GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES OFFICE OF THE REGIONAL CONTROLLER OF MINES

Size: px
Start display at page:

Download "GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES OFFICE OF THE REGIONAL CONTROLLER OF MINES"

Transcription

1 No. TN/RJJ/Lst-1.MDS Mine Code: 38TMN23013 C-4-A, Rajaji Bhavan To: Dated: Sri K.Rajkumar,Managing Partner Sri Balaji Mining Company No.3/175,S.Valavandhi, Paramathi velur taluk Namakkal District Rules,1988, in respect of your Valavandhi Limestone mine over 3.01hect in S. S.Valavandhi village Paramathi velur taluk,namakkal district of Tamilnadu State. Geologist on Geologist on in presence of you. Mining operations to be in accordance with approved scheme of mining : 13(1) It was proposed in the approved scheme of mining dt ,under table no.25 to produce 1560 tonnes of limestone to work for a depth of 1.5m-2.5m at RL for the year But, the actual production for the year was 2610 tonnes and, it was observed that development has been extended beyond RL89 thereby the current development reached beyond the depth proposed at RL-87 and presently working reached almost RL The Controller of Mines (SZ),, Bangalore.

2 No. TN/DAN /Lst-29MDS Mine Code: 38TMN C-4-A, Rajaji Bhavan To: Dated: Sri G.Raghunath Singh,Agent (Mines) M/s Chettinad Cement Corporation Ltd,. Alambadi Mines Post Puliyur Cement Factory Post Karur District Sub: Violation of provisions of Mineral Conservation and Development Rules,1988, in respect of your Alambadi Limestone mine (GO.26)over 2.415hect in Alambadi village Vedasandur taluk Dindigul district of Tamilnadu State. above mine during the MCDR inspection by Sri A.S.Sanjeeva Rao, Asst., Mining Geologist on in presence of your Sri M.L.Balashanmugam,Manager (Mines). Rule No 24(1) Nature of Violations observed The owner, agent, mining engineer or manager of every mine shall send to Controller General, Controller of Mines and the a notice in Form D-1 when the mining or mineral processing operations in the mine or part thereof are discontinued for a period exceeding ninety days so as to reach them within one hundred and five days from the date of such temporary discontinuance Mine was discontinued, since April 2016 but, the temporary discontinuance notice in Form-D-1 has not been submitted by you till date. constitute an offence punishable under Rule 58 of Mineral Conservations and position to this office within 45 (forty five) days from the date of issue of this letter. 1. The Controller of Mines (SZ),, Bangalore.

3 No. TN/DGL /Lst-38MDS Mine Code: 38TMN33038 C-4-A, Rajaji Bhavan To: Dated: Sri A.Subramaniam,Managing Partner S.M.R Minerals, N.9,Trichy Road, Dindigul Rules,1988, in respect of your Panniyamalai Limestone mine over 1.485hect in Panniyamalai village Natham taluk Dindigul district of Tamilnadu State. above mine during the MCDR inspection by Sri A.S.Sanjeeva Rao, Asst., Mining Geologist on Rule No 24(1) Nature of Violations observed The owner, agent, mining engineer or manager of every mine shall send to Controller General, Controller of Mines and the a notice in Form D-1 when the mining or mineral processing operations in the mine or part thereof are discontinued for a period exceeding ninety days so as to reach them within one hundred and five days from the date of such temporary discontinuance Mine was discontinued,since June 2015 but, the temporary discontinuance notice in Form-D-1 has not been submitted by you till date. constitute an offence punishable under Rule 58 of Mineral Conservations and position to this office within 45 (forty five) days from the date of issue of this letter. 1. The Controller of Mines (SZ),, Bangalore.

4 No. TN/TNL/Lst-76.MDS Mine Code: 38TMN15066 C-4-A, Rajaji Bhavan To: Dated: Sri K.Krishna moorthy,owner M/s Jupitor Mines No.18,Siddhivinayagar koil North Street, Chatthiram,Pudukulam,Thachanallur post Tirunelvelli District Rules,1988, in respect of your Seethurayanpudur Limestone mine over 0.81hect in Seethurayanpudur village Sankarankoil taluk, Tirunelvelli district of Tamilnadu State. Geologist on in presence of you. Mining operations to be in accordance with approved scheme of mining : 13(1) It was proposed in the approved scheme of mining dt ,under table no.31 to produce 2312 tonnes of limestone for the year and 1886tonnes of limestone for year But, the actual production for the year was 4425 tonnes and 3581tonnes for the current year upto September 2016.During the inspection, it was observed that development has been extended beyond RL57 where development was proved. Every holder of a mining lease shall employ, in case of category 'B' 42(1)(c) mines, a part-time mining engineer and a part-time geologist. (ii) But, no part-time mining engineer or geologist has been employed by you. 1. The Controller of Mines (SZ),, Bangalore.

5 No. TN/TNL/Lst-24.MDS Mine Code: 38TMN15075 C-4-A, Rajaji Bhavan To: Dated: Microns Ltd., 307,Arundeep Complex, Race Course(South), Baroda Gujarat State. Rules,1988, in respect of your Moovirunthalai Limestone mine over 4.425hect in Moovirunthalai village Sankarankoil taluk, Tirunelvelli district of Tamilnadu State. Geologist on in presence of your representative Sri Vipin Pandey. Mining operations to be in accordance with approved scheme of mining : 13(1) The proposals made in the approved scheme of mining dated under the para no.5.2 and as per the plate no.6a,the year wise development &production. Exploration proposed 03 no of core drill holes as per table no.11 for the previous years & and 2 nos for the year It was observed during the inspection, that the production & development is being carried-out and extended to the northern side of ML which was proposed for the year Exploration proposed has not been carried out by you till date. Every holder of a mining lease shall employ, in case of category 'B' mines, a 42(1)(c) part-time mining engineer and a part-time geologist. (ii) But, no part-time mining engineer or geologist has been employed by you. 1. The Controller of Mines (SZ),, Bangalore.

