INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office
|
|
- Brittney Greene
- 5 years ago
- Views:
Transcription
1 INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation : (iii) Accompaning mine : Official with Designation D014 ( ) R.R.DONGRE (iv) Date of Inspection : 02/06/2016 (v) Prev.inspection date : 19/01/2010 Deputy Controller Mines Mine code : 38MPR (a) Mine Name (b) Registration NO. : PART-I : GENERAL INFORMATION : BISTRA (2.69 AC) (c) Category : A Other than Fully Mech. (d) Type of Working : Opencast (e) Postal address State : MADHYA PRADESH District : KATNI Village : BISTRA Taluka : KATNI Post office : JOBIKALAN Pin Code : FAX No. : N. A. N. A. Phone : N. A. (f) Police Station : (g) First opening date : 21/07/1987 (h) Weekly day of rest 2. Address for : correspondance : SUN VIJAYRAGHAVGARH M/S N.M.DUBASH STONE & LIME CO.PVT.LTD. STATION ROAD, P.O. MAIHAR, 3. (a) Lease Number : MPR1996 (b) Lease area : (c) Period of lease : 20 (d) Date of Expiry : 05/09/ Mineral worked : LIMESTONE Main
2 2 5. Name and Address of the Lessee : Owner : Mining Engineer Name : Qualification : Appointment/ : Termination date N.M.DUBASH STONE & LIME CO.PVT.LTD. STATION ROAD P.O. MAIHAR SATNA MADHYA PRADESH Phone: N. A. FAX : N. A. N.M.DUBASH STONE & LIME CO.PVT.LTD. STATION ROAD P.O. MAIHAR SATNA MADHYA PRADESH Phone: N. A. FAX : N. A. S.K.JAIN,Full Time B.E.(MINING) 01/07/ Date of approval of Mining : Renewal under rule 22 MCR1960 Plan/Scheme of Mining Mining Scheme rule 12 MCDR1988 Modif.approved Mining Scheme Mining Scheme rule 12 MCDR1988 Mining Scheme rule 12 MCDR /08/ /10/ /07/ /11/ /05/2015
3 3 Exploration : PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Sl.No. Item Proposals Actual work Remarks 1a Backlog of previous year seven bore holes upto 30 m depth were proposed four diamond core drilling upto 50 m depth wascarried out 1b Exploration over lease area for geological axis 1 or 2 done done as per the UNFC 1c Exploration Agencies and Expenditure in lakh rupees during the year not not 1d Balance area to be explored to bring Geological axis in 1 or 2 area under G1 is 9.2 hect balance area to explored is 4.0 hect 1e Balance reserve as on 01/04/ million ton million ton f General remarks of inspecting officers on geology, exploration etc this is very old mine and lesee has done sufficient exploration Development : 2a 2b 2c Location of development w.r.t.lease area Separate benches in topsoil, overburden and minerals (Rule 15) Stripping ratio or ore to OB ratio Quarry no *270*52 m yes : :0.05 Quarry no *270*52 m soil bench B1 limestone and dolomite benches from B2 to B7 B2 calcarous shale B3 shale B4 limestone B5 shale B6& B7 limestone : :0.10
4 4 2d 2e Quantity of topsoil generation in m3 Quantity of overburden generation in m cum cum f General remarks of inspecting officers on development of pit w.r.t. type of deposit etc mine is systematicaly developed Exploitation: 3a 3b 3c 3d 3e 3f 3g Number of pit proposed for production Quantity of ROM mineral production proposed Recovery of sailable/usable mineral from ROM production Quantity of mineral reject generation Grade of mineral rejects generation and threshold value declared. Quantity of sub grade mineral generation. Grade of sub grade mineral generation one % same asper proposal %
5 5 3h 3i 3j 3k 3l 3m 3n 3o Manual / Mechanised method adopted for segregating from ROM Any analysis or beneficiation study proposed and carried out for sub grade mineral and rejects. Provision of drilling and blasting in mineral benches Provision of mining machineries in mineral benches Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM Total area covered under excavation/pits Ore to OB ratio for the pit/mine during the year. Total area put in use under different heads at the end of year not proposed yes yes soil bench B1 limestone and dolomite benches from B2 to B7 B2 calcarous shale B3 shale B4 limestone B5 shale B6& B7 limestone 9.2 hect inpara 2 area under pits 9.20 area under dumps 4.0 area mineral stocks 1.0 area roads 0.10 no processing of the ore is done in the mine except sizing and sorting not done drilling by wds with dia of the 110 mm is carried out yes soil bench B1 limestone and dolomite benches from B2 to B7 B2 calcarous shale B3 shale B4 limestone B5 shale B6& B7 limestone same asabove in para 2 area under pits 9.20 area under dumps 4.0 area mineral stocks 1.0 area roads 0.10
6 6 3p 3q Production of ROM mineral during the last five year period as applicable General remarks of inspecting officers on method of mining etc mine is well develped Solid Waste Management - Dumping: 4a Separate dumping of topsoil, OB and mineral rejects (Rule 32,33) yes only temparary dumping 4b Location of topsoil, OB and mineral reject dumps only temparary dumping 4c Number of dumps within lease area and outside of lease area 4d Location of dumps w.r.t. ultimate pit limit (Rule 16) within UPL only temparary dumping 4e Number of active and alive dumps. 4f Number of dead dumps. 4g Number of dumps established. 4h Whether Retaining wall or garland drain all along dumps are there.
