CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

Similar documents
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

DOCUMENTATION WORKBOOK FY 2018

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

Exhibit "A" Date: 1/27/2011

Materials. Use materials meeting the following.

TABULATION OF TENDERS

SAN ANTONIO WATER SYSTEM

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Specifications Whitcomb Elementary School Demolition January 15, 2016

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Case Histories and Practical Examples

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

Closure of Remote Historic Underground Mines in Desert Environments

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

Print Date Wed 16 January 2013 U.S. Army Corps of Engineers Time 07:48:43. Cost Estimate Report

Rock & Aggregate Drop Inlet Protection

Critchfield Rd / SR-129

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Appendix C Benchmarking Cost Estimates

APPENDIX B WORKSHEETS & EXHIBITS

OC Public Works El Niño Storm Preparation 2015

Summary of Bids Received For

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

FIG. A1 TODDY THOMAS SCHOOL - NORTH SAFE ROUTES TO SCHOOL CONCEPTUAL LAYOUT CITY OF FORTUNA TODDY THOMAS SCHOOL - NORTH GENERAL NOTES KEYNOTES

WELCOME APWA How Best to Protect Asphalt Overlays with Interlayers - Delay Deterioration and Extend Pavement Life

NRCS - THUNDER ROAD #3, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

December 11, 2006 File:

West Tennessee Construction June 14-21, 2017

Bob Rettig Construction and Consulting

Case Study of a Decision-Making/Support Process to Schedule Multiple Highway Construction Projects

BUILDING AND SAFETY FEE SCHEDULE (Effective July1, 2013)

Culvert and Pipe Phasing


CONSTRUCTION EXIT SEDIMENT BARRIER

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

Use of Launched Soil Nails to Stabilize Landslides in Summit County, Ohio

Orica Australia Pty Ltd Ammonium Nitrate Facility Upgrade

Fast and Furious Rebuilding and Widening the I-90 West Corridor

ISSUED FOR CONSTRUCTION

ALUMINUM STRUCTURAL PLATE HEADWALLS AASHTO LRFD BASIS OF DESIGN

CCR Rule Annual Inspection Report (cont.) 2

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

REQUEST FOR PROPOSALS

Preliminary Hydraulic Report

CUSTER COUNTY SNOW REMOVAL PROCEDURES

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

SNOW AND ICE CONTROL GUIDELINES

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

SPECIFICATION FOR RAMM UPDATING OF ROADS

RETAINING WALL LOADS: Horizontal Equivalent Fluid Pressure = pcf. (Load Case = Soil)

Tropical E.S. - BUDGET

9/12/2014 O V E RV I E W

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Transcription:

358,904.13 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 841 CONTRACT ID: 007207066 PROJECT: C 72-7-66 CONTRACT: 07153205 AWARD : $31,159,119.31 PROJECTED : $31,159,119.31 ADJ. PROJECTED : $31,518,023.44 CONTRACT: CONTRACTOR: SUNDT CONSTRUCTION, INC. HIGHWAY: IH 10 DISTRICT NAME: San Antonio COUNTY: BEXAR AREA ENGINEER: Marshall Heap, P.E. AREA NUMBER: 054 ESTIMATE NUMBER: 0032 LETTING DATE: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD: 08/26/2018 to 09/25/2018 NOTICE TO PROCEED DATE: 11/24/2015 ESTIMATE TYPE: PROG WORK BEGIN DATE: 03/21/2016 % COMPLETE: 91.89 ACCEPTED DATE: 00/00/0000 % TIME USED: 106.05 PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $28,960,737.16 $28,553,991.66 PARTICIPATING $ $ NON-PARTICIPATING $28,960,737.16 $28,553,991.66 RETAINAGE $ $ LIQUIDATED DAMAGES ($124,32) ($51,80) INCENTIVE $90,00 $90,00 DISINCENTIVE ($120,00) ($120,00) OTHER ADJUSTMENTS $ $ $406,745.50 $ $406,745.50 $ ($72,52) $ $ $ PAID TO CONTRACTOR $28,806,417.16 $28,472,191.66 $334,225.50 CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 19 CONTRACT TIME STATEMENT WORK BEGIN DATE: 03/21/2016 ASSESSED LIQ DAMAGES: 48 TIME CHARGES BEGIN: 10/06/2015 LIQ DAMAGE RATE: $2,59 DAYS: 793 LIQUIDATED DAMAGES: 48 C. O. ADJUSTED DAYS: 0 DAYS AT CURRENT DAYS: 793 PER DAY $2,59 DAYS CHARGED : 841 TOTAL: $124,32 PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date Days or Days Charged Days Credited 08/26/2018 1 08/27/2018 1 08/28/2018 1 08/29/2018 1 08/30/2018 1 08/31/2018 1 09/01/2018 1 HOLIDAY TRAFFIC 09/02/2018 1 HOLIDAY TRAFFIC 09/03/2018 1 HOLIDAY TRAFFIC 09/04/2018 1 09/05/2018 1 09/06/2018 1 09/07/2018 1 09/08/2018 1 09/09/2018 1 09/10/2018 1 09/11/2018 1 09/12/2018 1 09/13/2018 1 09/14/2018 1 09/15/2018 1 09/16/2018 1 09/17/2018 1 09/18/2018 1 09/19/2018 1 09/20/2018 1 09/21/2018 1 09/22/2018 1 09/23/2018 1 09/24/2018 1 09/25/2018 1 Diary Adjustment PERIOD SUMMARY Date or Days Days Days Charged Credited 31 28 3 HOLIDAY TRAFFIC 3

CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 19 WORK PERFORMED THIS PERIOD PROJECT C 72-7-66 CONTROL 007207066 CATEGORY 001 ROADWAY S QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date 0065 01046009 000 REMOVING CONC (RIPRAP) SY 7.000 336.530 $2,355.71 10,50 2,849.08 0105 01106001 000 EXCAVATION (ROADWAY) CY 7.000 300 $2,10 90,92 90,479.01 0120 01606003 000 FURNISHING AND PLACING TOPSOIL (4") SY 0.050 6,436.660 $321.83 280,895.00 157,268.05 0125 01646041 000 DRILL SEEDING (TEMP) (WARM) SY 0.020 7,122.770 $142.46 280,895.00 134,236.11 0130 01646066 000 DRILL SEEDING (PERM)(WARM OR COOL) SY 0.030 7,122.770 $213.68 282,97 128,405.60 0140 01696001 000 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 0.900 7,122.770 $6,410.49 46,829.00 80,246.96 0225 04166015 000 DRILL SHAFT (NON - REINFORCED) (12 IN) LF 150 14.000 $2,10 2 14.00 0230 04166018 000 DRILL SHAFT (SIGN MTS) (24 IN) LF 130 95.500 $12,415.00 20 95.50 0235 04166029 000 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 125.000 64.000 $8,00 1,016.00 336.00 0280 04326006 000 RIPRAP (CONC)(CL B) CY 250 4.550 $1,137.50 59.00 17.62 0285 04326045 000 RIPRAP (MOW STRIP)(4 IN) CY 270 117.590 $31,749.30 47 544.15 0330 04646008 000 RC PIPE (CL III)(36 IN) LF 90 440 $39,60 645.00 44 0365 04656160 000 INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3,000 0 $3,00 17.00 1 0475 04966002 000 REMOV STR (INLET) EA 100 0 $10 15.00 0495 04966007 000 REMOV STR (PIPE) LF 0 219.000 $219.00 90 414.00 0525 05066011 001 ROCK FILTER DAMS (REMOVE) LF 0 26.000 $5 3,119.00 543.00 0575 05126025 000 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 5.000 5,370 $26,85 58,375.00 56,54 0590 05126049 000 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 3.000 6,120 $18,36 29,736.00 20,22 0610 05286001 000 COLORED TEXTURED CONC (4") SY 60 1,115.120 $66,907.20 95 1,164.27 0615 05296001 000 CONC CURB (TY I) LF 0 30 $256.00 35,37 36,004.83 0645 05316001 000 CONC SIDEWALKS (4") SY 30 8.890 $337.82 17,84 17,027.52 0650 05316005 000 CURB RAMPS (TY 2) EA 1,000 0 $1,00 3.00 5.00 0680 05406001 000 MTL W-BEAM GD FEN (TIM POST) LF 19.000 2,075.000 $39,425.00 6,166.00 5,875.00 0682 05406002 MTL W-BEAM GD FEN (STEEL POST) LF 53.500 50 $2,675.00 115.00 175.00 SUPP DESCR Added CO 13 0690 05406016 000 DOWNSTREAM ANCHOR TERMINAL SECTION EA 920 0 $92 7.00 7.00 0715 05446001 000 GUARDRAIL END TREATMENT (INSTALL) EA 2,700 0 $2,70 1 9.00 0725 05456003 000 CRASH CUSH ATTEN (MOVE & RESET) EA 800 3.000 $2,40 1 9.00 0730 05456005 000 CRASH CUSH ATTEN (REMOVE) EA 425.000 0 $425.00 5.00 0736 05456019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 8,749.130 0 $8,749.13 4.00 5.00 0760 06106050 000 IN RD IL AM (TY SA) 40T-8 (250W) S EA 2,500 16.000 $40,00 11 3 0765 06106051 000 IN RD IL AM (TY SA) 40T-8-8 (250W) S EA 3,500 0 $3,50 3.00 0815 06206007 000 ELEC CONDR (NO.8) BARE LF 0.900 3,567.000 $3,210.30 32,02 13,186.00 0820 06206008 000 ELEC CONDR (NO.8) INSULATED LF 0.800 7,134.000 $5,707.20 67,006.00 28,167.00 0860 06366002 000 ALUMINUM SIGNS (TY G) SF 20 965.000 $21,23 2,31 965.00 0865 06446001 000 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 400 14.000 $5,60 49.00 29.00 0870 06446004 000 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 480 20 $13,44 11 8 0875 06446030 000 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 720 6.000 $4,32 2 6.00 0880 06446033 000 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 620 0 $1,24 4.00 0885 06446051 000 IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1,000 0 $2,00 5.00 4.00 0895 06446076 000 REMOVE SM RD SN SUP&AM EA 90 64.000 $5,76 124.00 9 0900 06476001 000 INSTALL LRSS (STRUCT STEEL) LB 2.750 4,486.250 $12,337.19 9,359.00 4,486.25 0930 06586061 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 180 37.000 $6,66 25.00 37.00 1015 06666224 000 PAVEMENT SEALER 4" LF 0.100 30,599.000 $3,059.90 26,02 53,16

CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 19 QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date 1020 06666226 000 PAVEMENT SEALER 8" LF 0.300 5,240 $1,574.40 4,00 6,35 1030 06666228 000 PAVEMENT SEALER 12" LF 0.900 1,563.000 $1,406.70 873.00 1,563.00 1075 06776001 000 ELIM EXT PAV MRK & MRKS (4") LF 0.300 2,375.000 $712.50 79,377.00 39,157.00 1080 06776003 000 ELIM EXT PAV MRK & MRKS (8") LF 0.700 126.000 $88.20 74.00 387.00 1085 06776008 000 ELIM EXT PAV MRK & MRKS (ARROW) EA 57.000 6.000 $34 1 1090 06776009 000 ELIM EXT PAV MRK & MRKS (DBL ARROW) EA 75.000 0 $15 1095 06776012 000 ELIM EXT PAV MRK & MRKS (WORD) EA 56.000 6.000 $336.00 1 1100 06776019 000 ELIM EXT PAV MRK & MRKS (36")(YLD TRI) EA 14.000 0 $11 1140 06826001 000 VEH SIG SEC (12")LED(GRN) EA 150 0 $1,95 1145 06826002 000 VEH SIG SEC (12")LED(GRN ARW) EA 150 0 $30 1150 06826003 000 VEH SIG SEC (12")LED(YEL) EA 150 0 $1,95 1155 06826004 000 VEH SIG SEC (12")LED(YEL ARW) EA 150 0 $30 1160 06826005 000 VEH SIG SEC (12")LED(RED) EA 150 0 $1,95 1165 06826018 000 PED SIG SEC (LED)(COUNTDOWN) EA 200 0 $40 1170 06826020 000 PED SIG SEC (HOUSING ONLY) EA 150 0 $30 1175 06826023 000 BACK PLATE (12")(3 SEC) EA 50 10 $55 1 1 1180 06826025 000 BACK PLATE (12")(5 SEC) EA 75.000 0 $15 1203 06866027 INS TRF SIG PL AM(S)1 ARM(24')LUM EA 5,302.500 0 $5,302.50 1204 06866031 INS TRF SIG PL AM(S)1 ARM(28')LUM EA 5,461.580 0 $5,461.58 1205 06866033 000 INS TRF SIG PL AM(S)1 ARM(32') EA 3,000 0 $3,00 1226 06866167 INS TRF SIG PL AM(S)2 ARM(44-36')LUM EA 10,180.800 0 $10,180.80 1251 60016001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 118.710 104.000 $12,345.84 10 19 1596 96082001 UNIQUE CHANGE ORDER 1 DOL 1,292.830 0 $1,292.83 24.00 3 CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date 1540 96016001 MATERIAL ON HAND DOL 0-61,022.400 -$61,022.40 1,00 135,239.45 1560 96066053 LAW ENFORCEMENT PERSONNEL DOL 0 8,625.840 $8,625.84 1,00 68,923.23 TOTAL EARNINGS THIS ESTIMATE $406,745.50

CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 19 CONTRACT S PROJECT CATEGORY C 72-7-66 CONTROL 007207066 001 ROADWAY S SUPP $ 0060 01006002 000 PREPARING ROW STA 10,000 179.000 0 179.00 1,790,00 0065 01046009 000 REMOVING CONC (RIPRAP) SY 7.000 10,500 0 2,849.08 19,943.56 0070 01046011 000 REMOVING CONC (MEDIANS) SY 0 634.000 0 42.72 555.36 0075 01046017 000 REMOVING CONC (DRIVEWAYS) SY 0 1,675.000 0 1,675.00 13,40 0080 01046021 000 REMOVING CONC (CURB) LF 3.000 4,035.000 0 2,017.00 6,05 0085 01046022 000 REMOVING CONC (CURB AND GUTTER) LF 4.000 210 0 47 1,88 0090 01056008 000 REMOVING STAB BASE AND AH PAV (6") SY 3.000 4,640 0 7,849.44 23,548.32 0095 01056014 000 REMOVING STAB BASE & AH PAV (7"-12") SY 5.000 62,130-127.000 49,297.71 246,488.55 0105 01106001 000 EXCAVATION (ROADWAY) CY 7.000 86,829.000 4,090 90,479.01 633,353.07 0106 01126001 SUBGRADE WIDENING (ORD COMP) STA 1,538.980 0 3.100 2.60 4,001.35 CO #16 0110 01326003 000 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 7.000 199,783.000-944.000 198,450.01 1,389,150.07 0115 01506002 000 BLADING HR 70 53.000 0 16.00 1,12 0120 01606003 000 FURNISHING AND PLACING TOPSOIL (4") SY 0.050 280,895.000 0 157,268.05 7,863.40 0125 01646041 000 DRILL SEEDING (TEMP) (WARM) SY 0.020 280,895.000 0 134,236.11 2,684.73 0130 01646066 000 DRILL SEEDING (PERM)(WARM OR COOL) SY 0.030 282,970 0 128,405.60 3,852.17 0140 01696001 000 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 0.900 46,829.000 0 80,246.96 72,222.26 0145 02166001 000 PROOF ROLLING HR 45.000 105.000 0 26.00 1,17 0160 03416008 000 D-GR HMA TY-B PG64-22 TON 70 28,670 250 34,672.61 2,427,082.70 0161 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL 0 1,000 0 4,426.37 4,426.37 Production Bonus for D-GR HMA TY-B PG64-22 0163 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL 0 1,000 0 4,102.12 4,102.12 Placement Bonus for D-GR HMA TY-B PG64-22 0170 03416028 000 D-GR HMA TY-C PG70-22 TON 75.000 10,616.000 90 8,594.59 644,594.25 0171 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL 0 1,000 0 2,349.54 2,349.54 Production Bonus for D-GR HMA TY-C PG70-22 0173 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL 0 1,000 0 377.16 377.16 Placement Bonus for D-GR HMA TY-C PG70-22 0174 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL -0 1,000 0 8,329.70-8,329.70 Placement Penaly for D-GR HMA TY-C PG70-22 0175 03516025 000 FLEX PAVEMENT STRUCTURE REPAIR (8"-15") SY 85.000 953.000 0 135.50 11,517.50 0180 03606007 000 CONC PVMT (CONT REINF - CRCP) (13") SY 60 57,970 290 59,069.21 3,544,152.60 0200 04006005 000 CEM STABIL BKFL CY 90 420 0 236.68 21,301.20 0210 04016001 000 FLOWABLE BACKFILL CY 130 90 0 53.34 6,934.20 0215 04026001 000 TRENCH EXCAVATION PROTECTION LF 0.250 310 0 31 77.75 0220 04036001 000 TEMPORARY L SHORING SF 10 24,430 9,577.530 20,685.15 206,851.50 0225 04166015 000 DRILL SHAFT (NON - REINFORCED) (12 IN) LF 150 20 0 14.00 2,10 0230 04166018 000 DRILL SHAFT (SIGN MTS) (24 IN) LF 130 200 0 95.50 12,415.00 0235 04166029 000 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 125.000 1,120-110 336.00 42,00 0240 04166031 000 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 95.000 23.000 0 33.90 3,220.50 0245 04166032 000 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 100 53.000-23.000 28.40 2,84 0251 04206066 CL C CONC (RAIL FOUNDATION) CY 408.080 0 130 13 53,458.49 Added CO #15

CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 19 CATEGORY 001 ROADWAY S SUPP $ 0255 04226015 000 APPROACH SLAB CY 320 153.100 0 153.10 48,99 0256 04206074 CL C CONC (MISC) CY 424.340 0 42.250 42.25 17,928.37 Change Order 17 0260 04236001 000 RETAINING WALL (MSE) SF 50 68,690 0 68,547.00 3,427,35 0265 04236003 000 RETAINING WALL (TEMP WALL) SF 17.500 53,110 0 53,11 929,46 0270 04326001 000 RIPRAP (CONC)(4 IN) CY 200 399.000 6.080 272.97 54,594.00 0275 04326003 000 RIPRAP (CONC)(6 IN) CY 125.000 3,070 0 2,489.43 311,178.75 0280 04326006 000 RIPRAP (CONC)(CL B) CY 250 59.000 0 17.62 4,405.00 0285 04326045 000 RIPRAP (MOW STRIP)(4 IN) CY 270 470 0 544.15 146,920.50 0290 04506023 000 RAIL (TY SSTR) LF 0 4,907.000 0 4,894.50 63,628.50 0295 04506030 000 RAIL (TY C221) LF 50 960 0 96 48,00 0300 04506042 000 RAIL (TY PR1) LF 80 3,445.000 0 3,775.00 302,00 0305 04596008 000 GABION MATTRESSES (GALV)(18 IN) SY 75.000 587.000 0 170.27 12,770.25 0310 04626019 000 CONC BOX CULV (8 FT X 4 FT) LF 620 280-100 16 104,16 0315 04646003 000 RC PIPE (CL III)(18 IN) LF 49.000 490 0 376.00 18,424.00 0320 04646005 000 RC PIPE (CL III)(24 IN) LF 90 5,160-7.000 4,993.00 449,37 0325 04646007 000 RC PIPE (CL III)(30 IN) LF 80 1,195.000 0 1,047.00 83,76 0330 04646008 000 RC PIPE (CL III)(36 IN) LF 90 645.000 0 44 39,60 0340 04656002 000 MANH (COMPL)(PRM)(48IN) EA 250 10 0 4.00 1,00 0345 04656005 000 JCTBOX(COMPL)(PJB)(3FTX3FT) EA 350 0 0 1 6,30 0349 04656032 INLET (COMPL)(PCU)(3FT)(BOTH) EA 6,828.160 0 10 1 68,281.60 CHANGE ORDER 14 0355 04656152 000 INLET (COMPL)(PAZD)(RC)(3FTX3FT) EA 5,000 0 0 4.00 20,00 0365 04656160 000 INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3,000 19.000-0 1 30,00 0375 04656233 000 INLET (COMP) (TY SIDEWALK BRIDGE) EA 1,000 10 0 1 10,00 0380 04656235 000 INLET (COMPL)(RWI)(TY I) EA 7,000 15.000 0 15.00 105,00 0400 04666173 000 WINGWALL (PW - 1) (HW=12 FT) EA 7,000 0 0 7,00 0435 04676357 000 SET (TY II) (18 IN) (RCP) (3: 1) (P) EA 750 5.000 0 4.00 3,00 0445 04676389 000 SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 1,000 15.000 0 15.00 15,00 0450 04676394 000 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1,000 0 0 2,00 0470 04796006 000 ADJUSTING INLET (CAP) EA 0 17.000 0 7.00 14.00 0475 04966002 000 REMOV STR (INLET) EA 100 15.000 0 10 0480 04966004 000 REMOV STR (SET) EA 100 9.000 0 20 0485 04966005 000 REMOV STR (WINGWALL) EA 5.000 0-6.000 5.00 0490 04966006 000 REMOV STR (HEADWALL) EA 10 43.000-35.000 2 0495 04966007 000 REMOV STR (PIPE) LF 0 900 0 414.00 414.00 0500 04966008 000 REMOV STR (BOX CULVERT) LF 5.000 3,130-100 1,663.00 8,315.00 0505 05006001 000 MOBILIZATION LS 1,000,000 0 0 0.90 900,00 0510 05026001 000 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15,000 26.000 0 26.00 390,00 0515 05066002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 20 2,630 0 1,604.00 32,08 0520 05066003 001 ROCK FILTER DAMS (INSTALL) (TY 3) LF 40 489.000 0 29 11,64 0525 05066011 001 ROCK FILTER DAMS (REMOVE) LF 0 3,119.000 0 543.00 1,086.00 0530 05066020 001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 15.000 460 0 27 4,17 0540 05066038 001 TEMP SEDMT CONT FENCE (INSTALL) LF 0 19,950 0 12,35 24,716.00 0545 05066039 001 TEMP SEDMT CONT FENCE (REMOVE) LF 0.100 19,950 0 1,026.00 102.60 0551 96066055 FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1,000 0 17,239.97 17,239.97 0555 05086001 000 CONSTRUCTING DETOURS SY 47.000 40,370 0 40,922.36 1,923,350.92

CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 19 CATEGORY 001 ROADWAY S SUPP $ 0556 96082002 UNIQUE CHANGE ORDER 2 DOL 6,893.250 0 0 6,893.25 Change Order 3, Mill EBML Rumble Strip 0560 05126001 000 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 44.000 30,630 0 30,63 1,347,72 0565 05126009 000 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 30 28,440 0 20,12 764,56 0570 05126010 000 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40 2,240 0 1,98 79,20 0575 05126025 000 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 5.000 59,490-1,115.000 56,54 282,70 0580 05126033 000 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 3.000 31,220 0 22,52 67,56 0585 05126034 000 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 6.000 280 0 1,10 6,60 0590 05126049 000 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 3.000 30,630-894.000 20,22 60,66 0595 05126057 000 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 0 28,440 0 7,20 14,40 0600 05126058 000 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 0 2,240 0 68 1,36 0605 05146001 000 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 64.000 5,425.000-140 6,395.00 409,28 0606 05146004 PERM CTB (SGL SLOPE) (TY 4) (42 ) LF 209.890 0 140 14 29,384.60 CHANGE ORDER 8 0610 05286001 000 COLORED TEXTURED CONC (4") SY 60 950 0 1,164.27 69,856.20 0615 05296001 000 CONC CURB (TY I) LF 0 34,080 1,284.000 36,004.83 288,038.64 0625 05296018 000 CONC CURB (TY F3) LF 100 39.000 0 48.50 4,85 0630 05306002 000 INTERSECTIONS (ACP) SY 53.000 3,240 0 2,681.96 142,143.88 0635 05306004 000 DRIVEWAYS (CONC) SY 53.000 1,685.000 0 1,969.01 104,357.53 0640 05306005 000 DRIVEWAYS (ACP) SY 16.000 4,450 0 3,749.28 59,988.48 0645 05316001 000 CONC SIDEWALKS (4") SY 30 17,500 330 17,027.52 647,045.76 0650 05316005 000 CURB RAMPS (TY 2) EA 1,000 3.000 0 5.00 5,00 0655 05316008 000 CURB RAMPS (TY 5) EA 1,000 7.000 0 5.00 5,00 0656 05316010 CURB RAMPS (TY 7) EA 1,724.160 0 0 1,724.16 CO #16 0660 05316013 000 CURB RAMPS (TY 10) EA 900 20-0 24.00 21,60 0661 05316014 CURB RAMPS (TY 11) EA 2,417.670 0 0 2,417.67 CO #16 0665 05316016 000 CURB RAMPS (TY 21) EA 3,000 3.000 0 3.00 9,00 0670 05316017 000 CURB RAMPS (TY 22) EA 2,800 0 0 2,80 0675 05366002 000 CONC MEDIAN SY 55.000 855.000 0 370.89 20,398.95 0680 05406001 000 MTL W-BEAM GD FEN (TIM POST) LF 19.000 5,290 875.000 5,875.00 111,625.00 0682 05406002 MTL W-BEAM GD FEN (STEEL POST) LF 53.500 0 115.000 175.00 9,362.50 Added CO 13 0685 05406003 000 MTL THRIE-BEAM GD FEN (TIM POST) LF 56.000 40 0 4 2,24 0690 05406016 000 DOWNSTREAM ANCHOR TERMINAL SECTION EA 920 7.000 0 7.00 6,44 0695 05426001 000 REMOVE METAL BEAM GUARD FENCE LF 0 5,700 0 6,169.00 6,169.00 0700 05426002 000 REMOVE TERMINAL ANCHOR SECTION EA 130 0 0 1,69 0705 05436019 001 CABLE BARRIER TERMINAL SECTION (TL-3) EA 2,700 4.000 0 4.00 10,80 0710 05436021 001 REMOVE CABLE BARRIER LF 0 7,346.000 0 7,40 14,80 0715 05446001 000 GUARDRAIL END TREATMENT (INSTALL) EA 2,700 10 0 9.00 24,30 0720 05446003 000 GUARDRAIL END TREATMENT (REMOVE) EA 110 3.000 0 3.00 33 0725 05456003 000 CRASH CUSH ATTEN (MOVE & RESET) EA 800 9.000 0 9.00 7,20 0730 05456005 000 CRASH CUSH ATTEN (REMOVE) EA 425.000 5.000 0 425.00 0735 05456013 000 CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) EA 13,000 5.000-4.000 13,00 0736 05456019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 8,749.130 0 4.000 5.00 43,745.65 Change Order 1

