December 20, 2017 (Revised from December 15, 2017) Project No
|
|
- Clinton Smith
- 6 years ago
- Views:
Transcription
1 December 20, 2017 (Revised from December 15, 2017) Project No Ms. Laura Krusinski, P.E. Senior Geotechnical Engineer Maine Department of Transportation State House Station 16 Augusta, Maine Re: Addendum No. 1 to Geotechnical Design Report North Parish Bridge No North Parish Road over Nezinscot River Turner, Maine WIN Dear Ms. Krusinski, We are pleased to provide this addendum to our Geotechnical Design Report (GDR) dated November 6, 2017 to MaineDOT for the North Parish Bridge No which carries the North Parish Road (State Route 117) over the Nezinscot River in Turner, Maine. This report has been completed in accordance with the Project-Specific Task Order No dated October 26, 2016, and our proposals dated October 24, 2016 and September 8, This addendum is subject to the limitations contained in Appendix A of the GDR dated November 6, SUPPLEMENTAL SUBSURFACE EXPLORATIONS New England Boring Contractors, of Hermon, Maine drilled an additional test boring (BB- TNR-108) within the footprint of the north abutment on October 30 and 31, The test boring was advanced using drive and wash methods with an automatic hammer, and was observed and logged by Nobis personnel. The boring was drilled to depths of 40 feet below existing grades including a 5-foot long bedrock core. The boring log and photo log of the rock core sample are included in the Appendix, and the approximate test boring location is shown on the updated Figure 3, Boring Location Plan. LABORATORY TESTING Samples of rock/soil were selected by Nobis and submitted to GeoTesting Express of Acton, Massachusetts for laboratory testing. Laboratory testing included: Client-Focused, Employee-Owned Nobis Engineering, Inc. 585 Middlesex Street Lowell, MA T (978)
2 Two (2) grain size analyses sieve only (in accordance with ASTM D422); One (1) compressive strength and elastic moduli of rock test (in accordance with ASTM D7012). The laboratory test results are included in the Appendix. SUBSURFACE CONDITIONS The additional boring BB-TNR-108 completed at the proposed north abutment encountered 5 inches of asphalt, overlying approximately 3 feet of fill, overlying approximately 6 feet of alluvium deposits, overlying approximately 2.5 feet of cobbles/boulders, overlying approximately 23 feet of glacial till. Bedrock was encountered at a depth of approximately 35 feet below grade. The rock quality designation (RQD) of the collected metasandstone rock core was 35%. The laboratory uniaxial compressive strength (UCS) test was performed on the rock core resulting in a peak value of 7,003 psi. GEOTECHNICAL DESIGN RECOMMENDATIONS We believe that the subsurface information obtained from the additional test boring does not change our geotechnical design recommendations provided in our geotechnical design report dated November 6, However, it does provide additional information for a contractor to prepare a bid. It has been a pleasure serving the MaineDOT and HNTB on this project. Please let us know if you have any questions regarding this report. Very truly yours, Nobis Engineering, Inc. Brien Waterman Project Manager Kurt Jelinek, P.E. Director, Transportation Services Attachments: Figures 3. Boring Location Plan Appendix Boring Log Photo Log of Rock Core Laboratory Test Results Nobis File North Parish Bridge (#2619), Turner, Maine Page 2 of 2
3 FIGURES
4 NOTES: 1. THE BASE PLAN WAS DEVELOPED FROM.DGN FILES PROVIDED BY HNTB ON SEPTEMBER 1, LOCATIONS AND SITE FEATURES DEPICTED ARE APPROXIMATE AND GIVEN FOR ILLUSTRATIVE PURPOSES. 3. SOIL BORINGS BB-TNR-101 THROUGH BB-TNR-107 WERE DRILLED BY NEW ENGLAND BORING CONTRACTORS OF DERRY, NEW HAMPSHIRE, AND OBSERVED BY NOBIS BETWEEN DECEMBER 8 AND DECEMBER 15, SOIL BORING BB-TNR-108 WAS DRILLED BY NEW ENGLAND BORING CONTRACTORS OF HERMON, MAINE, AND OBSERVED BY NOBIS BETWEEN OCTOBER 30 AND OCTOBER 31, LEGEND BB-TNR-101 APPROXIMATE BORING LOCATION OBSERVED BY NOBIS BB-TNR-104 BB-TNR-108 BB-TNR-106 BB-TNR-101 BB-TNR-102 BB-TNR-103 BB-TNR-105 BB-TNR ' 80' GRAPHIC SCALE FIGURE 3 Engineering a Sustainable Future Nobis Engineering, Inc. 585 Middlesex Street Lowell, MA T(978) Client - Focused, Employee - Owned BORING LOCATION PLAN NORTH PARISH BRIDGE (#2619) NORTH PARISH ROAD OVER NEZINSCOT RIVER TURNER, MAINE DRAWN BY: PROJECT NO. KAK CHECKED BY: BTW DATE: DECEMBER 2017
