APPENDIX A 5 BUSSYSTEM DATA

Size: px
Start display at page:

Download "APPENDIX A 5 BUSSYSTEM DATA"

Transcription

1 5 BUSSYSTEM DATA APPENDIX A A. BUSDATA S.No P gen Q gen P load Q Load Voltage Shunt B. LINE DATA S. No BUS BUS R X Ysh Tap

2 APPENDIX B REFORMS IN ANDHRA PRADESH The Electricity Supply Industry in Andhra Pradesh is basically governed by four enhancements namely: 1. Electricity Act, Electricity (supply) Act, The Electricity Act, Electricity Act, The Electricity (Supply) act, 1948 mandated the creation of a State Electricity Board. The Andhra Pradesh State Electricity Board (APSEB) was formed in 1959 with a responsibility of arranging the supply of electricity in the state of Andhra Pradesh. APSEB was in the forefront of technological advances in the design, construction, operation and maintenance of generation, transmission and distribution systems. The capacity was 213 MW in In fulfilling its statutory responsibility to ensure continuity of a safe and economic supply of electricity, APSEB built up a powerful engineering capability, and accumulated a wealth of experience in the design, construction, operation and maintenance of Generation, Transmission and Distribution systems. Government of AP has initiated the reforms through IE Act These reforms have involved unbundling of the State Electricity Board into separate generation, transmission and distribution companies. 204

3 Reforms in APSEB have resulted in restructuring of APSEB into six successive companies namely 1. APGENCO 2. APTRANSCO 3. AP Eastern Power Discom Corporation Ltd (AP EPDCL) 4. AP Southern Power Discom Corporation Ltd (AP SPDCL) 5. AP Nothern Power Discom Corporation Ltd (AP NPDCL) 6. AP Central Power Discom Corporation Ltd (AP CPDCL) All these entities came into existence on as a consequence of restructuring of the erstwhile AP State Electricity Board (APSEB). AP Genco has to look after Generation of Electricity in Andhra Pradesh, APTransco has to look after Transmission of Electricity and Discos to look after distribution of electricity in their respective geographical areas. APTransco remained as Single buyer in the state - purchasing power from various Generators. It sold power to DISCOs in accordance with the terms and conditions of the individual PPAs at Bulk Supply Tariff (BST) rates from Feb 1999 to June Subsequently, as per the Third Transfer Scheme notified by Government of Andhra Pradesh (GOAP), APTransco has ceased to do power trading and has retained with Power Transmission responsibility. The purchasing power from various generators according to the requirement is the responsibility of the each Distributing company. Since all the four Disco s are not fully equipped to do so, Government of Andhra Pradesh formed a 205

4 committee during June 2005 namely Andhra Pradesh Power Coordination Committee (APPCC). Since then the committee has taken over the responsibility of power procurement from various generators. The APPCC reviews the power requirement situation periodically and issues necessary guidance for procurement of power and Grid Operation for implementing the procurement and supply to each individual Discos. At present it is increased to 10,328 MW (including share from central projects) and is the third largest power system in the country. The allocation of various generation capacities to four DISCOs as per GOAP Gazette (The Gazette Ms.No.53,Energy (Power III),28 Th,April 2008) is as summarized type of generation wise and station wise as follows: TABLE 1 Summaries of PPA Allocations by Generation Type Generator Capacity in (MW) EPDCL SPDCL CPDCL NPDCL APGENCO (T) APGENCO (H) CGS IPP MPP NCE tal Where MPP Mini Power Plants and NCE Non-conventional Energy 206

5 TABLE 2 Details of the PPA Allocation table (GOAP Approval) Generator EPDCL SPDCL CPDCL NPDCL Kothagundam TPS A APGENCO Kothagundam TPS B APGENCO Kothagundam TPS C APGENCO Kothagundam TPS V 1 APGENCO Kothagundam TPS V 2 APGENCO Vijayawada TPS I APGENCO Vijayawada TPS II APGENCO Vijayawada TPS III APGENCO Nellore TPS APGENCO Ramagundam TS B APGENCO Rayalaseema TPP 1 APGENCO APGENCO Hydro APGENCO Simhadri CGS NTPC Ramagundam CGS NLC I CGS NLC II CGS Madras Atomic PS CGS Eastern Region CGS Talcher II CGS Talcher II I CGS Talcher II I CGS GVK J IPP SPECTRUM IPP LANCO IPP BSES IPP LVS IPP APGCL I MPP APGCL II MPP RVK MPP 0 NCE Eastern NCE NCE Southern NCE NCE Central NCE NCE Northern NCE SVS NCE tal

