CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 HIGHWAY: FM 462 COUNTY: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD:

Similar documents
CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/08/17 HIGHWAY: RM 2721 COUNTY: 09/07/2012 ESTIMATE PAID: AWARD DATE: 09/27/2012 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/17 HIGHWAY: FM 532 COUNTY: 02/10/2016 ESTIMATE PAID: AWARD DATE: 02/25/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 10 COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: FM 373 COUNTY: 05/02/2018 ESTIMATE PAID: AWARD DATE: 05/24/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 309 COUNTY: 12/06/2017 ESTIMATE PAID: AWARD DATE: 12/14/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/08/17 HIGHWAY: US 82 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 06/07/17 HIGHWAY: FM 534 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 03/06/2018 ESTIMATE PAID: AWARD DATE: 03/29/2018 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 HIGHWAY: US 83 COUNTY: 12/02/2014 ESTIMATE PAID: AWARD DATE: 12/18/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 04/06/17 HIGHWAY: SH 44 COUNTY: 04/02/2014 ESTIMATE PAID: AWARD DATE: 04/24/2014 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: IH 20 COUNTY: 04/07/2015 ESTIMATE PAID: AWARD DATE: 04/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/11/19 HIGHWAY: IH 35 COUNTY: 02/06/2013 ESTIMATE PAID: AWARD DATE: 02/28/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 07/12/2017 ESTIMATE PAID: AWARD DATE: 07/27/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/10/13 HIGHWAY: FM 157 COUNTY: 08/11/2009 ESTIMATE PAID: AWARD DATE: 08/27/2009 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 07/11/18 HIGHWAY: US 277 COUNTY: 08/09/2017 ESTIMATE PAID: AWARD DATE: 08/31/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 09/10/18 HIGHWAY: IH 10 COUNTY: 06/07/2016 ESTIMATE PAID: AWARD DATE: 07/13/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: SH 31 COUNTY: 11/04/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: IH 20 COUNTY: 05/08/2013 ESTIMATE PAID: AWARD DATE: 05/30/2013 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/08/18 HIGHWAY: COUNTY: 10/25/2015 ESTIMATE PAID: AWARD DATE: 11/01/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 08/10/18 HIGHWAY: IH 10 COUNTY: 05/02/2017 ESTIMATE PAID: AWARD DATE: 05/25/2017 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: FM 156 COUNTY: 11/03/2015 ESTIMATE PAID: AWARD DATE: 11/19/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: FM 762 COUNTY: 01/05/2018 ESTIMATE PAID: AWARD DATE: 01/25/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/07/18 10/05/2016 ESTIMATE PAID: AWARD DATE: 10/27/2016 ESTIMATE PERIOD: 00/00/0000 % TIME USED:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 10/10/18 HIGHWAY: IH 10 COUNTY: 07/08/2015 ESTIMATE PAID: AWARD DATE: 07/30/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 03/12/18 HIGHWAY: US 90 COUNTY: 05/06/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 12/11/17 HIGHWAY: US 290 COUNTY: 05/05/2015 ESTIMATE PAID: AWARD DATE: 05/28/2015 ESTIMATE PERIOD:

Addendum No: 1 THE FOLLOWING IS BEING ISSUED AS ADDENDUM NO. 1 PLEASE REVIEW THE FOLLOWING PAGES. Firm: Address

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

Franklin County Engineer's Office - Highway Design Dublin Road And Fishinger Road Improvements Rebid Bid Tabulation

20217 CLEAR STONE TON $14.20 $5, $ $ $ %

10701 TRAFFIC CONTROL 1.00 LUMP SUM $4, $4, $ $4, $4, %

TENDER NO TABULATION OF TENDERS INFRASTRUCTURE AND TRANSPORTATION SUMMARY OF PRICES CONTRACTOR SECTION 1 BID TOTAL

Materials. Use materials meeting the following.

Provide sediment tubes for ditch check and Type A inlet structure filter applications that meet the minimum performance requirements of Table 1.

