltd (FILE) 1 copy 1 copy

Distribution: Tonkin & Taylor Ltd (FILE) 1 copy 1 copy REPORT Proposed Second Runway Geotechnical Environmental Baseline Report Prepared for Prepared by Tonkin & Taylor Ltd Date October 2015 Job Number 29777.2000.v3 Distribution: Tonkin & Taylor Ltd (FILE)

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

Pressurised TBMs and their interaction with weathered rock. Nick Shirlaw

Pressurised TBMs and their interaction with weathered rock. Nick Shirlaw Pressurised TBMs and their interaction with weathered rock Nick Shirlaw Pressurised TBMs Two basic types: slurry or Earth Pressure Balance (EPB) Fundamental differences in how they provide pressure to

More information

Session 3 Mohr-Coulomb Soil Model & Design (Part 2)

Session 3 Mohr-Coulomb Soil Model & Design (Part 2) Mohr Coulomb Model Session 3 Mohr-Coulomb Soil Model & Design (Part 2) Time Session Topic 09:00 10:30 1 Overview 10:30 11:00 Coffee Break 11:00 12:30 2 Design (Part 1) 12:30-01:30 Lunch 01:30 03:00 3 Mohr-Coulomb

More information

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence

Comparison between predicted liquefaction induced settlement and ground damage observed from the Canterbury earthquake sequence Power, P.M. & Jacka, M. (2013) the Canterbury earthquake sequence Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown Comparison between predicted liquefaction induced settlement and ground

More information

Landslide FE Stability Analysis

Landslide FE Stability Analysis Landslide FE Stability Analysis L. Kellezi Dept. of Geotechnical Engineering, GEO-Danish Geotechnical Institute, Denmark S. Allkja Altea & Geostudio 2000, Albania P. B. Hansen Dept. of Geotechnical Engineering,

More information

APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE. A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada

APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE. A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada APPROACH FILL DESIGN OF NORTH SASKATCHEWAN RIVER BRIDGE A.F. Ruban, EBA Engineering Consultants Ltd., Edmonton, Alberta, Canada Paper prepared for presentation at the Slope and Embankment Engineering for

More information

SETTLEMENT TROUGH DUE TO TUNNELING IN COHESIVE GROUND

SETTLEMENT TROUGH DUE TO TUNNELING IN COHESIVE GROUND Indian Geotechnical Journal, 41(), 11, 64-75 SETTLEMENT TROUGH DUE TO TUNNELING IN COHESIVE GROUND Mohammed Y. Fattah 1, Kais T. Shlash and Nahla M. Salim 3 Key words Tunnel, clay, finite elements, settlement,

More information

DETAILED INVESTIGATION OF PILES DAMAGED BY HYOGOKEN NAMBU EARTHQUAKE

DETAILED INVESTIGATION OF PILES DAMAGED BY HYOGOKEN NAMBU EARTHQUAKE DETAILED INVESTIGATION OF PILES DAMAGED BY HYOGOKEN NAMBU EARTHQUAKE Kenichi HORIKOSHI 1, Akira TATEISHI 2 And Hiroyasu OHTSU 3 SUMMARY Since the 199 Hyogoken Nambu earthquake, a number of detailed investigations

More information

Foundations on Deep Alluvial Soils

Foundations on Deep Alluvial Soils Canterbury Earthquakes Royal Commission Hearings 25 October 2011, Christchurch GEO.CUB.0001.1-35.1 Foundations on Deep Alluvial Soils Misko Cubrinovski, Ian McCahon, Civil and Natural Resources Engineering,

More information

Prediction of behavior of structures due to large bore EPBM tunneling at the Port of Miami

Prediction of behavior of structures due to large bore EPBM tunneling at the Port of Miami World Tunnel Congress 2013 Geneva Underground the way to the future! G. Anagnostou & H. Ehrbar (eds) 2013 Taylor & Francis Group, London ISBN 978-1-138-00094-0 Prediction of behavior of structures due

More information

EFFECTIVE STRESS ANALYSES OF TWO SITES WITH DIFFERENT EXTENT OF LIQUEFACTION DURING EAST JAPAN EARTHQUAKE

EFFECTIVE STRESS ANALYSES OF TWO SITES WITH DIFFERENT EXTENT OF LIQUEFACTION DURING EAST JAPAN EARTHQUAKE Proceedings of the International Symposium on Engineering Lessons Learned from the 211 Great East Japan Earthquake, March 1-4, 212, Tokyo, Japan EFFECTIVE STRESS ANALYSES OF TWO SITES WITH DIFFERENT EXTENT

More information

3.0 GEOLOGY AND HYDROGEOLOGY

3.0 GEOLOGY AND HYDROGEOLOGY 3.0 GEOLOGY AND HYDROGEOLOGY 3.1 Methodology The Geological Survey of Ireland (GSI) publication Geology of South Cork was consulted to establish the nature of the bedrock lithology and Quaternary sediments.

