1 Study about Velocity Index in Actual River during Flooding Atsuhiro Yorozuya 1, Kazuhiko Fukami 1 1 International Centre for Water Hazard and Risk Management (ICHARM) under the auspices of UNESCO, Public Works Research Works, Japan yorozuya@pwri.go.jp Abstract For the purposes of a development of an automatic water discharge measurement, a field measurement was conducted using non-contact current meters for obtaining Water Surface (WS) velocity, water gauges for estimating WS slope, Acoustic Doppler Current Profiler (ADCP) mounted on tethered ADCP platform, as well as an echo sounder fixed on H-steel for monitoring riverbed during flooding. Observational site was selected aiming understanding of flow as well as river bed characteristic at where riverbed deformation easily occurs. Actually, when two flood waves with magnitude of 1,000 m 3 /s passed through the site involving significant river bed deformation, observation with few mentioned devices were successfully conducted. For example, the echo sounder successfully monitored the bed form with maximum wave height of 1.5m when the water surface elevation increase about 2.5m from normal stage. Based on those observed results, the present study describes mainly about the velocity index with relating to the WS velocity, as well as the Manning's roughness coefficient incorporated with the bed form. The results show that the velocity indices of 0.85±5 were observed by ADCP with none or less bed form height condition; however, the values of 1.1 or 0.7 were also recognized when the bed form predominated. 1. Introduction Water discharge measurements in river, as well as storage of the observed values, are very fundamental in terms of designing the river-infrastructure, such as levee, dam, and etc. For conducting the measurement, the current meter incorporating with a depth sounder has been employed in many countries, especially in continental rivers. In the case of Japan, float-type measurements, which established in 1940s, have employed since then, because character of Japanese rivers is highly unsteadiness, loose boundary, and, above all, rough water surface. Recently many devices have developed with different principles, such as acoustic especially using H-ADCP by Nihei and Kimitu (2008), video images of LSPIV by Muste et al. (2008), or STIV by Fujita et al. (2009), erector-magnetic by Yamaguchi and Niizato (1994), and etc. They have been well developed in terms of durability in the field, as well as reliability of data accuracy, which was confirmed by the direct comparison between those devices and ADCP measurements by Yorozuya et al. (2010), and Hara et al. (2011). However, considering about the water discharge value, additional information such as a water depth, as well as a velocity index are still necessary to be taken into account. Authors have tried to develop an automatic water discharge measurement system employing few devices, such as such as non-contact current meter as fixed type measurement, water

2 surface slope to determine the velocity index employing the log-law as well as the WS velocity, and ADCP traverse measurement for bathymetry monitoring as well as verification purposes, e.g., Yorozuya at al. (2010). In terms of the velocity index, authors have not satisfied by ourselves as the automatic system; rather, applied constant value as 0.85 as other studies do. Contrary with the authors' previous study, the water discharge measurement was conducted in mountainous area aiming understanding of flow as well as river bed characteristic at where riverbed deformation frequently occurs. In addition to devices listed previously, the automatic river bed monitoring system using echo sounder in the middle of channel was employed. Actually, when two flood waves with magnitude of 1,000 m 3 /s passed through the site involving significant river bed deformation, observation with few mentioned devices were successfully conducted. For example, the echo sounder successfully monitored the bed form with maximum wave height of 1.5m when the water surface elevation increase about 2.5m from normal stage. Based on those observed results, the authors discussed about the timely change of the WS velocity, the Manning's roughness coefficient, as well as a velocity index incorporated with the bed form. Regarding to the velocity indices, the values of 0.85±5 were observed by ADCP with none or less bed form height condition; however, the values of 1.1 or 0.7 were also recognized when the bed form predominated. 2. Methodology The observational site of this study has river characteristics, such as a bed slope of about 1/200, bed material between 30 and 210 mm, and a river width of about 250 m including a main channel of 120m as well as a flood plain of 130m. At upstream of this site, many mountains with slope failure locate, as well as Sabo works have conducted inside of this catchment area. Because of sediment supplies, as well as steep bed slope, frequent river bed elevation change is recognized. Authors experienced flooding with discharge of about 1,000 m 3 /s, whose water surface elevation is about 2.5m higher than normal flow. Usually, this section has normal water discharge of about 50m 3 /s. In following few paragraphs, instrumentation will be explained. Non-contact current meter to measure water surface (WS) velocity has specification of 24.15Ghz ghz with a horn antenna as well as a half power angle of about 12 degree. Eight cross sections were setup with total 120m width of water-flow section during our observation. Single non-contact current meter was employed observing frequency of 1Hz in 5 minutes, whose representative value obtained by averaging them. Thereafter the observation is conducted continuously at another section, until it measured at eight different points within one hour. Using those data, timely interpolated values were employed for determining value at an assigned time. Though this instrument has a characteristic of obtaining falling velocity of rain or snow when it is that weather condition, there was no rain or snow during the observation. Two water gauges were employed to estimate the water surface slope; e.g., the Cera Diver whose specification has a resolution of 0.25cm and an accuracy of 2cm, as well as the one of the Ministry of Land, Infrastructure, Transport and Tourism (MLIT). The Cera Diver located at 360m upstream from the bridge, while the one of MLIT located at 30 upstream.

3 River-bed elevation change was monitored by two echo sounders fixed with oblique angle on H-type steels located on middle of water flow, whose conceptual diagram is shown in Figure 1. Those three echo sounders were named as observatory B1, B2 and B3 with the angle of 5, 50.4, and 52.8 degree, respectively. Among them, B1 and B2 locate in the main channel, while B3 locates on the floodplain. The monitoring system is located about 30m upstream from a bridge in the Figure 1. The echo sounders have specification of 200 khz, with time interval of 0.2 seconds. 10 seconds measurement was conducted with every 10 minutes, and saved as one single value after averaging them. The beam of echo sounder should be located high enough to illuminate the spot which is outside of wake flow generated by the H-type steel; at the same time, it should be low enough, since measurements cannot start unless a transducer sinks to the flood water. Therefore, the location of the echo sounders should be carefully decided considering designing the magnitude of flooding. For this study, the targeted discharge for B1 and B2 was selected as about 1 time in a year. Logger box H-type steel Solar panel B3 B2 Echo Sounder B1 River bed Location of observation Ring Method Figure 1: Conceptual diagram of the river bed monitoring system with echo sounder Traverse measurements with ADCP mounted on a tethered platform was also conducted to profile horizontal/vertical water velocity distribution as well as bathymetry. Those observed values are employed to obtain the velocity index as well as to estimate WS velocities. For the estimation, the least square method was employed assuming the vertical velocity distribution is the logarithmic profile; thereafter, the velocity at a upper unmeasured zone was extrapolated using the relation. The estimated WS velocities were compared with that obtained by the non-contact current meter for verification purposes. Though this paper are not well explained about the comparison, the WS velocity obtained from both of them were fairly well fitted. To actual measurement, the traversing of the boat with tethering the field workers on the bridge was applied to obtain cross sectional values. The boat path, therefore, was the downstream side of the bridge with the distance of 10 to 20m depend on the water velocity. Peripheral devices, such as a high speed river boat as well as Real Time Kinematic (RTK)- GPS, were employed to the measurement to execute the rough water surface vibration as well as active bedload condition. The Work Horse ADCP with 1,200 khz by Teledyne RD instruments were employed with commands showing in Table1.