7 7 4i Length of Retaining wall or garland drain all along dumps 4j Number of settling ponds 4k Specific comments of inspecting officer on waste dump management there are temparary dumps Solid Waste Management - Backfilling: 5a 5b 5c 5d 5e Status of part or full extraction of mineral from mined out area before starting backfilling. Area under backfilling of mined out area Concurrent use of topsoil for restoration or of mineral out area (Rule 32) Total area fully reclaimed and rehabilitated General remarks of inspecting officers on backfilling and reclamation etc. full extraxtion 0.82 yes.70 full extraction of the mineral 0.50 done as per the proposal 0.20 the cu m of the ob generated from the mine, same is used for the backfilled Progressive Mine Clousre Plan:
8 8 6a Whether Annual report on PMCP submitted on time and correctly. Rule 23 E(2). submitted submitted 6b Area available for (ha) hect 0.50 hect 6c afforestation done (ha) d No. of saplings planted during the year e Cumulative no.of plants f Any other method of 0.70 hect 0.20 rehabilatation over backfilled area 6g Cost incurred on watch and care during the year not available 6h Compliance on reclamation and by backfilling (i) Voids available for backfilling ( Lx B x D 6i Compliance on reclamation and by backfilling (ii) Voids filled by waste / tailings 6j Compliance on reclamation and by backfilling (iii)afforestati on on backfilled area
9 9 6k Compliance on reclamation and by backfilling (iv) Rehabilitation by making water reservoir 6l Compliance on reclamation and by backfilling (v)any other specific means. 6m Compliance of of waste land within lease (i)afforestation n Compliance of of waste land within lease (ii)area (ha) 6o Compliance of of waste land within lease (iii)method of 6p Compliance of environmental monitoring (core zone and buffer zone) done done 6q General remarks of inspecting officers on PMCP compliance and progressive closure operations etc. leseee has done reclaimation and rehabilatation by measn of backfilling Mineral Conservation:
10 10 7a 7b 7c 7d 7e ROM Mineral dispatch or grade-wise sorting within lease area Method of gradewise mineral sorting i.e. manual or mechanical. Different grade of mineral sorted out at mines. Any beneficiation process at mines. General remarks of inspecting officer on Mineral conservation and beneficiation issues manual cement and BF grade manual same as per ther proposal no mineral conservation problem noticed Environment: Compliance of Rule 45: 9a Status of submission of Monthly and Annual returns submitted submitted 9b Annual return for information on Mining Engineer, Geologist and Manager appointed appointed
11 11 9c land use pattern for area under pits, reclaimed area, dumps etc. 9d afforestation 9e mineral reject generation (Grade and quantity) 9f ROM stock and/or graded ore 9g sale value, Ex. Mine price and production cost 9h fixed assets 9k mining machineries found to be correct
12 12 Details of violations observed during current inspection and compliance position of violation pointed out Violation observed Rule 13(1) 30/06/2016 Show couse position Rule NO. Issued on Compliance on Rule NO. Issued on Compliance on Date : (R.R.DONGRE) Indian Bureau of Mines
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official
More informationMCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)
::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM
More informationMCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Bangalore regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/CTD/LST/19/BNG (ii) Designation : (iii) Accompaning mine : Official
More informationMCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/RCH/G-4/BNG (i) Name of the Inspecting : Officer and ID No. (ii)
More informationCONTENTS. and 62 of MCDR Flow Diagram for Notice of opening of mine under Rule 20, 2.1 Rule - 18 Beneficiation studies to be carried out 11
Part NO. CONTENTS CHAPTER I Flow Diagram for Rule 20, 21, 28, 30, 35, 45, 49, 50, 51 and 62 of MCDR 2017 1.1 Flow Diagram for Notice of opening of mine under Rule 20, PAGE NO. 1 MCDR 2017 1.2 Flow diagram
More informationFOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund
Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...
More informationMINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988
MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small
More information(3) The consent letter/declaration/undertaking may have uniform signature of the lessee.
Annexure SCRUTINY COMMENTS ON THE DRAFT REVIEW OF MINING PLAN AND PMCP OF RAJABERA IRON ORE MINE (41.697 HA.) OF SHRI PADAM KUMAR JAIN LOCATED IN SINGHBHUM (WEST) DISTRICT, JHARKHAND SUBMITTED UNDER RULE
More informationGOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES OFFICE OF THE REGIONAL CONTROLLER OF MINES
No. TN/RJJ/Lst-1.MDS Mine Code: 38TMN23013 C-4-A, Rajaji Bhavan To: Dated: 23.01.2017 Sri K.Rajkumar,Managing Partner Sri Balaji Mining Company No.3/175,S.Valavandhi, Paramathi velur taluk Namakkal District
More informationSRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:
MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE
More informationTABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.
TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri
More information5.11 MINERAL RESOURCES
5.11 This section of the Draft PEIR evaluates the potential impacts to mineral resources in the Plan Area from implementation of the Clovis General Plan and Development Code Update (proposed project).
More informationSRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:
MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22
More informationBrief Summary. Production = 4,00,000 TPA
S. NO. ITEMS DETAILS 1 Name of the Project: Dhrang Lime Stone Mine (Survey No 196, 197, 413P) 2 Serial no. in schedule As per EIA Notification dated 14.09.2006 and O.M. dated 24.12.2013, the project activity
More informationIBM MANUAL FOR APPRIASAL OF MINING PLAN
IBM MANUAL FOR APPRIASAL OF MINING PLAN 0. INTRODUCTION 01. The recent amendments in Mines and Minerals (Development & Regulation) (MMD&R) Act 1957 and Mineral Concession Rules (MCR), 1960 have been brought
More informationKurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,
1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone
More informationSCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149. A. TEXT:
Annexure SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149.7343 HA) OF M/S NIRMAL KUMAR PRADEEP KUMAR IN GHATKURI AND KARAMPADA RESERVE FOREST DISTICT WEST SINGBHUM
More informationGuidelines for preparation of Mining Plans for Coal/Lignite Blocks
Guidelines for preparation of Mining Plans for Coal/Lignite Blocks Annexure The following guidelines are issued for preparation of mining plans for coal/lignite block development by the block holders.
More information4.12 Mineral Resources
4.12.1 Setting Section 2.2, Project Location, provides general information about the Project s regional and local setting. This Section 4.12.1 provides setting information specific to mineral resources.
