TYPE APPROVAL CERTIFICATE

Size: px
Start display at page:

Download "TYPE APPROVAL CERTIFICATE"

Transcription

1 TYPE APPROVAL CERTIFICATE Certificate No: D-5952 File No: Job Id: This is to certify: That the Kill and Choke Equipment with type designation(s) Ell, Tee & Lateral Issued to Kemper Valve & Fitting Corp. ISLAND LAKE IL, United States is found to comply with DNV-OS-E101 Drilling Plant October 2013 and Det Norske Veritas AS understanding of the implementation and interpretation of: PSA's "Regulations relating to design and outfitting of the facilities etc. in the petroleum activities" (THE FACILITIES REGULATIONS), January 2011, Ch.VIII NMD's "Regulation of 4 September 1987, amended 11 April 2003, concerning construction of mobile offshore units" Application : See page 2 This Certificate is valid until Issued at Houston on DNV GL local station: Approval CMC Houston for DNV GL Approval Engineer: Josephine Huang Christian Nilsen Team Lead This Certificate is subject to terms and conditions overleaf. Any significant change in design or construction may render this Certificate invalid. The validity date relates to the Type Approval Certificate and not to the approval of equipment/systems installed. Form code: TA 1411a Revision: Page 1 of 16 DNV GL DNV GL and the Horizon Graphic are trademarks of DNV GL AS.

2 Product Description 1, 1-1/2, 2, 3 & 4 Fig. 602, 1002 &1502 Long Radius Ell, Flow Ell, Cushion Ell, Flow Tee, Flow Lateral, Cross and WYE. References : [1] API Specification 6A, Specification for Christimas Tree and Equipment, 20 th Edition [2] API 16C, Specification for Choke and Kill Systems, 1 st Edition [3] ASME VIII, Div. 2, Boiler & Pressure Vessel Code, current Edition [4] NACE MR0175/ISO 15156, Petroleum and Natural Gas Industries Material for Use in H2S Containing Environments in Oil and Gas Production, 2nd Edition Application/Limitation - Minimum Design Temperature : -29 o C (-20 o F) - Maximum Design Temperature : 121 o C (250 o F) Part No. Description Serv. Max. Long Radius Ells psi RB3FB3MA LONG RADIUS ELL: 3 FIG 1002 F X M STD 10,000 RB4FB4MA LONG RADIUS ELL: 4 FIG 1002 F X M STD 10,000 RR2FR2MA LONG RADIUS ELL: 2 FIG 1502 F X M STD 15,000 RR3FR3MA LONG RADIUS ELL: 3 FIG 1502 F X M STD 15,000 RR4FR4MA LONG RADIUS ELL: 4 FIG 1502 F X M STD 15,000 RS3FS3MA LONG RADIUS ELL: 3 FIG 602 F X M STD 6,000 RS4FS4MA LONG RADIUS ELL: 4 FIG 602 F X M STD 6,000 RS2FS2MA LONG RADIUS ELL: 2 FIG 602 F X M STD 6,000 RR1FR1MA LONG RADIUS ELL: 1 FIG 1502 F X M STD 15,000 RR1MR1MA LONG RADIUS ELL: 1 FIG 1502 M X M STD 15,000 RR15FR15MA LONG RADIUS ELL: 1 1/2 FIG 1502 F X M STD 15,000 9RB3FB3MA LONG RADIUS ELL: 3 FIG 1002 F X M SG H2S 7,500 9RR2FR2MA LONG RADIUS ELL: 2 FIG 1502 F X M SG H2S 10,000 9RR3FR3MA LONG RADIUS ELL: 3 FIG 1502 F X M SG H2S 10,000 9RR4FR4MA LONG RADIUS ELL: 4 FIG 1502 F X M SG H2S 10,000 9RS3FS3MA LONG RADIUS ELL: 3 FIG 602 F X M SG H2S 6,000 9RS4FS4MA LONG RADIUS ELL: 4 FIG 602 F X M SG H2S 6,000 Flow Ells E45R3FR3MA FLOW ELL: 45 3 FIG 1502 F X M STD 15,000 E45R3MR3FA FLOW ELL: 45 3 FIG 1502 M X F STD 15,000 ER2FR2MA FLOW ELL: 2 FIG 1502 F X M STD 15,000 ER3FB4MA FLOW ELL: 3 FIG 1502 F X 4 FIG 1002 M STD 10,000 ER3FR3MA FLOW ELL: 3 FIG 1502 F X M STD 15,000 ER3MR3FA FLOW ELL: 3 FIG 1502 M X F STD 15,000 ER3MR3MA FLOW ELL: 3 FIG 1502 M X M STD 15,000 ES3FS3MA FLOW ELL: 3 FIG 602 F X M STD 6,000 ES3FS4MA FLOW ELL: 3 FIG 602 F X 4 FIG 602 M STD 6,000 Form code: TA 1411a Revision: Page 2 of 16

3 Part No. Description Serv. Max. Flow Ells (Continued) psi EB3FB3MA FLOW ELL: 3 FIG 1002 F X M STD 10,000 ES4FS3MA FLOW ELL: 4 FIG 602 F X 3 FIG 602 M STD 6,000 ES4FS4MA FLOW ELL: 4 FIG 602 F X M STD 6,000 EB4FB4MA FLOW ELL: 4 FIG 1002 F X M STD 10,000 ER2MR2FA FLOW ELL: 2 FIG 1502 M X F STD 15,000 ER4FR4MA FLOW ELL: 4 FIG 1502 F X M STD 15,000 ES3MS3MA FLOW ELL: 3 FIG 602 M X M STD 6,000 ER15FR15MA FLOW ELL: 1 1/2 FIG 1502 F X M STD 15,000 9ER2FR2MA FLOW ELL: 2 FIG 1502 F X M SG H2S 10,000 9E45R3FR3MA FLOW ELL: 3 FIG 1502 F X M SG H2S 10,000 9E45R3MR3FA FLOW ELL: 3 FIG 1502 M X F SG H2S 10,000 9EB3FB3MA FLOW ELL: 3 FIG 1002 F X M SG H2S 7,500 9EB4FB4MA FLOW ELL: 4 FIG 1002 F X M SG H2S 7,500 9ER2MR2FA FLOW ELL: 2 FIG 1502 M X F SG H2S 10,000 9ER2MR2MA FLOW ELL: 2 FIG 1502 M X M SG H2S 10,000 9ER3FB4MA FLOW ELL: 3 FIG 1502 F X 4 FIG 1002 M SG H2S 7,500 9ER3FR3MA FLOW ELL: 3 FIG 1502 F X M SG H2S 10,000 9ER3MR3FA FLOW ELL: 3 FIG 1502 M X F SG H2S 10,000 9ER3MR3MA FLOW ELL: 3 FIG 1502 M X M SG H2S 10,000 9ER4FR4MA FLOW ELL: 4 FIG 1502 F X M SG H2S 10,000 Cushion Ells CB3MB3FA CUSHION ELL: 3 FIG 1002 M X F STD 10,000 CB4FB4MA CUSHION ELL: 4 FIG 1002 F X M STD 10,000 CB4MB4FA CUSHION ELL: 4 FIG 1002 M X F STD 10,000 CB4MR3FA CUSHION ELL: 4 FIG 1002 M X 3 FIG 1502 F STD 10,000 CR2FR2FA CUSHION ELL: 2 FIG 1502 F X F STD 15,000 CR2FR2MA CUSHION ELL: 2 FIG 1502 F X M STD 15,000 CR2MR2FA CUSHION ELL: 2 FIG 1502 M X F STD 15,000 CR2MR2MA CUSHION ELL: 2 FIG 1502 M X M STD 15,000 CR3FR3MA CUSHION ELL: 3 FIG 1502 F X M STD 15,000 CR3MR3FA CUSHION ELL: 3 FIG 1502 M X F STD 15,000 CR4FR4MA CUSHION ELL: 4 FIG 1502 F X M STD 15,000 CS3FS3MA CUSHION ELL: 3 FIG 602 F X M STD 6,000 CS3MS3FA CUSHION ELL: 3 FIG 602 M X F STD 6,000 CS4FS4MA CUSHION ELL: 4 FIG 602 F X M STD 6,000 CS4MS4FA CUSHION ELL: 4 FIG 602 M X F STD 6,000 CR3MR3MA CUSHION ELL: 3 FIG 1502 M X M STD 15,000 9CR3FR3MA CUSHION ELL: 3 FIG 1502 F X M SG H2S 10,000 9CR3MR3FA CUSHION ELL: 3 FIG 1502 M X F SG H2S 10,000 9CR4FR4MA CUSHION ELL: 4 FIG 1502 F X M SG H2S 10,000 Form code: TA 1411a Revision: Page 3 of 16

4 Part No. Description Serv. Max. Cushion Ells (Continued) psi 9CB4MB4FA CUSHION ELL: 4 FIG 1002 M X F SG H2S 7,500 9CB3MB3FA CUSHION ELL: 3 FIG 1002 M X F SG H2S 7,500 9CB4FB4MA CUSHION ELL: 4 FIG 1002 F X M SG H2S 7,500 9CR2FR2FA CUSHION ELL: 2 FIG 1502 F X F SG H2S 10,00 9CR2FR2MA CUSHION ELL: 2 FIG 1502 F X M SG H2S 10,000 9CR2MR2FA CUSHION ELL: 2 FIG 1502 M X F SG H2S 10,000 9CR2MR2MA CUSHION ELL: 2 FIG 1502 M X M SG H2S 10,000 9CR3MR3MA CUSHION ELL: 3 FIG 1502 M X M SG H2S 10,000 9CS3MS3FA CUSHION ELL: 3 FIG 602 M X F SG H2S 6,000 9CS4MS4FA CUSHION ELL: 4 FIG 602 M X F SG H2S 6,000 Flow Tee TB3FR2FB3MA FLOW TEE: F X F X M STD 10,000 TB4FB4FB4MA FLOW TEE: 4 FIG 1002 F X F X M STD 10,000 TB4FB4MB4FA FLOW TEE: 4 FIG 1002 F X M X F STD 10,000 TB4FB4MB4MA FLOW TEE: 4 FIG 1002 F X M X M STD 10,000 TB4FR2FB4MA FLOW TEE: F X F X M STD 10,000 TB4FR3FB4MA FLOW TEE: F X F X M STD 10,000 TB4FR3HDFB4MA FLOW TEE: F X HD F X M STD 10,000 TB4MB4FB4MA FLOW TEE: 4 FIG 1002 M X F X M STD 10,000 TB4MB4MB4MA FLOW TEE: 4 FIG 1002 M X M X M STD 10,000 TB4MR2FB4MA FLOW TEE: M X F X M STD 10,000 TR15FR15FR15MA FLOW TEE: 1 1/2 FIG 1002 F X F X M STD 10,000 TR1FR1FR1MA FLOW TEE: 1 FIG 1502 F X F X M STD 15,000 TR1FR1MR1FA FLOW TEE: 1 FIG 1502 F X M X F STD 15,000 TR2FB1FR2MA FLOW TEE: F X F X 2 M 1502 STD 10,000 TR2FR15FR15MA FLOW TEE: 2 FIG 1502 F X 1 1/2 F X 1 1/ 2 M STD 15,000 TR2FR2FR2FA FLOW TEE: 2 FIG 1502 F X F X F STD 15,000 TR2FR2FR2M-2A FLOW TEE: F X F X M BORE STD 15,000 TR2FR2FR2MA FLOW TEE: 2 FIG 1502 F X F X M STD 15,000 TR2FR2MR2FA FLOW TEE: 2 FIG 1502 F X M X F STD 15,000 TR2FR2MR2MA FLOW TEE: 2 FIG 1502 F X M X M STD 15,000 TR2MR2FR2MA FLOW TEE: 2 FIG 1502 M X F X M STD 15,000 TR2MR2MR2MA FLOW TEE: 2 FIG 1502 M X M X M STD 15,000 TR3FR2FR3MA FLOW TEE: F X F X M STD 15,000 TR15FR15MR15FA FLOW TEE: 1 1/2 FIG 1502 F X M X F STD 15,000 TR4FR4MR4FA FLOW TEE: 4 FIG 1502 F X M X F STD 15,000 TR3FFF-25A FLOW TEE: F X F X F 25 DEG BORE STD 15,000 TR3FFM-25A FLOW TEE: F X F X M 25 DEG BORE STD 15,000 TS3FS3FS4MA FLOW TEE: F X F X M STD 6,000 Form code: TA 1411a Revision: Page 4 of 16