DOCUMENTATION WORKBOOK FY 2018

Exhibit "A" Date: 1/27/2011

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

APPENDIX B WORKSHEETS & EXHIBITS

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

TABULATION OF TENDERS

FOR PROJECTS INITIATED AFTER NOVEMBER 1, 2008 ITEM 716 EMBANKMENT EARTH OUTLET SEDIMENT TRAP

Franklin County Engineer's Office Riggins Road Extension Avery To Wilcox Bid Tabulation

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

Specifications Whitcomb Elementary School Demolition January 15, 2016

DESIGN BULLETIN No. 39/2006 (Revised June 2007) June 2007 Amendment to Design Bulletin #39/2006

Agenda. INDOT Office of Environmental Services. Describe Results of FHWA QAR. Landscape and Waterway Permitting Unit. Interviews Site Inspections

Summary of Bids Received For

Countermeasure Calculations and Design

Selected Site BMPs: Why s the Water Muddy? John C. Hayes, Ph.D., P. E. Biosystems Engineering Clemson University

Average Bid Prices for Awarded Contracts Page 1 State Aid Projects Not Included 1/1/2016 to 12/31/2016

Tropical E.S. - BUDGET

Colorado Department of Transportation Structure Inspection and Inventory Report (English Units)

Bob Rettig Construction and Consulting

Limited Use Document This presentation is provided in the interest of the free exchange of ideas but may not represent the final or complete results

Rapid Response Team, LLC

NORTH DAKOTA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TEMPORARY EROSION AND SEDIMENT BEST MANAGEMENT PRACTICES

BUILDING HOME CONSTRUCTION

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Project T Dinkel Construction II, LLC. Construction. Brian Thompson Karl Brewer Chuck Cool Armando Tinajero Joshua Mattox

Disbursement Claim for Measure Z Funds. Wire Fee $ Subtotal $ 2,972, Less Bank Fees $ (10.00) TOTAL AMOUNT $ 2,972,60 I.

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

**Temporary Erosion Control**

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

SAN ANTONIO WATER SYSTEM

Snow Removal Policy WARREN COUNTY ENGINEER S OFFICE (WCEO) WARREN COUNTY HIGHWAY DEPARTMENT. October 16, 2014

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

OC Public Works El Niño Storm Preparation 2015

Rock & Aggregate Drop Inlet Protection

Case Histories and Practical Examples

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

CONSTRUCTION EXIT SEDIMENT BARRIER

ADDENDUM NO. 1. PROJECT NAME: Surf Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB #

Stone Outlet Sediment Trap

ROAD INVENTORY FOR CERTIFICATION OF MILEAGE

Commonwealth of Pennsylvania PA Test Method No. 729 Department of Transportation October Pages LABORATORY TESTING SECTION. Method of Test for

TENNESSEE EROSION & SEDIMENT CONTROL HANDBOOK

U.S. Army Corps of Engineers - Buffalo District Project : Blanchard River Flood Control Project Cost Estimate

SPECIFICATION FOR RAMM UPDATING OF ROADS

Prime6400 Software. Furnish and Install: Architectural Metalwork. SS Counter Tops Metal Brackets Metal Tops Metal Wall Panels

8. Relax and do well.

SNOW AND ICE CONTROL GUIDELINES

Rock Sizing for Batter Chutes

Critchfield Rd / SR-129

Appendix C Benchmarking Cost Estimates

Rainbow International of Buena Park

Ch. 9 NOTES ~ Chemical Bonding NOTE: Vocabulary terms are in boldface and underlined. Supporting details are in italics.

Geosynthetics Applications and Performance Reviews Select Case Histories

State Highway Log. Planning Report Olympic Region. Washington State Department of Transportation. Strategic Planning Division

Local Conditions-NE Minnesota

MAJOR REHABILITATION REPORT: BASELINE COST ESTIMATE FOR RECOMMENDED PLAN

Culvert and Pipe Phasing

MONTGOMERY COUNTY SNOW PLAN

INSTRUCTIONS: CHEM Exam I. September 13, 1994 Lab Section

Transcription:

