Ground and Rooftop Arrays Projects Completed

Size: px
Start display at page:

Download "Ground and Rooftop Arrays Projects Completed"

Transcription

1 Ground and Rooftop Arrays Projects Completed Retail, Commercial, Public Works Previous work from 11.7 kw to 4,048 kw 206 Cambria Avenue Suite A Pleasantville, NJ Phone: (609) Fax: (609)

2 Bridgewater Location: Bridgewater, MA Project Size: 4,000kW Fixed Ground Annual Output: 5,287,422 kwh Contact: John Kornick- (609)

3 Dorchester Shipyard Location: 16 Front St., Dorchester, NJ Project Size: 167 kw Fixed Ground Annual Output: 217 kwh Contact: James Roussos (856)

4 Cambria Commerce Center Location: 206 Cambria Avenue, Pleasantville, NJ Project Size: 302 kw DC-STC Roof Mounted Photovoltaic (PV) Solar System Annual Output: 368,861 kwh Contact: Nicholas Droboniku - (609)

5 Month Day Y ea r Daniel Scott Mascione Architect, LLC Location: 1409 New Road, Northfield, NJ Project Size: 11.7 kw DC-STC Roof Mounted Photovoltaic (PV) Solar System Annual Output: 14,203 kwh Contact: Daniel Mascione - (609)

6 Cheshire MA Location: Cheshire, MA Project Size: 500kW Fixed Ground Annual Output: 660,928 kwh

7 Elmer Elementary School Location: 207 Front St, Elmer, NJ Project Size: 110kW Fixed Ground Annual Output: 145,404 kwh Contact: Henry Bermann- (856)

8 Gardner True Value Hardware Location: 2489 North Route 9, Ocean View, NJ Project Size: 71 kw DC-STC Roof Mounted Photovoltaic Solar System Annual Output: 79,897 kwh Contact: Joe Gardner - (609)

9 PLACE PHOTO HERE, OTHERWISE DELETE BOX J. Byrne Insurance Agency Location: 1032 Route 9 South, Cape May Court House, NJ Project Size: kw DC-STC Roof Mounted Photovoltaic (PV) Solar System Annual Output: 16,840 kwh Contact: Tom Byrne - (609)

10 Lower Cape May Regional High School Location: 687 South Route 9, Erma, NJ Project Size: 1830 kw DC-STC Fixed-Tilt Ground Mounted Photovoltaic (PV) Solar Farm Annual Output: 2,235,150 kwh Contact: Chris Kobik - (609)

11 Lower Township Elementary School Location: 838 Seashore Rd. Cold Spring, NJ Project Size: 1,400 kw DC-STC Fixed-Tilt Ground Mounted Annual Output: 1,838,650kWh Contact: Chris Conley - (609)

12 Lower Township Municipal Utilities Authority Location: 2900 Bayshore Road, Villas, NJ Project Size: 1,234 kw DC-STC Fixed-Tilt Ground Mounted Photovoltaic (PV) Solar Farm Annual Output: 1,544,367 kwh Contact: Craig Loper - (609)

13 Millville City Sewer Department Location: 335 Fowser Road, Millville, NJ Project Size: 1,570 kw DC-STC Fixed-Tilt Ground Mounted Photovoltaic (PV) Solar Farm Annual Output: 1,917,588 kwh Contact: Mayor Tim Shannon - (856)

14 Norma Elementary School Location: 873 Gershal Ave, Pittsgrove Township, NJ Project Size: 360kW Fixed Ground Annual Output: 475,868 kwh Contact: Henry Bermann- (856)

15 Olivet Elementary School Location: 235 Sheep Pen Rd, Elmer, NJ Project Size: 110kW Fixed Ground Annual Output: 145,404 kwh Contact: Henry Bermann- (856)

16 Pittsgrove Township Administration Building Location: 1076 Almond Rd, Pittsgrove, NJ Project Size: 40kW Fixed Ground Annual Output: 52,874 kwh Contact: Henry Bermann (856)

17 Pittsgrove Township High School Location: 718 CentertonRd., Pittsgrove, NJ Project Size: 1,000kW Fixed Ground Annual Output: 1,32,0185 kwh Contact: Henry Bermann (856)

18 Pittsgrove Township Middle School Location: 1082 Almond Rd, Pittsgrove, NJ Project Size: 700kW Fixed Ground Annual Output: 925,299 kwh Contact: Henry Bermann (856)

19 Pleasantville Public Schools Solar Farm Location: 6821 Delilah Road, Egg Harbor, NJ Project Size: 4,048 kw DC-STC Fixed-Tilt Ground Mounted Photovoltaic (PV) Solar Farm Annual Output: 5,066,124 kwh Contact: John Egnor - (609)

20 Raritan Convention Center Location: 97 Sunfield Ave, Edison, NJ Project Size: 725kW Ballasted Roof Annual Output: 958,345 kwh Contact: Leah Kozo (732)

21 Commercial Township Senior Center Location: 8879 Highland St, Port Norris, NJ Project Size: 31.15kW Fixed Ground Annual Output: 40.3kWh Contact: Mayor Ronald Sutton (856)

22 West Cape May Elementary School Location: 301 Moore Street, West Cape May, NJ Project Size: 66.9 kw DC-STC Ballasted Roof Mount Annual Output: 82,470 kwh Contact: Dr. Dominick Potena - (609)

Northern Alberta Institute of Technology

Northern Alberta Institute of Technology Northern Alberta Institute of Technology Alternative Energy Program Solar Photovoltaic Reference Array Report March 31, 2016 Goals Provide solar energy system educators, installers and adopters with real

