1 Network Quality and Reliability of Supply Code 2017/18 Performance Report Prepared by: Asset Services

2 Left blank intentionally DM# /18 Page 2 of 22

3 Contents 1. INTRODUCTION 5 2. AUDIT REQUIREMENTS 5 3. SCHEDULE 1 - INFORMATION TO BE PUBLISHED: 6 Clause 4 and 10 6 Clause 5 - Significant interruptions to small use customers. 7 Clause 7 and 10 - Number of customer complaints in each discrete area: 12 Clause 8 and 10 - Total amount spent addressing complaints. 13 Clause 9 and 10 - Payments to customers for failure to meet certain standards 13 Clause 11(a), 12 and 13 - Average Length of Interruption of Supply to Customer Premises in Minutes 14 Clause 11(b), 12 and 13 - Average Number of Interruptions of Supply to Customer Premises 15 Clause 11(c), 12 and 13 - Average Percentage Of Time That Electricity Has Been Supplied To Customer Premises. 16 Clause 11(d), 12 and 13 - Average Total Length of All Interruptions of Supply to Customer Premises in Minutes 17 Clause 14(a) - Horizon Power - Average Length of Interruption - Frequency Distribution 18 Clause 15 Average Length of Interruption - Frequency Graph. 18 Clause 14(b) - Horizon Power - Number of Interruptions - Frequency Distribution 19 Clause 15 Number of Interruptions - Frequency Graph. 19 Clause 14(c) - Horizon Power - Total Length of all Interruptions - Frequency Distribution 20 Clause 15 Total Length of all Interruptions - Frequency Graph MAJOR EVENT DAYS APPENDIX 22 Major Event Days 22 Major Event Day Classification 22 Normalised Data Sets - Unplanned 22 DM# /18 Page 3 of 22

4 DM# /18 Page 4 of 22

5 1. INTRODUCTION This report has been produced to meet the requirements of the Electricity Industry (Network Quality and Reliability of Supply) Code 2005, Schedule 1 Information to be published. To assist in meeting reporting requirements the Economic Regulation Authority Western Australia (ERA WA) publishes the Electricity Distribution Licence Performance Reporting Handbook which specifies measures to be reported. The report is prepared in accordance with Schedule 1 of the Code, however as Horizon Power is a vertically integrated business (responsible for generation, transmission and distribution) reliability data includes generation and transmission outages. 2. AUDIT REQUIREMENTS Division 3 of the Electricity Industry (Network Quality and Reliability of Supply) Code 2005 requires that Horizon Power arrange for an independent expert to audit, and report on the operation of the systems that Horizon Power has in place for monitoring its compliance with the code. In 2017, the Minister for Energy removed the requirement for licence holders, such as Horizon Power, to annually engage an independent expert to audit and report on the operation of the systems in place for monitoring compliance with legislated electricity quality and reliability standards. The audit period was extended to three yearly. DM# /18 Page 5 of 22

6 3. SCHEDULE 1 - INFORMATION TO BE PUBLISHED: Clause 4 and 10 Voltage Fluctuations and Harmonics Clause 4(a) Number of breaches of each provision of the Code: Quality of Supply 2016/ /18 Voltage fluctuations 0 0 Harmonics 0 0 Clause 4(b) Remedial action taken for each provision: Voltage Fluctuations Location N/A Action Taken N/A Harmonics Location N/A Action Taken N/A N/A = Not Applicable. Continuous monitoring of voltage and frequency fluctuations is done at the substation busbar. Temporary power quality monitoring equipment is installed on the network for specific problem monitoring in response to a customer power quality complaint. DM# /18 Page 6 of 22

7 Clause 5 - Significant interruptions to small use customers. Clause Description 2016/ /18 Clause 5(a) Number of premises that experienced interruptions greater than 12 hours continuous Clause 5(b) Number of premises that experienced more than 16 interruptions Detailed analysis of interruptions where duration is greater than 12 hours for 17/18 System Duration Start Incident Premises Cause Description (Minutes) Date Category Bidyadanga /12/2017 Wind or Wind Bourne Feeder Trip Bidyadanga /02/2018 Equipment Failure Potential Neutral Problem - AMI Bidyadanga /02/2018 Equipment Failure Potential Neutral Problem - AMI Bidyadanga /02/2018 Equipment Failure Potential Neutral Problem - AMI Broome /07/2017 Vegetation On Service Wire Broome /08/2017 Equipment Failure No Power Broome /08/2017 Equipment Failure No Power Broome /12/2017 Bat Intermittent Power Broome /12/2017 Bat Intermittent Power Broome /12/2017 Emergency Outage For Miscellaneous Broome /12/2017 Emergency Outage For Arcing Street Wire Broome /12/2017 Wind or Wind Bourne Pole Down Broome /12/2017 Emergency Outage For Transformer On A Pole Damaged Broome /12/2017 Wind or Wind Bourne On Service Wire Broome /12/2017 Wind or Wind Bourne On Service Wire Broome /12/2017 Wind or Wind Bourne Low Hanging Service Wire Across Road Broome /12/2017 Wind or Wind Bourne Arcing Street Wire Broome /12/2017 Wind or Wind Bourne Service Wire Down Broome /12/2017 Wind or Wind Bourne On Street Wire Broome /12/2017 Wind or Wind Bourne Service Wire Down Broome /12/2017 Wind or Wind Bourne Pole Broken/Damaged Broome /12/2017 Wind or Wind Bourne Service Wire Down Broome /12/2017 Wind or Wind Bourne Service Wire Down Broome /12/2017 Wind or Wind Bourne Low Hanging Service Wire Across Road Broome /12/2017 Wind or Wind Bourne Intermittent Power Broome /12/2017 Vegetation LV Fuse Trip DM# /18 Page 7 of 22

