1 Prepared for: Compliance Noise Survey & Assessment Duralie Coal Mine October 2008 Report No. 29N TRP December 2008 Vipac Engineers & Scientists Ltd Newcastle, NSW

2 Co mpliance Noise Survey & Assessment Page 2 of 30 DOCUMENT CONTROL Compliance Noise Survey & Assessment REPORT NO: LIBRARY CODE: 29N TRP PREPARED FOR: PREPARED BY: Vipac Engineers & Scientists Ltd P.O. Box 168 Shop 5 Shopping Village, Laycock Street Gloucester NSW 2422 CAREY BAY NSW 2283 AUSTRALIA Contact: John Trotter huntervalley@vipac.com.au Phone: Phone: Fax : Fax : AUTHOR: REVIEWED/APPROVED BY: REVISION HISTORY: Simon Ritchie Date: 3 December 2008 Consulting Engineer Ian Guy Date: 3 December 2008 Manager, Newcastle Office Revision No. Date Issued Reason/Comments 0 3 December 2008 Initial Issue 1 3 December 2008 Update site map DISTRIBUTION: Copy No._2_ KEYWORDS: Location 1 Project 2 UNCONTROLLED COPY Client, pdf format Mining; Compliance; Noise NOTE: This is a controlled document within the document control system. If revised, it must be marked SUPERSEDED and returned to the Vipac QA Representative. This document contains commercial, conceptual and engineering information, which is proprietary to VIPAC Engineers & Scientists Ltd. We specifically state that inclusion of this information does not grant the Client any license to use the information without VIPAC's written permission. We further require that the information not be divulged to a third party without our written consent.

3 Co mpliance Noise Survey & Assessment Page 3 of 30 EXECUTIVE SUMMARY Vipac Engineers & Scientists Ltd (VIPAC) was engaged to undertake Environmental Compliance Noise Monitoring in the rural environment surrounding the Duralie Coal Mine (DCM) Site, Bucketts Way, Stroud Road NSW. The purpose of the assessment was to conduct ambient noise monitoring in accordance with the Department of Planning (DoP) Development Consent Modification Schedule 3 Condition 2, dated 2006 and the Environmental Protection Authority (EPA), now Department of Environment and Climate Change (DECC) Environmental Pollution Licence (EPL 11701), Section L6.1, Noise Limits. The noise monitoring survey commenced at 18:30hrs on Monday 27 th October and ended at 16:00hrs on Tuesday 28 th October Day-time Operator Attended Impact Assessment 28 th October 2008 DCM operation L eq (15 minute) noise emissions during the daytime attended noise-monitoring period, under the prevailing weather conditions were as follows: Sound Pressure Level L eq Noise Criteria L eq Monitoring Locations AAS1 Lyall Nil 35 0 N2 S Doherty < AS3 Jensen Nil 35 0 Excursion Evening-time Operator Attended Impact Assessment 27 th October 2008 DCM operation L eq (15 minute) noise emissions during the evening-time attended noise-monitoring period, under the prevailing weather conditions were as follows: Sound Pressure Level L eq Noise Criteria L eq Monitoring Locations AAS1 Lyall < N2 S Doherty Nil 35 0 AS3 Jensen Nil 35 0 Excursion Night-time Operator Attended Impact Assessment 28 th October 2008 DCM operation L eq (15 minute) noise emissions during the nighttime attended noise-monitoring period, under the prevailing weather conditions were as follows: Sound Pressure Level L eq Noise Criteria L eq Monitoring Locations AAS1 Lyall <35, , 2* N2 S Doherty <35, < , 0 AS3 Jensen Nil, Nil 35 0, 0 *Note: Significant temperature inversion was recorded at this time. Excursion

4 Co mpliance Noise Survey & Assessment Page 4 of 30 Assessment of Compliance Sigma-theta data indicated a moderately strong temperature inversion (F to G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, the recorded 37dB mine contribution at AAS1 Lyall can be attributed to the moderate to strong temperature inversion (greater than 3 o C/100m) at the time. As stated in the conditions of consent Schedule 3 note c), the 35 criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria does not apply in this case. Mine operating noise emissions were at or below the 35 noise criteria at all monitoring locations during the October 2008 Environmental Noise Level Survey except the one instance at AAS1 Lyall where noise from the mine was enhanced due to the effects of temperature inversion. The nominated monitoring locations represent the closest residences to the mine so that further located properties will receive mine noise levels somewhat lower than those measured, due to distance attenuation under stable atmospheric conditions. Under the prevailing weather conditions and based on the attended monitoring results it is concluded that mine noise emissions did not breach the 35 criteria at any nearby residence during the 27 th 28 th October 2008 survey.

5 Co mpliance Noise Survey & Assessment Page 5 of 30 TABLE OF CONTENTS 1. INTRODUCTION DEFINITIONS OF ACOUSTICAL TERMS DURALIE COAL MINE SITE DESCRIPTION DESCRIPTION OF OPERATION METHODOLOGY INSTRUMENTS MONITORING LOCATIONS MONITORING WEATHER CRITERIA TEMPERATURE INVERSION CONDITIONS RESULTS DAY SURVEY RESULTS TUESDAY 28 TH OCTOBER Equipment Operating Prevailing Weather Conditions...11 Table 5.1.3: Day Noise Survey Results, 28 th October : Noise Impact Assessment - Daytime EVENING SURVEY RESULTS 27 TH OCTOBER Equipment Operating Prevailing Weather Conditions...12 Table 5.2.3: Evening Noise Survey Results, 27 th October Noise Impact Assessment - Evening NIGHT SURVEY RESULTS 28 TH OCTOBER Equipment Operating Prevailing Weather Conditions...14 Table 5.3.3: Night time Noise Survey Results, 28 th October Noise Impact Assessment - Night COMPLIANCE ASSESSMENT DISCUSSION & CONCLUSION...16 APPENDIX A: WEATHER CONDITIONS...18 APPENDIX B: LOCALITY MAP & SURVEY LOCATIONS...22 APPENDIX C: TIME TRACES...23

6 Co mpliance Noise Survey & Assessment Page 6 of INTRODUCTION Vipac Engineers & Scientists Ltd (VIPAC) was engaged to undertake Environmental Compliance Noise Monitoring in the rural environment surrounding the Duralie Coal Mine (DCM) Site, Buckets Way, Stroud Road NSW. The purpose of the assessment was to conduct ambient noise monitoring in accordance with the Department of Planning (DoP) Development Consent Modification Schedule 3 Condition 2, dated 2006 and the Environmental Protection Authority (EPA), now Department of Environment and Climate Change (DECC) Environmental Pollution Licence (EPL 11701), Section L6.1, Noise Limits. The noise monitoring survey commenced at 18:30hrs on Monday 27 th October and ended at 16:00hrs on Tuesday 28 th October DEFINITIONS OF ACOUSTICAL TERMS Table 1.1 provides the definitions of common acoustical terms and is presented as an aid to understanding this report. Term Lw L P Leq L 90 L 10 Table Acoustical Terms and Definition Definition A unit of measurement in decibels (A), of sound pressure level which has its frequency characteristics modified by a filter ("A-weighted") so as to more closely approximate the frequency response of the human ear. Sound Power Level radiated by a noise source per unit time re 1pW. Sound pressure level (SPL) or sound level L p is a logarithmic measure of the rms sound pressure of a sound relative to a reference value. Equivalent Continuous Noise Level - which, lasting for as long as a given noise event has the same amount of acoustic energy as the given event. The noise levels that is equalled or exceeded for 90% of the measurement period. An indicator of the mean minimum noise level, and is used in Australia as the descriptor for background or ambient noise (usually in dba). The noise levels that is equalled or exceeded for 10% of the measurement period. L 10 is an indicator of the mean maximum noise level, and is generally used in Australia as the descriptor for intrusive noise (usually in dba).