6 No. TN/TNL/Lst-24.MDS Mine Code: 38TMN15091 C-4-A, Rajaji Bhavan To: Dated: Sri C.Senthil Kumar,Partner S/o, Sri P.Chinnannan, Tirunelvelli Lime Products 58/1,Anna Nagar,3 rd Street, Karur Mills,Thanthonimalai Post Karur Rules,1988, in respect of your Kuppanapuram Limestone mine over hect in Sellianallur village Tirunelvelli taluk & district of Tamilnadu State. Geologist on in presence of Sri Selvakumar,Geologist. The owner, agent, mining engineer or manager of every mine shall 24(1) send to Controller General, Controller of Mines and the Regional Controller of Mines a notice in Form D-1 when the mining or mineral processing operations in the mine or part thereof are discontinued for a period exceeding ninety days so as to reach them within one hundred and five days from the date of such temporary discontinuance Mine was discontinued, but, the temporary discontinuance notice in Form-D-1 has not been submitted by you till date. 1. The Controller of Mines (SZ),, Bangalore.

7 No. TN/TNL/Lst-7.MDS Mine Code: 38TMN15022 C-4-A, Rajaji Bhavan To: Dated: Sri C.Mesvin,Manager(Mines) M/s India Cements Ltd, Sellianallur Limestone mine Sankarnagar Tirunelvelli District Rules,1988, in respect of your Sellianallur Limestone mine over hect in Sellianallur village Tirunelvelli taluk & district of Tamilnadu State. Geologist on in presence of Sri KN.Jiju, AMG(geology)of your company. The owner, agent, mining engineer or manager of every mine 24(1) shall send to Controller General, Controller of Mines and the a notice in Form D-1 when the mining or mineral processing operations in the mine or part thereof are discontinued for a period exceeding ninety days so as to reach them within one hundred and five days from the date of such temporary discontinuance Mine was discontinued, but, the temporary discontinuance notice in Form-D-1 has not been submitted by you till date. 1. The Controller of Mines (SZ),, Bangalore.

8 No. TN/SLM/Lst-116.MDS Mine Code: 38TMN11087 C-4-A, Rajaji Bhavan To: M/s Max Mining Syndicate. Alathur Limestone mine 202,Sangodan Palayam, Tiruchengode Namakkal District Dated: Rules,1988, in respect of your Alathur Limestone mine over hect in Alathur village,sankari taluk of Salem district of Tamilnadu State. Geologist on in presence of Sri Sukumar, your representative. The proposals made in the approved scheme of mining in the para 13(1) no.4.2 under proposed exploration programme as per the table no.14,to put 8 no of wagon drill holes to know the continuity and depth continuity of limestone in the year But, the exploration programme has not been carried out by you. (ANUPAM NANDI) Deputy Controller of Mines&OIC 1. The Controller of Mines (SZ),, Bangalore. (ANUPAM NANDI) Deputy Controller of Mines&OIC

9 No. TN/SLM/Lst-40.MDS Mine Code: 38TMN11005 C-4-A, Rajaji Bhavan To, Dated: Sri S.Selladurai. M/s Sree Krishna Mines & Chemicals. Devannagoundanur Limestone mine No.3,Sankagiri Main Road, Annadanapatty, Salem Rules,1988, in respect of your Devannagoundanur Limestone mine over hect in Devannagoundanur village,sankari taluk of Salem district of Tamilnadu State. Geologist on in presence of Sri Saravanan, your representative. The owner, agent, manager or mining engineer shall submit to the 23E(2), a yearly report before 1st July of every year setting forth the extent of protective and rehabilitative works carried out as envisaged in the approved scheme of mining. But, the report on protective measures under taken in the year has not been submitted by you. (ANUPAM NANDI) Deputy Controller of Mines&OIC 1. The Controller of Mines (SZ),, Bangalore. (ANUPAM NANDI) Deputy Controller of Mines&OIC

10 No. TN/SLM/Lst-123.MDS Mine Code: 38TMN11077 C-4-A, Rajaji Bhavan To: Dated: Sri K.Sekaran, M/s Kalaimagal MineralCorporation. Chinnagoundanur Limestone mine No.7,Kotai Street,Sankari, Salem Rules,1988, in respect of your Chinnagoundanur Limestone mine over hect in Chinnagoundanur village,sankari taluk of Salem district of Tamilnadu State. Geologist on in presence of Sri S.Sengodan, your representative. Every holder of a mining lease shall employ, in case of category 'B' 42(1)(c)(ii) mines, a part-time mining engineer and a part-time geologist. But, no part-time mining engineer or geologist has been employed by you. (ANUPAM NANDI) Deputy Controller of Mines&OIC 1. The Controller of Mines (SZ),, Bangalore. (ANUPAM NANDI) Deputy Controller of Mines&OIC

11 C-4-A, Rajaji Bhavan C No. TN/VRD/LSt-30.MDS Mine Code: 38TMN30023 Dated: To: Smt K.Gowri. M/s Gowri kumar&company A.Reddiyapatti Limestone mine No.50,Ramakrishna road, Salem Rules,1988, in respect of your A.Reddiyapatti Limestone mine over 1.34hect in A.Reddiyapatti village,virudhunagar district Tamilnadu state. above mine during the MCDR inspection by Sri A.S.Sanjeeva Rao, Asst., Mining Geologist on in presence of your representative Sri Muniyandi. 16 The overburden and waste material obtained during mining operations shall not be allowed to be mixed with non-salable or subgrade minerals/ores. They shall be dumped and stacked separately on the ground earmarked for the purpose. But, on the day of inspection, it was observed that the limestone mineral is not segregated properly and mineral is not separated/dumped in lease area instead of stacking on the place earmarked for it. constitute an offence punishable under Rule 58 of Mineral Conservations and position to this office within 45 (forty five) days from the date of issue of this letter. 1. The Controller of Mines (SZ),, Bangalore. (T.K.Rath) (T.K.Rath)