5 Part No. Description Serv. Max. Flow Tees (Continued) psi 9TR2FR2FR2FA FLOW TEE: 2 FIG 1502 F X F X F SG H2S 10,000 9TR3FR3FR3MA FLOW TEE: 3 FIG 1502 F X F X M SG H2S 10,000 9TR4FR4MR4MA FLOW TEE: 4 FIG 1502 F X M X M SG H2S 10,000 9TS3FS3FS3MA FLOW TEE: 3 FIG 602 F X F X M SG H2S 6,000 9TR2FR2FR2MA FLOW TEE: 2 FIG 1502 F X F X M SG H2S 10,000 9TB3FB3MB3MA FLOW TEE: 3 FIG 1002 F X M X M SG H2S 7,500 9TB3FR2FB3MA FLOW TEE: F x F x M SG. H2S 7,500 9TB3FR3FB3MA FLOW TEE: F x F x M SG H2S 7,500 9TB4FB4FB4FA FLOW TEE: 4 FIG 1002 F X F X F SG H2S 7,500 9TB4FB4FB4MA FLOW TEE: 4 FIG 1002 F X F X M SG H2S 7,500 9TB4FB4MB4FA FLOW TEE: 4 FIG 1002 F X M X F SG H2S 7,500 9TB4FB4MB4MA FLOW TEE: 4 FIG 1002 F X M X M SG H2S 7,500 9TB4FR2FB4MA FLOW TEE: F x F x M SG H2S 7,500 9TB4FR3FB4MA FLOW TEE: F x F x M SG H2S 7,500 9TB4FR3HDFB4MA FLOW TEE: F x FHD x M SG H2S 7,500 9TB4MB4FB4MA FLOW TEE: 4 FIG 1002 M X F X M SG H2S 7,500 9TB4MB4MB4MA FLOW TEE: 4 FIG 1002 M X M X M SG H2S 7,500 9TB4MR2FB4MA FLOW TEE: M x F x M SG H2S 7,500 9TR15FR15FR15MA FLOW TEE: 1 1/2 FIG 1502 F X F X M SG H2S 10,000 9TR15FR15MR15MA FLOW TEE: 1 1/2 FIG 1502 F X M X M SG H2S 10,000 9TR15FR2MR15MA FLOW TEE: 1 1/2 1502F x M x 1 1/2 1502M H2S 10,000 SG 9TR1FR1FR1MA FLOW TEE: 1 FIG 1502 F X F X M SG H2S 10,000 9TR1FR1MR1FA FLOW TEE: 1 FIG 1502 F X M X F SG H2S 10,000 9TR2FB1FR2MA FLOW TEE: F x F x M SG H2S 7,500 9TR2FB2FR2MA FLOW TEE: F x F x M SG H2S 7,500 9TR2FR15FR15MA FLOW TEE: F x 1 1/2 1502F x 1 1/ M H2S 10,000 SG 9TR2FR2MR2FA FLOW TEE: 2 FIG 1502 F X M X F SG H2S 10,000 9TR2FR2MR2MA FLOW TEE: 2 FIG 1502 F X M X M SG H2S 10,000 9TR2MR2FR2MA FLOW TEE: 2 FIG 1502 M X F X M SG H2S 10,000 9TR2MR2MR2MA FLOW TEE: 2 FIG 1502 M X M X M SG H2S 10,000 9TR3FR2FR3MA FLOW TEE: F x F x M SG H2S 10,000 9TR3FR3MR3FA FLOW TEE: 3 FIG 1502 F X M X F SG H2S 10,000 9TR3FR3MR3MA FLOW TEE: 3 FIG 1502 F X M X M SG H2S 10,000 9TR3MR2FR3MA FLOW TEE: M x F x M SG H2S 10,000 9TR3MR3FR3MA FLOW TEE: 3 FIG 1502 M X F X M SG H2S 10,000 9TR4FR2FB4MA FLOW TEE: F x F x M SG H2S 7,500 9TR4FR2FR4MA FLOW TEE: F x F x M SG H2S 10,000 9TR4FR3FR4MA FLOW TEE: F x 3 FIG 1502F x M SG H2S 10,000 Form code: TA 1411a Revision: Page 5 of 16

6 Part No. Description Serv. Max. Flow Tees (Continued) psi 9TR4FR4FR4FA FLOW TEE: 4 FIG 1502 F X F X F SG H2S 10,000 9TR4FR4FR4MA FLOW TEE: 4 FIG 1502 F X F X M SG H2S 10,000 9TR4MR4FR4MA FLOW TEE: 4 FIG 1502 M X F X F SG H2S 10,000 9TR4MR4MR4MA FLOW TEE: 4 FIG 1502 M X M X M SG H2S 10,000 9TS4FR2FB4MA FLOW TEE: 4 602F x F x M SG H2S 6,000 9TS4FR3FS4MA FLOW TEE: 4 602F x F x 4 602M SG H2S 6,000 9TS4FS4FS4MA FLOW TEE: 4 FIG 602 F X F X M SG H2S 6,000 9TS4FR2FS4MA FLOW TEE: 4 602F x F x 4 602M SG H2S 6,000 LATERALS LB3FB3FB3MA FLOW LATERAL: 3 FIG 1002 F X F X M STD 10,000 LB4FB4FB4MA FLOW LATERAL: 4 FIG 1002 F X F X M STD 10,000 LB4FR3FB4MA FLOW LATERAL: F x F x M STD 10,000 LB4MB4MB4FA FLOW LATERAL: 4 FIG 1002 M X M X F STD 10,000 LR3FR3FB4MA FLOW LATERAL: F x F x M STD 10,000 LR3FR3FR3MA FLOW LATERAL: 3 FIG 1502 F X F X M STD 15,000 LR3MR3FR3FA FLOW LATERAL: 3 FIG 1502 M X F X F STD 15,000 LR4FR3HDFR4MA FLOW LATERAL: F x F HD x M STD 15,000 LR3FR3FR4MA FLOW LATERAL: F x F x M STD 15,000 LR4FR4FR4MA FLOW LATERAL: 4 FIG 1502 F X F X M STD 15,000 LS4FS4FS4MA FLOW LATERAL: 4 FIG 602 F X F X M STD 6,000 LR4FR3FR4MA FLOW LATERAL: F x F x M STD 15,000 LR3MR3MR4FA FLOW LATERAL: M x M x F STD 15,000 LB4FR2FB4MA FLOW LATERAL: F x F x M STD 10,000 CROSS 9XB4FB4FB4FB4FA CROSS W/ 4" F X F X F X F, FIG SG H2S 7,500 9XB4FB4FB4FB4MA CROSS W/ 4" F X F X F X M, FIG SG H2S 7,500 9XB4FB4MB4MB4MA CROSS W/ 4" F X M X M X M, FIG SG H2S 7,500 9XB4MB4FB4FB4FA CROSS W/ 4" M X F X F X F, FIG SG H2S 7,500 9XB4MB4FB4MB4FA CROSS W/ 4" M X F X M X F, FIG SG H2S 7,500 9XB4MB4MB4FB4FA CROSS W/ 4" M X M X F X F, FIG SG H2S 7,500 9XR2FR2FR2FR2FA CROSS W/ 2" F X F X F X F, FIG SG H2S 10,000 9XR2FR2FR2FR2MA CROSS W/ 2" F X F X F X M, FIG SG H2S 10,000 9XR2FR2FR2MR2MA CROSS W/ 2" F X F X M X M, FIG SG H2S 10,000 9XR2FR2MR2FR2FA CROSS W/ 2" F X M X F X F, FIG SG H2S 10,000 9XR2FR2MR2FR2MA CROSS W/ 2" F X M X F X M, FIG SG H2S 10,000 9XR2FR2MR2MR2FA CROSS W/ 2" F X M X M X F, FIG SG H2S 10,000 9XR2FR2MR2MR2MA CROSS W/ 2" F X M X M X M, FIG SG H2S 10,000 9XR2MR2FR2FR2FA CROSS W/ 2" M X F X F X F, FIG SG H2S 10,000 9XR2MR2FR2FR2MA CROSS W/ 2" M X F X F X M, FIG SG H2S 10,000 Form code: TA 1411a Revision: Page 6 of 16

7 Part No. Description Serv. Max. 9XR2MR2FR2MR2FA CROSS W/ 2" M X F X M X F, FIG SG H2S 10,000 9XR2MR2FR2MR2MA CROSS W/ 2" M X F X M X M, FIG SG H2S 10,000 9XR2MR2MR2FR2FA CROSS W/ 2" M X M X F X F, FIG SG H2S 10,000 9XR2MR2MR2MR2FA CROSS W/ 2" M X M X M X F, FIG SG H2S 10,000 9XR2MR2MR2MR2MA CROSS W/ 2" M X M X M X M, FIG SG H2S 10,000 9XR4FR4FR4FR4FA 4 CROSS W/ 4 F X F X F X F, FIG SG H2S 10,000 9XR4MR4FR4FR4FA 4 CROSS W/ 4 M X F X FX X F, FIG SG H2S 10,000 9XR4MR4FR4FR4FA 4 CROSS W/ 4 M X F X M X F, FIG SG H2S 10,000 9XR4MR4MR4FR4FA 4 CROSS W/ 4 M X M X F X F, FIG SG H2S 10,000 9XR4MR4MR4FR4MA 4 CROSS W/ 4 M X M X F X M, FIG SG H2S 10,000 9XS2FS2FS2FS2MA 2 CROSS W/ 2 F X F X F X M, FIG. 602 ENDS, SG H2S 10,000 XB4FB4FB4FB4A 4 CROSS W/ 4 F X F X F X F, FIG ENDS STD 10,000 XB4FB4FB4FB4MA 4 CROSS W/ 4 F X F X F X M, FIG ENDS STD 10,000 XB4FB4MB4MB4MA 4 CROSS W/ 4 F X M X M X M, FIG ENDS STD 10,000 XB4MB4FB4FB4FA 4 CROSS W/ 4 M X F XF X F, FIG ENDS STD 10,000 XB4MB4FB4MB4FA 4 CROSS W/ 4 M X F X M X F, FIG ENDS STD 10,000 XB4MB4MB4FB4FA 4 CROSS W/ 4 F X F X F X M, FIG ENDS STD 10,000 XR2FR2FR2FR2FA 2 CROSS W/2 F X F X F X F, FIG ENDS STD 15,000 XR2FR2FR2FR2MA 2 CROSS W/2 F X F X F X M, FIG END STD 15,000 XR2FR2FR2MR2MA 2 CROSS W/2 F X F X M X M, FIG END STD 15,000 XR2FR2MR2FR2FA 2 CROSS W/2 F X M X F X F, FIG END STD 15,000 XR2FE2MR2FR2MA 2 CROSS W/2 F X M X F X M, FIG END STD 15,000 XR2FR2MR2MR2FA 2 CROSS W/2 F X M X M X F, FIG ENDS STD 15,000 XR2FR2MR2MR2MA 2 CROSS W/2 F X M X M X M, FIG ENDS STD 15,000 XR2MR2FR2FR2FA 2 CROSS W/2 M X F X F X F, FIG ENDS STD 15,000 XR2MR2FR2FR2MA 2 CROSS W/2 M X F X F X M, FIG ENDS STD 15,000 XR2MR2FR2MR2FA 2 CROSS W/2 M X F X M X F, FIG ENDS STD 15,000 XR2MR2FR2MR2MA 2 CROSS W/2 M X F X M X M, FIG ENDS STD 15,000 XR2MR2MR2FR2FA 2 CROSS W/2 M X M X F X F, FIG ENDS STD 15,000 XR2MR2MR2MR2FA 2 CROSS W/2 M X M X M X F, FIG ENDS STD 15,000 XR2MR2MR2MR2MA 2 CROSS W/2 M X M X M X M, FIG ENDS STD 15,000 XR3FR3FR3FR3FA 3 CROSS W/3 F X F X F X F, FIG ENDS STD 15,000 XR3FR3FR3FR3MA 3 CROSS W/3 F X F X F X M, FIG ENDS STD 15,000 XR3FR3FR3MR3MA 3 CROSS W/3 F X F X M X M, FIG ENDS STD 15,000 XR3FR3MR3FR3MA 3 CROSS W/3 F X M X F X M, FIG ENDS STD 15,000 XR3FE3MR3MR3MA 3 CROSS W/3 F X M X M X M, FIG ENDS STD 15,000 XR3MR3MR3FR3MA 3 CROSS W/3 M X M X F X, FIG ENDS STD 15,000 XR3MR3MR3MR3MA 3 CROSS W/3 M X M X M X M, FIG ENDS STD 15,000 XR4FR4FR4FR4FA 4" CROSS W/ 4" F X F X F X F, FIG ENDS STD 15,000 XR4MR4FR4FR4FA 4" CROSS W/ 4" M X F X F X F, FIG ENDS STD 15,000 XR4MR4FR4MR4FA 4" CROSS W/ 4" M X F X M X F, FIG ENDS STD 15,000 XR4MR4MR4FR4FA 4" CROSS W/ 4" M X M X F X F, FIG ENDS STD 15,000 XR4MR4MR4FR4MA 4" CROSS W/ 4" M X M X F X M, FIG ENDS STD 15,000 XS2FS2FS2FS2MA 2" CROSS W/ 2" F X F X F X M, FIG. 602 ENDS STD 6,000 XS4MS4MS4FS4MA 4" CROSS W/ 4" M X M X F X M, FIG. 602 ENDS STD 6,000 Form code: TA 1411a Revision: Page 7 of 16