6 APPENDIX C LINE DATA S.No R X B/2 B/2 Taps

7 S.No R X B/2 B/2 Taps

8 S.No R X B/2 B/2 Taps

9 S.No R X B/2 B/2 Taps

10 S.No R X B/2 B/2 Taps

11 S.No R X B/2 B/2 Taps

12 S.No R X B/2 B/2 Taps

13 S.No R X B/2 B/2 Taps

14 S.No R X B/2 B/2 Taps

15 S.No R X B/2 B/2 Taps

16 S.No R X B/2 B/2 Taps

17 S.No R X B/2 B/2 Taps

18 S.No R X B/2 B/2 Taps

19 S.No R X B/2 B/2 Taps

20 S.No R X B/2 B/2 Taps

21 S.No R X B/2 B/2 Taps

22 S.No R X B/2 B/2 Taps

23 S.No R X B/2 B/2 Taps

24 S.No R X B/2 B/2 Taps

25 APPENDIX C INDIAN STATE POWER SYSTEM DATA BUSDATA SNo. BUS VOLTGAE Generation Load Qlimits shunt Zone Type Magnitude Angle MW MVAR MW MVAR MAX MIN

26 SNo. BUS VOLTGAE Generation Load Qlimits shunt Zone Type Magnitude Angle MW MVAR MW MVAR MAX MIN

27 SNo. BUS VOLTGAE Generation Load Qlimits shunt Zone Type Magnitude Angle MW MVAR MW MVAR MAX MIN

28 SNo. BUS VOLTGAE Generation Load Qlimits shunt Zone Type Magnitude Angle MW MVAR MW MVAR MAX MIN

29 SNo. BUS VOLTGAE Generation Load Qlimits shunt Zone Type Magnitude Angle MW MVAR MW MVAR MAX MIN

Category-wise and Voltage-wise Actual Sales ( )

Category-wise and Voltage-wise Actual Sales ( ) Voltage LT 11 33 132kV & Above HT Total CAT Category-wise and Voltage-wise Actual Sales (2008-09) APCPDCL 2008-09 ATP KNL MBNR NLG MDK RRN RRS HYN HYS HYC Total 1 Domestic 309.19 347.85 169.23 253.39 253.89

More information

POWER SYSTEM OPERATION CORPORATION LIMITED.

POWER SYSTEM OPERATION CORPORATION LIMITED. POWER SYSTEM OPERATION CORPORATION LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE DAILY OPERATION REPORT POWER SUPPLY POSITION IN SOUTHERN REGION FOR 03-AUG-2017 DATE OF REPORTING : 04-AUG-2017 AT 06:00HRS

More information

Wheeling Tariffs FY to FY and. Retail Supply Tariffs

Wheeling Tariffs FY to FY and. Retail Supply Tariffs Wheeling Tariffs FY2009-10 to FY2013-14 and Retail Supply Tariffs FY2009-10 Order 20 th March 2009 Andhra Pradesh Electricity Regulatory Commission Singareni Bhavan, Red Hills, Lakdi-Ka-Pool, Hyderabad

More information

NPCIL ISGS. Units Units Capacity in MW Stage-I&II Stage-III Stage- II Stage- II 1&2 3&4 Unit-1. Stage -II

NPCIL ISGS. Units Units Capacity in MW Stage-I&II Stage-III Stage- II Stage- II 1&2 3&4 Unit-1. Stage -II ANNEXURE ( Page 1 of 3) REVISED PERCENTAGE ALLOCATION ( FIRM+UNALLOCATED ) FROM ISGS OF SR w.e.f.26.02.2015 From 18:00 hrs to 22:00 hrs. NTPC NLC NTECL NPCIL ISGS Ramagundam Talcher Simhadri TPS-II @ TPS-

More information

SOUTHERN REGION POWER SECTOR PROFILE GOVERNMENT OF INDIA MINISTRY OF POWER PROJECT MONITORING CELL NIRMAN BHAVAN NEW DELHI

SOUTHERN REGION POWER SECTOR PROFILE GOVERNMENT OF INDIA MINISTRY OF POWER PROJECT MONITORING CELL NIRMAN BHAVAN NEW DELHI SOUTHERN REGION POWER SECTOR PROFILE GOVERNMENT OF INDIA MINISTRY OF POWER PROJECT MONITORING CELL NIRMAN BHAVAN NEW DELHI JANUARY 2007 SOUTHERN REGION POWER SECTOR PROFILE TABLE OF CONTENTS Sl. No. Contents

More information

SUMMARY REPORT FOR COUNCIL OF MINISTERS ON IMPORTANT DEVELOPMENTS IN POWER SECTOR DURING THE MONTH OF OCTOBER, 2018

SUMMARY REPORT FOR COUNCIL OF MINISTERS ON IMPORTANT DEVELOPMENTS IN POWER SECTOR DURING THE MONTH OF OCTOBER, 2018 SUMMARY REPORT FOR COUNCIL OF MINISTERS ON IMPORTANT DEVELOPMENTS IN POWER SECTOR DURING THE MONTH OF OCTOBER, 2018 1. CAPACITY ADDITION (Generation and Transmission) (i) Thermal capacity 600 MW has been