4 3. Observational results Table 1: Commands of ADCP Mode of Bottom truck BM5: 5 normal Pings for Bottom truck BP3: 3 pings Pings for Water truck WP3: 3 pings Type of band WB0: Broad band Distance of first blank WS25: 25 cm Mode of measurement WM12: high speed mode Number of layer WN40: 40 layers Thickness of layer WS25: 25 cm Figure 2 shows time series of the WS elevation, riverbed elevation, the observational time of ADCP traverse measurements, and WS velocity measured by non-contact current meter. As it shows, observation with ADCP as well as non-contact current meter was conducted when two flood waves pass through the observational point. Water surface elevation started to increase at 6:00 of first day, it reached at the first peak around 21:00 with increasing about 2.5m in water depth when discharge of 1,000 m 3 /s and WS velocity of m/s was obtained. After water surface elevation decreases to 118.0m within 24hours, next peak came with slightly less discharge compared with first peak, whose discharge is about 800 m 3 /s and WS velocity of about m/s. The monitoring of the river-bed elevation by observ.b1 started after WS elevation increased about 117.7m, while observ.b2 started about m. At depression time between two flood peaks, the transducer of observ.b2 quit monitoring, since WS elevation reached to below transducer. Thereafter, it started monitoring again with increasing of water depth. Elevation of WS and riverbed, m WS, TP ADCP obser. Observ. B1 Observ. B2 non-contact current meter WS velocity, m/s - 1st Day 2nd Day Figure 2: Time series of river bed elevation, water surface elevation, and timing of ADCP measurements Regarding of observ.b1 starting around 12:00 of 1 st day, sediment deposition prevailed till the peak of flooding. After peak discharge pass, river bed elevation decreased with magnitude of 1m vibrating within the similar range till the WS elevation decrease. At 12:00 of 2nd day, sediment deposition continues resulting about 50cm accumulation in next 12 hours with decreasing of water depth. After next flood came, it shows similar trend with the first one; thereafter, it came back to the initial level. Regarding of observ.b2, the relation between WS 3rd Day 4th Day

5 and riverbed elevation shows similar trend with that of observ.b1. Slightly different characteristic is that magnitude of the vibration of river bed is higher than that of B1. Common characteristics for both of them are that minimum river bed height appears not at the peak of water discharge but after few hours, as well as timing of the bed vibration. Authors expected that area of flow section have simple-increasing function with WS elevation, such as degradations and aggradations corresponding with increasing and decreasing of water discharge; however, actual phenomenon in this case was not so simple, e.g., that bed forms was developed and pass though the observational section. To illustrate general ideas of the current study as well as observational section, flow pattern, and etc, Figure 3 indicates one of examples of observational results, such as velocity distribution, river bed elevation, and location of bridge pier and echo sounders. The horizontal, vertical, secondary vertical axes indicate distance from the left river bank in m, water velocity in cm/s, and elevation for riverbed and water surface in m, respectively. Among the marks in this figure, the filled circles are for WS velocities converted by the ADCP measurements; vertical-dotted lines for section boarders with section number from 1 to 8; triangles for section averaged values of the filled circles; open-circles for WS velocities measured with noncontact current meters; diamonds for locations of the echo sounder; BP for locations and width of the bridge pier; solid curve for river bed obtained by the ADCP measurements; a broken line for river bed surveyed few years ago; and a dotted line for water surface elevation. velocity, cm/s river bed, water surface elevation, m BP BP Distance from left river bank, m Surface velocity by ADCP Averaged velocity by ADCP Surface velocity with non-contact river bed taken by ADCP Original river bed Water surface elevation Location of Echo sounder BP Location of bridge pier Figure 3: Cross sectional distribution of velocity and river bed As this figure indicates, the velocity distributions were widely and locally distributed with affecting by the bridge piers, as well as by local turbulence. Especially, flow as well as sediment deposition behind bridge pier are concaved, though concaved parts is not exactly located at that of bridge pier because of skewed flow. As comparison between triangles as well as open-circles indicates, both of them are not so exactly identical but few difference within acceptable range.

6 Figure 4 shows time series of water surface elevation as well as water surface slope obtained by water gauges, river bed elevation averaged the observed values in the section 2 obtained by ADCP, WS velocity obtained by the non-contact current meter, and the Manning s roughness coefficient. As figure 3 indicates, the section 2 is one of downstream section from the river bed monitoring B1. It was unfortunate that the riverbed values around 9:00 of the 3 rd day are less dense compared with other time because of unreliable observed values with many missing ensemble. To estimate the Manning s roughness coefficient, the WS velocity with non-contact current meter, WS slope, WS elevation, the river bed elevation which most recently observed by ADCP, as well as the velocity index obtained by ADCP were employed. WS velocity, m/s, Manning's n/100, 1/WS slope WS slope Manning's n WS velocity riverbed elevation WS elevation elevation, m 1st day 2nd day 3rd day 4th day Figure 4: Time series of river bed elevation, WS elevation, WS slope, WS velocity, and the Manning s roughness coefficient at section 2 Figure 4 indicates that, starting from 18:00 of 2 nd day, as water surface increase, firstly the WS velocity increase until 6:00 of 3 rd day, secondary it start to fluctuate with range about 25cm until 13:00 of 3 rd day, and finally it continuously decreases. On the other hand, river bed elevation changes in this section shows similar trend with obser.b1 indicated in Figure 2, in terms of the shape as well as the magnitude of sand wave. Correspondence between the WS velocity and the riverbed elevation implies that sand wave generated at the bottom of river bed affects to the WS velocity, though WS elevation does not show any similarity, since they are located at the river bank. Regarding of WS slope, it has minimum values about 1/650 in between two flood peaks; thereafter, it reached to the maximum values about 1/300 at 12:00 of 3 rd day, then it continuously decreases. The Manning s coefficient, involving most of variables described in this paragraph, starts around 4 from 18:00 of 2 nd day; thereafter, it decreases the values till 35, probably because of smoothing of roughened river bed which was disturbed by the first peak. With generating of the bed form, the roughness also rapidly increases to more than 5. Thereafter, it gradually decreases with the WS elevation decreasing. Based on this change, authors could estimate the grain roughness is about 35 while form roughness is about additional 2. In this figure, the correspondence among the bed form, the WS velocity, as well as the roughness was clearly described based on the observed values. Figure 5 shows time series of variables alike with Figure 4 adding discharges and velocity index, as well as deducting the WS slope and the Manning's roughness. Similar with the bed elevation change, the velocity index was estimated with averaging the observed values in the section 2 obtained by ADCP. The discharge with 0.85 obtained by applying the velocity index

