1 MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest ha.,non forest land land 3 Mine code 38CHG IBM Registration Number under rule 45 of MCDR, 1988 IBM reg Name of the lessee, Address, phone, and fax number Shri Gangaram Sharma,C/O Shri Gopaldas Ptitwani,E-5,Sect-2,Devendra Nagar,P.O.& Distt.-Raipur(C.G.) 6 Village Matia 7 Taluka/Mandal Raipur 8 District Raipur 9 Pincode 10 State Chhattisgarh 11 Post office Raipur 12 Nearest police station Raipur 13 Nearest Railway station Raipur 14 Date of Grant of Mining Lease Date of Execution Date of opening of Mine Date of first Renewal, if applicable and its period & expiry 18 Date of second Renewal, if applicable and its period & expiry 19 Date of submission of renewal application if Mining Operations are continuing under deemed extension 20 Name of the Nominated Owner with Address, phone, , fax number and date of appointment Shri Gangaram Sharma,C/O Shri Gopaldas Ptitwani,E-5,Sect-2,Devendra Nagar,P.O.& Distt.-Raipur(C.G.),Phone No Name of the Mine Agent with Address, phone, , fax number and date of appointment 1
2 22 Name of the Mines Manager with Address, phone, , fax number and date of appointment in mines 23 Name of the Mining Engineer, Qualification and total experience with Address, phone, , fax number and date of appointment in mine 24 Whether Geologist and Mining Engineer appointed in mines satisfy the rule 42 & carrying out their duties as per rule 43 & Date of Approval of Mining Plan/Modified Mining Plan with five-year period and specific condition in approval letter, if any. 26 Date of Approval of Scheme of Mining/Modified Scheme of Mining with five-year period and specific condition in approval letter, if any. 27 Mineral(s) granted in lease and proved for mining Limestone 28 Method of Mining(Opencast, Underground) Opencast 29 Category (Fully Mechanised, Others or Manual) Manual 30 Captive/Non Captive Non Captive No Geologist and Mining Engineer appointed in mines and mine is non working and mine is under suspension from to and still not started working. Rap/LST/MPLN-603/NGP dated for period to nd scheme dated for period to Scientific Mining: Compliance of proposals of approved mining plan/scheme of mining. (Duplication of information in existing TMIS data sheets and draft write up has been avoided.) Exploration 1a Backlog of previous year No proposal in b Exploration over lease area for Geological axis 1 or 2. almost the lease area is exposed due to mining pit 1c Exploration Agency & Expenditure Mine is nonworking and mine is under suspension from to and still not started working. 2
3 1d in lakh Rupees during the year Balance area to be explored to bring Geological axis in 1 or 2 1e Balance reserves as on f General remarks of inspecting officer on geology, exploration etc. Depthwise exploration required but no proposal in The ML is mostly exposed due to existing mining pit but below exposed area exploration is required to delineate the ore body. Development 2a Location of development w.r.t. lease NE direction of ML area 2b Separate benches in topsoil, No top soil and no OB overburden and mineral (Rule 15) 2c Stripping ratio or ore to OB ratio 2d Quantity of topsoil generation in m 3 2e Quantity of overburden generation in m 3 2f General remarks of inspecting officer on development of pit w.r.t. type of deposit etc. As mentioned above the mine is non-working. Exploitation 3a Number of pits proposed for production one 3b Quantity of ROM mineral production proposed MT 3c Recovery of salable/usable mineral from ROM production 95% 3d Quantity of mineral reject generation 1283 MT 3e Grade of mineral reject generation and Not mentioned threshold value declared specifically 3f Quantity of sub-grade mineral generation 3g Grade of sub-grade mineral generation 3h Manual / Mechanised method adopted for segregating from ROM 3i Any analysis or beneficiation study None proposed & carried out for sub-grade mineral and reject 3j Provision of drilling & blasting in mineral benches Jack hammer drilling with 34 mm jackhammer operated by compressed air. 3