More information

Appendix A 2011 Air Monitoring Sites

Appendix A 2011 Air Monitoring Sites Appendix A 2011 Air Monitoring Sites New Jersey Department of Environmental Protection Appendix A 1 www.njaqinow.net FIGURE 1 NORTHERN NEW JERSEY AIR MONITORING SITES Appendix A 2 www.njaqinow.net County

More information

G.1. Motion to approve Project Calendar regarding Planning and Development Department Payments as follows:

G.1. Motion to approve Project Calendar regarding Planning and Development Department Payments as follows: G.1.a council memo DATE: Wednesday, January 31, 2018 TO: FROM: RE: Mayor and City Council Tracey Bellach, Administrative Assistant G.1. Motion to approve Project Calendar regarding Planning and Development

More information

Evaluating a Site s Solar Potential May, 2003

Evaluating a Site s Solar Potential May, 2003 Evaluating a Site s Solar Potential May, 2003 When evaluating a site s solar potential, there are several things to consider. Major points: 1. Area large enough to support in which to mount a solar system

More information

The effect of reflection from snow on the output of solar panels based on six years of observations

The effect of reflection from snow on the output of solar panels based on six years of observations The effect of reflection from snow on the output of solar panels based on six years of observations Juha A. Karhu 1, Anders Lindfors 1, Sami Rantamäki 2 1 Finnish Meteorological Institute (FMI), (email:

More information

FRANCHISE EXPIRATION LIST

FRANCHISE EXPIRATION LIST Jeanne M. Fox President Frederick F. Butler Commissioner Connie O. Hughes Commissioner Joseph L. Fiordaliso Commissioner State of New Jersey Board of Public Utilities Two Gateway Center Newark, NJ 07102

More information

Solar photovoltaic energy production comparison of east, west, south-facing and tracked arrays

Solar photovoltaic energy production comparison of east, west, south-facing and tracked arrays The Canadian Society for Bioengineering The Canadian society for engineering in agricultural, food, environmental, and biological systems. La Société Canadienne de Génie Agroalimentaire et de Bioingénierie

More information

PHOTOVOLTAIC SOLAR ENERGY TRAINER DL SOLAR-D1 Manual

PHOTOVOLTAIC SOLAR ENERGY TRAINER DL SOLAR-D1 Manual PHOTOVOLTAIC SOLAR ENERGY TRAINER DL SOLAR-D1 Manual DL SOLAR-D1 Contents 1. Solar energy: our commitment 5 to the environment 1.1. Basic principles and concepts 6 Mechanical work, energy and power: 6

More information

THE SOLAR SYSTEM NOTE TAKING WORKSHEET ANSWERS

THE SOLAR SYSTEM NOTE TAKING WORKSHEET ANSWERS page 1 / 5 page 2 / 5 the solar system note pdf The Solar System is the gravitationally bound planetary system of the Sun and the objects that orbit it, either directly or indirectly. Of the objects that

More information

Draft Urban Hamilton Official Plan. Amendment No. XX

Draft Urban Hamilton Official Plan. Amendment No. XX 1 of 52 The following text, together with: Draft Appendix A Volume 1, Schedule E Urban Structure Appendix B Volume 1, Schedule E-1 Urban Land Use Designations Appendix C Volume 1, Appendix A Parks Classification

More information

SHADOW STUDY REPORT REGARDING

SHADOW STUDY REPORT REGARDING SHADOW STUDY REPORT REGARDING an APPLICATION TO REDEVELOP Three 6 Storey Condominiums Regional Road 25 (Ontario Street) and Britannia Road Milton, Ontario KNYMH FILE # 17030 Prepared by: Krista Lilley

More information

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519

January 12, Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 January 12, 2018 Mr. Ryan Granger TMGB Wilson, LLC 2221 Health Drive SW, Suite 2200 Wyoming, Michigan 49519 Re: Proposed Reserve at Rivertown Mixed-Use Development Updated Trip Generation and Site Driveway

More information

May 5, 2017 TOWNSHIP OF UPPER Page No: 1 12:41 PM Purchase Order Listing By Vendor Id

May 5, 2017 TOWNSHIP OF UPPER Page No: 1 12:41 PM Purchase Order Listing By Vendor Id May 5, 2017 TOWNSHIP OF UPPER Page No: 1 P.O. Type: All Open: N Paid: N Void: N Range: First to Last Rcvd: Y Held: N Aprv: N Format: Condensed Received Date Range: 05/01/17 to 05/05/17 Bid: Y State: Y

More information

Investors Title Insurance Company - Indiana Approved Search Providers

Investors Title Insurance Company - Indiana Approved Search Providers Investors Title Insurance Copany - Indiana Approved Search Providers The inforation provided in this list is for the sole and exclusive use of ITIC and ay not be republished, resold or duplicated, in whole

More information

Shining Light on an Issue with Solar Energy 2. Shining Light on an Issue with Solar Energy

Shining Light on an Issue with Solar Energy 2. Shining Light on an Issue with Solar Energy Shining Light on an Issue with Solar Energy 2 Shining Light on an Issue with Solar Energy Imagine a world where charging your home was as simple as placing your phone under the sunlight or parking your

More information

LEAD IN DRINKING WATER REPORT

LEAD IN DRINKING WATER REPORT 181 US Hwy 46 Mine Hill, NJ 07803 (908) 654-8068 (800) 783-0567 Fax 908-654-8069 LEAD IN DRINKING WATER REPORT Performed At: Montrose School 356 Clark St., South Orange, NJ 07079 Performed For: South Orange

More information

SPECIALIZES IN GENERATORS & TRANSFER SWITCHES

SPECIALIZES IN GENERATORS & TRANSFER SWITCHES P.O. Box 32 One Energy Place, New London, OH 44851 419-929-1571 1-800-533-8658 www.firelandsec.com AREA ELECTRICIANS The following electricians serve parts or all of the Firelands Electric service territory.