CONTRACTOR'S ESTIMATE PACKAGE Page 8 of 19 CATEGORY 001 ROADWAY S SUPP $ 0740 05606001 000 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 150 9.000 0 1 1,50 0750 05606003 000 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 200 0 0 3.00 60 0760 06106050 000 IN RD IL AM (TY SA) 40T-8 (250W) S EA 2,500 110 0 3 95,00 0765 06106051 000 IN RD IL AM (TY SA) 40T-8-8 (250W) S EA 3,500 9.000-0 3.00 10,50 0770 06106071 000 IN RD IL AM (TY ) 48S-10-10 (400W) S EA 3,500 14.000 0 14.00 49,00 0775 06186023 000 CONDT (PVC) (SCH 40) (2") LF 5.500 29,784.000-155.000 14,467.00 79,568.50 0780 06186046 000 CONDT (PVC) (SCH 80) (2") LF 6.000 1,704.000-86.000 1,415.00 8,49 0785 06186047 000 CONDT (PVC) (SCH 80) (2") (BORE) LF 10 1,466.000 170 484.00 5,324.00 0790 06186053 000 CONDT (PVC) (SCH 80) (3") LF 7.000 264.000 6.000 569.00 3,983.00 0795 06186054 000 CONDT (PVC) (SCH 80) (3") (BORE) LF 15.000 416.000-15.000 13 1,95 0815 06206007 000 ELEC CONDR (NO.8) BARE LF 0.900 32,100-80 13,186.00 11,867.40 0820 06206008 000 ELEC CONDR (NO.8) INSULATED LF 0.800 67,180-176.000 28,167.00 22,533.60 0825 06206009 000 ELEC CONDR (NO.6) BARE LF 0 1,376.000-7.000 167.00 167.00 0830 06206010 000 ELEC CONDR (NO.6) INSULATED LF 0 460 20 334.00 334.00 0840 06246002 000 GROUND BOX TY A (122311)W/APRON EA 600 24.000 0 1 6,60 0845 06246010 000 GROUND BOX TY D (162922)W/APRON EA 700 0 0 4.00 2,80 0850 06286078 000 ELC SRV TY A 240/480 100(NS)SS(E)TP(O) EA 3,400 6.000 0 5.00 17,00 0851 96066001 FORCE ACCOUNT ID 1 DOL 0 1,000 0 9,831.64 9,831.64 Item 628.5.1 Invoice for Connection Charge 0855 06286169 000 ELC SRV TY D 120/240 070(NS)AL(N)PS(U) EA 3,400 0 0 3,40 0860 06366002 000 ALUMINUM SIGNS (TY G) SF 20 2,310 0 965.00 21,23 0865 06446001 000 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 400 49.000 0 29.00 11,60 0870 06446004 000 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 480 110 0 8 42,24 0875 06446030 000 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 720 20 0 6.00 4,32 0880 06446033 000 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 620 0 0 4.00 2,48 0885 06446051 000 IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1,000 5.000 0 4.00 4,00 0890 06446064 000 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1,500 6.000 0 3,00 0895 06446076 000 REMOVE SM RD SN SUP&AM EA 90 124.000 0 9 8,10 0900 06476001 000 INSTALL LRSS (STRUCT STEEL) LB 2.750 9,359.000 0 4,486.25 12,337.19 0905 06476003 000 REMOVE LRSA EA 1,200 3.000 0 1,20 0930 06586061 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 180 25.000 0 37.00 6,66 0945 06626060 000 WK ZN PAV MRK REMOV (W)4"(BRK) LF 0.500 24,167.000 0 9,44 4,72 0950 06626063 000 WK ZN PAV MRK REMOV (W)4"(SLD) LF 0.500 24,167.000 1,500 32,12 16,06 0955 06626095 000 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 0.500 162,980 1,670 179,326.00 89,663.00 1015 06666224 000 PAVEMENT SEALER 4" LF 0.100 26,550-530 53,16 5,316.80 1020 06666226 000 PAVEMENT SEALER 8" LF 0.300 3,815.000 187.000 6,35 1,905.00 1030 06666228 000 PAVEMENT SEALER 12" LF 0.900 873.000 0 1,563.00 1,406.70 1075 06776001 000 ELIM EXT PAV MRK & MRKS (4") LF 0.300 79,377.000 0 39,157.00 11,747.10 1080 06776003 000 ELIM EXT PAV MRK & MRKS (8") LF 0.700 74.000 0 387.00 270.90 1085 06776008 000 ELIM EXT PAV MRK & MRKS (ARROW) EA 57.000 0 0 1 57 1090 06776009 000 ELIM EXT PAV MRK & MRKS (DBL ARROW) EA 75.000 0 0 15 1095 06776012 000 ELIM EXT PAV MRK & MRKS (WORD) EA 56.000 0 0 1 56 1100 06776019 000 ELIM EXT PAV MRK & MRKS (36")(YLD TRI) EA 14.000 0 0 11 1105 06786001 000 PAV SURF PREP FOR MRK (4") LF 0.020 26,550-530 16,323.00 326.46 1140 06826001 000 VEH SIG SEC (12")LED(GRN) EA 150 0 0 1,95 1145 06826002 000 VEH SIG SEC (12")LED(GRN ARW) EA 150 0 0 30 1150 06826003 000 VEH SIG SEC (12")LED(YEL) EA 150 0 0 1,95 1155 06826004 000 VEH SIG SEC (12")LED(YEL ARW) EA 150 0 0 30

CONTRACTOR'S ESTIMATE PACKAGE Page 9 of 19 CATEGORY 001 ROADWAY S SUPP $ 1160 06826005 000 VEH SIG SEC (12")LED(RED) EA 150 0 0 1,95 1165 06826018 000 PED SIG SEC (LED)(COUNTDOWN) EA 200 0 0 40 1170 06826020 000 PED SIG SEC (HOUSING ONLY) EA 150 0 0 30 1175 06826023 000 BACK PLATE (12")(3 SEC) EA 50 10 0 1 55 1180 06826025 000 BACK PLATE (12")(5 SEC) EA 75.000 0 0 15 1203 06866027 INS TRF SIG PL AM(S)1 ARM(24')LUM EA 5,302.500 0 0 5,302.50 CHANGE ORDER 10 1204 06866031 INS TRF SIG PL AM(S)1 ARM(28')LUM EA 5,461.580 0 0 5,461.58 CHANGE ORDER 10 1205 06866033 000 INS TRF SIG PL AM(S)1 ARM(32') EA 3,000 0 0 3,00 1226 06866167 INS TRF SIG PL AM(S)2 ARM(44-36')LUM EA 10,180.800 0 0 10,180.80 CHANGE ORDER 10 1245 07346002 000 LITTER REMOVAL CYC 430 24.000 0 4.00 1,72 1250 60016002 000 PORTABLE CHANGEABLE MESSAGE SIGN EA 14,000 0 0 28,00 1251 60016001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 118.710 0 100 19 22,673.61 Change Order 1 1596 96082001 UNIQUE CHANGE ORDER 1 DOL 1,292.830 0 24.000 3 40,077.73 Change Order 1/Provide & Maintain Project Field Office/Month 1598 96086003 UNIQUE CHANGE ORDER 3 DOL 6,409.390 0 0 6,409.39 Added CO 11-Relocate Sign Exit 550 1599 96086004 UNIQUE CHANGE ORDER 4 DOL 1,549.790 0 0 9.00 13,948.11 Added CO 11-Lane Closure for Emergency Repairs 1600 96086005 UNIQUE CHANGE ORDER 5 DOL 8,839.380 0 0 8,839.38 Added CO 12-Underdrain Sump Pit EBFR Sta 216+70 +/- Lt 1601 96086006 UNIQUE CHANGE ORDER 6 DOL 120,000 0 0 120,00 CHANGE ORDER 14/DISINCENTIVE OFFSET/LS 1602 96086007 UNIQUE CHANGE ORDER 7 DOL 13,238.040 0 0 13,238.04 RAC-R Work Prior to Revision Paid by LS 1603 96086008 UNIQUE CHANGE ORDER 8 DOL 81,960 0 0 81,96 Added CO 18-3415 LF Unused Precast Single Slope Barrier CATEGORY 002 IH 10 - Fredericksburg and Culverts 4, 8, 8 A, 10, 10 A Category Subtotal $26,498,091.18 SUPP $ 1360 04166004 000 DRILL SHAFT (36 IN) LF 160 400 0 52 84,48 1361 96026601 EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL 184.000 0 0 120.77 22,221.68 DS 36 extra depth 5'-15' pay by the LF 1365 04166005 000 DRILL SHAFT (42 IN) LF 255.000 184.000 0 190.58 48,597.90 1370 04206013 000 CL C CONC (ABUT) CY 650 92.200 0 92.20 59,93 1375 04206025 000 CL C CONC (BENT) CY 1,150 129.400 0 129.40 148,81 1380 04226001 000 REINF CONC SLAB SF 10 24,600 0 24,60 246,00 1385 04256038 000 PRESTR CONC GIRDER (TX46) LF 160 2,686.680 0 2,686.68 429,868.80 1390 04506023 000 RAIL (TY SSTR) LF 0 644.000 0 644.00 8,37 1395 04546001 000 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF 80 160 0 16 12,96