8 WYE 1 1/2" WYE W/ 1 1/2" F X F X M, FIG H2S 1,5000 9YR15FR15FR15MA ENDS, ASSY. SG 2" WYE W/ 2" F X F X F, FIG ENDS, H2S 10,000 9YB2FB2FB2FA ASSY. SG 2" WYE W/ 2" F X F X M, FIG ENDS, H2S 10,000 9YB2FB2FB2MA ASSY. SG 2" WYE W/ 2" M X M X F, FIG ENDS, H2S 10,000 9YB2MB2MB2FA ASSY. SG 2" WYE W/ 2" M X M X M, FIG ENDS, H2S 10,000 9YB2MB2MB2MA ASSY. SG 2" WYE W/ 2" F X F X F, FIG ENDS, H2S 1,5000 9YR2FR2FR2FA ASSY. SG 2" WYE W/ 2" F X F X M, FIG ENDS, H2S 1,5000 9YR2FR2FR2MA ASSY. SG 2" WYE W/ 2" F X M X M, FIG ENDS, H2S 1,5000 9YR2FR2MR2MA ASSY. SG 2" WYE W/ 2" M X F X F, FIG ENDS, H2S 1,5000 9YR2MR2FR2FA ASSY. SG 2" WYE W/ 2" M X M X F, FIG ENDS, H2S 1,5000 9YR2MR2MR2FA ASSY. SG 2" WYE W/ 2" M X M X M, FIG ENDS, H2S 1,5000 9YR2MR2MR2MA ASSY. SG 2" WYE W/ 2" F X F X F, FIG. 602 ENDS, ASSY. H2S 6,000 9YS2FS2FS2FA SG 2" WYE W/ 2" F X F X M, FIG. 602 ENDS, ASSY. H2S 6,000 9YS2FS2FS2MA SG 2" WYE W/ 2" M X M X F, FIG. 602 ENDS, H2S 6,000 9YS2MS2MS2FA ASSY. SG 2" WYE W/ 2" M X M X M, FIG. 602 ENDS, H2S 6,000 9YS2MS2MS2MA ASSY. SG 1 1/2" WYE W/ 1 1/2" F X F X M, FIG STD 1,5000 YR15FR15FR15MA ENDS, ASSY. 2" WYE W/ 2" F X F X F, FIG ENDS, STD 1,5000 YR2FR2FR2FA ASSY. 2" WYE W/ 2" F X F X M, FIG ENDS, STD 1,5000 YR2FR2FR2MA ASSY. 2" WYE W/ 2" F X M X M, FIG ENDS, STD 1,5000 YR2FR2MR2MA ASSY. 2" WYE W/ 2" M X F X F, FIG ENDS, STD 1,5000 YR2MR2FR2FA ASSY. 2" WYE W/ 2" M X M X F, FIG ENDS, STD 1,5000 YR2MR2MR2FA ASSY. 2" WYE W/ 2" M X M X M, FIG ENDS, STD 1,5000 YR2MR2MR2MA ASSY. YS2FS2FS2FA 2" WYE W/ 2" F X F X F, FIG. 602 ENDS, ASSY. STD 6,000 YS2FS2FS2MA 2" WYE W/ 2" F X F X M, FIG. 602 ENDS, ASSY. STD 6,000 2" WYE W/ 2" M X M X F, FIG. 602 ENDS, STD 6,000 YS2MS2MS2FA ASSY. YS2MS2MS2MA 2" WYE W/ 2" M X M X M, FIG. 602 ENDS, ASSY. STD 6,000 Form code: TA 1411a Revision: Page 8 of 16

9 Type Approval documentation Drawings: Drawing No. Rev Description Long Radius ELL 9RB3FB3M B LONG RADIUS ELL: 3" 1002 F X M SG 9RR2FR2M - LONG RADIUS ELL: 2" 1502 F X M SG 9RR3FR3M B LONG RADIUS ELL: 3" 1502 F X M SG 9RR4FR4M - LONG RADIUS ELL: 4" 1502 F X M SG 9RS3FS3M B LONG RADIUS ELL: 3" 602 F X M SG 9RS4FS4M - LONG RADIUS ELL: 4" 602 F X M SG RB3FB3M B LONG RADIUS ELL: 3" 1002 F X M RB4FB4M A LONG RADIUS ELL: 4" 1002 F X M RR15FR15M - LONG RADIUS ELL: 1 1/2" 1502 F X M RR1FR1M - LONG RADIUS ELL: 1" 1502 F X M RR1MR1M - LONG RADIUS ELL: 1" 1502 M X M RR2FR2M A LONG RADIUS ELL: 2" 1502 F X M RR3FR3M B LONG RADIUS ELL: 3" 1502 F X M RR4FR4M - LONG RADIUS ELL: 4" 1502 F X M RS2FS2M - LONG RADIUS ELL: 2" 602 F X M RS3FS3M B LONG RADIUS ELL: 3" 602 F X M RS4FS4M B LONG RADIUS ELL: 4" 602 F X M FLOW ELL 9E45R3FR3M - FLOW ELL: 3" 1502 F X M SG 9E45R3MR3F - FLOW ELL: 3" 1502 M X F SG 9EB3FB3M - FLOW ELL: 3" 1002 F X M SG 9EB4FB4M - FLOW ELL: 4" 1002 F X M SG 9ER2FR2M - FLOW ELL: 2" 1502 F X M SG 9ER2MR2F B FLOW ELL: 2" 1502 M X F SG 9ER2MR2M - FLOW ELL: 2" 1502 M X M SG 9ER3FB4M A FLOW ELL: 3" 1502 F X 4" 1002 M SG 9ER3FR3M B FLOW ELL: 3" 1502 F X M SG 9ER3MR3F - FLOW ELL: 3" 1502 M X F SG 9ER3MR3M - FLOW ELL: 3" 1502 M X M SG 9ER4FR4M - FLOW ELL: 4" 1502 F X M SG E45R3FR3M - FLOW ELL: 45 3" 1502 F X M E45R3MR3F - FLOW ELL: 45 3" 1502 M X F EB3FB3M - FLOW ELL: 3" 1002 F X M EB4FB4M - FLOW ELL: 4" 1002 F X M ER15FR15M - FLOW ELL: 1 1/2" 1502 F X M ER2FR2M D FLOW ELL: 2" 1502 F X M ER2MR2F B FLOW ELL: 2" 1502 M X F ER3FB4M A FLOW ELL: 3" 1502 F X 4 FIG 1002 M ER3FR3M B FLOW ELL: 3" 1502 F X M ER3MR3F B FLOW ELL: 3" 1502 M X F ER3MR3M A FLOW ELL: 3" 1502 M X M ER4FR4M - FLOW ELL: 4" 1502 F X M ES3FS3M - FLOW ELL: 3" 602 F X M ES3FS4M - FLOW ELL: 3" 602 F X 4" 602 M Form code: TA 1411a Revision: Page 9 of 16

10 Drawing No. Rev Description ES3MS3M - FLOW ELL: 3" 602 M X M ES4FS3M - FLOW ELL: 4" 602 F X 3" 602 M ES4FS4M - FLOW ELL: 4" 602 F X M CUSHION ELL 9CB3MB3F - CUSHION ELL: 3" 1002 M X F SG 9CB4FB4M - CUSHION ELL: 4" 1002 F X M SG 9CB4MB4F - CUSHION ELL: 4" 1002 M X F SG 9CR2FR2F - CUSHION ELL: 2" 1502 F X F SG 9CR2FR2M - CUSHION ELL: 2" 1502 F X M SG 9CR2MR2F - CUSHION ELL: 2" 1502 M X F SG 9CR2MR2M - CUSHION ELL: 2" 1502 M X M SG 9CR3FR3M B CUSHION ELL: 3" 1502 F X M SG 9CR3MR3F - CUSHION ELL: 3" 1502 M X F SG 9CR3MR3M - CUSHION ELL: 3" 1502 M X M SG 9CR4FR4M B CUSHION ELL: 4" 1502 F X M SG 9CS3MS3F - CUSHION ELL: 3" 602 M X F SG 9CS4MS4F - CUSHION ELL: 4" 602 M X F SG CB3MB3F B CUSHION ELL: 3" 1002 M X F CB4FB4M C CUSHION ELL: 4" 1002 F X M CB4MB4F B CUSHION ELL: 4" 1002 M X F CB4MR3F - CUSHION ELL: 4" 1002 M X 3" 1502 F CR2FR2F B CUSHION ELL: 2" 1502 F X F CR2FR2M B CUSHION ELL: 2" 1502 F X M CR2MR2F D CUSHION ELL: 2" 1502 M X F CR2MR2M B CUSHION ELL: 2" 1502 M X M CR3FR3M C CUSHION ELL: 3" 1502 F X M CR3MR3F B CUSHION ELL: 3" 1502 M X F CR3MR3M B CUSHION ELL: 3" 1502 M X M CR4FR4M B CUSHION ELL: 4" 1502 F X M CS3FS3M - CUSHION ELL: 3" 602 F X M CS3MS3F B CUSHION ELL: 3" 602 M X F CS4FS4M - CUSHION ELL: 4" 602 F X M CS4MS4F C CUSHION ELL: 4" 602 M X F FLOW TEE 9TB3FB3MB3M - FLOW TEE: 3" 1002 F x M x M SG 9TB3FR2FB3M - FLOW TEE: 3" 1002F x 2" 1502F x 3" 1002M SG 9TB3FR3FB3M - FLOW TEE: 3" 1002F x 3" 1502F x 3" 1002M SG 9TB4FB4FB4F - FLOW TEE: 4" 1002 F x F x F SG 9TB4FB4FB4M - FLOW TEE: 4" 1002 F x F x M SG 9TB4FB4MB4F - FLOW TEE: 4" 1002 F x M x F SG 9TB4FB4MB4M - FLOW TEE: 4" 1002 F x M x M SG 9TB4FR2FB4M - FLOW TEE: 4" 1002F x 2" 1502F x 4" 1002M SG 9TB4FR3HDFB4M - FLOW TEE: 4" 1002F x 3" 1502FHD x 4" 1002M SG 9TB4FR3FB4M - FLOW TEE: 4" 1002F x 3" 1502F x 4" 1002M SG 9TB4MB4FB4M - FLOW TEE: 4" 1002 M x F x M SG 9TB4MB4MB4M - FLOW TEE: 4" 1002 M x M x M SG 9TB4MR2FB4M - FLOW TEE: 4" 1002M x 2" 1502F x 4" 1002M SG 9TR15FR15FR15M - FLOW TEE: 1-1/2" 1502 F x F x M SG Form code: TA 1411a Revision: Page 10 of 16