8 System Duration Start Incident Premises Cause Description (Minutes) Date Category Broome /12/2017 Wind or Wind Bourne No Power Broome /12/2017 Vegetation LV Fuse Trip Broome /12/2017 Wind or Wind Bourne Service Wire Down Broome /12/2017 Wind or Wind Bourne Part Power Broome /12/2017 Wind or Wind Bourne No Power Broome /12/2017 Wind or Wind Bourne Part Power Broome /12/2017 Wind or Wind Bourne Part Power Broome /12/2017 Wind or Wind Bourne Part Power Broome /12/2017 Wind or Wind Bourne Part Power Broome /12/2017 Wind or Wind Bourne Part Power Broome /12/2017 Wind or Wind Bourne No Power Broome /12/2017 Wind or Wind Bourne No Power Broome /12/2017 Wind or Wind Bourne No Power Broome /12/2017 Wind or Wind Bourne Part Power Broome /01/2018 Vegetation Underground Dome Damaged Broome /01/2018 Water Infiltration or Flooded No Power Equipment Broome /01/2018 Vegetation Feeder Trip Broome /01/2018 Vegetation Service Wire Down Broome /01/2018 Wind or Wind Bourne On Service Wire Broome /01/2018 Wind or Wind Bourne On Service Wire Broome /01/2018 Vegetation On Service Wire Broome /01/2018 Vegetation On Service Wire Broome /01/2018 Equipment Failure Part Power Broome /02/2018 Wind or Wind Bourne Tight Service Wire Broome /02/2018 Equipment Failure Part Power Broome /03/2018 Equipment Failure Part Power Broome /03/2018 Human Error No Power Broome /03/2018 Water Infiltration or Flooded Miscellaneous Equipment Carnarvon /03/2018 Equipment Failure Recloser Trip Carnarvon /05/2018 Wind or Wind Bourne Miscellaneous Carnarvon /05/2018 Wind or Wind Bourne Pole Broken/Damaged Carnarvon /05/2018 Unknown Miscellaneous Carnarvon /05/2018 Wind or Wind Bourne Carnarvon /05/2018 Wind or Wind Bourne Carnarvon /05/2018 Wind or Wind Bourne Miscellaneous Non Miscellaneous Non Pole Broken/Damaged DM# /18 Page 8 of 22

9 System Duration Start Incident Premises Cause Description (Minutes) Date Category Carnarvon /05/2018 Wind or Wind Bourne Miscellaneous Non Carnarvon /05/2018 Equipment Failure Miscellaneous Non Carnarvon /05/2018 Equipment Failure Miscellaneous Non Carnarvon /05/2018 Equipment Failure Miscellaneous Non Carnarvon /05/2018 Equipment Failure Miscellaneous Non Carnarvon /05/2018 Unknown Part Power Carnarvon /05/2018 Equipment Failure Reconnection Cue /02/2018 Lightning Part Power Denham /07/2017 Equipment Failure Part Power Denham /08/2017 Equipment Failure Part Power Denham /11/2017 Equipment Failure Part Power Derby /07/2017 Unknown SFW PQI Voltage Fluctuation Derby /02/2018 Equipment Failure Part Power Esperance /07/2017 Unknown Sectionaliser Trip Esperance /08/2017 Equipment Failure Drop Out Fuse Trip Esperance /09/2017 Unknown No Power Esperance /11/2017 Lightning Recloser Trip Esperance /11/2017 Equipment Failure Part Power Esperance /11/2017 Bird Drop Out Fuse Trip Esperance /11/2017 Insect No Power Esperance /12/2017 PQI - Default Code SFW PQI High Volts Esperance /12/2017 Equipment Failure Switch Isolation Esperance /01/2018 Pollution Recloser Trip Esperance /01/2018 Equipment Failure Intermittent Power Esperance /02/2018 Equipment Failure No Power Esperance /02/2018 Lightning No Power Esperance /02/2018 Lightning No Power Esperance /02/2018 Equipment Failure Recloser Trip Esperance /02/2018 Equipment Failure Sectionaliser Trip Esperance /02/2018 Vegetation On Street Wire Esperance /02/2018 Equipment Failure Recloser Trip Esperance /02/2018 Emergency Outage For Disconnect For Fault Esperance /02/2018 Equipment Failure Drop Out Fuse Trip Esperance /04/2018 Vehicle Service Wire Down Esperance /04/2018 Vehicle Drop Out Fuse Trip Esperance /04/2018 Bird Recloser Trip Esperance /04/2018 Lightning Drop Out Fuse Trip Esperance /05/2018 Equipment Failure Part Power Esperance /05/2018 Vegetation Miscellaneous Non Esperance /05/2018 Plan Outage or Planned HVN Incident Disconnection Esperance /05/2018 Bird Drop Out Fuse Trip Esperance /05/2018 Emergency Outage For No Power DM# /18 Page 9 of 22

10 System Duration Start Incident Premises Cause Description (Minutes) Date Category Esperance /06/2018 Pole Top Fire Pole Fire Esperance /06/2018 Pole Top Fire Switch Isolation Esperance /06/2018 Equipment Failure No Power Exmouth /08/2017 PQI - Default Code SFW PQI High Volts Exmouth /10/2017 Equipment Failure Pole Arcing Exmouth /01/2018 Equipment Failure Pole Broken/Damaged Exmouth /01/2018 Water Infiltration or Flooded Underground Dome Equipment Damaged Exmouth /03/2018 PQI - Default Code SFW PQI High Volts Exmouth /06/2018 Equipment Failure Miscellaneous Non Exmouth /06/2018 Equipment Failure Miscellaneous Non Fitzroy /12/2017 Equipment Failure No Power Crossing Fitzroy /02/2018 Vandalism or Willful No Power Crossing Damage Fitzroy /05/2018 Vandalism or Willful No Power Crossing Damage Fitzroy Crossing /05/2018 Equipment Failure Miscellaneous Non Hopetoun /11/2017 Plan Outage or Recloser Trip Disconnection Hopetoun /11/2017 Vehicle Part Power Hopetoun /01/2018 Pollution No Power Hopetoun /03/2018 Equipment Failure SFW PQI Low Volts Hopetoun /06/2018 Wind or Wind Bourne No Power Kalumburu /05/2018 Vandalism or Willful No Power Damage Karratha /07/2017 Equipment Failure Pole Broken/Damaged Karratha /08/2017 Fire (Not Pole Top Fire) House / Building Fire Karratha /08/2017 Human Error Miscellaneous Non Karratha /09/2017 Pollution Feeder Trip Karratha /09/2017 Equipment Failure Part Power Karratha /11/2017 Plan Outage or Feeder Trip Disconnection Karratha /05/2018 Unknown Underground Dome Damaged Karratha /06/2018 Equipment Failure Miscellaneous Non Karratha /06/2018 Equipment Failure Underground Dome Damaged Karratha /06/2018 Equipment Failure Part Power Karratha /06/2018 Vandalism or Willful No Power Damage Kununurra /07/2017 Vehicle Underground Dome Damaged Kununurra /10/2017 Human Error Miscellaneous Kununurra /01/2018 Equipment Failure Recloser Trip Kununurra /05/2018 Equipment Failure Electric Shock Kununurra /05/2018 Vandalism or Willful Meter Box Damaged Damage Laverton /10/2017 Equipment Failure No Power Laverton /10/2017 System Generated No Power Laverton /11/2017 Equipment Failure Part Power DM# /18 Page 10 of 22

