HISTORY OF CONSTRUCTION W.H. Sammis Coal Plant North and South Ponds Stratton, Ohio

Size: px
Start display at page:

Download "HISTORY OF CONSTRUCTION W.H. Sammis Coal Plant North and South Ponds Stratton, Ohio"

Transcription

1 Prepared for: FirstEnergy Generation, LLC 76 South Main St Akron, OH HISTORY OF CONSTRUCTION Stratton, Ohio Prepared by: Wincopin Circle, Floor 4 Columbia, Maryland October 2016 pdf 1 of 24

2 TABLE OF CONTENTS 1. INTRODUCTION Purpose Site Location Impoundment Description CCR RULE REQUIREMENTS FOR HISTORY OF CONSTRUCTION (C) HISTORY OF CONSTRUCTION Owner and Unit Identification Unit Location on USGS Map Purpose of the CCR Unit Name and Size of the Watershed Description of Foundation and Abutment Materials Overview Regional Geology Foundation Materials Abutment Materials Description of the Materials, Methods, and Dates of Construction Overview Initial Construction Circa Pond Modifications Circa Pond Plans Circa Pond Modification and Discharge Piping Upgrades Circa Pond Outlet Modification and Discharge Piping Upgrades Drawings Type, Purpose, and Location of Instrumentation Area-Capacity Curves Spillway Description and Calculations Construction Specifications and Provisions for Operations and Maintenance Record of Structural Instability REFERENCES...13 ME1292/257.73(c)(1) History of Construction FNL i October 2016 pdf 2 of 24

3 LIST OF FIGURES Figure 1 Site Location Map: North and South Ponds Figure 2 Site Plan: North and South Ponds LIST OF APPENDICES Appendix A Drawing Appendix B Stage-Storage Curves ME1292/257.73(c)(1) History of Construction FNL ii October 2016 pdf 3 of 24

4 1. INTRODUCTION 1.1 Purpose Geosyntec Consultants (Geosyntec) has prepared this History of Construction Report for FirstEnergy Generation, LLC (FirstEnergy) for the existing W.H. Sammis Coal Plant North and South Ponds (North and South Ponds) in Stratton, Ohio. This report is prepared for compliance with the Federal Coal Combustion Residuals (CCR) Rule, 40 CFR 257. This Regulation is referred to herein as the CCR Rule. In this History of Construction Report, the requirements of (c) are addressed. 1.2 Site Location The North and South Ponds are located at the W.H. Sammis Plant (Plant) in Stratton, Jefferson County, Ohio. The Plant can be found on the United States Geological Survey (USGS) 7.5-minute topographic map for the Wellsville, Ohio Quadrangle (Figure 1). The Plant is located adjacent to Ohio State Route 7 and the Ohio River. The North and South Ponds are located in the southeast quadrant of the generating facility. 1.3 Impoundment Description The North and South Ponds were initially constructed circa 1959, modified in 1971, and further modified into their current configuration in The ponds are used for temporary storage of bottom ash (i.e., CCR) and treatment of other wastewater produced by plant operations. Each pond is typically in service for approximately six to nine months (depending on the volume of CCR and waste produced by the Plant s generating units) before being taken out of service for removal of accumulated CCR s, at which time the adjacent pond is used for temporary storage of CCR and plant wastewater. General maintenance activities are performed when a pond is out of service. When in service, water and bottom ash enter one corner of the North or South Pond and flows around the perimeter to the opposite corner where the water discharges through a concrete outlet riser. The North Pond outlet riser is fitted with a weir plate that governs the pond elevation. The water elevation in the South Pond is, historically and currently, controlled by timber stop logs and an inline valve. As part of planned upgrades to the South Pond hydraulic structures, the outlet riser is to be fitted with a weir plate to control the water elevation. The modification is expected to occur at a future time when the Pond is removed from service for regular cleaning and maintenance. Water passes from the base of the outlet risers through buried conveyance pipes and enters into a storm drain buried along the northern perimeter of the North Pond, which discharges at an NPDES permitted outfall. The storm drain pipe is part of a network which passes run-on water from the west side of the Plant to the Ohio River. The storm drain network terminates at an endwall structure located adjacent to State Route 7 at the northeast corner of the North Pond. The discharge immediately enters a concrete box culvert beneath the road and enters into the Ohio River at the upstream side of the New Cumberland Lock and Dam. A site plan identifying the primary features of the North and South Ponds is presented on Figure 2. ME1292/257.73(c)(1) History of Construction FNL 1 October 2016 pdf 4 of 24

5 The culvert outlet at the endwall of the storm drain network, which discharges the combined stormwater and CCR impoundment effluent, is a permitted discharge point under the Ohio Environmental Protection Agency (OEPA), National Pollutant Discharge Elimination System (NPDES), Permit No. OH The North Pond is regulated by the Ohio Department of Natural Resources (ODNR) Dam Safety Program as a Class II Dam, File No ME1292/257.73(c)(1) History of Construction FNL 2 October 2016 pdf 5 of 24

6 2. CCR RULE REQUIREMENTS FOR HISTORY OF CONSTRUCTION (c) The CCR Rule requires the owner or operator of an existing CCR unit to compile a history of construction containing, to the extent feasible, the information specified by the CCR Rule. The CCR Rule states that, for existing units, the history of construction is required to include the specified information only to the extent that it is readily available and that no new information should be generated as part of the history of construction. Part 3 of this document presents the documentation required for compliance with (c). The table below summarizes the information to be included in the history of construction and identifies the location in this report where the information is provided. RULE SECTION RULE REQUIREMENT LOCATION WHERE ADDRESSED IN DOCUMENT (c)(1)(i) Owner and Unit Identification Section (c)(1)(ii) Unit Location on USGS Map Section (c)(1)(iii) Purpose of the CCR Unit Section (c)(1)(iv) Name and Size of the Watershed Section (c)(1)(v) (c)(1)(vi) Description of Foundation and Abutment Materials Description of the Materials, Methods, and Timeframe of Construction Section 3.5 Section (c)(1)(vii) Drawings Section (c)(1)(viii) Instrumentation Section (c)(1)(ix) Area Capacity Curves Section (c)(1)(x) Spillway Description and Calculations Section (c)(1)(xi) Construction Specifications and Provisions for Operations and Maintenance Section (c)(1)(xii) Record of Any Structural Instability Section 3.12 ME1292/257.73(c)(1) History of Construction FNL 3 October 2016 pdf 6 of 24