7 of 0.85 for obtaining the averaged velocity from the WS velocity by the non-contact current meter, the water depth obtained by the WS elevation as well as the river bed elevation, while the discharge with ADCP index applies the velocity index obtained by ADCP observation. WS velocity, m/s, dishcarge, m 3 /s 20, velocity index/5, 6.0 WS velocity discharge with 0.85 discharge with ADCP index velocity index riverbed elevation WS elevation elevation, m 1st day 2nd day 3rd day 4th day Figure 5: Time series of river bed elevation, WS elevation, WS velocity, velocity index obtained by ADCP, discharge with velocity index of 0.85 and that by ADCP at section 2 As this figure indicates, the velocity index has number in between 0.75 and 0.85 when bed form does not exist. When bed form generated between 6:00 and 15:00 of 3 rd day, the velocity index vibrates between 1.1 and Those numbers with the bed from are slightly larger than other study. For example, Polatel (2006) conducted experimental studies as well as numerical computation with different types of roughness. In this study, she obtained the velocity index between 0.85 and on roughened bed. On the other hand, Hino and Miyanaga (1977) shows the vertical velocity distribution at the different location of sand wave; e.g., trough, crest and in between. They shows that velocity distribution at the crest is almost vertical or sometimes overshooting type which indicates the velocity index around, while that at the trough is widely distributed including the reverse flow which has possibility of the velocity index of less than 0.8. Correspondingly, two discharges are directly related to differences of velocity index; for example, they are not much different when the velocity indices are around 0.85, while 24% and 16% difference occurs when the velocity index is 1.13 and 0.73, respectively. Figure 6 and 7 indicates the variables obtained at section 7 with the same format and contents of Figure 4 and 5, respectively. As Figure 5 indicates, the riverbed vibration in this section is more severe compared with Figure 4 but somehow similar with the results of the river bed monitoring B2 in Figure 2 in terms of shape of wave as well as magnitude of wave height. Actually, both of them have deposition toward the peak of the WS elevation, and higher oscillation during recession phase within the range of 1.5m. In addition, the WS velocity as well as the Manning's roughness coefficient show similar trend with those in Figure 4, but more dynamically vibrate with corresponding to the river bed fluctuation. Regarding of the roughness coefficient, either grain or form roughness cannot be clearly determined in this section, since riverbed vibrates even low WS elevation; though, the authors can clearly state that the severer river bed vibration makes the higher values of the Manning's roughness coefficients. On the other hand, most of the velocity indices in between 18:00 of 2nd day and

8 23:00 of 3rd day idles around 0.85 within the range of ±5. With generation of the bed forms, the velocity index correspondingly vibrates. WS velocity, m/s, Manning's n/100, 1/WS slope WS slope Manning's n WS velocity riverbed elevation WS elevation elevation, m 1st day 2nd day 3rd day 4th day Figure 6: Time series of river bed elevation, WS elevation, WS slope, WS velocity, and the Manning s roughness coefficient at section 7 WS velocity, m/s, dishcarge, m 3 /s 20, velocity index/5, WS velocity discharge with 0.85 discharge with ADCP index velocity index riverbed elevation WS elevation elevation, m 1st day 2nd day 3rd day 4th day Figure 7: Time series of river bed elevation, WS elevation, WS velocity, velocity index obtained by ADCP, discharge with velocity index of 0.85 and that by ADCP at section 7 4. Discussion and Conclusion With aiming to develop an automatic water discharge measurement, the authors discussed about flow properties based on the observed results obtained in the mountain area. With the observed flood event, the bed form was obtained with ADCP traverse measurement as well as the riverbed monitoring system. Based on those results, authors discussed about the velocity index aiming to compile the automatic water discharge measurement system. The significant outputs from above discussion can be listed as follows; 1) most of the velocity index without or with less height of bed form are about 0.85±5, 2) when bed form exist, they varied to 1.1 to 0.7 which is depned on size as well as relative location of the bed form, 3) therefore, existance of the bed form should be carefully confirmed to determine the velocity index, 4) the bed form generated not necessary at the maximum flood peak, 5) time series of the WS velocity maybe one of the indicators 6) the Manning's roughness coefficient was also estimated from observed values, and

9 7) the authors had expected the riverbed monitoring system as estimating of the flow area, it is also capable to estimating the velocity index. Acknowledgement Observed data presented herein were obtained by River division of National Institute for Land and Infrastructure Management, Japan. Authors appreciated their cooperation for providing us the valuable data. References Ichiro Fujita et al. (2009) Efficient space-time image analysis of river surface pattern using two dimensional fast Fourier transformation. Proceedings of 33rd IAHR Congress, pp Hiroki Hara et al. (2011) Accuracy of non-intrusive river flow measurements by using space time image velocimetry. 11 th Asian Symposium on Visualization, Niigata, Japan Mikio Hino, and Yoichi Miyanaga (1977) Analysis of two-dimensional flow in a wavy conduit. Proceedings of the Japan Society of Civil Engineers, 264, pp (in Japanese) Marian Muste et al. (2008) Large-scale particle image velocimetry for measurements in riverine environments. Water Resour. Res., 44, W00D19, doi: /2008wr Yasuo Nihei and Akira Kimizu (2008) A new monitoring system for river discharge with H- ADCP measurements and river-flow simulation. Water Resources Research, Vol.44, W00D20, doi: /2008wr Ceyda Polatel (2006) Large-scale roughness effect of free-surface and bulk flow characteristics in open channel flows. Ph.D. thesis, Univ. of Iowa, Iowa. Takayuki Yamaguchi and Kunio Niizato (1994) Flood discharge observation using radio current meter. Journal of Hydraulic, Coastal and Environmental Engineering(II), 497:28, (in Japanese) Atsuhiro Yorozuya et al. (2010) Development of automatic water discharge measurement system. Environmental Hydraulics, Christodoulou & Stamou 2010 Taylor & Francis Group, London, ISBN , pp

A DYNAMIC INTERPOLATION AND EXTRAPOLATION METHOD TO EVALUATE CROSS-SECTIONAL VELOCITY FROM POINT VELOCITY

A DYNAMIC INTERPOLATION AND EXTRAPOLATION METHOD TO EVALUATE CROSS-SECTIONAL VELOCITY FROM POINT VELOCITY A DYNAMIC INTERPOLATION AND EXTRAPOLATION METHOD TO EVALUATE CROSS-SECTIONAL VELOCITY FROM POINT VELOCITY J. KASHIWADA, 1 Y. NIHEI, 2 E. TAKASHIMA, 3 Y. YAMASAKI, 4 and M. ICHIYAMA 5 1 Engineer, River

More information

A DYNAMIC INTERPOLATION AND EXTRAPOLATION METHOD TO EVALUATE CROSS-SECTIONAL VELOCITY FROM POINT VELOCITY

A DYNAMIC INTERPOLATION AND EXTRAPOLATION METHOD TO EVALUATE CROSS-SECTIONAL VELOCITY FROM POINT VELOCITY A DYNAMIC INTERPOLATION AND EXTRAPOLATION METHOD TO EVALUATE CROSS-SECTIONAL VELOCITY FROM POINT VELOCITY J. Kashiwada, 1 Y. Nihei, 2 E. Takashima, 3 Y. Yamasaki, 4 and M. Ichiyama 5 1 Engineer, River

More information

Flood River Discharge Measurement Method in Japan

Flood River Discharge Measurement Method in Japan Flood River Discharge Measurement Method in Japan Hydrologic Engineering Research Team Hydraulic Engineering Research Group Public Work Research Institute (PWRI) Contents 1. Overview of River Discharge

