CONQUEST ENGINEERING LTD.

Similar documents
CONQUEST ENGINEERING LTD.

CERTIFICATE OF ANALYSIS

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Geotechnical Data Report

Appendix A. Producer Statement Advisory Note



REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

Geotechnical Engineering Report

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

APPENDIX A GEOTECHNICAL REPORT

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

DRILL HOLE # BH-BGC13-FN-01

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

B-1 SURFACE ELEVATION

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

ENGINEERING ASSOCIATES

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

Geotechnical Engineering Report

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

GEOTECHNICAL INVESTIGATION Paq tnkek First Nation Underpass (Ant 275) Antigonish County, Nova Scotia

Geotechnical Engineering Report

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

FINAL REPORT, GEOTECHNICAL INVESTIGATION, NORTHWEST RIVER BRIDGE RECONSTRUCTION, TERRA NOVA NATIONAL PARK, NL. File No:

Geotechnical Engineering Report

AN EMPLOYEE OWNED COMPANY

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Chapter 12 Subsurface Exploration

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Attachment B. Grain Size Distribution Curves

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

APPENDIX H SOIL SURVEY

APPENDIX E SOILS TEST REPORTS

Geotechnical Investigation

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

GEOTECHNICAL INVESTIGATION MULTIPLE STREETS AND ROADS F18-INF CITY OF CLARENCE-ROCKLAND

NAPLES MUNICIPAL AIRPORT

Subsurface Geology of the Kennebec River

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

APPENDIX C HYDROGEOLOGIC INVESTIGATION

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

HDD PA-LA SR (S-K34, S-K35, PEM-K32)

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

Geotechnical Data Report

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

December 20, 2017 (Revised from December 15, 2017) Project No

GZA GeoEnvironmental, Inc.

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

Northern Colorado Geotech

LEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW

APPENDIX C. Borehole Data

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

WELL NUMBER 14-BW03 PAGE 1 OF 5

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

GEOTECHNICAL INVESTIGATION REPORT

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Geotechnical Engineering Report

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Earthquake Commission. Darfield Earthquake Recovery Geotechnical Factual Report Avondale

patersongroup memorandum 1.0 Field Investigation consulting engineers

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

REPORT OF SUBSURFACE EXPLORATION

SOIL AND AGGREGATE FUNDAMENTALS STUDENT GUIDE AMRC April, 2006 AREA MANAGER ROADS CERTIFICATION PROGRAM FOR EDUCATIONAL PURPOSES ONLY

LIONS GATE SECONDARY WWTP SEWER CONVEYANCE

3.0 SUMMARY OF FINDINGS

GEOTECHNICAL ENGINEERING SERVICES REPORT

February 22, 2016 AG File No

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

TIERRA. Florida License No Florida License No

Geotechnical Engineering Report

REPORT OF PRELIMINARY GEOTECHNICAL SITE INVESTIGATION KERSHAW COUNTY EXIT 87 OFFICE PARK. ELGIN, SOUTH CAROLINA S&ME Project No.

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

DRAFT GEOTECHNICAL INVESTIGATION REPORT

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT

Pierce County Department of Planning and Land Services Development Engineering Section

Transcription:

CONQUEST ENGINEERING LTD. Geotechnical and Materials Engineers Concrete Technology, Blasting Consultants Construction Quality Assurance / Quality Control 8 Bluewater Road, Bedford, NS BB J6 Phone (9)85-7 Fax (9)85-6 January 5, Mr. Leonard Avery, P.Eng. Heritage Gas -8 Brownlow Avenue Dartmouth, NS BB Y Dear Mr. Avery, Re: Geotechnical Investigation, Phase New Glasgow Pipeline Pictou County, Nova Scotia This is our report on the geotechnical investigation conducted for Phase (Boreholes to 7) for the proposed Natural Gas Pipeline in Pictou County, Nova Scotia. The subsurface conditions in the boreholes consisted of rootmat over compact to dense sandy silt till then bedrock (mudstone). Bedrock was encountered at each borehole with the exception of Borehole. The presence of bedrock at most borehole locations will complicate the proposed directional drilling. Table A: Summary of Findings Thickness of Borehole Rootmat/Topsoil Thickness of Till Bedrock Depth BH. >.8 >.8 Groundwater Depth* groundwater not encountered BH. 6. 6.5 encountered at.6 m BH 5..8.9 groundwater not encountered BH 6. 8.6 8.8 encountered at. m BH 7..9. encountered at. m * encountered at the time of drilling. Actual groundwater depth may vary. Please contact us if you require additional information. Thank you, Glenn Graham, P.Eng. Geotechnical Engineer ggraham@conquest-eng.com Project No. 5- Saint John Moncton Bedford Fredericton Cornerbrook

