CRaTER Project Monthly Technical Progress and Schedule Status Report (NNG05EB92C DRD 20 & 21) April 2005
|
|
- Kristin Kelley
- 5 years ago
- Views:
Transcription
1 CRaTER Project Monthly Technical Progress and Schedule Status Report (NNG05EB92C DRD 20 & 21) April 2005 Page 1 of 6
2 Table of Contents Project Scientist s Report... 3 Project Engineer s Report... 3 Mission Assurance Manager s Report... 4 Program Manager s Report... 4 Schedule Status... 4 Meetings & Telecoms... 4 Budget Status... 5 Risk Analysis... 6 Page 2 of 6
3 Project Scientist s Report The science team has been focused on trade studies in the instrument design that reflect the complete picture of the LRO spacecraft and mission and the comments from our peer reviewers transmitted during the debriefing on the CRaTER proposal. The three main issues we have been working on are the optimum telescope design for measuring energy deposition through the telescope, the properties of galactic cosmic rays and solar energetic particles, and the properties of alpha-radiation from the lunar surface. In order to study the optimum telescope design we have been running several numerical simulations of energetic particle propagation through different detector designs. Calculations using FLUKA and GEANT have been used to model the effects of straggling and secondary particle production in the detectors. Calculations in IDL and SRIM have been used to study the effects of shielding in improving the accuracy of the measurements. Our main findings are that two sections of TEP (tissue equivalent plastic) combined with six detectors are preferable to the original design of three TEP sections, that the two TEP sections should have different lengths, and that a small metal collar on the top of the instrument could significantly improve the quality of the measurements at lower energies. In terms of the properties of the energetic particles themselves, we have been studying the extreme solar event of January 2005, which produced one of the most intense solar energetic particle environments ever observed in space. We find that the rates of particles striking the detectors are consistent with telemetry limit imposed by the 1553 interface of 1250 events per second, and that the rate is far below that needed for us to be concerned about saturation effects in the detectors. Project Engineer s Report In early January we set up a CRaTER Engineering web page to consolidate our engineering documentation. Since it was very similar, we also quickly adapted the data ICD from SPIDR for the LRO mission so that the Project would have a feel for our flight data handling strategy. We attended the LRO instrument kick-off meeting at Goddard on January 12-14, presented the as-proposed concept of the CRaTER instrument, and learned about the current state of the spacecraft design. Power and mass appeared not to be a problem, though accommodation of the 60-degree full width field of view in both the zenith and nadir direction was clearly going to present challenges. Our data ICD was taken under advisement, and it was not immediately clear if our request for 100Kbps of telemetry bandwidth on the 1553 bus could be granted --switching over to SpaceWire was an alternative. Team building at Aerospace has been restricted by contract difficulties, so that only preliminary design of the silicon particle detectors and their associated electronics has been accomplished. Mechanical design of the telescope has not yet started. A preliminary design of the combined telescope/electronics box indicates that the asproposed volume and mass were not unreasonable, but a quick power calculation indicated that -- depending upon radiation-hardened part availability -- could turn out to Page 3 of 6
4 be a problem. That the science team has been doing trade studies, which may well reduce our telescope field-of-view, provides hope that our accommodation problems on the spacecraft will be relieved. Mission Assurance Manager s Report The draft Performance Assurance Implementation Plan (PAIP) dated 1/27/05 and draft Mission Assurance Requirements (MAR) dated 2/11/05 have been reviewed. The MAR contains the Contract Data Requirements List (CDRL) which was has also been evaluated. The above documents were compared to the Requirements of the Proposal Information Package (PIP), Rev A. dated 8/18/04. Many major differences were noted and documented. Most notable were the added number of data items and plans. The BU-CSP PAIP has been started. This document includes Mission Assurance for BU/CSP, MIT/CSR, and the Aerospace Corporation. A new draft instrument PAIP was received from GSFC on 3/11/05. That newer draft PAIP is now