5 APPENDIX
6 0 Maine Department of Transportation 1D 24/6 Soil/Rock Exploration Log /9/8/ Project: North Parish Bridge (#2619) over Nezinscot River Location: Turner, Maine RC Boring No.: Medium-coarse grained asphalt, (PAVEMENT) (6"): Brown-gray, moist-wet, fine to coarse SAND, little fine gravel, little silt, several asphalt fragments, (FILL). BB-TNR-108 US CUSTOMARY UNITS WIN: Driller: New England Boring Contractors Elevation (ft.) Auger ID/OD: N/A Operator: M. Porter Datum: NAVD-88 Sampler: 1-3/8" Split-Spoon Logged By: K. Kocia (Nobis) Rig Type: B-59 Mobile Truck Hammer Wt./Fall: 140#/30" Date Start/Finish: Oct. 30, 2017 Drilling Method: Cased Wash Boring Core Barrel: NQ2 Boring Location: Sta 11+13, 25 feet Lt. Casing ID/OD: 4"/4.5"; 3"/3.5" Water Level*: 15.6 feet Hammer Efficiency Factor: Hammer Type: Automatic Hydraulic Rope & Cathead Definitions: R = Rock Core Sample S u = Peak/Remolded Field Vane Undrained Shear Strength (psf) T v = Pocket Torvane Shear Strength (psf) D = Split Spoon Sample SSA = Solid Stem Auger S u(lab) = Lab Vane Undrained Shear Strength (psf) WC = Water Content, percent MD = Unsuccessful Split Spoon Sample Attempt HSA = Hollow Stem Auger q p = Unconfined Compressive Strength (ksf) LL = Liquid Limit U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw Field SPT N-value PL = Plastic Limit MU = Unsuccessful Thin Wall Tube Sample Attempt WOH = Weight of 140lb. Hammer Hammer Efficiency Factor = Rig Specific Annual Calibration Value PI = Plasticity Index V = Field Vane Shear Test, PP = Pocket Penetrometer WOR/C = Weight of Rods or Casing N 60 = SPT N-uncorrected Corrected for Hammer Efficiency G = Grain Size Analysis MV = Unsuccessful Field Vane Shear Test Attempt WO1P = Weight of One Person N 60 = (Hammer Efficiency Factor/60%)*N-uncorrected C = Consolidation Test Depth (ft.) Sample No. Pen./Rec. (in.) Sample Depth (ft.) Sample Information Blows (/6 in.) Shear Strength (psf) or RQD (%) N-uncorrected N 60 Casing Blows Elevation (ft.) Graphic Log Visual Description and Remarks Laboratory Testing Results/ AASHTO and Unified Class. 5 2D 3D 24/12 24/ /3/3/3 4/3/3/ D-A: (8"): Brown-grey, wet, fine to coarse SAND, little fine gravel, trace silt, several asphalt fragments, (FILL) D-B: (4"): Tan, wet, fine to medium SAND, little silt, (SAND). (6"): Tan-brown, wet, fine to coarse SAND, little silt, little medium to coarse gravel, (SAND). A-4, SM/GM 4D 24/ /11/7/ (8"): Tan-brown, wet, fine to coarse SAND, little fine to coarse gravel, trace silt, (SAND). A-4, SM-GM Heavy resistance, due to inferred cobbles/boulders (COBBLES/ BOULDERS) D 4/ (4"): Grey-brown, wet, fine to coarse SAND, some fine to coarse gravel, little clayey silt, few wooden pieces/fragments, very few pulverized rock, minor redoximorphic staining present, (TILL). 15 6D 24/ /38/27/ (9"): Grey-brown, wet, fine to coarse SAND and CLAYEY SILT, some fine to coarse gravel, few rock fragments, heavy redoximorphic staining present, (TILL) Wash color changed to strong grey coloring D 24/ /15/16/ (14")": Grey, wet, SILT & CLAY and fine to coarse SAND, trace fine gravel, (TILL). 25 Remarks: -Borehole backfilled with native soils, 3 bags of filter sand, and 3 bags of crushed stone. Topped with approximately 10 inches of cold asphalt patch. -bgs = below ground surface. -No Casing Blow Counts were recorded. -Automatic Hammer ID# B-24. Stratification lines represent approximate boundaries between soil types; transitions may be gradual. * Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other than those present at the time measurements were made. Page 1 of 2 Boring No.: BB-TNR-108