7 3. HISTORY OF CONSTRUCTION 3.1 Owner and Unit Identification The North and South Ponds are owned and operated by FirstEnergy Generation, LLC located at 76 S. Main Street, Akron, Ohio W.H. Sammis Coal Plant is located at State Route 7, Stratton, Ohio The units are commonly referred to as the North and South Ponds, respectively. The North Pond, which is regulated by the ODNR Dam Safety Program, is identified by the ODNR as the Sammis Station North Bottom Ash Pond with File No Unit Location on USGS Map The ponds are located in Stratton, Jefferson County, Ohio. A 7.5-minute United States Geological Survey (USGS) map of the Wellsville Quadrangle showing the location of the ponds is provided as Figure Purpose of the CCR Unit The North and South Ponds are used for temporary storage of CCR bottom ash and treatment of process wastewater produced as byproducts of the coal-fired electric generating units of the W.H. Sammis Coal Plant. 3.4 Name and Size of the Watershed The units are located in the Upper Ohio watershed (ID ) 1. The North and South ponds are each located on the right bank of the Ohio River, above the FEMA 100-yr flood elevation, and directly adjacent to the upstream side of the New Cumberland Lock and Dam. Despite the close proximity of the units to the Ohio River, historic flood information reveals that river elevations have only reached the toe of the embankments two times in the last 74 years 2. Therefore, the Ohio River is not considered to be a significant influence on the operation or stability of the North and South Ponds. The contributing drainage area to the North and South Ponds includes only the immediate industrial areas of the Plant surrounding the ponds. The contributing drainage areas to the North and South Ponds, including the surface area of the ponds, are approximately 7.3 acres 6.5 acres, respectively ME1292/257.73(c)(1) History of Construction FNL 4 October 2016 pdf 7 of 24

8 3.5 Description of Foundation and Abutment Materials Overview The North and South Ponds are formed by multiple upground embankments abutted to placed fill soil. The North Pond is formed by upground embankments to the east and south with its west and north embankment formed by at-grade fill material. The South pond is formed by upground embankments to the north (shared with the North pond), east, and south with its west embankment formed by at-grade native or fill material. Geotechnical investigations indicate that fill placement within the pond footprints extends from ground surface down to approximate elevations between 660 and 670 f (L.R. Kimball, 2007; Geosyntec, 2016a). The remainder of this section presents documentation of the regional geology and location-specific information pertaining to the foundation and abutment soils Regional Geology Details of the regional geology are obtained from the map of Ohio Bedrock Geology (Ohio Division of Geological Survey, 2006). The bedrock in Jefferson County is sedimentary rock laid down during the Pennsylvanian and Permian periods and the rock strata are not horizontal or regularly sloping. Shale, siltstone, and sandstone are the most common types of bedrock to outcrop. The Allegheny and Conemaugh Formations have a higher proportion of sandstone and clay shale and a lower proportion of limestone than the Monongahela and Dunkard Group. Information about the regional geologic units is summarized below: Allegheny and Pottsville Groups, Undivided: this geologic unit is as much as 700 feet thick and consists of shale, siltstone, claystone, sandstone, limestone, and coal. The shale is calcareous in part, and locally contains marine fossils. Siltstone in this group is thin bedded to medium bedded and locally contains marine fossils. The sandstone is mostly very fine to medium grained with limestone in the upper third of unit, conglomeratic in the lower third of the unit. Coal is mostly banded bituminous and generally in discrete beds. Conemaugh Group: this geologic unit contains a calcareous shale, a thin bedded to nonbedded siltstone, mudstone, fine to medium grained and thin to massive cross bedded sandstone, and thin layers of limestone and coal. The unit is as much as 500 feet thick and lateral and vertical lithic variability and gradation is common. Monongahela Group: this unit is as much as 350 feet thick and contains shale, siltstone, mudstone, sandstone, limestone, and coal. Similar to the Conemaugh group, lateral and vertical lithic variability and gradation is common. Dunkard Group: Around two thirds of this 600 feet thick unit is composed of mudstone, shale, and siltstone. Approximately one third is a fine grained to locally conglomeratic sandstone. The small remaining portion is limestone and coal, which are best developed in the lower 90 to 200 feet of the unit. Quaternary Alluvium: this unit contains alluvial deposits of sand, gravel, silt, and clay. ME1292/257.73(c)(1) History of Construction FNL 5 October 2016 pdf 8 of 24

9 3.5.3 Foundation Materials Field and laboratory data relevant to the physical and engineering properties of the foundation materials is available from previous site investigations. A summary of those properties, as indicated by various subsurface investigations, is presented below. A project report from the US Army Corps of Engineers summarizes the subsurface investigation supporting the design and construction of the New Cumberland Lock and Dam located on the Ohio River adjacent to the North and South Ponds (USACE, 1945). The report and accompanying boring logs indicate that the native soils beneath the embankment fill are comprised of brown silt and sand with some clay to an elevation of approximately 650 ft and a gravel, sand, and silt stratum to an approximate elevation of 605 ft. Bedrock is identified at an elevation of approximately 605 ft with firm rock indicated at an elevation of 602 ft. L.R. Kimball (2006, 2007) presents the results of a geotechnical investigation of various areas outside of the North and South Pond embankments performed in support of general site construction. The boring logs presented by L.R. Kimball (2006, 2007) show that the native soil consists of various layers of clay, silty clay, sandy clay, silty sand, and sand and gravel. Both sand and gravel ranged from fine to coarse particles. Laboratory tests on the fine-grained native material indicate that the materials generally comprise low-plasticity silts and clays and silty sand (United Soil Classification System [USCS] classifications CL, ML, and SM) with plasticity index less than 20. Fill material overlying the native soil generally comprises coal ash, slag, silty clay, clayey sand, sand, gravel, and cobbles. Boring logs presented by L.R. Kimball (2007) and Geosyntec (2016a) show the east embankment foundation soils to be similar to the native soils described above for the areas outside of the North and South Pond embankments. That is, foundation soils comprise silt and clay underlain by sand and gravel. Laboratory testing results presented by Geosyntec (2016a) indicate the fine-grained material is low-plasticity clay (CL) with plasticity index less than 20. All boring logs show the consistency or stiffness of the foundation soil, as indicated by the Standard Penetration Test (SPT) blowcount (N) to vary with depth. Further discussion of the engineering properties of the foundation soils is presented in the Periodic Safety Factor Assessment, Stratton, Ohio (Geosyntec, 2016a) Abutment Materials The North and South Ponds are formed on two sides and one side, respectively, by at-grade embankments that also act as abutments to the upground embankments forming the remaining sides of the ponds. The at-grade abutments consist of fill materials as indicated by the results of geotechnical investigations of the areas to the north and west of the ponds performed by L.R. Kimball (2006, 2007). A description of physical and engineering properties of the native and fill materials observed during those investigations is presented in Section ME1292/257.73(c)(1) History of Construction FNL 6 October 2016 pdf 9 of 24

