OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL
|
|
- Claud Mosley
- 5 years ago
- Views:
Transcription
1 API UMBER: 011 Horizontal Hole Oil & Gas OKLAHOMA CORPORATIO COMMISSIO OIL & GAS COSERVATIO DIVISIO P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) Approval Date: 03/29/2018 Expiration Date: 09/29/2018 PERMIT TO DRILL WELL LOCATIO: Sec: 35 Twp: 16 Rge: 12W County: BLAIE FEET FROM QUARTER: SPOT LOCATIO: SW SW SW SW FROM SOUTH FROM WEST SECTIO LIES: Lease ame: MOOSE 35_ W Well o: 2HX Well will be 219 feet from nearest unit or lease boundary. Operator ame: DEVO EERGY PRODUCTIO CO LP Telephone: ; OTC/OCC umber: DEVO EERGY PRODUCTIO CO LP PO BOX 2098 OKLAHOMA CITY, OK DOROTHY & KEETH BREWER 108 BOSTO DRIVE WATOGA OK Formation(s) (Permit Valid for Listed Formations Only): ame Depth ame Depth 1 MISSISSIPPIA MISSISSIPPI SOLID WOODFORD Spacing Orders: Location Exception Orders: Increased Density Orders: Pending CD umbers: Special Orders: Total Depth: Ground Elevation: 1506 Surface Casing: 1999 Depth to base of Treatable Water-Bearing FM: 150 Under Federal Jurisdiction: PIT 1 IFORMATIO o Fresh Water Supply Well Drilled: o Surface Water used to Drill: Yes Approved Method for disposal of Drilling Fluids: Type of Pit System: Type of Mud System: CLOSED Closed System Means Steel Pits WATER BASED Chlorides Max: 8000 Average: 5000 Is depth to top of ground water greater than 10ft below base of pit? Within 1 mile of municipal water well? Wellhead Protection Area? Pit is not located in a Hydrologically Sensitive Area. Category of Pit: C Liner not required for Category: C Pit Location is O HSA Pit Location Formation: DOG CREEK Y D. One time land application -- (REQUIRES PERMIT) PERMIT O: H. SEE MEMO This permit does not address the right of entry or settlement of surface damages. The duration of this permit is SIX MOTHS, except as otherwise provided by Rule 165: Rule 165: (c) (7) (e) - The Operator shall give 24 Hours notice by telephone to the appropriate District Office of the Conservation Division as to when Surface Casing will be run. Page 1 of 3
2 PIT 2 IFORMATIO Type of Pit System: CLOSED Closed System Means Steel Pits Type of Mud System: OIL BASED Chlorides Max: Average: Is depth to top of ground water greater than 10ft below base of pit? Within 1 mile of municipal water well? Wellhead Protection Area? Pit is not located in a Hydrologically Sensitive Area. Category of Pit: C Liner not required for Category: C Pit Location is O HSA Pit Location Formation: DOG CREEK Y HORIZOTAL HOLE 1 Sec 26 Twp 16 Rge 12W County BLAIE Spot Location of End Point: E W W W Feet From: Feet From: Depth of Deviation: Radius of Turn: 477 Direction: 1 Total Length: 9832 Measured Total Depth: True Vertical Depth: ORTH 1/4 Section Line: 50 WEST 1/4 Section Line: End Point Location from Lease, Unit, or Property Line: 50 otes: Category DEEP SURFACE CASIG HYDRAULIC FRACTURIG ITERMEDIATE CASIG LOCATIO EXCEPTIO Description 3/26/ G71 - APPROVED; OTIFY OCC FIELD ISPECTOR IMMEDIATELY OF AY LOSS OF CIRCULATIO OR FAILURE TO CIRCULATE CEMET TO SURFACE O AY CODUCTOR OR SURFACE CASIG 3/26/ G71 - OCC 165: REQUIRES: 1) PRIOR TO COMMECEMET OF HYDRAULIC FRACTURIG OPERATIOS FOR HORIZOTAL WELLS, OTICE GIVE FIVE BUSIESS DAYS I ADVACE TO OFFSET OPERATORS WITH WELLS COMPLETED I THE SAME COMMO SOURCE OF SUPPLY WITHI 1/2 MILE; 2) WITH OTICE ALSO GIVE 48 HOURS I ADVACE OF HYDRAULIC FRACTURIG ALL WELLS TO BOTH THE OCC CETRAL OFFICE AD LOCAL DISTRICT OFFICES, USIG THE "FRAC OTICE FORM" FOUD AT THE FOLLOWIG LIK: OCCEWEB.COM/OG/OGFORMS.HTML; AD, 3) THE CHEMICAL DISCLOSURE OF HYDRAULIC FRACTURIG IGREDIETS FOR ALL WELLS TO BE REPORTED TO FRACFOCUS WITHI 60 DAYS AFTER THE COCLUSIO THE HYDRAULIC FRACTURIG OPERATIOS, USIG THE FOLLOWIG LIK: FRACFOCUS.ORG 3/26/ G71 - DUE TO THE KOW POTETIAL RISK OF ECOUTERIG A OVER- PRESSURED ZOE I THE MORROW SERIES I THIS AREA, THE TECHICAL MAAGER RECOMMEDS SETTIG A ITERMEDIATE STRIG OF CASIG IMMEDIATELY ABOVE THE MORROW SERIES 3/27/ G56 - (I.O.) 26 & W X MSSP, WDFD ( W) X MSSSD, WDFD ( W) COMPL. IT. ( W) CT 165' FSL, CT 0' FL, CT 330' FWL COMPL. IT. ( W) CT 0' FSL, CT 165' FL, CT 330' FWL DEVO EERGY PROD. CO. LP This permit does not address the right of entry or settlement of surface damages. The duration of this permit is SIX MOTHS, except as otherwise provided by Rule 165: Rule 165: (c) (7) (e) - The Operator shall give 24 Hours notice by telephone to the appropriate District Office of the Conservation Division as to when Surface Casing will be run Page 2 of 3
