Spin-Filtering Studies at COSY

Size: px
Start display at page:

Download "Spin-Filtering Studies at COSY"

Transcription

1 Mitglied der Helmholtz-Gemeinschaft Spin-Filtering Studies at COSY Proposal and beam request #199 PAX collaboration 6. September 2009 Mikhail Nekipelov

2 Outline Spin-filtering. Polarisation buildup at COSY. Status of machine acceptance studies (proposal #198). PAX-at-COSY. Measurements. Time plan. 6. September 2009 Folie 2

3 Polarisation Build-up of the stored beam in 2 sub states: up/down selective loss remove one substate more than the other selective flip Reverse one substate more than the other 6. September 2009 Folie 3

4 Polarisation Build-up of the stored beam in 2 sub states: up/down selective loss remove one substate more than the other selective flip Reverse one substate more than the other PLB 674 (2009) September 2009 Folie 4

5 Spin Filtering (Selective Loss) Polarisation build-up of an originally unpolarised particle beam by repeated interaction with polarised hydrogen target, e.g. in a storage ring: unpolarised beam polarised beam polarised target 6. September 2009 Folie 5

6 Cross Sections σ tot = σ 0 + σ 1 P Q + σ 2 (P k)(q k) P beam polarisation Q target polarisation k beam direction max dσ σ1 2π (Axx Ayy)d dω 0 ~ TSR measurement Longitudinal σ ~ 1 2π max acc dσ dω (A xx A yy )d Transverse N.Nikolaev, arxiv:hep-ph/ September 2009 Folie 6

7 σ 0 [mb] σ 1 [mb] Spin-flip Cross Sections Θ acc [mrad] Θ acc [mrad] Δσ 0,1 << σ 1 (>Θ acc ) 6. September 2009 Folie 7

8 Acceptance of the Cooled Beam (2008) NIM A 441 (2000) 54 acc x y Θ acc =2.14±0.15 mrad 6. September 2009 Folie 8

9 y' (mrad) y' (mrad) Principle of the Measurement y (mm) 4 y (mm) NIM A599 (2009) 130 Fig. 11. y-y' phase space at the ANKE interaction point at 2.65 GeV with a machine acceptance of A y = 25 π mm mrad, and a beam emittance of y = 3.8 π mm mrad (left panel). When the aperture is moved into the machine acceptance (right panel), the reduced maximum allowed y' leads to smaller beam lifetime. Geometrical COSY acceptance ~ 40 p mm mrad 6. September 2009 Folie 9

10 Beam current (a.u.) Beam current (a.u.) Acceptance of the Uncooled Beam (2008) A x =(23.7±2.4)µm Electron beam reduces machine acceptance X (s) Y (s) A y =(15.7±1.3)µm Dynamic effects are believed to be responsible for the difference with the geometrical value 6. September 2009 Folie 10

11 COSY Orbit Correction Orbit response matrix method, PhD thesis D.Welsch 6. September 2009 Folie 11

12 Working Point 6. September 2009 Folie 12

13 Acceptance of the Cooled Beam Acceptance of the cooled and uncooled beam: A x = A y = 25 p mm mrad Improvement is due to the minimisation of the orbit distortions. Electron cooler does not restrict machine acceptance. No special care has been taken to establish good vacuum conditions for these studies. Acceptance angle at PAX target position: acc = 8.4 mrad 6. September 2009 Folie 13

14 Polarisation Buildup Transverse Longitudinal COSY cooling range Strong dependence on COSY vacuum need for improvement 6. September 2009 Folie 14

15 COSY Ring 6. September 2009 Folie 15

16 PAX-at-COSY Main purpose: 1. Quantitative understanding of the polarisation buildup 2. Commissioning of the experimental setup for AD COSY-Quadupoles ABS Target chamber with storage cell and detector system BRP Low-β quadrupoles (CELSIUS) 6. September 2009 Folie 16

17 number of events number of events Measurements (Transverse Case) o o o pp analysing powers are very small and cannot be used to measure beam or target polarisation Use dp at T d =98.6 MeV to measure target Q After spin-filtering in pp use pd at T p =49.3 MeV to measure beam polarisation dp at T d =98.6 MeV pd at T p =49.3 MeV cell region cell region vertex z [mm] vertex z [mm] 6. September 2009 Folie 17

18 Polarisation Evolution Transverse T=49.3 MeV t l 4 measurement points are needed (2 per target spin state) in order to determine the slope 6. September 2009 Folie 18

19 Count Rates (6h filtering + 0.5h cycle) * 8.5h measurement / 0.5h cycle = 5 days 6. September 2009 Folie 19

20 Anticipated Time Plan COSY st COSY Proposal submitted Installation of low-β insertion 2 nd Commissioning of the low-β section, and vacuum improvement Machine acceptance measurement AD CERN Proposal submitted July 2009 CERN Research board decision st Installation of the target chamber, cryo pump, ABS, BRP, holding field, collimators, fixed cell etc. Commissioning and measurement of the acceptance angle 2 nd Installation of COSY detection system Measurement of the target polarisation in dp and pd elastic scattering Spin-filtering at COSY with transverse polarisation st Spin-filtering at COSY with transverse polarisation (continued) Installation of the AD low-β insertion Commissioning of the AD low-β insertion AD user compatibility PAX optics 2 nd Installation of the target chamber and scraper system st Implementation of solenoid(s) in injection beam line Installation of ANKE ABS and AD detector at TP1 Commissioning of the AD detector with openable cell 2 nd Spin-filtering at COSY with longitudinal beam using ecooler + WASA solenoids st Implementation of the ½ AD Siberian snake at ANKE Commissioning of the AD Siberian snake Spin-filtering with longitudinal beam Machine acceptance studies Stacking studies Installation of PAX ABS and BRP Installation of openable storage cell and detection system Measurement of H and D target polarisation with pbar beam Spin-filtering using H and D target below 70 MeV, transverse polarisation 2 nd Implementation of 300 kev ecooler st Commissioning of ecooler with beam 2 nd Spin-filtering with H and D target below 430 MeV with transverse polarisation 2015 Implementation of the Siberian snake 2016 PAX optics with Siberian snake Spin-filtering measurements with H and D target below 430 MeV with longitudinal polarisation, including commissioning of the Siberian snake. 6. September 2009 Folie 20