10 3.6 Description of the Materials, Methods, and Dates of Construction Overview The results of subsurface investigations of the North and South Pond east embankments are presented by L.R. Kimball (2007), GAI (2009), and Geosyntec (2016a). Field observations indicate that the embankment fill material generally consists interbedded deposits of sand, gravel, and low-plasticity clay and fly ash. Embankment fill was observed from the ground surface at approximately elevation 695 ft-msl to elevations between 660 ft-msl and 670 ft-msl. Sand and gravel particle sizes range from fine to coarse. SPT blowcounts indicate very loose to dense sands and gravels, very soft clays, and very soft to very stiff fly ash deposits. Further discussion of the engineering properties of the embankment materials is presented by Geosyntec (2016a). Records of the construction methods and dates of construction of the North and South Pond were obtained from historical and contemporary design drawings provided by FirstEnergy and design drawings of the North Cumberland Locks and Dam. A listing of the specific drawings reviewed is provided in Section 3.7. The drawings provide an approximate timeline of the development of the North and South Ponds. The following is a description of the construction sequence and primary features associated with development of the Ponds Initial Construction Circa 1959 The North and South Ponds are absent from design documents dated June 1945, which illustrate construction of the New Cumberland Lock and Dam. The earliest identified engineering drawing to make reference to CCR management in the current location of the North and South Ponds, is a 1959 Yard Grading Plan (Drawing No. O-ST-780-G1907) prepared by Commonwealth Associates Inc. This drawing identifies construction of two disposal areas (Fill Area #1 and Fill Area #2) for management of Ash. The drawing illustrates grading for construction of two east to west oriented dikes which are approximately coincident with the southern embankments of the current South and North Ponds. A topographic rise provides containment to the north of the fill area, while the embankment of State Highway Route 7 provides containment to the east. A third dike along the west side completes the containment area. Along the eastern boundary construction of a 24-inch RCP is proposed. The inlet to the pipe is identified as a permanent manhole and skimming weir. Along the northern boundary construction of a 48-inch diameter reinforced culvert pipe (RCP) oriented west to east is proposed. The inlet to the pipe is adjacent to existing railroad tracks and appears to convey run-on from off-site areas. These two pipes meet in a depressed area outside of the containment areas in the northeastern corner of the site. Discharge from the pipes is directed into a 7-ft by 5-ft existing box culvert beneath State Route 7. Cross sections through the site illustrate proposed leveling of the fill areas using existing ash, placement of future ash to an elevation of approximately 689 ft-msl and subsequent capping of the ash fill with six inches of earth cover. ME1292/257.73(c)(1) History of Construction FNL 7 October 2016 pdf 10 of 24

11 Information regarding the construction materials, methods, and specific timeframes for the initial construction phases is not available Pond Modifications Circa 1967 A series of drawings for the South Ash Disposal Area project, prepared Commonwealth Associates Inc. and dated May 1967, identify modifications to the North and South Pond. These plans identify multiple revisions continuing from May 1967 through April The drawings are titled South Ash Disposal Areas Plan and Section, Details, and Dewatering and Diking (Drawing Nos. O-ST- 780-G2911-1, -2, and -3, respectively). These plans show the location and increased height of the perimeter embankments, include grading of the current east-west oriented finger berms within each pond, and indicate relocation of the 48- in RCP north of the previously installed location. Details include construction of new North and South Pond concrete discharge structures, which are connected to the previously-constructed 24-in and 48-in diameter concrete pipes. Crosssections through the site illustrate existing ash at elevations at 691 ft-msl and indicate excavation of ash is required to an elevation of 680 ft-msl. Information regarding the construction materials, methods, and specific timeframes for this series of pond modifications is not available Pond Plans Circa 1980 A series of drawings prepared by Commonwealth Associates, dated April 1979 and April 1980, show further development and modification of the North and South Ponds. These drawings provide a general overview of site drainage and topography circa 1979 by showing the location of the 48-in and 24-in concrete pipes and backfilling of the northeastern corner of the site. The April 1980 drawings titled North Ash Pond Dike Rehabilitation and South Yard Ash Piping Relocation Plan and Details (Drawing Nos. S780G and S780G , respectively) provide information pertaining to grading and reconstruction of the North Pond north embankment to accommodate placement of at-grade pipe racks to support process water effluent piping. Information regarding the construction materials, methods, and specific timeframes for this series of pond modifications is not available Pond Modification and Discharge Piping Upgrades Circa 2007 During the mid-2000 s new facilities were constructed at the western end of the North and South Ponds. Construction of the new facilities required backfilling portions of the North and South Ponds. The resulting grades are consistent with the topography illustrated on the drawing titled Ash Ponds from Aerial Photography Dated April 28, 2015 (L.R. Kimball, 2016). A copy of this drawing is provided in Appendix A. ME1292/257.73(c)(1) History of Construction FNL 8 October 2016 pdf 11 of 24

12 In 2007 the existing 24-in RCP South Pond discharge pipe was modified by slip lining the initial 270 feet of the pipe with a high-density polyethylene (HDPE) liner and replacing another 270 of the pipe RCP with a new 30-in diameter SDR 11 HDPE pipe. The abandoned RCP pipe was sealed and backfilled using flowable fill. Additional information regarding the construction materials, methods, and specific timeframes for the South Pond discharge pipe modification are not available Pond Outlet Modification and Discharge Piping Upgrades 2016 In June 2016, several alterations were made to the hydraulic structures discharging from and beneath the North and South Ponds. The alterations were approved, prior to construction; by the ODNR Dam Safety Program. The following modifications were made to the hydraulic features of the North and South Ponds: Replacement, slip-lining, and grouting of various section of the existing reinforced concrete stormwater conveyance pipe located along the north embankment of the North Pond; Installation of three new manholes along the stormwater pipe at north embankment of the North pond; Installation of an ungated overflow parallel to the normal North Pond discharge structure; Replacement of the existing 24-in reinforced concrete North Pond discharge pipe; Installation of an ungated 12-in diameter overflow pipe between the South Pond and North Pond; and Installation of stainless steel fixed-elevation weir plates in the North Pond discharge structure. A similar weir plate is to be installed in the South Pond discharge structure at a future time when the South Pond is out of service for cleaning and maintenance. The existing reinforced concrete stormwater pipe was replaced with HDPE pipe for the total length of the North Pond north embankment (approximately 450 ft). Pipe sections upstream and downstream of the north embankment were slip lined with HDPE pipe. The north embankment of the North Pond was reconstructed following the modifications to the hydraulic structures. The embankment was reconstructed to the design lines and grades shown on Drawing No. 3 of the construction drawings set, Stormwater and North Pond Discharge Pipe Replacement (Geosyntec, 2016c). Materials and methods of construction of the 2016 modifications conform to the specifications discussed in Section Drawings Available drawings relevant to the design, construction, operation, and maintenance of the North and South Ponds are identified in the table below. Note that not all of the drawings listed below ME1292/257.73(c)(1) History of Construction FNL 9 October 2016 pdf 12 of 24