12 C-4-A, Rajaji Bhavan C No. TN/TCR/LSt-.MDS Mine Code: 38TMN1 Date: To: M/s Dandapani Cements Ltd., Rules,1988, in respect of your Neiveli limestone mine over 3.22 hect in Neiveli village, Lalgudi taluk Trichy district Tamilnadu State. above mine during the MCDR inspection by Sri A.S.Sanjeeva Rao, Asst., Mining Geologist on in presence of your representative Sri Diwakar. 13(1) It was proposed in the approved scheme of mining to produce 1357 tonnes of limestone from pit-iii during the year , whereas actual production for the year was 3531 tonnes as reported in the review of the Scheme of Mining submitted for onwards. constitute an offence punishable under Rule 58 of Mineral Conservations and position to this office within 45 (forty five) days from the date of issue of this letter. 1. The Controller of Mines (SZ),, Bangalore. (T.K.Rath) (T.K.Rath)

13 C-4-A, Rajaji Bhavan C No. TN/TCR/LSt-30.MDS Mine Code: 38TMN14041 Date: To: Thiru N. Mahadevan Meenakshi Mineral & Chemicals 143/1,E.B Road, Trichy Rules,1988, in respect of your Neiveli limestone mine over 3.22 hect in Neiveli village, Lalgudi taluk Trichy district Tamilnadu State. above mine during the MCDR inspection by Sri A.S.Sanjeeva Rao, Asst., Mining Geologist on in presence of your representative Sri Diwakar. 13(1) It was proposed in the approved scheme of mining to produce 1357 tonnes of limestone from pit-iii during the year , whereas actual production for the year was 3531 tonnes as reported in the review of the Scheme of Mining submitted for onwards. 45(5)(a) The Owner, Agent, Mining Engineer or Manager of every mine shall submit monthly return of the mine before 10th of every month in respect of preceding month in the form F-8, but the same has not received by the Regional Controller of Mines,, Chennai, since April, (5)(b) The Owner, Agent, Mining Engineer or Manager of every mine should submit an annual return of the mine before the 1st July every year for the preceding financial year in form H-8, but the same has not been received by the Regional Controller of Mines,, and Chennai for the year till date. constitute an offence punishable under Rule 58 of Mineral Conservations and position to this office within 45 (forty five) days from the date of issue of this letter. 1. The Controller of Mines (SZ),, Bangalore. (T.K.Rath) (T.K.Rath)

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Chennai regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION TN/TCR/LST-1, MDS (ii) Designation : (iii) Accompaning mine : Official

More information

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha)

MCDR INSPECTION General. Date of Inspection Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) ::1:: MCDR INSPECTION General SN Particulars Details Date of Inspection 23.8.2015 1 Name of the Mine Bhatbhera Limestone Mine 2 Total Lease Area (Ha) 4.808 Hect (Govt. Revenue Land), Non-forest land with

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR inspection REPORT Jabalpur regional office Mine file No : MP/KTN/LST-96 (i) Name of the Inspecting : Officer and ID No. (ii) Designation

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT. Bangalore regional office 1. Mine file No : (i) Name of the Inspecting : Officer and ID No. INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION KNT/CTD/LST/19/BNG (ii) Designation : (iii) Accompaning mine : Official

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 12.137 Ha. land 3 Mine code 38CHG14086 4 IBM

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine Matia Limestone Mine 2 Total Lease Area (Ha) with breakup of Non-forest and forest 8.144 ha.,non forest land land 3 Mine code

More information

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection

MCDR INSPECTION REPORT. S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection MCDR INSPECTION REPORT General S. N. Particulars Details 1 Name of the Mine, Inspecting officer with Designation, Date of Inspection Bharuadih Limestone Mine,Rajesh Kumar Das,Sr.ACOM,18.08.2017 2 Total

More information

MCDR INSPECTION REPORT

MCDR INSPECTION REPORT MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the inspecting officer J.S. Hada, AMG 2 Date of Inspection 9.9.2017 3 Accompanying mine official Lessee and Mining Engineer Shri K.L.

More information

DETAILS OF EXISTING LIMESTONE MINES. Extent (in Hect./ Acres) Classifi cation of land. S.F.No. 49/ Hects Hects. 39/8 etc.

DETAILS OF EXISTING LIMESTONE MINES. Extent (in Hect./ Acres) Classifi cation of land. S.F.No. 49/ Hects Hects. 39/8 etc. DETAILS OF EXISTING LIMESTONE MINES DISTRICT: TIRUCHIRAPPALLI Non- Sl. No. Major Mineral Name and Address of lessee Taluk and Village S.F.No. Extent (in Hect./ Acres) Classifi cation of land G.O./ proceedings

More information

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011

MCDR INSPECTION REPORT hect. (All Non-forest) IBM/4816/2011 MCDR INSPECTION REPORT 1.0 GENERAL SN Particulars Details 1 Name of the Mine, Name of Inspecting officer with designation and date of inspection 2 Total Lease Area (Ha) with breakup of Non-forest and forest

More information

CONTENTS. and 62 of MCDR Flow Diagram for Notice of opening of mine under Rule 20, 2.1 Rule - 18 Beneficiation studies to be carried out 11

CONTENTS. and 62 of MCDR Flow Diagram for Notice of opening of mine under Rule 20, 2.1 Rule - 18 Beneficiation studies to be carried out 11 Part NO. CONTENTS CHAPTER I Flow Diagram for Rule 20, 21, 28, 30, 35, 45, 49, 50, 51 and 62 of MCDR 2017 1.1 Flow Diagram for Notice of opening of mine under Rule 20, PAGE NO. 1 MCDR 2017 1.2 Flow diagram

More information

(3) The consent letter/declaration/undertaking may have uniform signature of the lessee.