304,734.52 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 02/09/15 299 107.00 CONTRACT ID: 084801039 PROJECT: STP 2012(035) CONTRACT: 09113222 AWARD : $2,072,108.71 PROJECTED : $2,084,109.71 ADJ. PROJECTED : $2,388,844.23 CONTRACT: CONTRACTOR: RAY FARIS, INC. HIGHWAY: FM 462 DISTRICT NAME: San Antonio COUNTY: MEDINA AREA ENGINEER: Eddie Reyes, P.E. AREA NUMBER: 053 ESTIMATE NUMBER: 0033 LETTING DATE: 09/09/2011 ESTIMATE PAID: AWARD DATE: 09/29/2011 ESTIMATE PERIOD: 08/12/2014 to 08/19/2014 NOTICE TO PROCEED DATE: 11/02/2011 ESTIMATE TYPE: FINL WORK BEGIN DATE: 02/01/2012 % COMPLETE: 10 ACCEPTED DATE: 00/00/0000 % TIME USED: 101.36 PHYSICAL WORK COMPLETION DATE: 00/00/0000 % RETAINAGE: RECAPITULATION TOTAL PREV THIS ESTIMATE EARNINGS $2,412,323.37 $2,405,699.07 PARTICIPATING $1,929,858.78 $1,924,559.34 NON-PARTICIPATING $482,464.59 $481,139.73 RETAINAGE LIQUIDATED DAMAGES ($3,20) ($3,20) INCENTIVE DISINCENTIVE OTHER ADJUSTMENTS $6,624.30 $5,299.44 $1,324.86 PAID TO CONTRACTOR $2,409,123.37 $2,402,499.07 $6,624.30 CONTRACT ADJUSTMENTS THIS ESTIMATE ADJUSTMENTS THIS ESTIMATE ADJUSTMENT : ADJUSTMENT : REMARKS: ADJUSTMENT : ADJUSTMENT : REMARKS: ***There are no Contract Adjustments for this estimate*** ***There are no Line Item Adjustments for this estimate*** CERTIFIED AS CORRECT AND ONE COPY HAS BEEN GIVEN TO THE CONTRACTOR AREA/PROJECT ENGINEER DATE

CONTRACTOR'S ESTIMATE PACKAGE Page 2 of 8 CONTRACT TIME STATEMENT WORK BEGIN DATE: 02/01/2012 ASSESSED LIQ DAMAGES: 4 TIME CHARGES BEGIN: 00/00/0000 LIQ DAMAGE RATE: $80 DAYS: 188 LIQUIDATED DAMAGES: 4 C. O. ADJUSTED DAYS: 107 DAYS AT CURRENT DAYS: 295 PER DAY $80 DAYS CHARGED : 299 TOTAL: $3,20 PHYSICAL WORK COMPLETE: 00/00/0000 DAILY BREAKDOWN Date or Charged Credited 08/12/2014 1 AWAITING FINAL DOCUMENTATION 08/13/2014 1 AWAITING FINAL DOCUMENTATION 08/14/2014 1 BOX DELIVERED TO DCO Diary Adjustment Date or PERIOD SUMMARY Charged Credited 3 0 3 AWAITING FINAL DOC 2 OTHER - SEE RMRKS 1

CONTRACTOR'S ESTIMATE PACKAGE Page 3 of 8 WORK PERFORMED THIS PERIOD PROJECT STP 2012(035) CONTROL 084801039 CATEGORY 001 ROADWAY QTY THIS ESTIMATE PAID THIS ESTIMATE Total Bid Quantity QTY Paid To Date 0215 05002001 005 MOBILIZATION LS 220,810.140 0.030 $6,624.30 TOTAL EARNINGS THIS ESTIMATE $6,624.30