21 Anticipated Time Plan COSY st COSY Proposal submitted Installation of low-β insertion 2 nd Commissioning of the low-β section, and vacuum improvement Machine acceptance measurement st Installation of the target chamber, cryo pump, ABS, BRP, holding field, collimators, fixed cell etc. Commissioning and measurement of the acceptance angle 2 nd Installation of COSY detection system Measurement of the target polarisation in dp and pd elastic scattering Spin-filtering at COSY with transverse polarisation st Spin-filtering at COSY with transverse polarisation (continued) AD CERN Proposal submitted July weeks CERN Research board decision 2 weeks Installation of the AD low-β insertion 2+4 weeks Commissioning of the AD low-β insertion AD user compatibility PAX optics 2 nd Installation of the target chamber and scraper system st Implementation of solenoid(s) in injection beam line Installation of ANKE ABS and AD detector at TP1 Commissioning of the AD detector with openable cell 2 nd Spin-filtering at COSY with longitudinal beam using ecooler + WASA solenoids st Implementation of the ½ AD Siberian snake at ANKE Commissioning of the AD Siberian snake Spin-filtering with longitudinal beam Machine acceptance studies Stacking studies 4 weeks 1+4 weeks Installation of PAX ABS and BRP Installation of openable storage cell and detection system Measurement 3 weeks of H and D target polarisation with pbar beam Spin-filtering using H and D target below 70 MeV, transverse polarisation 2 nd Implementation of 300 kev ecooler st Commissioning of ecooler with beam 2 nd Spin-filtering with H and D target below 430 MeV with transverse polarisation 2015 Implementation of the Siberian snake 2016 PAX optics with Siberian snake Spin-filtering measurements with H and D target below 430 MeV with longitudinal polarisation, including commissioning of the Siberian snake. 6. September 2009 Folie 21

22 The COSY Low-b Section July 2009 installation of the PAX Low-β Section at COSY: Vacuum: New section 1.2, NEG-coated beam-line, fast shutters Magnets: 4 CELSIUS quadrupoles, 4 steerer magnets 6. September 2009 Folie 22

23 COSY Low-b Section: Vacuum Installation 2xTS Fast Shutters NEG 5000 l/s NEG 5000 l/s BPM IG 100 l/s IG 100 l/s BPM BPM IG 100 l/s IG 100 l/s 6. September 2009 Folie 23

24 Commissioning 2009/10 Develop PAX optics up to 135 MeV Use steerers to keep beam on axis Measure machine acceptance Long beam life time without target (better COSY vacuum needed) 6. September 2009 Folie 24

25 individual beam requests Anticipated Time Plan COSY st COSY Proposal submitted Installation of low-β insertion 2 nd Commissioning of the low-β section, and vacuum improvement Machine acceptance measurement st Installation of the target chamber, cryo pump, ABS, BRP, holding field, collimators, fixed cell etc. Commissioning and measurement of the acceptance angle 2 nd Installation of COSY detection system Measurement of the target polarisation in dp and pd elastic scattering Spin-filtering at COSY with transverse polarisation AD CERN Proposal submitted July weeks CERN Research board decision 2 weeks Installation of the AD low-β insertion 2+4 weeks st Spin-filtering at COSY with transverse polarisation (continued) Commissioning of the AD low-β insertion AD user compatibility PAX optics 2 nd Installation of the target chamber and scraper system st Implementation of solenoid(s) in injection beam line Installation of ANKE ABS and AD detector at TP1 Commissioning of the AD detector with openable cell 2 nd Spin-filtering at COSY with longitudinal beam using ecooler + WASA solenoids st Implementation of the ½ AD Siberian snake at ANKE Commissioning of the AD Siberian snake Spin-filtering with longitudinal beam Machine acceptance studies Stacking studies 4 weeks 1+4 weeks Installation of PAX ABS and BRP Installation of openable storage cell and detection system Measurement 3 weeks of H and D target polarisation with pbar beam Spin-filtering using H and D target below 70 MeV, transverse polarisation 2 nd Implementation of 300 kev ecooler st Commissioning of ecooler with beam 2 nd Spin-filtering with H and D target below 430 MeV with transverse polarisation 2015 Implementation of the Siberian snake 2016 PAX optics with Siberian snake Spin-filtering measurements with H and D target below 430 MeV with longitudinal polarisation, including commissioning of the Siberian snake. 6. September 2009 Folie 25

26 Installation 2010 Target chamber with 3 additional fast shutters (ABS, BRP and UGSS) Weak holding field coil system Openable collimators Cryo pump ABS BRP COSY-PAX interlock system NEG-activation (230 C) Rail system for installation of detection system COSY detection system with fixed storage cell 6. September 2009 Folie 26

27 individual beam requests Anticipated Time Plan COSY st COSY Proposal submitted Installation of low-β insertion 2 nd Commissioning of the low-β section, and vacuum improvement Machine acceptance measurement AD CERN Proposal submitted July weeks Present beam request CERN Research board decision st Installation of the target chamber, cryo pump, ABS, BRP, holding field, collimators, fixed cell etc. Commissioning and measurement of the acceptance angle 2 nd Installation of COSY detection system Measurement of the target polarisation in dp and pd elastic scattering Spin-filtering at COSY with transverse polarisation 2 weeks Installation of the AD low-β insertion 2+4 weeks st Spin-filtering at COSY with transverse polarisation (continued) Commissioning of the AD low-β insertion AD user compatibility PAX optics 2 nd Installation of the target chamber and scraper system st Implementation of solenoid(s) in injection beam line Installation of ANKE ABS and AD detector at TP1 Commissioning of the AD detector with openable cell 2 nd Spin-filtering at COSY with longitudinal beam using ecooler + WASA solenoids Machine acceptance studies Stacking studies 4 weeks 1+4 weeks Installation of PAX ABS and BRP individual st Implementation of the ½ AD Siberian snake at ANKE Commissioning of the AD Siberian snake Spin-filtering with longitudinal beam Installation of openable storage cell and detection system Measurement 3 weeks of H and D target polarisation with pbar beam Spin-filtering using H and D target below 70 MeV, transverse polarisation 2 nd Implementation of 300 kev ecooler Σ = 22 weeks st Commissioning of ecooler with beam 2 nd Spin-filtering with H and D target below 430 MeV with transverse polarisation 2015 Implementation of the Siberian snake 2016 PAX optics with Siberian snake Spin-filtering measurements with H and D target below 430 MeV with longitudinal polarisation, including commissioning of the Siberian snake. 6. September 2009 Folie 27

