DISTRICT ODESSA 3222 ANDREWS SH STP 2011(177)SB $ 4,932, NO AWARD

Size: px
Start display at page:

Download "DISTRICT ODESSA 3222 ANDREWS SH STP 2011(177)SB $ 4,932, NO AWARD"

Transcription

1

2 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ODESSA 3222 ANDREWS SH STP 2011(177)SB $ 4,932, NO AWARD CONTRACTOR: PRICE CONSTRUCTION, LTD. $ 5,099, NO LIMITS: AT FM 1788 TO. CONTRACT AMOUNT $ 5,099, TYPE: CONSTRUCTION OF NEW INTERCHANGE DISTRICT LUFKIN 3250 ANGELINA FM BR 2009(262) $ 825, NO AWARD CONTRACTOR: LONGVIEW BRIDGE AND ROAD, LTD. $ 833, NO LIMITS: AT ODELL CREEK TO CONTRACT AMOUNT $ 833, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT CORPUS CHRISTI 3083 ARANSAS SH STP 2011(142)SB $ 117, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 137, NO LIMITS: 0.4 MI. W. OF WALKER ROAD TO 0.4 MI. E. OF WALKER ROAD CONTRACT AMOUNT $ 137, TYPE: INSTALL LEFT TURN LANE OR TWCTL DISTRICT AUSTIN 3060 BASTROP CR BR 2005(708) $ 480, NO AWARD CONTRACTOR: A GREATER AUSTIN DEVELOPMENT COMPANY, LT $ 462, NO LIMITS: ON ST DELIGHT AT PIN OAK CREEK,ETC. TO CONTRACT AMOUNT $ 462, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT AUSTIN 3221 BASTROP FM STP 2011(117)SB $ 4,929, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 3,787, NO LIMITS: MI E OF SH 21 TO FM 20 TYPE: ADDITIONAL PAVED SURFACE WIDTH CONTRACT AMOUNT $ 3,787,648.30

3 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 2 DISTRICT WICHITA FALLS 3272 BAYLOR FM BR 2011(197) $ 265, NO AWARD CONTRACTOR: STRILAND CONSTRUCTION, INC. $ 264, NO LIMITS: AT COAL CREEK TO. CONTRACT AMOUNT $ 264, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT CORPUS CHRISTI 3029 BEE FM C $ 2,399, NO AWARD CONTRACTOR: RAY FARIS, INC. $ 2,458, NO LIMITS: FM 2985 TO SH 72 CONTRACT AMOUNT $ 2,458, TYPE: REHAB ROADWAY AND WIDEN DISTRICT WACO 3308 BELL SH STP 2011(352) $ 1,027, NO AWARD CONTRACTOR: JAMES CONSTRUCTION GROUP, L.L.C. $ 1,182, NO LIMITS: 0.3 MI S OF FM 2268 IN HOLLAND TO 0.4 MI N OF FM 2268 IN HOLLAND CONTRACT AMOUNT $ 1,182, TYPE: IMPROVE DRAINAGE AND ADD CURB AND GUTTER DISTRICT WACO 3309 BELL FM STP 2011(354) $ 344, NO AWARD CONTRACTOR: RYAN EQUIPMENT INC $ 414, NO FM 3219 TO. CONTRACT AMOUNT $ 414, TYPE: INTERSECTION IMPROVEMENT BY INSTALLING TRAFFIC SIGNAL, NIGHT LIGHTING AND TURN LANES DISTRICT SAN ANTONIO 3212 BEXAR IH C $ 720, NO AWARD CONTRACTOR: MICA CORPORATION $ 589, NO LIMITS: AT US 281 TO. TYPE: HIGH MAST ILLUMINATION CONTRACT AMOUNT $ 589,660.00

4 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 3 DISTRICT SAN ANTONIO 3211 BEXAR IH C $ 2,004, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 2,240, NO LIMITS:.995 MI SOUTH OF RITTIMAN RD. TO.155 MI SOUTH OF RITTIMAN RD.,ETC. CONTRACT AMOUNT $ 2,240, TYPE: INSTALL CONCRETE MEDIAN BARRIER & ILLUMINATION DISTRICT SAN ANTONIO 3050 BEXAR IH BR 2009(169) $ 713, NO AWARD CONTRACTOR: SHANNON-MONK, INC. $ 673, NO LIMITS: EB FR AT LEON CREEK TO. CONTRACT AMOUNT $ 673, TYPE: REHAB BRIDGE & APPROACHES DISTRICT SAN ANTONIO 3240 BEXAR MH C $ 30,261, NO AWARD CONTRACTOR: BALLENGER CONSTRUCTION COMPANY $ 26,448, NO LIMITS: WURZBACH PARKWAY ON NEW LOCATION TO FROM FM 2696 TO WEST AVE CONTRACT AMOUNT $ 26,448, TYPE: CONSTRUCT 4 LANE DIVIDED ROADWAY ON NEW LOCATION DISTRICT SAN ANTONIO 3001 BEXAR PS C $ 29,428, NO AWARD CONTRACTOR: BALLENGER CONSTRUCTION COMPANY $ 24,018, NO LIMITS: ON WURZBACH PARKWAY ON NEW LOCATION TO FROM JONES-MALTSBERGER TO WETMORE CONTRACT AMOUNT $ 24,018, TYPE: CONSTRUCT 4 LANE DIVIDED ROADWAY_ON NEW LOCATION DISTRICT WACO 3109 BOSQUE FM STP 2011(353) $ 2,269, NO AWARD CONTRACTOR: BIG CREEK CONSTRUCTION, LTD. $ 2,036, NO LIMITS: SH 22 TO FM 2490 TYPE: REHABILITATE AND WIDEN PAVEMENT TO ADD SHOULDERS, UPGRADE SAFETY FEATURES AND RESURFACE CONTRACT AMOUNT $ 2,036,618.39

5 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 4 DISTRICT WACO 3010 BOSQUE FM STP 2011(188)SB $ 3,781, NO AWARD CONTRACTOR: LINDSEY CONTRACTORS, INC. $ 4,277, NO LIMITS: FM 1713 TO SH 22 CONTRACT AMOUNT $ 4,277, TYPE: PROVIDE ADDITIONAL PAVED SURFACE WIDTH DISTRICT WACO 3249 BOSQUE FM BR 2011(189) $ 859, NO AWARD CONTRACTOR: BIG CREEK CONSTRUCTION, LTD. $ 935, SEE ATTACHMENT 1 LIMITS: FM HOG CREEK STR #022 AND TO HARRIS CRK(WNDSR RD)MAP#828 CONTRACT AMOUNT $ 935, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT WACO 3078 BOSQUE FM CC $ 228, NO AWARD CONTRACTOR: STRILAND CONSTRUCTION, INC. $ 205, SEE ATTACHMENT 1 LIMITS: 1.57 MI E OF FM 56 TO 1.63 MI E OF FM 56 CONTRACT AMOUNT $ 205, TYPE: REPLACE CULVERT DISTRICT ATLANTA 3090 BOWIE SH STP 2011(308) $ 2,148, NO AWARD CONTRACTOR: R. K. HALL CONSTRUCTION, LTD. $ 2,041, NO LIMITS: 0.2 MILE SOUTH OF US 82 TO FM 1840 CONTRACT AMOUNT $ 2,041, TYPE: RESURFACE EXISTING 2-LANE HIGHWAY WITH ASPHALTIC CONCRETE DISTRICT ATLANTA 3202 BOWIE IH NH 2011(104) $ 15,075, YES AWARD CONTRACTOR: EAST TEXAS BRIDGE, INC. $ 15,994, NO LIMITS: SPUR 86 TO FM 560 TYPE: CONSTRUCT INTERCHANGE AT WEST HOOKS COUNTY ROAD & CONSTRUCT ONE-WAY FRONTAGE ROADS BETWEEN FM 560 AND SP 86 CONTRACT AMOUNT $ 15,994,499.70

6 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 5 DISTRICT ATLANTA 3015 BOWIE FM STP 2011(106)ES $ 123, NO AWARD CONTRACTOR: HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR $ 118, NO LIMITS: AT INTERSECTION OF FM 2240 TO CONTRACT AMOUNT $ 118, TYPE: UPGRADE EXISTING TRAFFIC SIGNALS 3296 BRAZORIA SH NH 2011(344) $ 6,818, NO AWARD CONTRACTOR: DURWOOD GREENE CONSTRUCTION CO. $ 5,828, NO LIMITS: HAYES CREEK TO BS 288B CONTRACT AMOUNT $ 5,828, TYPE: SEAL COAT & ACP OVERLAY 3070 BRAZORIA SH NH 2011(169) $ 331, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 287, NO LIMITS: AT CR 44 TO CONTRACT AMOUNT $ 287, TYPE: INSTALL BOX CULVERT 3251 BRAZORIA CS BR 2001(693) $ 513, NO AWARD CONTRACTOR: SOUTH COAST CONSTRUCTION, INC. $ 389, SEE ATTACHMENT 1 LIMITS: OLD ALVIN ROAD TO AT HICKORY SLOUGH CONTRACT AMOUNT $ 389, TYPE: REPLACE BRIDGE AND APPROACHES 3241 BRAZORIA CR BR 2006(323) $ 856, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 974, SEE ATTACHMENT 1 LIMITS: CR 121 AT DRAW TO TYPE: REPLACE BRIDGE CONTRACT AMOUNT $ 974,311.98

7 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE BRAZORIA CR BR 2006(327) $ 989, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 1,076, SEE ATTACHMENT 1 LIMITS: CR 128 AT DRAINAGE DITCH TO CONTRACT AMOUNT $ 1,076, TYPE: REPLACE BRIDGE (NBI# 12020AA ) 3076 BRAZORIA PW C $ 294, NO AWARD CONTRACTOR: CRAIG & HEIDT, INC. $ 252, NO LIMITS: AT SEA CENTER TEXAS TO CONTRACT AMOUNT $ 252, TYPE: PAVE LEVEES AROUND 36 ONE-ACRE PONDS 3077 BRAZORIA VA STP 2011(202) $ 240, NO AWARD CONTRACTOR: ISI CONTRACTING, INC. $ 208, NO LIMITS: VARIOUS TO. CONTRACT AMOUNT $ 208, TYPE: STRUCTURAL REPAIR DISTRICT BRYAN 3088 BRAZOS SH NH 2011(316) $ 6,142, NO AWARD CONTRACTOR: KNIFE RIVER CORPORATION - SOUTH $ 5,113, NO LIMITS: FM 158 TO FM 2818 CONTRACT AMOUNT $ 5,113, TYPE: OVERLAY CONSISTING OF MILLING, SURFACE TREATMENT, HMA OVERLAY AND PAVEMENT MARKINGS AND MARKERS DISTRICT BRYAN 3301 BRAZOS FM STP 2011(314) $ 982, NO AWARD CONTRACTOR: GLENN FUQUA, INC. $ 749, NO LIMITS: FM 2818 TO SH 21 CONTRACT AMOUNT $ 749, TYPE: UPGRDING NON-FREEWAY FACILITY CONSISTING OF SCARIFYING EXISTING BSE, FLEXIBLE BSE, SURFACE TRTMENT AND PVMT MRKING

8 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 7 DISTRICT CHILDRESS 3094 BRISCOE SH STP 2011(307) $ 1,935, NO AWARD CONTRACTOR: GILVIN-TERRILL, LTD. $ 1,460, NO LIMITS: SH 86,E TO MILES CONTRACT AMOUNT $ 1,460, TYPE: ACP, UTBWC AND STRUCTURES DISTRICT BROWNWOOD 3063 BROWN PW C $ 455, NO AWARD CONTRACTOR: ALLEN KELLER COMPANY $ 365, NO LIMITS: WITHIN MCGILLVRY-MUSE STATE PARK TO CONTRACT AMOUNT $ 365, TYPE: CONST 0.7 MI ROAD ACCESS TO CHECK STATION & SUPPORT FAC. AND REBUILD 3.0 MI OF ROADS. DISTRICT AUSTIN 3110 BURNET US STP 2011(355) $ 5,433, NO AWARD CONTRACTOR: DAN WILLIAMS COMPANY $ 4,671, NO LIMITS: HOUSTON CLINTON DR TO GREEN MILE RD CONTRACT AMOUNT $ 4,671, TYPE: REHAB RDWY DISTRICT AUSTIN 3267 CALDWELL US STP 2011(112)HES $ 362, NO AWARD CONTRACTOR: D. I. J. CONSTRUCTION, INC. $ 256, NO LIMITS: VARIOUS LOCATIONS TO. CONTRACT AMOUNT $ 256, TYPE: CENTERLINE RUMBLE STRIPS DISTRICT AUSTIN 3079 CALDWELL CR BR 2005(214) $ 245, NO AWARD CONTRACTOR: RELMCO, INC. $ 261, NO LIMITS: ON MINERAL SPRINGS W FORK PLUM TO CREEK, AA TYPE: REPLACE BRIDGE AND APPROACHES CONTRACT AMOUNT $ 261,620.88