13 represent the current configuration of the North and South Ponds but were retained here as they provide relevant information regarding the history of the construction history of the units. Drawings that have been completely superseded (i.e., all aspects of the drawing are no longer applicable) are highlighted with a double asterisk (**) in the table below. IMPOUNDMENT FEATURE Plan view and Cross-Sections of Unit Foundation Improvements Drainage Provisions Spillways Diversion Ditches Outlets Instrument Locations Slope Protection Normal Operating Pool Elevation Maximum Pool Surface Elevation Expected Maximum Depth of CCR Features that could adversely affect the operation of the unit O-ST-780-G O-ST-780-G O-ST-780-G S780G RELEVANT DRAWING(S) Foundation improvements are not identified on any available drawings. OST-780-G OST-780-G G-ST ** S780G OST-780-G O-ST-780-G S780G ** Diversion ditches are not identified on available drawings. Drawing Nos. 1 & 2 from Inflow Design Flood Control System Plan,, Stratton Ohio (Geosyntec, 2016b) Ash Ponds from Aerial Photography Dated April 28, 2015 (L.R. Kimball, 2016) Figure 1 Location of Piezometers (GAI, 2009) Slope protection measures are not shown on available drawings. Drawing Nos. 1 & 2 from Inflow Design Flood Control System Plan,, Stratton Ohio (Geosyntec, 2016b) Drawing Nos. 1 & 2 from Inflow Design Flood Control System Plan,, Stratton Ohio (Geosyntec, 2016b) The depth of CCR is managed according to the effluent characteristics and cleaned from each basin on a regular basis. O-ST-780-G (South Pond discharge pipe leak) S780G (process piping leak) Drawing Nos. 3, from Inflow Design Flood Control System Plan,, Stratton Ohio (Geosyntec, 2016b) (stormwater pipe leak) ME1292/257.73(c)(1) History of Construction FNL 10 October 2016 pdf 13 of 24

14 3.8 Type, Purpose, and Location of Instrumentation Ten piezometers, all less than 12 feet in depth, were installed in the east embankments of the North and South Ponds and in the south embankment of the South Pond in February 2009 (GAI, 2009). The piezometers were installed approximately at the crest and toe of the downstream slopes of the embankments. The piezometer locations are shown on Figure 1, Location of Piezometers (GAI, 2009). The purpose of the piezometers is to monitor the water elevations in the embankment in support of a stability analysis (GAI, 2009). Two additional piezometers and eight groundwater monitoring wells were installed at various locations around the North and South ponds in May These instruments were installed to obtain groundwater elevation and groundwater samples for testing to support compliance demonstrations required by the CCR Rule. 3.9 Area-Capacity Curves Area-capacity curves (also known as Stage-Storage curves) provide a means to estimate the volume of material or water within an impoundment based upon the elevation of the material or water. The curves are a necessary input for computational evaluation of basin hydraulics and are a useful tool for estimating day-to-day volume of material or water within the impoundment based on easily obtainable measurements of elevation from a fixed staff gauge. Stage-Storage curves for the North and South Ponds, developed using the stage-area data compiled by Geosyntec (2016b) are presented in Appendix B. A review of the curves indicates a peak storage, as measured from the base of the pond to the lowest point of the embankment, of approximately 31 ac-ft and 60 ac-ft for the North and South Pond, respectively. Storage volumes associated with other key elevations, such as the weir elevation and normal and peak operating water surface elevations, can be read from the curves. For reference, key elevations are also provided on the stage-storage curves Spillway Description and Calculations The North Pond outlet riser is fitted with a weir plate to control the water elevation. The maximum water elevation is controlled by a 48-in open stand pipe which is set six inches above the normal operating water level. Water passes from the base of the outlet riser through a buried 24-in diameter HDPE pipe end enters into a concrete manhole in the northern embankment of the pond. The manhole is part of a storm drain network which is buried along the northern perimeter of the North Pond. The storm drain network passes run-on water form west side the Plant to the Ohio River and terminates at an endwall structure located adjacent to State Route 7 at the northeast corner of the North Pond. As noted in Section 1.3, water is discharged from the North and South Ponds under an OEPA NPDES permit. The South Pond outlet riser is intended to be retrofitted with a weir plate to control the water elevation, as noted in Section 1.3, and illustrated on drawing 2 from Inflow Design Flood Control System Plan,, Stratton Ohio (Geosyntec 2016b). ME1292/257.73(c)(1) History of Construction FNL 11 October 2016 pdf 14 of 24

15 The maximum water elevation will be controlled by an overflow pipe positioned six inches above the normal operating water level and set into the northern embankment of the South Pond. Water passes from the base of the outlet riser into a buried a culvert buried within the eastern embankment of the South and North Ponds. This culvert consists of multiple segments separated by manholes. The segments are constructed of either RCP that has been sealed with an HDPE liner and segments constructed of solid wall pipe manufactured from high density polyethylene (HDPE). This culvert intersects the same 48-in diameter storm drain network to which the North Pond discharge is connected. Further information on hydraulic computations supporting the design of the North and South Pond outlet structures are provided by Geosyntec (2016b) Construction Specifications and Provisions for Operations and Maintenance Other than the identification of material types on the available drawings, no specifications pertaining to the initial construction of the North or South Pond were identified. Material and construction specifications for construction activities related to the 2016 modifications to pond outlet and discharge structures are included as part of the drawing set titled, Stormwater and North Pond Discharge Pipe Replacement Drawings (Geosyntec, 2016c). Provisions for the operation and maintenance of the Ponds are described in the document, Operations and Maintenance Manual for Sammis Station North Bottom Ash Dam (First Energy, 2014b). Additional information regarding provisions for action to be taken in the event of an emergency are presented in the document Emergency Action Plan (EAP) for Sammis Station North Bottom Ash Dam (First Energy, 2014a) Record of Structural Instability GAI (2009) indicates that a sink hole occurred in the eastern embankment of the north pond during construction of the 30-in HDPE discharge pipe beneath the east embankment of the North Pond. GAI (2008, 2009) indicates that the sinkhole was backfilled with concrete. ME1292/257.73(c)(1) History of Construction FNL 12 October 2016 pdf 15 of 24

16 4. REFERENCES FirstEnergy Generation, LLC (First Energy) (2014a). Emergency Action Plan for Sammis Station North Bottom Ash Dam, Jefferson County, Village of Stratton, ODNR, DSWR File Number: April FirstEnergy Generation, LLC (First Energy) (2014b). Operations and Maintenance Manual for Sammis Station North Bottom Ash Dam, Jefferson County, Village of Stratton, ODNR, DSWR File Number: Draft. April GAI (2008). Dike Inspection North and South Ash Ponds W.H. Sammis Power Plant, Stratton, Ohio. GAI Consultants, Homestead, PA. August GAI (2009). Piezometer Installation and Stability Analyses, North and South Ash Ponds, W.H. Sammis Plant, Stratton, Ohio. GAI Consultants, Homestead, PA. November Geosyntec (2016a). Safety Factor Assessment W.H. Sammis Coal Plant, North and South Ponds, Stratton, Ohio. Geosyntec Consultant s, Inc. 17 October Geosyntec (2016b). Inflow Design Flood Control System Plan, W.H. Sammis Coal Plan North and South Ponds, Stratton, Ohio. Geosyntec Consultants, Inc. 17 October Geosyntec (2016c). Stormwater and North Pond Discharge Pipe Replacement. Geosyntec Consultant s, Inc. 24 May L.R. Kimball (2006). W.H. Sammis Plant Geotechnical Investigation. L. Robert Kimball & Associates. February L.R. Kimball (2007). First Energy Sammis Project. L. Robert Kimball & Associates. May L.R. Kimball (2016). Ash Ponds from Aerial Photography Dated April 28, L. Robert Kimball & Associates. February Ohio Division of Geological Survey (2006). Bedrock geologic map of Ohio: Ohio Department of Natural Resources, Division of Geological Survey Map BG-1. United State Army Corps of Engineers (USACE) (1945). Definite Project Report on New Cumberland Locks and Dam Ohio River. US Engineer Office, Pittsburgh, PA. June United States Environmental Protection Agency (USEPA) (2015). Hazardous and Solid Waste Management System; Disposal of Coal Combustion Residuals from Electric Utilities; Final Rule. Title 40 Code of Federal Regulations, Parts 257 and 261. ME1292/257.73(c)(1) History of Construction FNL 13 October 2016 pdf 16 of 24