7 25 Maine Department of Transportation 8D 24/21 Soil/Rock Exploration Log /57/63/ Project: North Parish Bridge (#2619) over Nezinscot River Location: Turner, Maine RC Boring No.: (21"): Dark grey, wet, fine to coarse SAND and CLAYEY SILT, little fine to coarse gravel, (TILL). BB-TNR-108 US CUSTOMARY UNITS WIN: Driller: New England Boring Contractors Elevation (ft.) Auger ID/OD: N/A Operator: M. Porter Datum: NAVD-88 Sampler: 1-3/8" Split-Spoon Logged By: K. Kocia (Nobis) Rig Type: B-59 Mobile Truck Hammer Wt./Fall: 140#/30" Date Start/Finish: Oct. 30, 2017 Drilling Method: Cased Wash Boring Core Barrel: NQ2 Boring Location: Sta 11+13, 25 feet Lt. Casing ID/OD: 4"/4.5"; 3"/3.5" Water Level*: 15.6 feet Hammer Efficiency Factor: Hammer Type: Automatic Hydraulic Rope & Cathead Definitions: R = Rock Core Sample S u = Peak/Remolded Field Vane Undrained Shear Strength (psf) T v = Pocket Torvane Shear Strength (psf) D = Split Spoon Sample SSA = Solid Stem Auger S u(lab) = Lab Vane Undrained Shear Strength (psf) WC = Water Content, percent MD = Unsuccessful Split Spoon Sample Attempt HSA = Hollow Stem Auger q p = Unconfined Compressive Strength (ksf) LL = Liquid Limit U = Thin Wall Tube Sample RC = Roller Cone N-uncorrected = Raw Field SPT N-value PL = Plastic Limit MU = Unsuccessful Thin Wall Tube Sample Attempt WOH = Weight of 140lb. Hammer Hammer Efficiency Factor = Rig Specific Annual Calibration Value PI = Plasticity Index V = Field Vane Shear Test, PP = Pocket Penetrometer WOR/C = Weight of Rods or Casing N 60 = SPT N-uncorrected Corrected for Hammer Efficiency G = Grain Size Analysis MV = Unsuccessful Field Vane Shear Test Attempt WO1P = Weight of One Person N 60 = (Hammer Efficiency Factor/60%)*N-uncorrected C = Consolidation Test Depth (ft.) Sample No. Pen./Rec. (in.) Sample Depth (ft.) Sample Information Blows (/6 in.) Shear Strength (psf) or RQD (%) N-uncorrected N 60 Casing Blows Elevation (ft.) Graphic Log Visual Description and Remarks Laboratory Testing Results/ AASHTO and Unified Class. 30 9D 24/ /49/62/ (23"): Dark grey. wet. fine to coarse SAND and CLAYEY SILT, little fine to coarse gravel, (TILL) R1 60/ RQD = 35% NQ R1 (21"): Bedrock: Dark grey, fine to coarse-grained, METASANDSTONE, moderately hard, fresh to slightly weathered, horizontal to moderately-dipping joints, very close to moderately close joints. Sangerville Formation. Rock Mass Quality = Poor. R1: Core Times (min:sec) feet (2:30) feet (1:30) feet (2:15) feet (1:15) feet (1:30) Bottom of Exploration at feet below ground surface. UCT q p = 7,003 psi Remarks: -Borehole backfilled with native soils, 3 bags of filter sand, and 3 bags of crushed stone. Topped with approximately 10 inches of cold asphalt patch. -bgs = below ground surface. -No Casing Blow Counts were recorded. Stratification lines represent approximate boundaries between soil types; transitions may be gradual. * Water level readings have been made at times and under conditions stated. Groundwater fluctuations may occur due to conditions other than those present at the time measurements were made. Page 2 of 2 Boring No.: BB-TNR-108
8 North Parish Bridge (#2619) Turner, ME Photo Log No. 4 Boring BB-TNR-108 Rock Core October 31, 2017 Photo 1: Boring BB-TNR-108 Rock Core Sample R-1 (Row 1); top-section of each sample. Photo 2: Boring BB-TNR-108 Rock Core Sample R-1 (Row 1); mid-section of each sample. Photo 3: Boring BB-TNR-108 Rock Core Sample R-1 (Row 1); end-section of each sample. Client Focused, Employee Owned Nobis Engineering, Inc. 585 Middlesex Street Lowell, MA T (978)
9 Client: Nobis Engineering, Inc. Project: N. Parish Rd Bridge Location: Turner, ME Project No: Boring ID: BB-TNR-108 Sample Type: jar Tested By: Sample ID: S-2A Test Date: 11/16/17 Checked By: Depth : 3-5 ft Test Id: Test Comment: --- Visual Description: Moist, olive gray sand with silt and gravel Sample Comment: --- Particle Size Analysis - ASTM D422 GTX GA emm 0.75 in 0.5 in in #4 #10 #20 #40 #60 # # Percent Finer Grain Size (mm) % Cobble % Gravel Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies 0.75 in 0.5 in in #4 #10 #20 #40 #60 # # % Sand 75.1 D 85 = mm D 60 = mm D 50 = mm % Silt & Clay Size 6.4 Coefficients D 30 = mm D 15 = mm D 10 = mm C u = C c =0.965 Classification ASTM N/A AASHTO Stone Fragments, Gravel and Sand (A-1-b (1)) Sample/Test Description Sand/Gravel Particle Shape : ANGULAR Sand/Gravel Hardness : HARD printed 12/12/2017 1:25:30 PM