7 Co mpliance Noise Survey & Assessment Page 7 of DURALIE COAL MINE 2.1. SITE DESCRIPTION DCM is located east of the Bucketts Way between the villages of Stroud Road and Wards River, NSW DESCRIPTION OF OPERATION The following activities have the potential to generate noise during DCM operations: Operation of mobile equipment (e.g. excavators, loaders, haul trucks, dozers, graders, and water carts) for: Vegetation removal and stripping/stockpiling of soil resources; Open cut development and production; and Haulage of raw coal and mine waste; Operation of fixed plant (e.g. ROM bin, raw coal conveyor, bin loading/unloading, lighting plant and pit pumps); and, Rail transportation of coal on the mining lease. 3. METHODOLOGY Ambient noise level measurements were conducted in accordance with the requirements of the DECC, and as detailed in Australian Standard AS , Acoustics Description and Measurement of Environmental Noise, Part 1 General Procedures. The operator-attended surveys were conducted at each monitoring location to quantify ambient noise levels and the contributed levels of noise emitted from current Duralie Mining operations. The day, evening and night survey was conducted as follows: Daytime - conducted between 14:53hrs 15:59hrs Tuesday 28 th October 2008; Evening - conducted between 18:33hrs 19:36hrs Monday 27 th October 2008; Night - conducted between 01:14hrs - 03:58hrs Tuesday 28 th October The Engineer determines Mine s noise contribution by noting instantaneous meter reading when the mine was clearly audible and dominant. Alternatively, the Mine s contribution was determined by noting the relative audibility of the mining activities at otherwise quiet times and establishing the difference in received sound level between the Mine s activities and the background noise level. The mine s contribution could be measured directly at most residential locations during the surveys. A scale of audibility is provided to gain a general understanding of the mining operation s noise levels received at the nearby residential locations. Clearly Audible: Audible: Faintly Audible: Not Audible: Background noise level (L 90 ) plus 5 and greater. Background noise level (L 90 ) plus/minus 5. Background noise level (L 90 ) minus 5 to 8. Background noise level (L 90 ) minus 8 and less. Exceptions to the above could be intermittent sounds from reverse beeps and dozer tracks etc. On occasions when the background noise levels are elevated due to extraneous noise sources the mine noise emissions are determined utilizing the octave filters of the sound level meter where possible.

8 Co mpliance Noise Survey & Assessment Page 8 of INSTRUMENTS Attended noise measurements were taken with A Brüel & Kjær (B&K) 2250 integrating sound level meter, fitted with a B&K 4189 ½ inch diameter electret microphone and a windshield. This instrument has performance characteristics within the requirements of Type 1 accuracy in accordance with AS1259, and has the capability to measure steady, fluctuating, intermittent and/or impulsive sound, and to compute and display percentile noise levels for the measuring period. During the attended surveys the B&K 2250 instrument was used to record a 1/3 octave, one-second interval time trace of each 15-minute measurement enabling detailed analysis of the acoustic environment. Audio recording was performed simultaneously by the B&K2250 to enable crosschecking of the sample data where required. Noise levels over the 15-minute periods were calculated and stored in the B&K 2250 at each location during the surveys. The identifiable noise sources and their contributions were ranked in order of prominence. A Rion Sound Level Calibrator NC-73 was used to calibrate the SLM prior to measurement and checked at the conclusion. The difference in the two measurements was less than 0.5dB. The SLM was supported with the microphone approximately 1.5m above the ground at the monitoring locations. The 15-minute time traces from the surveys are collated in Appendix C MONITORING LOCATIONS Monitoring locations are described in Table below where operator attended noise monitoring was conducted and are shown on the Map of the Area, Appendix B. Table Monitoring Locations Location Resident/ Owner Address AAS1 2 Lyall Off Johnson Creek Road N2 S. Doherty 863 Johnson Creek Road AS3 2 Jensen Duralie Road REF 1 Mine Site W4 Johnson Creek Road Note: 1 Reference Site mine owned dwelling used as additional noise monitoring location. 2 Alternative noise monitoring site MONITORING WEATHER The Mine Weather Station compound is located centrally on the Mine lease. Meteorological data from this location is collected by the Mine Management and provided to VIPAC for analysis. Data is presented in fifteen-minute intervals in Appendix A of this Report including meteorological parameters such as wind direction, wind speed, temperature, sigma-theta and rainfall.

9 Co mpliance Noise Survey & Assessment Page 9 of CRITERIA The DECC s Environmental Pollution Licence (EPL 11701) L6.1 Noise Limits states the following: L6.1 Operational Noise from the premises must not exceed: Noise Limits`1 Location Period Intrusive Criteria Leq(15 minute) SOUTHERN SITE (N1) Boundary of DCM controlled land adjacent to Johnson Creek Road 2 Day, Evening & Night 35 S DOHERTY (N2) Day, Evening & Night 35 AJ & DM HARRISON (N3) 3 Day, Evening & Night 35 Note: 1. The noise emissions identified in L6.1 apply for prevailing meteorological conditions (winds up to 3ms -1 ), except under conditions of temperature inversions. 2. An alternative noise monitoring site AAS1 Lyall, which is the closest non-mine owned dwelling in the vicinity of N1 relative to mine operations (refer to site map in Appendix B). 3. An alternative to noise monitoring site AS3 (T. Jensen), which is the closest non-mine owned dwelling in the vicinity of N3 relative to mine operations (refer to site map in Appendix B). Furthermore, DCM obtained approval from Department of Planning for the Duralie Coal Mine Extension Section 96(2) Modification Notice of Modification dated 30 th July 2006 (DA No. 169/99). The relevant noise criterion is given in Schedule 3 Condition 2 and is reproduced below. SCHEDULE 3 NOISE Noise Impact Assessment Criteria 2. The Applicant shall ensure that the noise generated by the development does not exceed the noise impact assessment criteria in Table 2. Day L Aeq (15 minute) (Extract) Table 2: Noise Impact Assessment Criteria Evening L Aeq (15 minute) Night L Aeq (15 minute) Land Number Woodley Trigg N Relton (old) S Relton (new) Guidice 124 Zulomovski 135 Hare-Scott All other privately owned land excluding the land listed in Table 1 Notes: a) Noise from the development is to be measured at the most affected point or within the residential boundary, or at the most affected point within 30 metres of a dwelling (rural situations) where the dwelling is more than 30 metres from the boundary, to determine compliance with the L Aeq(15 minute) noise limits in the above table. Where it can be demonstrated that direct measurement of noise from the development is impractical, the Department and the DECC may accept alternative means of determining compliance (see Chapter 11 of the NSW Industrial Noise Policy). The modification factors in Section 4 of the NSW Industrial Noise Policy shall also be applied to the measured noise levels where applicable. b) Noise from the development is to be measured at 1 metre from the dwelling façade to determine compliance with the L A1(1 minute) noise limits in the above table. Where it can be demonstrated that direct measurement of noise from the development is impractical, the Department and the DECC may accept alternative means of determining compliance (see Chapter 11 of the NSW Industrial Noise Policy). c) The emission limits identified in the above table apply under meteorological conditions of: Wind speeds of up to 3 m/s at 10 metres above ground level: or Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level.

10 Co mpliance Noise Survey & Assessment Page 10 of TEMPERATURE INVERSION CONDITIONS Meteorological data provided by Duralie Coal Mine and calculated Pasquil Stability Categories allows for the prediction of wind and temperature profiles to within a moderately narrow range without recourse to actual measurement. The sigma-theta method developed by the US EPA is employed to determine the occurrence of different stability classes and refers to observations of sigma theta, wind speed and time of day. The Pasquil stability method categories may be determined by using a relationship between stability categories and standard deviation of the horizontal wind direction fluctuations and wind speed as shown in Table Table 4.1.1: Pasquil-Gifford stability categories based on sigma-theta Daytime Pasquil Stability Category Standard deviation of the horizontal wind direction fluctuations ( A in degrees) A A 22.5 B 17.5 A < 22.5 C 12.5 A < 17.5 Wind 10m (ms -1 ) < < < Night-time Pasquil Stability Category D 7.5 A < 12.5 Any D E 3.8 A < to 5 E F 2.1 A < to 3 F G A 2.1 < 2 G Note: Daytime stability category is calculated using A only; Nighttime stability category is determined using A and wind speed at 10m. Once the stability category is known the range of possible temperature gradients may be inferred as shown in Table along with estimates of the stability frequency. Stability Class Table 4.1.2: Frequency of Occurrence of Stability Classes Percentage Frequency 1 Percentage Frequency 2 Range of vertical temperature gradient DT/DZ ( O C/100 m) F E D F E D E D Qualitative Description A 31% 0% DT/DZ < -1.9 Lapse B 13% 0% -1.9 DT/DZ < -1.7 Lapse C 29% 0% -1.7 DT/DZ < -1.5 Lapse D 13% 38% -1.5 DT/DZ < -0.5 Neutral E 7% 10% -0.5 DT/DZ < 1.5 Weak Inversion F 0% 31% 1.5 DT/DZ < 4.0 Moderate Inversion G 7% 21% 4.0 DT/DZ Strong Inversion Note: 1 Based on daytime data for the measurement period 27 th 28 th October Based on evening/night time data for the measurement period 27 h 28 th October Based on the information above, moderate to strong inversions occurred approximately 52% of the evening/nighttime and 7% during the daytime survey period. Therefore since significant inversions are predicted to have occurred during the evening/nighttime period, the noise enhancing effects of temperature inversion will be considered where audible mine noise was recorded during evening and night attended monitoring.

