Minutes of the HSC section
|
|
- Eunice Thompson
- 5 years ago
- Views:
Transcription
1 Minutes of the HSC section 49 th meeting on Monday 22/06/2015 (14:00, 6/R-012) HSC members: Olav Berrig (OB), Christian Carli (CC), Elias Metral (EM), Giovanni Rumolo (GR), Frank Schmidt (FS), Elena Wildner (EW), Elena Benedetto (EB), Michael Bodendorfer (MB), Kevin Li (KL), Tatiana Pieloni (TP), Benoit Salvant (BS), Guido Sterbini (GS), Daria Astapovych (DA), Meghan McAteer (MM), Nicolo Biancacci (NB), Alexander Huschauer (AH), Giovanni Iadarola (GI), Adrian Oeftiger (AO), Serena Persichelli (SP), Tatiana Rijoff (TR), Letizia Ventura (LV), Claudia Tambasco (CT), Magdalena Kowalska (MK), Andrea Passarelli (AP), Annalisa Romano (AR), Michael Schenk (MS), Vincenzo Forte (VF), Javier Barranco (JB), Aaron Paul Axford (APA), Malte Titze (MT), Francesco Paciolla (FP), Mario Stefan Beck (MSB), Stefan Hegglin (SH), Alpo Valimaa (AV), Hannes Bartosik (HB), Lee Robert Carver (LRC). Present/Excused: OB, CC, EM, GR, FS, EW, EB, MB, KL, TP, BS, GS, DA, MM, NB, AH, GI, AO, SP, TR, LV, CT, MK, AP, AR, MS, VF, JB, APA, MT, FP, MSB, SH, AV, HB, LRC, XavierB, Na Wang, LottaM, Themistoklis Mastoridis, Philippe Baudrenghien, WolfgangH, RamaC, AlexejG, YannisP. 1) Newcomers / visitors - None. 2) Comments on the minutes of the previous 48 th meeting + Actions - No comment. 3) General infos - SL meeting => Short SLM as we had the ABP info meeting. - For supervisors: be careful with extension of students as COAS if they have a lot of vacation which would cover most of the COAS extension => Encouragement to the students to take all their vacation before the end of their contracts. - LBOC meeting with talk in particular from LeeC on chromaticity => Several actions and recommendations made. To be continued. - Task 2.4 meeting on the impedance of the Crab Cavities => To be finalized during the next
2 meeting on 01/07/ MSWG with i) talk from SerenaP on the PS tune shifts (good agreement now reached at 2 GeV. Next step: understand why the impedance increases with chromaticity, which has been confirmed). Reminder: SerenaP s farewell lunch on Friday. Many thanks for all SerenaP and good luck in the US!; ii) PS longitudinal coupled-bunch instability by LetitziaV. - Discussion with Andrea Latina about his recent work on a space charge code => He will present this work at some point to the SC WG. - Impedance meeting with talk by SerenaP on PS new elements (BGI and SMH42), NaW on impedance calculations for the new LHC triplet shielded bellows and the changes linked to 5th axis in LHC, AlpoV on update on SPS Wire Scanner Prototype Measurements (and proposed solution through feed-throughs and all-modes coupler). 4) Brief performance reports for the different machines - PSB (ElenaB) - A busy week for the PSB, after the TS. We started well as the PSB was back on its feet with beams happily running in the machine by 11 am. Unfortunately, we soon realized together with the BI experts, that the wire-scanner in ring 3 vertically, the one replaced during the TS, was broken. On Wednesday, with LHC in TS, experts could focus on 3 dedicated MDs: 1) A dedicated MD for the RFQ in Linac2 to check if the transmission could be improved. In the end, the Linac2 team could only gain in transmission (up to 5-6 ma) in conditions that are not very suitable for operation (significant beam loading, tank3 saturation, unstable RF conditions). The nominal settings run at the moment is still considered to be the best option. 2) A dedicated MD to investigate the position fluctuation, present since the beginning of the year, in the beam position monitors at the end of the BI line. The stability of these pick-ups is very important for the PSB operations/mds. It turned out that the BPMs are very sensitive to the bunching of the Linac2 beam and more work is needed to have the equipment robust against the L2 beam bunching. 3) A dedicated MD on the TFB to investigate the random losses in ring 4 which are quite disruptive for the PSB operations. A lot of work was done, few hardware parts were changes, but the losses are unfortunately still there. Some additional useful feedback may come from the Finemet MDs currently carried on in the PSB. Generally the issue is closely followed up by the TFB team in conjunction with the PSB crew. - PS (GuidoS)