(3) The consent letter/declaration/undertaking may have uniform signature of the lessee. Annexure SCRUTINY COMMENTS ON THE DRAFT REVIEW OF MINING PLAN AND PMCP OF RAJABERA IRON ORE MINE (41.697 HA.) OF SHRI PADAM KUMAR JAIN LOCATED IN SINGHBHUM (WEST) DISTRICT, JHARKHAND SUBMITTED UNDER RULE

More information

*** The following Notification shall be published in an extra-ordinary issue of the Andhra Pradesh Gazette dt

*** The following Notification shall be published in an extra-ordinary issue of the Andhra Pradesh Gazette dt GOVERNMENT OF ANDHRA PRADESH ABSTRACT Mines and Minerals Punitive Measures to control Illegal Mining and Transportation of Minor Minerals Amendments to A.P. Minor Mineral Concession Rules, 1966 - Orders

More information

Lease Statistics (The First Half of FY2018)

Lease Statistics (The First Half of FY2018) Lease Statistics (The First Half of FY2018) October 29, 2018 The lease transaction volume in the first half of FY2018 (from April 2018 to September 2018) is 2,362.8 billion yen, increased by 3.9% compared

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF ROUGH STONE (Extent 1.91.5Ha)-B2 Project IN S.F.No 1257/1 Village Nagamangalam Taluk Denkanikottai District

More information

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office

INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION MCDR INSPECTION REPORT Bangalore regional office Mine file No : KNT/RCH/G-4/BNG (i) Name of the Inspecting : Officer and ID No. (ii)

More information

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund

FOR Sand Stone Quarry Village : Chhirraleva Tehsil : Basna District : Mahasamund Project Report FOR Sand Stone Quarry at Village : Chhirraleva Tehsil : Basna District : Mahasamund Contents 1. About the Firm... 1 2. Location of the Project... 1 3. Environmental Setting of Project...

More information

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE

FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT FOR QUARRYING OF BLACK GRANITE FORM -1 MINING PLAN & PRE-FEASIBILITY REPORT TO OBTAIN ENVIRONMENTAL CLEARANCE FOR QUARRYING OF BLACK GRANITE (Extent 2.3.0Ha)-B2 Project IN S.F.Nos 248/2 (P), 248/1A (P), 248/1B(P) and 248/1C (P) Village

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.800Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) BLOCK PERIOD 2015-16 TO 2021-22 BALANCE

More information

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY

Geological Report on Limestone Exploration Of Bhatvadiya B Block Of EXECUTIVE SUMMARY Geological Report on Limestone Exploration Of Bhatvadiya B Block Of Kalyanpur Taluka, Devbhumi Dwarka District, Gujarat EXECUTIVE SUMMARY Prepared for: Gujarat Mineral Research & Development Society Government

More information

Cominco ltd. REPORT OF GRID "C" GEOCHEMICAL SURVEY ON VINE 1 CLAIM, VINE 1, 25, 27 CLAIM GROUP Fort Steele Mining Division

Cominco ltd. REPORT OF GRID C GEOCHEMICAL SURVEY ON VINE 1 CLAIM, VINE 1, 25, 27 CLAIM GROUP Fort Steele Mining Division GOVERNMENT OFFICE Cominco ltd. EXPLORATION DIVISION REPORT OF GRID "C" GEOCHEMICAL SURVEY ON VINE 1 CLAIM, VINE 1, 25, 27 CLAIM GROUP Fort Steele Mining Division Submitted by: E.W. BATCHELOR Cominco Ltd.

More information

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY PROPOSAL TO OBTAIN ENVIRONMENTAL CLEARANCE FROM District Level Environment Impact Assessment Authority (DEIAA), Tiruvannamalai District, Tamilnadu FOR QUARRYING OF KAGANAM ROUGH STONE AND GRAVEL QUARRY

More information

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No:

SRI E.DEVARAJULU, S/O.E.Ramachandra Naidu, D.No: 26-39, Palamaner Road,Kajur, Chittoor (District), Andhara Pradesh State. Contact No: MINING SCHEME FOR BLACK GRANITE OVER AN EXTENT OF 1.500Hects. IN Sy.No. 1406 OF VAVILTHOTA(V), PUTHALAPATTU (M), CHITTOOR (Dist) A.P (Under Rule 18(2) of GCDR 1999) 1st SCHEME PERIOD 2017-18 TO 2021-22

More information

DECREE No. 44. of the Ministry of Economy of the Slovak Republic. dated 19 February 1999,

DECREE No. 44. of the Ministry of Economy of the Slovak Republic. dated 19 February 1999, DECREE No 44 of the Ministry of Economy of the Slovak Republic dated 19 February 1999, Implementing Act on the Prohibition of Chemical Weapons, and on Changes and Amendments to some Acts The Ministry of

More information

ZZI/CLAB-KSPCB/04/ Environmental Officer

ZZI/CLAB-KSPCB/04/ Environmental Officer ZZI/CLAB-KSPCB/04/ 7266 18-11-2015 Environmental Officer Regional Office, Karnataka State Pollution Control Board Parisara Bhavan, LIG II, B 217 B-1, Main Road, A-16th Cross Near Hari Om Trust, Habbuwada

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block A, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary

Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat. Executive Summary Geological report on Limestone Exploration of Goyla Block, Abadasa Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared by Geovale

More information

COAL EXPLORATION & RESOURCES

COAL EXPLORATION & RESOURCES COAL EXPLORATION & RESOURCES Chapter-3 3.1 INTRODUCTION Exploration for Coal in the country is carried out in two broad stages i.e. the Regional Exploration and Detailed Exploration. The regional exploration

More information

IBM MANUAL FOR APPRIASAL OF MINING PLAN

IBM MANUAL FOR APPRIASAL OF MINING PLAN IBM MANUAL FOR APPRIASAL OF MINING PLAN 0. INTRODUCTION 01. The recent amendments in Mines and Minerals (Development & Regulation) (MMD&R) Act 1957 and Mineral Concession Rules (MCR), 1960 have been brought

More information

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1

ANNEXURE I Site Location map of M/s. Stone Plus quarry lease A-1 ANNEXURE I Site Location map of M/s. quarry lease A-1 Quarry Lease boundary map of M/s. A-2 a. Introduction M/s. proposes to conduct semi mechanized open cast method quarrying for Colour granite extraction

More information

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary

Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat. Executive Summary Geological Report on Limestone Exploration of Mudhvay Sub-block B, Lakhpat Taluka, Kachchh District, Gujarat Executive Summary Prepared for Commissioner of Geology & Mining Government of Gujarat Prepared

More information

List of Legislative Regulations Dealing with Nuclear Energy and Ionizing Radiation and Related Documents

List of Legislative Regulations Dealing with Nuclear Energy and Ionizing Radiation and Related Documents List of Legislative Regulations Dealing with Nuclear Energy and Ionizing Radiation and Related Documents as on 18 June 2001 I. Atomic Act and Related Implementing Regulations a) Atomic Act 1. Act No. 18/1997