TABLE OF CONTENTS page. INTRODUCTION.... SITE DESCRIPTION AND GEOLOGY.... SUBSURFACE CONDITIONS... 5. CLOSURE... TABLES Table A: Summary of Findings... APPENDICES APPENDIX A: BOREHOLE RECORDS TO 7 FIGURE : GRAIN SIZE DISTRIBUTION SOIL RESISTIVITY CERTIFICATE OF ANALYSIS DRAWING NO. BOREHOLE LOCATIONS Saint John Moncton Bedford Fredericton Cornerbrook Page i

Proposed Natural Gas Pipeline, Pictou County, NS January 5, Leonard Avery P.Eng. Heritage Gas Project # 5-. INTRODUCTION We have conducted Phase of the Geotechnical Investigation for the proposed natural gas pipeline in Pictou County, NS at the request Heritage Gas. The purpose of this investigation was to evaluate the subsurface conditions on the site, and to provide a factual report of our findings.. SITE DESCRIPTION AND GEOLOGY Boreholes and are located at the crossing of Highway # in Alma, NS. Borehole 5 is located along the power transmission line right of way on top of MacDonald Hill. Boreholes 6 and 7 are located at the crossing for Middle River. Figure A shows an aerial view of Boreholes to 5. Figure B shows an aerial view of Boreholes 6 and 7. The borehole locations along the power transmission line right of way are predominantly cleared with some overgrown brush (alders) present. The borehole locations along Middle River were predominantly wooded. Access to the sites was through private properties. Bedrock was exposed in the locations for BH5 and BH7. Figure A: Borehole locations The principal soil type is sandy silt till over bedrock (mudstone) which is part of the Middle River Formation. Figure B: Borehole locations Saint John Moncton Bedford Fredericton Cornerbrook Page

Proposed Natural Gas Pipeline, Pictou County, NS January 5, Leonard Avery P.Eng. Heritage Gas Project # 5-. SUBSURFACE CONDITIONS The field program consisted of five boreholes (BH to BH7) completed on January 7 to January 9,. The borehole locations are shown in Figure A and Figure B (Figure in the appendix is a complete location plan). The boreholes were drilled using a track mounted drill rig. Representative samples were taken during the field work and the conditions at the boreholes were logged in detail. The soil and groundwater conditions encountered at the site are described in detail on the appended Borehole Records and summarized in the following paragraphs and Table A. The subsurface conditions in the boreholes consisted of rootmat over compact to dense sandy silt till then bedrock (mudstone). Bedrock was encountered at each borehole with the exception of Borehole. Groundwater was encountered in Boreholes, 5, and 6 at the time of drilling. Table A below lists the depths for each layer encountered. Grainsize analysis of one sample from Borehole showed 5% gravel, % sand, and 55% fines. One sample from Borehole 6 showed % gravel, 7% sand, and 5% fines. Moisture content analysis from Borehole ranged from.6% to 6.7%., with an average of.%. Moisture content analysis from Borehole 6 ranged from 6. % to 7.8%, with an average of.9%. Compressive strength analysis of the bedrock for two samples from Borehole 6 was.89 MPa, and.98 MPa. Laboratory analysis for electrical resistivity of two samples showed 667 Ω. cm, and 769 Ω. cm. Table A: Summary of Findings Thickness of Borehole Rootmat/Topsoil Thickness of Till Bedrock Depth BH. >.8 >.8 BH. 6. 6.5 BH 5..8.9 BH 6. 8.6 8.8 BH 7..9. * encountered at the time of drilling. Actual groundwater depth may vary. Groundwater Depth* groundwater not encountered encountered at.6 m groundwater not encountered encountered at. m encountered at. m Saint John Moncton Bedford Fredericton Cornerbrook Page