10 Client: Nobis Engineering, Inc. Project: N. Parish Rd Bridge Location: Turner, ME Project No: Boring ID: BB-TNR-108 Sample Type: jar Tested By: Sample ID: S-4 Test Date: 11/16/17 Checked By: Depth : 7-9 ft Test Id: Test Comment: --- Visual Description: Moist, olive brown sand with silt and gravel Sample Comment: --- Particle Size Analysis - ASTM D422 GTX GA emm 1.0 in 0.75 in 0.5 in in #4 #10 #20 #40 #60 # # Percent Finer Grain Size (mm) % Cobble % Gravel Sieve Name Sieve Size, mm Percent Finer Spec. Percent Complies 1.0 in 0.75 in 0.5 in in #4 #10 #20 #40 #60 # # % Sand 57.0 D 85 = mm D 60 = mm D 50 = mm % Silt & Clay Size 7.7 Coefficients D 30 = mm D 15 = mm D 10 = mm C u = C c =0.170 Classification ASTM N/A AASHTO Stone Fragments, Gravel and Sand (A-1-b (1)) Sample/Test Description Sand/Gravel Particle Shape : ANGULAR Sand/Gravel Hardness : HARD printed 12/12/2017 1:25:31 PM
11 Client: Project Name: Project Location: Nobis Engineering, Inc. N. Parish Rd Bridge Turner, ME GTX #: Test Date: 11/21/2017 Tested By: Checked By: Boring ID: Sample ID: rlc mpd BB-TNR-108 RC-1 Depth, ft: Sample Type: Sample Description: rock core See photographs Discontinuity material failure Compressive Strength and Elastic Moduli of Rock by ASTM D Method D 9000 Stress vs. Strain 8000 Lateral Strain Axial Strain 7000 Vertical Stress (psi) MicroStrain Peak Compressive Stress: 7,003 psi Stress Range, psi Young's Modulus, psi Poisson's Ratio ,070, ,900, ,940, Notes: Test specimen tested at the approximate as-received moisture content and at standard laboratory temperature. The axial load was applied continuously at a stress rate that produced failure in a test time between 2 and 15 minutes. Young's Modulus and Poisson's Ratio calculated using the tangent to the line in the stress range listed. Calculations assume samples are isotropic, which is not necessarily the case.
12 Client: Nobis Engineering, Inc. Test Date: 11/17/2017 Project Name: N. Parish Rd Bridge Tested By: trm/rlc Project Location: Turner, ME Checked By: jsc GTX #: Boring ID: BB-TNR-108 Sample ID: RC-1 Depth: ft Visual Description: See photographs UNIT WEIGHT DETERMINATION AND DIMENSIONAL AND SHAPE TOLERANCES OF ROCK CORE SPECIMENS BY ASTM D4543 BULK DENSITY DEVIATION FROM STRAIGHTNESS (Procedure S1) 1 2 Average Specimen Length, in: Maximum gap between side of core and reference surface plate: Specimen Diameter, in: Is the maximum gap < 0.02 in.? YES Specimen Mass, g: Bulk Density, lb/ft Minimum Diameter Tolerence Met? YES Maximum difference must be < in. Length to Diameter Ratio: 2.0 Length to Diameter Ratio Tolerance Met? YES Straightness Tolerance Met? YES END FLATNESS AND PARALLELISM (Procedure FP1) END Diameter 1, in Diameter 2, in (rotated 90 o ) Difference between max and min readings, in: 0 = = END Diameter 1, in Diameter 2, in (rotated 90 o ) Difference between max and min readings, in: 0 = = Maximum difference must be < in. Difference = Flatness Tolerance Met? YES End 1 Diameter 1 y = x End 1 Diameter 2 y = x DIAMETER 1 Dial Gage Reading, in Diameter, in Dial Gage Reading, in Diameter, in End 1: End 2: Slope of Best Fit Line Angle of Best Fit Line: Slope of Best Fit Line Angle of Best Fit Line: Maximum Angular Difference: Parallelism Tolerance Met? Spherically Seated YES End 2 Diameter 1 y = x End 2 Diameter 2 y = x DIAMETER 2 Dial Gage Reading, in Diameter, in Dial Gage Reading, in Diameter, in End 1: End 2: Slope of Best Fit Line Angle of Best Fit Line: Slope of Best Fit Line Angle of Best Fit Line: Maximum Angular Difference: Parallelism Tolerance Met? Spherically Seated YES PERPENDICULARITY (Procedure P1) (Calculated from End Flatness and Parallelism measurements above) END 1 Difference, Maximum and Minimum (in.) Diameter (in.) Slope Angle Perpendicularity Tolerance Met? Maximum angle of departure must be < 0.25 Diameter 1, in YES Diameter 2, in (rotated 90 o ) YES Perpendicularity Tolerance Met? YES END 2 Diameter 1, in Diameter 2, in (rotated 90 o ) YES YES
13 Client: Nobis Engineering, Inc. Project Name: N. Parish Rd Bridge Project Location: Turner, ME GTX #: Test Date: 11/21/2017 Tested By: rlc Checked By: jsc Boring ID: BB-TNR-108 Sample ID: RC-1 Depth, ft: After cutting and grinding After break
B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.