More information

Study on river-discharge measurements with a bottom-mounted ADCP

Study on river-discharge measurements with a bottom-mounted ADCP Study on river-discharge measurements with a bottom-mounted ADCP Y. Nihei & T. Sakai Tokyo University of Science, Dept. of Civil Engineering, Chiba, Japan ABSTRACT: To examine the accuracy of discharge

More information

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE YASUO NIHEI AND YUICHI IMASHIMIZU Department of Civil Eng., Tokyo University of Science, 2641 Yamazaki, Noda-shi 278-851,

More information

PRESSURE AND SCOURING AROUND A SPUR DIKE DURING THE SURGE PASS

PRESSURE AND SCOURING AROUND A SPUR DIKE DURING THE SURGE PASS Annual Journal of Hydraulic Engineering, JSCE, Vol.3, 3, February PRESSURE AND SCOURING AROUND A SPUR DIKE DURING THE SURGE PASS Tomasz MIODUSZEWSKI and Shiro MAENO Student Member of JSCE, Doctoral Student,

More information

Measurement of bed load with the use of hydrophones in mountain torrents

Measurement of bed load with the use of hydrophones in mountain torrents 222 Erosion ami Sediment Transport Measurement in Rivers: Technological and Methodological Advances (Proceedings ol'lhe Oslo Workshop. June 2002). IAHS Publ. 283. 2003. Measurement of bed load with the

More information

http://water.usgs.gov/waterwatch/ Stream Flow Measurement: Velocity-Area method Stream discharge = Q = U * A Q = volumetric flow rate in [L 3 T -1 ] U= average stream velocity [L 2 T -1 ] A = cross sectional

More information

COMPARISON OF LABORATORY AND FIELD MEASUREMENTS OF BRIDGE PIER SCOUR

COMPARISON OF LABORATORY AND FIELD MEASUREMENTS OF BRIDGE PIER SCOUR COMPARISON OF LABORATORY AND FIELD MEASUREMENTS OF BRIDGE PIER SCOUR LEE, SEUNGOH, STURM, T. W., School of Civil and Environ. Engrg., Georgia Institute of Technology Atlanta, GA 30332-0512 USA GOTVALD,

More information

Method for predicting sediment runoff processes and channel changes in West Rapti River, Nepal

Method for predicting sediment runoff processes and channel changes in West Rapti River, Nepal Method for predicting sediment runoff processes and channel changes in West Rapti River, Nepal Gopal Sharma* (MEE15628) ABSTRACT Supervisor: Dr. Atsuhiro Yorozuya** : Prof. Shinji Egashira*** Present study

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

Experimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams

Experimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams Experimental Study of the Sediment Trap Effect of Steel Grid-Type Sabo Dams Teruyoshi TAKAHARA 1 and Kazuki MATSUMURA 1 1 Graduate school of Agriculture, Kyoto Pref. University (1-5 Shimogamonakaragicyo,

More information

Module 2. The Science of Surface and Ground Water. Version 2 CE IIT, Kharagpur

Module 2. The Science of Surface and Ground Water. Version 2 CE IIT, Kharagpur Module The Science of Surface and Ground Water Lesson Sediment Dynamics in Alluvial Rivers and Channels Instructional Objectives On completion of this lesson, the student shall be able to learn the following:.

More information

Flood Capacity of Shirakawa River at Tatsudajinnnai Area in Kumamoto Prefecture

Flood Capacity of Shirakawa River at Tatsudajinnnai Area in Kumamoto Prefecture International Journal of Economy, Energy and Environment 218; 3(5): 51-57 http://www.sciencepublishinggroup.com/j/ijeee doi: 1.11648/j.ijeee.21835.13 ISSN: 2575-513 (Print); ISSN: 2575-521 (Online) Flood

More information

Growing and decaying processes and resistance of sand waves in the vicinity of the Tone River mouth

Growing and decaying processes and resistance of sand waves in the vicinity of the Tone River mouth Advances in River Sediment Research Fukuoka et al. (eds) 2013 Taylor & Francis Group, London, ISBN 978-1-138-00062-9 Growing and decaying processes and resistance of sand waves in the vicinity of the Tone

More information

DYNAMICS OF FLOOD FLOWS AND BED VARIATIONS IN RIVER SECTIONS REPAIRED TO SHIP-BOTTOM SHAPED CHANNELS FROM COMPOUND CHANNLS

DYNAMICS OF FLOOD FLOWS AND BED VARIATIONS IN RIVER SECTIONS REPAIRED TO SHIP-BOTTOM SHAPED CHANNELS FROM COMPOUND CHANNLS E-proceedings of the 36 th IAHR World Congress DYNAMICS OF FLOOD FLOWS AND BED VARIATIONS IN RIVER SECTIONS REPAIRED TO SHIP-BOTTOM SHAPED CHANNELS FROM COMPOUND CHANNLS TAKUMA SASAKI (1) & SHOJI FUKUOKA

More information

Development of Kanako, a wide use 1-D and 2-D debris flow simulator equipped with GUI

Development of Kanako, a wide use 1-D and 2-D debris flow simulator equipped with GUI Monitoring, Simulation, Prevention and Remediation of Dense Debris Flows II 49 Development of Kanako, a wide use 1-D and 2-D debris flow simulator equipped with GUI K. Nakatani, T. Wada, Y. Satofuka &

More information

Within-event spatially distributed bedload: linking fluvial sediment transport to morphological change

Within-event spatially distributed bedload: linking fluvial sediment transport to morphological change Within-event spatially distributed bedload: linking fluvial sediment transport to morphological change C.D. Rennie 1, R. Williams 2, J. Brasington 3, D. Vericat 4, and M. Hicks 5 1 Department of Civil

More information

Complete Velocity Distribution in River Cross-sections Measured by Acoustic Instruments

Complete Velocity Distribution in River Cross-sections Measured by Acoustic Instruments Complete Velocity Distribution in River Cross-sections Measured by Acoustic Instruments Ralph T. Cheng and Jeffrey W. Gartner U. S. Geological Survey Menlo Park, California (650) 329-4500 rtcheng@usgs.gov

More information

MORPHOLOGICAL RESPONSE OF RIVER CHANNEL DUE TO WEIR RECONSTRUCTION

MORPHOLOGICAL RESPONSE OF RIVER CHANNEL DUE TO WEIR RECONSTRUCTION D-12 Fourth International Conference on Scour and Erosion 28 MORPHOLOGICAL RESPONSE OF RIVER CHANNEL DUE TO WEIR RECONSTRUCTION Hao ZHANG 1, Keiichi KANDA 2, Yasunori MUTO 3 and Hajime NAKAGAWA 4 1 Member

More information

EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION

EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION DOI: 10.4408/IJEGE.2011-03.B-116 EFFECT OF TWO SUCCESIVE CHECK DAMS ON DEBRIS FLOW DEPOSITION Farouk Maricar (*), Haruyuki Hashimoto (*), Shinya Ikematsu (*) & Tomohiro Miyoshi (*) (*) Department of Civil

More information

EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA)

EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA) Civil Engineering Forum Volume XXI/1 - January 01 EFFECT OF SAND MINING ACTIVITY ON THE SEDIMENT CONTROL SYSTEM (A CASE STUDY OF SOMBE-LEWARA RIVER, DONGGALA, INDONESIA) Y. A. Bawias Agency of Public Works,

More information

IMPROVEMENT OF DISCHARGE OBSERVATION ACCURACY IN ICE-COVERED RIVERS FOR RIVER MANAGEMENT

IMPROVEMENT OF DISCHARGE OBSERVATION ACCURACY IN ICE-COVERED RIVERS FOR RIVER MANAGEMENT in the Environment: Proceedings of the 16th IAHR International Symposium on Dunedin, New Zealand, 2nd 6th December 2002 International Association of Hydraulic Engineering and Research IMPROVEMENT OF DISCHARGE

More information

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan

The effectiveness of check dams in controlling upstream channel stability in northeastern Taiwan Erosion, Debris Mows and Environment in Mountain Regions (Proceedings of the Chengdu Symposium, July 1992). IAHS Publ. no. 209, 1992. 423 The effectiveness of check dams in controlling upstream channel

More information

Evaluation of flood discharge hydrographs and bed variations in a channel network on the Ota River delta, Japan

Evaluation of flood discharge hydrographs and bed variations in a channel network on the Ota River delta, Japan 3 Floods: From Risk to Opportunity (IAHS Publ. 357, 3). Evaluation of flood discharge hydrographs and bed variations in a channel network on the Ota River delta, Japan T. GOTOH, S. FUKUOKA & R. TANAKA

More information

Innovative Technologies and Methodologies to Help Solve Complex Problems in Spatial River Studies

Innovative Technologies and Methodologies to Help Solve Complex Problems in Spatial River Studies Innovative Technologies and Methodologies to Help Solve Complex Problems in Spatial River Studies John V. Sloat Chief Technical officer WaterCube, LLC Overview Water depth, water-velocity, and water-surface

More information

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir

MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq Shakir ISSN 2320-9100 11 International Journal of Advance Research, IJOAR.org Volume 1, Issue 8,August 2013, Online: ISSN 2320-9100 MODELING OF LOCAL SCOUR AROUND AL-KUFA BRIDGE PIERS Saleh I. Khassaf, Saja Sadeq

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

STREAM GAUGING TECHNIQUES

STREAM GAUGING TECHNIQUES World Meteorological Organization -- Working together in weather, climate and water STREAM GAUGING TECHNIQUES Presentation based on the WMO Manual on streamgauging (2010), Volume II Chapter 2, with additional

More information

Sediment Transport Mechanism and Grain Size Distributions in Stony Bed Rivers. S.FUKUOKA 1 and K.OSADA 2

Sediment Transport Mechanism and Grain Size Distributions in Stony Bed Rivers. S.FUKUOKA 1 and K.OSADA 2 Sediment Transport Mechanism and Grain Size Distributions in Stony Bed Rivers S.FUKUOKA 1 and K.OSADA 1 Professor, Research and Development Initiative, Chuo-University, 1-13-7 Kasuga Bunkyo-ku, Tokyo,

More information

8 Current Issues and Research on Sediment Movement in the River Catchments of Japan

8 Current Issues and Research on Sediment Movement in the River Catchments of Japan 8 Current Issues and Research on Sediment Movement in the River Catchments of Japan YUTAKA ICHIKAWA INTRODUCTION Prediction of sediment movement is one of the challenging tasks in water-related research.

More information

New computation method for flood flows and bed variations in a low-lying river with complex river systems

New computation method for flood flows and bed variations in a low-lying river with complex river systems River Flow 2014 Schleiss et al. (Eds) 2014 Taylor & Francis Group, London, ISBN 978-1-138-02674-2 New computation method for flood flows and bed variations in a low-lying river with complex river systems

More information

LOGO Self-Cleansing of Storm Drain through Incipient Motion Design Concept and Flushing Gate

LOGO Self-Cleansing of Storm Drain through Incipient Motion Design Concept and Flushing Gate LOGO Self-Cleansing of Storm Drain through Incipient Motion Design Concept and Flushing Gate River Engineering & Urban Drainage Research Centre (REDAC) Sedimentation Problem Sediment deposits in drainage

More information

Rock Sizing for Waterway & Gully Chutes

Rock Sizing for Waterway & Gully Chutes Rock Sizing for Waterway & Gully Chutes WATERWAY MANAGEMENT PRACTICES Photo 1 Rock-lined waterway chute Photo 2 Rock-lined gully chute 1. Introduction A waterway chute is a stabilised section of channel

More information

Experimental Study for Investigating the Impact Force on a Wooden House by Driftwood in Steady and Unsteady Surge-type Flow

Experimental Study for Investigating the Impact Force on a Wooden House by Driftwood in Steady and Unsteady Surge-type Flow Experimental Study for Investigating the Impact Force on a Wooden House by Driftwood in Steady and Unsteady Surge-type Flow K. Miyahara 1 and N. Tanaka 2 1 Graduate School of Science and Engineering, Saitama

More information

Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of Riffle-Pool in Downstream Reach by a Flushing Bypass Tunnel

Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of Riffle-Pool in Downstream Reach by a Flushing Bypass Tunnel Study on Flushing Mechanism of Dam Reservoir Sedimentation and Recovery of -Pool in Downstream Reach by a Flushing Bypass Tunnel Tomoo Fukuda Department of Science and Engineering, Chuo University, Tokyo,

More information

The investigation of sediment processes in rivers by means of the Acoustic Doppler Profiler

The investigation of sediment processes in rivers by means of the Acoustic Doppler Profiler 368 Evolving Water Resources Systems: Understanding, Predicting and Managing Water Society Interactions Proceedings of ICWRS014, Bologna, Italy, June 014 (IAHS Publ. 364, 014). The investigation of sediment

More information

ADCP MEASUREMENTS OF VERTICAL FLOW STRUCTURE AND COEFFICIENTS OF FLOAT IN FLOOD FLOWS

ADCP MEASUREMENTS OF VERTICAL FLOW STRUCTURE AND COEFFICIENTS OF FLOAT IN FLOOD FLOWS ADCP MEASUREMENTS OF VERTICAL FLOW STRUCTURE AND COEFFICIENTS OF FLOAT IN FLOOD FLOWS Yasuo NIHEI (1) and Takeiro SAKAI (2) (1) Department of Civil Engineering, Tokyo University of Science, 2641 Yamazaki,

More information

Experimentally determined distribution of granular-flow characteristics in collisional bed load transport

Experimentally determined distribution of granular-flow characteristics in collisional bed load transport Experimentally determined distribution of granular-flow characteristics in collisional bed load transport Václav Matoušek 1,*, Štěpán Zrostlík 1, Luigi Fraccarollo 2, Anna Prati 2, and Michele Larcher

More information

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b.