being used for the BU/CSP PAIP. Tissue Equivalent Plastic (TEP a.k.a A150) is a major material in the CRaTER Telescope. This material is made by Standard Imaging Corporation and is identified by the product name of A150. They do not have a data sheet on A150 but will send us a list of ingredients, a Material Safety Data Sheet (MSDS) and a sample for testing. Diane Kolos, the Materials Laboratory manager at GSFC is interested in testing TEP. We have asked her to test for outgassing, offgassing, and flammability. TEP will not be used in a structural application, so we have not requested any physical testing at this time. Program Manager s Report The major programmatic events for the period involved setting up the various contracts for the project. The Schedule Status For Phase A/B/C_bridge, the milestone schedule is somewhat short, with the CRaTER Project currently supporting the LRO Project Schedule V0.5. No deviations from that schedule are currently anticipated. Meetings & Telecoms Weekly CRaTER project management meetings between the Principal Investigator, Project Scientist, Project Engineer and Project Manager were instituted for the project during this period and were held regularly. Weekly telecoms between the CRaTER project management team and NASA instrument management/systems engineering were initiated during this period and held regularly. Weekly telecoms between the CRaTER project management team and the rest of the CRaTER Co-Investigator team were initiated and held regularly. Bi-weekly participation by the CRaTER PI, the other LRO Instrument PIs and the LRO Project Scientist was initiated and held regularly. Page 4 of 6
5 The following meetings were/will be supported by the CRaTER Project Team: LRO Kick-off Meeting (Jan 12, 2005) Internal CRaTER Team Meeting 1 (Apr 13, 2005) Technical Interface Meeting with NASA (Apr 14, 2005) Mission Assurance Meeting with NASA (Apr 26,2005) Instrument Accommodation Review (Apr 28,2005) Internal CRaTER Team Meeting 2 (TBS) Instrument Preliminary Design Review (late June, ) LRO Preliminary Design Review (mid-late July, ) Internal CRaTER Team Meeting 3 (TBS) Budget Status The CRaTER Project was able to negotiate the prime contract during this period with NASA, as well as subcontract with MIT. The Aerospace and the University of Tennessee subcontracts are anticipated to be in place during the Actuals vs Budget next reporting period. $2,500,000 $2,000,000 $1,500,000 $1,000,000 $500,000 $0 Jan ,785 Feb-05 Mar-05 Apr-05 May-05 Period Jun-05 Jul-05 Aug-05 Sep-05 Baseline Budget Reserves Actuals Since the original proposal, the major budget change has been in the area of transferring the Program Manager and Project Scientist budget from the B.U. prime contract to the MIT subcontract. While both the Project Manager and Project Scientist are affiliated with B.U., they will receive their CRaTER associated The CRaTER project is currently running significantly under budget as it tries to get to ramp up the engineering effort ($140.8K vs. $433.4K. Financial details can be found in the April 2005 submittal of the 533Q for the project. We were only partially successful in getting resources, particularly engineering, assigned to the project without the formal contracts/subcontracts in place. While there is still a certain amount of activity remaining getting the team in place, at least the team leads and top level work assignments are significantly in place. As it stands now, financial resources do not pose any problem for the CRaTER Project to get to the next major milestone (I-PDR). By the next status report, 1 Actual dates still to be confirmed Page 5 of 6
6 the dust on all the cumulative costs should of settled (At this point, the Aerospace precontract assessment is not complete). Risk Analysis At this point, there are no Red (nor yellow for that matter) class risks associated with the overall CRaTER project using the NASA standard likelihood/impact classification scheme. Currently, the highest level generic risk on the project concerns sole source EEE piece parts (such as: alerts show up on a part in the as built system or flight delivered semi-custom detectors are not acceptable). After PDR, we will be able to start to identify these parts and address them specifically piece by piece as we proceed to CDR. Also using the NASA classification scheme, we do not see any red or yellow risks associated with the requirements development process currently in process. While science and spacecraft requirements are still in a state of refinement, there is nothing that appears overly threatening at this point in the overall project. On the short term (i.e. getting thru I-PDR), the biggest challenge is getting the requirements/interfaces settled and the engineering team in place. It is felt, however, that reasonable progress is being made in this area. Page 6 of 6