11 Drawing No. Rev Description 9TR15FR15MR15M - FLOW TEE: 1-1/2" 1502 F x M x M SG 9TR15FR2MR15M - FLOW TEE: 1-1/2"1502Fx2"1502Mx1-1/2"1502MSG 9TR1FR1FR1M - FLOW TEE: 1" 1502 F x F x M SG 9TR1FR1MR1F - FLOW TEE: 1" 1502 F x M x F SG 9TR2FB1FR2M - FLOW TEE: 2" 1502 F x 1" 1002F x 2" 1502M SG 9TR2FB2FR2M - FLOW TEE: 2" 1502F x 1" 1002F x 2" 1502M SG 9TR2FR15FR15M - FLOW TEE: 2"1502Fx1-1/2"1502Fx1-1/ 2"1502MSG 9TR2FR2FR2F - FLOW TEE: 2" 1502 F x F x F SG 9TR2FR2FR2M - FLOW TEE: 2" 1502 F x F x M SG 9TR2FR2MR2F - FLOW TEE: 2" 1502 F x M x F SG 9TR2FR2MR2M - FLOW TEE: 2" 1502 F x M x M SG 9TR2MR2FR2M - FLOW TEE: 2" 1502 M x F x M SG 9TR2MR2MR2M - FLOW TEE: 2" 1502 M x M x M SG 9TR3FR2FR3M - FLOW TEE: 3"1502F x 2"1502F x 3"1502M SG 9TR3FR3FR3M - FLOW TEE: 3" 1502 F x F x M SG 9TR3FR3MR3F - FLOW TEE: 3" 1502 F x M x F SG 9TR3FR3MR3M - FLOW TEE: 3" 1502 F x M x M SG 9TR3MR2FR3M - FLOW TEE: 3"1502M x 2"1502F x 3"1502M SG 9TR3MR3FR3M - FLOW TEE: 3" 1502 M x F x M SG 9TR4FR2FB4M - FLOW TEE: 4"1502F x 2"1502F x 4"1002M SG 9TR4FR2FR4M - FLOW TEE: 4"1502F x 2"1502F x 4"1502M SG 9TR4FR3FR4M - FLOW TEE: 4"1502F x 3"1502F x 4"1502MSG 9TR4FR4FR4F - FLOW TEE: 4" 1502 F x F x F SG 9TR4FR4FR4M - FLOW TEE: 4" 1502 F x F X x M SG 9TR4FR4MR4M A FLOW TEE: 4" 1502 F x M x M SG 9TR4MR4FR4M - FLOW TEE: 4" 1502 M x F x F SG 9TR4MR4MR4M - FLOW TEE: 4" 1502 M x M x M SG 9TS3FS3FS3M - FLOW TEE: 3" 602 F x F x M SG 9TS4FR2FB4M - FLOW TEE: 4" 602F x 2" 1502F x 4" 1002M SG 9TS4FR2FS4M - FLOW TEE: 4" 602F x 2" 1502F x 4" 602M SG 9TS4FR3FS4M - FLOW TEE: 4 602F x F x 4 602M SG 9TS4FS4FS4M - FLOW TEE: 4" 602 F x F x M SG FTB4MB4FB4M - FLOW TEE: 4" 1002 M x F x M TB2FB2FB2M - FLOW TEE: 2" 1002 F x F x M TB3FB3MB3M A FLOW TEE: 3" 1002 F x M x M TB3FR2FB3M A FLOW TEE: 3" 1002 F X 2" 1502 F X 3" 1002 M TB3FR3FB3M - FLOW TEE: 3" 1002F x 3" 1502F x 3" 1002M TB4FB4FB4F C FLOW TEE: 4" 1002 F x F x F TB4FB4FB4M A FLOW TEE: 4" 1002 F X F X M TB4FB4MB4F B FLOW TEE: 4" 1002 F X M X F TB4FB4MB4M B FLOW TEE: 4" 1002 F X M X M TB4FR2FB4M C FLOW TEE: 4" 1002 F X 2" 1502 F X 4" 1002 M TB4FR3FB4M D FLOW TEE: 4" 1002 F X 3" 1502 F X 4" 1002 M TB4FR3FB4M-SP - FLOW TEE: 4" 1002F x 3" 1502F x 4" 1002M SPL TB4FR3HDFB4M C FLOW TEE: 4" 1002 F x 3" 1503 HD F x 4" 1002 M TB4MB4FB4M B FLOW TEE: 4" 1002 M x F x M TB4MB4MB4M B FLOW TEE: 4" 1002 M x M x M TB4MR2FB4M B FLOW TEE: 4" 1002 M x 2" 1502 F x 4" 1002 M Form code: TA 1411a Revision: Page 11 of 16

12 Drawing No. Rev Description TR15FR15FR15M F FLOW TEE: 1 1/2" 1002 F x F x M TR15FR15MR15F - FLOW TEE: 1-1/2" 1502 F x M x F TR15FR15MR15M F FLOW TEE: 1-1/2" 1502F x M x M TR15FR2MR15M C FLOW TEE: 1-1/2" 1502F x 2" 1502M x 1-1/2" 1502M TR1FR1FR1M B FLOW TEE: 1" 1502 F x F x M TR1FR1MR1F B FLOW TEE: 1" 1502 F x M x F TR1FR1MR1M - FLOW TEE: 1" 1502 F x M x M TR2FB1FR2M A FLOW TEE: 2 "1502 F x 1" 1002 F x 2" 1502 M TR2FB2FR2M - FLOW TEE: 2" 1502F x 1" 1002F x 2" 1502M TR2FR15FR15M E FLOW TEE: 2" 1502 F x 1-1/2" F x 1-1/ 2" M TR2FR2FR2F A FLOW TEE: 2" 1502 F x F x F TR2FR2FR2M D FLOW TEE: 2" 1502 F x F x M TR2FR2MR2F A FLOW TEE: 2" 1502 F x M x F TR2FR2MR2M A FLOW TEE: 2" 1502 F x M x M TR2FR3FR2M - FLOW TEE: 2" 1502F x 3" 1502F x 2" 1502M TR2MR2FR2M A FLOW TEE: 2" 1502 M x F x M TR2MR2MR2M A FLOW TEE: 2" 1502 M x M x M TR3FFF-25 - FLOW TEE: 3" 1502 F x F x F 25 DEG BORE TR3FFM-25 - FLOW TEE: 3" 1502 F x F x M 25 DEG BORE TR3FR2FR3M B FLOW TEE: 3" 1502 F x 2" 1502 F x 3" 1502 M TR3FR3FR3F - FLOW TEE: 3" 1502 F x F x F TR3FR3FR3M B FLOW TEE: 3" 1502 F x F x M TR3FR3MR3F A FLOW TEE: 3" 1502 F x M x F TR3FR3MR3M A FLOW TEE: 3" 1502 F x M x M TR3HDFR3HDFB4M A FLOW TEE: 3" 1502F HD x 3" 1502F HD x 4" 1002M TR3MR2FR3M A FLOW TEE: 3" 1502 M x 2" 1502 F x 3" 1502 M TR3MR3FR3M A FLOW TEE: 3" 1502 M x F x M TR3MR3MR3M - FLOW TEE: 3" 1502 M x M x M TR4FR2FB4M - FLOW TEE: 4" 1502 F x 2" 1502 F x 4" 1002 M TR4FR2FR4M B FLOW TEE: 4" 1502 F x 2" 1502 F x 4" 1502 M TR4FR3FR4M - FLOW TEE: 4" 1502 F x 3" 1502 F x 4" 1502 M TR4FR3HDFR4M A FLOW TEE: 4" 1502F x 3" 1502F HD x 4" 1502M TR4FR3MR4M - FLOW TEE: 4" 1502 F x 3" 1502 M x 4" 1502 M TR4FR3MR4M-1 - FLOW TEE: 4" 1502 F x 3" 1502 M x 4" 1502 M TR4FR4FR4F - FLOW TEE: 4" 1502 F x F x F TR4FR4FR4M A FLOW TEE: 4" 1502 F x F x M TR4FR4MR4F - FLOW TEE: 4" 1502 F x M x F TR4FR4MR4M - FLOW TEE: 4" 1502 F x M x M TR4MR4FR4M - FLOW TEE: 4" 1502 M x F x F TR4MR4MR4M - FLOW TEE: 4" 1502 M x M x M TS3FS2MS3M - FLOW TEE: 3" 602 F x 2" 602 M x 3" 602 M TS3FS3FS3M A FLOW TEE: 3" 602 F x F x M TS3FS3FS4M - FLOW TEE: 3" 602 F x 3" 602 F x 4" 602 M TS4FR2FB4M C FLOW TEE: 4" 602F x 2" 1502F x 4" 1002M TS4FR2FS4M B FLOW TEE: 4" 602 F x 2" 1502 F x 4" 602 M TS4FR3FS4M A FLOW TEE: 4" 602 F x 3" 1502 F x 4" 602 M TS4FS4FS4M B FLOW TEE: 4" 602 F x F x M CROSS Form code: TA 1411a Revision: Page 12 of 16

13 Drawing No. Rev Description 9XB4FB4FB4FB4F A CROSS W/ 4" F X F X F X F, FIG SG 9XB4FB4FB4FB4M A CROSS W/ 4" F X F X F X M, FIG SG 9XB4FB4MB4MB4M A CROSS W/ 4" F X M X M X M, FIG SG 9XB4MB4FB4FB4F A CROSS W/ 4" M X F X F X F, FIG SG 9XB4MB4FB4MB4F A CROSS W/ 4" M X F X M X F, FIG SG 9XB4MB4MB4FB4F A CROSS W/ 4" M X M X F X F, FIG SG 9XR2FR2FR2FR2F A CROSS W/ 2" F X F X F X F, FIG SG 9XR2FR2FR2FR2M A CROSS W/ 2" F X F X F X M, FIG SG 9XR2FR2FR2MR2M A CROSS W/ 2" F X F X M X M, FIG SG 9XR2FR2MR2FR2F A CROSS W/ 2" F X M X F X F, FIG SG 9XR2FR2MR2FR2M A CROSS W/ 2" F X M X F X M, FIG SG 9XR2FR2MR2MR2F A CROSS W/ 2" F X M X M X F, FIG SG 9XR2FR2MR2MR2M A CROSS W/ 2" F X M X M X M, FIG SG 9XR2MR2FR2FR2F A CROSS W/ 2" M X F X F X F, FIG SG 9XR2MR2FR2FR2M A CROSS W/ 2" M X F X F X M, FIG SG 9XR2MR2FR2MR2F A CROSS W/ 2" M X F X M X F, FIG SG 9XR2MR2FR2MR2M A CROSS W/ 2" M X F X M X M, FIG SG 9XR2MR2MR2FR2F A CROSS W/ 2" M X M X F X F, FIG SG 9XR2MR2MR2MR2F A CROSS W/ 2" M X M X M X F, FIG SG 9XR2MR2MR2MR2M A CROSS W/ 2" M X M X M X M, FIG SG 9XR4FR4FR4FR4F A 4 CROSS W/ 4 F X F X F X F, FIG SG 9XR4MR4FR4FR4F A 4 CROSS W/ 4 M X M F X F X F, FIG SG 9XR4MR4FR4MR4F A 4 CROSS W/ 4 M X F X M X F, FIG SG 9XR4MR4MR4FR4F A 4 CROSS W/ 4 M X M X F X F, FIG SG 9XR4MR4MR4FR4M A 4 CROSS W/ 4 M X M X F X M, FIG SG D NUT_4 FIG SG F SEGMENTED RING, 4 FIG XS2FS2FS2FS2M A 2 CROSS W/ 2 F X F X F X M, FIG. 602 ENDS, SG D NUT_2 FIG. 602 SG G SEGMENTED RING, 2 FIG. 602 XB4FB4FB4FB4F B 4 CROSS W/ 4 F X F X F X F, FIG ENDS XB4FB4FB4FB4M B 4 CROSS W/ 4 F X F X F X M, FIG ENDS XB4FB4MB4MB4M A 4 CROSS W/ 4 F X M X M X M, FIG ENDS XB4MB4FB4FB4 B 4 CROSS W/ 4 M X F X F X F, FIG ENDS XB4MB4FB4MB4F B 4 CROSS W/ 4 M X F X M X F, FIG ENDS XB4MB4MB4FB4F B 4 CROSS W/ 4 M X M X F X F, FIG ENDS D K NUT, DETACHABLE_4 FIG I SEGMENTED RING, 4 FIG. 602/1002 XR2FR2FR2FR2F A 2 CROSS W/ 2 F X F X F X F, FIG ENDS XR2FR2FR2FR2M A 2 CROSS W/2 F X F X F X M, FIG ENDS XR2FR2FR2MR2M A 2 CROSS W/2 F X F X M X M, FIG ENDS XR2FR2MR2FR2F A 2 CROSS W/2 F X M X F X F, FIG ENDS XR2FR2MR2FR2M A 2 CROSS W/2 F X M X F X M, FIG ENDS XR2FR2MR2MR2F A 2 CROSS W/2 F X M X M X F, FIG 1502 ENDS XR2FR2MR2MR2M A 2 CROSS W/2 F X M X M X M, FIG ENDS XR2MR2FR2FR2F A 2 CROSS W/2 M X F X F X F, FI G ENDS XR2MR2FR2FR2M A 2 CROSS W/2 M X F X F X M, FIG ENDS XR2MR2FR2MR2F A 2 CROSS W/2 M X F X M X F, FIG ENDS Form code: TA 1411a Revision: Page 13 of 16