CONTRACTOR'S ESTIMATE PACKAGE Page 4 of 8 CONTRACT S PROJECT CATEGORY STP 2012(035) CONTROL 084801039 001 ROADWAY SUPP $ 0060 01002002 002 PREPARING ROW STA 2,102.400 9.000 0 9.00 18,921.60 0065 01102001 000 EXCAVATION (ROADWAY) CY 7.270 14,144.000 0 14,144.00 102,826.88 0070 01322003 000 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 8.750 849.000 0 849.00 7,428.75 0085 01642035 002 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 0.100 66,125.000 0 17,75 1,775.00 0090 01642041 002 DRILL SEEDING (TEMP) (WARM) SY 0.100 66,125.000 0 40,94 4,094.10 0095 01642043 002 DRILL SEEDING (TEMP) (COOL) SY 0.100 66,125.000 0 25,20 2,52 0100 01662001 001 FERTILIZER AC 368.000 13.670 0 17.40 6,403.20 0105 01682001 000 VEGETATIVE WATERING MG 3.000 1,034.000 0 57.00 17 0110 01692002 002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 0 2,590 0 6,869.80 6,869.80 0115 02472054 033 FL BS (CMP IN PLC)(TY D GR 2)(FNAL POS) CY 31.330 11,136.000-5,665.000 5,47 171,406.43 0116 02472392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 30.830 0 5,665.000 5,947.50 183,361.43 CO # 3: Change Fl Bs to Ty D Gr. 5 0120 02512026 000 REWORK BS MTL (TY B) (8") (ORD COMP) SY 1.600 38,546.570 0 38,548.00 61,676.80 0125 02752001 002 CEMENT TON 90 383.000 0 439.40 39,546.00 0130 02752002 002 CEMENT TREAT (EXIST MATL) (6") SY 1.020 50,998.000 0 51,005.00 52,025.10 0135 03162015 016 AH (RC-250) GAL 4.320 9,770.240 0 9,815.00 42,400.80 0140 03162029 016 AH (AC-15P OR AC-20-5TR) GAL 3.690 13,678.270 17,296.870 30,715.00 113,338.35 0145 03162196 016 AGGR(TY-E GR-3 SAC-B) CY 48.000 542.780-512.780 3 1,44 0150 03162201 016 AGGR(TY-E GR-5 SAC-B) CY 51.750 348.930 0 437.00 22,614.75 0151 03162220 AGGR(TY-PB GR-3S SAC-B) CY 48.000 0 512.780 494.00 23,712.00 CO#6; Change Ty E Gr 3 to Ty PB Gr 3S 0155 03162248 016 AGGR(TY-PE GR-4 SAC-B) CY 52.500 424.740 0 416.00 21,84 0161 03512004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 18.060 0 2,078.000 2,707.00 48,888.42 CO#1; Add Flex Pvmt Repair 0170 04032001 000 TEMPORARY L SHORING SF 9.000 420 164.000 584.00 5,256.00 0175 04322001 000 RIPRAP (CONC)(4 IN) CY 325.000 31.200 0 29.20 9,49 0180 04322039 000 RIPRAP (MOW STRIP)(4 IN) CY 350 50 0 34.10 11,935.00 0185 04602004 000 CMP (GAL STL 24 IN) LF 35.000 458.640 0 458.64 16,052.40 0190 04622013 011 CONC BOX CULV (6 FT X 6 FT) LF 550 20.090 0 20.09 11,049.50 0195 04662051 000 WINGWALL (PW)(HW=7 FT) EA 7,500 2.000 0 2.00 15,00 0200 04672262 000 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 850 18.000 0 18.00 15,30 0205 04962010 000 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 50,000 0 0 50,00 0210 04962042 000 REMOV STR (SMALL) EA 750 3.000 0 3.00 2,25 0215 05002001 005 MOBILIZATION LS 220,810.140 0 0 220,810.14 0220 05022001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1,346.770 9.000 5.000 14.00 18,854.78 0225 05062002 011 ROCK FILTER DAMS (INSTALL) (TY 2) LF 25.000 600 0 264.00 6,60 0230 05062009 011 ROCK FILTER DAMS (REMOVE) LF 12.000 600 0 264.00 3,168.00 0235 05062016 011 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 15.000 150 0 133.89 2,008.35 0240 05062019 011 CONSTRUCTION EXITS (REMOVE) SY 5.000 150 0 133.89 669.45 0245 05062034 011 TEMPORARY SEDIMENT CONTROL FENCE LF 2.250 10,860 0 10,84 24,39 0250 05102001 000 ONE-WAY TRAFFIC CONTROL HR 45.000 700 0 647.00 29,115.00 0255 05122004 002 PORT CTB (FUR & INST)(SNGL SLP)(TY 1) LF 15.000 420 0 42 6,30 0260 05122022 002 PORT CTB (MOVE)(SNGL SLP) (TY 1) LF 8.000 420 0 42 3,36