CRaTER Project Monthly Technical Progress and Schedule Status Report (NNG05EB92C DRD 20 & 21) May 2005
CRaTER Project Monthly Technical Progress and Schedule Status Report (NNG05EB92C DRD 20 & 21) May 2005 Page 1 of 6 Table of Contents Project Scientist s Report... 3 Project Engineer s Report... 3 Mission
More informationCRaTER Science Requirements
CRaTER Science Requirements Lunar Reconnaissance Orbiter CRaTER Preliminary Design Review Justin Kasper (CRaTER Proj. Sci.) Outline Energy deposition Classical ionizing radiation Nuclear fragmentation
More informationCRaTER Pre-Environmental Review (I-PER) Science Requirements Update
CRaTER Pre-Environmental Review (I-PER) Science Requirements Update Justin C Kasper Smithsonian Astrophysical Observatory September 10-11, 2007 Outline Instrument Overview Verification Methods Science
More informationThe Cosmic Ray Telescope for the Effects of Radiation (CRaTER) Investigation for the Lunar Reconnaissance Orbiter
The Cosmic Ray Telescope for the Effects of Radiation (CRaTER) Investigation for the Lunar Reconnaissance Orbiter J. E. Mazur 1, H. E. Spence 2, J. B. Blake 1, E. L. Kepko 2, J. Kasper 2,3, L. Townsend
More informationIAC-08-A MONTE CARLO SIMULATIONS OF ENERGY LOSSES BY SPACE PROTONS IN THE CRATER DETECTOR
IAC-08-A1.4.06 MONTE CARLO SIMULATIONS OF ENERGY LOSSES BY SPACE PROTONS IN THE CRATER DETECTOR Lawrence W. Townsend The University of Tennessee, Knoxville, Tennessee, United States of America ltownsen@tennessee.edu
More informationCRaTER Instrument Requirements Document Instrument Performance and Data Products Specification. Dwg. No
Rev. ECO Description Author Approved Date 01 32-002 Initial Release for comment JCKasper 6/3/05 02 32-044 Reposition from Level II MRD to an IRD JCKasper 7/25/05 03 32-066 General Update JCKasper 11/16/05
More informationCRaTER Pre-Ship Review (PSR) Instrument Calibration Science Requirements Compliance
CRaTER Pre-Ship Review (PSR) Instrument Calibration Science Requirements Compliance Justin C Kasper Smithsonian Astrophysical Observatory January 3, 2008 Outline Calibration Relate the ADU of the Pulse
More informationDRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter (LRO)
DRAFT Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter (LRO) Comic Ray Telescope for the Effects of Radiation (CRaTER) to Spacecraft Mechanical Interface Control Document Date: July 13, 2005
More informationCosmic RAy Telescope for the Effects of Radiation. (CRaTER): Science Overview
Cosmic Ray Telescope for the Effects of Radiation (CRaTER): Science Overview Harlan E. Spence, Principal Investigator Boston University Department of Astronomy and Center for Space Physics My Background
More informationDRAFT. Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter 431-ICD Date: September 15, 2005
DRAFT Robotic Lunar Exploration Program Lunar Reconnaissance Orbiter Lunar Reconnaissance Orbiter to Comic Ray Telescope for the Effects of Radiation Mechanical Interface Control Document Date: September
More informationLunar Reconnaissance Orbiter Project. Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Mechanical Interface Control Document
Revision B DraftA Effective Date: July 17, 2006 Expiration Date: July 17, 2011 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Mechanical Interface
More informationCosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document
Effective Date: 01/11/2007 Expiration Date: 01/11/2012 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document December 19,
More informationCosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document
Effective Date: February 14, 2006 Expiration Date: February 14, 2011 Lunar Reconnaissance Orbiter Project Cosmic Ray Telescope for the Effects of Radiation to Spacecraft Thermal Interface Control Document
More informationThe Cassegrain ADC for Keck I Preliminary Design Review Process and Charter September 15, 2003 By Sean Adkins
CALIFORNIA ASSOCIATION FOR RESEARCH IN ASTRONOMY By Sean Adkins INTRODUCTION The Technical Facilities group of the UCO/Lick Observatory located on the Santa Cruz campus of the University of California
More informationWISE Science Data Center CDR
WISE Science Data Center CDR R. Cutri - IPAC WISE Science Data Manager RMC - 1 WSDC Top Level Schedule RMC - 2 WSDC Task Plan Fiscal Year FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 Total Phase B B/C C C/D
More informationMarch 4, 2013 Eric P. Smith JWST Program Office