More information

VOLUME LOSS CAUSED BY TUNNELLING IN KENNY HILL FORMATION

VOLUME LOSS CAUSED BY TUNNELLING IN KENNY HILL FORMATION Geotec., Const. Mat. & Env., DOI: https://doi.org/10.21660/2019.54.8316 ISSN: 2186-2982 (Print), 2186-2990 (Online), Japan VOLUME LOSS CAUSED BY TUNNELLING IN KENNY HILL FORMATION *Chee-Min Khoo 1,2, Thanath

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

IGJ PROOFS SETTLEMENT TROUGH DUE TO TUNNELING IN COHESIVE GROUND. Surface Settlement. Introduction. Indian Geotechnical Journal, 41(2), 2011, 64-75

IGJ PROOFS SETTLEMENT TROUGH DUE TO TUNNELING IN COHESIVE GROUND. Surface Settlement. Introduction. Indian Geotechnical Journal, 41(2), 2011, 64-75 Indian Geotechnical Journal, 41(), 11, 64-75 SETTLEMENT TROUGH DUE TO TUNNELING IN COHESIVE GROUND Key words Tunnel, clay, finite elements, settlement, complex variable Introduction The construction of

More information

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta Warmate Tamunonengiyeofori Geostrat International Services Limited, Rivers State, Nigeria www.geostratinternational.com info@geostratinternational.com,

More information

Harmonized European standards for construction in Egypt

Harmonized European standards for construction in Egypt Harmonized European standards for construction in Egypt EN 1998 - Design of structures for earthquake resistance Jean-Armand Calgaro Chairman of CEN/TC250 Organised with the support of the Egyptian Organization

More information

Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality

Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality Bowen, H. J. & Jacka, M. E. () Proc. th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown Liquefaction induced ground damage in the Canterbury earthquakes: predictions vs. reality H J Bowen & M E Jacka

More information

Underground Excavation Design Classification

Underground Excavation Design Classification Underground Excavation Design Underground Excavation Design Classification Alfred H. Zettler alfred.zettler@gmx.at Rock Quality Designation Measurement and calculation of RQD Rock Quality Designation index

More information

(C) Global Journal of Engineering Science and Research Management

(C) Global Journal of Engineering Science and Research Management GEOTECHNCIAL ASSESSMENT OF PART OF PORT HARCOURT, NIGER DELTA FOR STRUCTURAL ANALYSIS Warmate Tamunonengiyeofori Geostrat International Services Limited, www.geostratinternational.com. *Correspondence

More information

Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced Penetration Settlement of Wooden Houses

Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced Penetration Settlement of Wooden Houses 6 th International Conference on Earthquake Geotechnical Engineering 1-4 November 2015 Christchurch, New Zealand Residual Deformation Analyses to Demonstrate the Effect of Thin Steel Sheet Piles on Liquefaction-Induced

More information

STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS

STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS STUDY OF THE BEHAVIOR OF PILE GROUPS IN LIQUEFIED SOILS Shin-Tower Wang 1, Luis Vasquez 2, and Lymon C. Reese 3, Honorary Member,, ASCE ABSTRACT : 1&2 President & Project Manager, Ensoft, Inc. Email: ensoft@ensoftinc.com

More information

BELFAST SEWERS PROJECT

BELFAST SEWERS PROJECT BELFAST SEWERS PROJECT Adam Green - Atkins Tunnelling Scheme Overview New stormwater interceptor Tunnel Scheme within Belfast City Centre to alleviate flooding and divert storm water flows from existing

More information

J. Paul Guyer, P.E., R.A.

J. Paul Guyer, P.E., R.A. J. Paul Guyer, P.E., R.A. Paul Guyer is a registered mechanical engineer, civil engineer, fire protection engineer and architect with over 35 years experience in the design of buildings and related infrastructure.