Spin Filtering at COSY - First Results

Spin Filtering at COSY - First Results Mitglied der Helmholtz-Gemeinschaft Spin Filtering at COSY - First Results Dieter Oellers University of Ferrara, INFN Ferrara STORI11, Frascati PAX-Collaboration Goal: Produce a beam of polarized antiprotons

More information

Status of the PAX experiment

Status of the PAX experiment P. Lenisa Università di Ferrara and INFN PANDA Collab. Meeting Stockholm, 16.06.10 Physics case for polarized antiprotons Transversity distribution of the nucleon in Drell-Yan: Last leading-twist i t missing

More information

Polarization of a stored beam by spin filtering

Polarization of a stored beam by spin filtering Mitglied der Helmholtz-Gemeinschaft Polarization of a stored beam by spin filtering Christian Weidemann 03. June 2013 Motivation The PAX collaboration proposed to investigate so called Drell-Yan processes

More information

The PAX experiment. Paolo Lenisa Università di Ferrara and INFN - Italy. Tbilisi, July 10 th PAX - Polarized Antiprotons

The PAX experiment. Paolo Lenisa Università di Ferrara and INFN - Italy. Tbilisi, July 10 th PAX - Polarized Antiprotons The PAX experiment 1 Paolo Lenisa Università di Ferrara and INFN - Italy Tbilisi, July 10 th 2014 Motivation The PAX collaboration proposed to investigate Drell Yan processes in scattering of polarized

More information

PAX status report: Spin-filtering studies at COSY http://www.fz-juelich.de/ikp/pax Paolo Lenisa - Università di Ferrara and INFN - ITALY Roma, CSN III, 30 maggio 2006 P. Lenisa Spin-filtering studies at

More information

Polarized Antiproton

Polarized Antiproton Scattering and annihilation electromagnetic processes Trento 18-22 february 2013 Polarized Antiproton P.F.Dalpiaz, Ferrara University and INFN 18-22 february Trento P.F.Dalpiaz 1 Introduction P.F.Dalpiaz

More information

Towards Polarized Antiprotons at FAIR

Towards Polarized Antiprotons at FAIR Towards Polarized Antiprotons at FAIR http://www.fz-juelich.de/ikp/pax Frank Rathmann Institut für Kernphysik Forschungszentrum Jülich Kyoto, October 3, 2006 Outline PAX physics program Accelerator configuration

More information

Antiproton Polarization Studies for FAIR

Antiproton Polarization Studies for FAIR Mitglied der Helmholtz-Gemeinschaft Antiproton Polarization Studies for FAIR How to produce polarized antiprotons (and what to use them for?) May 31, 2008 Hans Ströher Transversity 2008 (Ferrara, Italy)

More information

Prospects for a Storage Ring EDM-Facility at COSY

Prospects for a Storage Ring EDM-Facility at COSY Mitglied der Helmholtz-Gemeinschaft Lepton Moments 2010 Prospects for a Storage Ring EDM-Facility at COSY July 2010 Hans Ströher EDM at COSY Motivation Why another EDM search: - New approach: polarized

More information

First experiments with the polarized internal gas target at ANKE/COSY

First experiments with the polarized internal gas target at ANKE/COSY Mitglied der Helmholtz-Gemeinschaft First experiments with the polarized internal gas target at ANKE/COSY September 9, 2009 Maxim Mikirtychyants for the ANKE collaboration FZ Jülich / JCHP and PNPI (Gatchina)

More information

Spin-physics with Polarized Antiprotons at GSI

Spin-physics with Polarized Antiprotons at GSI http://www.fz-juelich.de/ikp/pax Spin-physics with Polarized Antiprotons at GSI Frank Rathmann Forschungszentrum JülichJ Spin Physics and Beyond, Madison, June 10, 2005 QCD Physics at FAIR (CDR): unpolarized

More information

Commissioning of the Polarized Internal Gas Target (PIT) of ANKE at COSY

Commissioning of the Polarized Internal Gas Target (PIT) of ANKE at COSY Commissioning of the Polarized Internal Gas Target (PIT) of ANKE at COSY Ralf Engels Institut für Kernphysik, Forschungszentrum Jülich Tbilisi September 4, 2006 CGSWHP'06 Ralf Engels 1 Outline Introduction

More information

Physics Program at COSY-Jülich with Polarized Hadronic Probes

Physics Program at COSY-Jülich with Polarized Hadronic Probes Mitglied der Helmholtz-Gemeinschaft Physics Program at COSY-Jülich with Polarized Hadronic Probes Forschungszentrum Jülich October 9, 2008 Andro Kacharava (JCHP/IKP, FZ-Jülich) Overview COSY (Cooler Synchrotron)

More information

The physics program of PAX at COSY

The physics program of PAX at COSY Journal of Physics: Conference Series PAPER OPEN ACCESS The physics program of PAX at COSY To cite this article: Yury Valdau et al 2016 J. Phys.: Conf. Ser. 678 012027 View the article online for updates

More information

Storage Ring Based EDM Search Achievements and Goals

Storage Ring Based EDM Search Achievements and Goals Mitglied der Helmholtz-Gemeinschaft Storage Ring Based EDM Search Achievements and Goals October 20, 2014 Andreas Lehrach RWTH Aachen University & Forschungszentrum Jülich on behalf of the JEDI collaboration

More information

COSY Proposal. Support from the LSF program of the EC is not requested

COSY Proposal. Support from the LSF program of the EC is not requested COSY Proposal For Lab. use Exp. No.: Session No. 37 Title of Experiment Spin-Filtering Studies at COSY Collaborators: PAX collaboration Spokespersons: Address: Mikhail Nekipelov Institut für Kernphysik