11 5. RESULTS Co mpliance Noise Survey & Assessment Page 11 of 30 DCM supplies information on mining plant and equipment operations with specific site locations. The results of the day, evening, and nighttime operator attended surveys under prevailing weather conditions are presented in Table 5.1.3, and respectively, together with a description of audible sounds and their contribution. 5.1.DAY SURVEY RESULTS TUESDAY 28 TH OCTOBER Equipment Operating DCM operations during the day survey period consisted of the following: - Coal/Waste Waste Fleet Support - Liebherr Excavator (Ex 5002) 6 & 3 hrs RL 57m - Cat 789 Dump Trucks (x3) Coal to ROM Stockpile/ RL 17m - Liebherr Excavator (Ex 5029) 8 hrs RL 40m - Cat 789 Dump Trucks (x4) Waste to RL 17m. - EX2020 Excavator Coal on ROM 3hrs - D10 Dozers (x3) 7.6, 7.5 and 7.5 hrs - Water Cart 7 hrs - 16H Grader 8 hrs - Drill (x2) 7.5 & 7 hrs Processing - Train loading within the estimated periods of 10:00 to 10:45hrs and 13:25 to 15:06hrs Prevailing Weather Conditions The following atmospheric weather conditions were noted during this daytime survey: Location Measurement (hrs) Table 5.1.2: Daytime Weather Conditions Temp. O C Weather Parameter Cloud Cover Wind Speed 1 (ms -1 ) Wind Direction (deg.) Rainfall (mm) AAS1 14: N2 15: AS3 15: Wind speed was checked at each location during attended noise monitoring. Noise measurements were only conducted where wind speed was measured to be below 3.0m/s at the monitoring location.

12 Co mpliance Noise Survey & Assessment Page 12 of 30 Table 5.1.3: Day Noise Survey Results, 28 th October 2008 Location Measurement Description Primary Noise Descriptor Description of Noise Source and Typical Maximum Levels Lmax AAS1 Lyall 14:53hrs N2 S. Doherty 15:15hrs AS3 Jensen 15:43hrs Leq L 1 L 10 L 90 Road Traffic (55-70), Wind in foliage (40-52) Ambient Insects/frogs (38-49), Birds (46-47), Aeroplane (40-44), Train (35-43) Mine Measured Contribution: Nil Mining operations not audible Ambient Car passby (50-73), Birds (45-49), Train (45-48), Wind in foliage (46-46), Haul Trucks / Excavator / dozer (<35). Mine Measured Contribution: <35L eq Mining operations faintly audible Ambient Birds (42-67), Wind in foliage (41-45), Aeroplane (40-43), Road traffic (35-40). Mine Measured Contribution: Nil Mining operations not audible 5.1.4: Noise Impact Assessment - Daytime Based on the operator attended day survey on 28 th October 2008, the Mine L Aeq (15 minute) noise emissions were not audible at AAS1 Lyall & AS3 Jensen and <35 at N2 S. Doherty, in the prevailing weather conditions, being moderate winds from the south during the survey. 5.2.EVENING SURVEY RESULTS 27 TH OCTOBER Equipment Operating DCM operations during the evening survey period consisted of the following: - Coal/Waste Waste Fleet Support Processing - Liebherr Excavator (Ex 5002) 7.5 & 1.5 hrs RL 57m - Cat 789 Dump Trucks (x2), Coal to ROM stockpile/rl 17m - Liebherr Excavator (Ex 5029) 7.6 hrs RL 40m - Cat 789 Dump Trucks (x3) Waste to RL 68m. - D10 Dozers (x3) 9, 7.3, 6.2 hrs - Water Cart 4 hrs - 16H Grader 3.5 hrs - Drill (x2) 7.6, 6.5 hrs -Lighting plant - Train loading 21:00 to 21:45 hrs Prevailing Weather Conditions The following atmospheric conditions were noted during this evening survey:

13 Location Report No. 29N TRP Co mpliance Noise Survey & Assessment Page 13 of 30 Measurement (hrs) Table 5.1.2: Evening Weather Conditions Temp. O C Weather Parameter Cloud Cover Wind Speed (ms -1 ) Wind Direction (deg.) Rainfall (mm) AAS1 18:33hrs / REF 18:49hrs / N2 18:58hrs / AS3 19:25hrs / Table 5.2.3: Evening Noise Survey Results, 27 th October 2008 Location Measurement Description Primary Noise Descriptor Description of Noise Source and Typical Maximum Levels Lmax AAS1 Lyall 18:33hrs REF 18:49hrs N2 S. Doherty 18:58hrs AS3 Jensen 19:25hrs Leq L 1 L 10 L 90 Birds (36-66), Insects/frogs (37-53), Cattle (35-52), Dogs (40-45), Ambient Aeroplane (36-44), Domestic Activities (40-42), Mining activities (25-<35). Mine Measured Contribution:<35L eq Mining operations audible Ambient Aeroplane (40-44), Haul Trucks (35-41), Mine Activities (39-40), Insects/frogs (36-37), Road Traffic (32-35). Mine Measured Contribution: 37L eq Mining operations clearly audible Ambient Road traffic (30-73), Birds (27-69), Cattle (30-33), Insects/frogs (28-33) Mine Measured Contribution: Nil Mining operations not audible Ambient Birds (40-54), Road traffic (45-52), Insects/frogs (36-50), Cattle (43-46), Aeroplane (40-42). Mine Measured Contribution: Nil Mining operations not audible Noise Impact Assessment - Evening Based on the operator attended evening survey on 27 th October 2008, the Mine L Aeq (15 minute) noise emissions were Nil at AS3 Jensen & N2 S. Doherty and <35dB AAS1 Lyall in the prevailing weather conditions, being light north-north-westerly winds throughout the period. Sigma-theta data indicated a weak/moderate to occasionally strong temperature inversion (E to G class), therefore significant enhancement due to temperature gradient was observed although at all locations mine noise was recorded to be below the relevant criteria.

14 Co mpliance Noise Survey & Assessment Page 14 of NIGHT SURVEY RESULTS 28 TH OCTOBER Equipment Operating DCM operations during the night survey period consisted of the following: - Coal/waste Waste Fleet Support - Liebherr Excavator (Ex 5002) 7.5 & 1.5 hrs RL57 - Cat 789 Dump Truck (x2), Coal to ROM stockpile/rl 17m. - Liebherr Excavator (Ex 5029) 7.6 hrs RL 40m - Cat 789 Dump Truck (x3) Waste to RL 17m. - D10 Dozers (3) 9, 7.3 & 6.2 hrs - Water Cart 3 hrs - 16H Grader 3.5 hrs - Drill (2) 7.6 & 6.5 hrs -Lighting plant Prevailing Weather Conditions The following atmospheric conditions were noted during this evening survey: Location Measurement (hrs) Table 5.1.2: Night Weather Conditions Temp. O C Weather Parameter Cloud Cover Wind Speed (ms -1 ) Wind Direction (deg.) Rainfall (mm) AS3 01:14hrs / AS3 01:31hrs / AAS1 02:31hrs / AAS1 02:47hrs / REF 03:09hrs / N2 03:35hrs / N2 03:43hrs /

15 Co mpliance Noise Survey & Assessment Page 15 of 30 Table 5.3.3: Night time Noise Survey Results, 28 th October 2008 Location Measurement Description Primary Noise Descriptor Description of Noise Source and Typical Maximum Levels Lmax AS3 Jensen 01:14hrs Leq L 1 L 10 L 90 Ambient Insects/frogs (45-59), Dogs (35-40), Road traffic (<40). AS3 Jensen 01:31hrs AAS1 Lyall 02:31hrs AAS1 Lyall 02:47hrs REF 03:09hrs Mine Measured Contribution: Nil Mining operations not audible Ambient Insects/frogs (50-57), Birds (40-42), Aeroplane (<40). Mine Measured Contribution: Nil Mining operations not audible Insects/frogs (55-62), Train main line (45-49), Cattle (35-40), Ambient Aeroplane (30-40), Haul truck (25-39), Dozer (33-37), Mine Measured Contribution: <35L eq Mining operations not audible Train main line (45-49), Insects/frogs (37-48), Dozer Tracks (37-46), Ambient Cattle (42-44), Haul Truck (35-42), Aeroplane (37). Mine Measured Contribution: 37L eq Mining operations audible Ambient Train (47-49), Insects/frogs (40-42), Dozer & Haul trucks (<40). N2 S. Doherty 03:35hrs N2 S. Doherty 03:43hrs Mine Measured Contribution: 39L eq Mining operations clearly audible Train main line (48-56), Insects/frogs (41-50), Cattle (42-47), Ambient Aeroplane (40-45), Haul trucks & Dozer (<35). Mine Measured Contribution: <35L eq Mining operations audible Ambient Train main line (48-56), Birds (55), Insects/frogs (42-43), Haul Trucks (31-40). Mine Measured Contribution:<35L eq Mining operations audible Noise Impact Assessment - Night Based on the operator attended night-time survey on 28 th October 2008, the Mine L Aeq (15 minute) noise emissions were inaudible at AS3 Jensen; <35 & 37 at AAS1 Lyall; and <35 at N2 Doherty. Weather conditions consisted of light northerly and northwesterly breezes blowing from the mine towards AAS1 and away from N3. Sigma-theta data indicated a moderate strong temperature inversion (F to G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, the recorded 37dB mine contribution at AAS1 Lyall can be attributed to the moderate to strong temperature inversion (greater than 3 o C/100m) at the time. As stated in the conditions of consent Schedule 3 note c), the 35 criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria does not apply in this case.