4 3k 3l 3m 3n 3o 3p 3q Provision of mining machineries in mineral benches Whether height of benches in overburden and mineral suitable for method of mining proposed in MP/SOM Total area covered under excavation/pits Ore to OB ratio for the pit/mine during the year Total area put in use under different heads at the end of year Production of ROM mineral during last five-year period, as applicable General remarks of inspecting officer on method of mining etc. No proposal for heavy machinery. No OB as mentioned and in ore bench height is proposed 3 meter ha. No working ha No proposal MT MT MT MT No working As there is no mining activity going on therefore no observation. 4
5 Solid Waste Management-Dumping 4a Separate dumping of topsoil, OB & Separate dump for mineral reject (Rule 32, 33) waste 4b Location of topsoil, OB & mineral SW of ML reject dumps 4c Number of dumps within lease area One dump proposed and outside lease area and one old dump 4d Location of dumps w.r.t. ultimate SW of ML pit limit (Rule 16) 4e Number of active & alive dumps one 4f Number of dead dumps one 4g Number of dumps stabilished 4h Whether Retaining wall or garland drain all along dumps are there 4i Length of Retaining wall or garland drain all along dump 4j Number of settling ponds 4k Specific comments of inspecting officer on waste dump management No dump management work done. Solid Waste Management-Backfilling 5a Status on part or full extraction of mineral from mined out area before starting backfilling 5b Area under backfilling of mined out area 5c Concurrent use of topsoil for No top soil restoration or rehabilitation of mined out area (Rule 32) generation 5d Total area fully reclaimed & rehabilitated 5e General remarks of inspecting officer on backfilling, reclamation etc No backfilling done in ML area also not matured for backfilling Progressive Mine Closure Plan 6a Whether Annual report on PMCP submitted on time and correctly - Rule 23E(2). Details should be given in the format as given in Annexure b Management of worked/mined out benches i) Area available for rehabilitation (ha) ii) Afforestation done (ha) 5
6 6c 6d 6e 6f iii) No. of saplings planted during the year iv) Cumulative no. of plants v) Any other specific method of rehabilitation vi) Cost incurred on watch & care during the year Compliance on reclamation and rehabilitation by backfilling i) Voids available for backfilling (L *B * D) ii) Void filled by waste/tailings iii) Afforestation on the backfilled area iv) Rehabilitation by making water reservoir v) Any other specific means Compliance of Rehabilitation of waste land within lease i) Afforestation ii) Area rehabilitated (ha) iii) Method of rehabilitation Compliance of Environmental monitoring (core zone & buffer zone) General remarks of inspecting officer on PMCP compliance & progressive closure operations i) i) i) i) Mine is nonworking Mineral Conservation 7a ROM Mineral dispatch or grade-wise sorting within lease area 7b Method of grade-wise mineral sorting Grade-wise sorting i.e. manual or mechanical not proposed. 7c Different grade of mineral sorted out at mines 7d Any beneficiation process at mines No 7e General remarks of inspecting officer on Mineral conservation & beneficiation issues Mine is non-working and no beneficiation activity done within ML. Environment 8a Separate removal and utilization of topsoil (Rule 32) 8b Concurrent use or storage of topsoil 8c Separate dumps for overburden, Mineral reject dump waste rock, rejects and fines (Rule separately proposed 33) 8d Use of overburden, waste rock, rejects and fines dumps for restoring the land to its original use 6