N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232
More informationB-1 SURFACE ELEVATION
5A 5B LOGGED BY El. S. Bhangoo DRILLING CONTRACTOR Pitcher Drilling DRILLING METHOD Rotary Wash BEGIN DATE 12-14-12 SAMPLER TYPE(S) AND SIZE(S) (ID) SPT, MC BOREHOLE BACKFILL AND COMPLETION COMPLETION
More informationSOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED
More informationProject: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major
More informationHNTB Corporation January 29, 2018 Project No
www.schonewaldengineering.com HNTB Corporation January 29, 2018 Project No. 17-032 PROJECT BACKGROUND AND OBJECTIVES Localized slope failures and associated open tension cracks are located along the southerly
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,
More informationGeotechnical Data Report
Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road
More informationAPPENDIX C. Borehole Data
APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL
More informationGZA GeoEnvironmental, Inc.
GZA BORING NO.: GZ-1 SHEET: 1 of 1 PROJECT NO: 9.223. Drilling Co.: Geologic Type of Rig: Skid Boring Location: See Plan H. Datum: See Plan Rig Model: Mudline : Foreman: Ray Eastwood CME -.8 Final Boring
More informationPhoto 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking
More informationCivil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx
2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Polecat Creek Bridge (Bridge A) June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Prepared by: Terracon Consultants, Inc. TABLE
More informationDecember 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.
December 5, 2014 Junction Gateway, LLC 7551 W. Sunset Boulevard #203 90046 Attn: Re: Mr. James Frost P: 323.883.1800 Geotechnical Update Letter Sunset & Effie Mixed Use Development 4301 to 4311 Sunset
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,
More informationBoreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.
Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground
More informationDATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS
DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,
More informationDepth (ft) USCS Soil Description TOPSOIL & FOREST DUFF
Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,
More informationAPPENDIX A GEOTECHNICAL REPORT
The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation
More informationAPPENDIX C HYDROGEOLOGIC INVESTIGATION
Figure B-5.7 Figure B-5.8 Preliminary Geotechnical and Environmental Report Appendix C Hydrogeologic Investigation APPENDIX C HYDROGEOLOGIC INVESTIGATION December 21, 2011 WESTSIDE SUBWAY EXTENSION PROJECT
More informationADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON
F I N A L A D D E N D U M 1 R E P O R T ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON REPORT OF GEOTECHNICAL INVESTIGATION URS JOB NO. 3376186 Prepared for Tetra Tech Inc. 142
More informationATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY
ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com
More informationPreliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky
Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation
More informationPRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts
More informationGeneral. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation
DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM
More informationPRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.
PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION 42-INCH FORCE MAIN REPLACEMENT CHIQUITA BOULEVARD S AND SW 34 TH STREET CAPE CORAL, LEE COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials
More informationAPPENDIX E SOILS TEST REPORTS
Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this
More informationGEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.
Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,
More informationAPPENDIX A. Borehole Logs Explanation of Terms and Symbols
APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation
More informationENGINEERING ASSOCIATES
July 16, 211 Vista Design, Inc. 11634 Worcester Highway Showell, Maryland 21862 Attention: Reference: Dear Mr. Polk: Mr. Richard F. Polk, P.E. Geotechnical Engineering Report Charles County RFP No. 11-9
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Single-Span Bridge North Western Road & Hall of Fame Avenue August 25, 2015 Terracon Project No. 03155156 Prepared for: Olsson Associates Prepared by: Terracon Consultants,
More informationGeotechnical Data Report
Geotechnical Data Report ReWa Solar Farm at Durbin Creek Fountain Inn, South Carolina September 1, 2017 Terracon Project No. 86165043 Prepared for: Renewable Water Resources Greenville, South Carolina
More informationChapter 12 Subsurface Exploration
Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface
More informationREPORT OF SUBSURFACE EXPLORATION
REPORT OF SUBSURFACE EXPLORATION GRAND RIVER DAM AUTHORITY HULBERT 69 KV SWITCHING STATION S. 440 Road Hulbert, Cherokee County, Oklahoma ENERCON PROJECT NO. GRDA006 MARCH 7, 2012 PREPARED FOR: C/O ENERCON
More informationLimited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming
Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering
More informationLEGEND ODOT CLASS. A-4b. A-6a. A-6b TOTAL VISUAL WEATHERED SANDSTONE VISUAL BORING LOCATION - PLAN VIEW
PROJECT THE PROJECT CONSISTS IN PART OF ACING TWO STRUCTURES, EASTBOUND AND WESTBOUND STRUCTURES, RESPECTIVELY FOR THE PROPOSED SR OVER BLUE ROAD (CR 9). THE TWO STRUCTURES AS ANNED, ARE SINGLE-SPAN STRUCTURES
More informationSITE INVESTIGATION 1
SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.
More informationCITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014
CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: 13-3-1.32 Contract No.: 11 TO: All Recipients Date: April 14, 214 SUBJECT: Addendum No.1 This seventeen (17) page Addendum forms a
More informationAN EMPLOYEE OWNED COMPANY
CTL Engineering, Inc. 2860 Fisher Road, P.O. Box 4448, Columbus, Ohio 43204338 Phone: 614/2768123 Fax: 614/2766377 Email: ctl@ctleng.com AN EMPLOYEE OWNED COMPANY Consulting Engineers Testing Inspection
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,
More informationGeotechnical Data Report
Geotechnical Data Report S-38-50 (Four Holes Road) over I-26 Emergency Bridge Replacement Orangeburg County, South Carolina May 22, 2018 (Revision 1) SCDOT Project ID.: P037465 Terracon Project No. 73155050U
More informationREPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:
REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED
More informationGeotechnical Engineering Report
Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared
More informationGeotechnical Investigation Juneau Seawalk - Taku Fisheries to Miner s Wharf Juneau, Alaska DM&A Job No
Duane Miller & Associates 5821 Arctic Boulevard, Suite A Anchorage, AK 99518-1654 (907) 644-3200 Fax 644-0507 Arctic & Geotechnical Engineering May 4, 2006 Tetra Tech/KCM, Inc. 1971 First Avenue Seattle,
More informationM E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI
M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical
More informationLEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW
PROJECT THE PROJECT CONSISTS IN PART OF CONSTRUCTING A SINGLE-SPAN BRIDGE ON RELOCATED SHUMWAY HOOW ROAD OVER THE CSXT RAILROAD. THE STRUCTURE AS ANNED, IS A SINGLE-SPAN STRUCTURE WITH MSE WAS AT THE ABUTMENTS.
More informationKDOT Geotechnical Manual Edition. Table of Contents
KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of
More informationThe process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper
More information10. GEOTECHNICAL EXPLORATION PROGRAM
Geotechnical site investigations should be conducted in multiple phases to obtain data for use during the planning and design of the tunnel system. Geotechnical investigations typically are performed in
More informationAppendix 11-B Preliminary Geotechnical Investigation
Appendix 11-B Preliminary Geotechnical Investigation 11.0 Soil, Geology, and Seismology PRELIMINARY SUBSURFACE EXPLORATION AND CONCEPTUAL FOUNDATION ENGINEERING REPORT CPV VALLEY ENERGY CENTER Wawayanda,
More informationSoil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.
Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive
More informationpatersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01
patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade
More informationGeotechnical Data Report
Geotechnical Data Report Emergency Bridge Package 6 Richland County, South Carolina May 12, 2016 SCDOT Project ID.: P029942, P029943, P029944 Terracon Project No. 73100L (Rev. 1) Prepared for: South Carolina
More informationREPORT. Explorations and Geotechnical Engineering Services
REPORT September 9, 2015 15-0690 S Explorations and Geotechnical Engineering Services Runway 35 Localizer Slope Reconstruction MHT Airport Goffs Falls Road Manchester, New Hampshire PREPARED FOR: Jacobs
More informationAppendix G GEOLOGICAL INVESTIGATION
Appendix G GEOLOGICAL INVESTIGATION JOB NUMBER: 3268.001 DATE: 10-14-13 BY: CC SITE 0 2000 1"=2000' VICINITY MAP CARGILL PARCEL HICKORY STREET AND ENTERPRISE DRIVE NEWARK, CALIFORNIA FOR
More informationAppendix J. Geological Investigation
Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF
More informationPRELIMINARY GEOTECHNICAL ENGINEERING REPORT
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT TOWN OF ASHLAND TOWN HALL 101 THOMPSON STREET ASHLAND, VIRGINIA JOB NUMBER: 39016 PREPARED FOR: PMA PLANNERS & ARCHITECTS 10325 WARWICK BOULEVARD NEWPORT NEWS,
More informationGeotechnical Engineering Report
Geotechnical Engineering Report SH-9 Bridge over Wewoka Creek Hughes County, Oklahoma Job Piece No. 27059(04) July 16, 2015 Terracon Project No. 04125055 Prepared for: Holloway, Updike, and Bellen, Inc.
More informationSUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.
SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO. G1G PREPARED FOR KS ASSOCIATES, INC. PREPARED BY PRO GEOTECH, INC.
More informationReport of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011
11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -
More informationGeotechnical Properties of Soil
Geotechnical Properties of Soil 1 Soil Texture Particle size, shape and size distribution Coarse-textured (Gravel, Sand) Fine-textured (Silt, Clay) Visibility by the naked eye (0.05 mm is the approximate
More information3.0 SUMMARY OF FINDINGS
AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,
More informationGEOTECHNICAL ENGINEERING SERVICES REPORT
GEOTECHNICAL ENGINEERING SERVICES REPORT BRIDGE OVER BIG CREEK APPROXIMATELY.8 MILES EAST OF THE INTERSECTION OF COUNTY ROAD EW1546 AND COUNTY ROAD 193 LEFLORE COUNTY, OKLAHOMA PROJECT No. J2-8616(5),
More informationGeotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project
TECHNICAL MEMORANDUM Geotechnical Recommendations for Proposed Additions to the Three Mile Creek Severe Weather Attenuation Tank Project PREPARED FOR: PREPARED BY: DATE: June 28, 218 PROJECT NUMBER: 697482
More informationArdaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants
SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS LELY AREA STORMWATER IMPROVEMENT PROJECT (LASIP) COUNTY BARN ROAD AND WING SOUTH CHANNELS NAPLES, COLLIER CO., FLORIDA Ardaman & Associates, Inc.
More informationENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods
ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design
More informationExisting Bridge Proposed Bridge 66003
922 335 9 T2 X 924 919 9 T4 923 T3 919 922 9 T1 925 919 Existing Bridge 6842 919 9 Proposed Bridge 66003 Minnesota Department of Transportation Geotechnical Section Boring Log Descriptive Terminology (English
More informationTerraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing
Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing GEOTECHNICAL INVESTIGATION BLOCKS TO PIER HAMILTON, ONTARIO PREPARED FOR: City of Hamilton Waterfront
More informationAppendix A. Producer Statement Advisory Note
Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer
More informationPierce County Department of Planning and Land Services Development Engineering Section
Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT
More informationGeotechnical Investigation
Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro
More informationManual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI Federal Highway Administration Washington, DC
Manual on Subsurface Investigations National Highway Institute Publication No. FHWA NHI-01-031 Federal Highway Administration Washington, DC Geotechnical Site Characterization July 2001 by Paul W. Mayne,
More informationSUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource Evaluation Proposed Bernand Quarry San Diego County, California
October 3, 2 Mr. Mark San Agustin Project No. 28-- Home Land Investments Document No. -92 2239 Curlew Street San Diego, CA 92 SUBJECT: SUPPLEMENTARY INVESTIGATION AND LABORATORY TESTING Aggregate Resource
More informationTP-1 N61E 0 DARK BROWN SANDY SILT (ML) stiff, wet with roots (Disturbed Surficial Soil) DEPTH (FEET) 5 REDDISH BROWN SANDSTONE intensely fractured, weak to friable, deeply weathered, tight (Franciscan
More informationAPPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests
APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)
More informationHydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)
TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top
More informationPLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.