3 Category Description MEMO 3/26/ G71 - PITS 1 & 2 - CLOSED SYSTEM=STEEL PITS PER OPERATOR REQUEST, PIT 2 - OBM RETURED TO VEDOR, CUTTIGS PERMITTED PER DISTRICT SPACIG SPACIG SPACIG /27/ G56 - (640) W VAC CSTR, MSSSD EXT MSSP, WDFD 3/27/ G56 - (640) (HOR) W EST. MSSSD, WDFD, OTHER COMPL. IT. (MSSSD) LT 660' FB COMPL. IT (WDFD) LT 165' FL/FSL, LT 330' FEL/FWL (COEXIST WITH SP. ORDER # MSSSD) 3/27/ G56 - (I.O.) 26 & W EST. MULTIUIT HOR. WELL X MSSP, WDFD ( W) X MSSSD, WDFD ( W) (WDFD IS A ADJACET COMMO SOURCE OF SUPPLY TO MSSP AD MSSD) 50% ( W) 50% ( W) O OP. AMED This permit does not address the right of entry or settlement of surface damages. The duration of this permit is SIX MOTHS, except as otherwise provided by Rule 165: Rule 165: (c) (7) (e) - The Operator shall give 24 Hours notice by telephone to the appropriate District Office of the Conservation Division as to when Surface Casing will be run. Page 3 of 3
4 SURVEYIG CA973(PE/LS) Exp. 6/30/18 OPERATOR: DEVO EERGY PRODUCTIO COMPAY, L.P. LEASE AME: MOOSE 35_ W DISTACE & DIRECTIO FROM HWY JCT OR TOW: WELL O. 2HX AT THE JCT. OF US-270 & OK-3, HEAD SOUTH 3MI TO GOOD DRILL SITE: YES E840RD, HEAD WEST 1.8MI± TO 2550RD, HEAD ORTH 1MI TO THE ITER. WITH E830RD SITE IS O THE E CORER. BLAIE COUTY, STATE: OK PLEASE OTE THAT THIS LOCATIO WAS STAKED O THE GROUD UDER THE SUPERVISIO OF A GROUD ELEVATIO: ' GR. AT STAKE LICESED PROFESSIOAL LAD SURVEYOR, BUT ACCURACY OF THIS EXHIBIT IS OT GUARATEED. PLEASE COTACT CRAFTO TULL PROMPTLY IF AY ICOSISTECY IS DETERMIED, GPS DATA IS SURFACE HOLE FOOTAGE: OBSERVED FROM RTK-GPS. OTE:X AD Y DATA SHOW HEREO FOR SECTIO CORERS MAY OT HAVE BEE SURVEYED O SECTIO: 35 TOWSHIP: T16 RAGE: R12W THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. QUARTER SECTIO DISTACES MAY BE ASSUMED FROM A GOVERMET SURVEY PLAT OR : 26-T16-R12W,I.M. ASSUMED AT A PROPORTIOATE DISTACE FROM OPPOSIG SECTIO CORERS, OR OCCUPATIO THEREOF, AD MAY OT HAVE BEE MEASURED O THE GROUD, AD FURTHER, ACCESSIBILITY TO LOCATIO: FROM SOUTH LIE DOES OT REPRESET A TRUE BOUDARY SURVEY. TOPOGRAPHY & VEGETATIO: LOCATIO FELL I A FIELD GRID ORTH (AD 27) 380' FWL - 50' FL 35 50' 27.92" ORTH 98 27' 11.92" WEST X: Y: LAT: LOG: BLAIE COUTY, OKLAHOMA SECTIO 35 TOWSHIP 16 RAGE 12W I.M. LAST PERFORATIO POIT 380' FWL - 165' FL X= Y= X= Y= SURFACE HOLE DATA X: LOG: X: Y: GPS DATUM: AD LOG: DATA X: LOG: X: AD LOG: IFORMATIO PROVIDED BY OPERATOR LISTED ' 45.97" ORTH LOG: SW COR. 35 FIRST PERFORATIO POIT 380' FWL- 165' FSL X= Y= X= Y= SE COR. GRAPHIC SCALE I FEET REVISIO "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W PROPOSED DRILL SITE BLAIE COUTY, OKLAHOMA SCALE: 1" = 2000' PLOT DATE: DRAW BY: 1 OF 6
5 SURVEYIG CA973(PE/LS) Exp. 6/30/18 OPERATOR: DEVO EERGY PRODUCTIO COMPAY, L.P. LEASE AME: MOOSE 35_ W DISTACE & DIRECTIO FROM HWY JCT OR TOW: WELL O. 2HX AT THE JCT. OF US-270 & OK-3, HEAD SOUTH 3MI TO GOOD DRILL SITE: YES E840RD, HEAD WEST 1.8MI± TO 2550RD, HEAD ORTH 1MI TO THE ITER. WITH E830RD SITE IS O THE E CORER. BLAIE COUTY, STATE: OK GROUD ELEVATIO: ' GR. AT STAKE SURFACE HOLE FOOTAGE: SECTIO: 35 TOWSHIP: T16 RAGE: R12W : 26-T16-R12W,I.M. ACCESSIBILITY TO LOCATIO: FROM SOUTH LIE TOPOGRAPHY & VEGETATIO: LOCATIO FELL I A FIELD API: PLEASE OTE THAT THIS LOCATIO WAS STAKED O THE GROUD UDER THE SUPERVISIO OF A LICESED PROFESSIOAL LAD SURVEYOR, BUT ACCURACY OF THIS EXHIBIT IS OT GUARATEED. PLEASE COTACT CRAFTO TULL PROMPTLY IF AY ICOSISTECY IS DETERMIED, GPS DATA IS OBSERVED FROM RTK-GPS. OTE:X AD Y DATA SHOW HEREO FOR SECTIO CORERS MAY OT HAVE BEE SURVEYED O THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. QUARTER SECTIO DISTACES MAY BE ASSUMED FROM A GOVERMET SURVEY PLAT OR ASSUMED AT A PROPORTIOATE DISTACE FROM OPPOSIG SECTIO CORERS, OR OCCUPATIO THEREOF, AD MAY OT HAVE BEE MEASURED O THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. GRID ORTH (AD 27) 380' FWL - 50' FL 35 50' 27.92" ORTH 98 27' 11.92" WEST X: Y: LAT: LOG: BLAIE COUTY, OKLAHOMA SECTIO 35 TOWSHIP 16 RAGE 12W I.M. X= Y= X= Y= LAST PERFORATIO POIT 380' FWL - 165' FL X= Y= X= Y= X= Y= SURFACE HOLE DATA X: LOG: X: Y: GPS DATUM: AD LOG: DATA X: LOG: X: AD LOG: IFORMATIO PROVIDED BY OPERATOR LISTED. X= Y= X= Y= ' 45.97" ORTH LOG: X= Y= SW COR. X= Y= FIRST PERFORATIO POIT 380' FWL- 165' FSL X= Y= X= Y= X= Y= X= Y= SE COR. GRAPHIC SCALE I FEET REVISIO "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W PROPOSED DRILL SITE BLAIE COUTY, OKLAHOMA SCALE: 1" = 2000' PLOT DATE: DRAW BY: 1 OF 6