ES 105 Surface Processes I. Hydrologic cycle A. Distribution % in oceans 2. >3% surface water a. +99% surface water in glaciers b. ES 105 Surface Processes I. Hydrologic cycle A. Distribution 1. +97% in oceans 2. >3% surface water a. +99% surface water in glaciers b. >1/3% liquid, fresh water in streams and lakes~1/10,000 of water

More information

Tanjung Priok GFPPEP. Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta

Tanjung Priok GFPPEP. Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta Tanjung Priok GFPPEP Presentation and discussion, 22 October 2009 PT. PLN (Persero) Jasa Enjiniring Office Jl. KS Tubun I/2 Petamburan, Jakarta prepared by Department of Civil and Environmental Engineering

More information

Effect of River Levee with Geosynthetic- Reinforced Soil against Overflow Erosion and Infiltration

Effect of River Levee with Geosynthetic- Reinforced Soil against Overflow Erosion and Infiltration Utah State University DigitalCommons@USU International Symposium on Hydraulic Structures Jun 28th, 4:00 PM - 6:00 PM Effect of River Levee with Geosynthetic- Reinforced Soil against Overflow Erosion and

More information

The Effect of Bedform-induced Spatial Acceleration on Turbulence and Sediment Transport

The Effect of Bedform-induced Spatial Acceleration on Turbulence and Sediment Transport The Effect of Bedform-induced Spatial Acceleration on Turbulence and Sediment Transport S. McLean (1) (1) Mechanical and Environmental Engineering Dept., University of California, Santa Barbara, CA 93106,

More information

Varying Bathymetric Data Collection Methods and their Impact on Impoundment Volume and Sediment Load Calculations I.A. Kiraly 1, T.

Varying Bathymetric Data Collection Methods and their Impact on Impoundment Volume and Sediment Load Calculations I.A. Kiraly 1, T. Varying Bathymetric Data Collection Methods and their Impact on Impoundment Volume and Sediment Load Calculations I.A. Kiraly 1, T. Sullivan 2 1 Gomez and Sullivan Engineers, D.P.C., 41 Liberty Hill Road,

More information

Discharge Measurements at Niger River and its Tributaries Sota, Tinkisso and Niandan

Discharge Measurements at Niger River and its Tributaries Sota, Tinkisso and Niandan Discharge Measurements at Niger River and its Tributaries Sota, Tinkisso and Niandan Hannover, June 2012 Author: Torsten Krekeler Commissioned by: Project: Federal Ministry for Economic Cooperation and

More information

Quasi-three dimensional computations for flows and bed variations in curved channel with gently sloped outer bank

Quasi-three dimensional computations for flows and bed variations in curved channel with gently sloped outer bank River Sedimentation Wieprecht et al. (Eds) 2017 Taylor & Francis Group, London, ISBN 978-1-138-02945-3 Quasi-three dimensional computations for flows and bed variations in curved channel with gently sloped

More information

Sediment yield estimation from a hydrographic survey: A case study for the Kremasta reservoir, Western Greece

Sediment yield estimation from a hydrographic survey: A case study for the Kremasta reservoir, Western Greece Sediment yield estimation from a hydrographic survey: A case study for the Kremasta reservoir, Western Greece 5 th International Conference Water Resources Management in the Era of Transition,, Athens,

More information

GEOL 652. Poudre River Fieldtrip

GEOL 652. Poudre River Fieldtrip GEOL 652. Poudre River Fieldtrip One of the more difficult variables to measure and/or estimate when studying flow in natural channels is that of roughness. Roughness, usually approximated with Manning

More information

Born in Unzen The World s First Unmanned Construction of Multilayer Sediment Control Dam Using Sediment Forms Unzen Restoration Project Office

Born in Unzen The World s First Unmanned Construction of Multilayer Sediment Control Dam Using Sediment Forms Unzen Restoration Project Office Born in Unzen The World s First Unmanned Construction of Multilayer Sediment Control Dam Using Sediment Forms Unzen Restoration Project Office Unzen Restoration Project Office Kyushu Regional Construction

More information

Prediction of landslide-induced debris flow hydrograph: the Atsumari debris flow disaster in Japan

Prediction of landslide-induced debris flow hydrograph: the Atsumari debris flow disaster in Japan Monitoring, Simulation, Prevention and Remediation of Dense and Debris Flows 27 Prediction of landslide-induced debris flow hydrograph: the Atsumari debris flow disaster in Japan H. Takaoka 1, H. Hashimoto

More information

UGRC 144 Science and Technology in Our Lives/Geohazards

UGRC 144 Science and Technology in Our Lives/Geohazards UGRC 144 Science and Technology in Our Lives/Geohazards Flood and Flood Hazards Dr. Patrick Asamoah Sakyi Department of Earth Science, UG, Legon College of Education School of Continuing and Distance Education

More information

STREAM SYSTEMS and FLOODS

STREAM SYSTEMS and FLOODS STREAM SYSTEMS and FLOODS The Hydrologic Cycle Precipitation Evaporation Infiltration Runoff Transpiration Earth s Water and the Hydrologic Cycle The Hydrologic Cycle The Hydrologic Cycle Oceans not filling

More information

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration

Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle. Runoff Transpiration STREAM SYSTEMS and FLOODS The Hydrologic Cycle Precipitation Evaporation Infiltration Earth s Water and the Hydrologic Cycle Runoff Transpiration The Hydrologic Cycle The Hydrologic Cycle Oceans not filling

More information

Risk-based land use and spatial planning

Risk-based land use and spatial planning Risk-based land use and spatial planning Miho OHARA International Centre for Water Hazards and Risk Management (ICHARM) Public Works Research Institute PWRI), Japan Under the auspices of UNESCO Introduction

More information

Effect of Roughness on Discharge

Effect of Roughness on Discharge Effect of Roughness on Discharge T.W. Lau, and N.R. Afshar Abstract These Water resource projects and hydraulic engineering works have been developing rapidly throughout the world, thus prediction of water

More information

Engineering Hydrology (ECIV 4323) CHAPTER FOUR. Stream flow measurement. Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib

Engineering Hydrology (ECIV 4323) CHAPTER FOUR. Stream flow measurement. Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib Engineering Hydrology (ECIV 4323) CHAPTER FOUR Stream flow measurement Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib -١ 4.1 Introduction - Surface water hydrology deals with the movement of water

More information

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM

More information

NUMERICAL ANALYSIS OF THE BED MORPHOLOGY IN THE REACH BETWEEN CABRUTA AND CAICARA IN ORINOCO RIVER.