More information

GIS Geographical Information Systems. GIS Management

GIS Geographical Information Systems. GIS Management GIS Geographical Information Systems GIS Management Difficulties on establishing a GIS Funding GIS Determining Project Standards Data Gathering Map Development Recruiting GIS Professionals Educating Staff

More information

TIF Streetscapes Project Master Plan of Sign Types & Locations In the Middlebury East and Middlebury Southeast TIF boundaries of Town

TIF Streetscapes Project Master Plan of Sign Types & Locations In the Middlebury East and Middlebury Southeast TIF boundaries of Town TIF Streetscapes Project Master Plan of Sign Types & Locations In the Middlebury East and Middlebury Southeast TIF boundaries of Town for Town of Middlebury by Production Drawings for Quoting Revised January

More information

Investors Title Insurance Company - Indiana Approved Search Providers

Investors Title Insurance Company - Indiana Approved Search Providers Investors Title Insurance Copany - Indiana Approved Search Providers The inforation provided in this list is for the sole and exclusive use of ITIC and ay not be republished, resold or duplicated, in whole

More information

Windsor Solar Project DRAFT Design and Operations Report APPENDIX D

Windsor Solar Project DRAFT Design and Operations Report APPENDIX D Windsor Solar Project DRAFT Design and Operations Report APPENDIX D Glare Analysis Report GLARE ANALYSIS REPORT Windsor Solar Project September 2014 Windsor Solar Project Glare Analysis Report Table of

More information

Chapter 1 Data Collection

Chapter 1 Data Collection Chapter 1 Data Collection 1. Climate of Brunei Darussalam and Temburong District Situated at around four degrees north of the Equator, Brunei Darussalam enjoys an equatorial climate with an abundance of

More information

Case Doc 16 Filed 10/05/12 Entered 10/05/12 19:22:32 Desc Main Document Page 1 of 4

Case Doc 16 Filed 10/05/12 Entered 10/05/12 19:22:32 Desc Main Document Page 1 of 4 Document Page 1 of 4 UNITED STATES BANKRUPTCY COURT DISTRICT OF MASSACHUSETTS EASTERN DIVISION In re: THE UPPER CRUST, LLC, et al., 1 Chapter 11 Case No. 12-18134 Debtors. (Jointly Administered CERTIFICATE

More information

Town of Round Hill Virginia

Town of Round Hill Virginia 2017-2037 Comprehensive Plan Town of Round Hill Virginia JANUARY 10, 2017 ADOPTED BY THE ROUND HILL TOWN COUNCIL Acknowledgements Mayor Scott Ramsey Town Council Mary Anne Graham, Vice Mayor Janet Heston

More information

Bulletin Board. From Mayor s Desk... Jan - Mar this issue... City Numbers. Candidate Filing Information / 2016 Budget P. 3

Bulletin Board. From Mayor s Desk... Jan - Mar this issue... City Numbers. Candidate Filing Information / 2016 Budget P. 3 Bulletin Board Jan - Mar 2 016 this issue... Candidate Filing Information / 2016 Budget P. 3 Published by the City of Brentwood Missouri Public Works Reminders P. 4 City Calendar P. 5 Police Department

More information

5 Themes of Geography Review Video Notes What is Geography?

5 Themes of Geography Review Video Notes What is Geography? Name PG # 5 Themes of Geography Review Video Notes What is Geography? The study of, their, and their Main Idea or Topic Continents Notes about Main Idea or Topic There are 7 Continents or in the world:

More information

PUP R-4 R-3 R-4 R-3 R-4 B-1 B-3 B-1 B-1 B-1 R-3 C-1 R-3 R-3 A-1 M-2C SUBJECT PROPERTY B-3 R-5 B-3C B-3C B-3C B-3C B-2.

PUP R-4 R-3 R-4 R-3 R-4 B-1 B-3 B-1 B-1 B-1 R-3 C-1 R-3 R-3 A-1 M-2C SUBJECT PROPERTY B-3 R-5 B-3C B-3C B-3C B-3C B-2. 0 0 0 0 0 00 0 EARLY AVE 00 0 0 0 0 0 R- 0 0 0 C- 0 0 0 0 0 0 R- 0 B- 00 0 0 0 0 0 0 CARTER AVE EAST SIDE LN 0 0 0 JACKSON AVE 00 0 0 A- Parcels or Portions thereof identified on this sheet are within

More information

2015 Nonresidential Construction

2015 Nonresidential Construction Montgomery County Data: Nonresidential 2015 Nonresidential Construction Montgomery County, Pennsylvania In 2015, nonresidential construction in Montgomery County increased by over 380,000 SF. This represents

More information

Factors That Affect Climate

Factors That Affect Climate Factors That Affect Climate Factors That Affect Climate Latitude As latitude (horizontal lines) increases, the intensity of solar energy decreases. The tropical zone is between the tropic of Cancer and

More information

AHEAD OF THE STORM: Extreme Weather Resilience in the City of Toronto

AHEAD OF THE STORM: Extreme Weather Resilience in the City of Toronto AHEAD OF THE STORM: Extreme Weather Resilience in the City of Toronto David MacLeod Toronto Environment and Energy Office Environmental Applied Science and Management Symposium 2013 March 21, 2013 Ahead