More information

POLARIMETRY FOR A STORAGE-RING ELECTRIC-DIPOLE-MOMENT MEASUREMENT MARIA ŻUREK FOR THE JEDI COLLABORATION

POLARIMETRY FOR A STORAGE-RING ELECTRIC-DIPOLE-MOMENT MEASUREMENT MARIA ŻUREK FOR THE JEDI COLLABORATION POLARIMETRY FOR A STORAGE-RING ELECTRIC-DIPOLE-MOMENT MEASUREMENT 8 JUNE 2018 MARIA ŻUREK FOR THE JEDI COLLABORATION MOTIVATION Barion Asymmetry Problem Barion Asymmetry Observation Standard Cosmological

More information

Polarisation Experiments in Storage Rings

Polarisation Experiments in Storage Rings COSY Summer Student Program 2004 Polarisation Experiments in Storage Rings Frank Rathmann Institut für Kernphysik Forschungszentrum Jülich Jülich, September 14, 2004 Frank Rathmann Polarisation Experiments

More information

Accelerator Physics. Accelerator Development

Accelerator Physics. Accelerator Development Accelerator Physics The Taiwan Light Source (TLS) is the first large accelerator project in Taiwan. The goal was to build a high performance accelerator which provides a powerful and versatile light source

More information

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland

SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland Michael Böge 1 SLS Team at PSI Michael Böge 2 Layout of the SLS Linac, Transferlines Booster Storage Ring (SR) Beamlines and Insertion Devices

More information

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF

ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF ELIC: A High Luminosity And Efficient Spin Manipulation Electron-Light Ion Collider Based At CEBAF Lia Merminga and Yaroslav Derbenev Center for Advanced Studies of Accelerators, Jefferson Laboratory,

More information

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)

Statusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons) Statusreport Status of the GSI accelerators for FRS operation Jens Stadlmann (FAIR Synchrotrons) Overview Intensities reached and "candidates" for experiments. Uranium? Upgrade program New developments:

More information

Tools of Particle Physics I Accelerators

Tools of Particle Physics I Accelerators Tools of Particle Physics I Accelerators W.S. Graves July, 2011 MIT W.S. Graves July, 2011 1.Introduction to Accelerator Physics 2.Three Big Machines Large Hadron Collider (LHC) International Linear Collider

More information

Run II Status and Prospects

Run II Status and Prospects Run II Status and Prospects Jeff Spalding Fermilab June 14, 2004 Run II Status and Prospects - Spalding 1 Contents Introduction Major elements of the Run II campaign Present performance Status of the upgrade

More information

E166: Polarized Positrons & Polarimetry

E166: Polarized Positrons & Polarimetry (DESY) - on behalf of the E166 Collaboration ILC: - why polarized positrons - e+ source options - undulator source scheme E166 - proof-of-principle demonstration of the undulator method - undulator basics

More information

Physics with Tagged Forward Protons using the STAR Detector at RHIC. The Relativistic Heavy Ion Collider The pp2pp Experiment STAR 2009

Physics with Tagged Forward Protons using the STAR Detector at RHIC. The Relativistic Heavy Ion Collider The pp2pp Experiment STAR 2009 Physics with Tagged Forward Protons using the STAR Detector at RHIC The Relativistic Heavy Ion Collider The pp2pp Experiment 2002 2003 STAR 2009 Elastic and Diffractive Processes Elastic scattering Detect

More information

Storage Ring Experiments

Storage Ring Experiments Storage Ring Erhard Steffens University of Erlangen-Nürnberg, Germany steffens@physik.uni-erlangen.de Talk restricted to Please internal note: targets (mostly gaseous) Talk not about physics of Storage

More information

Polarised e ± at HERA

Polarised e ± at HERA olarised e ± at HERA D.. Barber, E. Gianfelice Deutsches Elektronen-Synchrotron DESY, Notkestrasse 85, D 223 Hamburg, Germany After a short summary of experience with e ± polarisation at the preupgraded

More information

Polarization of a stored beam by spin-filtering

Polarization of a stored beam by spin-filtering Polarization of a stored beam by spin-filtering W. Augustyniak a,l.barion b,s.barsov c,u.bechstedt d,e,p.benati b,s.bertelli b,v.carassiti b,d.chiladze f,g.ciullo b,m. Contalbrigo b,p.f.dalpiaz b,s.dymov

More information

Status of the ESR And Future Options

Status of the ESR And Future Options Status of the ESR And Future Options M. Steck for the Storage Ring Division (C. Dimopoulou, A. Dolinskii, S. Litvinov, F. Nolden, P. Petri, U. Popp, I. Schurig) Outline 1) New Old ESR 2) Slow (Resonant)

More information

Measurement of the Proton Beam Polarization with Ultra Thin Carbon Targets at RHIC

Measurement of the Proton Beam Polarization with Ultra Thin Carbon Targets at RHIC 1of23 Measurement of the Proton Beam Polarization with Ultra Thin Carbon Targets at RHIC Brookhaven National Laboratory for the RHIC Polarimetry Group Sep 12, 2013 Relativistic Heavy Ion Collider world

More information

Challenges in optics requirement and control of Storage Rings for Precision Measurement of EDM

Challenges in optics requirement and control of Storage Rings for Precision Measurement of EDM Mitglied der Helmholtz-Gemeinschaft Challenges in optics requirement and control of Storage Rings for Precision Measurement of EDM February 6, 2015 Andreas Lehrach RWTH Aachen University & Forschungszentrum

More information

Member of the Helmholtz Association. COSY and Beyond. M. Bai on behalf of Institut für Kernphysik-4, Forschungszentrum, Juelich

Member of the Helmholtz Association. COSY and Beyond. M. Bai on behalf of Institut für Kernphysik-4, Forschungszentrum, Juelich COSY and Beyond M. Bai on behalf of Institut für Kernphysik-4, Forschungszentrum, Juelich Georgia German School and Workshop for Basic Science, August 28 - Sept. 2, 2016 Outline Brief introduction and

More information

Spin Feedback System at COSY

Spin Feedback System at COSY Spin Feedback System at COSY 21.7.2016 Nils Hempelmann Outline Electric Dipole Moments Spin Manipulation Feedback System Validation Using Vertical Spin Build-Up Wien Filter Method 21.7.2016 Nils Hempelmann