9 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 8 DISTRICT PHARR 3247 CAMERON US STP 2011(183)HES $ 781, NO AWARD CONTRACTOR: HIGHWAY TECHNOLOGIES, INC. $ 371, NO LIMITS: HIDALGO COUNTY LINE TO 0.22 MILES EAST OF LEAL ST CONTRACT AMOUNT $ 371, TYPE: RUMBLE STRIPS DISTRICT PHARR 3007 CAMERON CS STP 2005(291)MM $ 4,767, NO AWARD CONTRACTOR: BALLENGER CONSTRUCTION COMPANY $ 5,494, SEE ATTACHMENT 1 LIMITS: ON MORRISON RD, FR W OF PABLO KISEL TO FM 1847 CONTRACT AMOUNT $ 5,494, TYPE: EXTEND & CONSTRUCT TO 4 LANES DISTRICT PHARR 3209 CAMERON FM STP 2011(090)HES $ 6,010, NO AWARD CONTRACTOR: G & T PAVING, LLC $ 6,815, NO LIMITS: 0.74 MI N OF US 281 TO 0.18 MI W OF US 77/83 CONTRACT AMOUNT $ 6,815, TYPE: IMPROVE TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTION DISTRICT BEAUMONT 3229 CHAMBERS IH IM 0108(168) $ 2,439, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 2,502, SEE ATTACHMENT 1 LIMITS: 2.3 MILES WEST OF FM 1410 TO 2.3 MILES WEST OF FM 1410 CONTRACT AMOUNT $ 2,502, TYPE: CONSTRUCT A TRUCK WEIGH STATION DISTRICT DALLAS 3004 COLLIN SH BR 2011(145) $ 6,722, NO AWARD CONTRACTOR: MCCARTHY BUILDING COMPANIES, INC. $ 6,209, NO LIMITS: AT EAST FORK TRINITY RIVER TO AND RELIEF STRUCTURES TYPE: REPLACE BRIDGE AND APPROACHES CONTRACT AMOUNT $ 6,209,528.27

10 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 9 DISTRICT DALLAS 3231 COLLIN FM BR 2011(086) $ 2,084, NO AWARD CONTRACTOR: ED BELL CONSTRUCTION COMPANY $ 1,874, NO LIMITS: SH 121 TO FM 2933 CONTRACT AMOUNT $ 1,874, TYPE: REPLACE BRIDGE DISTRICT DALLAS 3024 COLLIN FM C $ 3,659, NO AWARD CONTRACTOR: MCMAHON CONTRACTING, L.P. $ 3,276, NO LIMITS: SH 5 TO AIRPORT ROAD IN MCKINNEY CONTRACT AMOUNT $ 3,276, TYPE: RECONSTRUCT EXISTING 6 LANE UNDIVIDED URBAN TO 4 LANE DIVIDED URBAN DISTRICT SAN ANTONIO 3036 COMAL FM C $ 1,696, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 1,199, NO LIMITS: HANCOCK ROAD TO JACOBS CREEK PARK ROAD CONTRACT AMOUNT $ 1,199, TYPE: REHAB AND WIDEN RDWY TO PROVIDE TURN LANES DISTRICT SAN ANTONIO 3258 COMAL CR BR 94(111) $ 502, NO AWARD CONTRACTOR: RELMCO, INC. $ 534, NO LIMITS: SPRING BRANCH CYPRESS CREEK TO CONTRACT AMOUNT $ 534, TYPE: REPLACING BRIDGE AND APPROACHES DISTRICT SAN ANTONIO 3113 COMAL FM STP 2011(362) $ 5,066, NO AWARD CONTRACTOR: ANGEL BROTHERS ENTERPRISES, LTD. $ 4,111, NO LIMITS: MYSTIC PARKWAY TO FM 484 TYPE: WIDEN NARROW ROADWAY TO ADD SHOULDERS AND PASSING LANES CONTRACT AMOUNT $ 4,111,989.08

11 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 10 DISTRICT WICHITA FALLS 3025 COOKE FM STP 2011(198)SB $ 3,376, NO AWARD CONTRACTOR: ED BELL CONSTRUCTION COMPANY $ 3,585, SEE ATTACHMENT 1 LIMITS: 1 MILE NORTH OF US 82 TO 1 MILE SOUTH OF US 82 CONTRACT AMOUNT $ 3,585, TYPE: CONSTRUCT GRADE SEPARATION DISTRICT WACO 3095 CORYELL FM BR 2011(332) $ 1,344, NO AWARD CONTRACTOR: A GREATER AUSTIN DEVELOPMENT COMPANY, LT $ 1,410, NO PLUM CREEK (STR #006) TO CONTRACT AMOUNT $ 1,410, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT WACO 3259 CORYELL CR BR 2009(440) $ 499, NO AWARD CONTRACTOR: DIAMOND K EQUIPMENT INC. $ 489, SEE ATTACHMENT 1 LIMITS: ON CR DODDS BRANCH TO (MAP #11) CONTRACT AMOUNT $ 489, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT WACO 3201 CORYELL SH STP 2011(191) $ 30,330, NO REJECT CONTRACTOR: LEDCOR CMI INC. $ 31,976, SEE ATTACHMENT 1 LIMITS: US 190 TO FM 116 CONTRACT AMOUNT $ 31,976, TYPE: CONSTRUCT INITIAL TWO-LANE OF ULTIMATE FOUR-LANE DIVIDED FOR COPPERAS COVE NE RELIEF RTE & TANK DESTROYER BLVD CONNECTION DISTRICT CHILDRESS 3074 COTTLE PW C $ 297, NO AWARD CONTRACTOR: LONE WOLF CONSTRUCTION, LLC $ 260, NO MATADOR WILDLIFE REFUGE TO. TYPE: BASE AND STRUCTURES CONTRACT AMOUNT $ 260,477.18

12 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 11 DISTRICT SAN ANGELO 3118 CROCKETT IH IM 0103(109) $ 2,321, NO AWARD CONTRACTOR: REECE ALBERT, INC. $ 2,104, NO LIMITS: 5.0 MI E OF SH 163 IN OZONA TO 7.5 MI W OF SUTTON COUNTY LINE CONTRACT AMOUNT $ 2,104, TYPE: OVERLAY DISTRICT ODESSA 3044 CROCKETT FM BR 2011(178) $ 942, NO AWARD CONTRACTOR: VILLA & SONS CONSTRUCTION, INC. $ 760, NO LIMITS: AT PECOS RIVER TO. CONTRACT AMOUNT $ 760, TYPE: REPLACE BRIDGE DISTRICT EL PASO 3286 CULBERSON IH IM 0101(256) $ 1,587, NO AWARD CONTRACTOR: DAN WILLIAMS COMPANY $ 1,094, NO LIMITS: EXITT 138 ON RAMP TO US 90 CONTRACT AMOUNT $ 1,094, TYPE: MILL AND INLAY DISTRICT AMARILLO 3115 DALLAM US NH 2011(365) $ 9,256, NO AWARD CONTRACTOR: J. LEE MILLIGAN, INC. $ 7,331, NO LIMITS: OKLAHOMA STATE LINE TO SHERMAN COUNTY LINE CONTRACT AMOUNT $ 7,331, TYPE: SUPER 2-REHAB RDWY/ADD PASS LANES DISTRICT DALLAS 3230 DALLAS IH C $ 1,991, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 2,559, SEE ATTACHMENT 1 LIMITS: ERVAY ST IN DOWNTOWN DALLAS TO FERGUSON RD TYPE: CONSTRUCT PERMANENT CONTRAFLOW HOV LANES CONTRACT AMOUNT $ 2,559,067.92

13 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 12 DISTRICT DALLAS 3023 DALLAS IH HP 2011(147) $ 3,701, NO AWARD CONTRACTOR: GLENN THURMAN, INC. $ 3,832, NO LIMITS: AT FULGHUM ROAD INTERCHANGE TO CONTRACT AMOUNT $ 3,832, TYPE: UPGRADE INTERCHANGE FOR EXPANDED MULTIMODAL TRAFFIC DISTRICT DALLAS 3203 DALLAS SH C $ 10,166, NO AWARD CONTRACTOR: ZACHRY CONSTRUCTION CORPORATION $ 7,111, NO LIMITS: WEST OF STORY RD TO WINGREN RD CONTRACT AMOUNT $ 7,111, TYPE: CONSTRUCT EASTBOUND FRONTAGE ROAD DISTRICT DALLAS 3034 DALLAS US NH 2011(346) $ 3,482, NO AWARD CONTRACTOR: ARK CONTRACTING SERVICES, LLC $ 3,685, NO LIMITS: NORTH OF IH 20 TO SOUTH OF RED BIRD LN CONTRACT AMOUNT $ 3,685, TYPE: CONSTRUCT NB AUXILIARY LANE, WIDEN NBML BRIDGE, CHANNEL WORK DISTRICT DALLAS 3099 DALLAS CS BR 2007(305) $ 616, NO AWARD CONTRACTOR: IOWA BRIDGE & CULVERT, LC $ 681, NO LIMITS: WEST LAWTHER DRIVE TO AT WHITE ROCK CREEK CONTRACT AMOUNT $ 681, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT DALLAS 3300 DALLAS VA NH 2011(318) $ 532, NO AWARD CONTRACTOR: HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR $ 609, NO LIMITS: VARIOUS ON SYSTEM LOCATIONS TO. TYPE: REFURBISH BRIDGE PROTECTION ASSEMBLY SIGNS CONTRACT AMOUNT $ 609,207.67

14 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 13 DISTRICT DALLAS 3100 DALLAS IH CM 2011(319) $ 141, NO AWARD CONTRACTOR: MICA CORPORATION $ 138, NO LIMITS: DALLAS/TARRANT COUNTY LINE TO IH 35E CONTRACT AMOUNT $ 138, TYPE: INSTALLATION OF 2 DYNAMIC MESSAGE SIGNS DISTRICT DALLAS 3104 DALLAS IH CM 2011(320) $ 69, NO AWARD CONTRACTOR: MICA CORPORATION $ 60, NO LIMITS: TOWNE CENTRE BLVD TO IH 30 IN MESQUITE CONTRACT AMOUNT $ 60, TYPE: UPGRADE EXISTING ISDN TO A WIRELESS ITS SYSTEM DISTRICT DALLAS 3219 DENTON FM STP 2011(152) $ 330, NO AWARD CONTRACTOR: ENCINO LANDSCAPE, INC. $ 277, SEE ATTACHMENT 1 LIMITS: FM 423 TO DALLAS NORTH TOLLWAY (COLLIN C/L) CONTRACT AMOUNT $ 277, TYPE: LANDSCAPE DEVELOPMENT INCLUDING TREES AND SHRUBS AND IRRIGATION DISTRICT YOAKUM 3227 DEWITT US BR 2011(201) $ 3,252, YES AWARD CONTRACTOR: ACME BRIDGE COMPANY, INC. $ 2,887, NO LIMITS: AT GUADALUPE RIVER TO STR_# CONTRACT AMOUNT $ 2,887, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT ODESSA 3084 ECTOR IH IM 0201(177) $ 5,799, NO AWARD CONTRACTOR: JONES BROS. DIRT & PAVING CONTRACTORS, I $ 6,438, NO LIMITS: MIDLAND COUNTY LINE TO 0.6 MILES WEST OF US 385 TYPE: PAVEMENT OVERLAY CONTRACT AMOUNT $ 6,438,932.93

15 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 14 DISTRICT DALLAS 3276 ELLIS FM STP 2011(151)HES $ 172, NO AWARD CONTRACTOR: STRIPE-A-ZONE, INC. $ 129, NO LIMITS: FM 879 AND FM 1387 TO. CONTRACT AMOUNT $ 129, TYPE: INSTALL CENTERLINE RUMBLE STRIPS DISTRICT EL PASO 3285 EL PASO SH STP 2011(321) $ 3,843, NO AWARD CONTRACTOR: TEXAS CONCRETE AND ASPHALT, INC. $ 2,477, NO LIMITS: 0.34 MI E OF US 62 TO 9.05 MI E OF US 62 CONTRACT AMOUNT $ 2,477, TYPE: MILL AND INLAY DISTRICT EL PASO 3116 EL PASO US NH 2011(367) $ 2,859, NO AWARD CONTRACTOR: DAN WILLIAMS COMPANY $ 1,770, NO LIMITS: FM 2529 (MC COMBS ST) TO TEXAS/NEW MEXIC0 STATE LINE CONTRACT AMOUNT $ 1,770, TYPE: OVERLAY DISTRICT EL PASO 3091 EL PASO BU 54-A NH 2011(322) $ 1,440, NO AWARD CONTRACTOR: DAN WILLIAMS COMPANY $ 919, NO LIMITS: US 54 TO N OF THE INTERSEC OF SANDERS AVE. CONTRACT AMOUNT $ 919, TYPE: MILL AND INLAY DISTRICT EL PASO 3093 EL PASO US NH 2011(323) $ 4,912, NO AWARD CONTRACTOR: DAN WILLIAMS COMPANY $ 3,196, NO LIMITS: CIELO VISTA DRIVE TO APPROX 325' W OF LP 375 TYPE: 2" MILL AND INLAY CONTRACT AMOUNT $ 3,196,378.96