March 4, 2013 Eric P. Smith JWST Program Office 1 SIMPLIFIED SCHEDULE OTE = Optical Telescope Element OTIS = Optical Telescope + ISIM k months of project funded critical path (mission pacing) schedule
More informationExploration Carriers UPC-Orion Launch Opportunities for Lunar Missions. presented to The Joint Annual Meeting of LEAG-ICEUM-SRR
Exploration Carriers UPC-Orion Launch Opportunities for Lunar Missions presented to The Joint Annual Meeting of LEAG-ICEUM-SRR Bruce Milam and Ruthan Lewis, Ph.D. NASA Goddard Space Flight Center October
More informationGOES-R Instrument Status and Accommodations. Barbara Pfarr GOES-R Program Systems Engineering January 2010 AMS Conference
GOES-R Instrument Status and Accommodations Barbara Pfarr GOES-R Program Systems Engineering January 2010 AMS Conference Agenda Instrument Developmental Status Significant Changes in the Last Year Introducing
More informationNovember 3, 2014 Eric P. Smith JWST Program Office
November 3, 014 Eric P. Smith JWST Program Office 1 SINCE LAST CAA MEETING... Completed of 3 recommended GAO schedule risk analyses for this year. Mutually agreed to drop 3 rd. Will perform cost-risk study
More informationState of Passive Microwave Polar Stereographic Products. Walt Meier and polar stereographic product team
State of Passive Microwave Polar Stereographic Products Walt Meier and polar stereographic product team State of PM PS datasets NRT Tb and sea ice running nominally after many issues (see subsequent slides)
More informationGLAST Large Area Telescope Monthly Mission Review
GLAST Large Area Telescope Monthly Mission Review Gamma-ray Large Area Space Telescope LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center 1 FSW Status B0-10-1 available
More informationGAMINGRE 8/1/ of 7
FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95
More informationHERA MISSION. ESA UNCLASSIFIED - For Official Use
HERA MISSION ESA UNCLASSIFIED - For Official Use HERA/AIM mission scenario! First ever investigation of deflection test! Detailed analysis of impact crater (before/after impact or after only depending
More informationDeep Space Test Bed. POC Deep Space Test Bed (DSTB)
Deep Space Test Bed Workshop for Radiation Monitoring on the International Space Station September 3-5, 2003 Berkeley, California Presented by Eric Benton POC Mark.J.Christl@NASA.GOV http://sd.msfc.nasa.gov/cosmicray/dstb/dstb.htm
More informationAstrophysics. Paul Hertz Director, Astrophysics Division Science Mission
National Aeronautics and Space Administration Astrophysics R&A Update from the NASA Town Hall Meeting AAS 231st Meeting Washington, DC January 10, 2018 www.nasa.gov Paul Hertz Director, Astrophysics Division
More informationEPOXI (EPOCh) Drake Deming Planetary Systems Laboratory Goddard Space Flight Center
EPOXI (EPOCh) Drake Deming Planetary Systems Laboratory Goddard Space Flight Center Use or disclosure of information contained on this sheet is subject to the restriction on the title page of this presentation.
More informationQuestion Moon An Introduction to the Process of Science
Question Moon An Introduction to the Process of Science Generating Research Ideas Student Guide Question Moon An Introduction to the Process of Science Student Guide Lunar Student Imaging Project (LSIP)
More informationNASA: BACK TO THE MOON
NASA: BACK TO THE MOON Don Campbell Cornell University "I believe that this nation should commit itself to achieving the goal, before this decade is out, of landing a man on the moon and returning him
More informationIntroduction to Forecasting
Introduction to Forecasting Introduction to Forecasting Predicting the future Not an exact science but instead consists of a set of statistical tools and techniques that are supported by human judgment
More informationStefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017
James Webb Space Telescope Stefanie Milam Deputy Project Scientist for Planetary Science NASA GSFC January 12, 2017 JWST Vital Stats General Observatory: 5 years required; 10 years goal Primary mirror:
More informationWISE Science Data System Single Frame Position Reconstruction Peer Review: Introduction and Overview
WISE Science Data System Single Frame Position Reconstruction Peer Review: Introduction and Overview R. Cutri and the WSDC Team @ IPAC 1 Review Panel Rachel Akeson (IPAC/MSC) Gene Kopan (IPAC retired)
More informationGRUAN Station Report for Ny-Ålesund
WMO/IOC/UNEP/ICSU GLOBAL CLIMATE OBSERVING SYSTEM (GCOS) 8th GRUAN Implementation- Coordination Meeting (ICM-8) Boulder, USA 25 April 29 April 2016 Doc. 7.11 (05.IV.2016) Session 7 GRUAN Station Report
More informationESA activities towards the Gravitation Waves Space Observatory