16 Co mpliance Noise Survey & Assessment Page 16 of COMPLIANCE ASSESSMENT DCM operation L eq (15 minute) noise emissions during the attended noise-monitoring period, under the prevailing weather conditions were as follows: Table Received Noise Noise Monitoring Locations - under prevailing weather conditions Daytime Sound Pressure Level L eq Noise Criteria L eq Monitoring Locations AAS1 Lyall Nil 35 0 N2 S Doherty < AS3 Jensen Nil 35 0 Excursion As shown in Table 5.4.1, the required daytime noise level (criteria) was not exceeded on any occasion during the day survey. Table Received Noise Noise Monitoring Locations under prevailing weather conditions Evening time Sound Pressure Level L eq Noise Criteria L eq Monitoring Locations AAS1 Lyall < N2 S Doherty Nil 35 0 AS3 Jensen Nil 35 0 Excursion As shown in Table 5.4.2, the required evening-time noise level (criteria) was not exceeded on any occasion during the evening survey. Table Received Noise Noise Monitoring Locations under prevailing weather conditions Night time Sound Pressure Level L eq Noise Criteria L eq Monitoring Locations AAS1 Lyall <35, , 2* N2 S Doherty <35, < , 0 AS3 Jensen Nil, Nil 35 0, 0 Excursion As shown in Table 5.4.3, the required evening-time noise level (criteria) was exceeded at one occasion at AAS1 during the night survey, however a significant temperature inversion was present at the time. 6. DISCUSSION & CONCLUSION An Environmental Compliance Noise Monitoring Survey has been carried out in the rural environment surrounding the Duralie Coal Mine Site, Duralie Road, NSW. The survey was requested by to ascertain the degree of compliance of noise emissions generated from the operation of Duralie Coal Mine with licence and consent conditions.

17 Co mpliance Noise Survey & Assessment Page 17 of 30 Day received mine L Aeq (15 minute) noise emissions were not audible at AAS1 Lyall & AS3 Jensen and <35 at N2 S. Doherty, in the prevailing weather conditions, being moderate winds from the south during the survey. Evening received mine L Aeq (15 minute) noise emissions were Nil at AS3 Jensen & N2 S. Doherty and <35dB AAS1 Lyall in the prevailing weather conditions, being light north-north-westerly winds throughout the period. Night-time received mine L Aeq (15 minute) noise emissions were inaudible at AS3 Jensen; <35 & 37 at AAS1 Lyall; and <35 at N2 Doherty. Weather conditions consisted of light northerly and north-westerly breezes blowing from the mine towards AAS1 and away from N3. Sigma-theta data indicated a moderately strong temperature inversion (F to G Class) at times during the night survey period, therefore significant enhancement due to temperature gradient was observed. Consequently, the recorded 37dB mine contribution at AAS1 Lyall can be attributed to the moderate to strong temperature inversion (greater than 3 o C/100m) at the time. As stated in the conditions of consent Schedule 3 note c), the 35 criteria applies for Temperature inversion conditions of up to 3 o C/100m, and wind speeds of up to 2 m/s at 10 metres above ground level therefore the criteria does not apply in this case. Mine operating noise emissions were at or below the 35 noise criteria at all monitoring locations during the October 2008 Environmental Noise Level Survey except the one instance at AAS1 Lyall where noise from the mine was enhanced due to the effects of temperature inversion. The nominated monitoring locations represent the closest residences to the mine so that further located properties will receive mine noise levels somewhat lower than those measured, due to distance attenuation under stable atmospheric conditions. Under the prevailing weather conditions and based on the attended monitoring results it is concluded that mine noise emissions did not breach the 35 criteria at any nearby residence during the 27 th 28 th October 2008 survey.

18 Co mpliance Noise Survey & Assessment Page 18 of 30 Date (Hrs) APPENDIX A: WEATHER CONDITIONS Air Temperature ( o C) Wind Direction ( o Angle) Sigma ( o Angle) Wind Speed (m/s) Rain (mm) 27/10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ :

19 Co mpliance Noise Survey & Assessment Page 19 of 30 Date (Hrs) Weather conditions (cont..) Air Temperature ( o C) Wind Direction ( o Angle) Sigma ( o Angle) Wind Speed (m/s) Rain (mm) 28/10/2008 0: /10/2008 0: /10/2008 0: /10/2008 0: /10/2008 1: /10/2008 1: /10/2008 1: /10/2008 1: /10/2008 2: /10/2008 2: /10/2008 2: /10/2008 2: /10/2008 3: /10/2008 3: /10/2008 3: /10/2008 3: /10/2008 4: /10/2008 4: /10/2008 4: /10/2008 4: /10/2008 5: /10/2008 5: /10/2008 5: /10/2008 5: /10/2008 6: /10/2008 6: /10/2008 6: /10/2008 6: /10/2008 7: /10/2008 7: /10/2008 7: /10/2008 7: /10/2008 8: /10/2008 8: /10/2008 8: /10/2008 8: /10/2008 9: /10/2008 9: /10/2008 9: /10/2008 9: /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ :

20 Co mpliance Noise Survey & Assessment Page 20 of 30 Date (Hrs) Weather conditions (cont..) Air Temperature ( o C) Wind Direction ( o Angle) Sigma ( o Angle) Wind Speed (m/s) Rain (mm) 28/10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ : /10/ :

21 Co mpliance Noise Survey & Assessment Page 21 of 30 Noise Survey Wind Speed 12 Noon 27/10/08 to 12 Noon 28/10/ m/s :00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00 21:00 22:00 23:00 0:00 1:00 2:00 3:00 4:00 5:00 6:00 7:00 8:00 9:00 10:00 11:00 0:00 Wind Rose - 12 Noon 27/10/2008 to 12 Noon 28/10/08 Dominant Wind Direction WNW W NNW NW 30 N NNE 20 NE 10 ENE 0 E WSW SW SSW S SE SSE ESE Number in Class

22 Co mpliance Noise Survey & Assessment Page 22 of 30 APPENDIX B: LOCALITY MAP & SURVEY LOCATIONS

23 Co mpliance Noise Survey & Assessment Page 23 of 30 APPENDIX C: TIME TRACES Daytime Survey 85 AAS1 Lyall 15-Minute Trace 28/10/08 14: Nil 1 Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 85 N2 S. Doherty 15-Minute Trace 28/10/08 15: < Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

24 Co mpliance Noise Survey & Assessment Page 24 of 30 Daytime Survey (Cont...) 85 AS3 Jensen 15-Minute Trace 28/10/08 15: Nil 1 Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

25 Co mpliance Noise Survey & Assessment Page 25 of 30 Evening Survey 85 AAS1 Lyall 15-Minute Trace 27/10/08 18: < Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 85 REF 15-Minute Trace 27/10/08 18: Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

26 Co mpliance Noise Survey & Assessment Page 26 of 30 Evening Survey (Cont ) 85 N2 S. Doherty 15-Minute Trace 27/10/08 18: Nil 1 Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 85 AS3 Jensen 15-Minute Trace 27/10/08 19: Nil 1 Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

27 Co mpliance Noise Survey & Assessment Page 27 of 30 Night Survey 85 AS3 Jensen 15-Minute Trace 28/10/08 1: Nil 1 Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 85 AS3 Jensen 15-Minute Trace 28/10/08 1: Nil 1 Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

28 Co mpliance Noise Survey & Assessment Page 28 of 30 Night Survey (Cont ) 85 AAS1 Lyall 15-Minute Trace 28/10/08 2: < Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 85 AAS1 Lyall 15-Minute Trace 28/10/08 2: Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

29 Co mpliance Noise Survey & Assessment Page 29 of 30 Night Survey (Cont ) 85 REF 15-Minute Trace 28/10/08 3: Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 85 N2 S. Doherty 15-Minute Trace 28/10/08 3: < Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

30 Co mpliance Noise Survey & Assessment Page 30 of 30 Night Survey (Cont ) 85 N2 S. Doherty 15-Minute Trace 28/10/08 3: < Second Leq Leq L 90 Mine Contribution :00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00

Uncertainties in Acoustics

Uncertainties in Acoustics Uncertainties in Acoustics Norm Broner Broner Consulting Pty Ltd, Melbourne, Australia ABSTRACT In acoustics, we are often required to demonstrate compliance with a given criterion. The criteria may be

More information

Muswellbrook Coal Company

Muswellbrook Coal Company Muswellbrook Coal Company Mining Plant Sound Power Survey 2016 Prepared for Muswellbrook Coal Company Page i Muswellbrook Coal Company Mining Plant Sound Power Survey 2016 Reference: 16155_R02 Report date:

More information

PART I : SECTION (1) GENERAL Government Notifications

PART I : SECTION (1) GENERAL Government Notifications PART I : SECTION (1) GENERAL Government Notifications 924/12 THE NATIONAL ENVIRONMENT ACT, NO. 47 OF 1980 REGULATIONS made by the Minister of Transport, Environment and Women s Affairs under section 23P,

More information

PREDICTION RESULTS AND VALIDATION OF LONG RANGE NOISE PROPAGATION FROM BLAST EVENTS

PREDICTION RESULTS AND VALIDATION OF LONG RANGE NOISE PROPAGATION FROM BLAST EVENTS PREDICTION RESULTS AND VALIDATION OF LONG RANGE NOISE PROPAGATION FROM BLAST EVENTS Rachel Foster and Dr Peter Teague Vipac Engineers & Scientists, Adelaide, Australia Abstract The UNAPS Long Range Noise

More information

1 Wind Turbine Acoustics. Wind turbines generate sound by both mechanical and aerodynamic

1 Wind Turbine Acoustics. Wind turbines generate sound by both mechanical and aerodynamic Wind Turbine Acoustics 1 1 Wind Turbine Acoustics Wind turbines generate sound by both mechanical and aerodynamic sources. Sound remains an important criterion used in the siting of wind farms. Sound emission

More information

Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department

Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department Noise Maps, Report & Statistics, Dublin City Council Noise Mapping Project Roads and Traffic Department Produced by Traffic Noise & Air Quality Unit November 2007 Contact: brian.mcmanus@dublincity.ie Ph;

More information

Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control. Rob Stevens, HGC Engineering

Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control. Rob Stevens, HGC Engineering Noise from Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control Rob Stevens, HGC Engineering Noise From Oil & Gas Facilities Acoustics 101 and Best Practices for Noise Control Rob Stevens

More information

J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES

J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES J. E. COULTER ASSOCIATES LIMITED -ii- APPENDIX B: GUIDELINES NPC-115 NPC-115 Construction Equipment 1. Scope This Publication sets sound emission standards for various items of new construction

More information

Efficiency Matrix - Halogen Downlight Mitt - R Value Testing. Halogen Light Mitt - Thermal Efficiency Analysis. Efficiency Matrix Pty Ltd

Efficiency Matrix - Halogen Downlight Mitt - R Value Testing. Halogen Light Mitt - Thermal Efficiency Analysis. Efficiency Matrix Pty Ltd Efficiency Matrix - Halogen light Mitt - R Value Testing Halogen Light Mitt - Thermal Efficiency Analysis Report No. 30B-09-0338-TRP-445314-0 Vipac Engineers & Scientists Ltd Melbourne VIC 11 Nov 2009

More information

The Climate of Payne County

The Climate of Payne County The Climate of Payne County Payne County is part of the Central Great Plains in the west, encompassing some of the best agricultural land in Oklahoma. Payne County is also part of the Crosstimbers in the

More information

MARINE VESSEL FRONTIER ANGEL & MARINE VESSEL EL CONDOR PASA

MARINE VESSEL FRONTIER ANGEL & MARINE VESSEL EL CONDOR PASA MARINE VESSEL FRONTIER ANGEL & MARINE VESSEL EL CONDOR PASA ANALYSIS OF AIR QUALITY MONITORING DATA ASSOCIATED WITH BULK NICKEL SULFIDE SHIP-LOADING ON 18 TH TO 20 TH FEBRUARY 2010 Revision Prepared Reviewed

More information

SAMPLE. SITE SPECIFIC WEATHER ANALYSIS Wind Report. Robinson, Smith & Walsh. John Smith REFERENCE:

SAMPLE. SITE SPECIFIC WEATHER ANALYSIS Wind Report. Robinson, Smith & Walsh. John Smith REFERENCE: SAMPLE SITE SPECIFIC WEATHER ANALYSIS Wind Report PREPARED FOR: Robinson, Smith & Walsh John Smith REFERENCE: JACK HIGGINS / 4151559-01 CompuWeather Sample Report Please note that this report contains

More information

APPENDIX G-7 METEROLOGICAL DATA

APPENDIX G-7 METEROLOGICAL DATA APPENDIX G-7 METEROLOGICAL DATA METEOROLOGICAL DATA FOR AIR AND NOISE SAMPLING DAYS AT MMR Monthly Normals and Extremes for Honolulu International Airport Table G7-1 MMR RAWS Station Hourly Data Tables

More information

Assessment & Specifications for Noise Controls

Assessment & Specifications for Noise Controls Project 772600 Rev 1 Cargill North Vancouver Grain Terminal Assessment & Specifications for Noise Controls TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 Background...1 1.2 Site Description...1 2. SOUND LEVEL

More information

Roadway Traffic Noise Assessment. 407 Nelson Street Ottawa, Ontario

Roadway Traffic Noise Assessment. 407 Nelson Street Ottawa, Ontario 407 Nelson Street Ottawa, Ontario REPORT: GWE17-042 Traffic Noise Prepared For: Tony Kazarian AK Global Management Inc. 680 Eagleson Road Ottawa, Ontario K2M 2G9 Canada Prepared By: Omar Daher, B.Eng.,

More information

ISO INTERNATIONAL STANDARD

ISO INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 11201 Second edition 2010-05-15 Acoustics Noise emitted by machinery and equipment Determination of emission sound pressure levels at a work station and at other specified positions

More information

The Climate of Marshall County

The Climate of Marshall County The Climate of Marshall County Marshall County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average

More information

The Climate of Kiowa County

The Climate of Kiowa County The Climate of Kiowa County Kiowa County is part of the Central Great Plains, encompassing some of the best agricultural land in Oklahoma. Average annual precipitation ranges from about 24 inches in northwestern

More information

The Climate of Seminole County

The Climate of Seminole County The Climate of Seminole County Seminole County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeastern Oklahoma. Average

More information

The Climate of Bryan County

The Climate of Bryan County The Climate of Bryan County Bryan County is part of the Crosstimbers throughout most of the county. The extreme eastern portions of Bryan County are part of the Cypress Swamp and Forest. Average annual

More information

The Climate of Pontotoc County

The Climate of Pontotoc County The Climate of Pontotoc County Pontotoc County is part of the Crosstimbers. This region is a transition region from the Central Great Plains to the more irregular terrain of southeast Oklahoma. Average

More information

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. 315 Chapel Street. Ottawa, Ontario Roadway Traffic Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Traffic Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared

More information

CHRISTCHURCH INTERNATIONAL AIRPORT 2013 AIRCRAFT OPERATIONS NOISE MONITORING REPORT

CHRISTCHURCH INTERNATIONAL AIRPORT 2013 AIRCRAFT OPERATIONS NOISE MONITORING REPORT CHRISTCHURCH INTERNATIONAL AIRPORT 2013 AIRCRAFT OPERATIONS NOISE MONITORING REPORT TABLE OF CONTENTS 1.0 INTRODUCTION... 3 1.1 General... 3 1.2 Noise Performance Standards Aircraft Operations... 3 2.0

More information

Document No 10/6298/001/GLA/O/R/001 Issue : B2. Kingspan Renewables Ltd. Kingspan KW6 Wind Turbine Noise Performance Test

Document No 10/6298/001/GLA/O/R/001 Issue : B2. Kingspan Renewables Ltd. Kingspan KW6 Wind Turbine Noise Performance Test Document No 10/6298/001/GLA/O/R/001 Issue : B2 Kingspan Renewables Ltd Kingspan KW6 Wind Turbine Noise Performance Test December 11 2 Bath Street, Glasgow, G2 4GZ Telephone: +44 (0) 141 227 1700 www.sgurrenergy.com

More information

z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS

z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS vv, z, B1-\T11v10J.\J{TrrE1{ & 1-\~Boc1i~TE33111c. Efl.VIRONMENTAL ENGINEERS AND CONSULTANTS P.O. BOX 680369 FRANKLIN, TN 37068-0369 1113 MURFREESBORO RD., SUITE 310 FRANKLIN, TN 37064 615-595-0025 FAX

More information

Modern SLMs are very stable and shouldn t drift this much

Modern SLMs are very stable and shouldn t drift this much * Jon Tofts * * * * Key Changes: Is a field calibration check, not a calibration Sets the acceptable drift to ±0.5dB for attended measurements The drift can exceed ±0.5dB for long period monitoring (more

More information

SAMPLE. SITE SPECIFIC WEATHER ANALYSIS Wind Report. Robinson, Smith & Walsh. John Smith. July 1, 2017 REFERENCE: 1 Maple Street, Houston, TX 77034

SAMPLE. SITE SPECIFIC WEATHER ANALYSIS Wind Report. Robinson, Smith & Walsh. John Smith. July 1, 2017 REFERENCE: 1 Maple Street, Houston, TX 77034 SAMPLE SITE SPECIFIC WEATHER ANALYSIS Wind Report PREPARED FOR: Robinson, Smith & Walsh John Smith July 1, 2017 REFERENCE: JACK HIGGINS / 4151559-01 1 Maple Street, Houston, TX 77034 CompuWeather Sample