16 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 15 DISTRICT EL PASO 3204 EL PASO IH IM 0101(255) $ 9,241, NO AWARD CONTRACTOR: A.S. HORNER, INC. $ 7,727, NO LIMITS: 0.7 MI W OF SCHUSTER AVE. TO 0.5 MI E OF SCHUSTER AVE. CONTRACT AMOUNT $ 7,727, TYPE: CONSTRUCT INTERCHANGE IMPROVEMENTS DISTRICT EL PASO 3102 EL PASO IH IM 0101(253) $ 1,654, NO AWARD CONTRACTOR: DAN WILLIAMS COMPANY $ 1,063, NO LIMITS: SH 20 TO SUNLAND PARK INTERCHANGE CONTRACT AMOUNT $ 1,063, TYPE: MILL AND INLAY DISTRICT EL PASO 3303 EL PASO US NH 2011(326) $ 1,806, NO AWARD CONTRACTOR: J.A.R. CONCRETE, INC. $ 1,113, NO LIMITS: MI E OF I-10/SUNLAND PARK INT TO APPROX 2600' E OF YANDELL BRIDGE CONTRACT AMOUNT $ 1,113, TYPE: MILL AND INLAY ASP PAVEMENT; REPAIR PAVEMENT, BRIDGE JOINTS, CURB, & MEDIAN NOSE; AND STRIPING DISTRICT FT WORTH 3270 ERATH US STP 2011(155)HES $ 326, NO AWARD CONTRACTOR: STRIPING TECHNOLOGY, L.P. $ 220, NO LIMITS: PALO PINTO COUNTY LINE TO MI. SOUTH OF FM 8 CONTRACT AMOUNT $ 220, TYPE: CONSTRUCT CENTERLINE RUMBLE STRIPES/INSTALL PAVEMENT STRIPES AND MARKERS DISTRICT FT WORTH 3274 ERATH CR BR 2008(781) $ 237, NO AWARD CONTRACTOR: DIAMOND K EQUIPMENT INC. $ 237, NO LIMITS: CR 136 AT LOST CREEK TO. CONTRACT AMOUNT $ 237, TYPE: REPLACE BRIDGE AND APPROACHES OLD BRIDGE HAS BEEN TEMPORARILY REPL. BY A LOW WATER X-ING

17 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 16 DISTRICT FT WORTH 3038 ERATH FM STP 2011(160)SB $ 1,280, NO AWARD CONTRACTOR: JAY MILLS CONTRACTING, INCORPORATED $ 1,132, NO LIMITS: 1.0 MI E OF CR 437/STONE CUTOFF TO MI E OF CR 437/STONE CUTOF CONTRACT AMOUNT $ 1,132, TYPE: PROVIDE ADDITIONAL PAVED SURFACE BY WIDENING TRAVEL LANE BY 2 FEET AND THE ADDITION OF 2 FOOT SHOULDERS 2009W02002S DISTRICT ABILENE 3057 FISHER CR BR 2010(408) $ 570, NO AWARD CONTRACTOR: J. H. STRAIN & SONS, INC. $ 548, SEE ATTACHMENT 1 LIMITS: ON CR 427 AT EAST COTTONWOOD CREEK TO ETC. CONTRACT AMOUNT $ 548, TYPE: REPLACE BRIDGE AND APPROACHES 3014 FORT BEND US 90A NH 2011(162) $ 356, NO AWARD CONTRACTOR: THIRD COAST SERVICES, LLC $ 204, NO LIMITS: _KIRKWOOD TO _W. PRESENT STREET CONTRACT AMOUNT $ 204, TYPE: CONTINUOUS SAFETY LIGHTING 3298 FORT BEND CS CM 2010(600) $ 120, NO AWARD CONTRACTOR: STATEWIDE TRAFFIC SIGNAL COMPANY $ 94, SEE ATTACHMENT 1 LIMITS: 5TH STREET AT PRESENT ST TO CONTRACT AMOUNT $ 94, TYPE: INSTALL TRAFFIC SIGNALS AT INTERSECTION 3234 FORT BEND CS STP 2011(170) $ 841, NO AWARD CONTRACTOR: MAIN LANE INDUSTRIES, LTD. $ 596, SEE ATTACHMENT 1 LIMITS: S. KIRKWOOD AVE., US 90A TO MEADOWS PLACE CITY LIMITS TYPE: REHABILITATE ROAD CONTRACT AMOUNT $ 596,183.00

18 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE GALVESTON SH NH 2011(337) $ 3,143, NO AWARD CONTRACTOR: ANGEL BROTHERS ENTERPRISES, LTD. $ 2,959, NO LIMITS: 59TH STREET TO SEAWALL BLVD CONTRACT AMOUNT $ 2,959, TYPE: BASE REPAIR AND OVERLAY 3207 GALVESTON SH STP 2011(166)MM $ 6,422, NO AWARD CONTRACTOR: DURWOOD GREENE CONSTRUCTION CO. $ 6,850, SEE ATTACHMENT 1 LIMITS: GILCHRIST TO 2 MI W OF SH 124 & ON TO SH 124 FRM SH 87 TO.6 MI N OF SH8 CONTRACT AMOUNT $ 6,850, TYPE: RAISE ROAD AND ASPHALT CONCRETE PAVEMENT OVERLAY 3073 GALVESTON CS BR 2007(368) $ 309, NO AWARD CONTRACTOR: JOHN REED AND COMPANY, LTD. $ 371, NO LIMITS: CHERRY BENSON GULLY TO CONTRACT AMOUNT $ 371, TYPE: REPLACE BRIDGE 3097 GALVESTON VA CM 2011(329) $ 1,249, NO AWARD CONTRACTOR: FLORIDA TRAFFIC CONTROL DEVICES, INC. $ 633, SEE ATTACHMENT 1 LIMITS: BROADWAY ST FROM 6TH STREET TO 61ST STREET CONTRACT AMOUNT $ 633, TYPE: UPGRADE TRAFFIC SIGNALS & SYNCHRONIZATION (GALVESTON COUNTY) 3235 GALVESTON SH NH 2011(172) $ 1,293, NO AWARD CONTRACTOR: DURWOOD GREENE CONSTRUCTION CO. $ 639, NO LIMITS: IH 45 TO 51ST ST. (PELICAN ISLAND BRIDGE) TYPE: BASE REPAIRS, MILLING & 1.5" ASPHALT OVERLAY CONTRACT AMOUNT $ 639,287.95

19 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE GALVESTON SH ITS 2004(811) $ 151, NO AWARD CONTRACTOR: FLORIDA TRAFFIC CONTROL DEVICES, INC. $ 154, SEE ATTACHMENT 1 LIMITS: IH 45 TO 37TH STREET CONTRACT AMOUNT $ 154, TYPE: 2004 ITS DEPLOYMENT PROGRAM (ITS EQUIPMENT AND ROUTE INFORMATION); DYNAMIC MESSAGE SIGNS FOR PORT OF GALVESTON DISTRICT YOAKUM 3061 GONZALES US STP 2011(200)HES $ 475, NO AWARD CONTRACTOR: BATTERSON,LLP $ 415, NO LIMITS: DISTRICTWIDE TO CONTRACT AMOUNT $ 415, TYPE: CONSTRUCT CENTERLINE RUMBLE STRIPS DISTRICT YOAKUM 3098 GONZALES CR BR 2009(181) $ 228, NO AWARD CONTRACTOR: AARON, DAVID CONSTRUCTION COMPANY, INC. $ 228, SEE ATTACHMENT 1 LIMITS: AT FIVE MILE CREEK CR 193 TO STR AA CONTRACT AMOUNT $ 228, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT PARIS 3009 GRAYSON US STP 2010(989)SB $ 4,153, YES AWARD CONTRACTOR: D. L. LENNON INCORPORATED - CONTRACTOR $ 3,606, NO LIMITS: AT FM 1417 TO. CONTRACT AMOUNT $ 3,606, TYPE: GRADE SEPARATION DISTRICT PARIS 3026 GRAYSON US C $ 3,011, NO AWARD CONTRACTOR: R. K. HALL CONSTRUCTION, LTD. $ 2,144, NO LIMITS: FM 1417 TO FM 902 TYPE: REHABILITATE PAVEMENT CONTRACT AMOUNT $ 2,144,890.29

20 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 19 DISTRICT PARIS 3233 GRAYSON US STP 2011(148)ES $ 1,553, NO AWARD CONTRACTOR: ED BELL CONSTRUCTION COMPANY $ 1,384, NO LIMITS: INT. OF US 82 AND US 75 SB TO INT. OF LOY LAKE ROAD AND US 75 SB CONTRACT AMOUNT $ 1,384, TYPE: REVERSE EXISTING RAMP CONFIGURATION DISTRICT PARIS 3278 GRAYSON FM STP 2011(180)SB $ 130, NO AWARD CONTRACTOR: VESSELS CONSTRUCTION $ 193, NO LIMITS: 1025' SE OF THE FM 406 INTERSECTION TO 669' NW OF THE FM 406 INTERSECTION CONTRACT AMOUNT $ 193, TYPE: INSTALL LEFT TURN LANE DISTRICT SAN ANTONIO 3311 GUADALUPE FM STP 2011(359) $ 1,523, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 1,059, NO LIMITS: 0.2 MI WEST OF FM 1620 TO US 90 CONTRACT AMOUNT $ 1,059, TYPE: REHAB EXISTING RAODWAY AND ADD SHOULDERS DISTRICT SAN ANTONIO 3312 GUADALUPE FM STP 2011(361) $ 1,251, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 963, NO LIMITS: FM 78 TO FM 464 CONTRACT AMOUNT $ 963, TYPE: REHAB AND WIDEN NARROW ROADWAY DISTRICT BEAUMONT 3101 HARDIN FM STP 2011(311) $ 2,024, NO AWARD CONTRACTOR: A. L. HELMCAMP, INC. $ 1,832, NO LIMITS: SH 326, SOUTH TO FM 1003 TYPE: RESTORE EXISTING ROADWAY CONTRACT AMOUNT $ 1,832,807.75

21 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE HARRIS US 90A BR 2010(779) $ 3,698, NO AWARD CONTRACTOR: LONE STAR ROAD CONSTRUCTION, LTD. $ 3,356, NO LIMITS: SB AT CLINTON DR AT AND UPRR. TO CONTRACT AMOUNT $ 3,356, TYPE: REPLACE BRIDGE (NBI# SB) 3205 HARRIS IH STP 2011(025)MM $ 3,848, NO AWARD CONTRACTOR: BALFOUR BEATTY INFRASTRUCTURE, INC. $ 3,594, SEE ATTACHMENT 1 LIMITS: AT WHITE OAK BAYOU TO CONTRACT AMOUNT $ 3,594, TYPE: CONSTRUCT DRAINAGE AND DETENTION FACILITIES 3214 HARRIS IH IM 6107(424) $ 390, NO AWARD CONTRACTOR: BATTERSON,LLP $ 354, NO LIMITS: SAN FELIPE TO BELLAIRE CONTRACT AMOUNT $ 354, TYPE: PAVEMENT MARKINGS 3027 HARRIS IH DMO 2006(885) $ 2,595, NO REJECT CONTRACTOR: ROZCO CONTRACTING, INC. $ 3,075, NO LIMITS: 0.45 MILES NORTH OF TELLEPSEN TO 0.10 MILES SOUTH OF TELLEPSEN CONTRACT AMOUNT $ 3,075, TYPE: FLOOD/DRAINAGE IMPROVEMENTS (REPLACE PUMP STATION) 3018 HARRIS IH HP 2011(167) $ 1,143, NO AWARD CONTRACTOR: BIO LANDSCAPE & MAINTENANCE, INC. $ 855, NO LIMITS: MEADOW ROAD TO W OF BW 8 AT UPS RR (IN SECTIONS) TYPE: LANDSCAPE DEVELOPMENT CONTRACT AMOUNT $ 855,313.31