11 System Duration Start Incident Premises Cause Description (Minutes) Date Category Leonora /01/2018 Emergency Outage For Planned HVN Incident Leonora /05/2018 Vehicle Street Wire Down Looma /01/2018 Vegetation Low Hanging Service Wire Across Road Marble Bar /11/2017 Unknown Part Power Marble Bar /12/2017 Equipment Failure Low Hanging Street Wire Meekatharra /02/2018 Equipment Failure Recloser Trip Nullagine /02/2018 Vandalism or Willful No Power Damage Port Hedland /07/2017 Plan Outage or Planned HVN Incident Disconnection Port Hedland /07/2017 Vehicle Pole Broken/Damaged Port Hedland /10/2017 Human Error Electric Shock Port Hedland /11/2017 Equipment Failure No Power Port Hedland /11/2017 Insect Potential Neutral Problem - AMI Port Hedland /01/2018 Lightning No Power Sandstone /05/2018 Equipment Failure Miscellaneous Wiluna /04/2018 Vehicle Underground Dome Damaged 742 Number of Interruptions = 157 Customer interruptions greater than 12 hours that were due to significant events (cyclones, severe storms, fire & floods) that Horizon Power systems experienced in 2017/18. Power System Significant Event Dates Event Bidyadanga December 2017 Cyclone Hilda Broome December 2017 Cyclone Hilda DM# /18 Page 11 of 22

12 Clause 6 and 10 - Total number of Quality of Supply complaints received 2016/ / Clause 7 and 10 - Number of customer complaints in each discrete area: Discrete Area 2016/ /18 NWIS 8 4 Ardyaloon Beagle Bay Bidyadanga Broome 3 4 Carnarvon 2 2 Coral Bay Cue Denham 1 1 Derby Djarindjin Esperance 8 5 Exmouth 5 4 Fitzroy Crossing Gascoyne Junction Halls Creek 1 2 Hopetoun 6 3 Kalumburu Kununurra 4 1 Lake Argyle Laverton Leonora Looma Marble Bar Meekatharra Menzies 1 Mount Magnet 1 Norseman 1 Nullagine Onslow Sandstone Warmun 1 Wiluna Wyndham Yalgoo Yungngora Horizon Power Total DM# /18 Page 12 of 22

13 Clause 8 and 10 - Total amount spent addressing Power Quality and Reliability complaints. 2016/ /18 $1,647,756 $292,616 Note: The 2016/17 figure was overstated due to inaccuracies in work tracking and reporting practices. In 2017/18, there was a concerted effort to rectify these inaccuracies. Clause 9 and 10 - Payments to customers for failure to meet certain standards The number and total payments made to customers (who applied) for failure to give required notice of planned interruption. 2016/ /18 Number Cost Number Cost 1 $20 0 $0 The number and total payments made to customers (who applied) for supply interruptions exceeding 12 hours. 2016/ /18 Number Cost Number Cost 346 $27, $800 Note: 1 payment due to a cyclone 9 payments due to extended planned and unplanned outages DM# /18 Page 13 of 22

14 Clause 11(a), 12 and 13 - Average Length of Interruption of Supply to Customer Premises in Minutes 2 System 2014/ / / /18 Average NWIS Ardyaloon Beagle Bay Bidyadanga Broome Carnarvon Coral Bay Cue Denham Derby Djarindjin Esperance Exmouth Fitzroy Crossing Gascoyne Junction Halls Creek Hopetoun Kalumburu Kununurra Lake Argyle Laverton Leonora Looma Marble Bar Meekatharra Menzies Mount Magnet Norseman Nullagine Onslow Sandstone Warmun Wiluna Wyndham Yalgoo Yungngora Horizon Power Total NWIS North West Interconnected System as per Clause 1 Schedule 1 2 Corresponds to Customer Average Interruption Duration Index (CAIDI) DM# /18 Page 14 of 22

15 Clause 11(b), 12 and 13 - Average Number of Interruptions of Supply to Customer Premises 3 System 2014/ / / /18 Average NWIS Ardyaloon Beagle Bay Bidyadanga Broome Carnarvon Coral Bay Cue Denham Derby Djarindjin Esperance Exmouth Fitzroy Crossing Gascoyne Junction Halls Creek Hopetoun Kalumburu Kununurra Lake Argyle Laverton Leonora Looma Marble Bar Meekatharra Menzies Mount Magnet Norseman Nullagine Onslow Sandstone Warmun Wiluna Wyndham Yalgoo Yungngora Horizon Power Total NWIS North West Interconnected System as per Clause 1 Schedule 1 3 Corresponds to System Average Interruption Frequency Index (SAIFI) DM# /18 Page 15 of 22

16 Clause 11(c), 12 and 13 - Average Percentage Of Time That Electricity Has Been Supplied To Customer Premises. System % 2014/ / / /18 Average NWIS Ardyaloon Beagle Bay Bidyadanga Broome Carnarvon Coral Bay Cue Denham Derby Djarindjin Esperance Exmouth Fitzroy Crossing Gascoyne Junction Halls Creek Hopetoun Kalumburu Kununurra Lake Argyle Laverton Leonora Looma Marble Bar Meekatharra Menzies Mount Magnet Norseman Nullagine Onslow Sandstone Warmun Wiluna Wyndham Yalgoo Yungngora Horizon Power Total NWIS North West Interconnected System as per Clause 1 Schedule 1 DM# /18 Page 16 of 22

17 Clause 11(d), 12 and 13 - Average Total Length of All Interruptions of Supply to Customer Premises in Minutes 4 System 2014/ / / /18 Average NWIS Ardyaloon Beagle Bay Bidyadanga Broome Carnarvon Coral Bay Cue Denham Derby Djarindjin Esperance Exmouth Fitzroy Crossing Gascoyne Junction Halls Creek Hopetoun Kalumburu Kununurra Lake Argyle Laverton Leonora Looma Marble Bar Meekatharra Menzies Mount Magnet Norseman Nullagine Onslow Sandstone Warmun Wiluna Wyndham Yalgoo Yungngora Horizon Power Total NWIS North West Interconnected System as per Clause 1 - Schedule 1 4 Corresponds to System Average Interruption Duration Index (SAIDI) DM# /18 Page 17 of 22