More information

Lease Statistics (December 2018)

Lease Statistics (December 2018) January 28, 2018 Lease Statistics (December 2018) The lease transaction volume in December 2018 is 420.8 billion yen, increased by 2.7%, compared with the same period of the last year. The lease transaction

More information

Meghalaya. Mining their own business. Arwat Challam

Meghalaya. Mining their own business. Arwat Challam Meghalaya Mining their own business Arwat Challam Introduction Area of 22,429 sq. km. Divided into 7 Districts Meghalaya Three Main tribes- Khasi, Pnar and Garo Indo-Malayan Biodiversity Hotspot. Major

More information

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988

MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,1988 MINING PLAN FORMAT (A & B CATEGORY MINES) As per MCDR,988 INTRODUCTORY NOTES. 'A' category mines : all mines excluding 'B' Category mines. B' category mines : all 'B' Category mines excluding very small

More information

Mineralwise Existing Mines Details

Mineralwise Existing Mines Details District:KARUR Sl No Major Mineral Name of the Lessee with Address Other reasons For want of Environmnetal Clearance 1 2 3 4 5 6 7 8 9 10 11 12 Ms.No.162 10.08.1994 to 1 Limestone S.Sekar 833/4B 1.90.5

More information

ANALYSIS ON THE OPERATIONAL PERFORMANCE OF THE CORPORATION FOR THE PERIOD FROM 01/04/2018 TO 01/03/2019

ANALYSIS ON THE OPERATIONAL PERFORMANCE OF THE CORPORATION FOR THE PERIOD FROM 01/04/2018 TO 01/03/2019 SANCTION for 2017-18 to (6/4) (Rs in Crores) (1) (2) (3) (4) (6) (8) (9) General Scheme 227.08 173.63 160.30 Special Scheme Open Term Loan 91.58 71.74 76.26 630.00 Equipment Refinance 67.51 61.06 39.74

More information

Brief Summary. Production = 4,00,000 TPA

Brief Summary. Production = 4,00,000 TPA S. NO. ITEMS DETAILS 1 Name of the Project: Dhrang Lime Stone Mine (Survey No 196, 197, 413P) 2 Serial no. in schedule As per EIA Notification dated 14.09.2006 and O.M. dated 24.12.2013, the project activity

More information

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT

CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT DEPOSIT 65 Queen Street West Suite 825, P.O. Box 75 Toronto, Ontario M5H 2M5 Canada CROCODILE GOLD INTERSECTS 7.1 G/T AU OVER 4.5 METERS INCLUDING 11.2 G/T AU OVER 2.6 METERS AT THE UNION REEFS PROJECT, PROSPECT

More information

New Policies on Chemical Environmental Management in China. Gao Yingxin Chemical Registration Center of MEP September 9, 2010

New Policies on Chemical Environmental Management in China. Gao Yingxin Chemical Registration Center of MEP September 9, 2010 New Policies on Chemical Environmental Management in China Gao Yingxin Chemical Registration Center of MEP September 9, 2010 Measures on Environmental Management of New Chemical Substances Strengthened

More information

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study

Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study Section 5 TERMS OF REFERENCE (ToR) For Topographical Surveying, Geological Study, and Final Mining Feasibilitiy Study I. BACKGROUND State Mining Corporation Limited (SMC), a subsidaiary of Druk Holdings

More information

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6.

TABLE OF CONTENTS. 1.0 Introduction. 2.0 Geology, Exploration and Reserves. 3.0 Mining. 4.0 Blasting. 5.0 Mine Drainage. 6. TABLE OF CONTENTS 1.0 Introduction 2.0 Geology, Exploration and Reserves 3.0 Mining 4.0 Blasting 5.0 Mine Drainage 6.0 Site Services 1.0 INTRODUCTION Pankaj Chandrakar a resident oftemri, P.O. Deopuri

More information

WHAT IS MINERAL EXPLORATION?

WHAT IS MINERAL EXPLORATION? INDABA PRESENTATION CAPE TOWN FEBRUARY 2017 AIM:SAV WHAT IS MINERAL EXPLORATION? AIM:SAV What is mineral exploration? 2 Exploration is the term used to describe a wide range of activities aimed at searching

More information

JAI MAA SHARDA STONE CRUSHING

JAI MAA SHARDA STONE CRUSHING JAI MAA SHARDA STONE CRUSHING Prop. Hukum Singh (M. No. 9425585252) Near-Pahunadukan Kedarpur Ambikapur, (C.G.) To, The Member Secretary, SLEIAA(State Level Environment Impact Assessment Authority), Ministry

More information

Condor - Company Summary

Condor - Company Summary NOVEMBER 2014 Condor - Company Summary Condor is a project generator focused exclusively on precious and base metals exploration in Peru and Chile. Condor s objective is the discovery of a major new precious

More information

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO

BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO BEFORE THE OIL AND GAS CONSERVATION COMMISSION OF THE STATE OF COLORADO IN THE MATTER OF THE APPLICATION OF ) BLACK HILLS PLATEAU PRODUCTION, LLC ) CAUSE NO. 166 FOR AN ORDER ALLOWING TWO HORIZONTAL )

More information

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA)

ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-I (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-II (AS PER FORMAT ISSUED BY BIHAR-SEIAA) ANNEXURE-III LETTER OF INTENT Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner

More information

LONG LAKE ZINC MINE. Selected References "Zinc and Lead Deposits of Canada'% Geol. Surv. Can., Econ. Geol. Series, No k 8, 1930, pp, H6-151.

LONG LAKE ZINC MINE. Selected References Zinc and Lead Deposits of Canada'% Geol. Surv. Can., Econ. Geol. Series, No k 8, 1930, pp, H6-151. April,1952 31CI8NW8eie 63.3149 OLDEN 010 ^ LONG LAKE ZINC MINE Selected References Alcock, P.J., "Zinc and Lead Deposits of Canada'% Geol. Surv. Can., Econ. Geol. Series, No k 8, 1930, pp, H6-151. Harding,

More information

Mindarie Mineral Sands Project: A New Beginning

Mindarie Mineral Sands Project: A New Beginning Mindarie Mineral Sands Project: A New Beginning SA Exploration and Mining Conference November 28, 2013 Adelaide, SA Patrick Mutz CEO Murray Zircon Pty Ltd 1 Murray Zircon Pty Ltd Australia s newest mineral

More information

Provincial Standards for Early Exploration

Provincial Standards for Early Exploration Introduction Provincial Standards for Early Exploration Effective April 10, 2018 These Provincial Standards have been developed as part of the implementation of the graduated regulatory regime for early

More information

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.

CORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April. 16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 5.42 m grading 4.35 g/t Au, 77.34 g/t Ag, 7.48% Cu, 4.24% Zn and 0.22% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP

Hole (93) From (m) To (m) m Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) CMLP Toachi Mining Inc. Intersects 13.91 m grading 3.51 g/t Au, 64.24 g/t Ag, 0.59% Cu, 4.11% Zn and 0.85% Pb at the Gold-Rich La Plata VMS Project in Ecuador Toronto, Ontario October 11, 2017 Toachi Mining

More information

DISTRICT : TIRUNELVELI

DISTRICT : TIRUNELVELI MODIFICATION OF APPROVED MINING PLAN& PROGRESSIVE MINE CLOSURE PLAN FOR THENMALAI LIMESTONE MINE (PRIVATE / A CATEGORY OTHER THAN FULLY MECHANISED /MP& PMCP /NON-FOREST/ PATTA LAND) Mining plan period

More information

Forecasting of meteorological drought using ARIMA model

Forecasting of meteorological drought using ARIMA model Indian J. Agric. Res., 51 (2) 2017 : 103-111 Print ISSN:0367-8245 / Online ISSN:0976-058X AGRICULTURAL RESEARCH COMMUNICATION CENTRE www.arccjournals.com/www.ijarjournal.com Forecasting of meteorological

More information

EXTENT : HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU

EXTENT : HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU SCHEME OF MINING FOR BLACK GRANITE QUARRY EXTENT : 1.14.0HA. S.F.No. : 378/5 VILLAGE : KARANDAPALLI TALUK : DENKANIKOTTAI DISTRICT : KRISHNAGIRI STATE : TAMIL NADU (UNDER RULE 12 OF GCDR 1999) LESSEE m/s.

More information

Ref: VGK/SEIAA/2018 Date: Pushpa Hotel Center, Chalamavari Street, Kasturibaipet, Vijayawada-10 Ph: Andhra Pradesh.

Ref: VGK/SEIAA/2018 Date: Pushpa Hotel Center, Chalamavari Street, Kasturibaipet, Vijayawada-10 Ph: Andhra Pradesh. Ref: VGK/SEAA/2018 Date: 26-03-2018 To From The Member Secretary V. Gopala Krishnan State Environmental mpact Assessment Authority, Lessee Andhra Pradesh Pollution Control Board No. 573, 6th A Cross, 8th

More information

Indian Minerals Yearbook 2013

Indian Minerals Yearbook 2013 Indian Minerals Yearbook 2013 (Part- I) 52 nd Edition STATE REVIEWS (Bihar) (FINAL RELEASE) GOVERNMENT OF INDIA MINISTRY OF MINES INDIAN BUREAU OF MINES Indira Bhavan, Civil Lines, NAGPUR 440 001 PHONE/FAX

More information

SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149. A. TEXT:

SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149. A. TEXT: Annexure SCRUTINY COMMENTS ON DRAFT REVIEW OF MINING PLAN IN RESPECT OF GHATKURI IRON ORE MINE (149.7343 HA) OF M/S NIRMAL KUMAR PRADEEP KUMAR IN GHATKURI AND KARAMPADA RESERVE FOREST DISTICT WEST SINGBHUM

More information

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER)

PRE-FEASIBILITY REPORT VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) PRE-FEASIBILITY REPORT OF VASAI LIMESTONE MINE (APPLICANT: SHRI KHERAJBHA KARUBHA KER) 1. EXECUTIVE SUMMARY: The existing Mining lease for mineral Limestone over 4.9000 Hectares for a period of thirty

More information

1.0 PURPOSE AND FORMAT OF THE FINAL EIR

1.0 PURPOSE AND FORMAT OF THE FINAL EIR 1.0 PURPOSE AND FORMAT OF THE FINAL EIR 1.1 PROJECT OVERVIEW CEMEX (RMC Pacific Materials, dba CEMEX) operates the Bonny Doon Shale and Limestone Quarries in Santa Cruz County for the production of Portland

More information

Assessment of Directed Land Use Development in Chennai Metropolitan Area

Assessment of Directed Land Use Development in Chennai Metropolitan Area 85 Journal on Design and Manufacturing Technologies, Vol.1, No.1, November 2007 Assessment of Directed Land Use Development in Chennai Metropolitan Area 1 2 Sampath Kumar V, Helen Santhi M 1 2 Professor,

More information

SUPPLEMENT TO MAGNETOMETER 6 ELECTROMAGNETIC SURVEY REPORT. DATED NOVEMBER l, 1973 CIGLEN INVESTMENTS LIMITED CLAIMS GROUP BAD VERMILLION LAKE AREA

SUPPLEMENT TO MAGNETOMETER 6 ELECTROMAGNETIC SURVEY REPORT. DATED NOVEMBER l, 1973 CIGLEN INVESTMENTS LIMITED CLAIMS GROUP BAD VERMILLION LAKE AREA ^ A R l ^ 1974 010 PROJECTS UNIT SUPPLEMENT TO MAGNETOMETER 6 ELECTROMAGNETIC SURVEY REPORT DATED NOVEMBER l, 1973 CIGLEN INVESTMENTS LIMITED CLAIMS GROUP BAD VERMILLION LAKE AREA DISTRICT OF RAINY RIVER

More information

REPORT ON APPLICATION TO RECORD WORK. on the CLAIM GROUP. BY Owners. issued at Penticton, B.C. Jan 19,1976. issued at Rossland B.C. Jan.