More information

CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES

CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES REVIEW: Central Electricity Authority General Review 2006 CHAPTER 5 ELECTRIC POWER SUPPLY AND SYSTEM LOSSES During the year 2004-05 gross electricity generation

More information

Jawaharlal Nehru National Solar Mission

Jawaharlal Nehru National Solar Mission Jawaharlal Nehru National Solar Mission National Solar Mission-Phase-I Journey so far NTPC Vidyut Vyapar Nigam Ltd. 1 11/5/2012 Background India is located in the equatorial sun belt of the earth, thereby

More information

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. January 2018

य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT. January 2018 भ रत सरक र GOVERNMENT OF INDIA उज म लय MINISTRY OF POWER क य व त धकरण CENTRAL ELECTRICITY AUTHORITY द ण य व त स म त SOUTHERN REGIONAL POWER COMMITTEE य प र षण ल ख REGIONAL TRANSMISSION ACCOUNT January

More information

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited, Generation Business For the period FY to FY

Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited, Generation Business For the period FY to FY Multi Year Tariff Order For Himachal Pradesh State Electricity Board Limited, Generation Business For the period FY 2014-15 to FY 2018-19 Himachal Pradesh Electricity Regulatory Commission 10 th June 2014

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF ORDER. on Retail Supply Business for the FY

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF ORDER. on Retail Supply Business for the FY ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION TARIFF ORDER on Retail Supply Business for the FY 2008-09 of CENTRAL POWER DISTRIBUTION COMPANY OF A P LTD EASTERN POWER DISTRIBUTION COMPANY OF A P LTD

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION HYDERABAD

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION HYDERABAD ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION HYDERABAD Present Sri A. Raghotham Rao, Chairman Sri R. Radha Kishen, Member Sri C.R.Sekhar Reddy, Member Dated: 30-03-2011 O.P No: 02 of 2011 Central Power

More information

Replies to Additional Information

Replies to Additional Information Replies to Additional Information 1. Actual Consumers Category wise sales for the months January to March, 2017. Reply : Enclosed in Annexure-I 2. Excel Format-7 (Total Revenue at Current Tariff and )

More information

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION Singareni Bhavan, Red Hills,Lakdi-ka-pool,Hyderabad 04 TARIFF ORDER

ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION Singareni Bhavan, Red Hills,Lakdi-ka-pool,Hyderabad 04 TARIFF ORDER ANDHRA PRADESH ELECTRICITY REGULATORY COMMISSION Singareni Bhavan, Red Hills,Lakdi-ka-pool,Hyderabad 04 TARIFF ORDER Retail Supply Tariffs for FY 2010-11 In the Supply Areas of CENTRAL POWER DISTRIBUTION

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

Phone : ; FAX : ; ; web site:

Phone : ; FAX : ;   ; web site: WEBSITE भ रत सरक र क न र य व द य त प र वधकरण दवक षण क ष त र य व द य त सवमवत 29, र स क स क र स र ड ब गल र - 560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29,

More information

Contents Economic dispatch of thermal units

Contents Economic dispatch of thermal units Contents 2 Economic dispatch of thermal units 2 2.1 Introduction................................... 2 2.2 Economic dispatch problem (neglecting transmission losses)......... 3 2.2.1 Fuel cost characteristics........................

More information

Agenda for Long Term Access NVVNL Solar Power Projects

Agenda for Long Term Access NVVNL Solar Power Projects Agenda for Long Term Access NVVNL Solar Power Projects NTPC Vidyut Vyapar Nigam Ltd. (NVVNL) vide letter dated 04/11/2014 had applied for Long term Access (LTA) for transfer of 150MW power i.e. 100MW from

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres

System Impact Assessment Addendum #2 Greenfield & St. Clair Energy Centres IESO_REP_0292 System Impact Assessment Addendum #2 Greenfield & St. lair Energy entres onnection Assessment & Approval Process Issue 3.0 Greenfield Energy entre AA I 2004-167 Applicant: Greenfield Energy

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

Alectra Utilities List of Station Capacity

Alectra Utilities List of Station Capacity lectra Utilities List of Station Capacity s per Distribution System Code this list represents the llocated Capacity on stations owned by lectra Utilities (formerly PowerStream) as of July 1st, 2018. llocated

More information

Andhra Pradesh Electricity Regulatory Commission 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Lakdi-ka-pul, Hyderabad