CONTRACTOR'S ESTIMATE PACKAGE Page 10 of 19 CATEGORY 002 IH 10 - Fredericksburg and Culverts 4, 8, 8 A, 10, 10 A SUPP $ 1445 04626020 000 CONC BOX CULV (8 FT X 5 FT) LF 580 1,866.000 0 1,77 1,026,60 Culvert 8 1450 04666183 000 WINGWALL (PW - 1) (HW=8 FT) EA 4,000 0 0 8,00 Culvert 8 1531 04206074 CL C CONC (MISC) CY 424.340 0 60.220 60.22 25,553.75 Change Order 17 CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal $2,121,394.13 SUPP $ 1540 96016001 MATERIAL ON HAND DOL 0 1,000 0 135,239.45 135,239.45 1555 96066056 FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1,000 0 11,074.64 11,074.64 1560 96066053 LAW ENFORCEMENT PERSONNEL DOL 0 1,000 0 68,923.23 68,923.23 1590 96066003 FORCE ACCOUNT ID 3 DOL 0 1,000 0 56,692.03 56,692.03 Repair of Crash Cushion Repair PROJECT CATEGORY ROW 72-7-71 CONTROL 007207071 001 JOINT UTILITY Category Subtotal $271,929.35 SUPP $ 1900 70436001 000 ADJUST EXISTING VALVE BOX EA 570 30 0 3 17,67 1905 70436002 000 ADJUST AUTO AIR RELEASE VALVE (COMPL) EA 1,150 7.000 0 7.00 8,05 1910 70436003 000 TRENCH EXCAVATION PROTECTION LF 0.500 505.000 0 505.00 252.50 1915 70436004 000 FLOWABLE BACKFILL CY 170 255.000 0 255.00 43,35 Category Subtotal $69,322.50 PROJECT C 72-7-66 CONTROL 007207066 CATEGORY 001 ROADWAY S SUPP ($) 0100 01066001 000 OBLITERATING ABANDONED ROAD STA 220 33.000 0 0 0135 01686001 000 VEGETATIVE WATERING MG 0.250 8,796.000 0 0 0150 03166409 000 AGGR (TY-B GR-4) CY 85.000 700 46.000 0 0155 03166410 000 AH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR) GAL 4.000 24,157.000 234.000 0 0162 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL -0 1,000 0 0 Production Penalty for D-GR HMA TY-B PG64-22 0164 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL -0 1,000 0 0 Placement Penalty for D-GR HMA TY-B PG64-22 0165 03416027 000 D-GR HMA TY-C SAC-B PG70-22 TON 70 15,580 90 0 0166 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL 0 1,000 0 0 Production Bonus for D-GR HMA TY-C SAC-B PG70-22

CONTRACTOR'S ESTIMATE PACKAGE Page 11 of 19 0167 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL -0 1,000 0 0 Production Penalty for D-GR HMA TY-C SAC-B PG70-22 0168 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL 0 1,000 0 0 Placement Bonus for D-GR HMA TY-C SAC-B PG70-22 0169 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL -0 1,000 0 0 Placement Penalty for D-GR HMA TY-C SAC-B PG70-22 0172 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL -0 1,000 0 0 Production Penalty for D-GR HMA TY-C PG70-22 0181 05852006 RIDE BONUS/PENALTY ( 360) DOL 0 1,000 0 0 Surface Test Type B, Pay Adjustment Schedule 2 0205 04006006 000 CUT & RESTORING PAV SY 50 397.000 0 0 0250 04206136 000 CL C CONC (RAC-R) CY 700 53.000-53.000 0 0335 04646009 000 RC PIPE (CL III)(42 IN) LF 120 176.000 0 0 0350 04656036 000 INLET (COMPL)(PCU)(4FT)(BOTH) EA 9,000 10-10 0 0360 04656153 000 INLET (COMPL)(PAZD)(RC)(4FTX4FT) EA 5,000 0 0 0 0370 04656171 000 INLET (COMPL)(TY AZR) EA 5,000 0 0 0 0384 04666010 HEADWALL (CH - FW - 0) (DIA= 42 IN) EA 5,363.980 0 0 0 CHANGE ORDER 9 0385 04666099 000 HEADWALL (CH - PW - 0) (DIA= 30 IN) EA 1,500 0-0 0 0390 04666156 000 WINGWALL (FW - 0) (HW=9 FT) EA 3,000 0-0 0 0395 04666172 000 WINGWALL (PW - 1) (HW=11 FT) EA 6,000 0-0 0 0405 04666180 000 WINGWALL (PW - 1) (HW=5 FT) EA 1,500 0-0 0 0410 04666181 000 WINGWALL (PW - 1) (HW=6 FT) EA 2,500 0-0 0 0415 04666182 000 WINGWALL (PW - 1) (HW=7 FT) EA 2,500 0-0 0 0420 04666183 000 WINGWALL (PW - 1) (HW=8 FT) EA 4,000 7.000-5.000 0 0425 04666184 000 WINGWALL (PW - 1) (HW=9 FT) EA 4,000 0-0 0 0430 04676356 000 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 750 3.000 0 0 0440 04676388 000 SET (TY II) (24 IN) (RCP) (3: 1) (C) EA 1,000 0 0 0 0455 04676440 000 SET (TY II) (36 IN) (CMP) (3: 1) (P) EA 1,000 4.000 0 0 0460 04676449 000 SET (TY II) (36 IN) (RCP) (3: 1) (P) EA 2,500 0 0 0 0465 04676462 000 SET (TY II) (42 IN) (RCP) (3: 1) (P) EA 1,000 4.000 0 0 0535 05066024 001 CONSTRUCTION EXITS (REMOVE) SY 3.000 460 0 0 0550 05066041 001 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3.500 150 0 0 0620 05296015 000 CONC CURB (TY C1) LF 60 10 0 0 0716 05446002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 1,200 0 0 0 Change Order 23 0745 05606002 000 MAILBOX INSTALL-D (TWG-POST) TY 1 EA 150 0 0 0 0755 06106011 000 IN RD IL AM (U/P) (TY 1) (150W) S EA 1,000 0 0 0 0766 06106054 IN RD IL AM (TY SA) 40T-12 (250W) S EA 3,181.500 0 0 0 Change Order 5 0800 06186064 000 CONDT (RM) (1") LF 50 30 0 0 0805 06206003 000 ELEC CONDR (NO.12) BARE LF 0.900 106.000 0 0 0810 06206004 000 ELEC CONDR (NO.12) INSULATED LF 0.900 210 0 0 0835 06216005 000 TRAY CABLE (4 CONDR) (12 AWG) LF 1.400 854.000 40 0 0856 96066002 FORCE ACCOUNT ID 2 DOL 0 1,000 0 0 Item 628.5.1 Invoice for Connection Charge 0910 06586001 000 INSTL DEL ASSM (D-SW)SZ 1(FLX)GND EA 100 30 0 0 0915 06586013 000 INSTL DEL ASSM (D-SW)SZ (BRF)CTB EA 20 6.000 0 0 0920 06586036 000 INSTL DEL ASSM (D-DW)SZ 1(FLX)GND EA 47.000 65.000-0 0 0925 06586048 000 INSTL OM ASSM (OM-2Z)(FLX)GND EA 67.000 6.000 0 0 0935 06586064 000 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 180 25.000 0 0 0940 06586067 000 INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2 EA 180 6.000 0 0

CONTRACTOR'S ESTIMATE PACKAGE Page 12 of 19 0960 06666006 000 REFL PAV MRK TY I (W)4"(DOT)(100MIL) LF 0.700 437.000 5.000 0 0965 06666036 000 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 0.700 13,739.000 225.000 0 0970 06666042 000 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 1.600 1,410 0 0 0975 06666048 000 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 4.500 1,090 0 0 0980 06666054 000 REFL PAV MRK TY I (W)(ARROW)(100MIL) EA 87.000 15.000 0 0 0985 06666057 000 REFL PAV MRK TY I(W)(DBL ARROW)(100MIL) EA 160 5.000 0 0 0990 06666063 000 REFL PAV MRK TY I(W)(UTURN ARW)(100MIL) EA 180 0 0 0 0995 06666075 000 REFL PAV MRK TY I (W)(NUMBER)(100MIL) EA 150 4.000 0 0 1000 06666078 000 REFL PAV MRK TY I (W)(WORD)(100MIL) EA 110 23.000 0 0 1005 06666102 000 REF PAV MRK TY I(W)36"(YLD TRI)(100MIL) EA 30 35.000 0 0 1010 06666138 000 REFL PAV MRK TY I (Y)8"(SLD)(100MIL) LF 0.700 115.000 0 0 1025 06666227 000 PAVEMENT SEALER 10" LF 0.900 3,100 0 0 1035 06666248 000 PAVEMENT SEALER (NUMBER) EA 64.000 3.000 0 0 1040 06666300 000 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 0.300 9,620 0 0 1045 06666303 000 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 0.300 52,590-2,274.000 0 1050 06666315 000 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 0.300 50,503.000-1,500 0 1055 06686010 000 PREFAB PAV MRK TY B (W)(6")(BRK)CNTST LF 7.000 3,100 0 0 1060 06726008 000 REFL PAV MRKR TY I-R EA 3.000 110 0 0 1065 06726009 000 REFL PAV MRKR TY II-A-A EA 5.000 80 0 0 1070 06726010 000 REFL PAV MRKR TY II-C-R EA 2.600 1,340 3.000 0 1110 06786004 000 PAV SURF PREP FOR MRK (8") LF 0.200 3,820 187.000 0 1115 06786005 000 PAV SURF PREP FOR MRK (10") LF 0.500 3,000 0 0 1120 06786006 000 PAV SURF PREP FOR MRK (12") LF 0.700 873.000 0 0 1125 06786015 000 PAV SURF PREP FOR MRK (NUMBER) EA 5.000 3.000 0 0 1130 06806002 000 INSTALL HWY TRF SIG (ISOLATED) EA 5,000 0 0 0 1135 06806004 000 REMOVING TRAFFIC SIGNALS EA 1,000 0 0 0 1185 06846009 000 TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF 1.200 1,866.000-43.000 0 1190 06846012 000 TRF SIG CBL (TY A)(12 AWG)(7 CONDR) LF 1.700 1,700-50 0 1195 06846080 000 TRF SIG CBL (TY C)(14 AWG)(2 CONDR) LF 0.800 1,866.000-43.000 0 1200 06866014 000 INS TRF SIG PL AM (S)STR(TY C)(28')LUM EA 3,000 0-0 0 1210 06866039 000 INS TRF SIG PL AM(S)1 ARM(36')LUM EA 3,000 0-0 0 1215 06866045 000 INS TRF SIG PL AM(S)1 ARM(44') EA 3,000 0-0 0 1220 06866047 000 INS TRF SIG PL AM(S)1 ARM(44')LUM EA 3,000 0-0 0 1225 06866051 000 INS TRF SIG PL AM(S)1 ARM(48')LUM EA 3,000 0 0 0 1230 06876001 000 PED POLE ASSEMBLY EA 1,390 3.000 0 0 1235 06886002 000 PED DETECT PUSH BUTTON (STANDARD) EA 150 0 0 0 1240 07306107 003 FULL - WIDTH MOWING CYC 1,530 0 0 0 1255 60026001 000 VIVDS PROCESSOR SYSTEM EA 3,270 0 0 0 1260 60026002 000 VIVDS CAMERA ASSEMBLY EA 850 6.000 0 0 1265 60026003 000 VIVDS SET-UP SYSTEM EA 200 0 0 0 1270 60026005 000 VIVDS COMMUNICATION CABLE (COAXIAL) LF 0 880-60 0 1274 60256001 RADAR PRESENCE DETECTOR EA 6,745.510 0 0 0 CHANGE ORDER 22 1275 60256002 000 RADAR PRESENCE DETECTOR COMM CABLE LF 0 410 0 0 1280 60576001 000 RADAR ADVANCED DETECTION DEVICE EA 6,140 0 0 0 1281 60576001 RADAR ADVANCED DETECTION DEVICE EA 7,305.110 0 0 0 CHANGE ORDER 22/L 1285 60966002 000 INS LED WW SGN W/BASIC SOL PWR KIT EA 1,190 0 0 0 1597 96086002 UNIQUE CHANGE ORDER 2 DOL 9,307.370 0 0 0 CO 7/Replace TS Pole and Remove Mast Arm @ Ralph Fair/LS 1604 96086009 UNIQUE CHANGE ORDER 9 DOL 579.690 0 44.000 0 Change Order 19/Culvert Clean-Out/HR