22 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE HARRIS IH HP 2011(168) $ 904, NO AWARD CONTRACTOR: BIO LANDSCAPE & MAINTENANCE, INC. $ 650, NO LIMITS: AT UNION PACIFIC RAILROAD TO SPRING BAYOU CONTRACT AMOUNT $ 650, TYPE: LANDSCAPE DEVELOPMENT 3228 HARRIS VA CM 2008(495) $ 3,041, NO REJECT CONTRACTOR: ROZCO CONTRACTING, INC. $ 2,901, SEE ATTACHMENT 1 LIMITS: SH 6, VOSS ROAD TO 500 FT S OF TEAL BLVD IN FT BEND CO CONTRACT AMOUNT $ 2,901, TYPE: ACCESS MANAGEMENT IMPROVEMENTS (PHASE I) 3243 HARRIS CS BR 2007(834) $ 1,001, NO AWARD CONTRACTOR: LONE STAR ROAD CONSTRUCTION, LTD. $ 1,509, SEE ATTACHMENT 1 LIMITS: FARTHER POINT AT BUFFALO BAYOU TO CONTRACT AMOUNT $ 1,509, TYPE: REPLACE BRIDGE 3054 HARRIS CS STP 2011(272)ES $ 361, NO AWARD CONTRACTOR: ANGEL BROTHERS ENTERPRISES, LTD. $ 308, SEE ATTACHMENT 1 LIMITS: KATY HOCKLEY ROAD,NW OF BECKER RD. TO SOUTH OF JACK RD. CONTRACT AMOUNT $ 308, TYPE: ASPHALT OVERLAY 3248 HARRIS CS STP 2011(273)ES $ 867, NO AWARD CONTRACTOR: DURWOOD GREENE CONSTRUCTION CO. $ 712, SEE ATTACHMENT 1 LIMITS: CLAY ROAD, EAST OF FRY ROAD TO BARKER CYPRESS TYPE: ASPHALT OVERLAY CONTRACT AMOUNT $ 712,114.06

23 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE HARRIS PW C $ 381, NO AWARD CONTRACTOR: KEYSTONE SITEWORK $ 305, NO LIMITS: SHELDON LAKE STATE PARK TO HEADQUARTERS AT GARRETT ROAD CONTRACT AMOUNT $ 305, TYPE: CONSTRUCT PARKING LOT AND DRIVEWAY 3299 HARRIS CS BR 2007(835) $ 1,283, NO AWARD CONTRACTOR: SOUTH COAST CONSTRUCTION, INC. $ 1,160, SEE ATTACHMENT 1 LIMITS: CONGRESS AVE TO FROM SMITH STREET TO LOUISIANA ST CONTRACT AMOUNT $ 1,160, TYPE: REPLACE BRIDGE AND APPROACHES 3068 HARRIS CS BR 94(14) $ 434, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 409, SEE ATTACHMENT 1 LIMITS: TURNEY ROAD IN CITY OF HOUSTON TO AT HALLS BAYOU CONTRACT AMOUNT $ 409, TYPE: REPLACE BRIDGE 3217 HARRIS CS STP 2002(145)TE $ 1,453, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 1,165, NO LIMITS: BURKE/CRENSHAW PARK TO STRAWBERRY PARK ON VINCE BAYOU CONTRACT AMOUNT $ 1,165, TYPE: VINCE BAYOU PEDESTRIAN AND BICYCLE TRAIL IN PASADENA 3040 HARRIS CS BR 2005(25) $ 1,077, NO AWARD CONTRACTOR: LONE STAR ROAD CONSTRUCTION, LTD. $ 951, NO LIMITS: EL CAMINO REAL TO AT COW BYU/CAN TYPE: REPLACE BRIDGE AND APPROACHES CONTRACT AMOUNT $ 951,005.80

24 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE HARRIS VA CM 2008(894) $ 2,893, NO AWARD CONTRACTOR: FLORIDA TRAFFIC CONTROL DEVICES, INC. $ 1,924, SEE ATTACHMENT 1 LIMITS: VARIOUS LOCATIONS IN HARRIS COUNTY TO CONTRACT AMOUNT $ 1,924, TYPE: HARRIS COUNTY SIGNAL INTERCONNECT PHASE 2 PRECINCT 1-PROJECT HARRIS VA CM 2011(101) $ 7,055, NO AWARD CONTRACTOR: FLORIDA TRAFFIC CONTROL DEVICES, INC. $ 4,497, SEE ATTACHMENT 1 LIMITS: VARIOUS LOCATIONS IN HARRIS COUNTY TO CONTRACT AMOUNT $ 4,497, TYPE: HARRIS COUNTY SIGNAL INTERCONNECT PHASE 2 PRECINCT 3-PROJECT HARRIS FM NH 2010(988) $ 508, NO AWARD CONTRACTOR: ROZCO CONTRACTING, INC. $ 411, NO LIMITS: GREEN HOUSE ROAD TO FRY ROAD CONTRACT AMOUNT $ 411, TYPE: 2 DETENTION PONDS 3304 HARRIS SH NH 2011(330) $ 382, NO AWARD CONTRACTOR: MAIN LANE INDUSTRIES, LTD. $ 315, NO LIMITS: NE OF KINGSLAND GOVERNORS PL TO CONTRACT AMOUNT $ 315, TYPE: NOISE WALL CONTRACT 1 DISTRICT AUSTIN 3245 HAYS IH IM 0353(277) $ 977, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 866, SEE ATTACHMENT 1 LIMITS: AT RIVER RIDGE IN SAN MARCOS TO. CONTRACT AMOUNT $ 866, TYPE: IH 35 RIVER RIDGE ENTRANCE & EXIT RAMP PROJECT WILL CONST A NORTHBUND EXIT RAMP AND SOUTHBOUD ENTRANCE RAMP FOR IH 35

25 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 24 DISTRICT AUSTIN 3049 HAYS SH STP 2011(290)ES $ 769, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 671, SEE ATTACHMENT 1 LIMITS: S OF CR 127 TO N OF CR 127 CONTRACT AMOUNT $ 671, TYPE: ADD LEFT TURN LANE & SHOULDERS DISTRICT PHARR 3111 HIDALGO FM STP 2011(358) $ 4,804, NO AWARD CONTRACTOR: FOREMOST PAVING, INC. $ 5,495, NO LIMITS: US 281 TO 0.5 MI S. OF BUS. 83 CONTRACT AMOUNT $ 5,495, TYPE: REHABILITATE PAVEMENT AND ADD SHOULDERS DISTRICT WACO 3224 HILL FM STP 2011(094)HES $ 3,655, NO AWARD CONTRACTOR: KNIFE RIVER CORPORATION - SOUTH $ 4,037, NO LIMITS: FM 67 TO FM 2604 CONTRACT AMOUNT $ 4,037, TYPE: SAFETY TREAT FIXED OBJECTS, WIDEN LANES, CONSTRUCT PAVED SHOULDERS (1'-4') DISTRICT FT WORTH 3281 HOOD FM STP 2011(159) $ 68, NO AWARD CONTRACTOR: MPB, INC. $ 51, NO LIMITS: AT WALNUT CREEK TO CROSSING CONTRACT AMOUNT $ 51, TYPE: EXTEND MULTIPLE BOX CULVERT UPSTREAM TO ACCOMMODATE TURNING RADIUS FOR TRUCK TRAFFIC DISTRICT PARIS 3306 HOPKINS SH STP 2011(348) $ 5,337, NO AWARD CONTRACTOR: R. K. HALL CONSTRUCTION, LTD. $ 4,638, NO LIMITS: MILES EAST OF FM 269N TO WOOD COUNTY LINE TYPE: REHAB EXISTING ROAD CONTRACT AMOUNT $ 4,638,237.35

26 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 25 DISTRICT PARIS 3225 HOPKINS FM C $ 3,615, NO AWARD CONTRACTOR: D. L. LENNON INCORPORATED - CONTRACTOR $ 3,286, NO LIMITS: FM 71 TO SH 19 CONTRACT AMOUNT $ 3,286, TYPE: REHABILITATION OF EXISTING ROADWAY DISTRICT LUFKIN 3075 HOUSTON FM STP 2011(176)HES $ 284, NO AWARD CONTRACTOR: A R BROTHERS CONSTRUCTION SERVICES, INC. $ 278, NO LIMITS: BU 287-V TO ANDERSON COUNTY LINE CONTRACT AMOUNT $ 278, TYPE: SAFETY TREAT FIXED OBJECTS DISTRICT PARIS 3107 HUNT SH STP 2011(349) $ 4,006, NO AWARD CONTRACTOR: AUSTIN BRIDGE & ROAD, LP $ 3,428, NO LIMITS: ROCKWALL CL TO MI E OF FM 36 CONTRACT AMOUNT $ 3,428, TYPE: 2 1/2" TYPE D OVERLAY WITH 1" LEVEL-UP DISTRICT PARIS 3031 HUNT FM C $ 2,069, NO AWARD CONTRACTOR: D. L. LENNON INCORPORATED - CONTRACTOR $ 1,625, NO LIMITS: US 69 TO SH 276 CONTRACT AMOUNT $ 1,625, TYPE: REHAB EXISTING ROADWAY DISTRICT BEAUMONT 3103 JEFFERSON SH BR 2011(312) $ 13,013, NO AWARD CONTRACTOR: INTECH CONTRACTING LLC $ 9,987, NO LIMITS: MARTIN LUTHER KING JR. BRIDGE TO MARTIN LUTHER KING JR. BRIDGE TYPE: CLEAN AND PAINT STEEL BRIDGE CONTRACT AMOUNT $ 9,987,560.00

27 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 26 DISTRICT FT WORTH 3215 JOHNSON SH TCSP 2011(156) $ 75, NO AWARD CONTRACTOR: HIGHWAY INTELLIGENT TRAFFIC SYSTEMS, COR $ 71, NO LIMITS: AT FM 2331 TO IN GODLEY CONTRACT AMOUNT $ 71, TYPE: INSTALLATION OF A FULL TRAFFIC ACTUATED TRAFFIC SIGNAL DISTRICT FT WORTH 3265 JOHNSON SH STP 2011(301) $ 3,103, NO AWARD CONTRACTOR: LINDSEY CONTRACTORS, INC. $ 3,399, NO LIMITS: MI. WEST OF FM 2331 SOUTH TO FM 2331 SOUTH CONTRACT AMOUNT $ 3,399, TYPE: CEMENT TREAT BASE; ADD 4" NEW BASE AND 2" HMAC OVERLAY DISTRICT FT WORTH 3096 JOHNSON SH STP 2011(347) $ 1,975, NO AWARD CONTRACTOR: BIG CREEK CONSTRUCTION, LTD. $ 2,084, NO LIMITS: FOX RUN ROAD TO HILL COUNTY LINE CONTRACT AMOUNT $ 2,084, TYPE: CEMENT STABILIZE BASE AND HMAC OVERLAY DISTRICT CORPUS CHRISTI 3269 KARNES SH STP 2011(131)SB $ 333, NO AWARD CONTRACTOR: HUNTER INDUSTRIES, LTD. $ 289, NO LIMITS: 0.1 MI N OF FM 81 NORTH TO 0.1 MI S OF FM 81 SOUTH CONTRACT AMOUNT $ 289, TYPE: INSTALL LEFT TURN LANE OR TWCTL DISTRICT DALLAS 3005 KAUFMAN FM BR 2011(084) $ 8,419, NO AWARD CONTRACTOR: KNIFE RIVER CORPORATION - SOUTH $ 9,184, NO LIMITS: FM 987 TO US 175 IN CRANDALL TYPE: REPLACE BRIDGE AND APPROACHES CONTRACT AMOUNT $ 9,184,740.23

28 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 27 DISTRICT SAN ANTONIO 3033 KENDALL FM STP 2010(999)HRR $ 1,897, NO AWARD CONTRACTOR: WAGNER MATERIALS & CONSTRUCTION $ 1,238, NO LIMITS: RM 473 TO SH 46 CONTRACT AMOUNT $ 1,238, TYPE: SAFETY TREAT FIXED OBJECTS DISTRICT SAN ANTONIO 3112 KERR RM STP 2011(360) $ 1,354, NO AWARD CONTRACTOR: ALLEN KELLER COMPANY $ 1,492, NO LIMITS: 0.62 MI N OF SH 27 (JACKSON RD) TO SH 27 CONTRACT AMOUNT $ 1,492, TYPE: STORM SEWER DISTRICT CORPUS CHRISTI 3263 KLEBERG FM STP 2011(138)SB $ 222, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 273, NO LIMITS: FM 1717 TO 2100 FT WEST OF FM 1717 CONTRACT AMOUNT $ 273, TYPE: INSTALL LEFT TURN LANE OR TWCTL DISTRICT PARIS 3064 LAMAR US STP 2011(179)SB $ 981, NO AWARD CONTRACTOR: SAMMY GIST ENTERPRISES, INC. $ 937, NO LIMITS: US 82: 1.01 MI W OF SL 286 TO SL286 TO FM 195:3.0 MI N TO 3.2 MI N OF US82 CONTRACT AMOUNT $ 937, TYPE: INSTALL CONTINUOUS 2 WAY LEFT TURN LANE DISTRICT LUBBOCK 3292 LAMB FM STP 2010(905)HRR $ 1,296, NO AWARD CONTRACTOR: SCR CONSTRUCTION CO., INC. $ 1,528, NO LIMITS: US 385 TO LOOP 430 TYPE: HAZARD ELIMINATION SAFETY CONTRACT AMOUNT $ 1,528,665.00