Andhra Pradesh Electricity Regulatory Commission 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Lakdi-ka-pul, Hyderabad Andhra Pradesh Electricity Regulatory Commission 4 th & 5 th Floors, Singareni Bhavan, Red Hills, Lakdi-ka-pul, Hyderabad 500 004. TARIFF ORDER Retail Supply Tariffs for FY 2013-14 In the Supply Areas

More information

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part) PPA PROCUREMENT PLAN (Textual Part) Project information: Nigeria Electrification Project P161885 Project agency: Rural Electrification Agency Date of the Plan: [Jan 2018] Period covered by this Plan: [PPA]

More information

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2014-15 Head/Item Actuals up to COPPY

More information

Phone : ; FAX : ; ; web site:

Phone : ; FAX : ;   ; web site: WEBSITE भ त स क क न द र य व द य त प र व क ण दवक षण क ष त र य व द य त सव वत 29, स क सस क र स ड ब गल - 560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29, Race

More information

Tutorial 2: Modelling Transmission

Tutorial 2: Modelling Transmission Tutorial 2: Modelling Transmission In our previous example the load and generation were at the same bus. In this tutorial we will see how to model the transmission of power from one bus to another. The

More information

Performance Improvement of Hydro-Thermal System with Superconducting Magnetic Energy Storage

Performance Improvement of Hydro-Thermal System with Superconducting Magnetic Energy Storage Volume 114 No. 10 2017, 397-405 ISSN: 1311-8080 (printed version); ISSN: 1314-3395 (on-line version) url: http://www.ijpam.eu ijpam.eu Performance Improvement of Hydro-Thermal System with Superconducting

More information

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975)

Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Congo, Republic of Rep. of Congo - Water, Electricity & Urban Development SIL (LEN) (P106975) Operation

More information

PowerApps Optimal Power Flow Formulation

PowerApps Optimal Power Flow Formulation PowerApps Optimal Power Flow Formulation Page1 Table of Contents 1 OPF Problem Statement... 3 1.1 Vector u... 3 1.1.1 Costs Associated with Vector [u] for Economic Dispatch... 4 1.1.2 Costs Associated

More information

Chatham-Kent/Lambton/Sarnia

Chatham-Kent/Lambton/Sarnia Chatham-Kent/Lambton/Sarnia Regional Infrastructure Plan August 21, 2017 Prepared by Hydro One Networks Inc. (Lead Transmitter) With support from: Companies Independent Electricity System Operator (IESO)

More information

MORNING MEGAWATT. MARKET MOVERS 7 October 2017 PRICE IEX DAM. Delivery: 7 October 2017 Last updated: 10:00 AM. Price (Rs/MWh) Power (MW)

MORNING MEGAWATT. MARKET MOVERS 7 October 2017 PRICE IEX DAM. Delivery: 7 October 2017 Last updated: 10:00 AM. Price (Rs/MWh) Power (MW) MORNING MEGAWATT Delivery: 7 October 2017 Last updated: 10:00 AM MARKET MOVERS 7 October 2017 7000 Price West Bengal Buy Himachal Pradesh Sale 2500 5250 1875 Price (Rs/MWh) 3500 1250 1750 625 0 0 1700-1715

More information

'+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power. ~~~~ Northern Regional Power Committee

'+fl«phcfli «Government of India ~JOj?tI~4 Ministry of Power. ~~~~ Northern Regional Power Committee '+fl"«phcfli «Government of India ~JOj?tI~4 Ministry of Power ~~~~ Northern Regional Power Committee No: NRPCIOPRJI03/02/201S13179-3204 Dated:01.03.201S ('Q'1f J!. ~. tft. flr~') ttch-4 ~ 18-n:,"Tth- ~

More information

PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS

PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS IMPACT: International ournal of Research in Engineering & Technology (IMPACT: IRET) ISSN 2321-8843 Vol. 1, Issue 3, Aug 2013, 85-92 Impact ournals PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION

More information

Phone : ; FAX : ; web site:

Phone : ; FAX : ;   web site: Government of India Central Electricity Authority Southern Regional Power Committee 29, Race Course Cross Road BANGALORE - 560 009 Phone : 080-2228 2516 ; FAX : 080-2225 9343; e-mail: mssrpc@yahoo.com;

More information

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2014-15 Head/Item Actuals up to COPPY

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA South Asia Energy and Mining Global Practice IBRD/IDA Specific Investment Loan FY 2011 Seq No: 8 ARCHIVED on 01-Jun-2015 ISR18947 Implementing Agencies: Key Dates Key Project Dates Board Approval

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller

16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots. David Mueller 1 16PESGM2316 Characterizing Transmission System Harmonic Impedances with R-X Loci Plots David Mueller 2 Transmission System Harmonics Studies In the US, the closure of older coal fired plants is a driver