14 Drawing No. Rev Description XR2MR2FR2MR2M A 2 CROSS W/2 M X F X M X M, FIG ENDS XR2MR2MR2FR2F A 2 CROSS W/2 M X M X F X F, FIG ENDS XR2MR2MR2MR2F A 2 CROSS W/2 M X M X M X F, FIG ENDS XR2MR2MR2MR2M A 2 CROSS W/2 M X M X M X M, FIG ENDS H NUT_2 FIG F SEGMENTED RING, 2 FIG XR3FR3FR3FR3F D 3" CROSS W/ 3" F X F X F X F, FIG ENDS XR3FR3FR3FR3M D 3" CROSS W/ 3" F X F X F X M, FIG ENDS XR3FR3FR3MR3M C 3" CROSS W/ 3" F X F X M X M, FIG ENDS XR3FR3MR3FR3M C 3" CROSS W/ 3" F X M X F X M, FIG ENDS XR3FR3MR3MR3M D 3" CROSS W/ 3" F X M X M X M, FIG ENDS XR3MR3MR3FR3M D 3" CROSS W/ 3" M X M X F X M, FIG ENDS XR3MR3MR3MR3M A 3" CROSS W/ 3" M X M X M X M, FIG ENDS XR4FR4FR4FR4F A 4" CROSS W/ 4" F X F X F X F, FIG ENDS XR4MR4FR4FR4F D 4" CROSS W/ 4" M X F X F X F, FIG ENDS XR4MR4FR4MR4F D 4" CROSS W/ 4" M X F X M X F, FIG ENDS XR4MR4MR4FR4F B 4" CROSS W/ 4" M X M X F X F, FIG ENDS XR4MR4MR4FR4M A 4" CROSS W/ 4" M X M X F X M, FIG ENDS H NUT_4" FIG F SEGMENTED RING, 4" FIG XS2FS2FS2FS2M A 2" CROSS W/ 2" F X F X F X M, FIG. 602 ENDS G NUT_2" FIG G SEGMENTED RING, 2" FIG. 602 XS4MS4MS4FS4M A 4" CROSS W/ 4" M X M X F X M, FIG. 602 ENDS D E NUT, DETACHABLE_4" FIG I SEGMENTED RING, 4" FIG. 602/1002 WYE 9YR15FR15FR15M A 1 1/2" WYE W/ 1 1/2" F X F X M ENDS SG D NUT_1 1/2" FIG SG F SEGMENTED RING, 1 1/2" FIG YB2FB2FB2F A 2" WYE W/ 2" F X F X F ENDS SG 9YB2FB2FB2M A 2" WYE W/ 2" F X F X M ENDS SG 9YB2MB2MB2F A 2" WYE W/ 2" M X M X F ENDS SG 9YB2MB2MB2M A 2" WYE W/ 2" M X M X M ENDS SG E NUT_2" FIG SG G SEGMENTED RING, 2" FIG YR2FR2FR2F A 2" WYE W/ 2" F X F X F, FIG ENDS SG 9YR2FR2FR2M A 2" WYE W/ 2" F X F X M, FIG ENDS SG 9YR2FR2MR2M A 2" WYE W/ 2" F X M X M, FIG ENDS SG 9YR2MR2FR2F B 2" WYE W/ 2" M X F X F, FIG ENDS SG 9YR2MR2MR2F A 2" WYE W/ 2" M X M X F, FIG ENDS SG 9YR2MR2MR2M A 2" WYE W/ 2" M X M X M, FIG ENDS SG F NUT_2" FIG SG F SEGMENTED RING, 2" FIG YS2FS2FS2F A 2" WYE W/ 2" F X F X F ENDS SG 9YS2FS2FS2M A 2" WYE W/ 2" F X F X M ENDS SG 9YS2MS2MS2F A 2" WYE W/ 2" M X M X F ENDS SG 9YS2MS2MS2M AA 2" WYE W/ 2" M X M X M ENDS SG Form code: TA 1411a Revision: Page 14 of 16

15 Drawing No. Rev Description G SEGMENTED RING, 2" FIG YB2FB2FB2F A 2" WYE W/ 2" F X F X F ENDS SG 9YB2FB2FB2M A 2" WYE W/ 2" F X F X M ENDS SG 9YB2MB2MB2F A 2" WYE W/ 2" M X M X F ENDS SG 9YB2MB2MB2M A 2" WYE W/ 2" M X M X M ENDS SG E NUT_2" FIG SG G SEGMENTED RING, 2" FIG YR2FR2FR2F A 2" WYE W/ 2" F X F X F, FIG ENDS SG 9YR2FR2FR2M A 2" WYE W/ 2" F X F X M, FIG ENDS SG 9YR2FR2MR2M A 2" WYE W/ 2" F X M X M, FIG ENDS SG 9YR2MR2FR2F B 2" WYE W/ 2" M X F X F, FIG ENDS SG 9YR2MR2MR2F A 2" WYE W/ 2" M X F X F, FIG ENDS SG 9YR2MR2MR2M A 2" WYE W/ 2" M X M X M, FIG ENDS SG F NUT_2" FIG SG F SEGMENTED RING, 2" FIG YS2FS2FS2F A 2" WYE W/ 2" F X F X F ENDS SG 9YS2FS2FS2M A 2" WYE W/ 2" F X F X M ENDS SG 9YS2MS2MS2F A 2" WYE W/ 2" M X M X F ENDS SG 9YS2MS2MS2M A 2" WYE W/ 2" M X M X M ENDS SG D NUT_2" FIG. 602 SG G SEGMENTED RING, 2" FIG YB2FB2FB2F A 2" WYE W/ 2" F X F X F ENDS SG 9YB2FB2FB2M A 2" WYE W/ 2" F X F X M ENDS SG 9YB2MB2MB2F A 2" WYE W/ 2" M X M X F ENDS SG 9YB2MB2MB2M A 2" WYE W/ 2" M X M X M ENDS SG E NUT_2" FIG SG G SEGMENTED RING, 2" FIG. 602 YR2FR2FR2F B 2" WYE W/ 2" F X F X F, FIG ENDS YR2FR2FR2M B 2" WYE W/ 2" F X F X M, FIG ENDS YR2FR2MR2M B 2" WYE W/ 2" F X M X M, FIG ENDS YR2MR2FR2F A 2" WYE W/ 2" M X F X F, FIG ENDS YR2MR2MR2F B 2" WYE W/ 2" M X M X F, FIG ENDS YR2MR2MR2M A 2" WYE W/ 2" M X M X M, FIG ENDS H NUT_2" FIG F SEGMENTED RING, 2" FIG YR15FR15FR15M B 1 1/2" WYE W/ 1 1/2" F X F X M ENDS F NUT_1 1/2" FIG F SEGMENTED RING, 1 1/2" FIG YS2FS2FS2F A 2" WYE W/ 2" F X F X F ENDS YS2FS2FS2M A 2" WYE W/ 2" F X F X M ENDS YS2MS2MS2F A 2" WYE W/ 2" M X M X F ENDS YS2MS2MS2M A 2" WYE W/ 2" M X M X M ENDS G NUT_2" FIG G SEGMENTED RING, 2" FIG. 602 Note: Other part numbers or updated revisions may be acceptable under this Certificate provided critical aspects of the design remain the same. Changes shall be documented and approved (via Engineering Change Notice or similar) by the Manufacturer s Engineering and/or Quality department as appropriate. DNV s local surveyor shall verify the change before issuance of Product Certificate) Form code: TA 1411a Revision: Page 15 of 16

16 Calculations: Doc. No. Rev Date Title DSC91204/91502/ 91503/91504/962 02/96204 A , 1-1/2, 2, 3, 4 Fig 602/1002/1502 Integral Pup Joints & Integral Fittings w/ Hammer Union ends for up to 15,000 psi cold working pressure standard to 10,000 psi sour gas Material Specifications: Spec. Material Min Yield Str. Charpy ES-225 AISI ,000 psi 30 ft-lb@-50 F. ES-275 AISI ,000 psi 30 ft-lb@-20 F. ES-324 AISI 4140/42 100,000 psi 30 ft-lb@-20 F. ES-325 AISI ,000 psi 30 ft-lb@-20 F. ES-420 AISI ,000 psi 30 ft-lb@-20 F. ES-455 AISI ,000 psi 30 ft-lb@-50 F. Tests carried out Prototype hydrostatic pressure testing to be conducted on all models at 1.5 maximum allowable working pressure for a duration of 3 minutes and 15 minutes. Marking of product For traceability the following marking is to be carried out on each product: 1. Serial No. 2. Manufacturer s name or trademark 3. Marking shall be in accordance with DNV-OS-E101 Ch. 2 Sec.7 A300 and requirements of API 6A Periodical assessment For retention of the Type Approval, DNV GL s surveyor shall perform a survey every second year in accordance with DNV GL s Standard of Certification No Other conditions/comments 1. Procedures related to testing, welding, NDT, and other quality control requirements are to be reviewed/approved by DNV GL s local surveyor 2. Reference to TAC D-2993 for caculations. 3. DNV GL ref.: Project No. PP END OF CERTIFICATE Form code: TA 1411a Revision: Page 16 of 16

Laboratory Evaluation Report for: Dielectric Pipe Unions

Laboratory Evaluation Report for: Dielectric Pipe Unions American Society of Sanitary Engineering Seal (Certification) Program Laboratory Evaluation Report for: Dielectric Pipe Unions Tested under ASSE Standard 1079 Issued: September, 2005 Laboratory File Number

More information

Table 6, replace the Key with: Table 6, change SBX 151 for dimension G, from: 5.59 mm to 5.56 mm mm to mm

Table 6, replace the Key with: Table 6, change SBX 151 for dimension G, from: 5.59 mm to 5.56 mm mm to mm Date of Issue: Ocber 2015 Affected Publication: ANSI/API Specification 17D/ISO 13628-4, Design and Operation of Subsea Production Systems Subsea Wellhead and Tree Equipment, Second Edition, May 2011 ERRATA

More information

A damage-based condensation method to condense wave bins for tendon fatigue analysis

A damage-based condensation method to condense wave bins for tendon fatigue analysis Published by International Association of Ocean Engineers Journal of Offshore Engineering and Technology Available online at www.iaoejoet.org A damage-based condensation method to condense wave bins for

More information

TECHNICAL REPORT BALLTEC LTD. FINITE ELEMENT ANAYLSIS AND FATIGUE ASSESSMENT OF KN ANCHOR CONNECTOR REPORT NO REVISION NO.