17 pdf 17 of 24 FIGURES

18 ³ P:\GIS\Sammis Power Station - ME1292\Report 1\Figure 1 - Site Location Map N&S Ponds.mxd; RDW/MS; 13-Oct-2016 North and South Ponds Notes: Topographinc map provided by U.S Geological Survey on 13 October East Liverpool South, West Virginia (1985), and Wellsvill, Ohio (1986) 2,000 1, ,000 Feet Site Location Map: North and South Ponds Sammis Power Station Stratton, Ohio Figure Columbia, Maryland pdf 18 of 24 October

19 ³ Discharge at Headwall Ohio Route 7 48-in RCP 30-in HDPE 24-in RCP with HDPE Liner 24-in HDPE Outlet Riser and Valve Vault Primary Outlet 3 Outlet Riser and Valve Vault Primary Outlet 48-in HDPE Overflow Outlet 12" HDPE Overflow Outlet 48" HDPE North Pond South Pond 3 48" RCP with HDPE Liner P:\GIS\Sammis Power Station - ME1292\Report 1\Figure 2 - Site Plan N&S Ponds.mxd; MS/RDW; 13-Oct-2016 pdf 19 of 24 3 Legend 3 Manhole 24 inch pipe 30 inch pipe 48 inch pipe Notes: RCP - Reinforced Concrete Pipe HDPE - High-Density Polyethylene 1. Aerial imagery accessed via ArcGIS Online and provided by the United Stated Department of Agriculture on 13 October Image is dated 24 October All pipe and structure locations are approximate Feet Site Plan: North and South Ponds Sammis Power Station Stratton, Ohio Columbia, Maryland October 2016 Figure 2

20 APPENDIX A Drawings pdf 20 of 24

21 N LEGEND OF SYMBOLS AND ABBREVIATIONS MAJOR CONTOUR PIEZOMETER W E MINOR CONTOUR UNDERGROUND DRAINAGE LINE GUARD RAIL MANHOLE POST SIGN S 615 West Highland Ave. Ebensburg, Pa FENCE LINE LIGHT POLE EDGE OF WATER UTILITY POLE CONSULTANTS: PROJECT NAME: FIRST ENERGY W.H. SAMMIS PLANT STRATTON, OH OWNER: FIRST ENERGY W.H. SAMMIS PLANT STATE ROUTE 7 STRATTON, OH NOTES: 1. Source of topographic information: From ground control surveys January 18 and 29, 2016 and from aerial photography dated April 28, Horizontal control is based on OH North NAD83, State Plane Coordinates by the KeyNET VRS Network. All coordinates are true state plane. 3. Vertical control is based on NAVD88 vertical datum, GEOID12A by the KeyNET VRS Network. 4. Underground utility locations are by others and were not verified by L.R. Kimball using remote sensing techniques. C 2/22/2016 ADDITIONAL MAPPING B 2/15/2016 ADD. UG PIPE PER A 2/2/2016 ADD. UG PIPE / PIEZO. REV. DATE DESCRIPTION ISSUE: 1/22/2016 PROJECT NO: SCALE: DRAWN BY: CHECKED BY: WRB JAW CDI Infrastructure, LLC dba L.R. Kimball SHEET TITLE ASH PONDS FROM AERIAL PHOTOGRAPHY DATED APRIL 28, Feet pdf 21 of 24

22 APPENDIX B Stage-Storage Curves pdf 22 of 24

23 Geosyntec Consultants 696 Stage-Storage Curve FirstEnergy W.H. Sammis Coal Plant North Pond Impoundment 694 Top of Embankment; ft msl Elevation (ft-msl) Water Surface Elev. at 0.5 PMF Water Surface Elev at Normal Operations Crest of Overflow Bottom of Fixed Weir Pond Storage (ac-ft) Curve is based on elevation-area data presented in the report, pdf 23 of 24 Inflow Design Flood Control System Plan, (Geosyntec, 2016b).

24 Geosyntec Consultants 698 Stage-Storage Curve FirstEnergy W.H. Sammis Coal Plant South Pond Impoundment 696 Top of Embankment; ft-msl Water Surface Elev. at 0.5 PMF Water Surface Elev at Normal Operations Crest of Overflow Elevation (ft-msl) Bottom of Fixed Weir Pond Storage (ac-ft) Curve is based on elevation-area data presented in the report, pdf 24 of 24 Inflow Design Flood Control System Plan, (Geosyntec, 2016b).

STRUCTURAL STABILITY ASSESSMENT

STRUCTURAL STABILITY ASSESSMENT STRUCTURAL STABILITY ASSESSMENT CFR 257.73(d) Bottom Ash Pond Complex Cardinal Plant Brilliant, Ohio October, 2016 Prepared for: Cardinal Operating Company Cardinal Plant Brilliant, Ohio Prepared by: Geotechnical

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report

Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report Big Rivers Electric Corporation Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Impoundment Liner Assessment Report CCR Surface Impoundment Information Name: Operator:

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 2 (AP-2) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR (c)(1)(i)-(xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GADSDEN ASH POND 40 CFR 257.73(c)(1)(i)-(xii) (i) Site Name and Ownership Information: Site Name: Site Location: Site Address: Gadsden

More information

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No January 17, 2018 Mr. Michael Malone 145 Navarro Street San Antonio, Texas 78205 Project No. 0337367 Environmental Resources Management CityCentre Four 840 West Sam Houston Pkwy N. Suite 600 Houston, Texas

More information

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR )

ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR ) PLATTE RIVER POWER AUTHORITY RAWHIDE ENERGY STATION BOTTOM ASH TRANSFER (BAT) IMPOUNDMENTS LARIMER COUNTY, CO ENGINEER S CERTIFICATION OF FAULT AREA DEMONSTRATION (40 CFR 257.62) FOR COAL COMBUSTION RESIDUALS

More information

CCR Rule Annual Inspection Report (cont.) 2

CCR Rule Annual Inspection Report (cont.) 2 The inspection findings consisted of maintenance items and items that were not observed to be signs or potential signs of significant structural weakness. No deficiencies or disrupting conditions that

More information

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report

J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report J.H. Campbell Generating Facility Pond A - Location Restriction Certification Report Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Consumers Energy Company

More information

Materials. Use materials meeting the following.