More information

Commissioning and Testing of AVR and PSS

Commissioning and Testing of AVR and PSS Commissioning and Testing of AVR and PSS Excitation System Upgrade and commissioning challenges Vetti Bala Principal C&I Engineer G E N E S I S E N E R G Y L I M I T E D Contents Asset Testing - AVR AVR

More information

Public Disclosure Copy

Public Disclosure Copy Public Disclosure Authorized AFRICA Mali Energy & Extractives Global Practice IBRD/IDA Specific Investment Loan FY 2009 Seq No: 11 ARCHIVED on 10-Feb-2016 ISR22432 Implementing Agencies: Eenrgie du Mali

More information

Chapter 5. Transmission networks and electricity markets

Chapter 5. Transmission networks and electricity markets Chapter 5. Transmission networks and electricity markets 1 Introduction In most of the regions of the world: assumptions that electrical energy can be traded as if all generators were connected to the

More information

Implementation Status & Results Report Croatia & Bosnia & Herzegovina GEF Adriatic Sea Environmental Pollution Control Project (I) (P143921)

Implementation Status & Results Report Croatia & Bosnia & Herzegovina GEF Adriatic Sea Environmental Pollution Control Project (I) (P143921) EUROPE AND CENTRAL ASIA Western Balkans Water Global Practice Global Environment Project Investment Project Financing FY 2014 Seq No: 7 ARCHIVED on 04-Jan-2018 ISR31078 Implementing Agencies: Ministry

More information

Fig in '000 tes on date Monthly Progressive

Fig in '000 tes on date Monthly Progressive DESP RAJGHAT BADARPUR CCL Rail 0.00 163.60 BADARPUR (TO TALCHER STPS) CCL Rail 0.00 3.83 PANIPAT BCCL Rail 10.55 52.05 CCL Rail 0.00 7.54 NCL RGTPP (HISSAR) CCL Rail 3.76 125.32 MCL Rail 7.47 22.41 NCL

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented)

SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented) SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented) Amend paragraph 2.3 to read as follows: 2.3.1 In respect of each Settlement Period, for each

More information

STATE POWER SECTOR PERFORMANCE RATINGS

STATE POWER SECTOR PERFORMANCE RATINGS STATE POWER SECTOR PERFORMANCE RATINGS Final Report to the Ministry of Power Government of India June 2006 1 Table Of Contents 1. BACKGROUND...3 2. KEYFINDINGS...8 3. STATES THAT HAVE SHOWN SIGNIFICANT

More information

Business Plan for 5-Year MYT Control Period FY to FY Submitted To: Jammu & Kashmir State Electricity Regulatory Commission

Business Plan for 5-Year MYT Control Period FY to FY Submitted To: Jammu & Kashmir State Electricity Regulatory Commission FY 2016-17 to FY 2020-21 Business Plan for 5-Year MYT Control Period Submitted To: Jammu & Kashmir State Electricity Regulatory Commission Submitted By: Jammu & Kashmir Power Development Department-Distribution

More information

B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester. Electrical and Electronics Engineering. EE 1352 Power System Analysis

B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester. Electrical and Electronics Engineering. EE 1352 Power System Analysis B.E. / B.Tech. Degree Examination, April / May 2010 Sixth Semester Electrical and Electronics Engineering EE 1352 Power System Analysis (Regulation 2008) Time: Three hours Answer all questions Part A (10

More information

POWER SYSTEM STATISTICS

POWER SYSTEM STATISTICS POWER SYSTEM STATISTICS 2015-16 KERALA STATE ELECTRICITY BOARD LIMITED Table No. LIST OF TABLES Title 1 Growth of Kerala Power System 1 2 Plan wise Achievements 2 3 Particulars of Generators 3 4 Installed

More information

Transmission Planning: Cluster Analysis

Transmission Planning: Cluster Analysis Transmission Planning: Cluster Analysis OVERVIEW The Clean Energy Act requires the 2011 Integrated Resource Plan (IRP) to include a description of 30-year transmission needs including an assessment of

More information

The Need for Tariff Adjustment by the Distribution Companies in Nigeria.