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary July 2013

LOCAL CLIMATOLOGICAL DATA Monthly Summary July 2013 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 12 14

More information

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Conservancy Subdivision. Ottawa, Ontario Conservancy Subdivision Ottawa, Ontario REPORT: GWE17 151 Traffic Noise Prepared For: Andrew Finnson Barrhaven Conservancy East Inc. Ottawa, Ontario Prepared By: Joshua Foster, P.Eng., Principal Omar Daher,

More information

Appendix E FTA NOISE MODELING WORKSHEETS AND DETAILED METHODOLOGY

Appendix E FTA NOISE MODELING WORKSHEETS AND DETAILED METHODOLOGY Appendix E FTA NOISE MODELING WORKSHEETS AND DETAILED METHODOLOGY APPENDIX E General Noise Assessment The FTA General Noise Assessment procedure was used for calculating noise from transit sources associated

More information

The Climate of Murray County

The Climate of Murray County The Climate of Murray County Murray County is part of the Crosstimbers. This region is a transition between prairies and the mountains of southeastern Oklahoma. Average annual precipitation ranges from

More information

The Climate of Texas County

The Climate of Texas County The Climate of Texas County Texas County is part of the Western High Plains in the north and west and the Southwestern Tablelands in the east. The Western High Plains are characterized by abundant cropland

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT

ENVIRONMENTAL NOISE IMPACT ASSESSMENT REPORT REFERENCE: SA 4968 rev 1 ENVIRONMENTAL NOISE IMPACT ASSESSMENT British Standard 8233: 2014. CLIENT: MJ Gleeson SITE: Berengrave Nursery, 61 Berengrave Road, Rainham, Kent, ME 7NL SURVEY DATES: Noise

More information

6 MACRAES MINING PROJECT MINERAL ZONE

6 MACRAES MINING PROJECT MINERAL ZONE 6 MACRAES MINING PROJECT MINERAL ZONE 6.1 ZONE STATEMENT The Macraes Mining Zone applies to the area of land controlled by Macraes Mining Limited and included in Mining Permit 41-064 at the date of public

More information

The Climate of Grady County

The Climate of Grady County The Climate of Grady County Grady County is part of the Central Great Plains, encompassing some of the best agricultural land in Oklahoma. Average annual precipitation ranges from about 33 inches in northern

More information

The Climate of Haskell County

The Climate of Haskell County The Climate of Haskell County Haskell County is part of the Hardwood Forest. The Hardwood Forest is characterized by its irregular landscape and the largest lake in Oklahoma, Lake Eufaula. Average annual

More information

Chapter 3. Materials and Methods

Chapter 3. Materials and Methods Chapter 3 Materials and Methods CHAPTER3 MATERIALS AND METHODS The present study aims to identify the role of climatic factors in the dispersal of air pollutants released into the atmosphere at some important

More information

APPENDIX 3.6-A Support Information for Newcastle, Wyoming Meteorological Monitoring Site

APPENDIX 3.6-A Support Information for Newcastle, Wyoming Meteorological Monitoring Site APPENDIX 3.6-A Support Information for Newcastle, Wyoming Meteorological Monitoring Site September 2012 3.6-A-i Appendix 3.6-A This page intentionally left blank September 2012 Appendix 3.6-A APPENDIX

More information

ISO 3741 INTERNATIONAL STANDARD

ISO 3741 INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO 3741 Fourth edition 2010-10-01 Acoustics Determination of sound power levels and sound energy levels of noise sources using sound pressure Precision methods for reverberation

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary September 2016

LOCAL CLIMATOLOGICAL DATA Monthly Summary September 2016 Deg. Days Precip Ty Precip Wind Solar Hu- Adj. to Sea Level mid- ity Avg Res Res Peak 2 Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 11

More information

Transportation Noise Assessment. 590 Rideau Street. Ottawa, Ontario

Transportation Noise Assessment. 590 Rideau Street. Ottawa, Ontario Transportation Noise Assessment 590 Rideau Street Ottawa, Ontario REPORT: GWE16-019 Transportation Noise Prepared For: Kevin Yemm Richcraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa,

More information

LOCAL CLIMATOLOGICAL DATA Monthly Summary November 2006

LOCAL CLIMATOLOGICAL DATA Monthly Summary November 2006 Deg. Days Precip Ty Precip Wind Sun Hu- Adj. to Sea Level mid- ity Avg Res Res Peak Minute 1 fog 2 hvy fog 3 thunder 4 ice plt 5 hail 6 glaze 7 duststm 8 smk, hz 9 blw snw 1 2 3 4A 4B 5 6 7 8 9 12 14 15

More information

May 2017 Weather Summary P a g e 1 Alexander, P.J. & Power, S.

May 2017 Weather Summary P a g e 1 Alexander, P.J. & Power, S. May 2017 Weather Summary P a g e 1 May 2017 Beaufort Weather Station Summary Logistics May was the first full month of operation of the MaREI weather observing system (WOS) located on the grounds of the

More information

Certificate of Calibration Sound Level Calibrator

Certificate of Calibration Sound Level Calibrator NATacoustic Acoustic Caliration & Testing Laoratory Level, 48A Elizaeth Street., Surry Hills NSW 200 AUSTRALIA Ph: (02) 828 0570 email: service@natacoustic.com.au wesite: www.natacoustic.com.au A division

More information

McArthur River Mining Borroloola Caravan and Devils Spring Stations

McArthur River Mining Borroloola Caravan and Devils Spring Stations Borroloola Caravan and Devils Spring Ambient Air Quality Monitoring Validated Report 1 st July 2016 31 st July 2016 Report No.: DAT10991 Report issue date: 25 th August 2016 Maintenance contract: MC1100,

More information

Transportation Noise Assessment. 560 Rideau Street. Ottawa, Ontario

Transportation Noise Assessment. 560 Rideau Street. Ottawa, Ontario Transportation Noise Assessment 560 Rideau Street Ottawa, Ontario REPORT: GWE13-034 Transportation Noise Prepared For: Kevin Yemm Richcraft Group of Companies 2280 St. Laurent Boulevard, Suite 201 Ottawa,

More information

Omega Chemicals Emissions Testing Report

Omega Chemicals Emissions Testing Report Omega Chemicals 18-Feb-2015 Doc No. 60336610_1.1_RPT Omega Chemicals Emissions Testing Report February 2015 NATA ACCREDITATION No. 2778 (14391) Accredited for compliance with ISO/IEC 17025 This document

More information

Feasibility Noise Assessment. Westgate Shopping Centre Redevelopment. Ottawa, Ontario

Feasibility Noise Assessment. Westgate Shopping Centre Redevelopment. Ottawa, Ontario Feasibility Noise Assessment Westgate Shopping Centre Redevelopment Ottawa, Ontario REPORT: GWE15-067 - Feasibility Noise Prepared For: Stuart Craig 2300 Yonge Street, Suite 500 Toronto, Ontario M4P 1E4

More information

Transportation Noise Assessment Prince of Wales Residential Development Ottawa, Ontario

Transportation Noise Assessment Prince of Wales Residential Development Ottawa, Ontario Transportation Noise Assessment 1003 Prince of Wales Residential Development Ottawa, Ontario REPORT: GWE13-031 - Traffic Noise Prepared For: Kent Bugatsch Inc. 63 Pamilla Street Ottawa, Ontario K1S 3K7

More information

Heathrow Community Noise and Track-keeping Report: Chertsey

Heathrow Community Noise and Track-keeping Report: Chertsey Heathrow Community Noise and Track-keeping Report: Chertsey This document reports on an 98-day period of continuous noise monitoring from 9 June 211 to 14 September 211 using a Larson Davies LD 87 sound

More information

Transportation Noise Feasibility Assessment & 3930 Riverside Drive Ottawa, Ontario

Transportation Noise Feasibility Assessment & 3930 Riverside Drive Ottawa, Ontario Transportation Noise Feasibility Assessment 3960 & 3930 Riverside Drive Ottawa, Ontario REPORT: GWE18 039 Transportation Noise Prepared For: Alex Turner 225 Metcalfe Street, Suite 708 Ottawa, Ontario K2P

More information

ISO 6395 INTERNATIONAL STANDARD. Earth-moving machinery Determination of sound power level Dynamic test conditions

ISO 6395 INTERNATIONAL STANDARD. Earth-moving machinery Determination of sound power level Dynamic test conditions INTERNATIONAL STANDARD ISO 6395 Second edition 2008-03-15 Earth-moving machinery Determination of sound power level Dynamic test conditions Engins de terrassement Détermination du niveau de puissance acoustique

More information

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO

NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Smart Property Advisors Ltd. 802-500 Laurier Avenue West Ottawa, ON NOISE IMPACT ASSESSMENT 114 ISABELLA STREET RESIDENTIAL DEVELOPMENT OTTAWA, ONTARIO Prepared by: SMART PROPERTY ADVISORS LTD. 802 500