18 Clause 14(a) - Horizon Power - Average Length of Interruption - Frequency Distribution Percentile Minutes 25 th th th th th th th Clause 15 Average Length of Interruption - Frequency Graph. During the period 01/07/2017 to 30/06/2018 of those customers who experienced an interruption, 40% had an interruption of less than 60 minutes. DM# /18 Page 18 of 22

19 Clause 14(b) - Horizon Power - Number of Interruptions - Frequency Distribution Percentile Interruptions 25 th th th th th th th Clause 15 Number of Interruptions - Frequency Graph During the period 01/07/2017 to 30/06/2018, 99.97% of customers experienced an average of less than 16 outages or less. DM# /18 Page 19 of 22

20 Clause 14(c) - Horizon Power - Total Length of all Interruptions - Frequency Distribution Percentile Minutes 25 th th th th th th th Clause 15 Total Length of all Interruptions - Frequency Graph DM# /18 Page 20 of 22

21 During the period 01/07/2017 to 30/06/2018, 90% of customers experienced outages with durations of less than 290 minutes. 4. MAJOR EVENT DAYS In the period 01/07/2017 to 30/06/2018 there were 3 systems impacted by 1 significant event for which Major Event Days were recorded. Power System Major Event Day Dates Event Bidyadanga December 2017 Cyclone Hilda Broome December 2017 Cyclone Hilda Djarindjin December 2017 Cyclone Hilda DM# /18 Page 21 of 22

22 5. APPENDIX Major Event Days Major event days are days in which interruptions affect the delivery of supply in a system and are not reasonably practicable to control such as extreme weather events (cyclones, fires and floods). These days are excluded from Sustained Interruptions used for reliability measurement and reporting. This report makes reference to the impact of major event days where they have had a significant impact on the statistics. Major Event Day Classification The classification of Major Event Days is to allow major events to be studied separately from daily operation, and in the process, to better reveal trends in daily operation that would be hidden by the large statistical effect of major events. A Major Event Day is a day in which interruptions affect the delivery of supply in a system that is not reasonably practicable to control. All indices are calculated based on removal of the identified Major Event Days. Interruptions that span multiple days are accrued to the day on which the interruption begins. Normalised Data Set - Unplanned Horizon Power uses Normalised data set to measure the management of incidents that are within the business control. Sustained Interruptions in Horizon Powers systems are those interruptions that result in a loss of electricity to customers for more than one minute in duration. Horizon Power s Normalised Data excludes interruptions where the interruption is not reasonably practicable to control such as: Customer installations/ appliances Planned outages/ disconnections Vehicle, machine or tool damage Wilful damage Damage due to events that Horizon Power cannot, so far as is reasonably practicable, control such as cyclones, fires and floods. As Horizon Power is a vertically integrated business (responsible for generation, transmission and distribution) reliability data includes generation and transmission outages. DM# /18 Page 22 of 22

Network Quality and Reliability of Supply

Network Quality and Reliability of Supply Network Quality and Reliability of Supply Performance Report 2010/11 Prepared by: Operations Asset & Works Audited by: Qualeng Left blank intentionally DMS 3444560 2 CONTENTS Horizon Power service area

More information

Standard Horizon Power Environmental Conditions

Standard Horizon Power Environmental Conditions Standard Horizon Power Environmental Conditions Standard Number: HPC-9EJ-01-0001-2013 Document Control Author Name: Paul Savig Position: Senior Standards Engineer Document Owner (May also be the Process

More information

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT 2015 LIBERTY UTILITIES (CALPECO ELECTRIC) LLC (U 933 E) -- PUBLIC VERSION -- Prepared for California Public Utilities Commission July 15, 2016 EXECUTIVE SUMMARY

More information

BVES Annual Reliability Public Presentation 2016 Performance

BVES Annual Reliability Public Presentation 2016 Performance BVES Annual Reliability Public Presentation 2016 Performance December 13, 2017 Agenda Company Overview What is Electric Utility Reliability? Requirements & Definitions Reliability Indices 2016 Reliability

More information

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS EB-- Exhibit D Page of DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS FIVE-YEAR HISTORICAL RELIABILITY PERFORMANCE THESL tracks System Average Interruption Frequency Index

More information

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676)

P.O BOX 429, NUKU ALOFA, Tel: (676) Fax: (676) P.O BOX 429, NUKU ALOFA, Tel: (676) 21-400 Fax: (676) 23-047 Email: afernando@tongapower.to 27 February, 2015 Lord Dalgety Electricity Commission Tu atakilangi Nuku alofa Dear Lord Dalgety Re: Monthly

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared September 1, 2013 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects Information Item Date: June 22, 2015 To: From: Subject: Mayor and City Council Debbie Lee, Communications and Public Affairs Officer Update on Southern California Edison s Capital Improvement Projects

More information

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015 Consolidated Edison Company of New York, Inc. Electric Distribution Storm Hardening Initiatives Paul V. Stergiou Distribution Engineering October 14 th, 2015 Energy For New York City And Westchester 3.3

More information

Lake Lure Community Meeting with Duke Energy

Lake Lure Community Meeting with Duke Energy Lake Lure Community Meeting with Duke Energy A community meeting was held on February 11, 2019 at Lake Lure Town Hall to discuss electric service to the town and surrounding areas. Lake Lure staff worked

More information

Your safety is in your hands.

Your safety is in your hands. Your safety is in your hands. It s hard to imagine life without electricity. Having had electricity available at the flick of a switch for more than a hundred years, it is no surprise that many people

More information

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida Review of Florida s Investor-Owned Electric Utilities 2 0 1 1 Service Reliability reports N O V E M B E R 2 0 1 2 State of Florida Florida Public Service Commission Division of ENGINEERING Review of Florida

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared November 13, 2015 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida Review of Florida s Investor-Owned Electric Utilities 2 0 1 2 Service Reliability reports N O V E M B E R 2 0 1 3 State of Florida Florida Public Service Commission Division of ENGINEERING Review of Florida

More information

Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon, Canada

Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon, Canada Abstract Failure Bunching Phenomena in Electric Power Transmission Systems Roy Billinton Gagan Singh Janak Acharya Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon,

More information

Winter Ready DC District of Columbia Public Service Commission

Winter Ready DC District of Columbia Public Service Commission Winter Ready DC District of Columbia Public Service Commission Presented by: Michael Poncia, Vice President, Customer Operations, Pepco Holdings October 26, 2017 Preparing our System Improving our system

More information

Transmission & Distribution Electrical Reliability 2007 Annual Report

Transmission & Distribution Electrical Reliability 2007 Annual Report Transmission & Distribution Electrical Reliability 27 Annual Report Table of Contents SECTION 1 Executive Summary Report Summary Indices Synopsis Why We Track Overview of KEYS Reliability Statistics Overview

More information

2013 December Ice Storm

2013 December Ice Storm 2013 December Ice Storm The 2013 December ice storm caused major damage to the Lansing Board of Water & Light (BWL) electric distribution system and had a devastating effect on many BWL customers. We realize

More information

OPALCO Outage Analysis. December 2017 Board Meeting

OPALCO Outage Analysis. December 2017 Board Meeting OPALCO Outage Analysis December 217 Board Meeting What causes power outages in the islands? Wind Rain Major outages happen most often during wind storms - when winds are blowing above 3 miles per hour.