CONTRACTOR'S ESTIMATE PACKAGE Page 13 of 19 1605 96086010 UNIQUE CHANGE ORDER 10 DOL 110.620 0 26.000 0 Change Order 19/Culvert Clean-Out/Flagging/HR 1606 96086011 UNIQUE CHANGE ORDER 11 DOL 71.090 0 35.000 0 Change Order 19/Culvert Clean-Out/Water Sevices/HR 1607 96066005 FORCE ACCOUNT ID 5 DOL 0 0 35,000 0 Change Order 21/Pavement/Pothole Repair 1608 06366001 ALUMINUM SIGNS (TY A) SF 48.190 0 0 0 Change Order 22 CATEGORY 002 IH 10 - Fredericksburg and Culverts 4, 8, 8 A, 10, 10 A Category Subtotal SUPP ($) 1362 96026602 EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL 200 0 0 0 DS 36 extra depth over 15' pay by the LF 1366 96026601 EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL 293.250 0 0 0 DS 42 extra depth 5'-15' pay by the LF 1367 96026602 EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL 318.750 0 0 0 DS 42 extra depth over 15' pay by the LF 1420 04666184 000 WINGWALL (PW - 1) (HW=9 FT) EA 4,000 0-0 0 Culvert 4 1475 04666183 000 WINGWALL (PW - 1) (HW=8 FT) EA 4,000 0-0 0 Culvert 8 A 1500 04666183 000 WINGWALL (PW - 1) (HW=8 FT) EA 4,000 0-0 0 Culvert 10 1525 04666172 000 WINGWALL (PW - 1) (HW=11 FT) EA 6,000 0-0 0 Culvert 10 A 1530 04666182 000 WINGWALL (PW - 1) (HW=7 FT) EA 2,500 0-0 0 Culvert 10 A CATEGORY 003 CONTRACTOR FORCE ACCOUNT WORK Category Subtotal SUPP ($) 1545 96026001 PAYMENT ADJUSTMENT-POS DOL 0 1,000 0 0 1550 96026002 PAYMENT ADJUSTMENT-NEG DOL -0 12,306.000 0 0 1565 96066057 FORCE ACCOUNT-COMMER LAB USE DEDUCTION DOL -0 1,000 0 0 1570 96106001 ON THE JOB TRAINING DOL 0 1,000 0 0 1575 96056003 RUC DAMAGE ONLY DOL -1,020 0 0 0 IH 10 FR EB PS 42 Pay per Lane, per Hour 1580 96056003 RUC DAMAGE ONLY DOL -670 0 0 0 IH 10 FR WB PS 42 Pay per Lane, per Hour 1585 96056005 CALD CREDIT FOR EARLY COMPLETION DOL 3,000 0 0 0 008-006 pay by Day 1595 96066004 FORCE ACCOUNT ID 4 DOL 0 1,000 0 0 Repair of MBGF and Guardrial End Treatments Category Subtotal

CONTRACTOR'S ESTIMATE PACKAGE Page 14 of 19 PROJECT ROW 72-7-71 CONTROL 007207071 CATEGORY 001 JOINT UTILITY SUPP ($) 1875 70286001 000 SANITARY SEWER (ADJUST MANHOLE) EA 980 0 0 0 Category Subtotal TOTAL EARNINGS THIS CONTRACT $28,960,737.16

CONTRACTOR'S ESTIMATE PACKAGE Page 15 of 19 CONSTRUCTION ESTIMATE COMBINED ($) 01006002 000 PREPARING ROW STA 10,000 179.00 179.000 1,790,00 01046009 000 REMOVING CONC (RIPRAP) SY 7.000 10,50 2,849.080 19,943.56 01046011 000 REMOVING CONC (MEDIANS) SY 0 634.00 42.720 555.36 01046017 000 REMOVING CONC (DRIVEWAYS) SY 0 1,675.00 1,675.000 13,40 01046021 000 REMOVING CONC (CURB) LF 3.000 4,035.00 2,017.000 6,05 01046022 000 REMOVING CONC (CURB AND GUTTER) LF 4.000 21 470 1,88 01056008 000 REMOVING STAB BASE AND AH PAV (6") SY 3.000 4,64 7,849.440 23,548.32 01056014 000 REMOVING STAB BASE & AH PAV (7"-12") SY 5.000 62,13 49,297.710 246,488.55 01106001 000 EXCAVATION (ROADWAY) CY 7.000 86,829.00 90,479.010 633,353.07 01126001 SUBGRADE WIDENING (ORD COMP) STA 1,538.980 2.600 4,001.35 CO #16 01326003 000 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 7.000 199,783.00 198,450.010 1,389,150.07 01506002 000 BLADING HR 70 53.00 16.000 1,12 01606003 000 FURNISHING AND PLACING TOPSOIL (4") SY 0.050 280,895.00 157,268.050 7,863.40 01646041 000 DRILL SEEDING (TEMP) (WARM) SY 0.020 280,895.00 134,236.110 2,684.73 01646066 000 DRILL SEEDING (PERM)(WARM OR COOL) SY 0.030 282,97 128,405.600 3,852.17 01696001 000 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 0.900 46,829.00 80,246.960 72,222.26 02166001 000 PROOF ROLLING HR 45.000 105.00 26.000 1,17 03416008 000 D-GR HMA TY-B PG64-22 TON 70 28,67 34,672.610 2,427,082.70 03416028 000 D-GR HMA TY-C PG70-22 TON 75.000 10,616.00 8,594.590 644,594.25 03416059 PRODUCTION PAYMENT ADJUSTMENT DOL 0 2,00 6,775.910 6,775.91 Production Bonus for D-GR HMA TY-B PG64-22 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL -0 3,00 8,329.700-8,329.70 Placement Penalty for D-GR HMA TY-B PG64-22 03416060 PLACEMENT PAYMENT ADJUSTMENT DOL 0 3,00 4,479.280 4,479.28 Placement Bonus for D-GR HMA TY-B PG64-22 03516025 000 FLEX PAVEMENT STRUCTURE REPAIR (8"-15") SY 85.000 953.00 135.500 11,517.50 03606007 000 CONC PVMT (CONT REINF - CRCP) (13") SY 60 57,97 59,069.210 3,544,152.60 04006005 000 CEM STABIL BKFL CY 90 42 236.680 21,301.20 04016001 000 FLOWABLE BACKFILL CY 130 9 53.340 6,934.20 04026001 000 TRENCH EXCAVATION PROTECTION LF 0.250 31 310 77.75 04036001 000 TEMPORARY L SHORING SF 10 24,43 20,685.150 206,851.50 04166004 000 DRILL SHAFT (36 IN) LF 160 40 520 84,48 04166005 000 DRILL SHAFT (42 IN) LF 255.000 184.00 190.580 48,597.90 04166015 000 DRILL SHAFT (NON - REINFORCED) (12 IN) LF 150 2 14.000 2,10 04166018 000 DRILL SHAFT (SIGN MTS) (24 IN) LF 130 20 95.500 12,415.00 04166029 000 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 125.000 1,12 336.000 42,00 04166031 000 DRILL SHAFT (TRF SIG POLE) (30 IN) LF 95.000 23.00 33.900 3,220.50 04166032 000 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 100 53.00 28.400 2,84 04206013 000 CL C CONC (ABUT) CY 650 92.20 92.200 59,93 04206025 000 CL C CONC (BENT) CY 1,150 129.40 129.400 148,81 04206066 CL C CONC (RAIL FOUNDATION) CY 408.080 130 53,458.49 Added CO #15 04206074 CL C CONC (MISC) CY 424.340 102.470 43,482.12