7 8e 8f Phased restoration, reclamation and rehabilitation of lands affected by mining operations (Pits, dumps etc) Baseline information on existence of plantation & additional plantation done (Rule 41) 50 nos plants/year proposed 8g Survival rate 70% 8h Water sprinkling on roads to control 3 to 4 times water airborne dust spraying proposal on haul road daily to control dust. 8i General remarks of inspecting officer on aesthetic beauty in and around mines area Compliance of Rule 45 As mentioned above the mine is none working therefore no adverse impact on aesthetic beauty in and around mines area observed. S.N. Item COMMENTS Remarks 9a Status of submission of Monthly Not submitted and Annual returns S.N. Item Details GIVEN in Observation of Remarks A.R. I/Officer 9b Scrutiny of Annual return for information on Mining Engineer, Geologist and Manager 9c Scrutiny of Annual return on land use pattern for area under pits, reclaimed area, dumps etc. 9d Scrutiny of Annual return on afforestation 9e Scrutiny of Annual return on mineral reject generation (Grade & quantity) 9f Scrutiny of Annual return on ROM stock and/or graded ore 9g Scrutiny of Annual return on sale value, Ex. Mine price & production cost 9i Scrutiny of Annual return on fixed assets 9k Scrutiny of Annual return on mining machineries Details of violations observed during current inspection and compliance position of earlier violation pointed out:- Rule Nature of Violation observed 12(3) The scheme of mining ought to have been submitted to the competent authority at least one hundred twenty days before the expiry of the five years period, for which it was approved on the last occasion. The Scheme of Mining for the Mine was approved on for a period of to The proposed period of approved Mining 7
8 Plan expired and no Scheme of Mining/ Review of Mining Plan was submitted to the competent authority for the subsequent periods. 13(1) Rule 45(5)(a)(viii) Mining operations should have been undertaken in accordance with the approved Mining Plan/Scheme of Mining. Since you have no approved Scheme of Mining for your above mentioned Mine, it is evident that the mining operations are not being carried out in accordance with the approved Scheme of Mining. Monthly returns since april-2016 of mine has not been submitted to the Regional Controller of Mines, IBM, Hyderabad, which ought to have been Submitted in Form F-8 before 10 th of every month in respect of preceding month. Rule 45(5)(b)(viii) Annual returns for of the mine has not been submitted to the Regional Controller of Mines, IBM, Hyderabad, which ought to have been Submitted in Form H-8 before 1 st July each year for the preceding Year. (Name of inspecting officer with designation and date) Rajesh Kumar Das, Senior Assistant Controller of Mines, Date of inspection
MCDR INSPECTION REPORT
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM
More informationMCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection
MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total
More informationMCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)
::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with
More informationMCDR INSPECTION REPORT
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation
More informationMCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011
MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Bangalore regional office
1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/CTD/LST/19/BNG (ii) Designation : (iii) Accompaning mine : Official
More informationINDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office
INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/RCH/G-4/BNG (i) Name of the Inspecting : Officer and ID No. (ii)
More informationCONTENTS. and 62 of MCDR Flow Diagram for Notice of opening of mine under Rule 20, 2.1 Rule - 18 Beneficiation studies to be carried out 11
Part NO. CONTENTS CHAPTER I Flow Diagram for Rule 20, 21, 28, 30, 35, 45, 49, 50, 51 and 62 of MCDR 2017 1.1 Flow Diagram for Notice of opening of mine under Rule 20, PAGE NO. 1 MCDR 2017 1.2 Flow diagram
More informationFOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund
Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...
More informationMINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988
MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small
More information(3) The consent letter/declaration/undertaking may have uniform signature of the lessee.
Annexure SCRUTINY COMMENTS ON THE DRAFT REVIEW OF MINING PLAN AND PMCP OF RAJABERA IRON ORE MINE (41.697 HA.) OF SHRI PADAM KUMAR JAIN LOCATED IN SINGHBHUM (WEST) DISTRICT, JHARKHAND SUBMITTED UNDER RULE
More informationTABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.
TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri
More informationIBM MANUAL FOR APPRIASAL OF MINING PLAN
IBM MANUAL FOR APPRIASAL OF MINING PLAN 0. INTRODUCTION 01. The recent amendments in Mines and Minerals (Development & Regulation) (MMD&R) Act 1957 and Mineral Concession Rules (MCR), 1960 have been brought
More informationFIELD MONITORING OF STABILITY OF DUMP A CASE STUDY
FIELD MONITORING OF STABILITY OF DUMP A CASE STUDY Dr. Singam Jayanthu*, and Dr. Simantini Behera** Professor, Associate Professor Department of Mining Engineering National Institute of Technology Rourkela-769008
More informationSRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:
MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE
More informationGOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES OFFICE OF THE REGIONAL CONTROLLER OF MINES
No. TN/RJJ/Lst-1.MDS Mine Code: 38TMN23013 C-4-A, Rajaji Bhavan To: Dated: 23.01.2017 Sri K.Rajkumar,Managing Partner Sri Balaji Mining Company No.3/175,S.Valavandhi, Paramathi velur taluk Namakkal District
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District
More informationFORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE
FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village
More informationFOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY
PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY
More informationSCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149. A. TEXT:
Annexure SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149.7343 HA) OF M/S NIRMAL KUMAR PRADEEP KUMAR IN GHATKURI AND KARAMPADA RESERVE FOREST DISTICT WEST SINGBHUM
More informationGuidelines for preparation of Mining Plans for Coal/Lignite Blocks
Guidelines for preparation of Mining Plans for Coal/Lignite Blocks Annexure The following guidelines are issued for preparation of mining plans for coal/lignite block development by the block holders.
More informationANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1
ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction
More informationSIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING (MINERAL TITLE) REGULATIONS 2015
SIXTH SCHEDULE REPUBLIC OF SOUTH SUDAN MINISTRY OF PETROLEUM, MINING THE MINING ACT, 2012 THE MINING (MINERAL TITLE) REGULATIONS 2015 Guidelines should be prepared by the Directorate of Mineral Development
More informationSRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:
MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22
More information5.11 MINERAL RESOURCES
5.11 This section of the Draft PEIR evaluates the potential impacts to mineral resources in the Plan Area from implementation of the Clovis General Plan and Development Code Update (proposed project).
More informationBrief Summary. Production = 4,00,000 TPA
S. NO. ITEMS DETAILS 1 Name of the Project: Dhrang Lime Stone Mine (Survey No 196, 197, 413P) 2 Serial no. in schedule As per EIA Notification dated 14.09.2006 and O.M. dated 24.12.2013, the project activity
More informationSubmitted to: Central Coalfields Limited Ranchi, Jharkhand. Ashoka & Piparwar OCPs, CCL
Land Restoration / Reclamation Monitoring of more than 5 million cu. m. (Coal + OB) Capacity Open Cast Coal Mines of Central Coalfields Limited Based on Satellite Data for the Year 2013 Ashoka & Piparwar
More informationTHE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE:
THE MINISTRY OF ENERGY AND ENERGY INDUSTRIES MINERALS DIVISION MINE DESIGN TEMPLATE 1.0 GENERAL INFORMATION OPERATOR NAME: OPERATOR ADDRESS: PHONE NUMBER: FACSIMILE: NAME OF CONTACT: CELLULAR PHONE: EMAIL
More informationJAI MAA SHARDA STONE CRUSHING
JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry
More informationDMT Consulting Limited Technical Memorandum
DMT Consulting Limited International Mining Consultants From: To: Date: 4 th June 2018 Project Number: 2067 6813 Document Number DMT Consulting Limited Technical Memorandum Tim Horner Principal Geologist
More informationCoal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects
Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Presenter: Mike Allen Manager, Surface Mining April 29, 2015 Outline Terms / Definitions Factors affecting coal
More informationPRE FEASIBILITY REPORT. Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh
PRE FEASIBILITY REPORT Of Quartz and Feldspar Sy No 119 & 126/3, Kambampadu Village A. Konduru Mandal, Krishna District, Andhra Pradesh Area of Mining Lease 2.720 Ha For 1, 09,055.08 MT/Annum OF Quartz
More informationInstitutional Control Registry - Report
Institutional Control Registry - Report IC REGISTRY ICR # ICR - 01 Date of Acceptance May 11, 2009 Contact Lake Mine Cameco Corporation Cameco Corporation La Ronge 73-P-07 UTM-North 6141199 UTM-East 507983
More informationQUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)
QUARRYING PLAN FOR PARATAPUR SAND MINING BLOCK - 2 EXTENT 12.20 Acres (4.93 Hectare) IN KRISHNA RIVER BED ADJACENT TO SY.NO 8/1, 8/2, 7/1 & 7/2 OF PARATAPUR - VILLAGE DEVADURGA - TALUK RAICHUR- DISTRICT
More informationKurnool vide Proceedings No. 712/Q1/2012 dated Ulindakonda Village, Kallur Mandal, Kurnool District,
1.0 EXECUTIVE SUMMARY 1.1 Introduction The proposed mining area of 1.157Ha. in survey No. 291 of Ulindakonda Village, Kallur Mandal, Kurnool District has been leased to M/s.Sri Lakshmi Sreenivasa Stone
More informationPRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)
PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty
More informationSubmitted to Central Coalfields Limited BHURKUNDA OCP, CCL
Land Restoration / Reclamation Monitoring of Open Cast Coal Mines of Central Coalfields Limited producing less than 5 m cu m. (Coal+ OB) based on Satellite Data for the Year 2013 BHURKUNDA OCP, CCL Submitted
More informationGeological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary
Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared by Geovale
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 21 st September 2015 Operational Update from the Old Pirate Gold Mine and the Coyote Processing Plant ABM Resources NL ( ABM or the Company ) is pleased to announce
More informationWHAT IS MINERAL EXPLORATION?
INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching
More informationRoadmap to Stability
Landslide Policy Committee for Aizawl City February 2014 Technical Support by: Aizawl is in earthquake hazard zone V and highly prone to natural, man-made and earthquake induced landslides. In order to
More informationProtection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting
Protection of Underground Mine Structures Due to Adjoining Open-pit Mine Blasting By Pradeep K Singh Chief Scientist & Professor, Academy of Scientific & Innovative Research CSIR Central Institute of Mining
More information4.12 Mineral Resources
4.12.1 Setting Section 2.2, Project Location, provides general information about the Project s regional and local setting. This Section 4.12.1 provides setting information specific to mineral resources.
More informationPetra Diamonds Limited Resource Statement
Petra Limited 2016 Resource Statement Petra Limited ( Petra or the Company or the Group ) manages one of the world s largest diamond resources of over 300 million carats ( Mcts ). This major resource implies
More informationDISTRICT : TIRUNELVELI
MODIFICATION OF APPROVED MINING PLAN& PROGRESSIVE MINE CLOSURE PLAN FOR THENMALAI LIMESTONE MINE (PRIVATE / A CATEGORY OTHER THAN FULLY MECHANISED /MP& PMCP /NON-FOREST/ PATTA LAND) Mining plan period
More informationIntensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project
5 th July 2017 Intensive Field Based Exploration Program Commences at Dobsina Cobalt-Nickel-Copper Sulphide Project Intensive site based exploration has commenced at Dobsina Co-Ni Project. Activities include:
More informationGeological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY
Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government
More informationSection 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study
Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study I. BACKGROUND State Mining Corporation Limited (SMC), a subsidaiary of Druk Holdings
More informationEarly Exploration Plan Activity Information
Early Exploration Plan Activity Information Activities That Require an Early Exploration Plan: Line cutting that is a width of 1.5 metres or less; Geophysical surveys on the ground requiring the use of
More informationOposura Scoping Study Nearing Completion
20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near
More informationDilution and ore loss A short practical guide
Dilution and ore loss A short practical guide Following are a few helpful pointers when dealing with dilution and ore loss. Please refer to the suggested reading list that is at the bottom of this paper
More informationQUARRY PLAN FOR LIMESTONE SLABS
QUARRY PLAN FOR LIMESTONE SLABS (Under Rule 7 B of TSMMC Rules, 1966) INCLUDING PROGRESSIVE QUARRY CLOSURE PLAN (Under Rule 7 B (viii) of TSMMC Rules, 1966) (FOR THE PLAN PERIOD 2016 17 TO 2020 21) (FOR
More informationHERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA
ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire
More informationBatu Hijau Mine Closure Cost Estimation 1
APPENDIX 1 Batu Hijau Mine Closure Cost Estimation 1 1. MINE INFRASTRUCTURE 1.1 Process Plant / Mill 1.2 Main Workshop Area 1.3 Material Handling Systems Rail Line and Loop 1.4 Admin Buildings 1. 5 Ro
More informationLicensed Science Officer Benchmark
POSITION EVALUATION RATIONALE POSITION TITLE MINISTRY AND DIVISION Energy, Mines and Petroleum Resources: Geology Division BRANCH AND SECTION Mineral Resources Branch, Applied Geology Section UNIT OR PROGRAM
More informationMAD345 - Mining II INTRODUCTION. 10 October Hacettepe University. Introduction Prospecting Mining Dilution Resource and Reserve Estimation