6 GRID ORTH (AD 27) R SURVEYIG CA973(PE/LS) Exp. 6/30/18 OPERATOR: DEVO EERGY PRODUCTIO COMPAY, L.P. LEASE AME: MOOSE 35_ W DISTACE & DIRECTIO FROM HWY JCT OR TOW: WELL O. 2HX AT THE JCT. OF US-270 & OK-3, HEAD SOUTH 3MI TO GOOD DRILL SITE: YES E840RD, HEAD WEST 1.8MI± TO 2550RD, HEAD ORTH 1MI TO THE ITER. WITH E830RD SITE IS O THE E CORER. BLAIE COUTY, STATE: OK GROUD ELEVATIO: ' GR. AT STAKE SURFACE HOLE FOOTAGE: SECTIO: 35 TOWSHIP: T16 RAGE: R12W : 26-T16-R12W,I.M. ACCESSIBILITY TO LOCATIO: FROM SOUTH LIE TOPOGRAPHY & VEGETATIO: LOCATIO FELL I A FIELD 380' FWL - 50' FL 35 50' 27.92" ORTH 98 27' 11.92" WEST X: Y: LAT: LOG: BLAIE COUTY, OKLAHOMA SECTIO 35 TOWSHIP 16 RAGE 12W I.M. X= Y= PLEASE OTE THAT THIS LOCATIO WAS STAKED O THE GROUD UDER THE SUPERVISIO OF A LICESED PROFESSIOAL LAD SURVEYOR, BUT ACCURACY OF THIS EXHIBIT IS OT GUARATEED. PLEASE COTACT CRAFTO TULL PROMPTLY IF AY ICOSISTECY IS DETERMIED, GPS DATA IS OBSERVED FROM RTK-GPS. OTE:X AD Y DATA SHOW HEREO FOR SECTIO CORERS MAY OT HAVE BEE SURVEYED O THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. QUARTER SECTIO DISTACES MAY BE ASSUMED FROM A GOVERMET SURVEY PLAT OR ASSUMED AT A PROPORTIOATE DISTACE FROM OPPOSIG SECTIO CORERS, OR OCCUPATIO THEREOF, AD MAY OT HAVE BEE MEASURED O THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. X= Y= LAST PERFORATIO POIT 380' FWL - 165' FL X= Y= X= Y= X= Y= SURFACE HOLE DATA X: LOG: X: Y: GPS DATUM: AD LOG: DATA X: LOG: X: AD LOG: IFORMATIO PROVIDED BY OPERATOR LISTED. X= Y= X= Y= ' 45.97" ORTH LOG: X= Y= SW COR. X= Y= FIRST PERFORATIO POIT 380' FWL- 165' FSL X= Y= X= Y= X= Y= X= Y= SE COR. GRAPHIC SCALE I FEET REVISIO "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W PROPOSED DRILL SITE BLAIE COUTY, OKLAHOMA SCALE: 1" = 2000' PLOT DATE: DRAW BY: G:\ _MOOSE\EERGY\DWG_CLIPS\MOOSE 35_ W 3/29/2017 2HX.DWG1:31:27 PM DW OF 6
7 SURVEYIG CA973(PE/LS) Exp. 6/30/18 OPERATOR: DEVO EERGY PRODUCTIO COMPAY, L.P. LEASE AME: MOOSE 35_ W DISTACE & DIRECTIO FROM HWY JCT OR TOW: WELL O. 2HX AT THE JCT. OF US-270 & OK-3, HEAD SOUTH 3MI TO GOOD DRILL SITE: YES E840RD, HEAD WEST 1.8MI± TO 2550RD, HEAD ORTH 1MI TO THE ITER. WITH E830RD SITE IS O THE E CORER. BLAIE COUTY, STATE: OK GROUD ELEVATIO: ' GR. AT STAKE SURFACE HOLE FOOTAGE: SECTIO: 35 TOWSHIP: T16 RAGE: R12W : 26-T16-R12W,I.M. ACCESSIBILITY TO LOCATIO: FROM SOUTH LIE TOPOGRAPHY & VEGETATIO: LOCATIO FELL I A FIELD PLEASE OTE THAT THIS LOCATIO WAS STAKED O THE GROUD UDER THE SUPERVISIO OF A LICESED PROFESSIOAL LAD SURVEYOR, BUT ACCURACY OF THIS EXHIBIT IS OT GUARATEED. PLEASE COTACT CRAFTO TULL PROMPTLY IF AY ICOSISTECY IS DETERMIED, GPS DATA IS OBSERVED FROM RTK-GPS. OTE:X AD Y DATA SHOW HEREO FOR SECTIO CORERS MAY OT HAVE BEE SURVEYED O THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. QUARTER SECTIO DISTACES MAY BE ASSUMED FROM A GOVERMET SURVEY PLAT OR ASSUMED AT A PROPORTIOATE DISTACE FROM OPPOSIG SECTIO CORERS, OR OCCUPATIO THEREOF, AD MAY OT HAVE BEE MEASURED O THE GROUD, AD FURTHER, DOES OT REPRESET A TRUE BOUDARY SURVEY. GRID ORTH (AD 27) 380' FWL - 50' FL 35 50' 27.92" ORTH 98 27' 11.92" WEST X: Y: LAT: LOG: BLAIE COUTY, OKLAHOMA SECTIO 35 TOWSHIP 16 RAGE 12W I.M. X= Y= X= Y= LAST PERFORATIO POIT 380' FWL - 165' FL X= Y= X= Y= X= Y= SURFACE HOLE DATA X: LOG: X: Y: GPS DATUM: AD83 LAT: LOG: X= Y= X= Y= X= Y= X= Y= X= Y= DATA X: LOG: X: Y: AD LOG: IFORMATIO PROVIDED BY OPERATOR LISTED ' 45.97" ORTH LOG: X= Y= SW COR. X= Y= FIRST PERFORATIO POIT 380' FWL- 165' FSL X= Y= SE COR. GRAPHIC SCALE I FEET REVISIO "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W PROPOSED DRILL SITE BLAIE COUTY, OKLAHOMA SCALE: 1" = 2000' PLOT DATE: DRAW BY: G:\ _MOOSE\EERGY\DWG_CLIPS\MOOSE 35_ W 3/29/2017 2HX.DWG1:31:30 PM DW OF 6
8 SURVEYIG CA973(PE/LS) Exp. 6/30/18 380' FWL - 50' FL LAST PERFORATIO POIT 380' FWL - 165' FL GRID ORTH (AD 27) 26 PETERSO-1H 2320' FEL - 280' FSL IFORMATIO PROVIDED BY OPERATOR LISTED. EXISTIG WELL LOCATIOS TAKE FROM CORPORATIO COMMISSIO RECORDS AD MAY OT ECOMPASS ALL WELLS CURRETLY PERMITTIG OR OTHERWISE ABSET FROM THE RECORDS AT THE TIME OF THIS EXHIBIT. 600' HALO PROPOSED LATERAL 600' HALO 35 MARY LILLIE ' FWL - 990' FSL BREWER 1-35H 2440' FWL - 350' FSL FIRST PERFORATIO POIT 380' FWL- 165' FSL REVISIO GRAPHIC SCALE I FEET "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W BLAIE COUTY, OKLAHOMA EXISTIG WELL PROXIMITY SCALE: 1" = 1000' PLOT DATE: DRAW BY: G:\ _MOOSE\EERGY\DWG_CLIPS\MOOSE 35_ W 3/29/2017 2HX.DWG1:31:31 PM DW OF 6
9 SURVEYIG CA973(PE/LS) Exp. 6/30/18 VICIITY MAP GRID ORTH (AD 27) SEC. 35 TWP. 16 RG. 12W COUT_ BLAIE STATE:_ OK OPERATOR: Devon Energy Production Company, L.P. GRAPHIC SCALE I MILES REVISIO "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W PROPOSED DRILL SITE BLAIE COUTY, OKLAHOMA SCALE: 1/2" = 1 MILE PLOT DATE: DRAW BY: G:\ _MOOSE\EERGY\DWG_CLIPS\MOOSE 35_ W 3/29/2017 2HX.DWG1:31:34 PM DW OF 6
10 SURVEYIG CA973(PE/LS) Exp. 6/30/18 R 12 W 35 VICIITY MAP SCALE: 1" = 1000' BLAIE COUTY, OKLAHOMA SECTIO 35 TOWSHIP 16 RAGE 12W I.M ' 45.97" ORTH LOG: T ' ELEV: ELEV: GRID ORTH (AD 27) 380' 35 48' 45.97" ORTH LOG: ' THIS POIT LIES: 53 18' 26" E 65.13' FROM THE SOUTHWEST CORER OF SECTIO 35 ELEV: ELEV: ' PROPOSED PAD V-Door West GRAPHIC SCALE I FEET REVISIO "" PART OF THE SW/4 OF SECTIO 35, T-16-, R-12-W PROPOSED PAD SITE BLAIE COUTY, OKLAHOMA SCALE: 1" = 100' PLOT DATE: DRAW BY: G:\ _MOOSE\EERGY\DWG_CLIPS\MOOSE 35_ W 3/29/2017 2HX.DWG1:31:34 PM DW OF 6
OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL
API NUMBER: 039 Horizontal Hole 22513 Oil & Gas OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX 52000 OKLAHOMA CITY, OK 73152-2000 (Rule 165:10-3-1) Approval Date: 08/11/2017 Expiration
More informationOKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX OKLAHOMA CITY, OK (Rule 165:10-3-1) PERMIT TO DRILL
API NUMBER: 039 Horizontal Hole 22504 Oil & Gas OKLAHOMA CORPORATION COMMISSION OIL & GAS CONSERVATION DIVISION P.O. BOX 52000 OKLAHOMA CITY, OK 73152-2000 (Rule 165:10-3-1) Approval Date: 06/05/2017 Expiration
More information15-DAY PUBLIC NOTICE. Proposed revisions to sites include:
US Army Corps of Engineers Seattle District Joint Public otice Application for a Department of the Army Permit and a Washington Department of Ecology Water Quality Certification and/or Coastal Zone Management
More informationRAILROAD COMMISSION OF TEXAS OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG
RAILROAD COMMISSION OF TEXAS 1701 N. Congress P.O. Box 12967 Austin, Texas 78701-2967 Status: Form W-2 OIL WELL POTENTIAL TEST, COMPLETION OR RECOMPLETION REPORT, AND LOG Date: Tracking.: Approved 01/05/2016
More informationSUMMARY OF BOTTOM HOLE LOCATIONS CIMAREX ENERGY CO. 11,252'
SUMMARY OF BOTTOM HOLE LOCATIONS CIMAREX ENERGY CO. Lehman BIA 2-11H Section 11-15N-11W Blaine Co., Oklahoma Cause CD Number: 201803401-T Interim Order Number: 683171 Lehman BIA 2-11H MD TVD Location Surface
More informationBEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA CAUSE CD NO. APPLICANT: CONTINENTAL RESOURCES, INC.
BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA APPLICANT: CONTINENTAL RESOURCES, INC. CAUSE CD NO. RELIEF SOUGHT: MULTIUNIT HORIZONTAL WELL 201601055 LANDS COVERED: SECTIONS 33 AND 28, TOWNSHIP
More informationLecture 1. Statistics: A science of information. Population: The population is the collection of all subjects we re interested in studying.
Lecture Mai Topics: Defiitios: Statistics, Populatio, Sample, Radom Sample, Statistical Iferece Type of Data Scales of Measuremet Describig Data with Numbers Describig Data Graphically. Defiitios. Example
More informationRegulatory Report (Grid North)
Forge Energy Winkler County, TX (NAD 27 TC) UL 20 Tensleep #1H OH Survey: SDI Keeper Gyro Drop Regulatory Report (Grid North) 06 December, 2016 Regulatory Report (Grid North) Company: Forge Energy Local
More informationElk River Resources, LLC Andrews County, TX Sec 24, Blk 12, University Land Survey Wapiti H Wellbore #1 Survey: MWD Surveys (QES) QES Survey Re
Elk River Resources, LLC Andrews County, TX Sec 24, Blk 12, University Land Survey Wapiti 12-24 1H Wellbore #1 Survey: MWD Surveys (QES) QES Survey Report 08 February, 2017 QES Directional Drilling, LLC
More informationNational Oilwell Varco Survey Report
Elevation Resources Andrews County University 1-26 Unit 5H Surveys: 271`MD - 7076`MD Survey Date: Monday, July 04, 2016 National Oilwell Varco Survey Report Sunday, July 10, 2016 UWI No. 42-003-47118 Surface
More informationThe type of limit that is used to find TANGENTS and VELOCITIES gives rise to the central idea in DIFFERENTIAL CALCULUS, the DERIVATIVE.
NOTES : LIMITS AND DERIVATIVES Name: Date: Period: Iitial: LESSON.1 THE TANGENT AND VELOCITY PROBLEMS Pre-Calculus Mathematics Limit Process Calculus The type of it that is used to fid TANGENTS ad VELOCITIES
More informationUnit 4: Polynomial and Rational Functions
48 Uit 4: Polyomial ad Ratioal Fuctios Polyomial Fuctios A polyomial fuctio y px ( ) is a fuctio of the form p( x) ax + a x + a x +... + ax + ax+ a 1 1 1 0 where a, a 1,..., a, a1, a0are real costats ad
More informationTHE SOLUTION OF NONLINEAR EQUATIONS f( x ) = 0.
THE SOLUTION OF NONLINEAR EQUATIONS f( ) = 0. Noliear Equatio Solvers Bracketig. Graphical. Aalytical Ope Methods Bisectio False Positio (Regula-Falsi) Fied poit iteratio Newto Raphso Secat The root of
More informationCrane County, TX Sec. 37, Block 31, University Lands Survey University Lands A 37 #1H. Wellbore #1. Survey: MWD
Crane County, TX Sec. 37, Block 31, University Lands Wellbore #1 : MWD 16 May, 2012 Date: 1/12/12 Railroad Commission of Texas Oil and Gas Division 1701 North Congress Avenue Austin, Texas 78711 Attention:
More informationAcademic. Grade 9 Assessment of Mathematics. Released assessment Questions
Academic Grade 9 Assessmet of Mathematics 2014 Released assessmet Questios Record your aswers to the multiple-choice questios o the Studet Aswer Sheet (2014, Academic). Please ote: The format of this booklet
More informationExample: Find the SD of the set {x j } = {2, 4, 5, 8, 5, 11, 7}.