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2015

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2015 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,024,255.58 $ 251,596.99 2,038,576.81 $ 0.00 $ -0.6% 112-0THER 308,937.00 5,918.41 257,559.95 48,329.33 3,047.72 1% 112-TRANSFERS OUT 0.00

More information

COPPER RANCH SKETCH PLAN

COPPER RANCH SKETCH PLAN SHEET INDEX VICINITY MAP CONTACTS: THE TOWN OF ERIE LAND SUMMARY CHART TYPE AREA (AC.) % OF TOTAL AREA PARKS AND OPEN SPACE SUMMARY (RESIDENTIAL ONLY - 13.5 ACRES/216 UNITS) REQUIRED (ACRES) PROVIDED (ACRES)

More information

The Dance Hall Goes in What School District?

The Dance Hall Goes in What School District? The Dance Hall Goes in What School District? Vern C. Svatos Jarrod S. Doucette Abstract This paper presents the results of a GIS mapping effort created for the Delaware State Department of Education using

More information

APPENDIX I: Traffic Forecasting Model and Assumptions

APPENDIX I: Traffic Forecasting Model and Assumptions APPENDIX I: Traffic Forecasting Model and Assumptions Appendix I reports on the assumptions and traffic model specifications that were developed to support the Reaffirmation of the 2040 Long Range Plan.

More information

Residential Bill Comparison, June BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment BASE

Residential Bill Comparison, June BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment BASE Residential Bill Comparison, June 2017 160 150 140 130 -------- IOU Average = $125.93 $125.83 $125.94 Municipal Average = $115.22 $112.85 $116.28 120 $/1,000 kwh 110 100 90 80 70 60 50 40 30 with Negative

More information

OF THE IMPACT OF PARTIAL SHADING ON THE PERFORMANCE OF A GRID-TIED PHOTOVOLTAIC SYSTEM

OF THE IMPACT OF PARTIAL SHADING ON THE PERFORMANCE OF A GRID-TIED PHOTOVOLTAIC SYSTEM OF THE IMPACT OF PARTIAL SHADING ON THE PERFORMANCE OF A GRID-TIED PHOTOVOLTAIC SYSTEM K. Hurayb, Y. Moumouni, F. A. da Silva,Y. Baghzouz Electrical & Computer Engineering Department University of Nevada,

More information

August 21, 2015 TOWNSHIP OF UPPER Page No: 1 01:03 PM Purchase Order Listing By Vendor Id

August 21, 2015 TOWNSHIP OF UPPER Page No: 1 01:03 PM Purchase Order Listing By Vendor Id August 21, 2015 TOWNSHIP OF UPPER Page No: 1 P.O. Type: All Open: N Paid: N Void: N Range: First to Last Rcvd: Y Held: N Aprv: N Format: Condensed Received Date Range: 08/14/15 to 08/21/15 Bid: Y State:

More information

NABCEP Entry Level Exam Review Solfest practice test by Sean White

NABCEP Entry Level Exam Review Solfest practice test by Sean White 1. A fall protection system must be in place for all work done at heights in excess of a. 4 feet b. 6 feet c. 8 feet d. 10 feet 2. A circuit breaker performs the same function a. as a fuse b. as a switch

More information

Residential Bill Comparison, August BASE with Negative Fuel or Puchased Cost Adjustment ** BASE with Negative Fuel or Puchased Cost Adjustment

Residential Bill Comparison, August BASE with Negative Fuel or Puchased Cost Adjustment ** BASE with Negative Fuel or Puchased Cost Adjustment with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost WINTER PARK * WILLISTON

More information

Residential Bill Comparison, December BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment

Residential Bill Comparison, December BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost WINTER PARK * WILLISTON

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2018 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,594,667.25 $ 238,555.64 2,086,948.27 $ 0.00 $ 507,718.98 19.6% 112-0THER 509,581.41 5,357.20 387,792.22 85,450.37 36,338.82 7.1% 112-TRANSFERS OUT 0.00

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING August 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING August 31, 2018 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,326,186.36 $ 152,351.58 1,427,167.46 $ 55,516.82 $ 843,502.08 36.3% 112-0THER 427,540.04 17,954.13 321,938.98 78,936.82 26,664.24 6.2% 112-TRANSFERS

More information

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING October 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING October 31, 2018 PAGE 001 GENERAL FUND POLICE: PATROL 112-PERSONAL 2,326,186.36 $ 63,702.87 1,640,761.23 $ 52,633.26 $ 632,791.87 27.2% 112-0THER 427,540.04 19,133.95 362,966.31 51,203.59 13,370.14 3.1% 112-TRANSFERS OUT

More information

Residential Bill Comparison, January BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment

Residential Bill Comparison, January BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment Residential Bill Comparison, January 2018 160 150 140 130 -------- IOU Average = $125.93 $125.83 $127.85 Municipal Average = $115.22 $112.85 $114.24 120 $/1,000 kwh 110 100 90 80 70 60 50 40 30 with Negative

More information

Residential Bill Comparison, January BASE with Negative Fuel or Puchased Cost Adjustment BASE BASE BASE

Residential Bill Comparison, January BASE with Negative Fuel or Puchased Cost Adjustment BASE BASE BASE with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost WINTER PARK * WILLISTON