Proposed Natural Gas Pipeline, Pictou County, NS January 5, Leonard Avery P.Eng. Heritage Gas Project # 5-5. CLOSURE If there are changes to the proposed work we require that we be notified to allow for review of our recommendations. A field investigation is a limited sampling of a site. Some variation between sampling locations should be expected. If the conditions encountered are significantly different than described in this report, we request that we be notified immediately. This report was completed for the sole benefit of Heritage Gas. Any other person or entity may not rely on this report without the express written consent of Conquest Engineering Ltd. This report was written by Glenn Graham, P.Eng. and reviewed by Bruce MacNeil, P.Eng. Glenn Graham, P.Eng Geotechnical Engineer ggraham@conquest-eng.com R. Bruce MacNeil, P.Eng Senior Geotechnical Engineer bmacneil@conquest-eng.com Saint John Moncton Bedford Fredericton Cornerbrook Page

APPENDIX A

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 7, Borehole No.: Page: of Date Drilled: Jan 7, Datum: Assumed Depth Water Level Sample Type Sample Number Recovery (mm) N Value or RQD % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm ROOTMAT/TOPSOIL TILL: Compact to dense reddish brown sandy silt with gravel - trace cobbles 6 5 5 6 7 6 6 9 7 8 5 6 7 9 6 6

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 7, Borehole No.: Page: of Date Drilled: Jan 7, Datum: Assumed Depth Water Level Sample Type Sample Number Recovery (mm) N Value or RQD % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm 7 6 6 8 6 8 END OF BOREHOLE 5 6 7 8 9

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 8, Borehole No.: Page: of Date Drilled: Jan 8, Datum: Assumed Depth Water Level Sample Type Sample Number Recovery (mm) N Value or RQD % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm ROOTMAT/TOPSOIL TILL: Compact to dense reddish brown sandy silt with gravel - trace cobbles 6 7 5 6 9 6 6 6-mm BEDROCK: Mudstone 7 8 5-5mm 9 5-5mm END OF BOREHOLE groundwater at.6 m

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 8, Borehole No.: 5 Page: of Date Drilled: Jan 8, Datum: Assumed Depth Water Level Sample Type Sample Number Recovery (mm) N Value or RQD % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm ROOTMAT/TOPSOIL TILL: Compact dark reddish brown sandy silt with gravel - some cobbles/boulders inferred by augering performance 5-75mm BEDROCK: Mudstone with conglomerate - some cobbles/boulders inferred by augering performance 5-mm END OF BOREHOLE groundwater not observed 5 6 7 8 9

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 8, Borehole No.: 6 Page: of Date Drilled: Jan 8, Datum: Assumed Depth Water Level Sample Type Sample Number Recovery (mm) N Value or RQD % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm ROOTMAT/TOPSOIL TILL: Compact to dense reddish brown sandy silt with gravel - trace cobbles - trace boulders 5 6 - augered through cobbles/boulders 5 5 5-5mm - augered through cobbles/boulders 6 75 8 7 8 5 5 9 BEDROCK: Mudstone 5-5mm NQ 6 5 %

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 8, Borehole No.: 6 Page: of Date Drilled: Jan 8, Datum: Assumed Depth Water Level Sample Type Sample Number 6 Recovery (mm) N Value or RQD % % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm NQ 7 7% END OF BOREHOLE groundwater at. m 5 6 7 8 9

Conquest Engineering Ltd. BOREHOLE RECORD Project Name: Proposed Natural Gas Pipeline - Phase Project No.: 5- Client: Heritage Gas Location: Pictou County, Nova Scotia Water Level Date: Jan 9, Borehole No.: 7 Page: of Date Drilled: Jan 9, Datum: Assumed Depth Water Level Sample Type Sample Number Recovery (mm) N Value or RQD % Symbols SOIL AND/OR ROCK DESCRIPTION Elevation Moisture Content (%) Wp ---O--- WL SPT (N) Blows/mm ROOTMAT/TOPSOIL TILL: Compact to dense reddish brown sandy silt with gravel - trace cobbles 75 5 5 BEDROCK: Mudstone and conglomerate 5 NQ 5 % - splitspoon attempted with no recovery after 5 blows 6 NQ 5 % 7 - splitspoon attempted with no recovery after 5 blows 8 END OF BOREHOLE groundwater at. m 9 5

GRAIN SIZE DISTRIBUTION PLOT % 9% 8% 7% Percent passing 6% 5% % % % % %.. Grain Size (mm) Coarse GRAVEL Fine SAND Coarse Medium Fine SILT & CLAY SAMPLE ID DEPTH SYMBOL CLAIFICATION (ASTM D87 USCS) GRAVEL (%) SAND (%) FINES (%) BH, Sa - Sandy SILT with gravel (ML) 5% % 55% BH6, Sa - Sandy SILT with gravel (ML) % 7% 5% #N/A #N/A #N/A #N/A #N/A #N/A Sample Type : Borehole Samples Sample Location : Borehole BH,and BH6 Comments : Client : Heritage Gas Project : Proposed Natural Gas Pipeline Project No. : 5- Figure