More information

LOLA: Past, present and future operation

LOLA: Past, present and future operation LOLA: Past, present and future operation FLASH Seminar 1/2/29 Christopher Gerth, DESY 8/5/29 FLASH Seminar Christopher Gerth 1 Outline Past Present Future 8/5/29 FLASH Seminar Christopher Gerth 2 Past

More information

Status and Perspectives of Hadron Physics in Europe. Forschungszentrum Jülich in der Helmholtz-Gemeinschaft

Status and Perspectives of Hadron Physics in Europe. Forschungszentrum Jülich in der Helmholtz-Gemeinschaft Hans Ströher Status and Perspectives of Hadron Physics in Europe Forschungszentrum Jülich in der Helmholtz-Gemeinschaft Europe We are here: Tbilisi (Georgia) Area (EU 15): ~ π x 10 6 km 2 (EU 25): 1.25

More information

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC

Lattice Design for the Taiwan Photon Source (TPS) at NSRRC Lattice Design for the Taiwan Photon Source (TPS) at NSRRC Chin-Cheng Kuo On behalf of the TPS Lattice Design Team Ambient Ground Motion and Civil Engineering for Low Emittance Electron Storage Ring Workshop

More information

Commissioning of PETRA III. Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010

Commissioning of PETRA III. Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010 Commissioning of PETRA III Klaus Balewski on behalf of the PETRA III Team IPAC 2010, 25 May, 2010 PETRA III Parameters Circumference (m) Energy (GeV) ε x (nm rad) ε y (pm rad) Current (ma) # bunches Straight

More information

Development of Closed Orbit Diagnostics toward EDM Measurements at COSY in Jülich

Development of Closed Orbit Diagnostics toward EDM Measurements at COSY in Jülich Development of Closed Orbit Diagnostics toward EDM Measurements at COSY in Jülich March 17, 2016 Fabian Hinder 1, 2 for the JEDI collaboration DPG Frühjahrstagung Darmstadt 1 Institut für Kernphysik IV,

More information

The TESLA Dogbone Damping Ring

The TESLA Dogbone Damping Ring The TESLA Dogbone Damping Ring Winfried Decking for the TESLA Collaboration April 6 th 2004 Outline The Dogbone Issues: Kicker Design Dynamic Aperture Emittance Dilution due to Stray-Fields Collective

More information

A Low Energy Beam Transport Design with high SCC for TAC Proton Accelerator

A Low Energy Beam Transport Design with high SCC for TAC Proton Accelerator A Low Energy Beam Transport Design with high SCC for TAC Proton Accelerator * A. Caliskan 1, H. F. Kisoglu 2, S. Sultansoy 3,4, M. Yilmaz 5 1 Department of Engineering Physics, Gumushane University, Gumushane,

More information

Beam and Spin Dynamics for Charged Particle EDM Searches in Storage Rings

Beam and Spin Dynamics for Charged Particle EDM Searches in Storage Rings Mitglied der Helmholtz-Gemeinschaft Beam and Spin Dynamics for Charged Particle EDM Searches in Storage Rings September 11, 2015 Andreas Lehrach RWTH Aachen University & Forschungszentrum Jülich on behalf

More information

Lepton beam polarisation for the HERA experiments ZEUS and H1

Lepton beam polarisation for the HERA experiments ZEUS and H1 Lepton beam polarisation for the HERA experiments ZEUS and H1 Polarisation at collider machines The HERA storage ring The HERA polarimeters The collider experiments ZEUS and H1 The HERA II upgrade Data

More information

Experience on Coupling Correction in the ESRF electron storage ring

Experience on Coupling Correction in the ESRF electron storage ring Experience on Coupling Correction in the ESRF electron storage ring Laurent Farvacque & Andrea Franchi, on behalf of the Accelerator and Source Division Future Light Source workshop 2012 Jefferson Lab,

More information

Electron Beam Polarimetry: Status and Prospects. DIS 2005, Madison, April 2005 E. Chudakov (JLab)

Electron Beam Polarimetry: Status and Prospects. DIS 2005, Madison, April 2005 E. Chudakov (JLab) Electron Beam Polarimetry: Status and Prospects DIS 2005, Madison, April 2005 E. Chudakov (JLab) Motivation: what accuracy is required for various experiments Methods in use: Optical methods Mott scattering

More information

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1

LHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1 LHC commissioning Mike Lamont AB-OP nd June 005.06.05 LHC commissioning - CMS 1 Detailed planning for 7-87 8 and 8-18 005 006 Short Circuit Tests CNGS/TI8/IT1 HWC LSS.L8.06.05 LHC commissioning - CMS Sector

More information

Spin observables for polarizing antiprotons. Donie O Brien

Spin observables for polarizing antiprotons. Donie O Brien Spin observables for polarizing antiprotons Donie O Brien Trinity College Dublin, Ireland Email: donie@maths.tcd.ie 9th November 006 ECT* Trento Italy Donie O Brien Introduction The PAX project at GSI

More information

NEPTUN-A Spectrometer for measuring the Spin Analyzing Power in p-p elastic scattering at large P~ at 400 GeV (and 3 TeV) at UNK.

NEPTUN-A Spectrometer for measuring the Spin Analyzing Power in p-p elastic scattering at large P~ at 400 GeV (and 3 TeV) at UNK. NEPTUN-A Spectrometer for measuring the Spin Analyzing Power in p-p elastic scattering at large P~ at 400 GeV (and 3 TeV) at UNK. 1 All M. T. Lin Randall [.aboratory of Physics The University of Michigan,

More information

Touschek polarimeter for beam energy measurement of VEPP-4M collider LNFSS-08 1 / 16

Touschek polarimeter for beam energy measurement of VEPP-4M collider LNFSS-08 1 / 16 Touschek polarimeter for beam energy measurement of VEPP-4M collider Ivan Nikolaev Budker Institute of Nuclear Physics Novosibirsk, Russia Frascati Spring School Bruno Touschek May 12-16 2008 Touschek

More information

Design of a Low-Energy Chopper System for FRANZ

Design of a Low-Energy Chopper System for FRANZ 05.03.2007 Design of a Low-Energy System for FRANZ Christoph Wiesner Contents Introduction Design and Layout of the Multi-Particle Simulation LEBT Outlook Function of the Input: 150 ma cw proton beam,