More information

EN50160 Power Analysis Report PowerCET Corporation Santa Clara, CA

EN50160 Power Analysis Report PowerCET Corporation Santa Clara, CA 3350 Scott Blvd., Bldg. 55. Unit 1 95054 USA Voice: 408/988-1346 Fax: 408/988-4869 URL: http://www.powercet.com E-mail: consulting@powercet.com Introduction This is a report of testing to the EN50160 standard

More information

Director, Operations Services, Met-Ed

Director, Operations Services, Met-Ed Director, Operations Services, Met-Ed Pennsylvania House Republican Policy Committee Hearing on Storm Response Tobyhanna Township Municipal Building Pocono Pines, Pa. August 9, 2018 Planning and Forecast

More information

A new FMECA model for reliability computations in electrical distribution systems

A new FMECA model for reliability computations in electrical distribution systems Proceedings of the 6th WSEAS/IASME Int. Conf. on Electric Power Systems, High Voltages, Electric Machines, Tenerife, Spain, December 6-8, 2006 A new FMECA model for reliability computations in electrical

More information

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016. Town of Havana, Fl. Response to Review of Electric Utility Hurricane Preparedness and Restoration Actions- Applies only to Hermine and Irma. Maria and Nate posed no serious threat to Havana. Staging for

More information

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September Review of Florida s Investor-Owned Electric Utilities 2 0 1 5 Service Reliability Reports September 2 0 1 6 State of Florida Florida Public Service Commission Division of Engineering Review of Florida

More information

URD Cable Fault Prediction Model

URD Cable Fault Prediction Model 1 URD Cable Fault Prediction Model Christopher Gubala ComEd General Engineer Reliability Analysis 2014 IEEE PES General Meeting Utility Current Practices & Challenges of Predictive Distribution Reliability

More information

Reven ue Req u i remen t Ap pl icat ion 2004/05 and 2005/06. BC hydro m W. Volume 2. Appendix L. System Performance Indicators

Reven ue Req u i remen t Ap pl icat ion 2004/05 and 2005/06. BC hydro m W. Volume 2. Appendix L. System Performance Indicators Reven ue Req u i remen t Ap pl icat ion 00/0 and 00/0 BC hydro m W Volume Appendix L. System Performance Indicators BChydro m ui Table of Contents LIST OF FIGURES... I LIST OF TABLES... I LIST OF SCHEDULES...

More information

Reliability Based Vegetation Management Through Intelligent System Monitoring

Reliability Based Vegetation Management Through Intelligent System Monitoring PSERC Reliability Based Vegetation Management Through Intelligent System Monitoring Final Project Report Power Systems Engineering Research Center A National Science Foundation Industry/University Cooperative

More information

Circuit Reliability Review

Circuit Reliability Review Circuit Reliability Review Marina Del Rey January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a

More information

Reducing Wildfire Risk through the Use of Advanced Electrical Waveform Monitoring and Analytics

Reducing Wildfire Risk through the Use of Advanced Electrical Waveform Monitoring and Analytics 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2013 Grid of the Future Symposium Reducing Wildfire Risk through the Use of Advanced Electrical Waveform Monitoring and

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: March 7, 2006 Agenda Item # *10 Company: Docket Nos. Minnesota Power Northwestern Wisconsin Electric Company Interstate Power and

More information

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s

More information

Reliability Assessment of Radial distribution system incorporating weather effects

Reliability Assessment of Radial distribution system incorporating weather effects International Journal of Engineering Research and Development e-issn: 2278-067X, p-issn: 2278-800X, www.ijerd.com Volume 6, Issue 7 (pril 2013), PP. 45-51 Reliability ssessment of Radial distribution system

More information

Uranium mining a new beginning in Western Australia

Uranium mining a new beginning in Western Australia Government of Western Australia Department of Mines and Petroleum Uranium mining a new beginning in Western Australia Uranium deposits Rick Rogerson Acting Executive Director Geological Survey of Western

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November Review of Florida s Investor-Owned Electric Utilities 2 0 1 6 Service Reliability Reports November 2 0 1 7 State of Florida Florida Public Service Commission Division of Engineering Review of Florida

More information

SOLAR MORTEC INDUSTRIES.

SOLAR MORTEC INDUSTRIES. SOLAR MORTEC INDUSTRIES www.mortecindustries.com.au Wind Regions Region A Callytharra Springs Gascoyne Junction Green Head Kununurra Lord Howe Island Morawa Toowoomba Wittanoom Bourke Region B Adelaide

More information

Exploring the Reliability of U.S. Electric Utilities

Exploring the Reliability of U.S. Electric Utilities Exploring the Reliability of U.S. Electric Utilities Peter Larsen (Lawrence Berkeley National Laboratory/Stanford University) Kristina Hamachi LaCommare (LBNL) Joe Eto (LBNL) Jim Sweeney (Stanford) International

More information

By David & Debbie Hibbert

By David & Debbie Hibbert By David & Debbie Hibbert Electricity Distribution G AS- F I R E D P O W E R S T A T I O N Electricity Distribution - David & Debbie Hibbert - Electricity is an invisible energy resulting from the existence

More information

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s

Pursuant to Section 205 of the Federal Power Act ( FPA ) 1 and the Commission s PJM Interconnection 2750 Monroe Boulevard Norristown, PA 19403-2497 Steven R. Pincus Associate General Counsel 610.666.4370 fax 610.666.8211 steven.pincus@pjm.com July 31, 2017 Honorable Kimberly D. Bose

More information

Clearance around powerlines.