29 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 28 DISTRICT LUBBOCK 3316 LAMB FM STP 2011(368) $ 1,870, NO AWARD CONTRACTOR: REECE ALBERT, INC. $ 1,350, NO LIMITS: CASTRO COUNTY LINE TO US 70 CONTRACT AMOUNT $ 1,350, TYPE: REHABILITATION OF EXISTING ROAD DISTRICT BROWNWOOD 3297 LAMPASAS US NH 2011(345) $ 7,312, YES AWARD CONTRACTOR: PRATER EQUIPMENT CO., INC. $ 6,626, SEE ATTACHMENT 1 LIMITS: AVENUE E IN LAMPASAS TO NINTH STREET, ETC. CONTRACT AMOUNT $ 6,626, TYPE: REHABILITATION, CURB, SIDEWALK, DRAINAGE IMPROVEMENTS, ILLUMINATION DISTRICT LAREDO 3106 LA SALLE IH STP 2011(338)TE $ 11,807, NO DEFER CONTRACTOR: SATTERFIELD AND PONTIKES CONSTRUCTION, I $ 13,737, NO LIMITS: APPROXIMATELY 5 MI SOUTH COTULLA TO APPROXIMATELY 5 MI SOUTH COTULLA CONTRACT AMOUNT $ 13,737, TYPE: CONSTRUCTION OF TOURIST AND VISITOR CENTER DISTRICT BEAUMONT 3254 LIBERTY US STP 2011(121)HES $ 543, NO AWARD CONTRACTOR: BATTERSON,LLP $ 495, NO LIMITS: DISTRICTWIDE TO DISTRICTWIDE CONTRACT AMOUNT $ 495, TYPE: CENTERLINE TEXTURING DISTRICT BEAUMONT 3223 LIBERTY CS STP 2011(285)ES $ 58, NO AWARD CONTRACTOR: SMITH & COMPANY $ 59, SEE ATTACHMENT 1 LIMITS: SH 321 NORTH TO FM 787 TYPE: OVERLAY EXISTING ROADWAY CONTRACT AMOUNT $ 59,943.90

30 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 29 DISTRICT AMARILLO 3293 LIPSCOMB SH STP 2011(336) $ 2,225, NO AWARD CONTRACTOR: HIGHWAY CONTRACTORS, INC. $ 2,460, NO LIMITS: FM 2172 TO FM 1455 CONTRACT AMOUNT $ 2,460, TYPE: REHAB AND 2 COURSE SURFACE TREATMENT DISTRICT CORPUS CHRISTI 3242 LIVE OAK FM STP 2011(139)SB $ 1,011, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 1,166, NO LIMITS: MI E. OF CR 343 TO MI E. OF IH 37 CONTRACT AMOUNT $ 1,166, TYPE: WIDEN ROADWAY DISTRICT CORPUS CHRISTI 3055 LIVE OAK FM STP 2011(140)SB $ 616, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 670, NO LIMITS: MI E. OF CR 433 TO 1.42 MI SW OF US 281 CONTRACT AMOUNT $ 670, TYPE: WIDEN ROADWAY DISTRICT CORPUS CHRISTI 3072 LIVE OAK FM STP 2011(141)SB $ 348, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 396, NO LIMITS: MI S OF SH 72 TO SH 72 CONTRACT AMOUNT $ 396, TYPE: WIDEN ROADWAY DISTRICT CORPUS CHRISTI 3226 LIVE OAK FM C $ 3,425, NO AWARD CONTRACTOR: BAY LTD $ 3,145, NO LIMITS: US 281 TO FM 534 TYPE: REAHB ROADWAY AND WIDEN CONTRACT AMOUNT $ 3,145,702.12

31 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 30 DISTRICT AUSTIN 3051 LLANO SH STP 2011(109)HES $ 864, NO AWARD CONTRACTOR: D. I. J. CONSTRUCTION, INC. $ 661, NO LIMITS: VARIOUS LOCATIONS TO. CONTRACT AMOUNT $ 661, TYPE: CENTERLINE RUMBLE STRIPS DISTRICT LUBBOCK 3117 LUBBOCK FM STP 2011(369) $ 1,569, NO AWARD CONTRACTOR: THE LANE CONSTRUCTION CORPORATION $ 1,324, NO LIMITS: LOOP 289 TO 98TH STREET CONTRACT AMOUNT $ 1,324, TYPE: REHABILITATION OF EXISTING ROADWAY DISTRICT LUBBOCK 3318 LYNN FM STP 2011(370) $ 1,849, NO AWARD CONTRACTOR: REECE ALBERT, INC. $ 1,096, NO LIMITS: FM 1317 TO US 380 CONTRACT AMOUNT $ 1,096, TYPE: REHABILITATION OF EXISTING ROAD DISTRICT YOAKUM 3105 MATAGORDA FM STP 2011(293)HES $ 433, NO AWARD CONTRACTOR: L.L. & F. CONSTRUCTION MANAGEMENT, INC. $ 459, NO LIMITS: 0.6 MI. SOUTH OF SH 35 TO FM 3057 CONTRACT AMOUNT $ 459, TYPE: SAFFETY TREAT FIXED OBJECTS DISTRICT WACO 3264 MCLENNAN US STP 2011(185)HES $ 360, NO AWARD CONTRACTOR: STRIPE-A-ZONE, INC. $ 387, NO LIMITS: CORYELL CO LINE TO JOHNSON DRIVE TYPE: ADD CENTERLINE RUMBLE STRIP CONTRACT AMOUNT $ 387,088.17

32 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 31 DISTRICT WACO 3071 MCLENNAN CS BR 2007(722) $ 323, NO REJECT CONTRACTOR: ELLIS-MCGINNIS CONSTRUCTION CO. $ 485, SEE ATTACHMENT 1 CASTLEMAN CRK BRANCH TO (MAP #1008 RBS) (OLD ROBINSON RD) CONTRACT AMOUNT $ 485, TYPE: REPLACE BRIDGE AND APPROACHES DISTRICT BROWNWOOD 3275 MILLS US STP 2011(125)SB $ 173, NO AWARD CONTRACTOR: ALLEN KELLER COMPANY $ 199, NO LIMITS: AT FM 1029 TO CONTRACT AMOUNT $ 199, TYPE: CONSTRUCT A LEFT TURN LANE DISTRICT ABILENE 3280 MITCHELL VA STP 2011(102) $ 107, NO AWARD CONTRACTOR: BONTKE BROTHERS CONSTRUCTION COMPANY $ 134, NO LIMITS: VARIOUS LOCATIONS IN COLORADO CITY TO. CONTRACT AMOUNT $ 134, TYPE: ADA IMPROVEMENTS DISTRICT WICHITA FALLS 3287 MONTAGUE US STP 2011(333)RGS $ 5,032, YES AWARD CONTRACTOR: AUI CONTRACTORS, LLC $ 4,911, NO LIMITS: 2.0 MILES SOUTHEAST OF BOWIE TO. CONTRACT AMOUNT $ 4,911, TYPE: REPLACEMENT OF EXISTING RAILROAD UNDERPASS DISTRICT WICHITA FALLS 3016 MONTAGUE US NH 2011(193) $ 93, NO AWARD CONTRACTOR: DURABLE SPECIALTIES, INC. $ 98, NO LIMITS: AT FM 677 IN SAINT JO TO. TYPE: INSTALL TRAFFIC SIGNAL CONTRACT AMOUNT $ 98,000.00

33 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE MONTGOMERY SH STP 2011(163)HES $ 1,439, NO AWARD CONTRACTOR: HIGHWAY TECHNOLOGIES, INC. $ 878, NO LIMITS: WALKER COUNTY LINE, ETC. TO MI N OF ROGERS STREET CONTRACT AMOUNT $ 878, TYPE: CENTERLINE RUMBLE STRIPS 3277 MONTGOMERY SH STP 2011(165)HES $ 149, NO AWARD CONTRACTOR: MAIN LANE INDUSTRIES, LTD. $ 158, NO LIMITS: 900 FT WEST OF DUCK CREEK TO 835 FT SOUTH OF DUCK CREEK CONTRACT AMOUNT $ 158, TYPE: SAFETY TREATMENT, FIX OBJECTS, INSTALL CONTINUOUS LEFT TURN LANE AND ADD LEFT TURN LANE 3119 MONTGOMERY IH NH 2011(372) $ 23,694, NO AWARD CONTRACTOR: W.W. WEBBER, LLC $ 24,972, NO LIMITS: 1.1 MI SOUTH OF WALKER COUNTY LINE TO NORTH OF CALVARY ROAD CONTRACT AMOUNT $ 24,972, TYPE: WIDEN TO 6 MAIN LANES, BRIDGE AND INTERSECTION AT SHEPHARD HILL 3056 MONTGOMERY CR BR 2006(740) $ 576, NO AWARD CONTRACTOR: L. N. MCKEAN, INC. $ 709, SEE ATTACHMENT 1 LIMITS: DOGWOOD TRAIL AT WALNUT CREEK,ETC. TO CONTRACT AMOUNT $ 709, TYPE: REPLACE BRIDGE 3266 MONTGOMERY CR BR 2007(726) $ 381, NO AWARD CONTRACTOR: FORDE CONSTRUCTION COMPANY, INC. $ 498, NO LIMITS: SHAKEY HOLLOW ROAD SPRING BRANCH TYPE: REPLACE BRIDGE AND APPROACHES NBI# AA CONTRACT AMOUNT $ 498,909.80

34 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 33 DISTRICT DALLAS 3003 NAVARRO SH C $ 8,834, NO AWARD CONTRACTOR: LONE STAR CIVIL CONSTRUCTION, INC. $ 9,138, NO LIMITS: 28TH ST TO BEACON ST IN CORSICANA CONTRACT AMOUNT $ 9,138, TYPE: UPGRADE DRAINAGE, REPAIR PAVEMENT AND MEET ADA STANDARDS DISTRICT DALLAS 3253 NAVARRO FM STP 2011(149)HRR $ 723, NO AWARD CONTRACTOR: BYRD BROTHERS EMERGENCY SERVICES, LLC $ 776, NO LIMITS: ON FM 55, FM 637, & FM 744 TO IN NAVARRO COUNTY CONTRACT AMOUNT $ 776, TYPE: MODERNIZE BRIDGE RAIL & APPROACH GUARDRAIL; SAFETY TREAT FIXED OBJECTS DISTRICT BEAUMONT 3082 NEWTON SH STP 2011(123)HRR $ 128, NO AWARD CONTRACTOR: NIXON ENGINEERING $ 160, NO LIMITS: SABINE CO/L, SOUTH & FM 1005 EAST TO TO RR 255 & FM 252 CONTRACT AMOUNT $ 160, TYPE: SAFETY TREAT FIXED OBJECTS DISTRICT ABILENE 3239 NOLAN IH C $ 1,120, NO AWARD CONTRACTOR: VIKING CONSTRUCTION, INC. $ 1,038, NO LIMITS: WEST OF ROSCOE TO WEST OF SH 70 IN SWEETWATER CONTRACT AMOUNT $ 1,038, TYPE: REPAIR BASE FAILURES AND MICROSURFACING FOR IMPROVED SKID RESISTANCE DISTRICT ABILENE 3085 NOLAN IH STP 2011(292)HES $ 681, NO AWARD CONTRACTOR: LOCKHART CONTRACTING SERVICES, INC. $ 589, NO LIMITS: MITCHELL COUNTY LINE TO SH 70 TYPE: INSTALL MEDIAN BARRIER CONTRACT AMOUNT $ 589,049.95

35 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 34 DISTRICT CORPUS CHRISTI 3210 NUECES US BR 2011(127) $ 5,673, NO AWARD CONTRACTOR: SCR CONSTRUCTION CO., INC. $ 4,291, NO LIMITS: ON NUECES BAY CAUSEWAY TO N. BOUND LANES ON NORTH SIDE STR. CONTRACT AMOUNT $ 4,291, TYPE: REHABILITATION OF EXISTING BRIDGE STRUCTURE DISTRICT CORPUS CHRISTI 3216 NUECES US NH 2011(128) $ 135, NO AWARD CONTRACTOR: TIME STRIPING, INC. $ 103, NO LIMITS: ON US 77 TO AT 0.5 MI S. OF SH 44 INTERSECTION CONTRACT AMOUNT $ 103, TYPE: SIGN REPLACEMENT DISTRICT CORPUS CHRISTI 3237 NUECES BU 77-U STP 2011(132)SB $ 1,358, NO AWARD CONTRACTOR: BAY LTD $ 1,456, NO LIMITS:.556 MI N OF CR 44 TO SS22 (PARK RD) IN ROBSTOWN CONTRACT AMOUNT $ 1,456, TYPE: CONSTRUCT LEFT TURN LANE AND ADD SHLDRS DISTRICT CORPUS CHRISTI 3041 NUECES FM BR 2011(135) $ 1,052, NO AWARD CONTRACTOR: BAY LTD $ 963, NO LIMITS: AT BANQUETTE CREEK STR.28 ON FM 666 TO APPROX 1.40 MILE N. OF SH 44 CONTRACT AMOUNT $ 963, TYPE: BRIDGE REPLACEMENT DISTRICT CORPUS CHRISTI 3028 NUECES FM C $ 2,352, NO AWARD CONTRACTOR: BAY LTD $ 2,398, NO LIMITS: SH 44 TO FM 665 TYPE: REHAB. ROADWAY, WIDEN AND ADD SHLDRS. CONTRACT AMOUNT $ 2,398,623.31