TECHNICAL REPORT BALLTEC LTD. FINITE ELEMENT ANAYLSIS AND FATIGUE ASSESSMENT OF KN ANCHOR CONNECTOR REPORT NO REVISION NO. BALLTEC LTD. FINITE ELEMENT ANAYLSIS AND FATIGUE ASSESSMENT OF 11300 KN ANCHOR CONNECTOR REPORT NO. 2004-3463 REVISION NO. 01 DET NORSKE VERITAS Date of first issue: Project No.: 2004-10-19 71524015 Approved

More information

THREADED CLOSURES. For access to Filter Vessels, Strainers, Pig Launchers & Receivers. Tube Turns Products

THREADED CLOSURES. For access to Filter Vessels, Strainers, Pig Launchers & Receivers. Tube Turns Products THREADED CLOSURES For access to Filter Vessels, Strainers, Pig Launchers & Receivers Tube Turns Products HISTORY Tube Turns was founded in 927 in Louisville, Kentucky, USA. We were the f i r s t A m e

More information

Certificate of Accreditation

Certificate of Accreditation PERRY JOHNSON LABORATORY ACCREDITATION, INC. Certificate of Accreditation Perry Johnson Laboratory Accreditation, Inc. has assessed the Laboratory of: 5225 South 37 th Street, Suite 4, Phoenix, AZ 85040

More information

ASME BPVC VIII Example E E4.3.8 PTB

ASME BPVC VIII Example E E4.3.8 PTB ASME BPVC VIII-1 217 Example E4.3.7 - E4.3.8 PTB-4-213 Table of contents Comparison - Form for equations... 2 Example E4.3.7- Conical Transitions Without a Knuckle... 3 E4.3.7 Large End - Dished heads

More information

ProPress (304 FKM) 1.3

ProPress (304 FKM) 1.3 ProPress (304 FKM) 41 ProPress (304 FKM) Viega ProPress for stainless is engineered for harsh industrial environments where the piping systems may come into contact with corrosive cleaning liquids. A complete

More information

GLOBALG.A.P. v Main changes SAFER, SMARTER, GREENER

GLOBALG.A.P. v Main changes SAFER, SMARTER, GREENER GLOBALG.A.P. v. 5.1 Main changes 1 SAFER, SMARTER, GREENER Updated version 5.1 mandatory from October 1st 2017 The GLOBALG.A.P. published an update of the Standard, the Version 5.1. this new version is

More information

POLICY ISSUE (INFORMATION)

POLICY ISSUE (INFORMATION) POLICY ISSUE (INFORMATION) August 12, 2011 SECY-11-0112 FOR: FROM: SUBJECT: The Commissioners Michael R. Johnson, Director /RA/ Office of New Reactors STAFF ASSESSMENT OF SELECTED SMALL MODULAR REACTOR

More information

Transmitters for basic requirements SITRANS P MPS (submersible sensor) Transmitter for hydrostatic level

Transmitters for basic requirements SITRANS P MPS (submersible sensor) Transmitter for hydrostatic level Overview Function s are for measuring the liquid levels in wells, tanks, channels and dams. Sensor Diaphragm p U const. U +2 (brown) I EM I - (blue) 0, U B s are submersible sensors for hydrostatic level

More information

NORTH SEA FLOW MEASUREMENT WORKSHOP 2004 In. St Andrews, Scotland

NORTH SEA FLOW MEASUREMENT WORKSHOP 2004 In. St Andrews, Scotland NORTH SEA FLOW MEASUREMENT WORKSHOP 2004 In St Andrews, Scotland From the 26 th to 28 th October, 2004 Tests of the V-Cone Flow Meter at Southwest Research Institute and Utah State University in Accordance

More information

1.1. Operating Parameters:

1.1. Operating Parameters: Propress System Description Propress and Propress XL are safe, reliable, and economical copper pipe installation systems that use modern cold press connection technology for a wide assortment of more than

More information

Revision No Date Prepared By CNE CNE Checked By SM SM Approved By SM SM

Revision No Date Prepared By CNE CNE Checked By SM SM Approved By SM SM Supplier Document No. SM-100/002/TE Document Title Product WIND SENSOR SM-100 (Gill 1360) Revision No. 1 2 3 4 5 6 Date 05.06.03 17.02.04 Prepared By CNE CNE Checked By SM SM Approved By SM SM Abstract

More information

Spromak ltd YEARS OF EXCELLENCE

Spromak ltd YEARS OF EXCELLENCE 9 007 YEARS OF EXCELLENCE MANUFACTURERS OF FLANGED BUTTWELD OUTLET FLANGED NIPPLE OUTLET FLANGED LATERAL OUTLET FLANGED ELBOW OUTLET FLANGED INSERT OUTLET BUTTWELD OUTLETS SOCKETWELD OUTLETS THREADED OUTLETS

More information

API 4F, 4th Edition, Purchasing Guideline

API 4F, 4th Edition, Purchasing Guideline The following information should be provided by the purchaser when making an inquiry or placing an order: a) Reference to this standard; b) Reference to any requirement for third party certification, name

More information

ACCEPTANCE PROCEDURE FOR ROMET ROTARY METER BODIES AND/OR MECHANICAL NON-CONVERTING AND CONVERTING MODULES

ACCEPTANCE PROCEDURE FOR ROMET ROTARY METER BODIES AND/OR MECHANICAL NON-CONVERTING AND CONVERTING MODULES ACCEPTANCE PROCEDURE FOR ROMET ROTARY METER BODIES AND/OR MECHANICAL NON-CONVERTING AND CONVERTING MODULES (RPB-01) Approved by: Date: SECTION PAGE # 1.0 Scope 2.0 Definitions 3.0 References 4.0 Inspection

More information

PERFORMANCE TEST REPORT. Rendered to: VELUX AMERICA, INC. PRODUCT: SUN TUNNEL Domes TYPES: Acrylic and Polycarbonate

PERFORMANCE TEST REPORT. Rendered to: VELUX AMERICA, INC. PRODUCT: SUN TUNNEL Domes TYPES: Acrylic and Polycarbonate PERFORMANCE TEST REPORT Rendered to: VELUX AMERICA, INC. PRODUCT: SUN TUNNEL Domes TYPES: Acrylic and Polycarbonate Report No.: E3490.01-106-31 Report Date: 07/13/15 Test Record Retention Date: 06/18/19

More information

IBV Series C Carbon Steel Inverted Bucket Vertical Steam Trap

IBV Series C Carbon Steel Inverted Bucket Vertical Steam Trap Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without

More information

IBV Series Z Alloy Steel Inverted Bucket Vertical Steam Trap

IBV Series Z Alloy Steel Inverted Bucket Vertical Steam Trap Local regulations may restrict the use of this product to below the conditions quoted. In the interests of development and improvement of the product, we reserve the right to change the specification without

More information

C100 Cryomodule Vacuum Vessel Structural Analysis An Addendum to JLAB-TN

C100 Cryomodule Vacuum Vessel Structural Analysis An Addendum to JLAB-TN Introduction C100 Cryomodule Vacuum Vessel Structural Analysis An Addendum to JLAB-TN-07-081 Gary G. Cheng and Edward F. Daly The C100 cryomodule (CM) vacuum vessel structural analysis per ASME Boiler

More information

98 Series Backpressure Regulators and Relief Valves

98 Series Backpressure Regulators and Relief Valves 9 Series Backpressure Regulators and Relief Valves Bulletin.:9 November 09 W TYPE 9H W TYPE 9LD Figure. Typical 9 Relief Valves Introduction W TYPE 9HD The 9 Series (Figure ) is used for backpressure or

More information

O Plus Dry Bushing 25 kv system, 150 kv BIL, 3000 A

O Plus Dry Bushing 25 kv system, 150 kv BIL, 3000 A TYPE TEST REPORT O Plus Dry Bushing 25 kv system, 150 kv BIL, 3000 A 02 1 Abstract 02 2 Certification 03 3 Introduction 03 3.1 Description and ratings 03 3.2 Overview of tests 03 3.3 Applicable standards

More information

W E L L S I T E S E R V I C E S

W E L L S I T E S E R V I C E S WELL SITE SERVICES TABLE OF CONTENTS Gravel Pack Product List...GP-1 Washpipe Specifi cation Guide...GP-2 Baskets: Tool Baskets...GP-3 Handling Equipment: Becket and Bails...GP-4 Handling Equipment: Tongs...GP-5

More information

Submittal Package. Viega PureFlow Press Polymer Fittings for Use with Viega PureFlow Tubing. Project: Engineer: Contractor: Submitted By:

Submittal Package. Viega PureFlow Press Polymer Fittings for Use with Viega PureFlow Tubing. Project: Engineer: Contractor: Submitted By: Viega PureFlow Press Polymer Fittings for Use with Viega PureFlow Tubing Project: Engineer: Contractor: Submitted By: Potable Water Residential Fire Sprinkler Other of 2 Viega PureFlow Press Polymer Fittings

More information

FOWPI Metocean Workshop Modelling, Design Parameters and Weather Windows

FOWPI Metocean Workshop Modelling, Design Parameters and Weather Windows FOWPI Metocean Workshop Modelling, Design Parameters and Weather Windows Jesper Skourup, Chief Specialist, COWI 1 The Project is funded by The European Union Agenda 1. Metocean Data Requirements 2. Site

More information

PVC - WHITE PRESSURE FITTINGS L40P EFFECTIVE OCTOBER 1, 2018 REVISED PRODUCTS PRICE LIST

PVC - WHITE PRESSURE FITTINGS L40P EFFECTIVE OCTOBER 1, 2018 REVISED PRODUCTS PRICE LIST PRICE GROUP DESCRIPTION 01 SCH 40 PVC through 8 91 SCH 40 PVC 10" AND LARGER 96 CLASS 125 10 & 12 09 POOL AND SPA 14 LASCOTITE 15 ULTRAFIX REPAIR COUPLING DISCOUNT MULTIPLIER PRODUCTS PVC - WHITE PRESSURE

More information

Annex H (informative) Regional information

Annex H (informative) Regional information H.1 General Annex H (informative) Regional information This annex contains provisions for a limited number of regions; the content has been developed by ISO/TC 67 experts from the region or country concerned

More information

Technical Procedure for General Laboratory Equipment

Technical Procedure for General Laboratory Equipment Technical Procedure for General Laboratory Equipment 1.0 Purpose - This procedure specifies the required elements for the use of general laboratory equipment. 2.0 Scope - This procedure applies to all

More information

Experiment and Finite Analysis on Resonant Bending Fatigue of Marine Risers

Experiment and Finite Analysis on Resonant Bending Fatigue of Marine Risers Send Orders for Reprints to reprints@benthamscience.ae The Open Mechanical Engineering Journal, 015, 9, 05-1 05 Open Access Experiment and Finite Analysis on Resonant Bending Fatigue of Marine Risers Fang

More information

Flow Management Devices, LLC An ISO 9000:2008 Certified Company

Flow Management Devices, LLC An ISO 9000:2008 Certified Company Flow Management Devices, LLC An ISO 9000:2008 Certified Company Liquid Flow Prover US Patent # 7650775 UNCERTAINTY ANALYSIS Model FMD-060 For the proving of volumetric pulse output flow meters Flow Management

More information

FS Original Hole Ft April 26, 2016

FS Original Hole Ft April 26, 2016 Oilfield Services, Central U.S. Land PathFinder A Schlumberger Company Drilling Group Geo Market Area: South East Texas Basin 3600 BriarPark Houston, Texas 77042 Phone : (713) 789-9600 (Main) Fax : (713)

More information

New multiphase choke correlations for a high flow rate Iranian oil field. Correspondence to: M. Safar Beiranvand

New multiphase choke correlations for a high flow rate Iranian oil field. Correspondence to: M. Safar Beiranvand Mech. Sci., 3, 43 47, 2012 doi:10.5194/ms-3-43-2012 Author(s) 2012. Attribution 3.0 License. Mechanical Sciences Open Access New multiphase choke correlations for a high flow rate Iranian oil field M.

More information

Corzan Dimensional Data & Weights

Corzan Dimensional Data & Weights Volume II: 140 PVC & CPVC Dimensional Data & Weights Industrial Technical Manual Series S E C O N D E D I T I O N XIRTEC 140 PVC & CORZAN CPVC Dimensional Data and Weights www.ipexinc.com 140 PVC & CPVC

More information

Operating Instructions Validation Tool Kit, KT2 For use with USP Apparatus #1 & #2

Operating Instructions Validation Tool Kit, KT2 For use with USP Apparatus #1 & #2 Operating Instructions Validation Tool Kit, KT2 For use with USP Apparatus #1 & #2 P/N VALTOL-KT2 Revision 2.0 October 7, 2014 Prepared by: Quality Lab Accessories, LLC 100 Emlen Way, Suite 108 Telford,

More information

AMBIENT AIR MONITORING MONTHLY DATA REPORT

AMBIENT AIR MONITORING MONTHLY DATA REPORT MAXXAM ANALYTICS #1 2080 39 Ave. NE, Calgary, AB T2E 6P7 maxxam.ca Toll Free 800-386-7247 Fax 403-219-3673 AMBIENT AIR MONITORING MONTHLY DATA REPORT PEACE RIVER AREA MONITORING PROGRAM COMMITTEE RENO

More information

PD626 Polypro Replacement Material Evaluation and Selection

PD626 Polypro Replacement Material Evaluation and Selection PD626 Polypro Replacement Material Evaluation and Selection This test data provided is based on representative testing done in the lab and is provided to show the similarities between PD626 and 11R12A

More information

PVC - WHITE PRESSURE FITTINGS PRODUCTS PRICE LIST INCLUDES: PVC SCHEDULE 40, CLASS 125, POOL/SPA, LASCOTITE, ULTRAFIX REPAIR COUPLINGS PRICE GROUP