More informationGeological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary
Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared
More informationSIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015
SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING ACT, 2012 THE MINING (MINERAL TITLE) REGULATIONS 2015 Guidelines should be prepared by the Directorate of Mineral Development
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District
More informationANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1
ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village
More informationGeological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary
Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared by Geovale
More informationJAI MAA SHARDA STONE CRUSHING
JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry
More informationGeological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY
Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government
More informationTHE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:
THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL
More informationDISTRICT : TIRUNELVELI
MODIFICATION OF APPROVED MINING PLAN& PROGRESSIVE MINE CLOSURE PLAN FOR THENMALAI LIMESTONE MINE (PRIVATE / A CATEGORY OTHER THAN FULLY MECHANISED /MP& PMCP /NON-FOREST/ PATTA LAND) Mining plan period
More informationQUARRY PLAN FOR LIMESTONE SLABS
QUARRY PLAN FOR LIMESTONE SLABS (Under Rule 7 B of TSMMC Rules, 1966) INCLUDING PROGRESSIVE QUARRY CLOSURE PLAN (Under Rule 7 B (viii) of TSMMC Rules, 1966) (FOR THE PLAN PERIOD 2016 17 TO 2020 21) (FOR
More informationGeological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary
Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared
More informationPRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)
PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty
More informationOver an extent of 9.28 Acres in Sy. No. 72 / P of Jangameswarapuram (V), Martur (M), Prakasam District, Andhra Pradesh State
MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2014 15 TO 2018 19) (FOR THE ENSUING BALANCE 2 YEARS
More informationRE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H
November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference
More informationInstitutional Control Registry - Report
Institutional Control Registry - Report IC REGISTRY ICR # ICR - 01 Date of Acceptance May 11, 2009 Contact Lake Mine Cameco Corporation Cameco Corporation La Ronge 73-P-07 UTM-North 6141199 UTM-East 507983
More informationPetra Diamonds Limited Resource Statement
Petra Limited 2016 Resource Statement Petra Limited ( Petra or the Company or the Group ) manages one of the world s largest diamond resources of over 300 million carats ( Mcts ). This major resource implies
More informationDo Now - APES. Due Next Class. Mining HW. Work on QSC using today s notes
Do Now - APES 1. Grab a chromebook 2. Log on to Albert.io & work on The Living World Loss of Biodiversity Soil & Soil Dynamics Fishing (10min) Mining HW Due Next Class Work on QSC using today s notes Do
More informationFOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY
PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY
More informationBatu Hijau Mine Closure Cost Estimation 1
APPENDIX 1 Batu Hijau Mine Closure Cost Estimation 1 1. MINE INFRASTRUCTURE 1.1 Process Plant / Mill 1.2 Main Workshop Area 1.3 Material Handling Systems Rail Line and Loop 1.4 Admin Buildings 1. 5 Ro
More informationMAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation
MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration
More informationMeghalaya. Mining their own business. Arwat Challam
Meghalaya Mining their own business Arwat Challam Introduction Area of 22,429 sq. km. Divided into 7 Districts Meghalaya Three Main tribes- Khasi, Pnar and Garo Indo-Malayan Biodiversity Hotspot. Major
More informationFIELD MONITORING OF STABILITY OF DUMP A CASE STUDY
FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008
More informationLicensed Science Officer Benchmark
POSITION EVALUATION RATIONALE POSITION TITLE MINISTRY AND DIVISION Energy, Mines and Petroleum Resources: Geology Division BRANCH AND SECTION Mineral Resources Branch, Applied Geology Section UNIT OR PROGRAM
More informationQUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)
QUARRYING PLAN FOR PARATAPUR SAND MINING BLOCK - 2 EXTENT 12.20 Acres (4.93 Hectare) IN KRISHNA RIVER BED ADJACENT TO SY.NO 8/1, 8/2, 7/1 & 7/2 OF PARATAPUR - VILLAGE DEVADURGA - TALUK RAICHUR- DISTRICT
More informationGeology and Nonrenewable Mineral Resources
Environmental Science, 15e MILLER/SPOOLMAN G. TYLER MILLER SCOTT E. SPOOLMAN 12 Geology and Nonrenewable Mineral Resources Core Case Study: The Crucial Importance of Rare Earth Metals There are 17 rare
More informationLessee M/s Ambaji Minerals Post- Chikla, Ambaji , State- Gujarat
MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN (UNDER RULE OF MARBLE DEVELOPMENT & CONSERVATION 2002) OF CHIKLA MARBLE MINE (S. No. 88/P) FOR Mineral- Marble, Lease Area- 4.0469 Hect. Near Village Chikla,
More informationEarly Exploration Plan Activity Information
Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of