More information

Mixed Face Conditions and the Risk of Loss of Face in Singapore

Mixed Face Conditions and the Risk of Loss of Face in Singapore Mixed Face Conditions and the Risk of Loss of Face in Singapore J.N. Shirlaw, Golder Associates (Singapore) Pte. Ltd. ABSTRACT: Tunnelling using pressurised face Tunnel Boring Machines (PTBM), such as

More information

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE

Horizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed

More information

Liquefaction-Induced Lateral Spreading Misko Cubrinovski University of Canterbury, Christchurch, New Zealand

Liquefaction-Induced Lateral Spreading Misko Cubrinovski University of Canterbury, Christchurch, New Zealand US New Zealand Japan International Workshop Liquefaction-Induced Ground Movements Effects UC Berkeley, California, 2 4 November 2016 Liquefaction-Induced Lateral Spreading Misko Cubrinovski University

More information

Analysis of the horizontal bearing capacity of a single pile

Analysis of the horizontal bearing capacity of a single pile Engineering manual No. 16 Updated: 07/2018 Analysis of the horizontal bearing capacity of a single pile Program: Soubor: Pile Demo_manual_16.gpi The objective of this engineering manual is to explain how

More information

REPORT. Ngai Tahu Property Ltd. Wigram Skies Subdivision Geotechnical Assessment

REPORT. Ngai Tahu Property Ltd. Wigram Skies Subdivision Geotechnical Assessment REPORT Ngai Tahu Property Ltd Wigram Skies Subdivision Geotechnical Assessment REPORT Ngai Tahu Property Ltd Wigram Skies Subdivision Geotechnical Assessment Report prepared for: Ngai Tahu Property Ltd

More information

*** ***! " " ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14. " > /' ;-,=. / ١

*** ***!   ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14.  > /' ;-,=. / ١ ١ ******!" #$ % & '!( ) % * ") +,-./ % 01. 3 ( 4 56 7/4 ) 8%9 % : 7 ;14 < 8%9 % : *7./ = ;-, >/'." Soil Permeability & Seepage ٢ Soil Permeability- Definition ٣ What is Permeability? Permeability is the

More information

Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake

Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake Performance and Post Earthquake Assessment of CFA Pile Ground Improvement 22 February 2011 Christchurch, New Zealand Earthquake K. M. Murahidy, S. W Sutherland & M. E. Jacka Tonkin & Taylor Ltd, Christchurch,

More information

Effective stress analysis of pile foundations in liquefiable soil

Effective stress analysis of pile foundations in liquefiable soil Effective stress analysis of pile foundations in liquefiable soil H. J. Bowen, M. Cubrinovski University of Canterbury, Christchurch, New Zealand. M. E. Jacka Tonkin and Taylor Ltd., Christchurch, New

More information

Piles & Chalk. Lessons Learnt the Hard Way

Piles & Chalk. Lessons Learnt the Hard Way Piles & Chalk Lessons Learnt the Hard Way What is Chalk? White Pure Soft & friable What is Chalk? But Can be brown, red, green or grey Can contain clays and other minerals Varies in strength from soft

More information

LSN a new methodology for characterising the effects of liquefaction in terms of relative land damage severity

LSN a new methodology for characterising the effects of liquefaction in terms of relative land damage severity van Ballegooy, S., Lacrosse, V., Jacka, M. & Malan, P. (2013) Proc. 19 th NZGS Geotechnical Symposium. Ed. CY Chin, Queenstown LSN a new methodology for characterising the effects of liquefaction in terms

More information

APPALACHIAN COLLUVIAL

APPALACHIAN COLLUVIAL LANDSLIDE PROBLEMS ON APPALACHIAN COLLUVIAL SLOPES Geohazards in Transportation in the Appalachian Region Charleston, WV August 5 7, 2008 RICHARD E. GRAY DIGIOIA, GRAY & ASSOCIATES, LLC. 570 BEATTY ROAD

More information

Site characterization for the HZM immersed tunnel

Site characterization for the HZM immersed tunnel DGF 2013-09-12 (18 th ICSMGE Paris; Discussion Session TC102) Site characterization for the HZM immersed tunnel HKSAR Jørgen S. Steenfelt COWI, Denmark Co-authors: S. Yding, A. Rosborg, J.G. Hansen, R.