1 (*) If a lot of the data is far from the mea, the may of the (x j x) 2 terms will be quite large, so the mea of these terms will be large ad the SD of the data will be large. (*) I particular, outliers
More information17 Phonons and conduction electrons in solids (Hiroshi Matsuoka)
7 Phoos ad coductio electros i solids Hiroshi Matsuoa I this chapter we will discuss a miimal microscopic model for phoos i a solid ad a miimal microscopic model for coductio electros i a simple metal.
More informationDesign Data 16. Partial Flow Conditions For Culverts. x S o Q F = C 1 = (3) A F V F Q = x A x R2/3 x S o n 1/2 (2) 1 DD 16 (07/09)
Desig Data 16 Partial Flow Coditios For Culverts Sewers, both saitary ad storm, are desiged to carry a peak flow based o aticipated lad developmet. The hydraulic capacity of sewers or culverts costructed
More informationSlimPulse FS Original Hole Ft August 12, 2017
Oilfield Services, Central U.S. Land Schlumberger Drilling and Measurements Drilling Group Geo Market Area: South West Texas Basin 7220 W I-H 20 Midland, Texas 79706 Phone : (432) 742-5400 (Main) Fax :(432)
More informationRAILROAD COMMISSION OF TEXAS Oil & Gas Division P.O. Drawer Capitol Station Austin, TX
Evaluation, Drilling & Intervention 10000 West County Rd. 116 P.O. Box 61028 Midland, TX USA 79711 Tel. (432) 561-8892 Fax (432) 561-8895 RAILROAD COMMISSION OF TEXAS Oil & Gas Division P.O. Drawer 12967
More informationTEACHER CERTIFICATION STUDY GUIDE
COMPETENCY 1. ALGEBRA SKILL 1.1 1.1a. ALGEBRAIC STRUCTURES Kow why the real ad complex umbers are each a field, ad that particular rigs are ot fields (e.g., itegers, polyomial rigs, matrix rigs) Algebra
More informationInferential Statistics. Inference Process. Inferential Statistics and Probability a Holistic Approach. Inference Process.
Iferetial Statistics ad Probability a Holistic Approach Iferece Process Chapter 8 Poit Estimatio ad Cofidece Itervals This Course Material by Maurice Geraghty is licesed uder a Creative Commos Attributio-ShareAlike
More informationEconomics 250 Assignment 1 Suggested Answers. 1. We have the following data set on the lengths (in minutes) of a sample of long-distance phone calls
Ecoomics 250 Assigmet 1 Suggested Aswers 1. We have the followig data set o the legths (i miutes) of a sample of log-distace phoe calls 1 20 10 20 13 23 3 7 18 7 4 5 15 7 29 10 18 10 10 23 4 12 8 6 (1)
More informationChapter 8: Estimating with Confidence
Chapter 8: Estimatig with Cofidece Sectio 8.2 The Practice of Statistics, 4 th editio For AP* STARNES, YATES, MOORE Chapter 8 Estimatig with Cofidece 8.1 Cofidece Itervals: The Basics 8.2 8.3 Estimatig
More informationThe picture in figure 1.1 helps us to see that the area represents the distance traveled. Figure 1: Area represents distance travelled
1 Lecture : Area Area ad distace traveled Approximatig area by rectagles Summatio The area uder a parabola 1.1 Area ad distace Suppose we have the followig iformatio about the velocity of a particle, how
More informationFinite Difference Derivations for Spreadsheet Modeling John C. Walton Modified: November 15, 2007 jcw
Fiite Differece Derivatios for Spreadsheet Modelig Joh C. Walto Modified: November 15, 2007 jcw Figure 1. Suset with 11 swas o Little Platte Lake, Michiga. Page 1 Modificatio Date: November 15, 2007 Review
More informationUniversity of California, Los Angeles Department of Statistics. Hypothesis testing
Uiversity of Califoria, Los Ageles Departmet of Statistics Statistics 100B Elemets of a hypothesis test: Hypothesis testig Istructor: Nicolas Christou 1. Null hypothesis, H 0 (claim about µ, p, σ 2, µ
More informationCALCULUS BASIC SUMMER REVIEW
CALCULUS BASIC SUMMER REVIEW NAME rise y y y Slope of a o vertical lie: m ru Poit Slope Equatio: y y m( ) The slope is m ad a poit o your lie is, ). ( y Slope-Itercept Equatio: y m b slope= m y-itercept=
More informationLEWIS & CLARK. Location Description: Higgins Avenue, Russell Street, S.W. Higgins, and South Avenue. Miles of Streets: Miles of Trails: 1.
LEWIS & CLARK City of Missoula Locatio Descriptio: Higgis Aveue, Russell Street, S.W. Higgis, ad South Aveue. Size: 492.9 acres Date of Creatio: 1996 City Coucil Ward/Represetatives: Ward 4, Ly Hellegaard
More informationProblem Cosider the curve give parametrically as x = si t ad y = + cos t for» t» ß: (a) Describe the path this traverses: Where does it start (whe t =
Mathematics Summer Wilso Fial Exam August 8, ANSWERS Problem 1 (a) Fid the solutio to y +x y = e x x that satisfies y() = 5 : This is already i the form we used for a first order liear differetial equatio,
More informationCurve Sketching Handout #5 Topic Interpretation Rational Functions
Curve Sketchig Hadout #5 Topic Iterpretatio Ratioal Fuctios A ratioal fuctio is a fuctio f that is a quotiet of two polyomials. I other words, p ( ) ( ) f is a ratioal fuctio if p ( ) ad q ( ) are polyomials
More informationContinuous Data that can take on any real number (time/length) based on sample data. Categorical data can only be named or categorised
Questio 1. (Topics 1-3) A populatio cosists of all the members of a group about which you wat to draw a coclusio (Greek letters (μ, σ, Ν) are used) A sample is the portio of the populatio selected for
More informationChapter 12 - Quality Cotrol Example: The process of llig 12 ouce cas of Dr. Pepper is beig moitored. The compay does ot wat to uderll the cas. Hece, a target llig rate of 12.1-12.5 ouces was established.