Clearance around powerlines. Clearance around powerlines. Help us keep you safe. Why do trees need to stay clear of powerlines? Trees growing too close to powerlines are a safety risk they could cause fires or even bring down lines

More information

Southern California Edison Wildfire Mitigation & Grid Resiliency

Southern California Edison Wildfire Mitigation & Grid Resiliency Southern California Edison Wildfire Mitigation & Grid Resiliency California State Legislative Conference Committee on Wildfire Preparedness and Response August 7, 2018 CALIFORNIA S WILDFIRE RISK Year-Round

More information

Vegetation Related Transmission Outage Report

Vegetation Related Transmission Outage Report Vegetation Related Transmission Outage Report Third Quarter 0 5 Peachtree Road NE Suite 00, North Tower Atlanta, GA 0 404-44-50 www.nerc.com The NERC Board of Trustees Compliance Committee has reviewed

More information

Assessing Storm Tide Hazard for the North-West Coast of Australia using an Integrated High-Resolution Model System

Assessing Storm Tide Hazard for the North-West Coast of Australia using an Integrated High-Resolution Model System Assessing Storm Tide Hazard for the North-West Coast of Australia using an Integrated High-Resolution Model System J. Churchill, D. Taylor, J. Burston, J. Dent September 14, 2017, Presenter Jim Churchill

More information

CLIMATE CHANGE ASSESSMENT. A. Climate Change Risk Assessment and Adaptation Measures

CLIMATE CHANGE ASSESSMENT. A. Climate Change Risk Assessment and Adaptation Measures Solar Transmission Sector Project (RRP IND 49214) CLIMATE CHANGE ASSESSMENT I. Transmission System at Bhadla, Rajasthan A. Climate Change Risk Assessment and Adaptation Measures High temperature Risk is

More information

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician How Power is Restored After a Severe Storm Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician Hurricanes, ice storms, tornadoes One inch of ice on a single span of electric

More information

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE?

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE? IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE? Keeping your power on is our business Whether your business is large, small or somewhere in between, we understand that a power outage presents special challenges

More information

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology Chapter 2 Planning Criteria By Turaj Amraee Fall 2012 K.N.Toosi University of Technology Outline 1- Introduction 2- System Adequacy and Security 3- Planning Purposes 4- Planning Standards 5- Reliability

More information

Smart Grid Opportunities Being Pursued. Stephanie Hamilton Brookhaven National Laboratory June 5, 2013

Smart Grid Opportunities Being Pursued. Stephanie Hamilton Brookhaven National Laboratory June 5, 2013 Smart Grid Opportunities Being Pursued Stephanie Hamilton Brookhaven National Laboratory June 5, 2013 OUR DREAM!! BNL s Smarter Electric Grid Research, Innovation, Development. Demonstration, Deployment

More information

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2015

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2015 NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 23.01.2017 REGIONAL GROUP NORDIC 1 INTRODUCTION... 4 1.1 DESCRIPTION OF THE REPORT... 4 1.2 CONTACT PERSONS... 5 1.3 VOLTAGE LEVELS IN THE NORDIC AND BALTIC

More information

Contents: Platte-Clay Electric

Contents: Platte-Clay Electric Contents: Platte-Clay Electric Section 1: Introduction... 2 Section 2: Asset Inventory... 5 Section 3: Risk Assessment... 8 A. Historical Hazards... 10 Tornadoes... 10 Severe Thunderstorms, High Winds

More information

Western Electric A V a c u u m T u b e

Western Electric A V a c u u m T u b e 280A Western Electric 2 8 0 A V a c u u m T u b e Classification Half-wave, thermionic, mercury vapor rectifier The 280A vacuum tube is designed to supply direct current from an alternating-current supply.

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized EAST ASIA AND PACIFIC Vietnam Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 10 ARCHIVED on 08-Dec-2017 ISR30255 Implementing Agencies:

More information

f<~~ ~ Gulf Power April16, 2018

f<~~ ~ Gulf Power April16, 2018 ~ Gulf Power Rhonda J. Alexander One Energy Place I 1anage' Pensacola. ~l 32520-0780 Regulatory Fooecastmg & Procong 850 444 67,13 tel 850.:144 6026 fax r jale>xad @~out her nro com April16, 2018 Ms. Carlotta

More information

Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc.

Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc. Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc. Phone: (416)-345-5407 Email: Norm.Hann@HydroOne.com Closing the Crevice Achieving A Process For Asset Performance

More information

February Industry Communique

February Industry Communique February 2019 Industry Communique Important notice PURPOSE This communique is to inform on the planned outages required in the North-West Victorian and South-West New South Wales transmission network and

More information

Exploring the Reliability of U.S. Electric Utilities. Laboratory

Exploring the Reliability of U.S. Electric Utilities. Laboratory Exploring the Reliability of U.S. Electric Utilities Peter Larsen 1,2, James Sweeney 1, Kristina Hamachi-LaCommare 2, and Joseph Eto 2 1 Management Science & Engineering Department, Stanford University

More information

Fault Calculation Methods

Fault Calculation Methods ELEC9713 Industrial and Commercial Power Systems Fault Calculation Methods There are two major problems that can occur in electrical systems: these are open circuits and short circuits. Of the two, the

More information

By choosing to view this document, you agree to all provisions of the copyright laws protecting it.

By choosing to view this document, you agree to all provisions of the copyright laws protecting it. This material is posted here with permission of the IEEE. Such permission of the IEEE does not in any way imply IEEE endorsement of any of Helsinki University of Technology's products or services. Internal

More information

Storm Damage Modeling at Pacific Gas & Electric

Storm Damage Modeling at Pacific Gas & Electric 1 Storm Damage Modeling at Pacific Gas & Electric Mike Voss PG&E Applied Technology Insert damage photos March 2015 Gas System Operations Electric Operations Power-Gen/ Hydro 2 Short Term Energy Supply

More information

ADVANCED METHODS FOR PREDICTION OF ANIMAL-RELATED OUTAGES IN OVERHEAD DISTRIBUTION SYSTEMS MIN GUI

ADVANCED METHODS FOR PREDICTION OF ANIMAL-RELATED OUTAGES IN OVERHEAD DISTRIBUTION SYSTEMS MIN GUI ADVANCED METHODS FOR PREDICTION OF ANIMAL-RELATED OUTAGES IN OVERHEAD DISTRIBUTION SYSTEMS by MIN GUI B.S., Central South University, 2 M.S.,Central South University, 23 AN ABSTRACT OF A DISSERTATION submitted