More information

APPENDIX I - AREA PLANS

APPENDIX I - AREA PLANS ROUTE 37 WEST LAND USE PLAN ROUTE 37 WEST LAND USE PLAN Recent land use decisions and development trends have drawn attention to the land within the Route 37 western by-pass area between Route 50 and

More information

Residential Bill Comparison, June 2014 ** ** BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment

Residential Bill Comparison, June 2014 ** ** BASE with Negative Fuel or Puchased Cost Adjustment. BASE with Negative Fuel or Puchased Cost Adjustment with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost with Negative Fuel or Puchased Cost WINTER PARK WILLISTON WAUCHULA VERO BEACH STARKE ST. CLOUD QUINCY ORLANDO OCALA NEWBERRY NEW

More information

September 9, 2016 TOWNSHIP OF UPPER Page No: 1 12:03 PM Purchase Order Listing By Vendor Id

September 9, 2016 TOWNSHIP OF UPPER Page No: 1 12:03 PM Purchase Order Listing By Vendor Id September 9, 2016 TOWNSHIP OF UPPER Page No: 1 P.O. Type: All Open: N Paid: N Void: N Range: First to Last Rcvd: Y Held: N Aprv: N Format: Condensed Received Date Range: 09/06/16 to 09/09/16 Bid: Y State:

More information

Residential Bill Comparison, September BASE with Negative Fuel or Puchased Cost Adjustment BASE BASE BASE BASE BASE

Residential Bill Comparison, September BASE with Negative Fuel or Puchased Cost Adjustment BASE BASE BASE BASE BASE Residential Bill Comparison, September 2017 160 150 -------- IOU Average = $125.93 $125.83 $126.90 Municipal Average = $115.22 $112.85 $114.80 140 130 120 $/1,000 kwh 110 100 90 80 70 60 50 40 30 with

More information

L.O: EARTH'S 23.5 DEGREE TILT ON ITS AXIS GIVES EARTH ITS SEASONS March 21 (SPRING), June 21(SUMMER), Sept 22 (AUTUMN) & Dec 21(WINTER)

L.O: EARTH'S 23.5 DEGREE TILT ON ITS AXIS GIVES EARTH ITS SEASONS March 21 (SPRING), June 21(SUMMER), Sept 22 (AUTUMN) & Dec 21(WINTER) L.O: EARTH'S 23.5 DEGREE TILT ON ITS AXIS GIVES EARTH ITS SEASONS March 21 (SPRING), June 21(SUMMER), Sept 22 (AUTUMN) & Dec 21(WINTER) 1. The apparent daily path of the Sun changes with the seasons because

More information

SITUATION REPORT # 7 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 29, 2012, 8:00 A.M.

SITUATION REPORT # 7 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 29, 2012, 8:00 A.M. SITUATION REPORT # 7 NEW JERSEY STATE EMERGENCY OPERATIONS CENTER October 29, 2012, 8:00 A.M. A. CURRENT SYNOPSIS: The NJ ROIC and NJOEM are responding to the onset of Tropical force winds from Hurricane

More information

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973)

SNOW REMOVAL GUIDE. City Of Orange Township. Public Works Snow Removal Hotline: (973) My Orange Hotline: (973) Mayor Dwayne D. Warren, Esq. And The Orange Municipal Council MOVING ORANGE FORWARD City Of Orange Township SNOW REMOVAL GUIDE Public Works Snow Removal Hotline: (973) 266-4030 My Orange Hotline: (973)

More information

CHARLES A. VON STEIN, INC.

CHARLES A. VON STEIN, INC. C A V S CHARLES A.VON STEIN, INC. COMMERCIAL PROPERTY MANAGEMENT, SALES AND LEASING SPECIALISTS SINCE 1963 BUILDING FACTS Building Sq. Ft. 19,610 Sq. Ft. # Units in Building 840 North Cocoa 8 Retail/Office

More information

SUBJECT: Adjustments to Photovoltaic and Electric Vehicle Forecasts to be Used in Southern California Edison Company's Distribution Planning

SUBJECT: Adjustments to Photovoltaic and Electric Vehicle Forecasts to be Used in Southern California Edison Company's Distribution Planning STATE OF CALIFORNIA Edmund G. Brown Jr., Governor PUBLIC UTILITIES COMMISSION 505 VAN NESS AVENUE SAN FRANCISCO, CA 94102-3298 December 5, 2017 Advice Letter 3670-E Russell G. Worden Director, State Regulatory

More information

3301 East 120 th Avenue Assited Living & Memory Care

3301 East 120 th Avenue Assited Living & Memory Care UTILITY REPORT FOR 3301 East 120 th Avenue Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 Prepared for: 3301 E. 120 th Ave, LLC. 8200 E. Maplewood Ave., Suite

More information

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas. NOTICE OF PUBLIC HEARING CITY PLANNING COMMISSION CITY OF OVERLAND PARK, KANSAS Notice is hereby given that the City Planning Commission of Overland Park, Kansas, will hold a public hearing Monday, July

More information

2013 FORECAST ACCURACY BENCHMARKING SURVEY AND ENERGY

2013 FORECAST ACCURACY BENCHMARKING SURVEY AND ENERGY 2013 FORECAST ACCURACY BENCHMARKING SURVEY AND ENERGY Itron Forecasting Brown Bag June 4, 2013 Please Remember» Phones are Muted: In order to help this session run smoothly, your phones are muted.» Full

More information

Overcoming solar distribution network challenges. Michelle Spillar Head of Renewables, Met Office

