LEGEND BUSINESS ZONE NORTH OF AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE. Powells Road TEST PIT AGRESEARCH INNOVATION PARK. Hamilton Ring Road

Similar documents
Lake Rotoiti Wastewater Scheme - Stage 1 Investigations. Rotorua Lakes Council

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Appendix A. Producer Statement Advisory Note

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Bryndwr Appendix C: Borehole Logs

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

Earthquake Commission. Darfield Earthquake Recovery Geotechnical Factual Report Avondale

DRILL HOLE # BH-BGC13-FN-01

APPENDIX A GEOTECHNICAL REPORT



APPENDIX C HYDROGEOLOGIC INVESTIGATION


Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

Log of Monitoring Well D58B

APPENDIX B: BORING LOGS

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

3.0 SITE COMPARISON GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL 3.1 Comparison of Sites

GEOTECHNICAL INVESTIGATION FOSTER BLOCK, GOULDS ROAD ROLLESTON

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

College Road Breach Investigation - Geotechnical Factual Report

WELL NUMBER 14-BW03 PAGE 1 OF 5

BP Connect Development Turangi Preliminary Geotechnical Assessment Report

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

Geotechnical Investigation

Pierce County Department of Planning and Land Services Development Engineering Section

COPYRIGHT NOTICE LIMITATION OF LIABILITY

Appendix F Laboratory test results

B-1 SURFACE ELEVATION

Geotechnical Investigation Report

GEOTECHNICAL INVESTIGATION REPORT PROPOSED MIXED USE DEVELOPMENT 54 PARKWAY DRIVE ROSEDALE, AUCKLAND

CENTRAL REGION GEOHAZARDS RISK ASSESSMENT SITE INSPECTION FORM

Materials. Use materials meeting the following.

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

Eastwood & Partners St. Andrew's House 23 Kingfield Road Sheffield S11 9AS. Co-ords: Level: Dimensions: Depth 1.50m

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

APPENDIX C. Borehole Data

Chapter 12 Subsurface Exploration


Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

Technical Memorandum. Soil Borings

GEOLOGICAL PROCESSES AND MATERIALS SGM210

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

Superficial Geology Map - Slice A. Order Details: Order Number: Customer Reference: National Grid Reference: Slice: Site Area (Ha): Search Buffer (m):

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Geotechnical Data Report

Geotechnical Report for Derwent Way Transfer Station, New Westminster, BC

Manor Farm, Otley Road, Adel - preliminary findings

CONQUEST ENGINEERING LTD.

SUMMARY REPORT ON GROUND INVESTIGATIONS AT WALSHESTOWN PIT CO. KILDARE. Submitted to:

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT



71912 From: Dana Derrington Sent: Wednesday, May 31, :02 PM Central Standard Time TO:

Northern Colorado Geotech

GEOTECHNICAL INVESTIGATION. Proposed Douglas Street Bus Lane

GEOTECHNICAL SITE CHARACTERIZATION

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

Eastgate Parking Lot Geotechnical Investigation

D-23 DRILL LOG HOLE NO. : B - TOG - 1 SHEET NO. 1 OF 1 DESCRIPTION BLOW(CM)

CONQUEST ENGINEERING LTD.

GEOTECHNICAL INVESTIGATION REPORT


Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Yumbah Nyamat Works Approval Application October Appendix J. Geotechnical Site Investigation

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

Terraprobe Consulting Geotechnical & Environmental Engineering Construction Materials Inspection & Testing

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation

Gotechnical Investigations and Sampling

Earthquake Commission Darfield Earthquake Recovery Geotechnical Factual Report New Brighton

Appendix 1 MONITORING BORE LOGS

A6 to Manchester Airport Relief Road. B003 Mill Lane Accommodation Bridge Preliminary Design Report Report No. 1007/704/151

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

Pore pressure response during high frequency sonic drilling and SPT

Preston Downs Lot 295/296 Geotechnical Subdivision Report GW West Melton Limited

Foundations on Deep Alluvial Soils

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Construction Exits Rock pads

Free Range Broiler Farm, Arapohue: Geotechnical assessment

Report on Site Classification & Construction Testing

UAS Student Residence

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Omaroro Lower Playing Field - Geotechnical Interpretive Report

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW

Geotechnical Indications Of Eastern Bypass Area In Port Harcourt, Niger Delta

BOREHOLE LOCATION PLAN

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

APPENDIX C 6 WHARF DEVELOPMENT 3D GEOLOGICAL MODEL AND DREDGE VOLUMES

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Transcription:

LEGEND ra R aku Ru BUSINESS ZONE NORTH OF Powells Road oad AGRESEARCH BOREHOLE CPT SEISMIC CPT AUGER SCALE 3 mm TEST PIT AS121 SCPT12 TP18 BH13 TP15 2 AS125 AS126 TP14 BH12 AGRESEARCH CPT13 TP17 INNOVATION PARK AS123 Ruak TP16 ura R oad AS122 AS124 Hamilton Ring Road 1 mm 5 Tramway Road Revision Amendment Project Approved Revision Date Private Bag 357 Hamilton 324 New Zealand Hamilton Office +64 7 838 9344 Drawn Designed Approved Revision Date G.M.B. 1:5 @ A1 1: @ A3 Original Sheet Size A1 [841x594] 5 15 2 25 3 35 4 45 5 m Plot Date 29 May 213 @ 3:46 p.m. Path G:\232\32113_ Ruakura TGH\Drawings\CAD\Factual Report\2_1826_5_524_FIG_2-4.dwg FIG.3 22May13 TAINUI GROUP HOLDINGS LTD STAGE 1 GEOTECHNICAL INVESTIGATIONS RUAKURA DEVELOPMENT Sheet FIGURE 3: EXPLORATORY HOLE LOCATION PLAN BUSINESS ZONE NORTH OF AGRESEARCH Project No. Scale 232113. 1:5 [A1] 1: [A3] 2/1826/5/524 Drawing No. Sheet. No. Revision FIG.3 R1

LEGEND INLAND PORT ZONE BUSINESS ZONE SOUTH OF INLAND PORT BOREHOLE BH16 AS13 TP111 CPT TP112 3 mm SEISMIC CPT AS137 AS136 TP11 AUGER SCALE BH112 TP116 TEST PIT BH17 AS131 AS14 AS138 CPT15 CPT14 TP113 BH15 AS144 BH18 DEEP BH18 SHALLOW TP115 AS139 AS128 2 ra aku Ru Ro ad SCPT13 BH14 AS135 AS141 AS132 TP114 BH11 BH19 AS134 AS127 BH111 AS142 AS143 AS133 TP19 le R oad 1 mm 5 rda Silve AGRESEARCH Revision Amendment Project Approved Revision Date Private Bag 357 Hamilton 324 New Zealand Hamilton Office +64 7 838 9344 Drawn Designed Approved Revision Date G.M.B. 1:5 @ A1 1: @ A3 Original Sheet Size A1 [841x594] 5 15 2 25 3 35 4 45 5 m Plot Date 29 May 213 @ 3:46 p.m. Path G:\232\32113_ Ruakura TGH\Drawings\CAD\Factual Report\2_1826_5_524_FIG_2-4.dwg FIG.4 22May13 TAINUI GROUP HOLDINGS LTD STAGE 1 GEOTECHNICAL INVESTIGATIONS RUAKURA DEVELOPMENT Sheet FIGURE 4: EXPLORATORY HOLE LOCATION PLAN INLAND PORT ZONE AND BUSINESS ZONE TO SOUTH Project No. Scale 232113. 1:5 [A1] 1: [A3] 2/1826/5/524 Drawing No. Sheet. No. Revision FIG.4 R1