CONTRACTOR'S ESTIMATE PACKAGE Page 5 of 8 CATEGORY 001 ROADWAY SUPP $ 0265 05122040 002 PORT CTB (REMOVE)(SNGL SLP) (TY 1) LF 7.000 420 0 42 2,94 0270 05302012 000 DRIVEWAYS (SURF TREAT) SY 21.900 1,510 0 1,769.01 38,741.32 0275 05302018 000 TURNOUTS (SURF TREAT) SY 21.900 47.000 0 47.00 1,029.30 0280 05402001 023 MTL W-BEAM GD FEN (TIM POST) LF 16.400 450 0 40 6,56 0285 05402011 023 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1,242.000 4.000 0 4.00 4,968.00 0290 05422001 000 REMOVING METAL BEAM GUARD FENCE LF 0.950 400 0 50 475.00 0295 05422002 000 REMOVING TERMINAL ANCHOR SECTION EA 80 4.000 0 4.00 32 0300 05442001 000 GUARDRAIL END TREATMENT (INSTALL) EA 1,836.000 4.000 0 4.00 7,344.00 0305 05452049 000 CRASH CUSH ATTEN (INSTL)(WORK ZONE) EA 6,290 2.000 0 2.00 12,58 0310 05452050 000 CRASH CUSH ATTEN(MOV&RESET)(WORK ZONE) EA 600 2.000 0 2.00 1,20 0315 05452051 000 CRASH CUSH ATTEN (REMOVE)(WORK ZONE) EA 350 2.000 0 2.00 70 0320 05522003 000 WIRE FENCE (TY C) LF 12.780 165.000 0 102.00 1,303.56 0325 05602015 001 MAILBOX INSTALL-S(TWW-POST)TY 4 FND-TB EA 245.000 0 0 245.00 0330 05602016 001 MAILBOX INSTALL-D(TWW-POST)TY2 FND-TB EA 255.450 0 0 255.45 0335 06442022 000 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 525.000 12.000 0 12.00 6,30 0340 06582318 000 INSTL OM ASSM (OM-2Z)(FLX)SRF EA 90 10 0 8.00 72 0345 06622004 000 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 0.290 9,760 0 6,075.00 1,761.75 0350 06622016 000 WK ZN PAV MRK NON-REMOV (W) 24" (SLD) LF 12.000 20 0 49.00 588.00 0360 06622032 000 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 0.290 25,530 0 51,08 14,813.20 0361 06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 0.710 0 227.000 1,78 1,263.80 CO#2; Add Removable WZPM 0365 06622115 000 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1.060 3,919.000 0 1,45 1,537.00 0370 06662048 000 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 7.300 30 0 26.00 189.80 0375 06722015 034 REFL PAV MRKR TY II-A-A EA 4.300 500 0 574.00 2,468.20 0380 06772001 000 ELIM EXT PAV MRK & MRKS ( 4") LF 0.470 4,090 0 1,61 756.70 0385 06812001 002 TEMP TRAF SIGNALS EA 5,000 0 0 5,00 0390 68342001 000 PORTABLE CHANGEABLE MESSAGE SIGN DAY 70.370 40 0 18.00 1,266.66 0395 82512006 005 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 0.450 28,735.000 0 28,735.00 12,930.75 0400 82512015 005 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 0.480 3,040 0 3,04 1,459.20 0405 82512018 005 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 0.450 7,885.000 0 7,885.00 3,548.25 0407 96022001 PAYMENT ADJUSTMENT-POS DOL 0 1,000 0 3,20 3,20 0408 96022002 PAYMENT ADJUSTMENT-NEG DOL -0 1,000 0 3,20-3,20 CATEGORY 002 BRIDGE # 1 Category Subtotal $1,518,133.97 SUPP $ 0460 04032001 000 TEMPORARY L SHORING SF 9.000 2,914.000 0 5,624.00 50,616.00 0465 04162002 000 DRILL SHAFT (24 IN) LF 119.000 528.000 0 528.00 62,832.00 0470 04202003 002 CL C CONC (ABUT) CY 700 29.400 0 29.40 20,58 0475 04202004 002 CL C CONC (BENT) CY 810 22.400 0 22.40 18,144.00 0480 04202029 002 CL S CONC (SLAB) CY 460 93.200 0 93.20 42,872.00 0485 04202033 002 CL S CONC (APPR SLAB) CY 350 35.700 0 71.40 24,99 0490 04252016 001 PRESTR CONC SLAB BEAM (4SB15) LF 125.000 594.000 0 594.00 74,25 0495 04252017 001 PRESTR CONC SLAB BEAM (5SB15) LF 125.000 396.000 0 396.00 49,50 0500 04502161 001 RAIL (TY T223) LF 48.000 224.000 0 224.00 10,752.00 0505 04592005 000 GABION MATTRESSES (PVC)(6 IN) SY 52.000 930-57.890 872.11 45,349.72