ESA activities towards the Gravitation Waves Space Observatory Frédéric Safa ESA Science Directorate, Future Missions LISA Symposium, Zurich 2016 The Gravitation Wave Observatory in ESA Science Programme
More informationTeam X Study Summary for ASMCS Theia. Jet Propulsion Laboratory, California Institute of Technology. with contributions from the Theia Team
Team X Study Summary for ASMCS Theia Jet Propulsion Laboratory, California Institute of Technology with contributions from the Theia Team P. Douglas Lisman, NASA Jet Propulsion Laboratory David Spergel,
More informationThe World Bank Caribbean Regional Communications Infrastructure Program (P114963)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Caribbean Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 9 ARCHIVED on 25-Jan-2017 ISR26209 Implementing Agencies:
More informationCampaign 9 of K2: News from the K2 team
Campaign 9 of K2: News from the K2 team A talk by Geert Barentsen & Tom Barclay for the 20th Microlensing workshop in Paris on 14 January 2016. K2 Guest Observer Office (NASA Ames) http://keplerscience.arc.nasa.gov
More informationTelescope Mechanical Design
Telescope Mechanical Design Albert Lin The Aerospace Corporation (310) 336-1023 albert.y.lin@aero.org 6/27/06 6/27/06 Telescope Mechanical Design 1 Overview Design Overview Instrument Requirements Mechanical
More informationImplications of the Worsening GCR Radiation Environment
Implications of the Worsening GCR Radiation Environment N. A. Schwadron University of New Hampshire GCRs from the Galaxy and Beyond SEPs from Flares and CMEs Protracted Min (23) and Mini Max (24) Dropping
More informationWFIRST Project Response to post-wietr direction. Jeffrey Kruk WFIRST Project Scientist
WFIRST Project Response to post-wietr direction Jeffrey Kruk WFIRST Project Scientist Introduction WFIRST highest ranked large space mission in 2010 Decadal Survey Use of 2.4m telescope enables - Hubble
More informationThe Development of the Herschel Mission
30 Years of Innovation in Space Science - A Tribute to Professor Bruce Swinyard The Development of the Herschel Mission Göran Pilbratt, Herschel Project Scientist Rutherford Appleton Laboratory, 5-6 April
More information2.1 Inductive Reasoning Ojectives: I CAN use patterns to make conjectures. I CAN disprove geometric conjectures using counterexamples.
2.1 Inductive Reasoning Ojectives: I CAN use patterns to make conjectures. I CAN disprove geometric conjectures using counterexamples. 1 Inductive Reasoning Most learning occurs through inductive reasoning,
More informationVEXAG Update NASA PSS Meeting 4 September 2014
VEXAG Update NASA PSS Meeting 4 September 2014 Lori S. Glaze, NASA GSFC - VEXAG Chair Pat Beauchamp Deputy VEXAG Chair 9/4/2014 Planetary Science Subcommittee 1 Activities Mar. 2014 Aug. 2014 March: VEXAG
More informationThe World Bank Caribbean Regional Communications Infrastructure Program (P114963)
Public Disclosure Authorized LATIN AMERICA AND CARIBBEAN Caribbean Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2012 Seq No: 10 ARCHIVED on 18-Oct-2017 ISR29473 Implementing Agencies:
More informationImplementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)
Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893) Operation Name:
More informationThe radiation environment near the lunar surface: CRaTER observations and Geant4 simulations
SPACE WEATHER, VOL. 11, 142 152, doi:10.1002/swe.20034, 2013 The radiation environment near the lunar surface: CRaTER observations and Geant4 simulations M. D. Looper, 1 J. E. Mazur, 2 J. B. Blake, 1 H.
More informationScience with a Wide-Field Telescope in Space. NASA HQ Perspective. Richard Griffiths. Astrophysics Division Science Mission Directorate
Science with a Wide-Field Telescope in Space NASA HQ Perspective Richard Griffiths Astrophysics Division Science Mission Directorate February 13, 2012 1 Mission Timeline Last updated: January 4, 2012 ORION
More informationAyeyarwady Integrated River Basin Management Project (P146482)
EAST ASIA AND PACIFIC Myanmar Water Global Practice IBRD/IDA Investment Project Financing FY 2015 Seq No: 8 ARCHIVED on 19-Dec-2018 ISR35167 Implementing Agencies: Republic of the Union of Myanmar, Directorate
More informationThe radiation environment near the lunar surface: CRaTER observations and Geant4 simulations
University of New Hampshire University of New Hampshire Scholars' Repository Physics Scholarship Physics 4-1-2013 The radiation environment near the lunar surface: CRaTER observations and Geant4 simulations
More informationHerschel Mission Overview and Key Programmes
Herschel Mission Overview and Key Programmes SPIE Astronomical Instrumentation 2008 Space Telescopes and Instrumentation I: Optical, Infrared, and Millimeter Wave Marseille, 23-28 June 2008 Göran L. Pilbratt