More information

Analysis of Ground Deformations Induced by Tunnel Excavation

Analysis of Ground Deformations Induced by Tunnel Excavation Research Journal of Applied Sciences, Engineering and Technology (16): 87-88, 1 ISSN: -767 Maxwell Scientific Organization, 1 Submitted: April 7, 1 Accepted: April, 1 Published: August 1, 1 Analysis of

More information

August 10, 2007 File:

August 10, 2007 File: August 10, 2007 File: 15-85-72 Alberta Infrastructure and Transportation Room 301, Provincial Building 9621-96 Avenue Peace River, AB T8S 1T4 Attention: Mr. Ed Szmata PEACE REGION (PEACE HIGH LEVEL AREA)

More information

STUDY ON CONSOLIDATION OF ALLUVIAL CLAY IN NORTHERN QUEENSLAND

STUDY ON CONSOLIDATION OF ALLUVIAL CLAY IN NORTHERN QUEENSLAND STUDY ON CONSOLIDATION OF ALLUVIAL CLAY IN NORTHERN QUEENSLAND Barry Wai Choo, Kok Geotechnical Services Manager, Abigroup Australia Dr. Richard Gong Senior Geotechnical Engineer, AECOM Australia ABSTRACT

More information

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills

Background. Valley fills Sites in the Area. Construction over Mine Spoil Fills Construction over Mine Spoil Fills Wayne A. Karem, PhD, PE, PG, D.GE 2014 KSPE Annual Conference Background Strip mining; mountaintop and contour mining Creates huge quantities of mine spoil The mine spoil

More information

Engineeringmanuals. Part2

Engineeringmanuals. Part2 Engineeringmanuals Part2 Engineering manuals for GEO5 programs Part 2 Chapter 1-12, refer to Engineering Manual Part 1 Chapter 13. Pile Foundations Introduction... 2 Chapter 14. Analysis of vertical load-bearing

More information

Chapter 7 Permeability and Seepage

Chapter 7 Permeability and Seepage Permeability and Seepage - N. Sivakugan (2005) 1 7.1 INTRODUCTION Chapter 7 Permeability and Seepage Permeability, as the name implies (ability to permeate), is a measure of how easily a fluid can flow

More information

INTRODUCTION TO STATIC ANALYSIS PDPI 2013

INTRODUCTION TO STATIC ANALYSIS PDPI 2013 INTRODUCTION TO STATIC ANALYSIS PDPI 2013 What is Pile Capacity? When we load a pile until IT Fails what is IT Strength Considerations Two Failure Modes 1. Pile structural failure controlled by allowable

More information

CHAPTER 8 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS

CHAPTER 8 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS CHAPTER 8 SUMMARY, CONCLUSIONS AND RECOMMENDATIONS 8.1 SUMMARY This thesis aimed to investigate the mechanisms behind valley closure and upsidence over unmined coal and old longwall panels using UDEC.

More information

GNS Science, Lower Hutt, New Zealand NZSEE Conference

GNS Science, Lower Hutt, New Zealand NZSEE Conference A Ground Shaking Amplification Map for New Zealand U. Destegul, G. Dellow & D. Heron GNS Science, Lower Hutt, New Zealand. 2008 NZSEE Conference ABSTRACT: A ground shaking amplification map of New Zealand

More information

3.4 Typical Soil Profiles

3.4 Typical Soil Profiles SEI.UoC.0002.11 Figure 4. Streams in central Christchurch as mapped in March 1850, superposed on aerial photography captured on 24 February 2011. Streams digitised from the Black Map of Christchurch (March

More information

Introduction to Geotechnical Engineering. ground

Introduction to Geotechnical Engineering. ground Introduction to Geotechnical Engineering ground 1 Typical Geotechnical Project Geo-Laboratory ~ for testing soil properties Design Office ~ for design & analysis construction site 2 Shallow Foundations

More information

CHAPTER 8 ANALYSES OF THE LATERAL LOAD TESTS AT THE ROUTE 351 BRIDGE

CHAPTER 8 ANALYSES OF THE LATERAL LOAD TESTS AT THE ROUTE 351 BRIDGE CHAPTER ANALYSES OF THE LATERAL LOAD TESTS AT THE ROUTE 351 BRIDGE.1 INTRODUCTION An important objective of this research is to determine whether accurate analyses of the lateral load-deflection behavior

More information

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.)