Attention: Glenn Graham Conquest Engineering Ltd 8 Bluewater Road Bedford, NS CANADA BBJ6 Your P.O. #: 5- Your Project #: 5 Site Location: DARTMOUTH BRIDGE TERMINAL Your C.O.C. #: N/A Report Date: // CERTIFICATE OF ANALYSIS MAXXAM JOB #: B98 Received: //, 5:58 Sample Matrix: Soil # Samples Received: Date Date Method Analyses Quantity Extracted Analyzed Laboratory Method Reference Conductance - soil // // ATL SOP 6 Based on SM5B Remarks: Reporting results to two significant figures at the RDL is to permit statistical evaluation and is not intended to be an indication of analytical precision. * RPDs calculated using raw data. The rounding of final results may result in the apparent difference. Encryption Key Please direct all questions regarding this Certificate of Analysis to your Project Manager. Mari Kenny, Project Manager Email: MKenny@maxxam.ca Phone# (9) - Ext:9 ==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section 5.. of ISO/IEC 75:5(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Total cover pages: Page of 6

Conquest Engineering Ltd Maxxam Job #: B98 Client Project #: 5 Report Date: // Site Location: DARTMOUTH BRIDGE TERMINAL Your P.O. #: 5- Sampler Initials: GG RESULTS OF ANALYSES OF SOIL Maxxam ID QH9965 QH9966 Sampling Date // // COC Number N/A N/A Inorganics Units BH BH7 RDL QC Batch Conductivity us/cm 5. 7 N/A = Not Applicable RDL = Reportable Detection Limit QC Batch = Quality Control Batch Page of 6

New Glasgow Steel Pipeline Proposed Boreholes December, Hole ID Feature Hole Location Access via Tree / Alder clearing * Approx. Mimimum Hole Depth Northing ** Easting ** BH Stream crossing West side BH Stream crossing East side BH BH Hwy, Stream, Salem Hill Hwy, Stream, Salem Hill 5m west of Hwy 5m east of Hwy Woods Rd off east side of "West River East Side Rd" to powerline access road Woods Rd off north side of Tanner Hill Rd, up to powerline, then west on powerline access road Woods Rd off north side of Tanner Hill Rd, up to powerline, then east on powerline access road Driveway off east side of "Hwy " (under south wire of powerline).5m xm alders 576 9569.5m x 5m alders 5 587 9679.5m x m alders 58 9769 None required 5858 9785 5 BH 5 Hwy, Stream, Salem Hill m east of Hwy (Top of hill south side of powerline) 6 BH 6 Middle River West side of River 7 BH 7 Middle River East side of River 8 BH 8A CB&CNS Railway 7m east of Granton Rd railway crossing Farmers field access off west side of Macdonald Hill Rd Civic 577 driveway off north side Hwy, after white barn turn right, go 75m, follow pink ribbon Daisy Lane off north side Hwy, left at cemetery, right onto driveway, go past mini home, stay right Possibly see if CB&CNS will allow to use tracked vehicle down beside railway tracks.5m x 5m alders 5869 9877.5m x 5m alders, few small trees 59779.5m x m alders 7 59867.5m x m alders, few small trees 5557 966 9 BH 8C Stream crossing West side Hwy 6, north of pond Woods Rd off west side Hwy 6.5m x m alders 8 557 99 BH 9 Stream crossing BH BH Hwy 6 & CB&CNS Railway crossings Abercrombie Rd & Begg Brook West side Hwy 6, south side of Begg Brook West side Hwy 6, north side of CB&CNS Railway in grassy area South side of Abercrombie Rd, west side CB&CNS Railway, across from Northern Pulp truck entrance just inside tree line Woods Rd off west side Hwy 6, follow along tree line, turn in and follow flags.5m x m alders 5556 Off Hwy 6 on ramp, Exit None required 7 55587 South side of Abercrombie Rd, between Exit off ramp and Railway crossing 5m x m 8 5566 6 * NOTE : Approximate mimimum borehole depth is given as an estimate of the variance in elevation between the ground surface at the borehole location and the low point of the feature that is being crossed added to the numbers as shown in section 6.. of t ** NOTE : Northing and Easting refers to the deg MTM, ATS 77 projection.