36 HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 35 DISTRICT CORPUS CHRISTI 3042 NUECES FM STP 2011(136)SB $ 1,202, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 1,130, NO LIMITS: CR 24 TO CR 22 IN PETRONILA CONTRACT AMOUNT $ 1,130, TYPE: INSTALL LEFT TURN LANE OR TWCTL DISTRICT CORPUS CHRISTI 3246 NUECES FM STP 2011(144)HES $ 961, NO AWARD CONTRACTOR: HAAS-ANDERSON CONSTRUCTION, LTD. $ 871, NO LIMITS: MI S. OF FM 70 TO 1.4 MI S OF FM 70 CONTRACT AMOUNT $ 871, TYPE: RESURFACING OF ROADWAY DISTRICT BEAUMONT 3020 ORANGE IH IM 0108(167) $ 449, NO AWARD CONTRACTOR: LEGENDS LANDSCAPES LLC $ 355, NO LIMITS: IH 10 NORTH TO SH 12 CONTRACT AMOUNT $ 355, TYPE: INSTALL LANDSCAPING DISTRICT BEAUMONT 3268 ORANGE FM STP 2011(291) $ 377, NO AWARD CONTRACTOR: APAC-TEXAS, INC. $ 410, NO LIMITS: MILES WEST OF FM 408 TO EAST OF FM 408. CONTRACT AMOUNT $ 410, TYPE: ADD SIGNAL AND RIGHT TURN LANE DISTRICT FT WORTH 3032 PALO PINTO US STP 2011(203) $ 1,813, NO AWARD CONTRACTOR: PRATER EQUIPMENT CO., INC. $ 1,517, NO LIMITS: FM 4 (WEST OF PALO PINTO) TO BRAZOS RIVER BRIDGE TYPE: OVERLAY CONTRACT AMOUNT $ 1,517,352.16

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT ATLANTA 3004 BOWIE US 67 0010-11-068 STP 2012(053) 110.500 $ 4,495,000.00 5-12.80 NO AWARD CONTRACTOR: CLARK CONSTRUCTION

More information

TEXAS TRANSPORTATION COMMISSION

TEXAS TRANSPORTATION COMMISSION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

TEXAS BOARD OF NURSING 12/2013

TEXAS BOARD OF NURSING 12/2013 UNKNOWN 1962 91 1062 190 3305 3183 ANDERSON 12 0 6 2 20 20 ANDREWS 4 0 2 1 7 7 ANGELINA 33 0 20 2 55 53 ARANSAS 3 0 0 0 3 3 ARMSTRONG 1 0 0 0 1 1 ATASCOSA 5 0 1 1 7 7 AUSTIN 4 0 1 0 5 5 BAILEY 3 0 0 1

More information

AS ADVANCED PRACTICE REGISTERED NURSES BY COUNTY OF EMPLOYMENT AND RECOGNITION GROUP

AS ADVANCED PRACTICE REGISTERED NURSES BY COUNTY OF EMPLOYMENT AND RECOGNITION GROUP ANDERSON 26 0 7 2 35 34 ANDREWS 7 0 2 1 10 10 ANGELINA 60 1 21 2 84 83 ARANSAS 3 0 0 0 3 3 ARCHER 1 0 0 0 1 1 ARMSTRONG 1 0 0 0 1 1 ATASCOSA 21 0 2 3 26 24 AUSTIN 5 0 1 0 6 6 BAILEY 4 0 0 1 5 3 BANDERA

More information

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION

DRAFT: SUBJECT TO CHANGE PRIOR TO COMMISSION ACTION TEXAS TRANSPORTATION COMMISSION VARIOUS Counties MINUTE ORDER Page 1 of 1 VARIOUS Districts Pursuant to Transportation Code, Chapter 223, Subchapter A, and Title 43, Texas Administrative Code, Chapter

More information

DISTRICT TYLER 3007 ANDERSON US STP 2011(003) $ 900, NO AWARD

DISTRICT TYLER 3007 ANDERSON US STP 2011(003) $ 900, NO AWARD HIGHWAY AND TRANSPORTATION ENHANCEMENT BUILDING CONSTRUCTION CONTRACTS PAGE 1 DISTRICT TYLER 3007 ANDERSON US 287 0109-02-024 STP 2011(003) 2.030 $ 900,199.40 7-8.43 NO AWARD CONTRACTOR: MADDEN CONTRACTING

More information

TEXAS SECRETARY OF STATE Cancellation Trend by County

TEXAS SECRETARY OF STATE Cancellation Trend by County PAGE 1 of 8 ANDERSON 0 0 4 26 0 0 7 37 0 ANDREWS 0 0 0 11 0 0 0 14 0 ANGELINA 7 0 0 58 10 0 1 61 0 ARANSAS 0 0 0 24 0 0 5 17 0 ARCHER 2 0 0 7 5 0 0 7 0 ARMSTRONG 0 0 0 2 0 0 0 3 0 ATASCOSA 0 0 2 27 0 0

More information

Texas Board of Nursing 2012 Enrollment, Graduation, and Admissions Professional Nursing Programs

Texas Board of Nursing 2012 Enrollment, Graduation, and Admissions Professional Nursing Programs 2012, Graduation, and issions Enrollees as of September 30, 2012 s from Academic Year 2011-2012 RN Student issions Enroll cap Qual App Reg & enroll A B C D E Diploma School Covenant School of Nursing Lubbock

More information

TEXAS BOARD OF NURSING 6/2018 CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST NURSING DEGREE

TEXAS BOARD OF NURSING 6/2018 CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST NURSING DEGREE UNKNOWN 1413 7288 15094 9 2887 7 332 1 7 13 ANDERSON 13 253 278 0 43 0 2 1 0 0 ANDREWS 6 83 32 0 13 0 2 0 0 0 ANGELINA 19 727 295 0 82 0 5 0 0 0 ARANSAS 5 101 53 0 31 0 2 0 0 0 ARCHER 0 56 39 0 11 0 0

More information

TEXAS BOARD OF NURSING 10/2017 CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST NURSING DEGREE

TEXAS BOARD OF NURSING 10/2017 CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST NURSING DEGREE UNKNOWN 1329 7433 14688 37 2750 5 301 1 5 11 ANDERSON 19 249 264 0 39 0 2 0 0 0 ANDREWS 6 75 29 0 12 0 2 0 0 0 ANGELINA 21 732 289 0 77 0 5 0 0 0 ARANSAS 6 102 49 1 29 0 3 0 0 0 ARCHER 0 54 41 0 10 0 0

More information

TEXAS BOARD OF NURSING 03/2018 CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST NURSING DEGREE

TEXAS BOARD OF NURSING 03/2018 CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST NURSING DEGREE UNKNOWN 1374 7389 14894 15 2822 7 321 1 6 14 ANDERSON 16 248 273 0 42 0 2 0 0 0 ANDREWS 6 80 31 0 13 0 2 0 0 0 ANGELINA 21 713 292 0 78 0 5 0 0 0 ARANSAS 6 102 50 0 29 0 2 0 0 0 ARCHER 0 55 42 0 9 0 0

More information

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT August 1, 2007

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT August 1, 2007 Anderson 72 5 0 4 8 19 2 2 0 6 0 0 0 118 0 118 296 39.86 148 Andrews 14 16 2 0 0 10 3 0 0 0 0 1 1 47 0 47 50 94.00 0 Angelina 70 33 23 10 7 19 32 3 24 21 4 8 0 230 24 254 279 91.04 0 Aransas 25 17 1 5

More information

Youth Parents in DFPS Conservatorship During FY

Youth Parents in DFPS Conservatorship During FY Unknown 1 1 3 Anderson 1 0 0 Andrews 0 0 0 Angelina 0 1 0 Aransas 0 0 0 Archer 0 0 0 Armstrong 0 0 0 Atascosa 2 0 0 Austin 2 0 0 Bailey 0 0 0 Bandera 0 0 0 Bastrop 2 0 0 Baylor 0 0 0 Bee 0 3 0 Bell 10

More information

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT May 1, 2009

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT May 1, 2009 Anderson 100 1 0 2 20 29 1 1 0 2 0 0 0 156 50 206 296 69.59 60 Andrews 9 11 1 0 1 5 2 0 0 0 1 1 0 31 0 31 50 62.00 14 Angelina 111 20 6 5 3 14 18 5 19 28 3 2 0 215 19 234 279 83.87 17 Aransas 28 19 0 3

More information

Work Zone Crashes and Injuries by County 2017

Work Zone Crashes and Injuries by County 2017 Work Zone and by 2017 Anderson Andrews Angelina Aransas Archer Armstrong Atascosa Austin Bailey Bandera Bastrop Baylor Bee Bell Bexar Blanco Borden Bosque Bowie Brazoria Brazos Brewster Briscoe Brooks

More information

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT January 1, 2008

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT January 1, 2008 Anderson 74 3 1 8 8 23 2 2 0 4 0 0 0 125 0 125 296 42.23 141 Andrews 10 6 1 1 1 13 1 2 0 0 0 0 1 36 0 36 50 72.00 0 Angelina 95 24 12 6 7 21 14 7 26 17 3 9 0 215 26 241 279 86.38 10 Aransas 22 11 0 1 2

More information

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT March 1, 2008

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT March 1, 2008 Anderson 107 5 2 1 9 18 4 1 0 1 0 2 0 150 0 150 296 50.68 116 Andrews 11 2 1 0 1 11 0 0 0 0 0 3 1 30 0 30 50 60.00 15 Angelina 82 40 18 3 8 11 32 12 0 23 3 9 0 241 0 241 279 86.38 10 Aransas 28 8 4 0 1

More information

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT April 1, 2008

TEXAS COMMISSION ON JAIL STANDARDS JAIL POPULATION REPORT April 1, 2008 Anderson 106 3 3 2 12 28 1 0 0 3 0 0 0 158 0 158 296 53.38 108 Andrews 11 3 1 0 1 11 0 0 0 0 0 3 1 31 0 31 50 62.00 14 Angelina 74 24 11 6 8 18 34 8 34 28 1 7 0 219 34 253 279 90.68 0 Aransas 27 9 4 4

More information

Texas Commission on Jail Standards - Abbreviated Population Report for 12/1/2017

Texas Commission on Jail Standards - Abbreviated Population Report for 12/1/2017 Texas Commission on Jail Standards - Abbreviated Report for 12/1/2017 to Anderson 90 2 2 4 14 18 2 1 0 33 2 0 0 168 0 168 300 56.00 102 Andrews 20 11 0 2 6 5 0 1 0 3 0 2 0 26 0 26 50 52.00 19 Angelina

More information

Texas Commission on Jail Standards - Abbreviated Population Report for 4/1/2004

Texas Commission on Jail Standards - Abbreviated Population Report for 4/1/2004 Texas Commission on Jail Standards - Abbreviated Report for 4/1/2004 Jail Anderson 79 11 0 4 14 19 2 0 0 2 0 0 0 131 0 131 129 101.55 0 Andrews 15 14 0 1 0 7 12 0 0 1 0 0 0 50 0 50 50 100.00 0 Angelina

More information

Children Waiting for Adoption* by Race/ Ethnicity: Fiscal Year 2008

Children Waiting for Adoption* by Race/ Ethnicity: Fiscal Year 2008 159 Anderson 7 5 2 0 0 0 Andrews 2 0 0 2 0 0 Angelina 11 3 8 0 0 0 Aransas 12 1 8 3 0 0 Archer 0 0 0 0 0 0 Armstrong 0 0 0 0 0 0 Atascosa 32 0 5 27 0 0 Austin 4 1 2 1 0 0 Bailey 3 0 2 1 0 0 Bandera 10

More information

DUI (Alcohol) Crashes and Injuries by County 2017

DUI (Alcohol) Crashes and Injuries by County 2017 DUI (Alcohol) and by 2017 Anderson Andrews Angelina Aransas Archer Armstrong Atascosa Austin Bailey Bandera Bastrop Baylor Bee Bell Bexar Blanco Borden Bosque Bowie Brazoria Brazos Brewster Briscoe Brooks

More information

TEXAS BOARD OF NURSING CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST DEGREE 09/01/2009

TEXAS BOARD OF NURSING CURRENTLY LICENSED TEXAS RNs RESIDING IN TEXAS BY COUNTY AND HIGHEST DEGREE 09/01/2009 UNKNOWN 0 44 261 256 3 34 1 5 3 607 ANDERSON 0 31 245 198 3 24 4 0 0 505 ANDREWS 0 7 64 17 0 7 1 0 1 97 ANGELINA 0 36 589 198 5 36 7 1 2 874 ARANSAS 0 16 97 33 4 10 1 1 2 164 ARCHER 0 1 38 25 0 6 1 0 0