Run 028 (Note: error in UKC at start of exercise due incorrect tide input then corrected ok.) Run 027 RNZ Full Bridge Simulation Run Plots Final Report Be-Software August 2016 Prepared for Royal Haskoning DHV on behalf of Refining New Zealand Limited 27 Run 028 (Note: error in UKC at start of exercise

More information

Influences of Shielding of Multi crossing Tunnels on Ground Displacement

Influences of Shielding of Multi crossing Tunnels on Ground Displacement Influences of Shielding of Multi crossing Tunnels on Ground Displacement Thayanan Boonyarak Chief of Engineering Division, Seafco Public Company Limited, 144 Prayasuren Road, Bangchan, Klongsamwah, Bangkok,

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

Finite Element Investigation of the Interaction between a Pile and a Soft Soil focussing on Negative Skin Friction

Finite Element Investigation of the Interaction between a Pile and a Soft Soil focussing on Negative Skin Friction NGM 2016 Reykjavik Proceedings of the 17 th Nordic Geotechnical Meeting Challenges in Nordic Geotechnic 25 th 28 th of May Finite Element Investigation of the Interaction between a Pile and a Soft Soil

More information

NUMERICAL VERIFICATION OF GEOTECHNICAL STRUCTURE IN UNFAVOURABLE GEOLOGICAL CONDITIONS CASE STUDY

NUMERICAL VERIFICATION OF GEOTECHNICAL STRUCTURE IN UNFAVOURABLE GEOLOGICAL CONDITIONS CASE STUDY NUMERICAL VERIFICATION OF GEOTECHNICAL STRUCTURE IN UNFAVOURABLE GEOLOGICAL CONDITIONS CASE STUDY Abstract Marián DRUSA Department of Geotechnics, Faculty of Civil Engineering, Univerzity of Žilina, Univerzitná

More information

THE STRUCTURAL DESIGN OF PILE FOUNDATIONS BASED ON LRFD FOR JAPANESE HIGHWAYS

THE STRUCTURAL DESIGN OF PILE FOUNDATIONS BASED ON LRFD FOR JAPANESE HIGHWAYS THE STRUCTURAL DESIGN OF PILE FOUNDATIONS BASED ON LRFD FOR JAPANESE HIGHWAYS Hideaki Nishida 1,Toshiaki Nanazawa 2, Masahiro Shirato 3, Tetsuya Kohno 4, and Mitsuaki Kitaura 5 Abstract One of the motivations

More information

Liquefaction and Foundations

Liquefaction and Foundations Liquefaction and Foundations Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Seismic Design of Reinforced Concrete Buildings 26 30 November, 2012 What is Liquefaction? Liquefaction

More information

Design of RC Retaining Walls

Design of RC Retaining Walls Lecture - 09 Design of RC Retaining Walls By: Prof Dr. Qaisar Ali Civil Engineering Department UET Peshawar www.drqaisarali.com 1 Topics Retaining Walls Terms Related to Retaining Walls Types of Retaining

More information

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist?

Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? Geotechnical issues in seismic assessments: When do I need a geotechnical specialist? B.H. Rama & S.J. Palmer Tonkin & Taylor Ltd (T+T), Wellington, New Zealand. 2016 NZSEE Conference ABSTRACT: The Canterbury

More information

THREE DIMENSIONAL NUMERICAL INVESTIGATION OF BAGHDAD METRO PASSING UNDER TIGRIS

THREE DIMENSIONAL NUMERICAL INVESTIGATION OF BAGHDAD METRO PASSING UNDER TIGRIS International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 10, October 2017, pp. 18 30, Article ID: IJCIET_08_10_004 Available online at http://http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=8&itype=10

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA

IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA IMAGING OF DEEP SINKHOLES USING THE MULTI-ELECTRODE RESISTIVITY IMPLANT TECHNIQUE (MERIT) CASE STUDIES IN FLORIDA David Harro The G3 Group, 2509 Success Drive, Suite 1, Odessa, FL 33556, david.harro@geo3group.com

More information

PERFORMANCE OF BITUMINOUS COATS IN REDUCING NEGATIVE SKIN

PERFORMANCE OF BITUMINOUS COATS IN REDUCING NEGATIVE SKIN PERFORMANCE OF BITUMINOUS COATS IN REDUCING NEGATIVE SKIN FRICTION Makarand G. Khare, PhD Research Scholar, Indian Institute of Technology Madras, Chennai, India Shailesh R. Gandhi, Professor, Indian Institute

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

D1. A normally consolidated clay has the following void ratio e versus effective stress σ relationship obtained in an oedometer test.