More informationHydraulic Impacts of Limestone Quarries and Gravel Pits. Jeff Green Minnesota DNR-Division of Ecological & Water Resources
Hydraulic Impacts of Limestone Quarries and Gravel Pits Jeff Green Minnesota DNR-Division of Ecological & Water Resources The Hydraulic Impacts of Limestone Quarries and Gravel Pits Study was funded by
More information*** The following Notification shall be published in an extra-ordinary issue of the Andhra Pradesh Gazette dt
GOVERNMENT OF ANDHRA PRADESH ABSTRACT Mines and Minerals Punitive Measures to control Illegal Mining and Transportation of Minor Minerals Amendments to A.P. Minor Mineral Concession Rules, 1966 - Orders
More information1.0 PURPOSE AND FORMAT OF THE FINAL EIR
1.0 PURPOSE AND FORMAT OF THE FINAL EIR 1.1 PROJECT OVERVIEW CEMEX (RMC Pacific Materials, dba CEMEX) operates the Bonny Doon Shale and Limestone Quarries in Santa Cruz County for the production of Portland
More informationSubmitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL
Land Restoration / Reclamation Monitoring of more than 5 million cu. m. (Coal + OB) Capacity Open Cast Coal Mines of Central Coalfields Limited Based on Satellite Data for the Year 2013 Ashoka & Piparwar
More informationGIS AND REMOTE SENSING FOR GEOHAZARD ASSESSMENT AND ENVIRONMENTAL IMPACT EVALUATION OF MINING ACTIVITIES AT QUY HOP, NGHE AN, VIETNAM
GIS AND REMOTE SENSING FOR GEOHAZARD ASSESSMENT AND ENVIRONMENTAL IMPACT EVALUATION OF MINING ACTIVITIES AT QUY HOP, NGHE AN, VIETNAM QuocPhi Nguyen 1, Phuong Nguyen 1, ThiHoa Nguyen 2 and TienPhu Nguyen
More informationNew Deep Inferred Resources at Tara Mine
New Deep Inferred Resources at Tara Mine Summary Deep drilling, over the period 2012-2016, on a seismic exploration target south of the Tara Mine, has intersected a new zone of Zn-Pb mineralisation with
More informationWHAT IS MINERAL EXPLORATION?
INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching
More informationResource Classification Systems by Dan Alexander
Resource Classification Systems by Dan Alexander EIA US Coal Reserves: 1997 Update SME Working Party #79, 1992 USGS Geologic Survey Circular 891, 1983 USBM/USGS Circular 831, 1980 SEC Securities Act of
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 21 st September 2015 Operational Update from the Old Pirate Gold Mine and the Coyote Processing Plant ABM Resources NL ( ABM or the Company ) is pleased to announce
More informationGeology and the Aggregate Industry: The Role of Geologists
Geology and the Aggregate Industry: The Role of Geologists Donald G. Mikulic Illinois State Geological Survey Prairie Research Institute University of Illinois at Urbana-Champaign Outline Importance of
More informationEMP. In respect of. Cluster of Two Mines (Cluster area Ha)
M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster
More information15 Mineral Resources
15 Mineral Resources Overview of Chapter 15 Introduction to Minerals Environmental Impact Associated with Minerals An International Perspective Increasing the Supply of Minerals Using Substitution and
More informationEXPLORATION TO PRODUCTION: OPTIMIZING THE ALGOLD TIJIRIT PROJECT THROUGH EXPERT GEOLOGICAL SERVICES
EXPLORATION TO PRODUCTION: OPTIMIZING THE ALGOLD TIJIRIT PROJECT THROUGH EXPERT GEOLOGICAL SERVICES MineAfrica 2018 Marc-Antoine Laporte, M.Sc., P.Geo. Global Project Geologist WHO IS SGS 2 SGS MINERALS
More informationMINING PLAN FOR QUARTZ & FELDSPAR
MINING PLAN FOR QUARTZ & FELDSPAR Prepared By : P. V. SATYANARAYANA RQP / DMG / AP / 34 / Page 1 INCLUDING PROGRESSIVE MINE CLOSURE PLAN (Under Amended Rule 7 A (1) of APMMC Rules, 1966 & Rule 7 A (3)
More information' ov' fy plar euarry Lease (survey No: 12g\r paiki;, Y" 10. !9u:t (Survey No: 128\l Paiki), Near village: Hlsanpar, Taluka: wankaner, District:
To, The Commissioner, CGM, Govt. of Gujarat, Udhyog Bhavan, Gandhinagar, Gujarat Date: 04/10120t6 Subject: submission of Mining plan of fy plar euarry Lease (survey No: 12g\r paiki;, Near village: Hasanpar,
More informationUNFC COAL MINES CASE STUDIES
UNFC COAL MINES CASE STUDIES Format for Collecting Information Block Geological Reserve in the block Geological Reserve Considered Extractable Reserve Balance Extractable Reserve Econ /Not Econ F1 F2 G1
More informationElectronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)
Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315) Module 1: Application Section A through Section I, the Application Checklist, and all narrative
More informationWESTERN REGION - RICHM~ND PLANT
LAFARGE CANADA $C. WESTERN REGION - RICHM~ND PLANT VANANDA QUARRY Texada Island, B.C. Nanairno Mining District, B.C. GEOLOGY, DRILLING & GEOPHYSIC REPORT Location: Latitude 49" 45' 02" North, Longitude
More informationITERAMS. WP1 (& WP2) Sampling and ore and rock properties modification
VTT TECHNICAL RESEARCH CENTRE OF FINLAND LTD WP1 (& WP2) Sampling and ore and rock properties modification WP1 D1.1, 2 nd Sampling, June 12 th to 14 th, 2018 Arctic circle in Kevitsa Mine in co-operation
More informationWHAT IS A ROCK? Granite. Muscovite. Orthoclase. Quartz. Feldspar. Biotite
Mining, Jobs October 2014 WHAT IS A ROCK? A ROCK IS DEFINED AS AN COMBINATION OF ONE OR MORE MINERALS. Granite Orthoclase Muscovite Feldspar Quartz Biotite What Makes One Rock Better than Another Rock?