The Need for Tariff Adjustment by the Distribution Companies in Nigeria. The Need for Tariff Adjustment by the Distribution Companies in Nigeria. N.T. Makanjuola 1 ; O. Shoewu 1 *; L.A. Akinyemi 1,2 ; and E.O. Imohimi 1 1 Department of Electronic and Computer Engineering, Lagos

More information

I. Why power? II. Model definition III. Model uses IV. The basics. A. Supply Dispatch B. Demand Bidding. D. Transmission

I. Why power? II. Model definition III. Model uses IV. The basics. A. Supply Dispatch B. Demand Bidding. D. Transmission Electric Power Markets: Why is Electricity Different? Dumb Grids, the Ultimate Just-in in-time Problem, & Polar Bears Benjamin F. Hobbs & Daniel Ralph Whiting School of Engineering The Johns Hopkins University

More information

EIA411 May 1, A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411

EIA411 May 1, A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411 EIA411 May 1, 2006 A Report to the Office of Energy Emergency Operations Department of Energy Under EIA-411 All questions concerning this data should be directed to: Jason Speer Southwest Power Pool 415

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 Statement of Receipts and Disbursements/Cash Flow for the year 2017-18 Head/Item Actuals up to COPPY % Variation

More information

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 Wind power and management of the electric system EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 HOW WIND ENERGY IS TAKEN INTO ACCOUNT WHEN MANAGING ELECTRICITY TRANSMISSION SYSTEM IN FRANCE?

More information

Economic Operation of Power Systems

Economic Operation of Power Systems Economic Operation of Power Systems Section I: Economic Operation Of Power System Economic Distribution of Loads between the Units of a Plant Generating Limits Economic Sharing of Loads between Different

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 Statement of Receipts and Disbursements/Cash Flow for the year 2017-18 Head/Item Actuals up to COPPY % Variation

More information

ARTIFICIAL BEE COLONY ALGORITHM FOR PROFIT BASED UNIT COMMITMENT USING MODIFIED PRE-PREPARED POWER DEMAND TABLE

ARTIFICIAL BEE COLONY ALGORITHM FOR PROFIT BASED UNIT COMMITMENT USING MODIFIED PRE-PREPARED POWER DEMAND TABLE ARTIFICIAL BEE COLONY ALGORITHM FOR PROFIT BASED UNIT COMMITMENT USING MODIFIED PRE-PREPARED POWER DEMAND TABLE Kuldip Deka 1, Dr. Barnali Goswami 2 1M.E. student, Assam Engineering College 2Associate

More information

Deregulated Electricity Market for Smart Grid: A Network Economic Approach

Deregulated Electricity Market for Smart Grid: A Network Economic Approach Deregulated Electricity Market for Smart Grid: A Network Economic Approach Chenye Wu Institute for Interdisciplinary Information Sciences (IIIS) Tsinghua University Chenye Wu (IIIS) Network Economic Approach

More information

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS

ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS Region Northern Region Western Region Southern Region Eastern Region North Eastern Region Islands ALL INDIA Figures at decimal may not tally due to rounding off ALL INDIA INSTALLED CAPACITY (IN MW) OF

More information

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives.

The World Bank. Kenya: Off-grid Solar Access Project for Underserved Counties (P160009) Key Dates. Project Development Objectives. Public Disclosure Authorized AFRICA Kenya Energy & Extractives Global Practice IBRD/IDA Investment Project Financing FY 2018 Seq No: 1 ARCHIVED on 24-Oct-2017 ISR29813 Implementing Agencies: Kenya Power

More information

Implementation Status & Results Burundi Burundi - Emergency Energy Project from IDA CRW (P122217)

Implementation Status & Results Burundi Burundi - Emergency Energy Project from IDA CRW (P122217) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Burundi Burundi - Emergency Energy Project from IDA CRW (P122217) Operation Name: Burundi - Emergency

More information

2017/18 Wider Cancellation Charge Statement. Version 1. Effective from 1 st April Based Upon: User Commitment Methodology.

2017/18 Wider Cancellation Charge Statement. Version 1. Effective from 1 st April Based Upon: User Commitment Methodology. 2017/18 Wider Cancellation Charge Statement Version 1 Effective from 1 st April 2017 Based Upon: User Commitment Methodology contained within Section 15 of the Connection and Use of System Code 1. Wider

More information

2018/19 Wider Cancellation Charge Statement. Version 2.0. Effective from 1 st April Based Upon: User Commitment Methodology.

2018/19 Wider Cancellation Charge Statement. Version 2.0. Effective from 1 st April Based Upon: User Commitment Methodology. 2018/19 Wider Cancellation Charge Statement Version 2.0 Effective from 1 st April 2018 Based Upon: User Commitment Methodology contained within Section 15 of the Connection and Use of System Code 1. Wider

More information

व षय: स श ध त क ष त र य प र शण ऱ ख

व षय: स श ध त क ष त र य प र शण ऱ ख WEBSITE भ रत सरक र क न र य व द य त प र वधकरण दवक षण क ष त र य व द य त सवमवत 29, र स क स क र स र ड ब गल र :-560 009 Government of India Central Electricity Authority Southern Regional Power Committee 29,