MAD345 - Mining II INTRODUCTION 10 October 2018 Course content MAD345 THEORY Date October, 10 October, 17 October, 24 October, 31 November, 7 November, 14 November, 21 Topic Introduction Prospecting, exploration
More informationNZQA unit standard New US6 to replace and version 1 Page 1 of 5
Page 1 of 5 Title Demonstrate knowledge of mining methods, and analyse and select plant for metalliferous underground extraction Level 6 Credits 20 Purpose People credited with this unit standard are able
More informationLessee M/s Ambaji Minerals Post- Chikla, Ambaji , State- Gujarat
MINING PLAN WITH PROGRESSIVE MINE CLOSURE PLAN (UNDER RULE OF MARBLE DEVELOPMENT & CONSERVATION 2002) OF CHIKLA MARBLE MINE (S. No. 88/P) FOR Mineral- Marble, Lease Area- 4.0469 Hect. Near Village Chikla,
More informationAPPLICANT: MD. SARFARAZ ANSARI & VIVEKA NAND RAY PRE FEASIBILITY REPORT PRE- FEASIBILITY REPORT
PRE- FEASIBILITY REPORT 0 CONTENTS EXECUTIVE SUMMARY... 3 1.0 INTRODUCTION... 3 1.1 SALIENT FEATURES OF THE PROJECT... 4 1.2 PRESENT LAND USE PLAN... 5 1.3 PROPOSED PLANNING... 5 1.4 UTILIZATION... 5 2.
More informationKing of the Hills Gold Project, Leonora, to commence production in Q2 2011
King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher
More information1.1 INTRODUCTION. EMP Report For 3.30 Ha. of Feldspar &, Quartz Mine located in Budharam village, Gopalpet Mandal, Wanaparthy District, T.S.
1. INTRODUCTION 1.1 INTRODUCTION M/s.SRI SAI MINES & MINERALS was granted Mining lease for Quartz & Feldspar in Survey Number 3.30 over an extent of 3.30 Hect. In sy No. 326 & 330 Budharam village, Gopalpet
More informationTable 1: Summary details of samples collected on surface at Bucks claims Sample ID. Sample Description
ARTISANAL GOLD ACTIVITY OPENS UP NEW GOLD REEF AT SURFACE Artisanal activity, which began three months ago in the vicinity of the historic Bucks Mine, has continued to expose high grade gold mineralisation
More informationGeological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary
Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared
More informationAccounts at a Glance (As at the end of JULY 2013)
Accounts at a Glance (As at the end of JULY 2013) 1 Sl. No Budget estimates 2013-14 Actuals upto July 2013 (Rupees in crore) % of Actuals to Budget Estimates Current 2013-14 Corresponding period of the
More informationDo Now - APES. Due Next Class. Mining HW. Work on QSC using today s notes
Do Now - APES 1. Grab a chromebook 2. Log on to Albert.io & work on The Living World Loss of Biodiversity Soil & Soil Dynamics Fishing (10min) Mining HW Due Next Class Work on QSC using today s notes Do
More informationProspect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode
Prospect Resources completes rehabilitation and mine construction at the Prestwood Gold Mine - moving into production mode Summary The main shaft at the Prestwood mine has been fully rehabilitated to 4
More informationProvincial Standards for Early Exploration
Introduction Provincial Standards for Early Exploration Effective April 10, 2018 These Provincial Standards have been developed as part of the implementation of the graduated regulatory regime for early
More informationElectronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315)
Electronic Submission Format Guide Large Noncoal (Industrial Minerals) Mine Permit Application (5600-PM-BMP0315) Module 1: Application Section A through Section I, the Application Checklist, and all narrative
More informationKrasny license: Operational update February 2016