More information

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 TRAFFIC ALERT FOR WEEK OF February 4 8, 2008 Highway work zones in the Staunton District The following is a list of highway work that might affect traffic in the Staunton transportation district during

More information

ENERGY SAVINGS AND NO X EMISSIONS REDUCTION POTENTIAL FROM THE 2012 FEDERAL LEGISLATION TO PHASE OUT INCANDESCENT LAMPS IN TEXAS

ENERGY SAVINGS AND NO X EMISSIONS REDUCTION POTENTIAL FROM THE 2012 FEDERAL LEGISLATION TO PHASE OUT INCANDESCENT LAMPS IN TEXAS ESL-TR-09-11-01 ENERGY SAVINGS AND NO X EMISSIONS REDUCTION POTENTIAL FROM THE 2012 FEDERAL LEGISLATION TO PHASE OUT INCANDESCENT LAMPS IN TEXAS Zi Liu, Ph.D. Juan-Carlos Baltazar-Cervantes, Ph.D. Jeff

More information

Texas Geography Portfolio Book

Texas Geography Portfolio Book Texas Geography Portfolio Book Note: All maps must be labeled and colored. Follow directions carefully. Neatness counts! 1. Cover (10 points) Design a cover on the Texas shape and cut out. The cover design

More information

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25 NEWS RELEASE a TxDOT Project For immediate release EL PASO DISTRICT Jennifer Wright (915) 790-4340 Jennifer.Wright3@txdot.gov February 9, 2018 I-10 East at Redd closes for 24 hours this Sunday, Feb 11

More information

West Tennessee Construction June 14-21, 2017

West Tennessee Construction June 14-21, 2017 FOR IMMEDIATE RELEASE Wednesday, June 14, 2017 CONTACT: Nichole Lawrence CELL: 731-225-6041 West Tennessee Construction June 14-21, 2017 BENTON COUNTY, I-40 Truck Climbing Lane Wednesday, June 7 through

More information

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar)

Washington State S. T. I. P to 2021 (Project Funds to Nearest Dollar) ( Funds to Nearest Dollar) Agency: Bellingham Number PIN ID 17 5565(001) BHAM 40 28 0.210 CE Yes Mahogany Ave Cordata Elementary 1,951,200 Cordata Safe Routes to School Program The project includes bike

More information

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation

UA SURVEY CONTROL MONUMENT UA #1 CLEVELAND STREET GARLAND AVENUE. Northing / Easting / Elevation #1 Northing 640586.689 / Easting 669419.281 / Elevation 1443.178 Center of bronze cap with UA seal. Located in sidewalk approx. 10 W of curb on Garland Ave. Approx. 24.5 SE of traffic signal post. UA #1

More information

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS DT2511563 2511563 FROM PORT OF MIAMI PORT OF MIAMI TUNNEL TO SR 836/I-395 0.5 NEW ROAD CONSTRUCTION $2,514,664 $790,186 - DESIGN/BUILD LF 2,766 2,849 2,935 3,023 3,113 DESIGN/BUILD GMR 22,152 22,990 24,338

More information

1 i12 4( H nnd Fl) (2 F Fxhtht I} Pa:e of

1 i12 4( H nnd Fl) (2 F Fxhtht I} Pa:e of 28231 11iB9 Exhibit 621A GIS Approved PROPOSED METES AND BOUNDS PD 621 PROPERTY AND SUBDISTRICT DESCRIPTIONS SUBDISTRICT 1 EXCLUDING Planned Development District (PDD) No. 339 (containing 9,865 square

More information

SEAUPG 2004 Conference - Baton Rouge Presented By Dale A. Rand, P.E. - Texas DOT

SEAUPG 2004 Conference - Baton Rouge Presented By Dale A. Rand, P.E. - Texas DOT Permeable Friction Courses TxDOT Experiences SEAUPG Baton Rouge, La. Nov. 17, 2004 Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch Background TxDOT used OGFC (plant mix seal) up

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/24/2019 5:16:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/24/2019 5:16:03 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

The Texas Association of Public Employee Retirement Systems

The Texas Association of Public Employee Retirement Systems TEXPERS 13111 Northwest Freeway, Suite 100 Houston, Texas 77040 Phone (713) 622-8018 Fax (713) 622-7022 TEXPERS Report on the Asset Allocation And Investment Performance of Texas Public Employee Retirement

More information

Objectives. Understand the different physical & human characteristics of each region

Objectives. Understand the different physical & human characteristics of each region TEXAS REGIONS Objectives Know the 4 regions of Texas Understand the different physical & human characteristics of each region Understand how physical differences affect human characteristics (way of life)

More information

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project

WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT Single Family Residential Project WEBER ROAD RESIDENTIAL DEVELOPMENT TRAFFIC IMPACT STUDY TABLE OF CONTENTS 1.0 Executive Summary Page 2.0 Introduction 2.1 DEVELOPMENT

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/22/2019 4:20:05 AM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/22/2019 4:20:05 AM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

Blue Ridge Relay Course Outline. leg distance

Blue Ridge Relay Course Outline. leg distance Blue Ridge Relay Course Outline leg leg distance segment distance direction road markers 1 Grayson Highlands State Park Visitors Center 3.90 3.90 S Grayson Highlands State Park Office and Gate 2 S Grayson

More information

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project

Information for File # MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Information for File # 2013-00531-MMJ; Trunk Highway (TH) 7 / Louisiana Ave. Interchange Project Applicant: City of St. Louis Park Corps Contact: Melissa Jenny Address: U.S. Army Corps of Engineers Attn:

More information

0.143 Hickory Circle

0.143 Hickory Circle Rank Width Leng ROAD NAME Total Feet Miles Cregar Road House 132 to Muni Bound 37.3 20' to 32 0.343 Mill Street McDonald Street to Trail 32.8 20 0.133 Academy Street 32.3 18 0.066 Sunset Drive 32.3 33

More information

A little helpful hint.. PLEASE TAKE CORNELL NOTES AND THEN REWRITE YOUR NOTES AT HOME. YOU WILL NEED TO ORGANIZE YOUR NOTES USING EITHER MAIN IDEAS

A little helpful hint.. PLEASE TAKE CORNELL NOTES AND THEN REWRITE YOUR NOTES AT HOME. YOU WILL NEED TO ORGANIZE YOUR NOTES USING EITHER MAIN IDEAS JOANNE HOWARD A little helpful hint.. PLEASE TAKE CORNELL NOTES AND THEN REWRITE YOUR NOTES AT HOME. YOU WILL NEED TO ORGANIZE YOUR NOTES USING EITHER MAIN IDEAS OR QUESTIONS Can you name the Regions of

More information

0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE

0.00 B9 TRANSIT GRANT CAP IMP (NON- VEHICLE) 0.00 BB TRANSIT VEHICLE PURCHASE CAP IMP (NON- VEHICLE) 0.00 B9 TRANSIT VEHICLE PURCHASE 842 BB TRF-0047-19A 2019 ROCHESTER SECT 5307: ROCHESTER RR OPERATING 0.00 B9 TRANSIT FTA 11,450,000 - - 2,000,000 - - 9,450,000 ASSISTANCE OPERATIONS 843 BB TRF-0047-19B 2019 ROCHESTER SECT 5307: CITY

More information

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS

New Jersey Department of Transportation DATE : 04/10/12 PAGE : TABULATION OF BIDS PAGE : 421-1 CONTRACT TIME : 12/15/12 COMPLETION DATE CONTRACT DESCRIPTION : PROJECT(S) : 100% STATE MAINTENANCE ROADWAY REPAIR CONTRACT CENTRAL, CONTRACT NO. C204, DP 11421 ROUTES US 1 NB & SB, 18 NB

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF SEPTEMBER 10, 2018 AGENDA ITEM NO. 116 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final November 2018 bid opening for $233,251,841,

More information

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016

Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: December 15, 2016 Welcome to the Public Meeting Red Bluff Road from Kirby Boulevard to State Highway 146 Harris County, Texas CSJ No.: 0912-72-340 December 15, 2016 No formal presentation will be made. Seabrook Intermediate

More information

Correlations Between Homeowner Mold Insurance Claims and Weather Databases in Texas

Correlations Between Homeowner Mold Insurance Claims and Weather Databases in Texas Correlations Between Homeowner Mold Insurance Claims and Weather Databases in Texas Douglas Kosar Dragan Nikolovski Principal Research Engineer Visiting Research Engineer Energy Resources Center Department

More information

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-10/

Technical Report Documentation Page 2. Government Accession No. 3. Recipient's Catalog No. 1. Report No. FHWA/TX-10/ 1. Report No. FHWA/TX-10/5-4519-01-1 4. Title and Subtitle INVESTIGATION OF RAINFALL AND REGIONAL FACTORS FOR MAINTENANCE COST ALLOCATION Technical Report Documentation Page 2. Government Accession No.

More information

CITY OF MINOT SNOW REMOVAL PLAN November 2017

CITY OF MINOT SNOW REMOVAL PLAN November 2017 CITY OF MINOT SNOW REMOVAL PLAN November 2017 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

12"CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC

12CMP DIA. ELEV. PVC CI DI CMP VCP RCP RCAP LRCP LCPP STA. LA LB BM-2 ROW PI POT LF TH PVC PLANS FOR X-REFS: FILE PATH: Z:\WEST BRANCH 3682 MAIN STREET SIDEWALK IMPROVEMENTS - PHASE 3\DRAWINGS\_PRODUCTION DRAWINGS\TITLE & INDEX PLOTTED: Thursday, May 26, 216 4:7:42 PM MAIN STREET SIDEWALK PHASE

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF DECEMBER 3, 2018 AGENDA ITEM NO. 159 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final February 2019 bid opening for $88,659,936, the

More information

Palo Pinto County Appraisal District Property Info

Palo Pinto County Appraisal District Property Info Palo Pinto County Appraisal District Property Info Property ID Geo ID Legal: R000036838 030360100.R91786 R000009211 073400000.R91786 Legal: Acres: 396.080, AB 429 TR 13-1 S TOWNSEND (SOUTH OF ) (0.750000

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/10/2019 7:20:01 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/10/2019 7:20:01 PM HWY372 22 22 Mount Bachelor Ski Area I-5 10 13 5 Mi S of Ashland Informational only

More information

Houston, Texas. Top 5. NASA Johnson Space Center. San Jacinto Monument And M... Downtown Aquarium. Hermann Park Conservancy

Houston, Texas. Top 5. NASA Johnson Space Center. San Jacinto Monument And M... Downtown Aquarium. Hermann Park Conservancy Photo: Katie Haugland Houston, Texas Located in Texas, the fourth largest city in the U.S. is known for NASA, its annual rodeo and the massive cluster of hospitals known as the Texas Medical Center. However,

More information

Rural Volunteer Fire Department Assistance Program Funding Summary-- Meeting 1 September 16, 2009 TRUCKS, CHASSIS AND SLIP-ON UNITS

Rural Volunteer Fire Department Assistance Program Funding Summary-- Meeting 1 September 16, 2009 TRUCKS, CHASSIS AND SLIP-ON UNITS Rural Volunteer Fire Department Assistance Program Funding Summary-- Meeting 1 September 16, 2009 TRUCKS, CHASSIS AND SLIP-ON UNITS THE GRANT APPROVALS MADE AT TODAY S FUNDING MEETING ARE PRELIMINARY IN

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 HIGHWAY: 05/03/2016 ESTIMATE PAID: AWARD DATE: 05/26/2016 ESTIMATE PERIOD: 3,933,355.47 CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 11/09/18 791 CONTRACT ID: 628572001 PROJECT: RMC - 628572001 CONTRACT: 05164007 AWARD AMOUNT: $20,967,966.00 PROJECTED AMOUNT: $20,970,966.00 ADJ.