More informationNext Generation SOFIA Science Instrument Call for Proposals
Next Generation SOFIA Science Instrument Call for Proposals Kimberly Ennico-Smith NASA SOFIA Project Scientist Alan Rhodes NASA SOFIA Science Instrument Development Manager NASA Ames Research Center Outline
More informationThe World Bank Pakistan: Third Punjab Education Sector Project (P154524)
Public Disclosure Authorized SOUTH ASIA Pakistan Education Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 2 ARCHIVED on 14-Apr-2017 ISR27416 Implementing Agencies: Public Disclosure
More informationKepler: A Search for Terrestrial Planets
Kepler: A Search for Terrestrial Planets Stellar Classification Program Plan NASA Ames Research Center Moffett Field, CA. 94035 Warning! This printed copy may not be the latest released version. It is
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Africa Trade & Competitiveness Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 22-Dec-2017 ISR30985 Public Disclosure Authorized
More informationProject Name: Income Generation Project 4 Pouk District, Siem Reap Province Implementing Partner: Farmer Livelihood Development (FLD)
Grant Category: Micro Finance Project Name: Income Generation Project 4 Pouk District, Siem Reap Province Implementing Partner: Farmer Livelihood Development (FLD) Status: Ongoing Start Date: 1 April 2012
More informationLRO Lunar Reconnaissance Orbiter
LRO Lunar Reconnaissance Orbiter Launch Date: June 18, 2009 Destination: Earth s moon Reached Moon: June 23, 2009 Type of craft: Orbiter Intended purpose: to map the moon like never before, add additional
More informationMars Atmosphere and Volatile Evolution Mission (MAVEN) Status of the MAVEN Mission at Mars 18 May 2018
Mars Atmosphere and Volatile Evolution Mission (MAVEN) Status of the MAVEN Mission at Mars 18 May 2018 Bruce Jakosky Laboratory for Atmospheric and Space Physics University of Colorado at Boulder USA MAVEN
More informationThe B612 Foundation Sentinel Mission. Ed Lu CEO, B612 Foundation
The B612 Foundation Sentinel Mission Ed Lu CEO, B612 Foundation The B612 Foundation Silicon Valley based nonprofit 501(c)3 Founded 2002 Mission is to protect humanity by preventing future asteroid impacts
More informationParameterizations of the linear energy transfer spectrum for the CRaTER instrument during the LRO mission
University of New Hampshire University of New Hampshire Scholars' Repository Physics Scholarship Physics 3-1-2010 Parameterizations of the linear energy transfer spectrum for the CRaTER instrument during
More informationEarth-Moon-Mars Radiation Environment Module (EMMREM): A Tool For Energetic Particle Fluxes and Radiation Doses Prediction In the Inner Heliosphere
Earth-Moon-Mars Radiation Environment Module (EMMREM): A Tool For Energetic Particle Fluxes and Radiation Doses Prediction In the Inner Heliosphere K. A. Kozarev, N. A. Schwadron, M. A. Dayeh, A. Fuegi,
More informationLunar Discovery and Exploration program
Lunar Discovery and Exploration program Space Policy Directive-1 (December 11, 2017) amends the National Space Policy to include the following paragraph: Lead an innovative and sustainable program of exploration
More informationJUICE/Laplace Mission Summary & Status
JUICE/Laplace Mission Summary & Status C. Erd JUICE Instrument WS, Darmstadt 9/11/2011 Activities during the Reformulation Phase 1. Feasible JGO s/c as a starting point a. no re-design of s/c necessary
More informationName of business: Food Control Plan Diary 2017 Supplementary Records Hot-Hold
Name of business: Food Control Plan Diary 2017 Supplementary Records Hot-Hold Th those s uitable for small to medium food businesses limited s Helpful Tips - Checking Food Temperatures Here are a few
More informationAgricultural Science Climatology Semester 2, Anne Green / Richard Thompson
Agricultural Science Climatology Semester 2, 2006 Anne Green / Richard Thompson http://www.physics.usyd.edu.au/ag/agschome.htm Course Coordinator: Mike Wheatland Course Goals Evaluate & interpret information,
More informationParticle Environment Package (PEP) for Laplace JGO
Particle Environment Package (PEP) for Laplace JGO Assessment study status report Stas Barabash 1 and the PEP Team 1 Swedish Inst. of Space Physics, Kiruna, Sweden 1 Outline PEP overview Assessment study
More informationTHE BUILDING SAFETY GROUP HEALTH AND SAFETY TRAINING COURSES 2018 DATES AND PRICES
THE BUILDING SAFETY GROUP HEALTH AND SAFETY TRAINING COURSES 2018 DATES AND PRICES CONTENTS Courses we run: Accredited courses CITB Site Management Safety Training Scheme (SMSTS) CITB Site Management Safety