More information

Sub: Regional Transmission Deviation Account for the month of December, Reg

Sub: Regional Transmission Deviation Account for the month of December, Reg FAX / POST भ रत सरक र Government of India क य व त धकरण Central Electricity Authority द ण य व त स म त Southern Regional Power Committee 29, र स क स स र ड 29, Race Course Cross Road ब गल र :-560 009 BANGALORE

More information

SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented)

SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented) SECTION T: SETTLEMENT AND TRADING CHARGES (Version 9 including Approved Modifications yet to be implemented) Amend paragraph 2.3 to read as follows: 2.3.1 In respect of each Settlement Period, for each

More information

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal

YORK REGION DISTRICT SCHOOL BOARD. Procedure #NP464.0, Snow/Ice Clearance and Removal YORK REGION DISTRICT SCHOOL BOARD Procedure #NP464.0, Snow/Ice Clearance and Removal Application The Snow/Ice Clearance and Removal procedure addresses the practices to be followed with regards to the

More information

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM

MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM MINISTRY OF POWER O/O CHIEF CONTROLLER OF ACCOUNTS SEWA BHAWAN, RK PURAM NEW DELHI-110066 (Rs. In Crores) Statement of Receipts and Disbursements/Cash Flow for the year 2015-16 Head/Item Actuals up to

More information

International Studies about the Grid Integration of Wind Generation

International Studies about the Grid Integration of Wind Generation International Studies about the Grid Integration of Wind Generation Dr.-Ing. Markus Pöller/DIgSILENT GmbH Internation Studies About Grid Integration of Wind Generation Grid Integration of Wind Generationin

More information

DEMAND FORECASTING PROTOCOL

DEMAND FORECASTING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 443 DEMAND FORECASTING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 444 DEMAND FORECASTING PROTOCOL Table of Contents DFP 1 OBJECTIVES,

More information

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME: EE 2303 - TRANSMISSION & DISTRIBUTION YEAR / SEM: III/V UNIT-I TRANSMISSION SYSTEM INTRODUCTION PART-A 1. What is

More information

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006)

SUBPART MULTIYEAR CONTRACTING (Revised December 19, 2006) SUBPART 217.1--MULTIYEAR CONTRACTING (Revised December 19, 2006) 217.103 Definitions. As used in this subpart-- Advance procurement means an exception to the full funding policy that allows acquisition

More information

Steady State Performance of Doubly Fed Induction Generator Used in Wind Power Generation

Steady State Performance of Doubly Fed Induction Generator Used in Wind Power Generation Steady State Performance of Doubly Fed Induction Generator Used in Wind Power Generation Indubhushan Kumar Mewar University Department of Electrical Engineering Chittorgarh, Rajasthan-312902 Abstract:

More information

COAL EXPLORATION & RESOURCES

COAL EXPLORATION & RESOURCES COAL EXPLORATION & RESOURCES Chapter-3 3.1 INTRODUCTION Exploration for Coal in the country is carried out in two broad stages i.e. the Regional Exploration and Detailed Exploration. The regional exploration

More information

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA

PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA PROJECT TITLE: 4.50 MW AKKIHEBBAL MINI HYDEL SCHEME, CAUVERY HYDRO ENERGY LTD., INDIA Document Prepared By: Cauvery Hydro Energy Limited Contact Information Cauvery Hydro Energy Limited 67, Lavina Courts,

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

Optimal Operation of Large Power System by GA Method

Optimal Operation of Large Power System by GA Method Journal of Emerging Trends in Engineering and Applied Sciences (JETEAS) (1): 1-7 Scholarlink Research Institute Journals, 01 (ISSN: 11-7016) jeteas.scholarlinkresearch.org Journal of Emerging Trends in

More information

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA

HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA HIMACHAL PRADESH ELECTRICITY REGULATORY COMMISSION, SHIMLA Suo-Motu Petition No. 1/2018 CORAM Sh. S.K.B.S. Negi Chairman Sh. Bhanu Pratap Singh Member Date of Public hearing 05.02.2018 Date of Order: 12.02.2018

More information

Statement of indicative wholesale water charges and charges scheme

Statement of indicative wholesale water charges and charges scheme Statement of indicative wholesale water charges and charges scheme 2019-2020 South Staffs Water and Cambridge Water Indicative Wholesale Charges Scheme Since April 2017, eligible business customers have

More information

A PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS

A PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS A PROPOSED STRATEGY FOR CAPACITOR ALLOCATION IN RADIAL DISTRIBUTION FEEDERS 1 P.DIVYA, 2 PROF. G.V.SIVA KRISHNA RAO A.U.College of Engineering, Andhra University, Visakhapatnam Abstract: Capacitors in

More information

Name Previous Rating Current Rating

Name Previous Rating Current Rating Public Disclosure Authorized Public Disclosure Copy SOUTH ASIA India Energy & Extractives Global Practice IBRD/IDA Program-for-Results FY 2016 Seq No: 2 ARCHIVED on 16-Mar-2017 ISR26862 Implementing Agencies:

More information

SECTION 2 BIDDING DATA

SECTION 2 BIDDING DATA SECTION 2 BIDDING DATA The following specific data for the works to be procured shall complement, amend, or supplement the provisions in Section1, Instructions to Bidders. Whenever there is a conflict,

More information

FY2011 Capital Budget Reprogramming

FY2011 Capital Budget Reprogramming Finance & Administration Committee Action Item III-A December 2, 2010 FY2011 Capital Budget Reprogramming Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information

More information

ANALYSIS OF SUBSYNCHRONOUS RESONANCE EFFECT IN SERIES COMPENSATED LINE WITH BOOSTER TRANSFORMER

ANALYSIS OF SUBSYNCHRONOUS RESONANCE EFFECT IN SERIES COMPENSATED LINE WITH BOOSTER TRANSFORMER ANALYSIS OF SUBSYNCHRONOUS RESONANCE EFFECT IN SERIES COMPENSATED LINE WITH BOOSTER TRANSFORMER G.V.RAJASEKHAR, 2 GVSSNS SARMA,2 Department of Electrical Engineering, Aurora Engineering College, Hyderabad,

More information

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379) Operation Name: Djibouti Power

More information

FACULTY OF ENGINEERING B.E. 4/4 (EEE) II - Semester (Old) Examination, May 2014 Subject : Electrical Power Distribution Engineering (Elective- II)

FACULTY OF ENGINEERING B.E. 4/4 (EEE) II - Semester (Old) Examination, May 2014 Subject : Electrical Power Distribution Engineering (Elective- II) B.E. 4/4 (EEE) II - Semester (Old) Examination, May 014 Subject : Electrical Power Distribution Engineering (Elective- II) Code No. 649 / O 1 Define Coincidence factor and Diversified factor. (3) Mention

More information

Chapter 3 AUTOMATIC VOLTAGE CONTROL

Chapter 3 AUTOMATIC VOLTAGE CONTROL Chapter 3 AUTOMATIC VOLTAGE CONTROL . INTRODUCTION TO EXCITATION SYSTEM The basic function of an excitation system is to provide direct current to the field winding of the synchronous generator. The excitation

More information

Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc.

Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc. Norm Hann Performance Manager, Performance Management Department Hydro One Networks Inc. Phone: (416)-345-5407 Email: Norm.Hann@HydroOne.com Closing the Crevice Achieving A Process For Asset Performance

More information

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR

PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 CHIEF SYSTEM OPERATOR CON EDISON SYSTEM OPERATION DEPARTMENT PROCEDURE SUBJECT: THUNDERSTORM/STORM PROCEDURE PROCEDURE NO.: SO5-2-6 PAGES: 1 OF 10 REVISED BY: S. BUFFAMANTE APPROVED: T. HALLERAN CHIEF SYSTEM OPERATOR DATE:

More information

St. James C of E Primary School

St. James C of E Primary School St. James C of E Primary School Geography Policy St. James C of E Primary School Geography Policy Written by: Lisa Harford Written: April 2016 Reviewed: April 2018 1. Introduction Geography is concerned

More information

Winter Season Resource Adequacy Analysis Status Report

Winter Season Resource Adequacy Analysis Status Report Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity

More information

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893) Operation Name:

More information

About the Author: Abstract:

About the Author: Abstract: Geospatial Technology: A Tool to estimate revenue loss from JJ Clusters in Delhi and implementation of Delhi Govt. Social Welfare Schemes Authors Name: Anil Kumar Rai+, Pooja Yadav+ & Varun Prakash* +Amity

More information

Satisfactory Satisfactory High

Satisfactory Satisfactory High Implementation Status & Results South Asia Central Asia South Asia Electricity Transmission and Trade Project (CASA-1000) (P145054) Operation Name: Central Asia South Asia Electricity Transmission and

More information

Sub: Regional Transmission Deviation Account for the month of February, Reg

Sub: Regional Transmission Deviation Account for the month of February, Reg FAX / POST भ रत सरक र Government of India क य व त धकरण Central Electricity Authority द ण य व त स म त Southern Regional Power Committee 29, र स क स स र ड 29, Race Course Cross Road ब गल र :-560 009 BANGALORE

More information

BETA Protecting. Low-Voltage Fuse Systems. LV HRC fuse links. 3/36 Siemens ET B1 2008

BETA Protecting. Low-Voltage Fuse Systems. LV HRC fuse links. 3/36 Siemens ET B1 2008 LV HRC fuse links Overview LV HRC fuses are used for installation systems in non-residential, commercial and industrial buildings as well as in switchboards of power supply companies. They therefore protect

More information