CONTRACTOR'S ESTIMATE PACKAGE Page 16 of 19 Change Order 17 04226001 000 REINF CONC SLAB SF 10 24,60 24,600 246,00 04226015 000 APPROACH SLAB CY 320 153.10 153.100 48,99 04236001 000 RETAINING WALL (MSE) SF 50 68,69 68,547.000 3,427,35 04236003 000 RETAINING WALL (TEMP WALL) SF 17.500 53,11 53,110 929,46 04256038 000 PRESTR CONC GIRDER (TX46) LF 160 2,686.68 2,686.680 429,868.80 04326001 000 RIPRAP (CONC)(4 IN) CY 200 399.00 272.970 54,594.00 04326003 000 RIPRAP (CONC)(6 IN) CY 125.000 3,07 2,489.430 311,178.75 04326006 000 RIPRAP (CONC)(CL B) CY 250 59.00 17.620 4,405.00 04326045 000 RIPRAP (MOW STRIP)(4 IN) CY 270 47 544.150 146,920.50 04506023 000 RAIL (TY SSTR) LF 0 5,55 5,538.500 72,000.50 04506030 000 RAIL (TY C221) LF 50 96 960 48,00 04506042 000 RAIL (TY PR1) LF 80 3,445.00 3,775.000 302,00 04546001 000 SEALED EXPANSION JOINT (4 IN) (SEJ - A) LF 80 16 160 12,96 04596008 000 GABION MATTRESSES (GALV)(18 IN) SY 75.000 587.00 170.270 12,770.25 04626019 000 CONC BOX CULV (8 FT X 4 FT) LF 620 28 160 104,16 04626020 000 CONC BOX CULV (8 FT X 5 FT) LF 580 1,866.00 1,770 1,026,60 Culvert 8 04646003 000 RC PIPE (CL III)(18 IN) LF 49.000 49 376.000 18,424.00 04646005 000 RC PIPE (CL III)(24 IN) LF 90 5,16 4,993.000 449,37 04646007 000 RC PIPE (CL III)(30 IN) LF 80 1,195.00 1,047.000 83,76 04646008 000 RC PIPE (CL III)(36 IN) LF 90 645.00 440 39,60 04656002 000 MANH (COMPL)(PRM)(48IN) EA 250 1 4.000 1,00 04656005 000 JCTBOX(COMPL)(PJB)(3FTX3FT) EA 350 10 6,30 04656032 INLET (COMPL)(PCU)(3FT)(BOTH) EA 6,828.160 10 68,281.60 CHANGE ORDER 14 04656152 000 INLET (COMPL)(PAZD)(RC)(3FTX3FT) EA 5,000 4.000 20,00 04656160 000 INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT) EA 3,000 19.00 10 30,00 04656233 000 INLET (COMP) (TY SIDEWALK BRIDGE) EA 1,000 1 10 10,00 04656235 000 INLET (COMPL)(RWI)(TY I) EA 7,000 15.00 15.000 105,00 04666173 000 WINGWALL (PW - 1) (HW=12 FT) EA 7,000 0 7,00 04666183 000 WINGWALL (PW - 1) (HW=8 FT) EA 4,000 0 8,00 Culvert 8 04676357 000 SET (TY II) (18 IN) (RCP) (3: 1) (P) EA 750 5.00 4.000 3,00 04676389 000 SET (TY II) (24 IN) (RCP) (3: 1) (P) EA 1,000 15.00 15.000 15,00 04676394 000 SET (TY II) (24 IN) (RCP) (6: 1) (C) EA 1,000 0 2,00 04796006 000 ADJUSTING INLET (CAP) EA 0 17.00 7.000 14.00 04966002 000 REMOV STR (INLET) EA 100 15.00 0 10 04966004 000 REMOV STR (SET) EA 100 9.00 0 20 04966005 000 REMOV STR (WINGWALL) EA 5.000 0 5.00 04966006 000 REMOV STR (HEADWALL) EA 10 43.00 0 2 04966007 000 REMOV STR (PIPE) LF 0 90 414.000 414.00 04966008 000 REMOV STR (BOX CULVERT) LF 5.000 3,13 1,663.000 8,315.00 05006001 000 MOBILIZATION LS 1,000,000 0.900 900,00 05026001 000 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 15,000 26.00 26.000 390,00 05066002 001 ROCK FILTER DAMS (INSTALL) (TY 2) LF 20 2,63 1,604.000 32,08 05066003 001 ROCK FILTER DAMS (INSTALL) (TY 3) LF 40 489.00 290 11,64 05066011 001 ROCK FILTER DAMS (REMOVE) LF 0 3,119.00 543.000 1,086.00 05066020 001 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 15.000 46 270 4,17

CONTRACTOR'S ESTIMATE PACKAGE Page 17 of 19 05066038 001 TEMP SEDMT CONT FENCE (INSTALL) LF 0 19,95 12,350 24,716.00 05066039 001 TEMP SEDMT CONT FENCE (REMOVE) LF 0.100 19,95 1,026.000 102.60 05086001 000 CONSTRUCTING DETOURS SY 47.000 40,37 40,922.360 1,923,350.92 05126001 000 PORT CTB (FUR & INST)(SGL SLOPE)(TY 1) LF 44.000 30,63 30,630 1,347,72 05126009 000 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 30 28,44 20,120 764,56 05126010 000 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40 2,24 1,980 79,20 05126025 000 PORT CTB (MOVE)(SGL SLP)(TY 1) LF 5.000 59,49 56,540 282,70 05126033 000 PORT CTB (MOVE)(LOW PROF)(TY 1) LF 3.000 31,22 22,520 67,56 05126034 000 PORT CTB (MOVE)(LOW PROF)(TY 2) LF 6.000 28 1,100 6,60 05126049 000 PORT CTB (REMOVE)(SGL SLP)(TY 1) LF 3.000 30,63 20,220 60,66 05126057 000 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 0 28,44 7,200 14,40 05126058 000 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 0 2,24 680 1,36 05146001 000 PERM CTB (SGL SLOPE) (TY 1) (42 ) LF 64.000 5,425.00 6,395.000 409,28 05146004 PERM CTB (SGL SLOPE) (TY 4) (42 ) LF 209.890 140 29,384.60 05286001 000 COLORED TEXTURED CONC (4") SY 60 95 1,164.270 69,856.20 05296001 000 CONC CURB (TY I) LF 0 34,08 36,004.830 288,038.64 05296018 000 CONC CURB (TY F3) LF 100 39.00 48.500 4,85 05306002 000 INTERSECTIONS (ACP) SY 53.000 3,24 2,681.960 142,143.88 05306004 000 DRIVEWAYS (CONC) SY 53.000 1,685.00 1,969.010 104,357.53 05306005 000 DRIVEWAYS (ACP) SY 16.000 4,45 3,749.280 59,988.48 05316001 000 CONC SIDEWALKS (4") SY 30 17,50 17,027.520 647,045.76 05316005 000 CURB RAMPS (TY 2) EA 1,000 3.00 5.000 5,00 05316008 000 CURB RAMPS (TY 5) EA 1,000 7.00 5.000 5,00 05316010 CURB RAMPS (TY 7) EA 1,724.160 0 1,724.16 CO #16 05316013 000 CURB RAMPS (TY 10) EA 900 2 24.000 21,60 05316014 CURB RAMPS (TY 11) EA 2,417.670 0 2,417.67 CO #16 05316016 000 CURB RAMPS (TY 21) EA 3,000 3.00 3.000 9,00 05316017 000 CURB RAMPS (TY 22) EA 2,800 0 2,80 05366002 000 CONC MEDIAN SY 55.000 855.00 370.890 20,398.95 05406001 000 MTL W-BEAM GD FEN (TIM POST) LF 19.000 5,29 5,875.000 111,625.00 05406002 MTL W-BEAM GD FEN (STEEL POST) LF 53.500 175.000 9,362.50 Added CO 13 05406003 000 MTL THRIE-BEAM GD FEN (TIM POST) LF 56.000 4 40 2,24 05406016 000 DOWNSTREAM ANCHOR TERMINAL SECTION EA 920 7.00 7.000 6,44 05426001 000 REMOVE METAL BEAM GUARD FENCE LF 0 5,70 6,169.000 6,169.00 05426002 000 REMOVE TERMINAL ANCHOR SECTION EA 130 0 1,69 05436019 001 CABLE BARRIER TERMINAL SECTION (TL-3) EA 2,700 4.00 4.000 10,80 05436021 001 REMOVE CABLE BARRIER LF 0 7,346.00 7,400 14,80 05446001 000 GUARDRAIL END TREATMENT (INSTALL) EA 2,700 1 9.000 24,30 05446003 000 GUARDRAIL END TREATMENT (REMOVE) EA 110 3.00 3.000 33 05456003 000 CRASH CUSH ATTEN (MOVE & RESET) EA 800 9.00 9.000 7,20 05456005 000 CRASH CUSH ATTEN (REMOVE) EA 425.000 5.00 0 425.00 05456013 000 CRASH CUSH ATTEN (INSTL)(R)(N)(TL3) EA 13,000 5.00 0 13,00 05456019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 8,749.130 5.000 43,745.65 05606001 000 MAILBOX INSTALL-S (TWG-POST) TY 1 EA 150 9.00 10 1,50 05606003 000 MAILBOX INSTALL-M (TWG-POST) TY 1 EA 200 3.000 60 06106050 000 IN RD IL AM (TY SA) 40T-8 (250W) S EA 2,500 11 30 95,00