NUMERICAL ANALYSIS OF THE BED MORPHOLOGY IN THE REACH BETWEEN CABRUTA AND CAICARA IN ORINOCO RIVER. NUMERICAL ANALYSIS OF THE BED MORPHOLOGY IN THE REACH BETWEEN CABRUTA AND CAICARA IN ORINOCO RIVER. Raul A CABRITA F MEE13634 Supervisor: Shinji EGASHIRA ABSTRACT The present study aims to evaluate numerically

More information

Earth Science Chapter 6 Section 2 Review

Earth Science Chapter 6 Section 2 Review Name: Class: Date: Earth Science Chapter 6 Section Review Multiple Choice Identify the choice that best completes the statement or answers the question. 1. Most streams carry the largest part of their

More information

The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido

The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido Symposium Proceedings of the INTERPRAENENT 2018 in the Pacific Rim The Effects of Hydraulic Structures on Streams Prone to Bank Erosion in an Intense Flood Event: A Case Study from Eastern Hokkaido Daisuke

More information

COMPUTER ALGORITHM FOR ANALYSIS OF BEDFORM GEOMETRY

COMPUTER ALGORITHM FOR ANALYSIS OF BEDFORM GEOMETRY 13 th International Symposium on Water Management and Hydraulic Engineering, September 9-12, 2013 Bratislava, Slovakia COMPUTER ALGORITHM FOR ANALYSIS OF BEDFORM GEOMETRY G. Gilja 1, N. Kuspilić 2 and

More information

Ultrasonic Measuring System for Deposition of Sediments in Reservoirs

Ultrasonic Measuring System for Deposition of Sediments in Reservoirs MECAHITECH 11, vol. 3, year: 011 Ultrasonic Measuring System for Deposition of Sediments in Reservoirs M. Mărgăritescu* 1, A. Moldovanu * 1, P. Boeriu *, A.M.E. Rolea* 1 * 1 National Institute of Research

More information

SEDIMENTATION AND ITS COUNTERMEASURE AT THE OFF-TAKE AREA OF NEW DHALESWARI RIVER

SEDIMENTATION AND ITS COUNTERMEASURE AT THE OFF-TAKE AREA OF NEW DHALESWARI RIVER SEDIMENTATION AND ITS COUNTERMEASURE AT THE OFF-TAKE AREA OF NEW DHALESWARI RIVER Tanjir Saif AHMED* MEE15634 Supervisors: Prof. EGASHIRA Shinji** Assoc. Prof. YOROZUYA Atsuhiro*** ABSTRACT Present study

More information

EVALUATION ON THE IMPLEMENTATION OF EARLY WARNING SYSTEM FOR DEBRIS FLOW IN MERAPI AREA (CASE STUDY AT BOYONG RIVER)

EVALUATION ON THE IMPLEMENTATION OF EARLY WARNING SYSTEM FOR DEBRIS FLOW IN MERAPI AREA (CASE STUDY AT BOYONG RIVER) Journal of the Civil Engineering Forum Vol. 1 No. 3 (September 2015) EVALUATION ON THE IMPLEMENTATION OF EARLY WARNING SYSTEM FOR DEBRIS FLOW IN MERAPI AREA (CASE STUDY AT BOYONG RIVER) Ali Cahyadi Achmad

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

1.060 Engineering Mechanics II Spring Problem Set 8

1.060 Engineering Mechanics II Spring Problem Set 8 1.060 Engineering Mechanics II Spring 2006 Due on Monday, May 1st Problem Set 8 Important note: Please start a new sheet of paper for each problem in the problem set. Write the names of the group members

More information

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form

Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form Texas A & M University and U.S. Bureau of Reclamation Hydrologic Modeling Inventory Model Description Form JUNE, 1999 Name of Model: Two-Dimensional Alluvial River and Floodplain Model (MIKE21 CHD & CST)

More information

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS

FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS FLOOD HAZARD MAPPING OF DHAKA-NARAYANGANJ-DEMRA (DND) PROJECT USING GEO-INFORMATICS TOOLS Md. Aminul Islam MEE07178 Supervisor: Prof. Kuniyoshi TAKEUCHI ABSTRACT Dhaka-Narayanganj-Demra (DND) Project is

More information

Working with Natural Stream Systems

Working with Natural Stream Systems Working with Natural Stream Systems Graydon Dutcher Delaware County Soil & Water Conservation District Stream Corridor Management Program Tropical Storm Sandy October 29,2012 What is a Watershed?

More information

Technical Memorandum No

Technical Memorandum No Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and

More information

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown.

Name. 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different soil horizons, A, B, C, and D, are shown. Name 1. In the cross section of the hill shown below, which rock units are probably most resistant to weathering? 4. The diagram below shows a soil profile formed in an area of granite bedrock. Four different

More information

ENGINEERING HYDROLOGY

ENGINEERING HYDROLOGY ENGINEERING HYDROLOGY Prof. Rajesh Bhagat Asst. Professor Civil Engineering Department Yeshwantrao Chavan College Of Engineering Nagpur B. E. (Civil Engg.) M. Tech. (Enviro. Engg.) GCOE, Amravati VNIT,

More information

River bed classification using multi-beam echo-sounder backscatter data

River bed classification using multi-beam echo-sounder backscatter data River bed classification using multi-beam echo-sounder backscatter data Niels Kinneging Mirjam Snellen Dimitrios Eleftherakis Dick Simons Erik Mosselman Arjan Sieben 13 November 2012 transport water management

More information

Application of an ultrasonic velocity profile monitor in a hydraulic laboratory

Application of an ultrasonic velocity profile monitor in a hydraulic laboratory Application of an ultrasonic velocity profile monitor in a hydraulic laboratory Abstract Helmut Knoblauch 1, Roman Klasinc 1, Thomas Geisler 1 Velocity profile measurement using the ultrasound-pulse-doppler

More information

CIVL4120/7020 Advanced open channel hydraulics and design - Tutorial (1) Unsteady open channel flows

CIVL4120/7020 Advanced open channel hydraulics and design - Tutorial (1) Unsteady open channel flows School of Civil Engineering at the University of Queensland CIVL4120/7020 Advanced open channel hydraulics and design - Tutorial (1) Unsteady open channel flows Attendance to tutorials is very strongly

More information

Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods

Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods by David D. Abraham and Thad Pratt PURPOSE: This Coastal and Hydraulics Engineering

More information

9. Flood Routing. chapter Two

9. Flood Routing. chapter Two 9. Flood Routing Flow routing is a mathematical procedure for predicting the changing magnitude, speed, and shape of a flood wave as a function of time at one or more points along a watercourse (waterway

More information

Lecture Note for Open Channel Hydraulics

Lecture Note for Open Channel Hydraulics Chapter -one Introduction to Open Channel Hydraulics 1.1 Definitions Simply stated, Open channel flow is a flow of liquid in a conduit with free space. Open channel flow is particularly applied to understand

More information

Flood risk analysis toward floodplain risk management

Flood risk analysis toward floodplain risk management Floods, from Defence to Management Van Alphen, van Beek & Taal (eds) 2006 Taylor & Francis Group, London, ISBN 0 415 39119 9 Flood risk analysis toward floodplain risk management H. Kawaguchi, T. Suetsugi

More information

Measurements of Turbulent Pressure Under Breaking Waves

Measurements of Turbulent Pressure Under Breaking Waves MEASUREMENTS OF TURBULENT PRESSURE UNDER BREAKING WAVES 33 Measurements of Turbulent Pressure Under Breaking Waves Author: Faculty Sponsor: Department: Christopher Olsen Francis Ting, Ph.D., P.E. Civil

More information

NUMERICAL SIMULATION OF OPEN CHANNEL FLOW BETWEEN BRIDGE PIERS

NUMERICAL SIMULATION OF OPEN CHANNEL FLOW BETWEEN BRIDGE PIERS TASK QUARTERLY 15 No 3 4, 271 282 NUMERICAL SIMULATION OF OPEN CHANNEL FLOW BETWEEN BRIDGE PIERS MICHAŁ SZYDŁOWSKI Faculty of Civil and Environmental Engineering, Gdansk University of Technology, Narutowicza