Materials. Use materials meeting the following. 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Description. Install and maintain erosion and sedimentation controls to minimize soil erosion and to control sedimentation from affecting

More information

CCR Surface Impoundment Location Restrictions Demonstration. MidAmerican Energy Company, Louisa Generating Station

CCR Surface Impoundment Location Restrictions Demonstration. MidAmerican Energy Company, Louisa Generating Station CCR Surface Impoundment Location Restrictions Demonstration MidAmerican Energy Company, Louisa Generating Station Final October 17, 2018 CCR Surface Impoundment Location Restrictions Demonstration Prepared

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Sediment Trap. At multiple locations within the project site where sediment control is needed.

Sediment Trap. At multiple locations within the project site where sediment control is needed. Sediment Trap SE-3 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

APPENDIX B WORKSHEETS & EXHIBITS

APPENDIX B WORKSHEETS & EXHIBITS APPENDIX B WORKSHEETS & EXHIBITS A worksheet provides the designer a representation of a measure that allows for input of specific design criteria. The plan designer will be required to assess field conditions

More information

Suitable Applications Sediment traps should be considered for use:

Suitable Applications Sediment traps should be considered for use: Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

3.0 SUMMARY OF FINDINGS

3.0 SUMMARY OF FINDINGS AECOM 500 W Jefferson St. Suite 1600 Louisville, KY 40202 www.aecom.com 502-569-2301 tel 502-569-2304 fax October 17, 2018 Big Rivers Electric Corporation Sebree Generating Station 9000 Highway 2096 Robards,

More information

Location Restriction Demonstration

Location Restriction Demonstration Location Restriction Demonstration R.M. Heskett Station Coal Ash Landfill Prepared for Montana-Dakota Utilities Company October 2018 Minneapolis, MN, Bismarck, ND Location Restrictions Demonstration October

More information

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards.

design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. design, construction, operation, and maintenance of the BAP is consistent with recognized and generally accepted good engineering standards. In addition to the field inspection, Associated Engineers, Inc.

More information

Rock & Aggregate Drop Inlet Protection

Rock & Aggregate Drop Inlet Protection Rock & Aggregate Drop Inlet Protection SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System Supplementary Trap Dispersive Soils

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway.

Sediment Trap. A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff through a stabilized spillway. Sediment Trap SC-15 Source: Caltrans Construction Site Best Management Practices Manual, 2003. Description A temporary runoff containment area, which promotes sedimentation prior to discharge of the runoff

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY

LOCATED IN INDIAN RIVER COUNTY PREPARED FOR S.J.R.W.M.D. AND F.W.C.D. DECEMBER, 2003 Updated 2007 Updated May 2014 PREPARED BY FELLSMERE WATER CONTROL DISTRICT EAST MASTER DRAINAGE PLAN AND STORMWATER HYDROLOGIC ANALYSIS OF THE GRAVITY DRAINAGE SYSTEM LOCATED BETWEEN THE EAST BOUNDARY, LATERAL U, THE MAIN CANAL, AND DITCH 24 LOCATED

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan

Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Coal Combustion Residuals Unit Inflow Design Flood Control System Plan Virginia Electric and Power Company Chesterfield Power Station Upper (East) Pond Chesterfield County, Virginia GAI Project Number:

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management 1100 North

More information

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0 LYCOMING COUNTY S.R.15, SECTION C41 FINAL HYDROLOGIC AND HYDRAULIC REPORT STEAM VALLEY RUN STREAM RELOCATION DATE: June, 2006 REVISED:

More information

Chapter 7 Mudflow Analysis

Chapter 7 Mudflow Analysis Chapter 7 Mudflow Analysis 7.0 Introduction This chapter provides information on the potential and magnitude of mud floods and mudflows that may develop in Aspen due to rainfall events, snowmelt, or rain

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SEDIMENT BASIN Definition A barrier, dam, excavated pit, or dugout constructed across a waterway or at other suitable locations to intercept and retain sediment. Basins created by construction

More information

UPPER COSUMNES RIVER FLOOD MAPPING

UPPER COSUMNES RIVER FLOOD MAPPING UPPER COSUMNES RIVER FLOOD MAPPING DRAFT BASIC DATA NARRATIVE FLOOD INSURANCE STUDY SACRAMENTO COUTY, CALIFORNIA Community No. 060262 November 2008 Prepared By: CIVIL ENGINEERING SOLUTIONS, INC. 1325 Howe

More information

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT

STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1. DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT STREUVER FIDELCO CAPPELLI, LLC YONKERS DOWNTOWN DEVELOPMENT PHASE 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT For: PALISADES POINT Prepared by: PAULUS, SOKOLOWSKI & SARTOR STORMWATER MANAGEMENT 1. Methodology

More information

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015 THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC Presentation for The Brunswick County Commissioners April 20, 2015 The Sanford Dam Earth Dam constructed in 1961 Drainage

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Geosynthetics Applications and Performance Reviews Select Case Histories

Geosynthetics Applications and Performance Reviews Select Case Histories Geosynthetics Applications and Performance Reviews Select Case Histories Debora J. Miller, Ph.D., P.E.; Dean B. Durkee,, Ph.D., P.E.; Michael A. Morrison, P.E., David B. Wilson, P.E., and Kevin Smith,

More information

TPDES: Soil, Erosion and Sedimentation Methods

TPDES: Soil, Erosion and Sedimentation Methods SAWS TPDES: Soil, Erosion and Sedimentation Methods Philip Handley Supervisor-Resource Protection & Compliance August 25, 2014 TPDES: Soil, Erosion and Sedimentation Methods Soil Common term: Dirt Common

More information

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area.

[1] Performance of the sediment trap depends on the type of outlet structure and the settling pond surface area. Sediment Trench SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils Type 3 System [1] Supplementary Trap Dispersive Soils [1] Performance of

More information

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT Hillsborough County Public Works County Center, 22nd Floor 601 E. Kennedy Blvd. Tampa, FL 33602 BRANDON LAKES AVENUE DRAINAGE IMPROVEMENTS Capital

More information

Continuing Education Associated with Maintaining CPESC and CESSWI Certification

Continuing Education Associated with Maintaining CPESC and CESSWI Certification Continuing Education Associated with Maintaining CPESC and CESSWI Certification Module 2: Stormwater Management Principles for Earth Disturbing Activities Sponsors: ODOTs Local Technical Assistance Program

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services

Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services Converse Consultants Geotechnical Engineering, Environmental & Groundwater Science, Inspection & Testing Services July 27, 2017 Ms. Rebecca Mitchell Mt. San Antonio College Facilities Planning & Management

More information

FRED BURR DAM FEASIBILITY STUDY

FRED BURR DAM FEASIBILITY STUDY FRED BURR DAM FEASIBILITY STUDY Fred Burr Dam Feasibility Study Purpose: Develop pre-feasibility risk reduction alternatives and recommendations for short-term operations and long-term rehabilitation.