More information

CAMARGO RANCH, llc. CRAIG BUFORD BufordResources.com

CAMARGO RANCH, llc. CRAIG BUFORD BufordResources.com CAMARGO RANCH, llc 2897 +/- acre Wheat & Cattle Farm Mangum, greer county, oklahoma CRAIG BUFORD 405-833-9499 BufordResources.com 4101 Perimeter Center Dr., Suite 107 Oklahoma City, OK 73112 405.833.9499

More information

Uncertainties associated with the use of a sound level meter

Uncertainties associated with the use of a sound level meter NPL REPORT DQL-AC 002 Uncertainties associated with the use of a sound level meter Richard Payne April 2004 April 2004 ABSTRACT Uncertainties associated with the use of a sound level meter Richard Payne

More information

Analysis on Factors of Summer Temperature Distribution in the Basin City

Analysis on Factors of Summer Temperature Distribution in the Basin City Analysis on Factors of Summer Temperature Distribution in the Basin City SHOHEI NOGUCHI 1, TAKAHIRO TANAKA 2, SATORU SADOHARA 3 1 Graduate School of Engineering, Hiroshima University, Higashihiroshima,

More information

ENVIRONMENTAL NOISE ASSESSMENT CERRO DE HULA WIND PROJECT ENERGÍA EÓLICA DE HONDURAS, S.A. (EEHSA)

ENVIRONMENTAL NOISE ASSESSMENT CERRO DE HULA WIND PROJECT ENERGÍA EÓLICA DE HONDURAS, S.A. (EEHSA) -----CERTIFIED TRANSLATION----- I, the undersigned, Patricia Andrés-Carmona, Official Translator of the Ministry of Foreign Affairs of the Republic of Costa Rica, appointed by Agreement No. 197-002-AJ

More information

Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method

Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method INTERNATIONAL STANDARD ISO 10494 Second edition 2018-04 Turbines and turbine sets Measurement of emitted airborne noise Engineering/survey method Turbines et groupes de turbines Mesurage du bruit aérien

More information

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects

Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Presenter: Mike Allen Manager, Surface Mining April 29, 2015 Outline Terms / Definitions Factors affecting coal

More information

Chapter 2: The Project site & its Environment

Chapter 2: The Project site & its Environment Chapter 2: The Project site & its Environment This section of the report provides a brief the description of the project and its characteristics. The chapter also provides information on the climatic conditions

More information

Environmental Noise Assessment. St-Charles Market. Ottawa, Ontario

Environmental Noise Assessment. St-Charles Market. Ottawa, Ontario Environmental Noise Assessment St-Charles Market Ottawa, Ontario REPORT: GWE15-120 - Noise Prepared For: Jenna Maw LineBox Studio Inc. 126 York Street, Suite 502 Ottawa, Ontario K1N 5T2 Prepared By: Michael

More information

Module 01 Lecture - 06 Pollution modeling I

Module 01 Lecture - 06 Pollution modeling I Health, Safety and Environmental Management in Offshore and Petroleum Engineering Prof. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institution of Technology, Madras Module 01 Lecture

More information

Insertion Loss Analysis of the Acoustic Panels with Composite Construction

Insertion Loss Analysis of the Acoustic Panels with Composite Construction ANALELE UNIVERSITĂłII EFTIMIE MURGU REŞIłA ANUL XX, NR., 13, ISSN 1453-7397 Vasile Ovidiu Insertion Loss Analysis of the Acoustic Panels with Composite Construction In order to reduce noise pollution,

More information

APPENDIX B. Noise Primer

APPENDIX B. Noise Primer APPENDIX B Noise Primer NOISE PRIMER TABLE OF CONTENTS 1. INTRODUCTION...1 2. BASIC SOUND PRINCIPLES...1 2.1. SOUND AS A WAVE...1 2.2. SOUND PRESSURE LEVEL...2 2.2.1. Decibel Math...4 2.2.2. Descriptive

More information

Development of wind rose diagrams for Kadapa region of Rayalaseema

Development of wind rose diagrams for Kadapa region of Rayalaseema International Journal of ChemTech Research CODEN (USA): IJCRGG ISSN: 0974-4290 Vol.9, No.02 pp 60-64, 2016 Development of wind rose diagrams for Kadapa region of Rayalaseema Anil Kumar Reddy ChammiReddy

More information

Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report

Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report Technical Memorandum 2017-2018 Monitoring Survey in the Vicinity of St. Marys Cement: Interim Report Ontario Ministry of the Environment & Climate Change Report Prepared by: Terrestrial Assessment and

More information

Greater Toronto Area/ Clean Air Council. Air Quality Modeling Pilot Project

Greater Toronto Area/ Clean Air Council. Air Quality Modeling Pilot Project Greater Toronto Area/ Clean Air Council Air Quality Modeling Pilot Project Liveable Peel Conference February 10th, 2006 Anthony Ciccone, Ph.D., P.Eng. Principal Golder Associates Limited 2390 Argentia

More information

ISO INTERNATIONAL STANDARD. Test code for machine tools Part 5: Determination of the noise emission

ISO INTERNATIONAL STANDARD. Test code for machine tools Part 5: Determination of the noise emission INTERNATIONAL STANDARD ISO 230-5 First edition 2000-08-01 Test code for machine tools Part 5: Determination of the noise emission Code d'essai des machines-outils Partie 5: Détermination de l'émission

More information

Method of Measuring Machinery Sound Within an Equipment Space

Method of Measuring Machinery Sound Within an Equipment Space ANSI/AHRI Standard 575 (Formerly ARI Standard 575) 2008 Standard for Method of Measuring Machinery Sound Within an Equipment Space Price $15.00 (M) $30.00 (NM) Printed in U.S.A. 8Copyright 1994, by Air-Conditioning

More information

HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study

HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study HABITAT FOR HUMANITY 2129 Nantes Street Detailed Noise Study HABITAT FOR HUMANITY 2129 Nantes Street DETAILED NOISE STUDY Prepared by: NOVATECH ENGINEERING CONSULTANTS LTD. 240 Michael Cowpland Drive,

More information

Traffic Noise Impact Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario

Traffic Noise Impact Study. 383 Slater Street / 400 Albert Street. Ottawa, Ontario 383 Slater Street / 400 Albert Street Ottawa, Ontario REPORT: GWE16-104 - Prepared For: Anand Aggarwal 2507701 Ontario Inc. Manor Park Management 231 Brittany Drive, Suite D Ottawa, Ontario K1K 0R8 Prepared

More information

METEOROLOGY AND AIR POLLUTION. JAI PRAKASH Civil Engineering IIT Delhi 1 AUGUST, 2011

METEOROLOGY AND AIR POLLUTION. JAI PRAKASH Civil Engineering IIT Delhi 1 AUGUST, 2011 METEOROLOGY AND AIR POLLUTION JAI PRAKASH Civil Engineering IIT Delhi 1 AUGUST, 2011 METEOROLOGY Aerosols particles which are emitted from the sources they are transported and dispersed through meteorological

More information

Material sobre SOM e db Fonte: http://www.engineeringtoolbox.com/decibel27_59.html Sound Pressure The Sound Pressure is the force of sound on a surface area perpendicular to the direction of the sound.

More information

Field Experiment on the Effects of a Nearby Asphalt Road on Temperature Measurement

Field Experiment on the Effects of a Nearby Asphalt Road on Temperature Measurement 8.3 Field Experiment on the Effects of a Nearby Asphalt Road on Temperature Measurement T. Hamagami a *, M. Kumamoto a, T. Sakai a, H. Kawamura a, S. Kawano a, T. Aoyagi b, M. Otsuka c, and T. Aoshima

More information

Fundamentals of Sound

Fundamentals of Sound Sound is an important consideration in the selection of mechanical equipment. The purpose of this article is to present a procedure for evaluating the sound levels created by evaporative cooling equipment

More information

3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT

3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT 3443 INNES ROAD NOISE IMPACT ASSESSMENT REPORT Prepared By: NOVATECH Suite 200, 240 Michael Cowpland Drive Kanata, Ontario K2M 1P6 December 2017 Novatech File No. 117077 Ref No.: R-2017-192 December 19,

More information

EVALUATION OF NOISE LEVELS PRODUCED BY OP- ERATION AND MAINTENANCE ACTIVITIES OF A CON- TINUOUS MOVEMENT FUNICULAR

EVALUATION OF NOISE LEVELS PRODUCED BY OP- ERATION AND MAINTENANCE ACTIVITIES OF A CON- TINUOUS MOVEMENT FUNICULAR EVALUATION OF NOISE LEVELS PRODUCED BY OP- ERATION AND MAINTENANCE ACTIVITIES OF A CON- TINUOUS MOVEMENT FUNICULAR Andrea Nicolini, Mirko Filipponi University of Perugia, via G. Duranti 67, 06125 Perugia,