Borehole No: 112 PROJECT CO-ORD. 18559 E 5815661 N R.L. SHEET 41.15 m 1 of 4 LOCATION Ruakura South REF. GRID NZTM DATUM Moturiki 1953 DEPTH 25.95 m GEOLOGY/UNIT MAIN DESCRIPTION R.L. (m) DEPTH (m) GRAPHIC LOG 'N' VALUE TESTS BLOW COUNTS OR SHEAR VALUE CORE TOTAL CORE RECOVERY (%) SAMPLE TYPE METHOD CASING BASE OF HOLE & WATER LEVEL ADDITIONAL NOTES PIEZOMETER DETAILS OTHER INSTRUMENTATION TOPSOIL FILL, sandy SILT, minor gravel, dark brown. Soft, wet, plastic. Gravel fine, pumice. 55 Concrete / Flush Toby 1.5m tree root in. FILL, SILT, dark brown. Soft, moist, plastic. 4 1 2 4/4//6/4/3/7 8 11 PT No casing installed. Bentonite 2.m timber fragments. FILL, sandy SILT, some gravel, dark brown. Soft, wet, non-plastic. Gravel fine, angular pumice. 2 8 ///2/2/2/2 36 FILL, fine-coarse SAND, minor silt, dark brown. Medium dense, wet, well graded, non-plastic. Nail and fabric fragments in. 38 3 4 14 4 1/2//1/2/6/5 4/7//8/9/1/13 13 HQ Size, Triple Tube, Wireline Rotary Coring 19/4/13 FILL, gravelly fine-coarse SANDgrey. Medium dense, wet, poorly graded, non-plastic. Gravel fine-medium, angular. Trace steel wire. 36 5 58 19/4/13 32mm Slotted PVC / Walton Park 5.7-6.m iron staining. 6 12 6/5//3/3/3/3 6.8m Wire fragment. SOIL LOG 2-32113..GPJ HMN_TEM.GDT 26/4/13 Fine-coarse SAND, greenish grey. Medium dense, wet, poorly graded, non-plastic. NOTES LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (25) 34 7 STARTED 11/4/213 INCLINATION/ AZIMUTH LOGGED CHECKED CLIENT Vertical; n/a J Garvey T de Malmanche Tainui Group Holdings Ltd FINISHED Co. RIG LAB REF. PROJECT No. Bentonite 12/4/213 Perry Geotech Tractor 13/843/1 2-32113. Scale 1:25 @ A3

Borehole No: 112 PROJECT CO-ORD. 18559 E 5815661 N R.L. SHEET 41.15 m 2 of 4 LOCATION Ruakura South REF. GRID NZTM DATUM Moturiki 1953 DEPTH 25.95 m GEOLOGY/UNIT MAIN DESCRIPTION R.L. (m) DEPTH (m) GRAPHIC LOG 'N' VALUE TESTS BLOW COUNTS OR SHEAR VALUE CORE TOTAL CORE RECOVERY (%) SAMPLE TYPE METHOD CASING BASE OF HOLE & WATER LEVEL ADDITIONAL NOTES PIEZOMETER DETAILS OTHER INSTRUMENTATION Fine-coarse SAND, greenish grey. Medium dense, wet, poorly graded, non-plastic.(continued) 12 3/3//3/3/3/3 8 Fine-coarse SAND, minor gravel, grey. Medium dense, wet, well graded, non-plastic. Gravel fine, angular. 65 9 32 14 5/4//4/4/4/2 67 9.5m wire fragment. Fine-coarse SAND, grey. Medium dense, wet, well graded, non-plastic. 1 Fine SAND, trace silt, light grey. Medium dense, moist, well graded, laminated, non-plastic. 1.5m grey, wet, homogeneous. 21 3/3//4/5/7/5 67 Fine-medium SAND, minor silt, grey. Loose, wet, well graded, non-plastic. Pumiceous. 3 11 12 7 3/4//3/1/1/2 9 HQ Size, Triple Tube, Wireline Rotary Coring Bentonite 13 76 28 13.3m thin sandy SILT layer, soft. SILT, trace sand, grey. Soft, moist, non-plastic. 5 3/3//2//1/2 89 14 Fine SAND, trace silt, grey. Loose, moist, uniformly graded, non-plastic. Pumice. 76 SOIL LOG 2-32113..GPJ HMN_TEM.GDT 26/4/13 NOTES LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (25) STARTED INCLINATION/ AZIMUTH LOGGED CHECKED CLIENT 11/4/213 Vertical; n/a J Garvey T de Malmanche Tainui Group Holdings Ltd FINISHED Co. RIG LAB REF. PROJECT No. 12/4/213 Perry Geotech Tractor 13/843/1 2-32113. Scale 1:25 @ A3