CONTRACTOR'S ESTIMATE PACKAGE Page 6 of 8 CATEGORY 002 BRIDGE # 1 SUPP $ 0510 04592015 000 GABIONS (PVC)( 3FT X 3 FT) CY 105.000 1,935.000-317.000 1,618.00 169,89 0603 96082001 UNIQUE CHANGE ORDER 1 DOL 324,413.680 0 0 324,413.68 CO#8; Temp Shoring Ineff. Comp. Category Subtotal $894,189.40 PROJECT STP 2012(035) CONTROL 084801039 CATEGORY 001 ROADWAY SUPP ($) 0075 01502002 000 BLADING HR 40.500 40 0 0 0080 01622002 000 BLOCK SODDING SY 5.000 362.000 0 0 0160 03162636 016 AH (CHFRS-2P OR CRS-2P) GAL 3.850 23,448.450-23,448.450 0 0165 04022001 000 TRENCH EXCAVATION PROTECTION LF 10 30 0 0 0355 06622030 000 WK ZN PAV MRK NON-REMOV (Y) 4" (BRK) LF 0.300 6,080 0 0 0406 96012001 MATERIAL ON HAND DOL 0 0 0 0 CATEGORY 002 BRIDGE # 1 Category Subtotal SUPP ($) 0466 96022601 EXTRA DEPTH DRILL SHAFT PAYMENT 115 PCT DOL 0 1,000 0 0 0467 96022602 EXTRA DEPTH DRILL SHAFT PAYMENT 125 PCT DOL 0 1,000 0 0 CATEGORY 003 CONTRACTOR FORCE ACCOUNT(S) Category Subtotal SUPP ($) 0600 96062053 OFF-DUTY UNIFORM POLICE OFFICER DOL 0 1,000 0 0 In accordance with Item 9.5 Peace Officers & Cruisers 0601 96042001 CONTRACTOR FORCE ACCOUNT 1 DOL 0 1,000 0 0 In accordance with Item 506.6 Maint Repair & Re-Install 0602 96042002 CONTRACTOR FORCE ACCOUNT 2 DOL 0 8,000 0 0 In accordance with Item 681.4 Temp Traf Contr Utility Conn Category Subtotal TOTAL EARNINGS THIS CONTRACT $2,412,323.37