More information

FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport

FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport FOR SALE +/- 419 ACRES ¼ Mile South of Alliance Airport Alliance Airport Subject property +/- 419 AC Pat McDowell +1 817 334 8106 pat.mcdowell@am.jll.com JLL 201 Main Street, Suite 1440 Fort Worth, TX

More information

FY 2018 Ten Year Capital Plan Review Project List

FY 2018 Ten Year Capital Plan Review Project List FY 2018 Ten Year Capital Plan Review Project List Program Category FY2018 FY2019 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 Highway Roadway/Safety 100,950,000 128,431,766 125,896,635 91,153,571

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Quarterly Project Status Report September 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update TxDot s contractor has nearly completed the superstructure false work

More information

CVS Derwood. Local Area Transportation Review

CVS Derwood. Local Area Transportation Review CVS Derwood Montgomery County, Maryland May 27, 2016 Local Area Transportation Review Prepared for: JC Bar Properties, Inc. Steve Fleming, PE 415 Fallowfield Road, Suite 301 Camp Hill, Pennsylvania 17011

More information

State Of the City Update CITY OF MAGNOLIA MAY 2018

State Of the City Update CITY OF MAGNOLIA MAY 2018 State Of the City Update CITY OF MAGNOLIA MAY 2018 FM1488- FM149 Flyover This image cannot currently be displayed. Magnolia High School State of the City Roads FM 1488 /FM 149 Railroad Flyover Under Construction

More information

Hurricane Florence Recovery Report 4:00 PM October 31, 2018

Hurricane Florence Recovery Report 4:00 PM October 31, 2018 Hurricane Florence Recovery Report 4:00 PM October 3, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 2 road closures on primary and secondary routes due to damage or flooding throughout

More information

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016

City of Saginaw Right of Way Division Snow and Ice Removal Policy January 18, 2016 Snow and Ice Removal Policy January 18, 2016 It is the policy of the to provide snowplowing and ice removal services in order to: Provide safe traveling conditions for motorists and pedestrians Assist

More information

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT Incident Number: 2018-6664 Incident Name: Southbound I-75 Closed Occurred: 10/26/2018 01:26 ET Reported to SWO: 10/26/2018

More information

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project

TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, :30 p.m. Allison Hollow Road Reconstruction Project TCHARTIERS TOWNSHIP BOARD OF SUPERVISORS SPECIAL MEETING March 11, 2014 5:30 p.m. Allison Hollow Road Reconstruction Project A. William Kiehl called the Special Meeting of Tuesday March 11, 2014, at 5:30

More information

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek

[Leveraging & Improving Neighborhood Connections] Area E Cedar Creek Community Charrette LINC Dallas [Leveraging & Improving Neighborhood Connections] Area E Cedar Creek 06.02.12 LINC Workshop Area E Area E has the unique distinction of at-grade frontage to the Trinity

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Project Overview Briefing Packet September 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project Divided into 3 Segments Segment 1:

More information

Hurricane Florence Recovery Report 4:00 PM November 15, 2018

Hurricane Florence Recovery Report 4:00 PM November 15, 2018 Hurricane Florence Recovery Report 4:00 PM November 5, 208 SCDOT Operations Mode: Recovery Statewide Summary There are 9 road closures on primary and secondary routes due to damage or flooding throughout

More information

Extreme Weather and Climate Change Vulnerability Assessment of Central Texas Transportation Infrastructure

Extreme Weather and Climate Change Vulnerability Assessment of Central Texas Transportation Infrastructure Extreme Weather and Climate Change Vulnerability Assessment of Central Texas Transportation Infrastructure Federal Highway Administration (FHWA) Pilot Project TxDOT Transportation Planning Conference June

More information

ROADWAY DESIGN CALCULATIONS

ROADWAY DESIGN CALCULATIONS ROADWAY DESIGN CALCULATIONS Interim Interchange at SR 400 (I-4) and Daryl Carter Parkway FPID: 441113-1-52-01 60% (Phase II) Prepared by: AECOM Technical Services, Inc. 150 North Orange Avenue, Suite 200

More information

TXMAS State Contract Discounting & Order Handling

TXMAS State Contract Discounting & Order Handling TXMAS State Contract Discounting & Order Handling Contract Number: Corporate DARRAN Contact: Rep Group: TXMAS-17-7107 Office Furniture Kelly Shaw kshaw@darran.com 2402 Shore St. High Point, NC 27263 1-800-334-7891

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP)

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP) Planning for a Mega Project in a Metropolitan Area TxDOT Short Course October 13, 2015 RECOMMENDED ALTERNATIVES Environmental Impact Statement (EIS) Project

More information

FUND THAN THAN ALL CODE YEARS

FUND THAN THAN ALL CODE YEARS PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/20/2012 HIGHWAYS ITEM NUMBER:230724 1 PROJECT DESCRIPTION:ANDREWS AVE EXT FROM POMPANO PARK PLACE TO S. OF ATLANTIC BLVD *NON-SIS* DISTRICT:04 COUNTY:BROWARD

More information

Technical Memorandum #2 Future Conditions

Technical Memorandum #2 Future Conditions Technical Memorandum #2 Future Conditions To: Dan Farnsworth Transportation Planner Fargo-Moorhead Metro Council of Governments From: Rick Gunderson, PE Josh Hinds PE, PTOE Houston Engineering, Inc. Subject:

More information

Environmental Justice Areas with 2040 Roads

Environmental Justice Areas with 2040 Roads CAPITAL AREA METROPOLITAN PLANNING ORGANIZATION CAMPO Region Date: 2/23/15 Environmental Justice Areas with 40 Roads Map : EJ Areas with 40 Road Types BRNET I BELL 138 WILLIAMSON 1 MILAM LLANO 9 281 TRAIS

More information

20. Security Classif. (of this page) Unclassified

20. Security Classif. (of this page) Unclassified 1. Report No. FHWA/TX-17/0-6861-1 4. Title and Subtitle GUIDELINES FOR DEPLOYING WEATHER RESPONSIVE OPERATIONS IN TXDOT TRAFFIC SIGNALS Technical Report Documentation Page 2. Government Accession No. 3.

More information

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006

Prepared for. 3D/International, Inc West Loop South, Suite 400 Houston, Texas November 2006 DRAFT TRAFFIC IMPACT STUDY FOR PHASED DEVELOPMENT OF TAMU CC Prepared for 3D/International, Inc. 1900 West Loop South, Suite 400 Houston, Texas 77027 November 2006 Interim Review Only Document Incomplete:

More information

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND

THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Quarterly Project Status Report May 2018 THE TRINITY RIVER VISION/ GATEWAY PARK / PANTHER ISLAND Flood Control Project Update Construction of North Main Street Bridge by TxDOT s bridge contractor, Texas

More information

MONTGOMERY COUNTY SNOW PLAN

MONTGOMERY COUNTY SNOW PLAN 2018 2019 MONTGOMERY COUNTY SNOW PLAN COMMUNICATION DURING SNOW/ICE SITUATIONS Communication will be established prior/during all winter storms between the Sheriff s Office, Public Works Department, and

More information

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works

PW 001 SNOW REMOVAL AND SANDING FOR ROADWAYS AND SIDEWALKS October 6, 2014 (#223-14) Original October 19, 2015; October 15, 2018 Public Works Policy Statement: The Village of Kitscoty will provide snow and ice control on municipal streets and sidewalks according to determined priorities. Purpose: To provide direction and information to employees

More information

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015

CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 CITY OF MINOT SNOW REMOVAL PLAN JANUARY 2015 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

City of Brainerd, Minnesota Snowplowing Policy

City of Brainerd, Minnesota Snowplowing Policy City of Brainerd, Minnesota Snowplowing Policy 1. Introduction The city of Brainerd, Minnesota, finds that it is in the best interest of the residents of the city to assume basic responsibility for control

More information

Hurricane Florence Recovery Report 4:00 PM October 17, 2018

Hurricane Florence Recovery Report 4:00 PM October 17, 2018 Hurricane Florence Recovery Report 4:00 PM October 17, 2018 SCDOT Operations Mode: Recovery Statewide Summary There are 27 road closures on primary and secondary routes due to damage or flooding throughout

More information

COLORING PAGES. Follow Raindy the Raindrop as he travels from your house out to sea.

COLORING PAGES.  Follow Raindy the Raindrop as he travels from your house out to sea. COLORING PAGES www.hcfcd.org Follow Raindy the Raindrop as he travels from your house out to sea. Raindy the Raindrop falls from the sky and lands on your house or in your neighborhood. Once he s on the

More information

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD:

CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 HIGHWAY: COUNTY: 06/06/2018 ESTIMATE PAID: AWARD DATE: 06/28/2018 ESTIMATE PERIOD: CONTRACTOR'S ESTIMATE PACKAGE REPORT DATE: 01/09/19 147 CONTRACT ID: 632428001 PROJECT: RMC - 632428001 CONTRACT: 06184221 AWARD AMOUNT: $359,81 PROJECTED AMOUNT: $359,818.00 ADJ. PROJECTED AMOUNT: $359,818.00

More information

Non Brazos County Space Change - ASF and E&G

Non Brazos County Space Change - ASF and E&G 00 - TAMUG-Campus Dean Non Brazos County Space Change - and 0050 - VICE PRESIDENT-TAMU GALVESTON 7,132 7,132 0 2,016 2,016 0 00 - TAMUG-Campus Dean Total: 7,132 7,132 0 2,016 2,016 0 01 - TAMUG-Academic

More information

Table of Contents Introduction... 4 Study Area... 5

Table of Contents Introduction... 4 Study Area... 5 Table of Contents Introduction... 4 Study Area... 5 Streets and s... 5 Traffic Volumes... 8 Recent and Anticipated Development... 10 Crash Analysis... 10 Projected Traffic Volumes... 11 Trip Generation...

More information

TOWN OF BASALT SNOW MANAGEMENT PLAN

TOWN OF BASALT SNOW MANAGEMENT PLAN TOWN OF BASALT SNOW MANAGEMENT PLAN Introduction Snow management in the Town of Basalt is the responsibility of the Department of Public Works. The overall goal is the restoration of clear, passable pavement

More information

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM

OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS 4/13/2019 2:54:03 PM OREGON DEPARTMENT OF TRANSPORTATION STATEWIDE ROAD, WEATHER AND INCIDENT CONDITIONS Incidents/: 4/13/2019 2:54:03 PM 57 56 @ Corvallis - Newport Hwy OR34 HWY372 22 22 Mount Bachelor Ski Area I-5 10 13

More information

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County TIP No. U-2827 B WBS # 34872.1.1 June 2013 Prepared for North Carolina Department of Transportation Prepared by Project

More information

Preliminary Hydraulic Report

Preliminary Hydraulic Report Tarrant County, Texas Preliminary Hydraulic Report Prepared for: Texas Department of Transportation Fort Worth District Prepared by: AECOM Corporation Scott C. Williams, P.E. No. 101334, Date 2009 This

More information

III. FORECASTED GROWTH

III. FORECASTED GROWTH III. FORECASTED GROWTH In order to properly identify potential improvement projects that will be required for the transportation system in Milliken, it is important to first understand the nature and volume

More information

C11 EDR - STRONGHOLD BUILDING STORM WATER QUALITY MANAGEMENT PLAN ROBSTOWN, TEXAS, COUNTY ROAD 69 MUNOZ ENGINEERING CIVIL STRUCTURAL MARINE

C11 EDR - STRONGHOLD BUILDING STORM WATER QUALITY MANAGEMENT PLAN ROBSTOWN, TEXAS, COUNTY ROAD 69 MUNOZ ENGINEERING CIVIL STRUCTURAL MARINE RMIII 6/3/7 U I U I TENTION POND REV ISSUED FOR CONSTRUCTION PHONE: 36-946-4848 38 ANDREA LN CORPUS CHRISTI, TX, 7844 TBPE FIRM No. F-4 TENTION DITCH LEGEND PROPOSED STORMWATER / DRAINAGE FLOW DIRECTION

More information

Texas Statewide Mesonet Network (TexMesonet) Dr. Kantave Greene 11/15/17

Texas Statewide Mesonet Network (TexMesonet) Dr. Kantave Greene 11/15/17 Texas Statewide Mesonet Network (TexMesonet) Dr. Kantave Greene 11/15/17 1 Observe weather features Why Mesonets? Thunderstorms Squall lines Dry-lines Sea breezes Improve weather & flood forecasts Drought

More information

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018

FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 FOR PRESENTATION AT THE COMMISSION MEETING OF APRIL 2, 2018 AGENDA ITEM NO. 47 SUBJECT: COUNTY: BID OPENINGS STATEWIDE This item consists of the final June 2018 bid opening for $58,352,185, the tentative

More information

Findings in the Horizontal Woodbine EAGLEBINE

Findings in the Horizontal Woodbine EAGLEBINE DUG 2012 Antonio ZaZa Energy Corporation Findings in the Horizontal Woodbine EAGLEBINE Thomas D Bowman VP Evaluation, Geology and Geophysics, ZaZa Energy Corporation Forward Looking Statement All statements

More information

The Sunland Park flyover ramp is set to close the week of March 19 until early summer

The Sunland Park flyover ramp is set to close the week of March 19 until early summer March 2, 2018 The Sunland Park flyover ramp is set to close the week of March 19 until early summer GO 10 is targeting the week of March 19 to close the Sunland Park Drive flyover entrance ramp to I 10

More information

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager

Welcome to the Business Owner Task Force. Selma Stockstill SouthGate Constructors Public Information Manager Welcome to the Business Owner Task Force Selma Stockstill SouthGate Constructors Public Information Manager Interim Project Limits SH 183 SH 121 to IH 35E SH 114 International Parkway to SH 183 Loop 12

More information

Hurricane Protection and Environmental Restoration

Hurricane Protection and Environmental Restoration November 16, 2010 Hurricane Protection and Environmental Restoration Presented by: Colonel (Ret.) Leonard Waterworth AGENDA How do we protect People/Environment/Economy 1900 Year Storm Hurricane Carla

More information