More information

LAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT

LAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT LAB-SCALE INVESTIGATION ONBAR FORMATION COORDINATES IN RIVER BASED ON FLOW AND SEDIMENT Mat Salleh M. Z., Ariffin J., Mohd-Noor M. F. and Yusof N. A. U. Faculty of Civil Engineering, University Technology

More information

Dolores River Watershed Study

Dolores River Watershed Study CHAPTER 4: RIVER AND FLOODPLAIN ISSUES The Dolores River falls into a category of streams in Colorado that share some unique characteristics. Like some other mountain streams in the state, it has a steep

More information

Flow Field Investigation in a Rectangular Shallow Reservoir using UVP, LSPIV and numerical model

Flow Field Investigation in a Rectangular Shallow Reservoir using UVP, LSPIV and numerical model Flow Field Investigation in a Rectangular Shallow Reservoir using UVP, LSPIV and numerical model S AMEH KANTOUSH, ERIK BOLLAERT, GIOVANNI DE CESARE, JEAN-LOUIS BOILLAT and ANTON SCHLEISS Ecole Polytechnique

More information

FAILURES IN THE AMAZON RIVERBANKS, IQUITOS, PERU

FAILURES IN THE AMAZON RIVERBANKS, IQUITOS, PERU FAILURES IN THE AMAZON RIVERBANKS, IQUITOS, PERU A.Carrillo-Gil University of Engineering & A.Carrillo Gil S.A.,Consulting Engineering,Lima,Peru L. Dominguez University of Engineering,Lima & The Maritime

More information

Why Geomorphology for Fish Passage

Why Geomorphology for Fish Passage Channel Morphology - Stream Crossing Interactions An Overview Michael Love Michael Love & Associates mlove@h2odesigns.com (707) 476-8938 Why Geomorphology for Fish Passage 1. Understand the Scale of the

More information

Keywords: flow characteristics, compound straight channel, bed morphology, floodplain

Keywords: flow characteristics, compound straight channel, bed morphology, floodplain Flow Characteristics on Floodplain Vegetation in Compound Straight Channels Nur Amirah Nabilah Mohd Zamri 1, a, Zulhilmi Ismail 1,b,Zulkiflee Ibrahim 1,c 1 Faculty of Civil Engineering, Universiti Teknologi

More information

Observation of Stormy Wave Fields by X-band Radar

Observation of Stormy Wave Fields by X-band Radar Journal of Japan Society of Civil Engineers Ser. B2 (Coastal Engineering), Vol. 7, No. 2, I_466-I_47, 24. Observation of Stormy Wave Fields by X-band Radar Komail RAFIEI and Satoshi TAKEWAKA 2 PhD Student,

More information

Paper 114 Validation of Actual Depth Measurements by Inland Vessels

Paper 114 Validation of Actual Depth Measurements by Inland Vessels Paper 114 Validation of Actual Depth Measurements by Inland Vessels VAN DER MARK C.F. 1 ; VIJVERBERG T. 2 ; OTTEVANGER W. 1 1 Deltares, Delft, the Netherlands 2 Royal HaskoningDHV, Amersfoort, the Netherlands

More information

A STUDY ON DEBRIS FLOW DEPOSITION BY THE ARRANGEMENT OF SABO DAM

A STUDY ON DEBRIS FLOW DEPOSITION BY THE ARRANGEMENT OF SABO DAM Annual Journal of Hydraulic Engineering, JSCE, Vol.57, 2013, February A STUDY ON DEBRIS FLOW DEPOSITION BY THE ARRANGEMENT OF SABO DAM Namgyun Kim 1, Hajime NAKAGAWA 2, Kenji KAWAIKE 3, and Hao ZHANG 4

More information

Flood Frequency Mapping using Multirun results from Infoworks RS applied to the river basin of the Yser, Belgium

Flood Frequency Mapping using Multirun results from Infoworks RS applied to the river basin of the Yser, Belgium Flood Frequency Mapping using Multirun results from Infoworks RS applied to the river basin of the Yser, Belgium Ir. Sven Verbeke Aminal, division Water, Flemish Government, Belgium Introduction Aminal

More information

Design of Stilling Basins using Artificial Roughness

Design of Stilling Basins using Artificial Roughness Design of Stilling Basins using Artificial Roughness N. AboulAtta 1, G. Ezizah 2, N. Yousif 3, S. Fathy 4 Abstract The stilling basins are commonly used to dissipate the energy and protect the downstream

More information

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River September 2015 0 Table of Contents 1. Introduction... 2 2. Data collection... 3 2.1 Additional data...

More information

Streams. Stream Water Flow

Streams. Stream Water Flow CHAPTER 14 OUTLINE Streams: Transport to the Oceans Does not contain complete lecture notes. To be used to help organize lecture notes and home/test studies. Streams Streams are the major geological agents

More information

EROSION RATE OF RESERVOIR DEPOSIT AS REVEALED BY LABORATORY EXPERIMENT

EROSION RATE OF RESERVOIR DEPOSIT AS REVEALED BY LABORATORY EXPERIMENT Civil Engineering Forum Volume XXI/1 - January 2012 EROSION RATE OF RESERVOIR DEPOSIT AS REVEALED BY LABORATORY EXPERIMENT A. S. Amar PT. Rekayasa Industri, EPC Company, 36 Kalibata Timur I, Jakarta, INDONESIA

More information

What is weathering and how does it change Earth s surface? Answer the question using

What is weathering and how does it change Earth s surface? Answer the question using 7 th Grade Lesson What is weathering and how does it change Earth s surface? Answer the question using the sentence frame. You have 4 minutes. Weathering is. This changes the Earth s surface because. 1

More information

Pirai river (Bolivia)

Pirai river (Bolivia) Pirai river (Bolivia) Confluent of the Amazon river which average discharge is only 6 m3/s, but with peak discharge over 5000 m3/s, a challenge for river basin management and for flood control HYDROEUROPE

More information

THE EFFECT OF THICKNESS OF PILLAR IN THE CHANNEL BEND TO CHANGES THE COEFFICIENT OF SUPERELEVATION

THE EFFECT OF THICKNESS OF PILLAR IN THE CHANNEL BEND TO CHANGES THE COEFFICIENT OF SUPERELEVATION Journal Engineering Science and Technology Vol. 11, No. 5 (2016) 745-754 School Engineering, Taylor s University THE EFFECT OF THICKNESS OF PILLAR IN THE CHANNEL BEND TO CHANGES THE COEFFICIENT OF SUPERELEVATION

More information

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435 Assignment 1 Measuring River Characteristics- Vernon Creek Applied Fluvial Geomorphology Field Techniques EESc 435 Amanda Jardine 30100093 Jaime McDonald 14177083 Erica Massey 50870088 April 28, 2012 Introduction

More information

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model

Opanuku Stream Benchmark Validation 1. Introduction. 2. The Opanuku Stream Model Opanuku Stream Benchmark Validation 1. Introduction The model accuracy benchmark published by the Flood Risk Management Committee of the IAHR in http://members.iahr.org/imis/communitymanagement/communitylayouts/flood_risk_manageme

More information