More information

SPIN2010. I.Meshkov 1, Yu.Filatov 1,2. Forschungszentrum Juelich GmbH. 19th International Spin Physics Symposium September 27 October 2, 2010

SPIN2010. I.Meshkov 1, Yu.Filatov 1,2. Forschungszentrum Juelich GmbH. 19th International Spin Physics Symposium September 27 October 2, 2010 Forschungszentrum Juelich GmbH SPIN200 9th International Spin Physics Symposium September 27 October 2, 200 Jülich, Germany Polarized Hadron Beams in NICA Project I.Meshkov, Yu.Filatov,2 JINR, Dubna 2

More information

Status of the MAGIX Spectrometer Design. Julian Müller MAGIX collaboration meeting 2017

Status of the MAGIX Spectrometer Design. Julian Müller MAGIX collaboration meeting 2017 Status of the MAGIX Spectrometer Design Julian Müller MAGIX collaboration meeting 2017 Magneto Optic Design Requirements relative momentum resolution Δp p < 10 4 resolution of the scattering angle Δθ

More information

Beam. RF antenna. RF cable

Beam. RF antenna. RF cable Status of LEP2 J. Wenninger, SL Operation for the SL division LEPC September 1998 Outline Optics and RF for 1998 Beam current limitations Injection and ramp Performance at high energy Conclusions LEPC/15-09-98

More information

2.6 Electron transport lines

2.6 Electron transport lines 2.6 Electron transport lines 2.6 Electron transport lines Overview The electron transport lines consist of all of the electron beamline segments that are neither part of the Linacs nor part of the injector.

More information

LHC operation in 2015 and prospects for the future

LHC operation in 2015 and prospects for the future LHC operation in 2015 and prospects for the future Moriond Workshop La Thuile March 2016 Jörg Wenninger CERN Beams Department Operation group / LHC For the LHC commissioning and operation teams 1 Moriond

More information

Donie O Brien Nigel Buttimore

Donie O Brien Nigel Buttimore Spin Observables and Antiproton Polarisation Donie O Brien Nigel Buttimore Trinity College Dublin Email: donie@maths.tcd.ie 17 July 006 CALC 006 Dubna Donie O Brien Introduction Relativistic formulae for

More information

The achievements of the CERN proton antiproton collider

The achievements of the CERN proton antiproton collider The achievements of the CERN proton antiproton collider Luigi DiLella Scuola Normale Superiore, Pisa, Italy Motivation of the project The proton antiproton collider UA1 and UA2 detectors Discovery of the

More information

IMP's activities in COSY programs and the extension to HPLUS

IMP's activities in COSY programs and the extension to HPLUS 2nd WHAT @ Beijing, July 2010 IMP's activities in COSY programs and the extension to HPLUS Xiaohua Yuan Institute of Modern Physics (IMP) - CAS, Lanzhou 73000 & Institut für Kernphysik, Forschungszentrum

More information

Development of a Rogowski coil Beam Position Monitor for Electric Dipole Moment measurements at storage rings

Development of a Rogowski coil Beam Position Monitor for Electric Dipole Moment measurements at storage rings Development of a Rogowski coil Beam Position Monitor for Electric Dipole Moment measurements at storage rings PHD defense talk Physics Institute III B Nuclear Physics Institute (IKP-II) Fabian Trinkel

More information

From COSY to HESR and EDM Storage Ring

From COSY to HESR and EDM Storage Ring From COSY to HESR and EDM Storage Ring M. Bai on behalf of Institut für Kernphysik, Forschungszentrum, Juelich DPG spring meeting, Technische Universität Darmstadt, March 17, 2016 Outline The story of

More information

Proton Polarimetry for the EIC

Proton Polarimetry for the EIC Electron Ion Collider Users Meeting June 24-27, 2014 at Stony Brook University Proton Polarimetry for the EIC Andrei Poblaguev Brookhaven National Laboratory 2014.06.27 EIC Users Meeting 1 Outline Proton

More information

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team

Diagnostics at the MAX IV 3 GeV storage ring during commissioning. PPT-mall 2. Åke Andersson On behalf of the MAX IV team Diagnostics at the MAX IV 3 GeV storage ring during commissioning PPT-mall 2 Åke Andersson On behalf of the MAX IV team IBIC Med 2016, linje Barcelona Outline MAX IV facility overview Linac injector mode

More information

The Metrology Light Source - Status

The Metrology Light Source - Status The Metrology Light Source - Status Jörg Feikes, Paul Goslawski, Tobias Goetsch, Markus Ries, Martin Ruprecht, Gode Wüstefeld, Helmholtz-Zentrum Berlin, Germany J. Feikes et al., Phys. Rev. ST Accel. Beams

More information

RHIC AND ITS UPGRADE PROGRAMS

RHIC AND ITS UPGRADE PROGRAMS Proceedings of EPAC8, Genoa, Italy FRXAGM1 Abstract RHIC AND ITS UPGRADE PROGRAMS Thomas Roser Brookhaven National Laboratory, Upton, New York 11793-5, USA As the first hadron accelerator and collider

More information

ELECTRON COOLING EXPERIMENTS AT S-LSR

ELECTRON COOLING EXPERIMENTS AT S-LSR ELECTRON COOLING EXPERIMENTS AT S-LSR T. Shirai #, S. Fujimoto, M. Ikegami, H. Tongu, M. Tanabe, H. Souda, A. Noda ICR, Kyoto-U, Uji, Kyoto, Japan, K. Noda, NIRS, Anagawa, Inage, Chiba, Japan, T. Fujimoto,

More information

Møller Polarimetry on Atomic Hydrogen

Møller Polarimetry on Atomic Hydrogen E.Chudakov June 21, 2011 Møller Polarimetry on Atomic Hydrogen 1 Møller Polarimetry on Atomic Hydrogen E.Chudakov 1 1 JLab Meeting at UVA Outline E.Chudakov June 21, 2011 Møller Polarimetry on Atomic Hydrogen

More information

Installed and commissioned during run 4 To be commissioned Installed/commissioned in run /10/2005 Raimondo Bertini

Installed and commissioned during run 4 To be commissioned Installed/commissioned in run /10/2005 Raimondo Bertini Installed and commissioned during run 4 To be commissioned Installed/commissioned in run 5 9-15/10/005 Raimondo Bertini Transverse Structure Functions Twist- PDFs f 1 g 1L g 1T h 1T Distribution functions