REPORT ON APPLICATION TO RECORD WORK. on the CLAIM GROUP. BY Owners. issued at Penticton, B.C. Jan 19,1976. issued at Rossland B.C. Jan. --.. REPORT ON APPLICATION TO RECORD WORK on the CLAIM GROUP 1976 2133 meters North-North-East Okanagan I- Falls Post Office 0,// --7 L Lat. 493 21 N., Long. 119 33 W

More information

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA Document Prepared By: Cauvery Hydro Energy Limited Contact Information Cauvery Hydro Energy Limited 67, Lavina Courts,

More information

Case study: Integration of REFLEX iogas and an Olympus PXRF analyzer with Leapfrog Geo for advanced dynamic modelling and better decision making

Case study: Integration of REFLEX iogas and an Olympus PXRF analyzer with Leapfrog Geo for advanced dynamic modelling and better decision making LEAPFROG GEO Case study: Integration of REFLEX iogas and an Olympus PXRF analyzer with Leapfrog Geo for advanced dynamic modelling and better decision making FIRST QUANTUM MINERALS LTD KEVITSA NI-CU-PT-PD

More information

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold

October 8, 2015 News Release Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold October 8, 2015 News Release 15-24 Brucejack Regional Drilling Intersects Over 8,000 Grams Per Tonne Gold Vancouver, British Columbia October 8, 2015; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or

More information

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year )

Engineer's Report. Main Street Business Area. Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year ) Engineer's Report for the Main Street Business Area Festoon Lighting and Sidewalk Cleaning Assessment District (Fiscal Year 2008-09) Prepared under the provisions of the Benefit Assessment Act of 1982

More information

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept

Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with Grams per Tonne (3.618 Ounces per Ton) Intercept March 3, 2015 Pershing Gold Hits Highest Grade Gold to Date in Relief Canyon with 123.90 Grams per Tonne (3.618 Ounces per Ton) Intercept LAKEWOOD, Colo., March 3, 2015 (PR NEWSWIRE) Pershing Gold Corporation

More information

For personal use only

For personal use only Quarterly Activities Report September 2013 Equus Mining Limited (ASX: EQE) is pleased to report on its exploration activities in Chile, South America, and corporate developments for the quarter ended 30

More information

DMT Consulting Limited Technical Memorandum

DMT Consulting Limited Technical Memorandum DMT Consulting Limited International Mining Consultants From: To: Date: 4 th June 2018 Project Number: 2067 6813 Document Number DMT Consulting Limited Technical Memorandum Tim Horner Principal Geologist

More information

SCHEME OF MINING FOR BLACK GRANITE(DOLERITE) MINE LESSEE

SCHEME OF MINING FOR BLACK GRANITE(DOLERITE) MINE LESSEE SCHEME OF MINING FOR BLACK GRANITE(DOLERITE) MINE EXTENT : 1.20.0HA. S.F.Nos. : 1/6, 2/1, 2/2A, 2/3B1 & 2/3B2 VILLAGE : SEMANGALAM TALUK : VANUR DISTRICT : VILUPPURAM STATE : TAMIL NADU (UNDER RULE 12

More information

Institutional Control Registry - Report

Institutional Control Registry - Report Institutional Control Registry - Report IC REGISTRY ICR # ICR - 01 Date of Acceptance May 11, 2009 Contact Lake Mine Cameco Corporation Cameco Corporation La Ronge 73-P-07 UTM-North 6141199 UTM-East 507983

More information

For personal use only

For personal use only PRIMARY INTERSECTS BROAD ZONES OF GOLD MINERALISATION AT MOUNT BUNDY INCLUDING 117M AT 1.5G/T GOLD HIGHLIGHTS Initial results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold

More information

6 MACRAES MINING PROJECT MINERAL ZONE

6 MACRAES MINING PROJECT MINERAL ZONE 6 MACRAES MINING PROJECT MINERAL ZONE 6.1 ZONE STATEMENT The Macraes Mining Zone applies to the area of land controlled by Macraes Mining Limited and included in Mining Permit 41-064 at the date of public

More information

ANSWER THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (SHRI PIYUSH GOYAL)

ANSWER THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER, COAL, NEW & RENEWABLE ENERGY AND MINES (SHRI PIYUSH GOYAL) 268. SHRI JUGAL KISHORE: GOVERNMENT OF INDIA MINISTRY OF MINES LOK SABHA UNSTARRED QUESTION NO.268 TO BE ANSWERED ON 17 TH NOVEMBER, 2016 ILLEGAL MINING OF IRON ORE AND MANGANESE Will the Minister of MINES

More information

For personal use only

For personal use only Niuminco Group Suite 50, 14 Narabang Way, Austlink Corporate Centre, Belrose NSW 2085, Australia Tel: (02) 9450 0828 Fax: (02) 9450 0877 Email: info@niuminco.com.au ABN 44 009 163 919 QUARTERLY ACTIVITIES

More information

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred

Fission s Initial Resource Totals at PLS: 79.6M lbs Indicated and 25.9M lbs Inferred Suite 700 1620 Dickson Ave. Kelowna, BC V1Y 9Y2 rich@fissionuranium.com www.fissionuranium.com TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF January 9, 2015 FRANKFURT SYMBOL: 2FU Fission s Initial Resource Totals

More information

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY

MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 24 April 2013 ASX: AOH, FSE: A2O MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 1,000 hole RAB drilling programme directed at large copper-gold anomalies Altona Mining Limited ( Altona ) has commenced

More information

Junior Uranium explorer in the Athabasca Basin. Patterson Claims

Junior Uranium explorer in the Athabasca Basin. Patterson Claims Junior Uranium explorer in the Athabasca Basin Patterson Claims Cautionary Note Regarding Forward-Looking Statements This Presentation and the exhibits attached herein contain forward-looking statements

More information

Disclaimer. Forward-Looking Statements. Competent Person s Statement

Disclaimer. Forward-Looking Statements. Competent Person s Statement Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements

More information

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway

June 4, 2015 News Release Valley of the Kings Underground Infill Drilling Underway June 4, 2015 News Release 15-10 Valley of the Kings Underground Infill Drilling Underway Vancouver, British Columbia June 4, 2015; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or the Company ) is pleased

More information

Drilling highlights include:

Drilling highlights include: Toro Gold Ltd Trafalgar Court Admiral Park Guernsey GY1 3EL News Release: 10 th July 2018, Guernsey Mako Mine, Senegal Exploration Drilling Update Toro Gold ( Toro Gold or the Company ) is pleased to provide

More information

Administration of Mineral Rights

Administration of Mineral Rights Administration of Mineral Rights Deborah Archibald Industry, Tourism and Investment, GNWT Malcolm Robb Aboriginal Affairs and Northern Development Canada Business Today How applications are being treated

More information

Sheffield Resources (SFX)

Sheffield Resources (SFX) Sheffield Resources (SFX) February 2015 Grant Craighead Research Manager gcraighead@breakawayinvestmentgroup.com Andrew McLeod Research Analyst amcleod@breakawayinvestmentgroup.com Company Information

More information

Geodata flow TUKES GTK mineral exploration data - future prospecting capital!