D1. A normally consolidated clay has the following void ratio e versus effective stress σ relationship obtained in an oedometer test. (d) COMPRESSIBILITY AND CONSOLIDATION D1. A normally consolidated clay has the following void ratio e versus effective stress σ relationship obtained in an oedometer test. (a) Plot the e - σ curve. (b)

More information

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES Soil Mechanics Chapter # 1 INTRODUCTION TO SOIL MECHANICS AND ITS TYPES Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak Chapter Outlines Introduction to Soil Mechanics, Soil

More information

STATEMENT OF PHYSICAL CHARACTERISTICS REPORT FOR WELLINGTON, HEREFORD AND WORCESTER MINERALS LOCAL PLAN

STATEMENT OF PHYSICAL CHARACTERISTICS REPORT FOR WELLINGTON, HEREFORD AND WORCESTER MINERALS LOCAL PLAN STATEMENT OF PHYSICAL CHARACTERISTICS REPORT FOR WELLINGTON, HEREFORD AND WORCESTER MINERALS LOCAL PLAN M J Wood ADAS Ref: 25/RPT/0039 Resource Planning Team Job No: 164/94 ADAS Statutory Group MAFF Ref:

More information

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer

Engineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical

More information

Climate effects on landslides

Climate effects on landslides GEORAMP ONE DAY SYMPOSIUM Climate effects on landslides E. E. Alonso, M. Sondón, N. M. Pinyol Universitat Politècnica de Catalunya October 14th, 2016. UPC, Barcelona Infiltration (evaporation) and slope

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015

Redwood City Harbor, California, Navigation Improvement Feasibility Study. Appendix D. Geotechnical Engineering. DRAFT April 2015 1 Redwood City Harbor, California, Navigation Improvement Feasibility Study Appendix D Geotechnical Engineering DRAFT April 2015 2 Contents 1 Purposes of Report... 3 2 Background... 3 3 References and

More information

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon

Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon Guidelines for Site-Specific Seismic Hazard Reports for Essential and Hazardous Facilities and Major and Special-Occupancy Structures in Oregon By the Oregon Board of Geologist Examiners and the Oregon

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

25th International Conference on Ground Control in Mining

25th International Conference on Ground Control in Mining ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris

More information

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation Yong-Beom Lee, Jorge Castillo Ausenco, USA Aurelian C. Trandafir Fugro GeoConsulting

More information

CENTURY CITY AREA TUNNELING SAFETY AND FAULT INVESTIGATIONS. Edward J. Cording, Geoffrey Martin, Harvey Parker, Tunnel Advisory Panel (TAP)

CENTURY CITY AREA TUNNELING SAFETY AND FAULT INVESTIGATIONS. Edward J. Cording, Geoffrey Martin, Harvey Parker, Tunnel Advisory Panel (TAP) CENTURY CITY AREA TUNNELING SAFETY AND FAULT INVESTIGATIONS Edward J. Cording, Geoffrey Martin, Harvey Parker, Tunnel Advisory Panel (TAP) Los Angeles County Metropolitan Transportation Authority October

More information

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE August 14, 2017 Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE Gregory.Raines@Stantec.com Develop Preliminary Geologic / Geotech Conceptual Model for the Project

More information

Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake

Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake Christchurch CBD: Lessons Learnt and Strategies for Foundation Remediation 22 February 2011 Christchurch, New Zealand, Earthquake K.M. Murahidy & A.F. Sleight Tonkin & Taylor Ltd, Christchurch, New Zealand

More information

GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition

GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition GEOTECHNICAL ENGINEERING INVESTIGATION HANDBOOK Second Edition Roy E. Hunt Taylor & Francis Taylor & Francis Croup Boca Raton London New York Singapore A CRC title, part of the Taylor & Francis imprint,

More information

Y. Shioi 1, Y. Hashizume 2 and H. Fukada 3

Y. Shioi 1, Y. Hashizume 2 and H. Fukada 3 Y. Shioi 1, Y. Hashizume 2 and H. Fukada 3 1 Emeritus Professor, Hachinohe Institute of Technology, Hachinohe, Japan 2 Chief Engineer, Izumo, Misawa, Aomori, Japan 3 Profesr, Geo-Technical Division, Fudo

More information

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam Land Subsidence (Proceedings of the Fifth International Symposium on Land Subsidence, The Hague, October 1995). 1AHS Publ. no. 234, 1995. 55 Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