Overcoming solar distribution network challenges. Michelle Spillar Head of Renewables, Met Office Overcoming solar distribution network challenges Michelle Spillar Head of Renewables, Met Office Solar Performance Mapping and Operational Yield Forecasting Supported by Innovate UK The thing is that Project

More information

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No MAT-02 October 7, 2014

MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No MAT-02 October 7, 2014 MINNESOTA DEPARTMENT OF TRANSPORTATION Engineering Services Division Technical Memorandum No. 14-10-MAT-02 To: From: Subject: Electronic Distribution Recipients Jon M. Chiglo, P.E. Division Director, Engineering

More information

Prentice Hall EARTH SCIENCE

Prentice Hall EARTH SCIENCE Prentice Hall EARTH SCIENCE Tarbuck Lutgens Chapter 21 Climate 21.1 Factors That Affect Climate Factors That Affect Climate Latitude As latitude increases, the intensity of solar energy decreases. The

More information

Gay E. Canough Solar Math. PV Installer s Class: Units and Math

Gay E. Canough Solar Math. PV Installer s Class: Units and Math Gay E. Canough 1.1--Solar Math October 2012 PV Installer s Class: Units and Math 1 Units Electricity Fluid KW, a unit of power Horsepower, a unit of power KWh, a unit of energy BTU, a unit of energy Voltage

More information

2014 FORECASTING BENCHMARK AND OUTLOOK SURVEY. Mark Quan and Stuart McMenamin September 16, 2014 Forecasting Brown Bag Seminar

2014 FORECASTING BENCHMARK AND OUTLOOK SURVEY. Mark Quan and Stuart McMenamin September 16, 2014 Forecasting Brown Bag Seminar 2014 FORECASTING BENCHMARK AND OUTLOOK SURVEY Mark Quan and Stuart McMenamin September 16, 2014 Forecasting Brown Bag Seminar PLEASE REMEMBER» Phones are Muted: In order to help this session run smoothly,

More information

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND

BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND BEFORE THE PUBLIC SERVICE COMMISSION OF MARYLAND IN THE MATTER OF THE APPLICATION OF * MASON DIXON SOLAR CENTER, LLC FOR A CERTIFICATE OF PUBLIC * Case No.: 9426 CONVENIENCE AND NECESSITY TO CONSTRUCT

More information

UNITED KINGDOM FOREIGN AND COMMONWEALTH OFFICE, DRAGON CAPITAL GROUP

UNITED KINGDOM FOREIGN AND COMMONWEALTH OFFICE, DRAGON CAPITAL GROUP UNITED KINGDOM FOREIGN AND COMMONWEALTH OFFICE, DRAGON CAPITAL GROUP SOLAR OUTPUT AT PEAK TARIFF FOR DIFFERENT SLOPE AND ORIENTATION IN HOCHIMINH CITY ARTELIA Vietnam Ho Chi Minh City Office 6 Phung Khac

More information

GRADE 11 NATIONAL SENIOR CERTIFICATE

GRADE 11 NATIONAL SENIOR CERTIFICATE GRADE 11 NATIONAL SENIOR CERTIFICATE MATHEMATICAL LITERACY P NOVEMBER 007 MARKING MEMORANDUM This memorandum consists of 8 pages. Mathematical Literacy/P QUESTION 1 [1] 1.1.1 R50 (1) 1.1. R15 per person

More information

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects Information Item Date: June 22, 2015 To: From: Subject: Mayor and City Council Debbie Lee, Communications and Public Affairs Officer Update on Southern California Edison s Capital Improvement Projects

More information

Planning Commission Report

Planning Commission Report QX f BEVERLY HILLS City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 TEL. (310) 285-1141 FAX. (310) 858-5966 Meeting Date: Subject: Project Applicant: Recommendation:

More information

Superstorm Sandy Willis Re s post-event field damage survey preliminary report

Superstorm Sandy Willis Re s post-event field damage survey preliminary report HURRICANE DAMAGE SURVEY REPORT event November 8, 2012 Superstorm Sandy Willis Re s post-event field damage survey preliminary report Immediately after Sandy s landfall, representatives of Willis Re s Catastrophe

More information

DuPont Photovoltaic Solutions The Crucial Role of Materials in Protecting the Longevity of Solar Investments Riyadh, Saudi Arabia October 3 rd, 2017

DuPont Photovoltaic Solutions The Crucial Role of Materials in Protecting the Longevity of Solar Investments Riyadh, Saudi Arabia October 3 rd, 2017 DuPont Photovoltaic Solutions The Crucial Role of Materials in Protecting the Longevity of Solar Investments Riyadh, Saudi Arabia October 3 rd, 2017 Dr. Stephan Padlewski, Marketing Leader, EMEA DuPont

More information

Energy yield I Unit 10

Energy yield I Unit 10 Energy yield I Unit 10 Marcus Rennhofer marcus.rennhofer@ait.ac.at Content Energy Yield Environmental parameters Irradiance Annual energy yield Generator quality measures Losses of energy Modelling Types

More information

Energy Yield. Marcus Rennhofer Unit : Energy Yield

Energy Yield. Marcus Rennhofer Unit : Energy Yield Energy Yield Marcus Rennhofer marcus.rennhofer@ait.ac.at Unit 11 Content Energy Yield Annual energy yield Generator quality measures Losses of energy Modelling Types of models Concepts of models Analytic

More information

Eastlake Assited Living & Memory Care

Eastlake Assited Living & Memory Care UTILITY REPORT FOR Eastlake Assited Living & Memory Care 1 st Submittal January 23, 2016 2 nd Submittal March 04, 2016 June 7, 2016 Final Submittal August 08, 2016 Prepared for: 3301 E. 120 th Ave, LLC.