More information

Stone Outlet Sediment Trap

Stone Outlet Sediment Trap 3.12 Sediment Control Description: A stone outlet sediment trap is a small detention area formed by placing a stone embankment with an integral stone filter outlet across a drainage swale for the purpose

More information

Stage Discharge Tabulation for Only Orifice Flow

Stage Discharge Tabulation for Only Orifice Flow Stage Discharge Tabulation for Only Orifice Flow DEPTH STAGE DISCHARGE (meters) (feet) (meters) (feet) (m 3 /s) (ft 3 /s) 0 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 0.7 1.3 2.0 2.6 3.3 3.9 4.6

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID #

SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # SAN JACINTO RIVER / BAUTISTA CREEK LEVEE SYSTEM RIVERSIDE COUNTY, CALIFORNIA NLD ID # 3805010019 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FEBRUARY 2013 FINAL RATING: MINIMALLY ACCEPTABLE

More information

3.18 GEOLOGY AND SOILS

3.18 GEOLOGY AND SOILS 3.18 GEOLOGY AND SOILS This section discusses geologic resource concerns as they relate to the environment, public safety, and project design both during construction and after completion of the project.

More information

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells, Doc. No. 162 Rev. 0 Mr. Paul West-Sells President & Chief Operating Officer Western Copper Corporation 2060-1111 West Georgia Street Vancouver, BC V6E 4M3 ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER

More information

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007

KANSAS GEOLOGICAL SURVEY Open File Report LAND SUBSIDENCE KIOWA COUNTY, KANSAS. May 2, 2007 KANSAS GEOLOGICAL SURVEY Open File Report 2007-22 LAND SUBSIDENCE KIOWA COUNTY, KANSAS Prepared by Michael T. Dealy L.G., Manager, Wichita Operations SITE LOCATION The site was approximately four miles

More information

ENTERGY INDEPENDENCE PLANT EAST AND WEST RECYCLE PONDS DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA , FAULT AREAS.

ENTERGY INDEPENDENCE PLANT EAST AND WEST RECYCLE PONDS DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA , FAULT AREAS. ENTERGY INDEPENDENCE PLANT EAST AND WEST RECYCLE PONDS DEMONSTRATION OF COMPLIANCE WITH EPA CCR RULE SITING CRITERIA 257.62, FAULT AREAS Prepared for Entergy Arkansas, Inc. PO Box 551 Little Rock, AR 72203

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION

APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION APPENDIX B DESIGN CRITERIA FOR TEMPORARY WATER QUALITY BMPS USED DURING CONSTRUCTION This Appendix presents design criteria and example calculations for the following temporary water quality BMPs for use

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

LOCATION RESTRICTION EVALUATION

LOCATION RESTRICTION EVALUATION Prepared for Buckeye Power, Inc 6677 Busch Blvd. Columbus, Ohio 43229 LOCATION RESTRICTION EVALUATION CARDINAL FAR II BRILLIANT, OHIO Prepared by 1420 Kensington Road, Suite 103 Oak Brook, Illinois 60523

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS Except where otherwise noted, the following Section is based on the Preliminary Geotechnical Investigation, Proposed Medical Office Buildings and Mixed-Use

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Sediment Control Practices. John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Sediment Control Practices John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources Practices Treat the Largest Soil Particles Sand Sand Silt Clay Treated Untreated Settleable

More information

Bedrock Dewatering for Construction of Marmet and Soo Lock Projects

Bedrock Dewatering for Construction of Marmet and Soo Lock Projects Bedrock Dewatering for Construction of Marmet and Soo Lock Projects Michael Nield Engineering Geologist Dam Safety Production Center, Huntington, WV August 2012 US Army Corps of Engineers BEDROCK DEWATERING

More information

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011 11242843_GeoTech_Preliminary - Feburary 2011_1/40 Report of Preliminary Geotechnical Exploration CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio February, 2011 11242843_GeoTech_Preliminary -

More information

Safety Factor Assessment Report. Area 15 DTE Monroe Power Plant

Safety Factor Assessment Report. Area 15 DTE Monroe Power Plant Submitted to DTE Energy, Inc. Submitted by AECOM 1300 East 9th Street, Suite 500 Cleveland, OH 44114 March 2018 AECOM Project No. 60516675 Safety Factor Assessment Report Area 15 DTE Monroe Power Plant

More information

GEOLOGY, SOILS, AND SEISMICITY

GEOLOGY, SOILS, AND SEISMICITY 4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration

More information

Location Restrictions Certification Report NIPSCO Michigan City Generating Station Boiler Slag Pond

Location Restrictions Certification Report NIPSCO Michigan City Generating Station Boiler Slag Pond Location Restrictions Certification Report NIPSCO Michigan City Generating Station Boiler Slag Pond Pursuant to: 40 CFR 257.60 40 CFR 257.61 40 CFR 257.62 40 CFR 257.63 40 CFR 257.64 Submitted to: Northern

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

14 Geotechnical Hazards

14 Geotechnical Hazards Volume 2: Assessment of Environmental Effects 296 14 Geotechnical Hazards Overview This Chapter provides an assessment of the underlying geotechnical conditions to identify: any potential liquefaction

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226

Submitted to: St. Johns River Power Park New Berlin Road Jacksonville, FL 32226 RUN-ON/RUN-OFF CONTROL SYSTEM PLAN RUN-ON AND RUN-OFF CONTROL SYSTEM PLAN St. Johns River Power Park Byproduct Storage Area B Phase I Development Submitted to: St. Johns River Power Park 11201 New Berlin

More information

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application

Electronic Submission Format Guide Anthracite Preparation Plant Permit Application Electronic Submission Format Guide Anthracite Preparation Plant Permit Application Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses Act 67 / 68

More information

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973

R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE. HELAVA CREEKl MILE MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 El R.M.HARW & ASSOCIATES LTD. GEOTECHNICAL INVESTIGATION PROPOSED BRIDGE SITE HELAVA CREEKl MILE 616.4 MACKENZIE HIGHWAY E-2510 OCTOBER 16, 1973 R,M,HARDV & ASSOCIATES LTD. CONSULTING ENGINEERING & TESTING

More information

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax:

MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA Phone: Fax: MIDDLESEX COUNTY Department of Planning and Community Development P.O. Box 427, Saluda, VA 23149 Phone: 804-758-3382 Fax: 804-758-0061 LAND DISTURBANCE PERMIT SUBMISSION REQUIREMENTS In order to expedite

More information

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations.

CHAPTER GEOLOGICALLY HAZARDOUS AREAS Applicability Regulations. CHAPTER 19.07 GEOLOGICALLY HAZARDOUS AREAS 19.07.010 Applicability. Geologically hazardous areas may pose a threat to the health and safety of citizens when incompatible development is sited in areas of

More information

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000.