More information

GROUND MOVEMENTS DUE TO SHALLOW TUNNELS IN SOFT GROUND: 2. ANALYTICAL INTERPRETATION AND PREDICTION

GROUND MOVEMENTS DUE TO SHALLOW TUNNELS IN SOFT GROUND: 2. ANALYTICAL INTERPRETATION AND PREDICTION GROUND MOVEMENTS DUE TO SHALLOW TUNNELS IN SOFT GROUND: 2. ANALYTICAL INTERPRETATION AND PREDICTION by Federico Pinto 1, Despina M. Zymnis 2 and Andrew J. Whittle 2 ABSTRACT: This paper considers the practical

More information

Geology, Soils, and Seismicity

Geology, Soils, and Seismicity Section 3.8 Geology, Soils, and Seismicity Introduction This section generally evaluates the effects of the alternatives analyzed in this Supplemental DEIS with regard to geology, soils and seismicity.

More information

Study of the liquefaction phenomenon due to an earthquake: case study of Urayasu city

Study of the liquefaction phenomenon due to an earthquake: case study of Urayasu city Disaster Management and Human Health Risk III 311 Study of the liquefaction phenomenon due to an earthquake: case study of Urayasu city S. Kamao 1, M. Takezawa 1, K. Yamada 1, S. Jinno 1, T. Shinoda 1

More information

Some Aspects on the Design of Near Surface. Tunnels - Theory and Practice. Thomas Marcher¹, Taner Aydogmus²

Some Aspects on the Design of Near Surface. Tunnels - Theory and Practice. Thomas Marcher¹, Taner Aydogmus² Mitteilungen für Ingenieurgeologie und Geomechanik Band 10 6 th Colloquium Rock Mechanics Theory and Practice p. 179-188 Wien 2013 Some Aspects on the Design of Near Surface Tunnels - Theory and Practice

More information

CPT Data Interpretation Theory Manual

CPT Data Interpretation Theory Manual CPT Data Interpretation Theory Manual 2016 Rocscience Inc. Table of Contents 1 Introduction... 3 2 Soil Parameter Interpretation... 5 3 Soil Profiling... 11 3.1 Non-Normalized SBT Charts... 11 3.2 Normalized

More information

Measured short-term ground surface response to EPBM tunnelling in London Clay

Measured short-term ground surface response to EPBM tunnelling in London Clay Wan, M. S. P. et al. Géotechnique [http://dx.doi.org/.68/jgeot.6.p.99] Measured short-term ground surface response to EPBM tunnelling in London Clay M. S. P. WAN, J. R. STANDING, D. M. POTTS and J. B.

More information

Analysis and measurements of settlement for heavy loaded rigid footing

Analysis and measurements of settlement for heavy loaded rigid footing Analysis and measurements of settlement for heavy loaded rigid footing I. Sokoli University of Zagreb, Faculty of Civil Engineering, Ka i eva 26, 1 Zagreb, Croatia T. Ivši University of Zagreb, Faculty

More information

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY AREA MANAGER ROADS CERTIFICATION PROGRAM AMRC 2011 SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE FOR EDUCATIONAL PURPOSES ONLY April, 2006 WPC #28013 07/09 2009 by British Columbia Institute of Technology

More information

R.SUNDARAVADIVELU Professor IIT Madras,Chennai - 36.

R.SUNDARAVADIVELU Professor IIT Madras,Chennai - 36. Behaviour of Berthing Structure under Changing Slope in Seismic Condition - A Case Study K.MUTHUKKUMARAN Research Scholar Department of Ocean Engineering, R.SUNDARAVADIVELU Professor IIT Madras,Chennai

More information

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS)

LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) J. Al Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 LANDSLIDES IN THE WHITE MOUNTAIN (GEOTECHNICAL STUDIES AND ENGINEERING TESTS) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

Landslide Granice in Zagreb (Croatia)

Landslide Granice in Zagreb (Croatia) Landslides and Engineered Slopes Chen et al. (eds) 28 Taylor & Francis Group, London, ISBN 978--415-41196-7 Landslide Granice in Zagreb (Croatia) Z. Mihalinec Civil Engineering Institute of Croatia, Zagreb,

More information

Subsurface Geology of the Kennebec River

Subsurface Geology of the Kennebec River Maine Geologic Facts and Localities July, 1998 Subsurface Geology of the Kennebec River 43 54 40.75 N, 69 48 29.01 W Text by Daniel B. Locke, Department of Agriculture, Conservation & Forestry 1 Map by

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information