More informationDilution and ore loss A short practical guide
Dilution and ore loss A short practical guide Following are a few helpful pointers when dealing with dilution and ore loss. Please refer to the suggested reading list that is at the bottom of this paper
More informationabout GCC
about GCC Bldg 234, Flat 11, Al Barakat Street, Hail Al Janaubiyah P.O Box: 94, Postal Code: 123, Al Khaudh, Sultante of Oman Fax : +968 24543188 Mobile :+968 96666445 info@gcc-oman.com www.gcc-oman.com
More informationLessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.
MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares
More informationSection 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study
Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study I. BACKGROUND State Mining Corporation Limited (SMC), a subsidaiary of Druk Holdings
More informationCOPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS
COPPER MOUNTAIN COMPLETES PHASE 2 DRILL PROGRAM AT NEW INGERBELLE WITH CONTINUED POSITIVE RESULTS Vancouver, British Columbia September 19, 2018 Copper Mountain Mining Corporation (TSX: CMMC ASX:C6C) (the
More informationPreparatory Site Report (PSR)
Preparatory Site Report (PSR) ACTIVITY 3.2 ILLEGAL QUARRYING CASE STUDY: LAKKA QUARRY CCaase Municipality of Kyrros, Prefecture of Pella, Region of Central Macedonia AUTHORS: Chatzipanagis Ioannis, Geologist,
More informationSOUTH AMERICAN GOLD AND COPPER COMPANY LIMITED
SOUTH AMERICAN GOLD AND COPPER COMPANY LIMITED www.sagc.com TSX SYMBOL: SAG September 2004 DISCLAIMER THIS PRESENTATION CONTAINS FORWARD LOOKING STATEMENTS WHICH ARE BASED SOLELY ON THE DIRECTORS BEST
More information5. Environmental Analysis
5.11 This section of the Draft Environmental Impact Report (DEIR) evaluated potential impacts to mineral resources from implementation of the General Plan. 5.11.1 Environmental Setting Minerals are defined
More informationKrasny license: Operational update February 2016
Kopy Goldfields AB (publ) Press release 3/2016 Stockholm, March 2, 2016 Krasny license: Operational update February 2016 Kopy Goldfields AB (publ) ( Kopy Goldfields or the Company ) hereby provides an
More informationSubmitted to Central Coalfields Limited BHURKUNDA OCP, CCL
Land Restoration / Reclamation Monitoring of Open Cast Coal Mines of Central Coalfields Limited producing less than 5 m cu m. (Coal+ OB) based on Satellite Data for the Year 2013 BHURKUNDA OCP, CCL Submitted
More informationTell me what the word aggregate means and at least three things aggregate is used to make.