More information

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis

FY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis FY04 Luminosity Plan SAG Meeting September 22, 2003 Dave McGinnis FY03 Performance Accelerator Issues TEV Pbar Main Injector Reliability Operations Study Strategy Shot Strategy Outline FY04 Luminosity

More information

Ion Polarization in RHIC/eRHIC

Ion Polarization in RHIC/eRHIC Ion Polarization in RHIC/eRHIC M. Bai, W. MacKay, V. Ptitsyn, T. Roser, A. Zelenski Polarized Ion Sources (reporting for Anatoly Zelenski) Polarized proton beams in RHIC/eRHIC Polarized He3 for erhic (reporting

More information

Status of Optics Design

Status of Optics Design 17th B2GM, February 5, 2014 Status of Optics Design Y. Ohnishi /KEK 17th B2GM KEK, February 5, 2014 Contents! Lattice parameters! Dynamic aperture under influence of beam-beam effect! Lattice preparation

More information

Møller Polarimetry for PV Experiments at 12 GeV

Møller Polarimetry for PV Experiments at 12 GeV Outline E.Chudakov Jan 15, 2010, MOLLER Review Møller Polarimetry 1 Møller Polarimetry for PV Experiments at 12 GeV E.Chudakov 1 1 JLab MOLLER Review Outline E.Chudakov Jan 15, 2010, MOLLER Review Møller

More information

Accelerator Design and Construction Progress of TPS Project

Accelerator Design and Construction Progress of TPS Project Accelerator Design and Construction Progress of TPS Project Taiwan Light Source (TLS), a 120-m storage ring originally designed for 1.3 GeV, was commissioned and opened to users in 1993. The energy of

More information

Status of GEp III high Q form factor ratio analysis. Andrew Puckett, MIT on behalf of the GEp III Collaboration

Status of GEp III high Q form factor ratio analysis. Andrew Puckett, MIT on behalf of the GEp III Collaboration Status of GEp III high Q form factor ratio 2 analysis Andrew Puckett, MIT on behalf of the GEp III Collaboration Experiments E04 108 and E04 019 e' e p Analysis Method Two primary tasks for form factor

More information

Layout of the HHG seeding experiment at FLASH

Layout of the HHG seeding experiment at FLASH Layout of the HHG seeding experiment at FLASH V. Miltchev on behalf of the sflash team: A. Azima, J. Bödewadt, H. Delsim-Hashemi, M. Drescher, S. Düsterer, J. Feldhaus, R. Ischebeck, S. Khan, T. Laarmann

More information

The Electron-Ion Collider

The Electron-Ion Collider The Electron-Ion Collider C. Tschalaer 1. Introduction In the past year, the idea of a polarized electron-proton (e-p) or electron-ion (e-a) collider of high luminosity (10 33 cm -2 s -1 or more) and c.m.

More information

COMMISSIONING AND STATUS OF THE DIAMOND STORAGE RING

COMMISSIONING AND STATUS OF THE DIAMOND STORAGE RING COMMISSIONING AND STATUS OF THE DIAMOND STORAGE RING R.P. Walker, Diamond Light Source (DLS), Oxfordshire, U.K., on behalf of the Diamond Machine Commissioning Team Abstract The commissioning of the Diamond

More information

Overview of LHC Accelerator

Overview of LHC Accelerator Overview of LHC Accelerator Mike Syphers UT-Austin 1/31/2007 Large Hadron Collider ( LHC ) Outline of Presentation Brief history... Luminosity Magnets Accelerator Layout Major Accelerator Issues U.S. Participation

More information

IR status. 2009/3/19 M. Iwasaki For Super-KEKB MDI group U. Tokyo, Tohoku U., and KEK

IR status. 2009/3/19 M. Iwasaki For Super-KEKB MDI group U. Tokyo, Tohoku U., and KEK IR status 2009/3/19 M. Iwasaki For Super-KEKB MDI group U. Tokyo, Tohoku U., and KEK Introduction 2 Super-KEKB High luminosity experiment To increase the luminosity, machine parameters will drastically

More information

Theory of electron cooling

Theory of electron cooling Theory of electron cooling Daria Astapovych 03/12/2014 HSC Meeting Outline Motivation and idea of the particle beam cooling Cooler Low energy, high energy beam Electron beam Kinetics of electron cooling

More information

STATUS OF THE TARN II PROJECT. T. Tanabe Institute for Nuclear Study, University of Tokyo, Tanashi, Tokyo 188, Japan

STATUS OF THE TARN II PROJECT. T. Tanabe Institute for Nuclear Study, University of Tokyo, Tanashi, Tokyo 188, Japan STATUS OF THE TARN II PROJECT T. Tanabe Institute for Nuclear Study, University of Tokyo, Tanashi, Tokyo 188, Japan Summary The construction of a synchrotron-cooler ring TARN II is currently in progress.

More information

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories

e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico e+e- Factories e + e Factories M. Sullivan Presented at the Particle Accelerator Conference June 25-29, 2007 in Albuquerque, New Mexico 1 Outline Factory Running KEKB PEP-II DAFNE CESR-c BEPCII 2 Summary Factory Running

More information

XIth International Conference on Elastic and Diffractive Scattering Château de Blois, France, May 15-20, 2005 arxiv:hep-ex/ v1 31 Oct 2005

XIth International Conference on Elastic and Diffractive Scattering Château de Blois, France, May 15-20, 2005 arxiv:hep-ex/ v1 31 Oct 2005 XIth International Conference on Elastic and Diffractive Scattering Château de Blois, France, May 15-20, 2005 arxiv:hep-ex/0510078v1 31 Oct 2005 Elastic Cross-Section and Luminosity Measurement in ATLAS

More information

EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS

EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS EFFECT OF THE FIRST AXIAL FIELD SPECTROMETER IN THE CERN INTERSECTING STORAGE RINGS (ISR) ON THE CIRCULATING BEAMS P.J.Bryant and G.Kantardjian CERN, Geneva, Switzerland Introduction and General Description