More information

Acoustics Attenuation of sound during propagation outdoors Part 2: General method of calculation

Acoustics Attenuation of sound during propagation outdoors Part 2: General method of calculation ISO 9613-2 INTERNATIONAL STANDARD First edition 1996-12-15 Acoustics Attenuation of sound during propagation outdoors Part 2: General method of calculation Acoustique Attenuation du son lors de sa propagation

More information

Mount Cotton Quarry Dust Investigation

Mount Cotton Quarry Dust Investigation Mount Cotton Quarry Dust Investigation December 28 to December 29 Department of Science, Information Technology, Innovation and the Arts Mount Cotton Quarry Dust Investigation: December 28 to December

More information

Dubai Municipality LRT Noise and Vibration Impact Stage 2

Dubai Municipality LRT Noise and Vibration Impact Stage 2 Dubai Municipality LRT Noise and Vibration Impact Stage 2 Environmental Impact 11 th of April, 2004 Environmental Impact Report According to the PS007 Agreement, Environmental Impact Report Based on Noise

More information

TAPM Modelling for Wagerup: Phase 1 CSIRO 2004 Page 41

TAPM Modelling for Wagerup: Phase 1 CSIRO 2004 Page 41 We now examine the probability (or frequency) distribution of meteorological predictions and the measurements. Figure 12 presents the observed and model probability (expressed as probability density function

More information

Site Instrumentation and Data Acquisition:

Site Instrumentation and Data Acquisition: Justification for the Decommissioning of the Clinton Power Station Back-up Meteorological Monitoring Tower. Prepared by Murray and Trettel, Inc., Consulting Meteorologists, Palatine, Illinois Dated August

More information

The information included in the following report presents the results of sound pressure and sound power testing.

The information included in the following report presents the results of sound pressure and sound power testing. ISO 7779:2010 Acoustics -- Measurement of airborne noise emitted by information technology and telecommunications equipment 1 of 14 DEVICES - solid panel case - window panel case Report Date: 06/25/2015

More information

EVALUATION OF VENTILATION PERFORMANCE IN VOID SPACE BY EXCEEDANCE PROBABILITIES BASED ON CFD SIMULATION

EVALUATION OF VENTILATION PERFORMANCE IN VOID SPACE BY EXCEEDANCE PROBABILITIES BASED ON CFD SIMULATION EVALUATION OF VENTILATION PERFORMANCE IN VOID SPACE BY EXCEEDANCE PROBABILITIES BASED ON CFD SIMULATION Zhen BU 1, Shinsuke KATO 2, Yoshihiro ISHIDA 2, and Hong HUANG 2 1 Graduate School of Engineering,

More information

Transportation Noise Assessment. 121 Parkdale Avenue. Ottawa, Ontario

Transportation Noise Assessment. 121 Parkdale Avenue. Ottawa, Ontario Transportation Noise Assessment 121 Parkdale Avenue Ottawa, Ontario REPORT: GWE 14-010 - Traffic Noise Prepared For: Michel Gagnon 98 Rue Lois Gatineau, Québec J8Y 3R7 Prepared By: Thomas Couper, B.A.Sc.,

More information

Typical Hydrologic Period Report (Final)

Typical Hydrologic Period Report (Final) (DELCORA) (Final) November 2015 (Updated April 2016) CSO Long-Term Control Plant Update REVISION CONTROL REV. NO. DATE ISSUED PREPARED BY DESCRIPTION OF CHANGES 1 4/26/16 Greeley and Hansen Pg. 1-3,

More information

STATEMENT OF EVIDENCE OF FIONA FORREST

STATEMENT OF EVIDENCE OF FIONA FORREST Resource Consent Applications under the Resource Management Act 1991 an application to discharge contaminants (including odour) into the air from the Roto-o-Rangi piggery at 30 Kairangi Road, Roto-o-Rangi

More information

GIS-BASED VISUALISATION OF TRAFFIC NOISE

GIS-BASED VISUALISATION OF TRAFFIC NOISE Proceedings of the 9 th International Conference on Environmental Science and Technology Rhodes island, Greece, 1 3 September 2005 GIS-BASED VISUALISATION OF TRAFFIC NOISE A. KONSTANTINIDIS 1, K. EVANGELIDIS

More information

DUST REPORT WALSHESTOWN RESTORATION LIMITED. For Site at Walshestown, Blackhall, Tipperkevin & Bawnoge, Naas, Co. Kildare

DUST REPORT WALSHESTOWN RESTORATION LIMITED. For Site at Walshestown, Blackhall, Tipperkevin & Bawnoge, Naas, Co. Kildare DUST REPORT WALSHESTOWN RESTORATION LIMITED For Site at Walshestown, Blackhall, Tipperkevin & Bawnoge, Naas, Co. Kildare October 2016 BY: TÚS NUA ENVIRONMENTAL BACK GATE LODGE KILLARKIN DUNBOYNE CO. MEATH

More information

Final Exam: Monday March 17 3:00-6:00 pm (here in Center 113) Slides from Review Sessions are posted on course website:

Final Exam: Monday March 17 3:00-6:00 pm (here in Center 113) Slides from Review Sessions are posted on course website: Final Exam: Monday March 17 3:00-6:00 pm (here in Center 113) 35% of total grade Format will be all multiple choice (~70 questions) Final exam will cover entire course - material since 2 nd midterm weighted

More information

5.0 WHAT IS THE FUTURE ( ) WEATHER EXPECTED TO BE?

5.0 WHAT IS THE FUTURE ( ) WEATHER EXPECTED TO BE? 5.0 WHAT IS THE FUTURE (2040-2049) WEATHER EXPECTED TO BE? This chapter presents some illustrative results for one station, Pearson Airport, extracted from the hour-by-hour simulations of the future period

More information

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced.

POLICY MANUAL. Hamlets/Residential named hamlets within the County of Grande Prairie whose roads are hard surfaced. POLICY MANUAL Legal References: Policy department: Public Works Department Cross References: N7 Adoption Date: January 19, 2005 Revision Date: June 20, 2005 Motion# 06/662/2005 October 20, 2014 Motion#

More information

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1136 Martime Way - Ottawa Prepared For

patersongroup Environmental Noise Control Study Proposed Multi-Storey Building 1136 Martime Way - Ottawa Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services Environmental Noise Control Study Proposed

More information

APPENDIXD. Traffic Noise Technical Report

APPENDIXD. Traffic Noise Technical Report APPENDIXD Traffic Noise Technical Report Environmental Assessment - Lincoln County, SD 85 th Street: Sundowner Avenue to Louise Avenue November 2017 F I N A L R E P O R T TRAFFIC NOISE TECHNICAL REPORT

More information

Weather Station: WH_500_Series. Battery Voltage

Weather Station: WH_500_Series. Battery Voltage Battery Voltage 12.800 12.795 12.790 Voltage 12.785 12.780 12.775 12.770 Apr 2015 8 Wed 15 Wed 22 Wed 1 Fri Time Page 1 Date Batt Volt Min 4/1/2015 12.77 4/2/2015 12.78 4/3/2015 12.80 4/4/2015 12.79 4/5/2015

More information

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project

Acquisition agreement to move to 100% ownership of the Ashford Coking Coal Project Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 GPO Box 1164, Brisbane QLD 4001 Telephone: 07 3108 3500 Fax: 07 3108 3501 Email: admin@lanewayresources.com.au www.lanewayresources.com.au ASX ANNOUNCEMENT

More information

WIND DATA REPORT. Vinalhaven

WIND DATA REPORT. Vinalhaven WIND DATA REPORT Vinalhaven July 1, 2004 September 30, 2004 Prepared for Fox Islands Electric Cooperative By Melissa L. Ray Anthony L. Rogers April 4, 2005 Renewable Energy Research Laboratory 160 Governors

More information

CITY OF MINOT SNOW REMOVAL PLAN October 2018

CITY OF MINOT SNOW REMOVAL PLAN October 2018 CITY OF MINOT SNOW REMOVAL PLAN October 2018 1.0 GENERAL This plan has been written to provide information regarding snow removal procedures and policies. The plan provides guidance, while maintaining

More information

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX J Wind and Temperature Gradients

FINAL REPORT. On Project Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX J Wind and Temperature Gradients FINAL REPORT On Project 25-34 Supplemental Guidance on the Application of FHWA s Traffic Noise Model (TNM) APPENDIX J Wind and Temperature Gradients Prepared for: National Cooperative Highway Research

More information

ACCURACY AND PRECISION IN TRAFFIC NOISE PREDICTION

ACCURACY AND PRECISION IN TRAFFIC NOISE PREDICTION ACCURACY AND PRECISION IN TRAFFIC NOISE PREDICTION Wolfgang Probst DataKustik GmbH, Greifenberg, Germany wolfgang.probst@datakustik.de Abstract Traffic is the main source responsible for unacceptable exposure

More information