More informationLecture Notes for Analysis Class
Lecture Notes for Aalysis Class Topological Spaces A topology for a set X is a collectio T of subsets of X such that: (a) X ad the empty set are i T (b) Uios of elemets of T are i T (c) Fiite itersectios
More information2. There is evidence of oil field waste discharged to an unnamed tributary to Bad Luck Creek. This is a violation of 40 CFR Part
September 10, 2008 Bill Fowler Chesapeake Energy Corporation P.O. Box 18496 Oklahoma City, OK 73154 RE: Cooper 7-9, 2-5H, Authorization #2008953 Dear Mr. Fowler: On, September 9, 2008, Eric Fleming and
More informationMathematics Extension 2
009 HIGHER SCHOOL CERTIFICATE EXAMINATION Mathematics Etesio Geeral Istructios Readig time 5 miutes Workig time hours Write usig black or blue pe Board-approved calculators may be used A table of stadard
More informationTrue North Directional Services Inc. Survey Report
Anglian Oil Company Ltd. Northern Lights AA Pad AA16, Slot #09 MWD Run #4 Job No. AB-CD-12345678 Date: 11 January 2013 True North Directional Services Inc. KellyDown - Version: 3.00.00.04 Project Northern
More informationMath 105: Review for Final Exam, Part II - SOLUTIONS
Math 5: Review for Fial Exam, Part II - SOLUTIONS. Cosider the fuctio f(x) = x 3 lx o the iterval [/e, e ]. (a) Fid the x- ad y-coordiates of ay ad all local extrema ad classify each as a local maximum
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationDrive Technology \ Drive Automation \ System Integration \ Services. Data Sheet. Functional Safety Safety Characteristics for BE..
Drive Techology \ Drive Automatio \ System Itegratio \ Services Data Sheet Fuctioal Safety Safety Characteristics for BE.. Brake Editio 12/2010 17062810 / EN SEW-EURODRIVE Drivig the world Data Sheet Safety
More informationBEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA
BEFORE THE CORPORATION COMMISSION OF THE STATE OF OKLAHOMA APPLICANT: CONTINENTAL RESOURCES, INC. CAUSE CD NO. RELIEF SOUGHT: MULTIUNIT HORIZONTAL WELL 201208449 LANDS COVERED: SECTION 16, TOWNSHIP 7 NORTH,
More informationNATIONAL SENIOR CERTIFICATE GRADE 12
NATIONAL SENIOR CERTIFICATE GRADE MATHEMATICS P EXEMPLAR 008 MARKS: 50 TIME: 3 hours This questio paper cosists of pages, diagram sheets ad a formula sheet. Please tur over Mathematics/P DoE/Eemplar 008
More informationDRILLING REPORT (DGO-GO-14)
Commonwealth of Virginia Department of Mines, Minerals, and Energy Division of Gas and Oil P.O. Box 1416; Abingdon, VA 24212 Telephone: (276) 676-5423 Tracking Number: Company: File Number: Operations
More informationLESSON 20: HYPOTHESIS TESTING
LESSN 20: YPTESIS TESTING utlie ypothesis testig Tests for the mea Tests for the proportio 1 YPTESIS TESTING TE CNTEXT Example 1: supervisor of a productio lie wats to determie if the productio time of
More informationMagnetic Length Sensor MLS (Hybrid)
Small Hybride Large Hybride AMR gradiet sesor Liear displacemet, movemets, velocities High precisio Various pole pitches available DESCRIPTION Slidig the MLS-Sesors alog a magetic scale will produce a
More information4.1 SIGMA NOTATION AND RIEMANN SUMS
.1 Sigma Notatio ad Riema Sums Cotemporary Calculus 1.1 SIGMA NOTATION AND RIEMANN SUMS Oe strategy for calculatig the area of a regio is to cut the regio ito simple shapes, calculate the area of each
More informationAP Calculus AB 2006 Scoring Guidelines Form B
AP Calculus AB 6 Scorig Guidelies Form B The College Board: Coectig Studets to College Success The College Board is a ot-for-profit membership associatio whose missio is to coect studets to college success
More informationStructure contours on Bone Spring Formation (Lower Permian), Delaware Basin
Structure contours on Bone Spring Formation (Lower Permian), Delaware Basin By Ronald F. Broadhead and Lewis Gillard New Mexico Bureau of Geology and Mineral Resources, a division of New Mexico Tech, Socorro
More informationSample Size Determination (Two or More Samples)
Sample Sie Determiatio (Two or More Samples) STATGRAPHICS Rev. 963 Summary... Data Iput... Aalysis Summary... 5 Power Curve... 5 Calculatios... 6 Summary This procedure determies a suitable sample sie
More informationParadoxes to Mississippian Production
Goals Field Examples of Fracturing and Drainage by Kurt Rottmann Understand fracture patterns in the Mississippian Review older fracture identification logs Review fracture components to volumetric OOIP
More informationDrive Technology \ Drive Automation \ System Integration \ Services. Data Sheet. Functional Safety Safety Characteristics for Brake BE..
Drive Techology \ Drive Automatio \ System Itegratio \ Services Data Sheet Fuctioal Safety Safety Characteristics for Brake BE..(FS) Editio 08/2012 19491212 / EN SEW-EURODRIVE Drivig the world Data Sheet
More informationCalculus 2 Test File Fall 2013
Calculus Test File Fall 013 Test #1 1.) Without usig your calculator, fid the eact area betwee the curves f() = 4 - ad g() = si(), -1 < < 1..) Cosider the followig solid. Triagle ABC is perpedicular to
More informationSail into Summer with Math!
Sail ito Summer with Math! For Studets Eterig Hoors Geometry This summer math booklet was developed to provide studets i kidergarte through the eighth grade a opportuity to review grade level math objectives
More informationIP Reference guide for integer programming formulations.
IP Referece guide for iteger programmig formulatios. by James B. Orli for 15.053 ad 15.058 This documet is iteded as a compact (or relatively compact) guide to the formulatio of iteger programs. For more
More informationMath 113 Exam 3 Practice
Math Exam Practice Exam 4 will cover.-., 0. ad 0.. Note that eve though. was tested i exam, questios from that sectios may also be o this exam. For practice problems o., refer to the last review. This
More informationPROSPECTORS AIRWAYS COMPANY, LIMITED. Suire KING STREI TORONTO. EMPIRE e-; MAGNETOMETIC SURVEY OF RIP PROPERTY - TASHOTA AREA.
PROSPECTORS AIRWAYS COMPANY, LIMITED Suire 6 44 KING STREI TORONTO EMPIRE e-; 42L05NE0065 63.646 SUMMIT LAKE 00 September 30th, 955 MAGNETOMETIC SURVEY OF RIP PROPERTY - TASOTA AREA. ONTARIO The Rip Property
More informationNATIONAL SENIOR CERTIFICATE GRADE 12
NATIONAL SENIOR CERTIFICATE GRADE MATHEMATICS P FEBRUARY/MARCH 009 MARKS: 50 TIME: 3 hours This questio paper cosists of 0 pages, a iformatio sheet ad 3 diagram sheets. Please tur over Mathematics/P DoE/Feb.