CONTRACTOR'S ESTIMATE PACKAGE Page 18 of 19 06106051 000 IN RD IL AM (TY SA) 40T-8-8 (250W) S EA 3,500 9.00 3.000 10,50 06106071 000 IN RD IL AM (TY ) 48S-10-10 (400W) S EA 3,500 14.00 14.000 49,00 06186023 000 CONDT (PVC) (SCH 40) (2") LF 5.500 29,784.00 14,467.000 79,568.50 06186046 000 CONDT (PVC) (SCH 80) (2") LF 6.000 1,704.00 1,415.000 8,49 06186047 000 CONDT (PVC) (SCH 80) (2") (BORE) LF 10 1,466.00 484.000 5,324.00 06186053 000 CONDT (PVC) (SCH 80) (3") LF 7.000 264.00 569.000 3,983.00 06186054 000 CONDT (PVC) (SCH 80) (3") (BORE) LF 15.000 416.00 130 1,95 06206007 000 ELEC CONDR (NO.8) BARE LF 0.900 32,10 13,186.000 11,867.40 06206008 000 ELEC CONDR (NO.8) INSULATED LF 0.800 67,18 28,167.000 22,533.60 06206009 000 ELEC CONDR (NO.6) BARE LF 0 1,376.00 167.000 167.00 06206010 000 ELEC CONDR (NO.6) INSULATED LF 0 46 334.000 334.00 06246002 000 GROUND BOX TY A (122311)W/APRON EA 600 24.00 10 6,60 06246010 000 GROUND BOX TY D (162922)W/APRON EA 700 4.000 2,80 06286078 000 ELC SRV TY A 240/480 100(NS)SS(E)TP(O) EA 3,400 6.00 5.000 17,00 06286169 000 ELC SRV TY D 120/240 070(NS)AL(N)PS(U) EA 3,400 0 3,40 06366002 000 ALUMINUM SIGNS (TY G) SF 20 2,31 965.000 21,23 06446001 000 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 400 49.00 29.000 11,60 06446004 000 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 480 11 80 42,24 06446030 000 IN SM RD SN SUP&AM TYS80(1)SA(T) EA 720 2 6.000 4,32 06446033 000 IN SM RD SN SUP&AM TYS80(1)SA(U) EA 620 4.000 2,48 06446051 000 IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL) EA 1,000 5.00 4.000 4,00 06446064 000 IN BRIDGE MNT CLEARANCE SGN ASSM(TY N) EA 1,500 6.00 0 3,00 06446076 000 REMOVE SM RD SN SUP&AM EA 90 124.00 90 8,10 06476001 000 INSTALL LRSS (STRUCT STEEL) LB 2.750 9,359.00 4,486.250 12,337.19 06476003 000 REMOVE LRSA EA 1,200 3.00 0 1,20 06586061 000 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 180 25.00 37.000 6,66 06626060 000 WK ZN PAV MRK REMOV (W)4"(BRK) LF 0.500 24,167.00 9,440 4,72 06626063 000 WK ZN PAV MRK REMOV (W)4"(SLD) LF 0.500 24,167.00 32,120 16,06 06626095 000 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 0.500 162,98 179,326.000 89,663.00 06666224 000 PAVEMENT SEALER 4" LF 0.100 26,55 53,160 5,316.80 06666226 000 PAVEMENT SEALER 8" LF 0.300 3,815.00 6,350 1,905.00 06666228 000 PAVEMENT SEALER 12" LF 0.900 873.00 1,563.000 1,406.70 06776001 000 ELIM EXT PAV MRK & MRKS (4") LF 0.300 79,377.00 39,157.000 11,747.10 06776003 000 ELIM EXT PAV MRK & MRKS (8") LF 0.700 74.00 387.000 270.90 06776008 000 ELIM EXT PAV MRK & MRKS (ARROW) EA 57.000 10 57 06776009 000 ELIM EXT PAV MRK & MRKS (DBL ARROW) EA 75.000 0 15 06776012 000 ELIM EXT PAV MRK & MRKS (WORD) EA 56.000 10 56 06776019 000 ELIM EXT PAV MRK & MRKS (36")(YLD TRI) EA 14.000 0 11 06786001 000 PAV SURF PREP FOR MRK (4") LF 0.020 26,55 16,323.000 326.46 06826001 000 VEH SIG SEC (12")LED(GRN) EA 150 0 1,95 06826002 000 VEH SIG SEC (12")LED(GRN ARW) EA 150 0 30 06826003 000 VEH SIG SEC (12")LED(YEL) EA 150 0 1,95 06826004 000 VEH SIG SEC (12")LED(YEL ARW) EA 150 0 30 06826005 000 VEH SIG SEC (12")LED(RED) EA 150 0 1,95 06826018 000 PED SIG SEC (LED)(COUNTDOWN) EA 200 0 40 06826020 000 PED SIG SEC (HOUSING ONLY) EA 150 0 30 06826023 000 BACK PLATE (12")(3 SEC) EA 50 1 10 55 06826025 000 BACK PLATE (12")(5 SEC) EA 75.000 0 15 06866027 INS TRF SIG PL AM(S)1 ARM(24')LUM EA 5,302.500 0 5,302.50

CONTRACTOR'S ESTIMATE PACKAGE Page 19 of 19 06866031 INS TRF SIG PL AM(S)1 ARM(28')LUM EA 5,461.580 0 5,461.58 06866033 000 INS TRF SIG PL AM(S)1 ARM(32') EA 3,000 0 3,00 06866167 INS TRF SIG PL AM(S)2 ARM(44-36')LUM EA 10,180.800 0 10,180.80 07346002 000 LITTER REMOVAL CYC 430 24.00 4.000 1,72 60016001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 118.710 190 22,673.61 60016002 000 PORTABLE CHANGEABLE MESSAGE SIGN EA 14,000 0 28,00 70436001 000 ADJUST EXISTING VALVE BOX EA 570 3 30 17,67 70436002 000 ADJUST AUTO AIR RELEASE VALVE (COMPL) EA 1,150 7.00 7.000 8,05 70436003 000 TRENCH EXCAVATION PROTECTION LF 0.500 505.00 505.000 252.50 70436004 000 FLOWABLE BACKFILL CY 170 255.00 255.000 43,35 96016001 MATERIAL ON HAND DOL 0 1,00 135,239.450 135,239.45 96026601 EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL 184.000 120.770 22,221.68 DS 36 extra depth 5'-15' pay by the LF 96066001 FORCE ACCOUNT ID 1 DOL 0 1,00 9,831.640 9,831.64 Item 628.5.1 Invoice for Connection Charge 96066003 FORCE ACCOUNT ID 3 DOL 0 1,00 56,692.030 56,692.03 Repair of Crash Cushion Repair 96066053 LAW ENFORCEMENT PERSONNEL DOL 0 1,00 68,923.230 68,923.23 96066055 FORCE ACCT-EROSION CONTROL MAINTENANCE DOL 0 1,00 17,239.970 17,239.97 96066056 FORCE ACCOUNT - SAFETY CONTINGENCY DOL 0 1,00 11,074.640 11,074.64 96082001 UNIQUE CHANGE ORDER 1 DOL 1,292.830 30 40,077.73 96082002 UNIQUE CHANGE ORDER 2 DOL 6,893.250 0 6,893.25 96086003 UNIQUE CHANGE ORDER 3 DOL 6,409.390 0 6,409.39 Added CO 11-Relocate Sign Exit 550 96086004 UNIQUE CHANGE ORDER 4 DOL 1,549.790 9.000 13,948.11 Added CO 11-Lane Closure for Emergency Repairs 96086005 UNIQUE CHANGE ORDER 5 DOL 8,839.380 0 8,839.38 Added CO 12-Underdrain Sump Pit EBFR Sta 216+70 +/- Lt 96086006 UNIQUE CHANGE ORDER 6 DOL 120,000 0 120,00 CHANGE ORDER 14/DISINCENTIVE OFFSET/LS 96086007 UNIQUE CHANGE ORDER 7 DOL 13,238.040 0 13,238.04 RAC-R Work Prior to Revision Paid by LS 96086008 UNIQUE CHANGE ORDER 8 DOL 81,960 0 81,96 Added CO 18-3415 LF Unused Precast Single Slope Barrier TOTAL EARNINGS $28,960,737.16