PVC - WHITE PRESSURE FITTINGS PRODUCTS PRICE LIST INCLUDES: PVC SCHEDULE 40, CLASS 125, POOL/SPA, LASCOTITE, ULTRAFIX REPAIR COUPLINGS PRICE GROUP PRICE GROUP DESCRIPTION 01 SCH 40 PVC through 8 91 SCH 40 PVC 10" AND LARGER 96 CLASS 125 10 & 12 09 POOL AND SPA 14 LASCOTITE 15 ULTRAFIX REPAIR COUPLING DISCOUNT MULTIPLIER PRODUCTS PVC - WHITE PRESSURE

More information

Procedure To Be Adopted When Working on High Voltage Mechanically Switched Capacitors with Damping Network (MSCDN)

Procedure To Be Adopted When Working on High Voltage Mechanically Switched Capacitors with Damping Network (MSCDN) 1. SCOPE This document details the procedures to be adopted when working on High Voltage Mechanically Switched Capacitors with. 2. ISSUE RECORD This is a Reference document. The current version is held

More information

Reference Only Spec. No. JEFL243B 0003F-01 P 1/ 6

Reference Only Spec. No. JEFL243B 0003F-01 P 1/ 6 Spec. No. JEFL243B 0003F-01 P 1/ 6 DC Common Mode Choke Coil PLT09HN2003R0P1B Reference Specification 1. Scope This reference specification applies to DC Common Mode Choke Coil (PLT09H Series). 2. Part

More information

TEST REPORT (Self-Tested Data)

TEST REPORT (Self-Tested Data) TEST REPORT (Self-Tested Data) CLIENT: IPC Validation Services 3000 Lakeside Drive Suite 105N Bannockburn, IL 60015 USA Attention: Mr. Randy Cherry +1-847-597-5606 TEST ITEMS: Peel Strength, Volume Resistivity,

More information

TEST REPORT (Self-Tested Data)

TEST REPORT (Self-Tested Data) TEST REPORT (Self-Tested Data) CLIENT: IPC Validation Services 3000 Lakeside Drive Suite 105N Bannockburn, IL 60015 USA Attention: Mr. Randy Cherry +1-847-597-5606 TEST ITEMS: Peel Strength, Volume Resistivity,

More information

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO

UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO UTILITY REPORT FOR THORNTON SELF STORAGE THORNTON, COLORADO Prepared by: Bowman Consulting 63 Park Point Dr. Suite 1 Golden, CO 841 (33)-81-29 June 29, 215 Revised August 14, 215 Revised September 3, 215

More information

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG

RAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 01/05/2016

More information

DMHP3(4)L(T)2A00 Series

DMHP3(4)L(T)2A00 Series STANDARDS Valve body: ASME B16.34 Material certification: EN10204-3.1 MTR Quality assurance: ISO 9001:2008 Steel casting: MSS SP-55 Valve marking: MSS SP-25 Valve test: API 598 Direct mount: ISO 5211 End

More information

COMPOSITE COMPONENTS

COMPOSITE COMPONENTS OFFSHORE STANDARD DNV-OS-C501 COMPOSITE COMPONENTS JANUARY 2003 Since issued in print (January 2003), this booklet has been amended, latest in April 2009. See the reference to Amendments and Corrections

More information

NUCLEAR REGULATORY COMMISSION. 10 CFR Chapter 1 [NRC ] Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing

NUCLEAR REGULATORY COMMISSION. 10 CFR Chapter 1 [NRC ] Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing This document is scheduled to be published in the Federal Register on 06/25/2018 and available online at https://federalregister.gov/d/2018-13570, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

ERRATA CRANE FLOW OF FLUIDS THROUGH VALVES, FITTINGS AND PIPE TECHNICAL PAPER NO. 410 METRIC VERSION

ERRATA CRANE FLOW OF FLUIDS THROUGH VALVES, FITTINGS AND PIPE TECHNICAL PAPER NO. 410 METRIC VERSION ERRATA CRANE FLOW OF FLUIDS THROUGH VALVES, FITTINGS AND PIPE TECHNICAL PAPER NO. 410 METRIC VERSION CONTACT Please address questions and possible errata to solutions@flowoffluids.com FRONT MATTER PAGE

More information

Monthly Pile Driving Summary and Underwater Noise Monitoring Results

Monthly Pile Driving Summary and Underwater Noise Monitoring Results Monthly Pile Driving Summary and Underwater Noise Monitoring Results Pile Driving Period: September 04, 2016 October 01, 2016 DOC Reference: TA_FHWA_03169_RPT_ENV Summary: No sturgeon were observed to

More information

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION

RAILROAD COMMISSION OF TEXAS OIL & GAS DIVISION API No. Drilling Permit # 4-003-47034 SWR Exception Case/Docket No. 6. Purpose of filing (mark ALL appropriate boxes): 7. Wellbore Profile (mark ALL appropriate boxes): 11. RRC District No. 80759 GENERAL

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 8426 Second edition 2008-02-01 Hydraulic fluid power Positive displacement pumps and motors Determination of derived capacity Transmissions hydrauliques Pompes et moteurs volumétriques

More information

Melton Series. Owners Manual. Lab Centrifuge. Model # s A C, A C, B C, B C, C C, C C, D C, D C

Melton Series. Owners Manual. Lab Centrifuge. Model # s A C, A C, B C, B C, C C, C C, D C, D C Melton Series Owners Manual Lab Centrifuge Model # s A-4-115-C, A-4-220-C, B-4-115-C, B-4-220-C, C-4-115-C, C-4-220-C, D-4-115-C, D-4-220-C Serial Numbers 85500 & Above NOTICE Wire this centrifuge according

More information

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES

TAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65

More information

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014

Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee. Quarterly Report October 1 December 31, 2014 Near-Field Sturgeon Monitoring for the New NY Bridge at Tappan Zee Quarterly Report October 1 December 31, 2014 Prepared by AKRF, Inc. 7250 Parkway Drive, Suite 210 Hanover, MD 21076 for New York State

More information

GC005 thru GC600. Wireless Load Cell. Features. Applications. General Description. Load Cell

GC005 thru GC600. Wireless Load Cell. Features. Applications. General Description. Load Cell Wireless Load Cell Features Standard single part line pull sizes ranging from 5,000 to 600,000 lb. All stainless frame and hardware Heavy duty construction from 17-4PH1150 stainless steel (17-4PH1025 on

More information

Variable Displacement Plug-In Motor A6VE. Series 6, for open and closed circuits Axial tapered piston, bent axis design

Variable Displacement Plug-In Motor A6VE. Series 6, for open and closed circuits Axial tapered piston, bent axis design rueninghaus Hydromatik Series 6, for open and closed circuits xial tapered piston, bent axis design Size 28...20 Nom. pressure up to 400 bar Peak pressure up to 40 bar RE 9606/0.97 RE 9606/0.97 replaces

More information

Serie B2.1. Flanged ductile iron ball valve. made in. Application fields. Shut-off valves E U R O P E. 18

Serie B2.1. Flanged ductile iron ball valve. made in. Application fields. Shut-off valves E U R O P E. 18 erie B. Flanged ductile iron ball valve BRanDOni made in E U R O P E Application fields WATER CONdITIONING GA EATING INdUTRY FIRE FIGTING www.brandoni.it erie B. eries B. valves are shut-off ball valves

More information

Solder Joint Reliability Lucent X Summary Report

Solder Joint Reliability Lucent X Summary Report Project Number: Tracking Code: 0217--0671 Requested by: Danny Boesing Date: 4/23/02 Product Rev: 4 Part #: QTS-100-01-L-D-RA Lot #: 01/02/02 Tech: Troy Cook Eng: John Tozier Part description: 0.635mm Double

More information

Certificate of Accreditation

Certificate of Accreditation PERRY JOHNSON LABORATORY ACCREDITATION, INC. Certificate of Accreditation Perry Johnson Laboratory Accreditation, Inc. has assessed the Laboratory of: (Hereinafter called the Organization) and hereby declares

More information

O Plus Dry Bushing 69 kv system, 350 kv BIL, 3000 A. Table of contents

O Plus Dry Bushing 69 kv system, 350 kv BIL, 3000 A. Table of contents Type test report O Plus Dry Bushing 69 kv system, 0 kv BIL, 000 A Table of contents Abstract... 2 2 Certification... 2 Introduction.... Description and ratings....2 Overview of tests.... Applicable standards....4

More information

Pipeline Fatigue Assessment

Pipeline Fatigue Assessment Pipeline Fatigue Assessment The purpose of this MathCAD sheet is to calculate cumulative pipeline fatigue damage using the well defined 'rainflow counting' process. The algorithms herein use pipeline variable

More information

Design Optimization for an Expansion Loop in Petrochemical Refinery

Design Optimization for an Expansion Loop in Petrochemical Refinery ISSN 2395-1621 Design Optimization for an Expansion Loop in Petrochemical Refinery #1 Sanjay S. Deshpande, #2 Hemant S. Sadafale, #3 Milind R. Joshi, #4 Yashodhan R. Soman, #5 Anagha A Pawar 1 deshpande.sanjay@gmail.com

More information

Cat Electronic Technician 2014A v1.0 Product Status Report 10/23/2016 9:09 AM

Cat Electronic Technician 2014A v1.0 Product Status Report 10/23/2016 9:09 AM Cat Electronic Technician 2014A v1.0 Product Status Report 10/23/2016 9:09 AM Product Status Report Parameter Engine Serial Number Equipment ID Comments Value DSE00164 78M-9-P RUNNING OF NOS.3 ENGINE AFTER

More information

SAMPLE SHEET. Supply of PF Process Calculation Spreadsheet (Excel Forma)

SAMPLE SHEET. Supply of PF Process Calculation Spreadsheet (Excel Forma) PROJECT NO. PO. 4500098732 / 10 / 01.01.2018 Supply of PF Process Calculation Spreadsheet (Excel Forma) DOCUMENT TITLE Small Bore Orifice Sizing Calculation For Gas Services as per ASME-MFC-14M-2001 DATE

More information

MOY/SCMI/36 SPECIFICATION OF ACCURACY FOR A PRECISION CLINOMETER

MOY/SCMI/36 SPECIFICATION OF ACCURACY FOR A PRECISION CLINOMETER Centre for Basic, Thermal and Length Metrology National Physical Laboratory MOY/SCMI/36 SPECIFICATION OF ACCURACY FOR A PRECISION CLINOMETER A Watts Precision Clinometer fitted with a circular glass scale

More information

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006)

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006) SUBPART 217.1--MULTIYEAR CONTRACTING (Revised December 19, 2006) 217.103 Definitions. As used in this subpart-- Advance procurement means an exception to the full funding policy that allows acquisition

More information

ISO INTERNATIONAL STANDARD. Metallic materials Vickers hardness test Part 3: Calibration of reference blocks

ISO INTERNATIONAL STANDARD. Metallic materials Vickers hardness test Part 3: Calibration of reference blocks INTERNATIONAL STANDARD ISO 6507-3 Third edition 2005-12-15 Metallic materials Vickers hardness test Part 3: Calibration of reference blocks Matériaux métalliques Essai de dureté Vickers Partie 3: Étalonnage

More information

TEST REPORT. The following sample(s) was(were) identified by the customer as : PP-NON WOVEN

TEST REPORT. The following sample(s) was(were) identified by the customer as : PP-NON WOVEN TEST REPORT To : ICON PACKAGING SDN. BHD. Report No. : IP1603-0608 No. 8, Jalan Pinang Emas 1, Taman Pinang Emas, Pinang Tunggal, Page No : 1 of 4 08000 Sungai Petani, Kedah. Date of Issue : 28/03/2016

More information

NUCLEAR REGULATORY COMMISSION [NRC ] Instructions for Recording and Reporting Occupational Radiation Dose Data

NUCLEAR REGULATORY COMMISSION [NRC ] Instructions for Recording and Reporting Occupational Radiation Dose Data This document is scheduled to be published in the Federal Register on 12/08/2016 and available online at https://federalregister.gov/d/2016-29391, and on FDsys.gov [7590-01-P] NUCLEAR REGULATORY COMMISSION

More information

UNIVERSITY OF HOUSTON ENVIRONMENTAL HEALTH AND & LIFE SAFETY POLICIES AND PROCEDURES I. PURPOSE

UNIVERSITY OF HOUSTON ENVIRONMENTAL HEALTH AND & LIFE SAFETY POLICIES AND PROCEDURES I. PURPOSE UNIVERSITY OF HOUSTON ENVIRONMENTAL HEALTH AND SAFETY POLICIES AND PROCEDURES SECTION: SUBJECT: ENVIRONMENTAL HEALTH AND & LIFE SAFETY HAZARD COMMUNICATION I. PURPOSE This procedure establishes the requirements