611 6 Defau FALS conto Conto DPLV lt Eurs20 01_to 3po Defau FALS conto Conto DPLV lt Eurs20 01_to 4po 612 Conto DPLV conto Defau FALS 01_to urs20 Elt po 5 Conto DPLV conto Defau FALS 01_to urs15 Elt po
More informationSafe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal
Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along
More informationProject No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD
Boring: SB-1 (1 of 1) Moist, brown to orange brown CLAY and SILT, trace sand with fine weathered rock fragments. POSSIBLE FILL. Dry, orange brown sandy SILT trace clay (SM-ML). RESIDUAL SOIL : Not Surveyed
More information6.2 Geotechnical Investigation and Construction Material Survey
6.2 Geotechnical Investigation and Construction Material Survey Geological surveys and investigations were conducted to obtain information on the subsurface geological condition required for the preliminary
More informationATTACHMENT 2 GEOTECHNICAL INFORMATION
ATTACHMENT 2 GEOTECHNICAL INFORMATION Memorandum 2301 Chestnut Street Philadelphia, PA 19103 USA +1.215.569.2900 Fax +1.215.569.5963 Date May 24, 2017 To From Dave Phelan, PE, Sean Robert, PE - Jacobs
More informationGEOTECHNICAL EXPLORATION REPORT ROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, & 8015 BEVERLY BOULEVARD
ADDENDUM TO GEOTECHNICAL EXPLORATION REPORT PROPOSED COMMERCIAL/RETAIL DEVELOPMENT 7967, 8001-8011 & 8015 BEVERLY BOULEVARD CITY OF LOS ANGELES, CALIFORNIA Prepared for: OPT Beverly, LLC 6400 South Fiddlers
More informationNorthern Colorado Geotech
PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared
More informationREPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.
REPORT OF PRELIMINARY SUBSURFACE EXPLORATION VCU Basketball Practice Facility 100/18 West Marshall Street City of Richmond, Virginia For Mr. Carl F. Purdin, AIA Assistant Director of Design Services VCU
More informationNAPLES MUNICIPAL AIRPORT
NAPLES MUNICIPAL AIRPORT NAPLES MUNICIPAL AIRPORT (APF) TAXIWAY D REALIGNMENT AND DRAINAGE IMPROVEMENTS NORTH QUADRANT ADDENDUM NUMBER TWO March, The following Addendum is hereby made a part of the Plans
More informationFIGURES 200 200 200 SW 175TH AVE 350 SW SCHOLLS FERRY RD SW FRIENDLY LN Area 64 SW ROY ROGERS RD 300 250 SW ONEILL CT SW LUKE LN SW LEEDING LN SW TUSCANY ST SW 164TH AVE SW BULL MOUNTAIN RD SW 164TH AVE
More informationCITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3
GEOTECHNICAL REPORT CITY OF CAPE CORAL NORTH UTILITIES EXTENSION PROJECT CONTRACT City of Cape Coral Procurement Division Cultural Park Boulevard, nd Floor Cape Coral, FL ISSUED FOR BID VOLUME of GEOTECHNICAL
More informationGEOTECHNICAL INVESTIGATION
GEOTECHNICAL INVESTIGATION I-80 WILDLIFE OVERCROSSING @ SILVER ZONE PASS ELKO COUNTY, NEVADA EA #73438 JULY 2011 MATERIALS DIVISION Table of Contents 1.0 INTRODUCTION... 1 2.0 PROJECT DESCRIPTION... 1
More informationField Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:
March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin
More informationFrom - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00
Závěrka 12,Praha 6,169 00 Log of Boring BH1 Project ID: 2018_A-017 Annex no.: A.1G Drilling equipment: Hütte 202 TF Location: Prague 12 Overall depth: 2 m Borehole position: Date start: 22.11.2017 Foreman:
More informationHorizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE
Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed
More informationGEOTECHNICAL INVESTIGATION REPORT
GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy
More informationDRILL HOLE # BH-BGC13-FN-01
DILL HOLE # BH-BGC3-FN-0 Drill Method: Mud otary/coring Depth To ock (m): N/A Page of 7 eviewed by: AJB 0 GAVEL (GW) Fine to coarse, sandy, well graded, dense, max particle size = 30 mm, angular to subrounded,
More informationRock Mechanics and Seismology Laboratory
CAEE 211 Geology Laboratory 6 Lab Date: 29 July 2016 Rock Mechanics and Seismology Laboratory Due Date: 5 August 2016 Attendance (based on signing): 30 points Submitting Student Name: Members of laboratory
More informationVOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE
VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPT CAPITAL REGION RESOURCE RECOVERY CENTRE APPENDIX A Borehole Records December Report No. //vol III LIST OF ABBREVIATIONS The abbreviations coonly employed
More informationA. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1
Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating
More informationJune 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON
PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western
More informationH.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE)
DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.1 SUMMARY OF SUBSURFACE STRATIGRAPHY AND MATERIAL PROPERTIES (DATA PACKAGE) Parsons P:\Honeywell -SYR\444576 2008 Capping\09
More informationCONTENTS. 1. GeneralsG Field Investigation WorkG Laboratory Testing Work Surface Soil Description-- 7.
CONTENTS Page 1. GeneralsG 4 2. Field Investigation WorkG 4 3. Laboratory Testing Work--- 5 4. Surface Soil Description-- 7 Appendix A Borehole Location Plan 11 Soil Profile-- 15 Bore Logs--=---- 18 Appendix
More informationPERIODIC SAFETY FACTOR ASSESSMENT
PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma
More information