More informationThe Mathematical Model and the Simulation Modelling Algoritm of the Multitiered Mechanical System
The Mathematical Model ad the Simulatio Modellig Algoritm of the Multitiered Mechaical System Demi Aatoliy, Kovalev Iva Dept. of Optical Digital Systems ad Techologies, The St. Petersburg Natioal Research
More informationContinuous Functions
Cotiuous Fuctios Q What does it mea for a fuctio to be cotiuous at a poit? Aswer- I mathematics, we have a defiitio that cosists of three cocepts that are liked i a special way Cosider the followig defiitio
More informationAPPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE
DEPARTMENT OF DEVELOPMENT & PLANNING 825 Ohio Avenue - Lynn Haven, FL 32444 (850) 265-2961 - (850) 265-3478 APPLICATION TO AMEND THE FUTURE LAND USE MAP (FLUM) SMALL SCALE Deadline to submit is 30 days
More informationx c the remainder is Pc ().
Algebra, Polyomial ad Ratioal Fuctios Page 1 K.Paulk Notes Chapter 3, Sectio 3.1 to 3.4 Summary Sectio Theorem Notes 3.1 Zeros of a Fuctio Set the fuctio to zero ad solve for x. The fuctio is zero at these
More informationConfidence Intervals รศ.ดร. อน นต ผลเพ ม Assoc.Prof. Anan Phonphoem, Ph.D. Intelligent Wireless Network Group (IWING Lab)
Cofidece Itervals รศ.ดร. อน นต ผลเพ ม Assoc.Prof. Aa Phophoem, Ph.D. aa.p@ku.ac.th Itelliget Wireless Network Group (IWING Lab) http://iwig.cpe.ku.ac.th Computer Egieerig Departmet Kasetsart Uiversity,
More informationPolynomial Functions and Their Graphs
Polyomial Fuctios ad Their Graphs I this sectio we begi the study of fuctios defied by polyomial expressios. Polyomial ad ratioal fuctios are the most commo fuctios used to model data, ad are used extesively
More informationC. C. Fu, Ph.D., P.E.
ENCE710 C. C. Fu, Ph.D., P.E. Shear Coectors Desig by AASHTO RFD (RFD Art. 6.10.10) I the egative flexure regios, shear coectors shall be rovided where the logitudial reiforcemet is cosidered to be a art
More informationAlgebra II Notes Unit Seven: Powers, Roots, and Radicals
Syllabus Objectives: 7. The studets will use properties of ratioal epoets to simplify ad evaluate epressios. 7.8 The studet will solve equatios cotaiig radicals or ratioal epoets. b a, the b is the radical.
More informationn m CHAPTER 3 RATIONAL EXPONENTS AND RADICAL FUNCTIONS 3-1 Evaluate n th Roots and Use Rational Exponents Real nth Roots of a n th Root of a
CHAPTER RATIONAL EXPONENTS AND RADICAL FUNCTIONS Big IDEAS: 1) Usig ratioal expoets ) Performig fuctio operatios ad fidig iverse fuctios ) Graphig radical fuctios ad solvig radical equatios Sectio: Essetial
More informationPolynomial Functions. New Section 1 Page 1. A Polynomial function of degree n is written is the form:
New Sectio 1 Page 1 A Polyomial fuctio of degree is writte is the form: 1 P x a x a x a x a x a x a 1 1 0 where is a o-egative iteger expoet ad a 0 ca oly take o values where a, a, a,..., a, a. 0 1 1.
More informationMATH 1A FINAL (7:00 PM VERSION) SOLUTION. (Last edited December 25, 2013 at 9:14pm.)
MATH A FINAL (7: PM VERSION) SOLUTION (Last edited December 5, 3 at 9:4pm.) Problem. (i) Give the precise defiitio of the defiite itegral usig Riema sums. (ii) Write a epressio for the defiite itegral
More informationChapter 5.4 Practice Problems
EXPECTED SKILLS: Chapter 5.4 Practice Problems Uderstad ad kow how to evaluate the summatio (sigma) otatio. Be able to use the summatio operatio s basic properties ad formulas. (You do ot eed to memorize
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationAP Statistics Review Ch. 8
AP Statistics Review Ch. 8 Name 1. Each figure below displays the samplig distributio of a statistic used to estimate a parameter. The true value of the populatio parameter is marked o each samplig distributio.
More informationDiffusivity and Mobility Quantization. in Quantum Electrical Semi-Ballistic. Quasi-One-Dimensional Conductors
Advaces i Applied Physics, Vol., 014, o. 1, 9-13 HIKARI Ltd, www.m-hikari.com http://dx.doi.org/10.1988/aap.014.3110 Diffusivity ad Mobility Quatizatio i Quatum Electrical Semi-Ballistic Quasi-Oe-Dimesioal
More informationn n 2 n n + 1 +
Istructor: Marius Ioescu 1. Let a =. (5pts) (a) Prove that for every ε > 0 there is N 1 such that a +1 a < ε if N. Solutio: Let ε > 0. The a +1 a < ε is equivalet with + 1 < ε. Simplifyig, this iequality
More informationMeasures of Spread: Variance and Standard Deviation
Lesso 1-6 Measures of Spread: Variace ad Stadard Deviatio BIG IDEA Variace ad stadard deviatio deped o the mea of a set of umbers. Calculatig these measures of spread depeds o whether the set is a sample
More informationSalmon: Lectures on partial differential equations. 3. First-order linear equations as the limiting case of second-order equations
3. First-order liear equatios as the limitig case of secod-order equatios We cosider the advectio-diffusio equatio (1) v = 2 o a bouded domai, with boudary coditios of prescribed. The coefficiets ( ) (2)
More informationDotting The Dot Map, Revisited. A. Jon Kimerling Dept. of Geosciences Oregon State University
Dottig The Dot Map, Revisited A. Jo Kimerlig Dept. of Geoscieces Orego State Uiversity Dot maps show the geographic distributio of features i a area by placig dots represetig a certai quatity of features
More informationBoundary Element Method (BEM)
Boudary Elemet Method BEM Zora Ilievski Wedesday 8 th Jue 006 HG 6.96 TU/e Talk Overview The idea of BEM ad its advatages The D potetial problem Numerical implemetatio Idea of BEM 3 Idea of BEM 4 Advatages
More informationMIDTERM 3 CALCULUS 2. Monday, December 3, :15 PM to 6:45 PM. Name PRACTICE EXAM SOLUTIONS
MIDTERM 3 CALCULUS MATH 300 FALL 08 Moday, December 3, 08 5:5 PM to 6:45 PM Name PRACTICE EXAM S Please aswer all of the questios, ad show your work. You must explai your aswers to get credit. You will
More informationUpper bound for ropelength of pretzel knots
Upper boud for ropelegth of pretzel kots Safiya Mora August 25, 2006 Abstract A model of the pretzel kot is described. A method for predictig the ropelegth of pretzel kots is give. A upper boud for the
More informationPROBLEM Copyright McGraw-Hill Education. Permission required for reproduction or display. SOLUTION. v 1 = 4 km/hr = 1.