More informationHERA MISSION & CM16 lessons learned
HERA MISSION HERA MISSION & CM16 lessons learned (CM16) Schedule criticality for 2020 launch Prepare Asteroid mission with launch opportunities in 2023 (with back-up in 2024 and 2025) (CM16) Payload selection
More informationNASA s STEREO Mission
NASA s STEREO Mission J.B. Gurman STEREO Project Scientist W.T. Thompson STEREO Chief Observer Solar Physics Laboratory, Helophysics Division NASA Goddard Space Flight Center 1 The STEREO Mission Science
More informationWinter Season Resource Adequacy Analysis Status Report
Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity
More informationThe World Bank Indonesia National Slum Upgrading Project (P154782)
Public Disclosure Authorized EAST ASIA AND PACIFIC Indonesia Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2017 Seq No: 4 ARCHIVED on 04-Apr-2018
More information1 Introduction STATUS OF THE GLAST LARGE AREA TELESCOPE. SLAC-PUB December Richard Dubois. Abstract
SLAC-PUB-10261 December 2003 STATUS OF THE GLAST LARGE AREA TELESCOPE Richard Dubois Stanford Linear Accelerator Center, Stanford University, PO Box 20750, Stanford, CA, USA Abstract The GLAST Large Area
More informationThe World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates
AFRICA Africa Environment Global Practice IBRD/IDA Adaptable Program Loan FY 2009 Seq No: 9 ARCHIVED on 22-Nov-2014 ISR16750 Implementing Agencies: Lake Victoria Basin Commission Key Dates Key Project
More informationOutage Coordination and Business Practices
Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what
More informationPrinceton Astrophysics Community Meeting
Princeton Astrophysics Community Meeting Michael Moore Program Executive Astrophysics Division Science Mission Directorate September 4, 2012 Timeline 2011 2012 10 January: Identification of hardware availability
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Western Africa Transport & ICT Global Practice IBRD/IDA Adaptable Program Loan FY 2011 Seq No: 10 ARCHIVED on 20-Mar-2017 ISR26574 Implementing Agencies: Public Disclosure
More informationNASA s Planetary Science Program Status
NASA s Planetary Science Program Status Presentation to VEXAG James L. Green Director, Planetary Science Division October 28, 2009 1 Outline MSL status Announcements of Opportunity R&A International Agreements
More information2019 Settlement Calendar for ASX Cash Market Products. ASX Settlement
2019 Settlement Calendar for ASX Cash Market Products ASX Settlement Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business
More informationJames Webb Space Telescope (JWST)
James Webb Space Telescope (JWST) Engineering the Beginning US Frontiers of Engineering Conference Amy S. Lo JWST System Engineering Space-Based observation has enabled giant leaps in our understanding
More informationISO Lead Auditor Lean Six Sigma PMP Business Process Improvement Enterprise Risk Management IT Sales Training
Training Calendar 2014 Public s (ISO LSS PMP BPI ERM IT Sales Training) www.excelledia.com (ISO, LSS, PMP, BPI, ERM, IT, Sales Public s) 1 Schedule Registration JANUARY FEBRUARY 2 days 26 JAN 27 JAN 3
More informationFinancial Review. No member of the Board of Directors has reported accepting any gifts or incentive from any vendor contracted by the association.
Financial Review In accordance with NRS 116.31083, the financial statements for La Jolla Classic HOA for the month ending March 31st, 2015 have been provided to the Board of Directors by Mesa Management,
More informationThe World Bank TOGO Community Development and Safety Nets Project (P127200)
Public Disclosure Authorized AFRICA Togo Social Protection & Labor Global Practice IBRD/IDA Specific Investment Loan FY 2012 Seq No: 9 ARCHIVED on 16-Sep-2016 ISR25166 Implementing Agencies: Technical
More informationWISE Science Data System Frame Co-addition Peer Review: Introduction and Overview
WISE Science Data System Frame Co-addition Peer Review: Introduction and Overview R. Cutri and the WSDC Team @ IPAC 1 Review Panel Sean Carey (IPAC/SSC) Nick Gautier (JPL/WISE Science Team) John Good (IPAC/IRSA)
More informationFrom VOA Learning English, this is Science in the News. I m June Simms.
From VOA Learning English, this is Science in the News. I m June Simms. And I m Jim Tedder. Today on the program, we tell about developments in space exploration. We tell about an American decision to
More informationINTEGRAL International Gamma-Ray Astrophysics Laboratory. Science Management Plan
INTEGRAL International Gamma-Ray Astrophysics Laboratory Science Management Plan ESA/SPC(94)1, rev.2, annex June 1994 1 2 Contents 1 Scope 1 2 Mission Overview 3 2.1 Introduction......................................