CONTRACTOR'S ESTIMATE PACKAGE Page 7 of 8 CONSTRUCTION ESTIMATE COMBINED ($) 01002002 002 PREPARING ROW STA 2,102.400 9.00 9.000 18,921.60 01102001 000 EXCAVATION (ROADWAY) CY 7.270 14,144.00 14,144.000 102,826.88 01322003 000 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 8.750 849.00 849.000 7,428.75 01642035 002 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 0.100 66,125.00 17,750 1,775.00 01642041 002 DRILL SEEDING (TEMP) (WARM) SY 0.100 66,125.00 40,940 4,094.10 01642043 002 DRILL SEEDING (TEMP) (COOL) SY 0.100 66,125.00 25,200 2,52 01662001 001 FERTILIZER AC 368.000 13.67 17.400 6,403.20 01682001 000 VEGETATIVE WATERING MG 3.000 1,034.00 57.000 17 01692002 002 SOIL RETENTION BLANKETS (CL 1) (TY B) SY 0 2,59 6,869.800 6,869.80 02472054 033 FL BS (CMP IN PLC)(TY D GR 2)(FNAL POS) CY 31.330 11,136.00 5,470 171,406.43 02472392 FL BS(CMP IN PLC)(TY D GR 5)(FNAL POS) CY 30.830 5,947.500 183,361.43 CO # 3: Change Fl Bs to Ty D Gr. 5 02512026 000 REWORK BS MTL (TY B) (8") (ORD COMP) SY 1.600 38,546.57 38,548.000 61,676.80 02752001 002 CEMENT TON 90 383.00 439.400 39,546.00 02752002 002 CEMENT TREAT (EXIST MATL) (6") SY 1.020 50,998.00 51,005.000 52,025.10 03162015 016 AH (RC-250) GAL 4.320 9,770.24 9,815.000 42,400.80 03162029 016 AH (AC-15P OR AC-20-5TR) GAL 3.690 13,678.27 30,715.000 113,338.35 03162196 016 AGGR(TY-E GR-3 SAC-B) CY 48.000 542.78 30 1,44 03162201 016 AGGR(TY-E GR-5 SAC-B) CY 51.750 348.93 437.000 22,614.75 03162220 AGGR(TY-PB GR-3S SAC-B) CY 48.000 494.000 23,712.00 CO#6; Change Ty E Gr 3 to Ty PB Gr 3S 03162248 016 AGGR(TY-PE GR-4 SAC-B) CY 52.500 424.74 416.000 21,84 03512004 FLEXIBLE PAVEMENT STRUCTURE REPAIR(8") SY 18.060 2,707.000 48,888.42 CO#1; Add Flex Pvmt Repair 04032001 000 TEMPORARY L SHORING SF 9.000 3,334.00 6,208.000 55,872.00 04162002 000 DRILL SHAFT (24 IN) LF 119.000 528.00 528.000 62,832.00 04202003 002 CL C CONC (ABUT) CY 700 29.40 29.400 20,58 04202004 002 CL C CONC (BENT) CY 810 22.40 22.400 18,144.00 04202029 002 CL S CONC (SLAB) CY 460 93.20 93.200 42,872.00 04202033 002 CL S CONC (APPR SLAB) CY 350 35.70 71.400 24,99 04252016 001 PRESTR CONC SLAB BEAM (4SB15) LF 125.000 594.00 594.000 74,25 04252017 001 PRESTR CONC SLAB BEAM (5SB15) LF 125.000 396.00 396.000 49,50 04322001 000 RIPRAP (CONC)(4 IN) CY 325.000 31.20 29.200 9,49 04322039 000 RIPRAP (MOW STRIP)(4 IN) CY 350 5 34.100 11,935.00 04502161 001 RAIL (TY T223) LF 48.000 224.00 224.000 10,752.00 04592005 000 GABION MATTRESSES (PVC)(6 IN) SY 52.000 93 872.110 45,349.72 04592015 000 GABIONS (PVC)( 3FT X 3 FT) CY 105.000 1,935.00 1,618.000 169,89 04602004 000 CMP (GAL STL 24 IN) LF 35.000 458.64 458.640 16,052.40 04622013 011 CONC BOX CULV (6 FT X 6 FT) LF 550 20.09 20.090 11,049.50 04662051 000 WINGWALL (PW)(HW=7 FT) EA 7,500 2.00 2.000 15,00 04672262 000 SET (TY II)(24 IN)(CMP)(4:1)(C) EA 850 18.00 18.000 15,30 04962010 000 REMOV STR (BRIDGE 100-499 FT LENGTH) EA 50,000 0 50,00 04962042 000 REMOV STR (SMALL) EA 750 3.00 3.000 2,25