Geodata flow TUKES GTK mineral exploration data - future prospecting capital! Geodata flow TUKES GTK mineral exploration data - future prospecting capital! Head of Unit, Regional Geodata and Interpretation Jouni Vuollo, GTK, 2016 Final report Six months Mineral exploration data

More information

Drilling Extending Mineralization in La Mina North Zone

Drilling Extending Mineralization in La Mina North Zone Toachi Mining Inc. Intersects 10.78 m grading 6.35 g/t Au, 54.32 g/t Ag, 9.64% Cu, 8.70% Zn and 0.43% Pb at the Gold-Rich La Plata VMS Project in Ecuador Drilling Extending Mineralization in La Mina North

More information

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare)

QUARRYING PLAN FOR. PARATAPUR SAND MINING BLOCK - 2 EXTENT Acres (4.93 Hectare) QUARRYING PLAN FOR PARATAPUR SAND MINING BLOCK - 2 EXTENT 12.20 Acres (4.93 Hectare) IN KRISHNA RIVER BED ADJACENT TO SY.NO 8/1, 8/2, 7/1 & 7/2 OF PARATAPUR - VILLAGE DEVADURGA - TALUK RAICHUR- DISTRICT

More information

WESTERN REGION - RICHM~ND PLANT

WESTERN REGION - RICHM~ND PLANT LAFARGE CANADA $C. WESTERN REGION - RICHM~ND PLANT VANANDA QUARRY Texada Island, B.C. Nanairno Mining District, B.C. GEOLOGY, DRILLING & GEOPHYSIC REPORT Location: Latitude 49" 45' 02" North, Longitude

More information

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING

CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING CENTRAL ZONE CONTINUES TO EXPAND AT EL GALLO 1 MINE REGIONAL DRILLING DELIVERS HIGH SILVER GRADES OVER GOOD WIDTHS NEW RESOURCE UPDATE PENDING TORONTO, ONTARIO (June 12, 2013) McEwen Mining Inc. (NYSE:

More information

Preparatory Site Report (PSR)

Preparatory Site Report (PSR) Preparatory Site Report (PSR) ACTIVITY 3.2 ILLEGAL QUARRYING CASE STUDY: LAKKA QUARRY CCaase Municipality of Kyrros, Prefecture of Pella, Region of Central Macedonia AUTHORS: Chatzipanagis Ioannis, Geologist,

More information

Administration by the CER of the Carbon Revenue Levy

Administration by the CER of the Carbon Revenue Levy Administration by the CER of the Carbon Revenue Levy DOCUMENT TYPE: REFERENCE: DATE PUBLISHED: QUERIES TO: Decision Paper CER/10/171 23 rd September 2010 Clive Bowers cbowers@cer.ie The Commission for

More information

REGIS RESOURCES LTD. McPhillamys Update Presentation May 2018

REGIS RESOURCES LTD. McPhillamys Update Presentation May 2018 1 REGIS RESOURCES LTD McPhillamys Update Presentation May 2018 INTRODUCTION 2 BACKGROUND Regis intends to develop a 7.0 Mtpa open pit gold mine at McPhillamys including the process facility and supporting

More information

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT

APPLICANT: M/s. Rock Sand & Minerals Pvt Ltd PRE-FEASIBILITY REPORT PRE- FEASIBILITY REPORT 1.1 Introduction EXECUTIVE SUMMARY The proposed mining lease of 19.80ha in survey no. 345 was granted to M/s. Rock Sand Minerals Pvt Ltd, for a period of 15 years by Asst. Director

More information

Drilling & Developing the Marcellus Shale

Drilling & Developing the Marcellus Shale Drilling & Developing the Marcellus Shale Presented by the Independent Oil and Gas Association of Pennsylvania at the Pennsylvania State Association of Township Supervisors Annual Meeting, May 12, 2008,

More information

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses

July 15, 2015 News Release Valley of the Kings Underground Infill Drilling Progresses July 15, 2015 News Release 15-13 Valley of the Kings Underground Infill Drilling Progresses Vancouver, British Columbia July 15, 2015; Pretium Resources Inc. (TSX/NYSE:PVG) ( Pretivm or the Company ) is

More information

Woodford County Erosion Prevention Plan and Permit. Application #

Woodford County Erosion Prevention Plan and Permit. Application # Woodford County Erosion Prevention Plan and Permit Application # Date Instructions: Applicant will complete Parts A and B, and attach a proposed site diagram. This diagram must be completed in accordance

More information

The Owl Creek Pit Part 1: Relocating Mine Rock from Surface Stockpiles to the Pit to Mitigate Acid Drainage

The Owl Creek Pit Part 1: Relocating Mine Rock from Surface Stockpiles to the Pit to Mitigate Acid Drainage The Owl Creek Pit Part 1: Relocating Mine Rock from Surface Stockpiles to the Pit to Mitigate Acid Drainage Jeff Martin 1, Thomas Sulatycky 2, Brian Fraser 1, Rina Parker 1, Bruce Rodgers 1 and Ron Nicholson

More information

For personal use only

For personal use only 18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand

More information

MINDARIE MINERAL SANDS PROJECT South Australia

MINDARIE MINERAL SANDS PROJECT South Australia MINDARIE MINERAL SANDS PROJECT South Australia Australia-China Resources Symposium Adelaide, South Australia 11 July 2012 Eddy Wu CEO Murray Zircon Pty Ltd 1 About Murray Zircon Established in June 2011,

More information