More information

Review of Polarized Targets

Review of Polarized Targets Review of Polarized Targets E. Steffens Univ. Erlangen-Nürnberg 1. Introduction 2. Polarized Solid Targets 3. Polarized Gas Targets 4. Examples (COMPASS, HERMES, PAX) 5. Outlook 1. INTRODUCTION Two-body

More information

Operational Experience with HERA

Operational Experience with HERA PAC 07, Albuquerque, NM, June 27, 2007 Operational Experience with HERA Joachim Keil / DESY On behalf of the HERA team Contents Introduction HERA II Luminosity Production Experiences with HERA Persistent

More information

Commissioning of RHIC p-carbon CNI Polarimeter 1 H. Huang 1, I. Alekseev 2, G. Bunce 1, A. Deshpande 1, D. Fields 3, K. Imai 4, V. Kanavets 2, K. Kuri

Commissioning of RHIC p-carbon CNI Polarimeter 1 H. Huang 1, I. Alekseev 2, G. Bunce 1, A. Deshpande 1, D. Fields 3, K. Imai 4, V. Kanavets 2, K. Kuri Commissioning of RHIC p-carbon CNI Polarimeter 1 H. Huang 1, I. Alekseev 2, G. Bunce 1, A. Deshpande 1, D. Fields 3, K. Imai 4, V. Kanavets 2, K. Kurita 1, B. Lozowski 5, W. MacKay 1, Y. Makdisi 1, T.

More information

Accelerator Vacuum Technology Challenges for Next-Generation Synchrotron-Light Sources

Accelerator Vacuum Technology Challenges for Next-Generation Synchrotron-Light Sources Accelerator Vacuum Technology Challenges for Next-Generation P. He (IHEP) 14-19 May 2017, IPAC 2017, Copenhagen, Denmark 14-19 May 2017, IPAC 2017, Copenhagen, Denmark Content 1. Introduction: Goals and

More information

Status and Outlook of the LHC

Status and Outlook of the LHC Status and Outlook of the LHC Enrico Bravin - CERN BE-BI J-PARC visit seminar 6 July 2017 Outlook Overview of LHC Objectives for run2 Parameters for 2016/2017 and differences w.r.t. 2015 Summary of commissioning

More information

Direct Neutrino Mass Measurement with KATRIN. Sanshiro Enomoto (University of Washington) for the KATRIN Collaboration

Direct Neutrino Mass Measurement with KATRIN. Sanshiro Enomoto (University of Washington) for the KATRIN Collaboration Direct Neutrino Mass Measurement with KATRIN Sanshiro Enomoto (University of Washington) for the KATRIN Collaboration DBD16, Osaka, Japan, 8 Nov 2016 Neutrino Mass Measurement with Single Beta Decay 2

More information

Tagging with Roman Pots at RHIC. Proton tagging at STAR

Tagging with Roman Pots at RHIC. Proton tagging at STAR Tagging with Roman Pots at RHIC Proton tagging at STAR Elastic and Diffractive Processes in High Energy Proton Scattering Elastic scattering Detect protons in very forward direction with Roman Pots (RPs)

More information

Vacuum System of Synchrotron radiation sources

Vacuum System of Synchrotron radiation sources 3 rd ILSF Advanced School on Synchrotron Radiation and Its Applications September 14-16, 2013 Vacuum System of Synchrotron radiation sources Prepared by: Omid Seify, Vacuum group, ILSF project Institute

More information

A Test Experiment for a Polarized Positron Source - E-166 at SLAC

A Test Experiment for a Polarized Positron Source - E-166 at SLAC A Test Experiment for a Polarized Positron Source - E-166 at SLAC Ralph Dollan Humboldt University, Berlin Outline Why polarized beams at the ILC The goal of E-166 The helical undulator Positron production

More information

A method to polarise antiprotons in storage rings and create polarised antineutrons

A method to polarise antiprotons in storage rings and create polarised antineutrons EPJ manuscript No. (will be inserted by the editor) A method to polarise antiprotons in storage rings and create polarised antineutrons Berthold Schoch Physikalisches Institut, Universität, Bonn, D-53115

More information

ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING

ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING ALIGNMENT RESULT FOR MAGNET UNITS OF THE SPRING-8 STORAGE RING Chao ZHANG, Sakuo MATSUI, Jun-ichi OHNISHI and Koji TSUMAKI SPring-8, Kamigori, Ako-gun, Hyogo 678-12, Japan 1. INTRODUCTION Magnet installation

More information

Compton Storage Rings

Compton Storage Rings Compton Polarimetry @ Storage Rings Wolfgang Hillert ELectron Stretcher Accelerator Physics Institute of Bonn University Møller-Polarimeter Compton-Polarimeter Mott-Polarimeter Compton Scattering Differential

More information

Muon Front-End without Cooling

Muon Front-End without Cooling EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Muon Front-End without Cooling CERN-Nufact-Note-59 K. Hanke Abstract In this note a muon front-end without cooling is presented. The muons are captured, rotated

More information

P-Carbon CNI Polarimeter Operation Experience

P-Carbon CNI Polarimeter Operation Experience P-Carbon CNI Polarimeter Operation Experience, A. Poblaguev, D. Steski, K. Yip, A. Zelenski Brookhaven National Laboratory, Upton, NY 11973, USA E-mail: huanghai@bnl.gov The p-carbon polarimeter working

More information

Polarization Preservation and Control in a Figure-8 Ring

Polarization Preservation and Control in a Figure-8 Ring Spin Physics (SPIN2014) International Journal of Modern Physics: Conference Series Vol. 40 (2016) 1660090 (7 pages) c The Author(s) DOI: 10.1142/S2010194516600909 Polarization Preservation and Control

More information

Small Isochronous Ring (SIR) project at NSCL, MSU. Eduard Pozdeyev NSCL, Michigan Sate University

Small Isochronous Ring (SIR) project at NSCL, MSU. Eduard Pozdeyev NSCL, Michigan Sate University Small Isochronous Ring (SIR) project at NSCL, MSU Eduard Pozdeyev NSCL, Michigan Sate University Talk Outline Isochronous regime in accelerators, application to Isochronous Cyclotrons Space charge effects

More information

RFQ Status. Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005

RFQ Status. Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005 RFQ Status Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005 RFQ Status & Testing of the RFQ Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005 Overview TITAN Background

More information