More information2024 Mars Sample Return Design Overview
2024 Mars Sample Return Design Overview Andrew Hoffman sentinel72@gmail.com Abstract Scheduled for two launches set during two consecutive launch windows with the first launch occurring in 2024, the landmark
More informationSOFIA Science Metrics Update
SOFIA Science Metrics Update Bill Reach SOFIA Deputy SMO Director WReach@usra.edu Astrophysics Advisory Committee NASA Headquarters July 2017 Kimberly Ennico Smith NASA SOFIA Project Scientist Kimberly.Ennico@nasa.gov
More information2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT
2017 Settlement Calendar for ASX Cash Market Products ASX SETTLEMENT Settlement Calendar for ASX Cash Market Products 1 ASX Settlement Pty Limited (ASX Settlement) operates a trade date plus two Business
More informationThe World Bank Bangladesh Modern Food Storage Facilities Project (P120583)
Public Disclosure Authorized SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 8 ARCHIVED on 10-Nov-2017 ISR28544 Implementing Agencies: Government
More informationESA UNCLASSIFIED For Official Use. BepiColombo à Exploring Mercury
BepiColombo à Exploring Mercury ESA / JAXA BepiColombo Mercury Mercury has always been something of a puzzle for planetary scientists. Its close position to the Sun means it is very difficult to observe.
More informationThe World Bank CG Rep. LISUNGI Safety Nets System Project (P145263)
Public Disclosure Authorized AFRICA Congo, Republic of Social Protection & Labor Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on 04-Dec-2017 ISR30246 Implementing Agencies:
More informationPublished by ASX Settlement Pty Limited A.B.N Settlement Calendar for ASX Cash Market Products
Published by Pty Limited A.B.N. 49 008 504 532 2012 Calendar for Cash Market Products Calendar for Cash Market Products¹ Pty Limited ( ) operates a trade date plus three Business (T+3) settlement discipline
More informationDates and Prices ICAEW - Manchester In Centre Programme Prices
Dates and Prices ICAEW - Manchester - 2019 In Centre Programme Prices Certificate Level GBP ( ) Intensive Accounting 690 Assurance 615 Law 615 Business, Technology and Finance 615 Mangement Information
More informationMonthly Proton Flux. Solar modulation with AMS. Veronica Bindi, AMS Collaboration
Solar modulation with AMS Monthly Proton Flux Veronica Bindi, AMS Collaboration Physics and Astronomy Department University of Hawaii at Manoa Honolulu, Hawaii, US 1 AMS on the ISS May 19, 2011 and for
More informationThe World Bank Bangladesh Modern Food Storage Facilities Project (P120583)
SOUTH ASIA Bangladesh Agriculture Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 22-Apr-2016 ISR23210 Implementing Agencies: Directorate General, Ministry of Food Key
More informationCRaTER. Justin Kasper, PS, Harvard-Smithsonian CfA
CRaTER Cosmic Ray Telescope for the Effects of Radiation Harlan E. Spence, PI, Boston University CSP Justin Kasper, PS, Harvard-Smithsonian CfA NASA s Goddard Space Flight Center Luna Ut Nos Animalia Tueri
More informationAnnouncement of Opportunity AKARI (ASTRO-F)
Announcement of Opportunity AKARI (ASTRO-F) CALL FOR OBSERVING PROPOSALS for the AKARI Post-Helium (phase 3) mission 2 nd year of Operations (October 2009 October 2010) Policies and procedures 27 May 2009
More informationFolsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam
Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 28, 2015 Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG WELCOME &
More informationPublic Disclosure Copy
Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SOUTH ASIA South Asia Transport & ICT Global Practice IBRD/IDA Investment Project Financing
More informationOrbit Design Marcelo Suárez. 6th Science Meeting; Seattle, WA, USA July 2010
Orbit Design Marcelo Suárez Orbit Design Requirements The following Science Requirements provided drivers for Orbit Design: Global Coverage: the entire extent (100%) of the ice-free ocean surface to at
More information2018 Annual Review of Availability Assessment Hours
2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory
More informationPROGRAM-LEVEL REQUIREMENTS FOR THE SOLAR DYNAMICS OBSERVATORY PROJECT. Appendix A -DRAFT- March 2003
PROGRAM-LEVEL REQUIREMENTS FOR THE SOLAR DYNAMICS OBSERVATORY PROJECT Appendix A -DRAFT- March 2003 1 Appendix A -DRAFT- Program-Level Requirements for the Solar Dynamics Observatory Project A-1.0 INTRODUCTION
More information