More information

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY GENERAL The purpose of this policy is to set up acceptable procedures and policies for the winter maintenance of public areas in the City of

More information

GIS Solution For Electric Utilities With Integration With Distribution Management System

GIS Solution For Electric Utilities With Integration With Distribution Management System GIS Solution For Electric Utilities With Integration With Distribution Management System Agenda Importance Of The GIS GIS - DMS Integration Requirements Distribution Management System The Benefits Of The

More information

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory Energy and Power Engineering, 2013, 5, 625-629 doi:10.4236/epe.2013.54b121 Published Online July 2013 (http://www.scirp.org/journal/epe) The Study of Overhead Line Fault Probability Model Based on Fuzzy

More information

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA BEFORE THE CORPORATION COMMISSION OF OKLAHOMA IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR AN ORDER OF THE COMMISSION ) CAUSE NO. PUD 20110008 AUTHORIZING APPLICANT TO

More information

SRP Voltage Sag Index Methodology Experience and FAQs

SRP Voltage Sag Index Methodology Experience and FAQs SRP Voltage Sag Index Methodology Experience and FAQs Rao Thallam and Kris Koellner IEEE PES P1564 TF Meeting Las Vegas, 1/28/2003 IEEE PE Review July 2001! While most utilities can quote reliability numbers..;

More information

Car Seat Installs and Inspections

Car Seat Installs and Inspections CITY COUNCIL EMBARKS ON BOLD STRATEGIC PLAN FOR THE VILLAGE On February 6, the City Council approved a strategic planning process focused on the major commercial corridors in The Village (Britton Road,

More information

COMPANY NEWS JANUARY 2019 BE PREPARED FOR OUTAGES

COMPANY NEWS JANUARY 2019 BE PREPARED FOR OUTAGES COMPANY NEWS JANUARY 2019 BE PREPARED FOR OUTAGES None of us will forget the monster storm in January 2012 where snow and ice blanketed Western Washington. Plunging temperatures and freezing rain encased

More information

Reliability Indices Measurement Reliability Indices Measurement for three 11 kv and 66 kv substations in Brunei Darussalam (PWR 01)

Reliability Indices Measurement Reliability Indices Measurement for three 11 kv and 66 kv substations in Brunei Darussalam (PWR 01) BNERI Reliability Indices Measurement Reliability Indices Measurement for three 11 kv and 66 kv substations in Brunei Darussalam (PWR 01) NUR SABIQAH HAJI ROSLI ACKNOWLEDGEMENT I would like to express

More information

Vegetation Related Transmission Outage Report

Vegetation Related Transmission Outage Report Vegetation Related Transmission Outage Report Third 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Executive Summary The NERC Board of Trustees Compliance

More information

Periodic Inspection and Testing of Electrical Installations Sample Test ( ) Version 1.3 July 2018

Periodic Inspection and Testing of Electrical Installations Sample Test ( ) Version 1.3 July 2018 Periodic Inspection and Testing of Electrical Installations Sample Test (2391-051) Version 1.3 July 2018 Sample Questions Version and date Change detail Section 1.3 July 2018 Modified questions/answers

More information

INVESTIGATING VEGETATION INDUCED FAULTS ON POWER TRANSMISSION LINE; A CASE STUDY OF THE IRRUA-AUCHI-AGENEBODE 33KV TRANSMISSION LINE EDO STATE NIGERIA

INVESTIGATING VEGETATION INDUCED FAULTS ON POWER TRANSMISSION LINE; A CASE STUDY OF THE IRRUA-AUCHI-AGENEBODE 33KV TRANSMISSION LINE EDO STATE NIGERIA Vol-3, Issue-3 PP. 177-183 ISSN: 2394-5788 INVESTIGATING VEGETATION INDUCED FAULTS ON POWER TRANSMISSION LINE; A CASE STUDY OF THE IRRUA-AUCHI-AGENEBODE 33KV TRANSMISSION LINE EDO STATE NIGERIA Ajayi A,

More information

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Operations Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: December 2, 2013 SUBJECT/REPORT NO: Winter Control

More information

Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals.

Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals. Glossary Alternating Current (AC): Alternating Current is electric current that reverses directions at regular intervals. American National Standards Institute (ANSI): American National Standards Institute

More information

2017 Hurricane Harvey

2017 Hurricane Harvey 2017 Hurricane Harvey Bret Burford, PE AEP Transmission Technical Support Corpus Christi, TX Texas A&M Relay Conference College Station, TX March 27-29, 2018 Presentation Assistance I would like to Thank:

More information

Storm Hardening & Grid Resiliency. Withstanding and Recovering From Extreme Weather Events

Storm Hardening & Grid Resiliency. Withstanding and Recovering From Extreme Weather Events Storm Hardening & Grid Resiliency Withstanding and Recovering From Extreme Weather Events Definition Storm Hardening Physical changes to the utility s infrastructure to make it less susceptible to storm

More information

GENERATOR INTERCONNECTION APPLICATION

GENERATOR INTERCONNECTION APPLICATION GENERATOR INTERCONNECTION APPLICATION FOR BUY-ALL/SELL-ALL PROJECTS WITH AGGREGATE GENERATOR OUTPUT OF MORE THAN 20 KW BUT LESS THAN OR EQUAL TO 1 MW Electric Utility Contact Information Great Lakes Energy

More information

Contents. Ipswich City Council Ipswich Adopted Infrastructure Charges Resolution (No. 1) Page

Contents. Ipswich City Council Ipswich Adopted Infrastructure Charges Resolution (No. 1) Page Ipswich City Council Ipswich Adopted Infrastructure Charges Resolution (No. 1) 2014 Contents Page Part 1 Introduction 3 1. Short title 3 2. Commencement 3 3. Sustainable Planning Act 2009 3 4. Purpose

More information

Transmission and Dispatching Operations Manual

Transmission and Dispatching Operations Manual MANUAL 12 Transmission and Dispatching Operations Manual April 2016 4.2.9 Adverse Operating Conditions NYISO Actions The NYISO may perform the following actions under adverse operating conditions: 1. Notify

More information

Storm Damage Modeling at the University of Connecticut

Storm Damage Modeling at the University of Connecticut Storm Damage Modeling at the University of Connecticut Brian Hartman, PhD ASA 31 January 2014.0 (but I don t care, it doesn t matter) Workshop on Insurance Mathematics Quebec, QC Acknowledgements The UConn

More information

THE FIRE AND RESCUE SERVICE S ROLE IN RESPONDING TO FLOODING DAVE RUSSEL ASSISTANT CHIEF FIRE OFFICER

THE FIRE AND RESCUE SERVICE S ROLE IN RESPONDING TO FLOODING DAVE RUSSEL ASSISTANT CHIEF FIRE OFFICER THE FIRE AND RESCUE SERVICE S ROLE IN RESPONDING TO FLOODING DAVE RUSSEL ASSISTANT CHIEF FIRE OFFICER RESPONDING TO FLOODING NATIONAL CONTEXT Fire and Rescue Services Act 2004: Power to respond to floods

More information

McArthur River Mining Borroloola Caravan and Devils Spring Stations

McArthur River Mining Borroloola Caravan and Devils Spring Stations Borroloola Caravan and Devils Spring Ambient Air Quality Monitoring Validated Report 1 st July 2016 31 st July 2016 Report No.: DAT10991 Report issue date: 25 th August 2016 Maintenance contract: MC1100,

More information

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit.