Lesson Plan Scout s Geology Objective: After today s lesson, you will be able to Tell me what the word aggregate means and at least three things aggregate is used to make. List the steps in the mining
More informationSmt. M. Hari Chandana
Smt. M. Hari Chandana Quarry lease area 11.201 Ha. (27.68 Acres) in Sy. No. 22, Kudavanandapur Village, Raikode Mandal, Sangareddy District, Telangana CLUSTER ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY
More informationGroundwater Monitoring & Aggregate Operations in the Villeneuve-Calahoo Area. William Gowdy, BSc. P.Geo
Groundwater Monitoring & Aggregate Operations in the Villeneuve-Calahoo Area William Gowdy, BSc. P.Geo Format of Talk General Background Sand and Gravel Geology & Formation of Sand and Gravel Deposits
More informationApril 9, Phosphate Mining and Reclamation Overview
April 9, 2012 Phosphate Mining and Reclamation Overview Business & Mission Mosaic produces the majority of the phosphate used by American farmers Employs approximately 7,000 people worldwide, 3,000 in
More informationPEAK GOLD JOINT VENTURE PROJECT TOK MINING DISTRICT, ALASKA
PEAK GOLD JOINT VENTURE PROJECT TOK MINING DISTRICT, ALASKA Contango ORE, Inc. September 20, 2017 1 CONTANGO ORE, INC. DISCLAIMER This presentation may contain forward-looking statements including, but
More informationLicensing of Geologists in Florida: A Result of the Population/Development Explosion and Political Environmental Awareness
State of Florida Department of Natural Resources Tom Gardner, Executive Director Division of Resource Management Jeremy Craft, Director Florida Geological Survey Walt Schmidt, State Geologist and Chief
More information1 Complementary Access Tools
ENERGY IHS AccuMap Shaped by industry and powered by IHS Markit information, AccuMap is a powerful and intuitive interpretation solution for the Canadian Energy Industry. 1 Complementary Access Tools AccuLogs
More informationC. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana
C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited
More informationWESTERN COALFIELDS LIMITED
Land Restoration / Reclamation Monitoring of less than 5 million Cu. M. (Coal+OB) Capacity Opencast Coal Mines of Western Coalfields Limited based on Satellite Data for the Year 2014 ERAI RIVER Coal Stock
More informationCentral Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement
Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT
More informationElectronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)
Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311) Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses.
More informationManaging Natural Resources Revenue Experience of Malaysia
Managing Natural Resources Revenue Experience of Malaysia NURUL HUDA BIN ROMLI Principal Assistant Director Minerals Economic Section Minerals and Geoscience Department, Malaysia (MGD) FINANCING FOR THE
More informationREPORT ON APPLICATION TO RECORD WORK. on the CLAIM GROUP. BY Owners. issued at Penticton, B.C. Jan 19,1976. issued at Rossland B.C. Jan.
--.. REPORT ON APPLICATION TO RECORD WORK on the CLAIM GROUP 1976 2133 meters North-North-East Okanagan I- Falls Post Office 0,// --7 L Lat. 493 21 N., Long. 119 33 W
More informationMetal Mining Successes in Alaska: A Review of Active and Developing Metal Mines in Alaska
Metal Mining Successes in Alaska: A Review of Active and Developing Metal Mines in Alaska November 7, 2006 JOGMEC Tokyo, Japan By Albert H. Clough, MSc, PGeol Deputy Commissioner Alaska Department of Commerce,
More informationDISTRICTS, MINES, AND GEOCHEMISTRY DATABASES IN NEW MEXICO. Virginia T. McLemore and Maureen Wilks
DISTRICTS, MINES, AND GEOCHEMISTRY DATABASES IN NEW MEXICO Virginia T. McLemore and Maureen Wilks ACKNOWLEDGEMENTS New Mexico Energy, Minerals and Natural Resource Department Company annual reports Personal
More informationChapter 16 Minerals: A Non-renewable Resource
Chapter 16 Minerals: A Non-renewable Resource Overview of Chapter 16 o Introduction to Minerals Mineral Distribution and Formation How Minerals are Found and Extracted o Environmental Impact of Minerals
More informationWork performed between August 1 and December 1, 1975 COMINCO LTD. WESTERN DISTRICT NTS 93 '(~15 EXPLORATION GEOCHEMICAL SURVEY THE CRY AND CAB CLAIMS
COMINCO LTD. EXPLORATION WESTERN DISTRICT NTS 93 '(~15 GEOCHEMICAL SURVEY ON THE CRY AND CAB CLAIMS CRIN PROPERTY Work performed between August 1 and December 1, 1975 NICHOLAS L. SZABO TABLE OF CONTENTS
More informationEarly Exploration Permit Activity Information
Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater
More information