Kopy Goldfields AB (publ) Press release 3/2016 Stockholm, March 2, 2016 Krasny license: Operational update February 2016 Kopy Goldfields AB (publ) ( Kopy Goldfields or the Company ) hereby provides an
More informationGeological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary
Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared
More informationJune 2017 Quarterly Report
ASX ANNOUNCEMENT Date: 31 July 2017 June 2017 Quarterly Report Victory Mines Limited (ASX:VIC) ( Victory or the Company ) provides a review of its activities during the June 2017 quarter. Exploration Western
More informationITERAMS. WP1 (& WP2) Sampling and ore and rock properties modification
VTT TECHNICAL RESEARCH CENTRE OF FINLAND LTD WP1 (& WP2) Sampling and ore and rock properties modification WP1 D1.1, 2 nd Sampling, June 12 th to 14 th, 2018 Arctic circle in Kevitsa Mine in co-operation
More informationCentral Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement
Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT
More informationFor personal use only
15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill
More informationEXTENT : HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU
SCHEME OF MINING FOR BLACK GRANITE QUARRY EXTENT : 1.14.0HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU (UNDER RULE 12 OF GCDR 1999) LESSEE m/s.
More informationRE: AFIN: ADEQ Reference #: WG-LA Well Site: Suarez-Gartner 8-12 No. 1-30H
November 2, 2017 Rick Spicer Regulatory & Environmental Superintendent Operations BHP Billiton Petroleum, LLC Fayetteville Petroleum Unit 1686 Letona Rd Searcy, AR 72143 RE: AFIN: 23-00000 ADEQ Reference
More informationC. SHASHI KUMAR. Mine lease area Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana
C. SHASHI KUMAR Mine lease area 24.28 Ha. in Sy. No. 120/1, Mailaram Village, Balmoor Mandal, Nagarkurnool District, Telangana ENVIRONMENTAL MANAGEMENT PLAN PREPARED BY ISO 9001: 2008 Certified Accredited
More informationEMP. In respect of. Cluster of Two Mines (Cluster area Ha)
M/s. NSC Consortium, Road Metal Mine 12.146 Ha. EMP In respect of Cluster of Two Mines (Cluster area 22.146 Ha) AT Sy. No. 734/P, Yadavalli Village, Dornala Mandal, Prakasam district, Andhra Pradesh Cluster
More informationElectronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311)
Electronic Submission Format Guide Bituminous Coal Surface Mine Permit Application (5600-PM-BMP0311) Module 1: Application Section A through Section J, the Application Checklist, and all narrative responses.
More informationEarly Exploration Permit Activity Information
Early Exploration Permit Activity Information Activities That Require an Early Exploration Permit: Line cutting that is a width greater than 1.5 metres Mechanized stripping of a total surface area of greater
More informationENVIRONMENTAL MANAGEMENT PLAN
ENVIRONMENTAL MANAGEMENT PLAN Of M/s. B.K.R. GRANITES 4.790 HA. BLACK GRANITE MINING COMP NO. 205 &215 RAGIMANUPENTA & PARADARAMI R.F., YADAMARRI (M) CHITTOOR (DT), ANDHRA PRADESH. Submitted by SV ENVIRO
More informationFor personal use only Heemskirk Tin Project - Tasmania
Heemskirk Tin Project - Tasmania CEO Peter Blight International Tin Conference 24-25 April 2012 Focused on Tin Rapidly advancing Heemskirk Tin near Zeehan, Tasmania single commodity - single project focus
More informationAPPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT
PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director
More informationIntegrated Company Profile
Integrated Company Profile 2016 Mintec Abadi All right reserved Vision Mission Slogan Core values One-stop Mining Engineering Services We contribute to maximize the value of Indonesia s natural resources