For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit. Current Transducer LDSR 0.3-TP/SP1 I P R N = 300 ma For the electronic measurement of current: DC, AC, pulsed..., with galvanic separation between the primary and the secondary circuit. Features Closed

More information

Resiliency of Power Grids After Earthquakes

Resiliency of Power Grids After Earthquakes Resiliency of Power Grids After Earthquakes John Eidinger, Alex Tang ATC 16th US - Japan - New Zealand Workshop Nara, June 27-29, 2016 eidinger@geengineeringsystems.com alexktang@mac.com No Power = No

More information

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation

Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Effects of Capacitor Bank Installation in a Medium Voltage (MV) Substation Adesina, Lambe Mutalub Department of Engineering & Standardization, Eko Electricity Distribution Plc, 24/25, Marina, Lagos Island,

More information

Western Electr/c A V a c u u m T u b e. The 301A vacuum tube is designed to supply direct current from an alternating-current supply.

Western Electr/c A V a c u u m T u b e. The 301A vacuum tube is designed to supply direct current from an alternating-current supply. 301A Western Electr/c 3 0 1 A V a c u u m T u b e Classification Fuii wave, thermionic, mercury vapor rectifier The 301A vacuum tube is designed to supply direct current from an alternating-current supply.

More information

Risk Management of Storm Damage to Overhead Power Lines

Risk Management of Storm Damage to Overhead Power Lines Risk Management of Storm Damage to Overhead Power Lines David Wanik, Jichao He, Brian Hartman, and Emmanouil Anagnostou Departments of Statistics, Mathematics, and Environmental and Civil Engineering University

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET

UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET UPDATE ELECTRICITY STATEMENT OF OPPORTUNITIES FOR THE NATIONAL ELECTRICITY MARKET Published: 26 October 2015 ELECTRICITY STATEMENT OF OPPORTUNITIES IMPORTANT NOTICE Purpose AEMO publishes the Electricity

More information

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame

Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Table-Top Exercise for Emergency Preparedness Evaluation: Little Anse, Isle Madame Alexander Chung, M.Sc. Candidate C-Change Student Research Associate May 2013 The Community of Little Anse Coastal community

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

Chapter 1 Overview of Maps

Chapter 1 Overview of Maps Chapter 1 Overview of Maps In this chapter you will learn about: Key points when working with maps General types of maps Incident specific maps Map legend and symbols Map sources A map is a navigational

More information

Applications of GIS in Electrical Power System. Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf

Applications of GIS in Electrical Power System. Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf Applications of GIS in Electrical Power System Dr. Baqer AL-Ramadan Abdulrahman Al-Sakkaf OUTLINES: Objective Importance of GIS GIS data development Application of GIS Findings Conclusions and Recommendations

More information

2018 General Rate Case Rebuttal Testimony

2018 General Rate Case Rebuttal Testimony Application No.: A.16-09-001 Exhibit No.: SCE-18, Vol. 05 Witnesses: A. Edeson (U 338-E) 2018 General Rate Case Rebuttal Testimony Transmission & Distribution (T&D) Volume 05 - Distribution Construction

More information

S Sapling INSTALLATION MANUAL FOR FIELD SELECTABLE ANALOG CLOCKS SAA SERIES SPECIFICATIONS. advanced time and control systems

S Sapling INSTALLATION MANUAL FOR FIELD SELECTABLE ANALOG CLOCKS SAA SERIES SPECIFICATIONS. advanced time and control systems INSTALLATION MANUAL FOR FIELD SELECTABLE ANALOG CLOCKS SAA SERIES SPECIFICATIONS Time base: 60 Hz (3-wire system) Quartz (2-wire system) Power input: 85 135 VAC / 60 Hz 7 28 VAC / 60 Hz Current consumption:

More information

NABCEP Entry Level Exam Review Solfest practice test by Sean White

NABCEP Entry Level Exam Review Solfest practice test by Sean White 1. A fall protection system must be in place for all work done at heights in excess of a. 4 feet b. 6 feet c. 8 feet d. 10 feet 2. A circuit breaker performs the same function a. as a fuse b. as a switch

More information

Transmission and Dispatching Operations Manual

Transmission and Dispatching Operations Manual MANUAL 12 Transmission and Dispatching Operations Manual October 2012 4.2.10 Adverse Operating Conditions NYISO Actions The NYISO may perform the following actions under adverse operating conditions: 1.

More information

PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011

PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011 PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011 December 31, 2013 Mr. John D. McMahon Chief Operating Officer Long Island Lighting Company d/b/a/ LIPA 333 Earle Ovington Boulevard,

More information

NEW RECLOSER CHARACTERISTIC TO IMPROVE FUSE SAVING IN DISTRIBUTION NETWORKS WITH DISTRIBUTED GENERATION

NEW RECLOSER CHARACTERISTIC TO IMPROVE FUSE SAVING IN DISTRIBUTION NETWORKS WITH DISTRIBUTED GENERATION Rev. Roum. Sci. Techn. Électrotechn. et Énerg. Vol. 62, 3, pp. 240 245, Bucarest, 2017 NEW RECLOSER CHARACTERISTIC TO IMPROVE FUSE SAVING IN DISTRIBUTION NETWORKS WITH DISTRIBUTED GENERATION SADEGH JAMALI,

More information

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR CON EDISON SYSTEM OPERATION DEPARTMENT PROCEDURE SUBJECT: THUNDERSTORM/STORM PROCEDURE PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 REVISED BY: S. BUFFAMANTE APPROVED: T. HALLERAN CHIEF SYSTEM OPERATOR DATE:

More information