Borehole No: 112 PROJECT CO-ORD. 18559 E 5815661 N R.L. SHEET 41.15 m 3 of 4 LOCATION Ruakura South REF. GRID NZTM DATUM Moturiki 1953 DEPTH 25.95 m GEOLOGY/UNIT MAIN DESCRIPTION R.L. (m) DEPTH (m) GRAPHIC LOG 'N' VALUE TESTS BLOW COUNTS OR SHEAR VALUE CORE TOTAL CORE RECOVERY (%) SAMPLE TYPE METHOD CASING BASE OF HOLE & WATER LEVEL ADDITIONAL NOTES PIEZOMETER DETAILS OTHER INSTRUMENTATION Fine SAND, trace silt, grey. Loose, moist, uniformly graded, non-plastic. Pumice.(continued) 26 8 2/2//2/2/2/2 Sandy SILT, grey. Soft, moist, non-plastic. 16 SILT, trace sand, grey. Soft, moist, non-plastic. 6 2/2//1//2/3 44 PEAT, dark brown. Firm. 17 24 SILT, trace sand, grey. Moist, non-plastic. 15 18 Fine SAND, trace silt, grey. Medium dense, moist, uniformly graded, non-plastic. SILT, trace sand, brown. Soft, moist, non-plastic. 22 19 23 3 3/4//5/7/6/5 /1///1/1/1 67 9 44 HQ Size, Triple Tube, Wireline Rotary Coring Bentonite 2 24 Sandy S ILT, bluish grey. Very soft, wet, non-plastic. 21 2 1////// 22 67 SOIL LOG 2-32113..GPJ HMN_TEM.GDT 26/4/13 NOTES Clayey fine-medium SAND, greyish white. Loose, moist, gap graded. Trace thin beds of soft white CLAY. LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (25) STARTED INCLINATION/ AZIMUTH LOGGED CHECKED CLIENT 11/4/213 Vertical; n/a J Garvey T de Malmanche Tainui Group Holdings Ltd FINISHED Co. RIG LAB REF. PROJECT No. 12/4/213 Perry Geotech Tractor 13/843/1 2-32113. Scale 1:25 @ A3

Borehole No: 112 PROJECT CO-ORD. 18559 E 5815661 N R.L. SHEET 41.15 m 4 of 4 LOCATION Ruakura South REF. GRID NZTM DATUM Moturiki 1953 DEPTH 25.95 m GEOLOGY/UNIT MAIN DESCRIPTION R.L. (m) DEPTH (m) GRAPHIC LOG 'N' VALUE TESTS BLOW COUNTS OR SHEAR VALUE CORE TOTAL CORE RECOVERY (%) SAMPLE TYPE METHOD CASING BASE OF HOLE & WATER LEVEL ADDITIONAL NOTES PIEZOMETER DETAILS OTHER INSTRUMENTATION Clayey fine-medium SAND, greyish white. Loose, moist, gap graded. Trace thin beds of soft white CLAY.(continued) 4 1/1//1/1/1/1 18 23 64 SILT, trace sand, bluish grey. Very soft, moist, plastic. 24 1/1///// HQ Size, Triple Tube, Wireline Rotary Coring 32mm Slotted PVC / Walton Park 25 16 2 1/1//1//1/ END OF BOREHOLE 26 27 14 28 29 12 SOIL LOG 2-32113..GPJ HMN_TEM.GDT 26/4/13 NOTES LOGGED IN ACCORDANCE WITH NZ GEOTECHNICAL SOCIETY GUIDELINES (25) STARTED INCLINATION/ AZIMUTH LOGGED CHECKED CLIENT 11/4/213 Vertical; n/a J Garvey T de Malmanche Tainui Group Holdings Ltd FINISHED Co. RIG LAB REF. PROJECT No. 12/4/213 Perry Geotech Tractor 13/843/1 2-32113. Scale 1:25 @ A3

Project No: 2-32113. Lab Ref No: 13/843/1 BH-112 Core Photos Page 1 of 2

Project No: 2-32113. Lab Ref No: 13/843/1 BH-112 Core Photos Page 2 of 2

Project No: 2-32113. Lab Ref No: 13/843/1 BH-112 Site Photos Page 1 of 1 BH-112 : view looking southwest, post-installation.

N Effluent Ponds Dairy Cow Milking Sheds, with detergents storage Historical Effluent Ponds Offal Pits Farm buildings Maintenance Workshop, with chemical storage and diesel tank. With suspect asbestos fibrolite roof. Key: Hand Auger: Groundwater Monitoring Well: Test Pit/Trench: PAGE 1 CHEDWORTH PARK LTD LAND TAINUI GROUP HOLDINGS JUNE 213 NTS 2-32113.

N Pastoral / Dairy land Approximate extent of burial pits (from Google Earth Imagery) Hamilton Ring Road Ditch / Stream Key: Hand Auger: Groundwater Monitoring Well: Test Pit/Trench: PAGE 2 CHEDWORTH PARK LTD LAND TAINUI GROUP HOLDINGS JUNE 213 NTS 2-32113.