More informationHaoma Mining NL A.B.N
Haoma Mining NL A.B.N 12 008 676 177 Registered Office & Head Office: 411 Collins Street, Melbourne, Vic., 3000, GPO Box 2282U, Melbourne, Vic., 3001. Telephone (03) 9629 6888, Facsimile (03) 9629 1250
More informationTODAY - March 20, 2000
information subject to this section and Sections 40(1) and 40(2) of DAO 92-29, shall be done only in cases allowed under Section 40(3) SECTION 9. FINES AND PENALTIES. Any person, natural or juridical,
More informationWESTERN COALFIELDS LIMITED
Land Restoration / Reclamation Monitoring of less than 5 million Cu. M. (Coal+OB) Capacity Opencast Coal Mines of Western Coalfields Limited based on Satellite Data for the Year 2014 ERAI RIVER Coal Stock
More informationCarrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April
OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred
More informationVictory plans gravity survey for Bonaparte after encouraging rock-chip results
ASX ANNOUNCEMENT 18 September 2017 Victory plans gravity survey for Bonaparte after encouraging rock-chip results Highlights Rock-chip sampling program at Bonaparte Project returns highly encouraging results
More informationOver an extent of 1.36 Hectares in Sy. No. 60 / 33 Vennaram (V), Dornakal (M), Mahabubabad District, Telangana State
SECOND SCHEME OF QUARRYING FOR BLACK GRANITE Extent : 1.36 Hectares 2019 SECOND SCHEME OF QUARRYING FOR BLACK GRANITE (Under Rule 7 B of TSMMC Rules, 1966) INCLUDING PROGRESSIVE QUARRY CLOSURE PLAN (Under
More informationNew Deep Inferred Resources at Tara Mine
New Deep Inferred Resources at Tara Mine Summary Deep drilling, over the period 2012-2016, on a seismic exploration target south of the Tara Mine, has intersected a new zone of Zn-Pb mineralisation with
More informationDrilling. What is the Activity?
Drilling What is the Activity? Drilling is a critical activity in mineral exploration. There are several types of drilling. Diamond drilling is the most common type of drilling conducted in Ontario. It
More informationMARKET UPDATE ON URANIUM AND GOLD PROJECTS
ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence
More informationPreparatory Site Report (PSR)
Preparatory Site Report (PSR) ACTIVITY 3.2 ILLEGAL QUARRYING CASE STUDY: LAKKA QUARRY CCaase Municipality of Kyrros, Prefecture of Pella, Region of Central Macedonia AUTHORS: Chatzipanagis Ioannis, Geologist,
More informationLessee. Sri.B.Srinivasa Rao S/o Seetha Ramaiah D.No:6-122/1 Guntupalli Village Ibrahimpatnam Mandal Krishna Dist.
MINING PLAN INCLUDING PROGRESSIVE MINE CLOSURE PLAN FOR ROAD METAL (Under Rule 7 A of APMMC Rules 1966 & Rule 23 (B) of MCDR 1988) (FOR THE PLAN PERIOD 2017 18 TO 2021 22) Over an extent of 2.024 Hectares
More informationCoalfields Limited. Based on Satellite Data for the Year Central Coalfields Limited Ranchi, Jharkhand. Submitted to:
Land Restoration / Reclamation Monitoring of less than 5 m cu. m. (Coal + OB) Capacity Open Cast Coal Mines of Central Coalfields Limited Based on Satellite Data for the Year 2011. N URIMARI (BIRSA) OCP,CCL
More informationProspect Resources Signs Mining Agreement over Bucks Reef Gold Mine.
Prospect Resources Signs Mining Agreement over Bucks Reef Gold Mine. HIGHLIGHTS Prospect Resources has secured the mining rights to the Bucks Reef Gold Mine, which lies some 600m west of its Prestwood
More informationFORTUNE MINERALS LIMITED
FORTUNE MINERALS LIMITED Test mining 1985-86 148 Fullarton Street, Suite 1508 London, Ontario, Canada N6A 5P3 Tel (519) 858-8188 Fax (519) 858-8155 info@fortuneminerals.com www.fortuneminerals.com MOUNT
More information