More information

SOUTHEAST PLANT POWER FEED AND PRIMARY SWITCHGEAR UPGRADES CIVIC DESIGN REVIEW - PHASE 1 - NOVEMBER 14, 2016

SOUTHEAST PLANT POWER FEED AND PRIMARY SWITCHGEAR UPGRADES CIVIC DESIGN REVIEW - PHASE 1 - NOVEMBER 14, 2016 SOUTHEAST PLANT POWER FEED AND PRIMARY SWITCHGEAR UPGRADES CIVIC DESIGN REVIEW - PHASE 1 - NOVEMBER 14, 2016 CITY & COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION PROJECT LOCATION CALTRAIN RAILROAD

More information

5 BUILDINGS ON 15 ACRES AVAILABLE

5 BUILDINGS ON 15 ACRES AVAILABLE INDUSTRIAL 5 BUILDINGS ON 15 ACRES AVAILABLE FOR SALE 1717 W. Park Drive, Huntington, IN 46750 Former Carter Lumber Approximately 38,000 sq. ft. in 5 buildings 15.06 acres with industrial zoning Property

More information

Pipex px SUSTAINABLE SYSTEMS

Pipex px SUSTAINABLE SYSTEMS Pipex px SUSTAINABLE SYSTEMS Pipex px Carbon Abatement Systems Met Office Headquarters Building, Exeter, Devon, UK The Project: Met Office, a Trading Fund within the Ministry of Defence, is the UK s national

More information

APPENDIX (R) Committed Developments Documentation

APPENDIX (R) Committed Developments Documentation APPENDIX 21-10 (R) Committed Developments Documentation Revised October 2008 Committed Developments Trip Generation Beacon Countyline DRI Development Location Land Use Approved Built Remaining PM Peak

More information

Winning Farm of Winchester

Winning Farm of Winchester Winning Farm of Winchester Planning Board Presentation Winning Farm of Winchester 12.9 acres of undeveloped forest on the former Winning Farm site Located north of Thornberry Road in the northwestern corner

More information

MAXWELL TECHNOLOGIES ULTRACAPACITOR CELL SIZING Document #

MAXWELL TECHNOLOGIES ULTRACAPACITOR CELL SIZING Document # APPLICATION NOTE MAXWELL TECHNOLOGIES ULTRACAPACITOR CELL SIZING Document # 10073627 Maxwell Technologies, Inc. Global Headquarters 5271 Viewridge Court, Suite 100 San Diego, CA 92123 USA Phone: +1 858

More information

Prentice Hall EARTH SCIENCE

Prentice Hall EARTH SCIENCE Prentice Hall EARTH SCIENCE Tarbuck Lutgens Chapter 21 Climate 21.1 Factors That Affect Climate Factors That Affect Climate Latitude As latitude increases, the intensity of solar energy decreases. The

More information

INTERSECTION RELATED ACCIDENT SUMMARY CITY OF GENEVA QUARTERLY COMPARISONS 2016 TO INTERSECTIONS WITH ACCIDENTS 1ST QTR 4TH QTR 3RD QTR

INTERSECTION RELATED ACCIDENT SUMMARY CITY OF GENEVA QUARTERLY COMPARISONS 2016 TO INTERSECTIONS WITH ACCIDENTS 1ST QTR 4TH QTR 3RD QTR EXHIBIT 1 INTERSECTION RELATED ACCIDENT SUMMARY CITY OF GENEVA QUARTERLY COMPARISONS TO Page 1 of 3 INTERSECTIONS WITH ACCIDENTS ANDERSON BLVD. AND IL ROUTE 38 1 3 4 1 1 2 ANDERSON BLVD. AND STEVENS ST.

More information

not for commercial-scale installations. Thus, there is a need to study the effects of snow on

not for commercial-scale installations. Thus, there is a need to study the effects of snow on 1. Problem Statement There is a great deal of uncertainty regarding the effects of snow depth on energy production from large-scale photovoltaic (PV) solar installations. The solar energy industry claims

More information

Missouri River Basin Water Management Monthly Update

Missouri River Basin Water Management Monthly Update Missouri River Basin Water Management Monthly Update Participating Agencies 255 255 255 237 237 237 0 0 0 217 217 217 163 163 163 200 200 200 131 132 122 239 65 53 80 119 27 National Oceanic and Atmospheric

More information

For Date: 08/23/ Wednesday

For Date: 08/23/ Wednesday For Date: 08/23/2017 - Wednesday Call Number Time Call Reason Action 17-18803 0025 Phone - SUICIDE ATTEMPT OR THREAT Services Rendered Location/Address: [KEE 259] DINKBEE'S - WASHINGTON ST 17-18804 0108

More information

IMPRESSIVE OFFICES TO LET

IMPRESSIVE OFFICES TO LET 1,000-11,470 sqft DESCRIPTION 36 Park Row is located within the prime core of city centre with suites available to let on new full repairing and insuring leases. Situated in the heart of city centre and

More information

CORPORATION OF THE CITY OF COURTENAY COUNCIL MEETING AGENDA

CORPORATION OF THE CITY OF COURTENAY COUNCIL MEETING AGENDA CORPORATION OF THE CITY OF COURTENAY COUNCIL MEETING AGENDA DATE: Monday, January 14, 2013 PLACE: City Hall Council Chambers TIME: 4:00 p.m. 1.00 ADOPTION OF MINUTES 1. Adopt January 7, 2013 Regular Council