More information

REPORT NUMBER: MID-001 ORIGINAL ISSUE DATE: April 22, 2016 REVISED DATE: NA. EVALUATION CENTER Intertek 8431 Murphy Drive Middleton, WI 53562

REPORT NUMBER: MID-001 ORIGINAL ISSUE DATE: April 22, 2016 REVISED DATE: NA. EVALUATION CENTER Intertek 8431 Murphy Drive Middleton, WI 53562 REPORT NUMBER: 102550917MID-001 ORIGINAL ISSUE DATE: April 22, 2016 REVISED DATE: NA TEST REPORT EVALUATION CENTER Intertek 8431 Murphy Drive Middleton, WI 53562 RENDERED TO Cali Bamboo 6675 Mesa Ridge

More information

ASSOCIATION POUR LA CERTIFICATION DES MATERIAUX ISOLANTS

ASSOCIATION POUR LA CERTIFICATION DES MATERIAUX ISOLANTS Revision index Date of implementation A 15/03/2013 ASSOCIATION POUR LA CERTIFICATION DES MATERIAUX ISOLANTS 4, avenue du Recteur-Poincarré, 75782 Paris Cedex 16 Tel. 33.(0)1.64.68.84.97 Fax. 33.(0)1.64.68.83.45

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 140-6 Second edition 1998-08-15 Acoustics Measurement of sound insulation in buildings and of building elements Part 6: Laboratory measurements of impact sound insulation of

More information

Major Point/Area Sources Name Type Major Emissions Distance (m) Direction CFB Cold Lake Air Force Base NOx, PM, HC, TRS 3km to aircraft West

Major Point/Area Sources Name Type Major Emissions Distance (m) Direction CFB Cold Lake Air Force Base NOx, PM, HC, TRS 3km to aircraft West Page 1 of 11 Site Documentation: Cold Lake South Continuous Monitoring Station General Site Information Item Description Site ID (CASA ID) LICA01 Station Name Cold Lake South Continuous Monitoring Station

More information

Solder Joint Reliability Report

Solder Joint Reliability Report Project Number: NA Tracking Code: 0218--0678 Requested by: Brian Vicich Date: 4/30/02 Product Rev: A Part #: QTS-100-01-L-D-A / QSS-100-01-L-D-A Lot #: 1/02/02 Tech: Troy Cook Eng: John Tozier Qty to test:

More information

VACUUM VESSEL LOWER PORT PENETRATIONS & IN VESSEL VIEWING PORT EXTENSION

VACUUM VESSEL LOWER PORT PENETRATIONS & IN VESSEL VIEWING PORT EXTENSION VACUUM VESSEL LOWER PORT PENETRATIONS & IN VESSEL VIEWING PORT EXTENSION 1. Purpose Call for Nomination (C4N) Ref. IO/CFT/18/15702/JPK Summary of Technical Specifications The purpose of the contract is

More information

HOUSE BILL No June 19, 2007, Introduced by Reps. Warren, Ward, Gillard, Wojno and Bauer and referred to the Committee on Regulatory Reform.

HOUSE BILL No June 19, 2007, Introduced by Reps. Warren, Ward, Gillard, Wojno and Bauer and referred to the Committee on Regulatory Reform. HOUSE BILL No. 4947 HOUSE BILL No. 4947 June 19, 2007, Introduced by Reps. Warren, Ward, Gillard, Wojno and Bauer and referred to the Committee on Regulatory Reform. A bill to amend 1980 PA 299, entitled

More information

STANFORD UNIVERSITY. Bonding Telescope to Quartz Block Readiness Review Completion Certificate. P0259 Rev. May 19, 1998 Updted February 12, 1999

STANFORD UNIVERSITY. Bonding Telescope to Quartz Block Readiness Review Completion Certificate. P0259 Rev. May 19, 1998 Updted February 12, 1999 P0259 Rev. W. W. Hansen Experimental Physics Laboratory STANFORD UNIVERSITY STANFORD, CALIFORNIA 94305-4085 Bonding Telescope to Quartz Block Readiness Review Completion Certificate P0259 Rev. May 19,

More information

ASTRA EVANGELISTA S.A.

ASTRA EVANGELISTA S.A. (1) STR EVNGELIST S.. PLNT CNNING COMPRESS Pressure Vessel Design Calculations Vessel No: Customer: FIUB Contract: Designer: HRI/SEG Date: lunes, agosto 09, 2004 1 / 33 Table Of Contents1) Table Of Contents

More information

SCOPE OF CERTIFICATION

SCOPE OF CERTIFICATION April, 0 Mr. Paul Heald Valvtechnologies, ncorporated 0 Bingle Rd Houston, TX 0 THE NATONAL BOARD OF' BOLER AND PRESSURE VESSEL NSPECTORS Subject: Capacity Certification, Z***NBWRAP-MKB (NB Cap. Cert D

More information

PERFORMANCE EVALUATION REPORT; COOLING PLANTS

PERFORMANCE EVALUATION REPORT; COOLING PLANTS PERFORMANCE EVALUATION REPORT; COOLING PLANTS it is recommended that you print out the original report and this translation and follow them side by side as this translation contains no pictures, signatures,

More information

Edward C. Robison, PE, SE. 02 January Architectural Metal Works ATTN: Sean Wentworth th ST Emeryville, CA 94608

Edward C. Robison, PE, SE. 02 January Architectural Metal Works ATTN: Sean Wentworth th ST Emeryville, CA 94608 Edward C. Robison, PE, SE ks ATTN: Sean Wentworth 1483 67 th ST Emeryville, CA 94608 02 January 2013 SUBJ: 501 CORTE MADERA AVE, CORTE MADERA, CA 94925 BALCONY GUARD BASE PLATE MOUNTS The guards for the

More information

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS

Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS Guideline REGULATORY REQUIREMENTS FOR FINAL WELL REPORTS ONSHORE TO OFFSHORE WELLS 1. Introduction The requirement to prepare and submit a Final Well Report is specified by subsection 201(1) of the Newfoundland

More information

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. GREENSLADE & CO., INC Wenneca Avenue Fort Worth, TX Larry Borowski Phone:

SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005. GREENSLADE & CO., INC Wenneca Avenue Fort Worth, TX Larry Borowski Phone: SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 GREENSLADE & CO., INC. 2234 Wenneca Avenue Fort Worth, TX 76102 Larry Borowski Phone: 800 435 2657 CALIBRATION Valid To: October 31, 2018 Certificate Number:

More information

API Ballot Summary Sheet 11/10/2009

API Ballot Summary Sheet 11/10/2009 Ballot: API Ballot Summary Sheet 11/10/2009 4F 3rd Ed - Service Rig Rating Ballot ID: 1845 Start Date: 9/15/09 Closing Date: 10/30/09 sociate: Roland Goodman Coordinator: Roland Goodman Proposal: VotingCategory

More information

ALASTAIR MCLACHLAN Applications Cameron

ALASTAIR MCLACHLAN Applications Cameron ALASTAIR MCLACHLAN Applications Cameron Have worked in the oil and gas flow measurement industry for 27 years primarily in custody transfer measurement using ultrasonic meters. Joined Cameron Caldon Ultrasonics

More information

Type M4 - SON - SO - MS

Type M4 - SON - SO - MS 9. REV. Type M - SON - SO - MS Aircaps Tank venting and water excluding aircaps. For installation on service tank air pipes. Inerted void spaces and ballast tanks In order to maintain inert gas pressure

More information

Available PartNum Description 1.00 BSS BUNA-N PKG. 4" 1000wp SPLIT+SLEEVE dr PSI

Available PartNum Description 1.00 BSS BUNA-N PKG. 4 1000wp SPLIT+SLEEVE dr PSI PLIDCO - Finished Goods in MAIN Warehouse Printed: 08/16/13 07:36 Available PartNum Description 1.00 BSS0-0400 BUNA-N PKG. 4" 1000wp SPLIT+SLEEVE dr6948 1000 PSI 2.00 CC02-7004S CROSS 2X2X2X2 1000 PSI

More information

HEAVY DUTY SWING-OUT VALVE

HEAVY DUTY SWING-OUT VALVE ISO 900 REGISTERED COMPANY HEAVY DUTY SWING-OUT VALVE 52 53 23 5 2 2 3 28 39 NOT USED WITH SZ HANDLE 2 NOT USED WITH SZ HANDLE 5 2 3 7 9 9 Premier Farnell Corporation. 20 All rights reserved. No portion

More information

405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Data Book and Flow Handbook

405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Data Book and Flow Handbook Reference Manual 405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Book and Flow Handbook www.rosemount.com Reference Manual 405 and 1595 405 Compact Orifice Series and 1595 Conditioning

More information

ASTM upvc Schedule 80

ASTM upvc Schedule 80 ASTM upvc PRESSURE PIPING SYSTEM SPECIFICATION Pipes Standards & Quality Sch. 80 pipe is manufactured to comply with NSF Standard 61, CSA B 137.3 and ASTM D1785, consistently meeting the Quality Assurance

More information

405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Data Book and Flow Handbook

405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Data Book and Flow Handbook 405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Book and Flow Handbook www.rosemount.com 405 Compact Orifice Series and 1595 Conditioning Orifice Plate Flow Test Book NOTICE Read

More information

Suitable drilling facilities. Roar Sognnes, Principal Engineer Petroleum Safety Authority

Suitable drilling facilities. Roar Sognnes, Principal Engineer Petroleum Safety Authority Suitable drilling facilities Roar Sognnes, Principal Engineer Petroleum Safety Authority Study: Suitable drilling facilities for operations in the Barents Sea A research question we asked ourselves: What

More information

OIML D 28 DOCUMENT. Edition 2004 (E) ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION. Conventional value of the result of weighing in air

OIML D 28 DOCUMENT. Edition 2004 (E) ORGANISATION INTERNATIONALE INTERNATIONAL ORGANIZATION. Conventional value of the result of weighing in air INTERNATIONAL DOCUMENT OIML D 28 Edition 2004 (E) Conventional value of the result of weighing in air Valeur conventionnelle du résultat des pesées dans l'air OIML D 28 Edition 2004 (E) ORGANISATION INTERNATIONALE

More information

Certificate: / 29 April 2014

Certificate: / 29 April 2014 Test report: 936/21218896/A of 20 September 2013 Initial certification: 01 April 2014 Date of expiry: 31 March 2019 Publication: BAnz AT 01 April 2014 B12, chapter IV, No. 5.1 Approved application The

More information

ECE/TRANS/180/Add.4/Amend.2

ECE/TRANS/180/Add.4/Amend.2 21 October 2010 Global registry Created on 18 November 2004, pursuant to Article 6 of the Agreement concerning the establishing of global technical regulations for wheeled vehicles, equipment and parts

More information

Perform Solder Heat Resistance using three temperature profiles: 230 C, 260 C and 280 C. Summary Report PART DESCRIPTION LTMM S-D-RA

Perform Solder Heat Resistance using three temperature profiles: 230 C, 260 C and 280 C. Summary Report PART DESCRIPTION LTMM S-D-RA Perform Solder Heat Resistance using three temperature profiles: 230 C, 260 C and 280 C. Summary Report PART DESCRIPTION LTMM-125-02-S-D-RA File: J:\QA LAB\Test Programs\TC031-Lead Free-0141\ TC031-Lead

More information

File OF-Surv-Inc April 2014

File OF-Surv-Inc April 2014 File OF-Surv-Inc-2014-33 01 14 April 2014 Mr. Russell K. Girling, President and Chief Executive Officer TransCanada Pipes Limited 450 1 st Street SW Calgary, AB T2P 5H1 Facsimile 403-920-2200 Dear Mr.

More information

Hull structural design - Ships with length 100 metres and above

Hull structural design - Ships with length 100 metres and above RULES FOR CLASSIFICATION OF Ships PART 3 CHAPTER 1 NEWBUILDINGS HULL AND EQUIPMENT MAIN CLASS Hull structural design - Ships with length 100 metres and above JANUARY 2015 The electronic pdf version of

More information

Pressure Measurement Single-range transmitters for general applications

Pressure Measurement Single-range transmitters for general applications Siemens AG 07 Overview Function SITRANS LH00 Transmitter for hydrostatic level U const. p U I EM Sensor Connection for auxiliary power supply Vent pipe with humidity filter Protective conductor connection/

More information