CONTRACTOR'S ESTIMATE PACKAGE Page 8 of 8 05002001 005 MOBILIZATION LS 220,810.140 0 220,810.14 05022001 033 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 1,346.770 9.00 14.000 18,854.78 05062002 011 ROCK FILTER DAMS (INSTALL) (TY 2) LF 25.000 60 264.000 6,60 05062009 011 ROCK FILTER DAMS (REMOVE) LF 12.000 60 264.000 3,168.00 05062016 011 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 15.000 15 133.890 2,008.35 05062019 011 CONSTRUCTION EXITS (REMOVE) SY 5.000 15 133.890 669.45 05062034 011 TEMPORARY SEDIMENT CONTROL FENCE LF 2.250 10,86 10,840 24,39 05102001 000 ONE-WAY TRAFFIC CONTROL HR 45.000 70 647.000 29,115.00 05122004 002 PORT CTB (FUR & INST)(SNGL SLP)(TY 1) LF 15.000 42 420 6,30 05122022 002 PORT CTB (MOVE)(SNGL SLP) (TY 1) LF 8.000 42 420 3,36 05122040 002 PORT CTB (REMOVE)(SNGL SLP) (TY 1) LF 7.000 42 420 2,94 05302012 000 DRIVEWAYS (SURF TREAT) SY 21.900 1,51 1,769.010 38,741.32 05302018 000 TURNOUTS (SURF TREAT) SY 21.900 47.00 47.000 1,029.30 05402001 023 MTL W-BEAM GD FEN (TIM POST) LF 16.400 45 400 6,56 05402011 023 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 1,242.000 4.00 4.000 4,968.00 05422001 000 REMOVING METAL BEAM GUARD FENCE LF 0.950 40 500 475.00 05422002 000 REMOVING TERMINAL ANCHOR SECTION EA 80 4.00 4.000 32 05442001 000 GUARDRAIL END TREATMENT (INSTALL) EA 1,836.000 4.00 4.000 7,344.00 05452049 000 CRASH CUSH ATTEN (INSTL)(WORK ZONE) EA 6,290 2.00 2.000 12,58 05452050 000 CRASH CUSH ATTEN(MOV&RESET)(WORK ZONE) EA 600 2.00 2.000 1,20 05452051 000 CRASH CUSH ATTEN (REMOVE)(WORK ZONE) EA 350 2.00 2.000 70 05522003 000 WIRE FENCE (TY C) LF 12.780 165.00 102.000 1,303.56 05602015 001 MAILBOX INSTALL-S(TWW-POST)TY 4 FND-TB EA 245.000 0 245.00 05602016 001 MAILBOX INSTALL-D(TWW-POST)TY2 FND-TB EA 255.450 0 255.45 06442022 000 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 525.000 12.00 12.000 6,30 06582318 000 INSTL OM ASSM (OM-2Z)(FLX)SRF EA 90 1 8.000 72 06622004 000 WK ZN PAV MRK NON-REMOV (W) 4" (SLD) LF 0.290 9,76 6,075.000 1,761.75 06622016 000 WK ZN PAV MRK NON-REMOV (W) 24" (SLD) LF 12.000 2 49.000 588.00 06622032 000 WK ZN PAV MRK NON-REMOV (Y) 4" (SLD) LF 0.290 25,53 51,080 14,813.20 06622067 WK ZN PAV MRK REMOV (W) 4" (SLD) LF 0.710 1,780 1,263.80 CO#2; Add Removable WZPM 06622115 000 WK ZN PAV MRK SHT TERM (TAB) TY Y-2 EA 1.060 3,919.00 1,450 1,537.00 06662048 000 REFL PAV MRK TY I (W) 24"(SLD)(100MIL) LF 7.300 3 26.000 189.80 06722015 034 REFL PAV MRKR TY II-A-A EA 4.300 50 574.000 2,468.20 06772001 000 ELIM EXT PAV MRK & MRKS ( 4") LF 0.470 4,09 1,610 756.70 06812001 002 TEMP TRAF SIGNALS EA 5,000 0 5,00 68342001 000 PORTABLE CHANGEABLE MESSAGE SIGN DAY 70.370 4 18.000 1,266.66 82512006 005 RE PM W/RET REQ TY I(W)4"(SLD)(100MIL) LF 0.450 28,735.00 28,735.000 12,930.75 82512015 005 RE PM W/RET REQ TY I(Y)4"(BRK)(100MIL) LF 0.480 3,04 3,040 1,459.20 82512018 005 RE PM W/RET REQ TY I(Y)4"(SLD)(100MIL) LF 0.450 7,885.00 7,885.000 3,548.25 96022001 PAYMENT ADJUSTMENT-POS DOL 0 1,00 3,200 3,20 96022002 PAYMENT ADJUSTMENT-NEG DOL -0 1,00 3,200-3,20 96082001 UNIQUE CHANGE ORDER 1 DOL 324,413.680 0 324,413.68 CO#8; Temp Shoring Ineff. Comp. TOTAL EARNINGS $2,412,323.37