PROLEM 13.119 35,000 Mg ocea lier has a iitial velocity of 4 km/h. Neglectig the frictioal resistace of the water, determie the time required to brig the lier to rest by usig a sigle tugboat which exerts
More informationTrue Nature of Potential Energy of a Hydrogen Atom
True Nature of Potetial Eergy of a Hydroge Atom Koshu Suto Key words: Bohr Radius, Potetial Eergy, Rest Mass Eergy, Classical Electro Radius PACS codes: 365Sq, 365-w, 33+p Abstract I cosiderig the potetial
More informationStratigraphy and Hydrocarbon Production from Pennsylvanian Age Granite Wash Reservoirs in the Western Anadarko Basin, Oklahoma and Texas
Stratigraphy and Hydrocarbon Production from Pennsylvanian Age Granite Wash Reservoirs in the Western Anadarko Basin, Oklahoma and Texas John Mitchell, Managing Partner/Consulting Geologist Fall River
More informationAnalytic Continuation
Aalytic Cotiuatio The stadard example of this is give by Example Let h (z) = 1 + z + z 2 + z 3 +... kow to coverge oly for z < 1. I fact h (z) = 1/ (1 z) for such z. Yet H (z) = 1/ (1 z) is defied for
More information4.1 Sigma Notation and Riemann Sums
0 the itegral. Sigma Notatio ad Riema Sums Oe strategy for calculatig the area of a regio is to cut the regio ito simple shapes, calculate the area of each simple shape, ad the add these smaller areas
More informationCS475 Parallel Programming
CS475 Parallel Programmig Dieretiatio ad Itegratio Wim Bohm Colorado State Uiversity Ecept as otherwise oted, the cotet o this presetatio is licesed uder the Creative Commos Attributio.5 licese. Pheomea
More informationUS ROCKIES REGION PLANNING
US ROCKIES REGION Plan: Standard 02 May, 2013 650 0 West(-)/East(+) -1300-650 0 650 1300 1950 2600 3250 9 5/8" 7" 650 0 Section: Sec. 5-T2N-R66W SHL: 226' FSL 1754' FWL SEC. 5 Latitude: 40.160463 Longitude:
More informationSampling Distributions, Z-Tests, Power
Samplig Distributios, Z-Tests, Power We draw ifereces about populatio parameters from sample statistics Sample proportio approximates populatio proportio Sample mea approximates populatio mea Sample variace
More informationExample 3.3: Rainfall reported at a group of five stations (see Fig. 3.7) is as follows. Kundla. Sabli
3.4.4 Spatial Cosistecy Check Raifall data exhibit some spatial cosistecy ad this forms the basis of ivestigatig the observed raifall values. A estimate of the iterpolated raifall value at a statio is
More informationVIVEKANANDA VIDYALAYA MATRIC HR SEC SCHOOL FIRST MODEL EXAM (A) 10th Standard Reg.No. : MATHEMATICS - MOD EXAM 1(A)
Time : 0:30:00 Hrs VIVEKANANDA VIDYALAYA MATRIC HR SEC SCHOOL FIRST MODEL EXAM 018-19(A) 10th Stadard Reg.No. : MATHEMATICS - MOD EXAM 1(A) Total Mark : 100 I. CHOOSE THE BEST ANSWER WITH CORRECT OPTION:-
More informationWe will multiply, divide, and simplify radicals. The distance formula uses a radical. The Intermediate algebra
We will multiply, divide, ad simplify radicals. The distace formula uses a radical. The Itermediate algera midpoit formula is just good fu. Class otes Simplifyig Radical Expressios ad the Distace ad Midpoit
More informationFS Original Hole Ft April 26, 2016
Oilfield Services, Central U.S. Land PathFinder A Schlumberger Company Drilling Group Geo Market Area: South East Texas Basin 3600 BriarPark Houston, Texas 77042 Phone : (713) 789-9600 (Main) Fax : (713)
More informationII. Descriptive Statistics D. Linear Correlation and Regression. 1. Linear Correlation
II. Descriptive Statistics D. Liear Correlatio ad Regressio I this sectio Liear Correlatio Cause ad Effect Liear Regressio 1. Liear Correlatio Quatifyig Liear Correlatio The Pearso product-momet correlatio
More informationTAX ROLL FOR CITY OF RICHMOND IN THE COUNTY OF, MI FOR THE YEAR 2017 Spec. Population: Ad Valorem+Special Acts
1/7 Parcel # Valuations Tax Heading Amount Tax Heading Amount --- Totals --- PARCEL #: 7405-006-1001-000 CLASS: 201 SUMMER TAX HEADING AMOUNT WINTER TAX HEADING AMOUNT SUM TAX 4,063.84 SCHOOL: 50180 05
More informationChapter 2 Descriptive Statistics
Chapter 2 Descriptive Statistics Statistics Most commoly, statistics refers to umerical data. Statistics may also refer to the process of collectig, orgaizig, presetig, aalyzig ad iterpretig umerical data
More informationTownship of JAFFRAY. Date. Report NO. Claim NO. Diamond Drilling. Hole NO i. Footage. Note (D. Notes:
Diamod Drillig 2E16SW«87 11 JAFFRAY 1 Towship of JAFFRAY Report NO Work performed by: Hore-Thrasher Optios Claim NO Hole NO i Footage 148 Date Note 2 21 3 12 4 12 1 6 147 7 1 Nov/4 Notes: (1) Rec'd from
More information3.2 Properties of Division 3.3 Zeros of Polynomials 3.4 Complex and Rational Zeros of Polynomials
Math 60 www.timetodare.com 3. Properties of Divisio 3.3 Zeros of Polyomials 3.4 Complex ad Ratioal Zeros of Polyomials I these sectios we will study polyomials algebraically. Most of our work will be cocered
More informationNABORS DRILLING TENOLOGIES USA, INC. 515 West Greens Road Houston, TX 77067 Phone: 281.874.0035 Fax: 281.872.5205 Friday, June 30, 2017 Railroad Commission of Texas Oil and Gas Division PO Box 12967 Capitol
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationImproving Well Performance through Multi Variate Completion Analyses in the US Bakken Shale. C. Mark Pearson
Improving Well Performance through Multi Variate Completion Analyses in the US Bakken Shale C. Mark Pearson Liberty Resources LLC Denver, CO Slide 2 An independent, private-equity backed E&P company with
More informationElementary Statistics
Elemetary Statistics M. Ghamsary, Ph.D. Sprig 004 Chap 0 Descriptive Statistics Raw Data: Whe data are collected i origial form, they are called raw data. The followig are the scores o the first test of
More information