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS West Q Avenue, Kalamazoo, MI P: () - F: () - www.texastownship.org REQUEST FOR PROPOSALS - Winter Snow Removal Services Proposals The Charter Township of Texas, Kalamazoo County Michigan, is requesting

More information

ABSTRACT OF RATABLES

ABSTRACT OF RATABLES ABSTRACT OF RATABLES ATLANTIC COUNTY 2011 Atlantic County Board of Taxation 5909 Main Street Mays Landing, New Jersey 08330 (609) 645-5820 Dennis Levinson, County Executive Gerald DelRosso, County Administrator

More information

REO 100% Leased Four (4) Unit Mixed-Use Property Along Ashland

REO 100% Leased Four (4) Unit Mixed-Use Property Along Ashland 5015 SOUTH ASHLAND AVENUE CHICAGO, IL 60609 DETAILS Sale Price $119,000 Lot Size 0.06 Acres Building Size 3,784 SF Occupancy 100% Year Built 1893 Market Cook County Sub Market South Chicago Cross Streets

More information

BUILDING PERMITS FOR NEW RESIDENTIAL CONSTRUCTION, BY TYPE, CENSUS TRACT, AND SUBDIVISION, KANSAS CITY, KANSAS (2010)

BUILDING PERMITS FOR NEW RESIDENTIAL CONSTRUCTION, BY TYPE, CENSUS TRACT, AND SUBDIVISION, KANSAS CITY, KANSAS (2010) BUILDING PERMITS FOR NEW RESIDENTIAL CONSTRUCTION, BY TYPE, CENSUS TRACT, AND SUBDIVISION, KANSAS CITY, KANSAS (2010) Finance Department, Research Division May 2011 BUILDING PERMITS FOR NEW RESIDENTIAL

More information

U.S. General Services Administration FOIA Requester Service Center (H1F) 1800 F Street, NW, Room 7308 Washington, DC Fax:

U.S. General Services Administration FOIA Requester Service Center (H1F) 1800 F Street, NW, Room 7308 Washington, DC Fax: Description of document: Requested date: Released date: Posted date: Source of document: List of General Services Administration (GSA) properties from the REXUS (Real Estate Across the United States) database

More information

REPORT. Non-Controls Lighting Evaluation for the Massachusetts Small Business Direct Install Program: Multi-Season Study.

REPORT. Non-Controls Lighting Evaluation for the Massachusetts Small Business Direct Install Program: Multi-Season Study. REPORT Non-Controls Lighting Evaluation for the Massachusetts Small Business Direct Install Program: Multi-Season Study June 14, 2012 Prepared by: The Cadmus Group, Inc. Energy Services Division 100 Fifth

More information

Urban Dispersion Program New York City Mesonet ROOFTOP WEATHER STATION NETWORK

Urban Dispersion Program New York City Mesonet ROOFTOP WEATHER STATION NETWORK Urban Dispersion Program New York City Mesonet ROOFTOP WEATHER STATION NETWORK GENERAL DESCRIPTION Introduction The Department of Homeland Security has established a meteorological research program in

More information

EFFECT OF WIND SPEED ON PERFORMANCE OF A SOLAR PV ARRAY

EFFECT OF WIND SPEED ON PERFORMANCE OF A SOLAR PV ARRAY EFFECT OF WIND SPEED ON PERFORMANCE OF A SOLAR PV ARRAY Brian D. Vick USDA-Agricultural Research Service Conservation and Production Research Laboratory P.O. Drawer 1 Bushland, TX 7912 E-mail: brian.vick@ars.usda.gov

More information

MACo Briefing General Assembly of Maryland

MACo Briefing General Assembly of Maryland MACo Briefing General Assembly of Maryland House Environment & Transportation Committee 1/22/2019 Introduction to Maryland Counties Maryland has 23 counties plus Baltimore City (which is legally both a

More information

Sky Park Business Center

Sky Park Business Center Lic. Lic. Suite Size Asking Rate Available 9210 Sky Park Court Suite 150 8,091 SF $2.05 + E AVAILABLE NOW 9265 Sky Park Court 100% Leased PROJECT FEATURES: Newly remodeled common areas and upgraded mechanical

More information

Sky Park Business Center

Sky Park Business Center Suite Size Available Rate 9210 Sky Park Court Suite 220 4,738 SF Now $1.95 + Util. 9265 Sky Park Court Suite 250 6,085 SF Now $1.95 + Util. * Suite 250 is divisible Project FEATURES: Newly remodeled common

More information

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No:

Technical Memorandum. City of Salem, Stormwater Management Design Standards. Project No: Technical Memorandum 6500 SW Macadam Avenue, Suite 200 Portland, Oregon, 97239 Tel: 503-244-7005 Fax: 503-244-9095 Prepared for: Project Title: City of Salem, Oregon City of Salem, Stormwater Management

More information

Purdue University Bifacial Module Calculator (PUB)

Purdue University Bifacial Module Calculator (PUB) Purdue University Bifacial Module Calculator (PUB) Date: 02/18/2018 Purdue University Bifacial Module Calculator (PUB) is a module-level simulator that can accurately model and optimize the performance

More information

SHADOW IMPACT STUDY REPORT

SHADOW IMPACT STUDY REPORT SHADOW IMPACT STUDY REPORT 175 Zoo Park Road Town of Wasaga Beach Date: September 2017 Prepared for: Simcoe County Housing Corporation Prepared by: MacNaughton Hermsen Britton Clarkson Planning Limited

More information