This report was prepared by Klohn Crippen Consultants Ltd. for Alberta Transportation Central Region under Contract No. CE053/2000. Alberta Transportation Central Region #401, 4902 51 Street Red Deer, Alberta T4N 6K8 June 7, 2002 Mr. Melvin Mayfield, P.Eng. Project Engineer Dear Mr. Mayfield: Central Region Landslide Assessment Site

More information

LOCATION RESTRICTION EVALUATION

LOCATION RESTRICTION EVALUATION Prepared for American Electric Power 1 Riverside Plaza Columbus, Ohio 43215 LOCATION RESTRICTION EVALUATION CARDINAL BOTTOM ASH POND BRILLIANT, OHIO Prepared by 1420 Kensington Road, Suite 103 Oak Brook,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS

AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS AN ARCHAEOLOGICAL SURVEY FOR THE EASTHAM STATE PRISON FARM UNIT PROJECT IN HOUSTON COUNTY TEXAS Antiquities Permit 5693 By William E. Moore and Edward P. Baxter Brazos Valley Research Associates Contract

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California.

Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California. Slope Stability Evaluation Ground Anchor Construction Area White Point Landslide San Pedro District Los Angeles, California Submitted To: Mr. Gene Edwards City of Los Angeles Department of Public Works

More information

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project.

GEOLOGY AND SOILS. This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. 9 GEOLOGY AND SOILS INTRODUCTION This chapter summarizes geologic and geotechnical aspects of the site as they relate to the Project. This chapter utilizes information from the following reports prepared

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

Core Description, Stratigraphic Correlation, and Mapping of Pennsylvanian Strata in the Appalachians

Core Description, Stratigraphic Correlation, and Mapping of Pennsylvanian Strata in the Appalachians Core Description, Stratigraphic Correlation, and Mapping of Pennsylvanian Strata in the Appalachians The remaining laboratory sessions for the semester will be collected into a series of exercises designed

More information

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION Nancy Case O Bourke, PE 1, Gregory L. Hartman, PE 2 and Paul Fuglevand, PE 3 ABSTRACT In-situ specific gravity

More information

Culvert and Pipe Phasing

Culvert and Pipe Phasing Culvert and Pipe Phasing Barney Blackburn, PE, CPESC, CPSWQ NCDOT Roadside Environmental Unit Soil & Water Engineering Section Supervisor NCDOT Culvert Phasing Process Hydraulics Unit: Culvert Survey Report

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

CLECO POWER LLC DOLET HILLS POWER STATION

CLECO POWER LLC DOLET HILLS POWER STATION SEPTEMBER 2018 CLECO POWER LLC DOLET HILLS POWER STATION SEISMIC IMPACT ZONES ASSESSMENT ASH BASIN No. 1 Prepared By: Providence Engineering and Environmental Group LLC 1201 Main Street Baton Rouge, Louisiana

More information

Starting at Rock Bottom

Starting at Rock Bottom Starting at Rock Bottom At rock bottom of the Brushy Creek site s geological column lies the first clue to human habitation: A smelting and heattreating furnace, and mold, carved into Bed Ked: Figure 15

More information

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE:

NRCS - THUNDER ROAD #2, TRIBUTARY TO QUILEUTE RIVER CULVERT REMOVAL AND REPLACEMENT PLAN CLALLAM COUNTY, WA., WRIA: 20, SITE: WDFW CONTROL POINT #1 Re-Bar, Elevation 100.00 Northing 10004.441 Easting 8002.5905 WDFW CONTROL POINT #2 Re-Bar, Elevation 101.36 Northing 10031.6683 Easting 846.0623 WDFW TBM #1 Spike in Tree Elevation

More information

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget Prepared for: Prepared By: - I. Introduction The Black Gore Creek Total Maximum Daily Load (TMDL) was developed in collaboration

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge B Bridge Crossing: South 257 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS. Abstract

GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS. Abstract GEOPHYSICAL IMAGING TO ENHANCE ANALYSIS, DESIGN AND DRILLING OF LARGE-SCALE GEOTHERMAL SYSTEMS John A. Mundell, Mundell & Associates, Inc., Indianapolis, Indiana Gabriel Hebert, Mundell & Associates, Inc.,

More information

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3

STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 STORMWATER REPORT FRITO LAY SUBDIVISION NO. 3 May 2018 STORMWATER REPORT I. Subdivision Data a. The parcel is adjacent to the existing Frito Lay property in Topeka; and the subject plat application encompasses

More information

Exhibit RMP-4. Foote Creek Geology and Topography

Exhibit RMP-4. Foote Creek Geology and Topography Exhibit RMP-4 Foote Creek Geology and Topography Memorandum To: From: CC: Travis Brown, PacifiCorp Daria Drago, P.E., PMP Dr. Deb Luchsinger Date: January 9, 2019 Re: Foote Creek Rim 1 - Geologic Conditions

More information

An Evaluation of Pavement Drainage Interstate 64, Rowan-Carter Counties

An Evaluation of Pavement Drainage Interstate 64, Rowan-Carter Counties Transportation Kentucky Transportation Center Research Report University of Kentucky Year 1984 An Evaluation of Pavement Drainage Interstate 64, Rowan-Carter Counties David L. Allen Herbert F. Southgate

More information

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION

SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS JURISDICTION DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, U.S. ARMY CORPS OF ENGINEERS 1455 MARKET STREET SAN FRANCISCO, CALIFORNIA 94103-1398 SAN FRANCISCO DISTRICT INFORMATION REQUESTED FOR VERIFICATION OF CORPS

More information

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow

More information

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project, Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION DRAINAGE IMPROVEMENTS TO THE HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants OFFICES Orlando, 88 S. Orange Avenue, Orlando,

More information

GROUNDWATER MONITORING DATA 2016 SAMPLING EVENT HARSHAW CHEMICAL COMPANY FUSRAP SITE

GROUNDWATER MONITORING DATA 2016 SAMPLING EVENT HARSHAW CHEMICAL COMPANY FUSRAP SITE GROUNDWATER MONITORING DATA 2016 SAMPLING EVENT HARSHAW CHEMICAL COMPANY FUSRAP SITE U.S. Army Corps of Engineers Buffalo District Building Strong April 2017 ly Utilized Sites Remedial Action Program The

More information

PERIODIC SAFETY FACTOR ASSESSMENT

PERIODIC SAFETY FACTOR ASSESSMENT PERIODIC SAFETY FACTOR ASSESSMENT CFR 257.73(e)(1) Pond 21, Pond 22, Pond 23, and Waste Water Sludge Pond Oklaunion Power Station Vernon, Texas October, 16 Prepared for: Public Service Company of Oklahoma

More information

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805 B805 MEASURES - OPSS 805 805.1 GENERAL Construction activities frequently remove protective cover and expose soil to accelerated rates of erosion. Sediments generated thereby can be conveyed via runoff

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Turner Turnpike Widening Bridge D Bridge Crossing: South 209 th West Avenue Creek County, Oklahoma June 1, 2016 Terracon Project No. 04155197 Prepared for: Garver, LLC Tulsa,

More information

Stream Simulation: A Simple Example

Stream Simulation: A Simple Example Stream Simulation: A Simple Example North Thompson Creek, CO Paul T. Anderson U.S.D.A. Forest Service Here s How We Started May 2011 2-1 USDA-Forest Service Here s How We Finished Forest Service Aquatic

More information