3 - See picture: => MTE extracting 1.4e13 ppp. - This week was marked by the TS and the SPS scrubbing run. All required beams were delivered: LHC25 72b high intensity (2e11ppb), LHC50 36b, LHC50 6b, LHCINDIV and AD. "Beam for physics was sent to TOF, the EAST Area and SPS (from Saturday). During the TS the 68H wire scanner was installed again (Reminder: 68H is very interesting because it will give the possibility to measure bunch by bunch, thanks to the high-bandwidth cable). The bumper 14 power supply was exchanged by the bipolar spare for the MTE extraction and the intervention on the PFWs (FNI, FNP, DNI, DNP) power supply inductance was finished. The changes on the BSW14 and PFWs have provided very good results on the MTE beam, the island capture is stable and the extraction on the outer side of TPS15 is now working. Optimization is ongoing. - SPS (HannesB and/or BenoitS) - See picture => scrubbing run: - Started scrubbing on Tuesday evening until Friday. - When they stopped for MKP heating, some dedicated MD could be used (in the PSB for instance, which helped them to identify an issue with the BPM). - An estimation of the contribution of uncaptured beam has been made (~ 4%). - It was a good week for the SPS devoted to the technical stop, to a scrubbing run and to HiRadMat extractions for the HRMT-22 experiment. North Area physics restarted on the weekend. - During the technical stop the firmware of the rotational wirescanners was successfully updated, the COLDEX bypass was re-installed with new Y-chambers and the SLAC rotatable collimator was installed. The endoscopy of sector 101 (where a horizontal aperture restriction is encountered with LHC beams) revealed traces of beam impact on the vacuum chamber in the bending magnet LHC and HL-LHC (EliasM) - Delay with the scrubbing run, which should start tomorrow (still tbc)... - LEIR (MichaelB) - Excused.
4 5) Summary of 1-beam and 2-beam stability predictions for LHC in 2015, from injection till collision => Tune footprint at LHC injection with space charge and octupoles (FrankS): and st 14 slides as reminder. - Slide 15 => parameters used and then results presented in the slides after with space charge only, space charge and octupoles (LOF = as beginning of 2012) and space charge and octupoles (LOF = as end of 2012 and now). Also +/- 1 A and +/- 3 A in the octupoles discussed. - It can be seen that with LOF ~ - 1 A there is a significant reduction (compensation) between space charge and octupoles for the particles amplitude below ~ 3 sigmas, as seen on slide 54 of (where a distribution up to 3.2 sigmas was considered, whereas FrankS considered here particles up to 6 sigmas). Please note that the beams sent to the LHC are cut at ~ 3 sigmas in the SPS and it was checked in the past (2012) that there was not much tail repopulation on the flat-bottom of the LHC (discussion with VerenaK, 25/06/2015) => One should redo these plots with particles up to ~ 3 sigmas only (or do not consider in the plots shown here the particles above ~ 3 sigmas). - In his second file ( FrankS made a detailed scan in the octupole current, from 0.4 A to 2.3 A, where the resulting tune footprint is superimposed to the one from space charge only (which looks that the tune footprint from BB, BBHO + BBLR! => To be checked). 6) Report on NAG: Numerical Algorithms Group (FrankS): - There is no request from the section => Do we all agree? 7) Transverse emittance growth due to RF noise in the Hi-Lumi LHC Crab Cavities (T. Mastoridis, California Polytechnic State University, San Luis Obispo, USA): - Themis and Philippe derived 2 nice formulas for the phase noise and the amplitude noise. - The growth rate dependence on bunch length is opposite for the 2 (which was also checked with HEADTAIL simulations): - Phase noise: it is maximum for short bunch length and 0 for long bunch length. - Amplitude noise: it is 0 for short bunch length (and this explains why this is/was not a worry for certain machines) and maximum for long bunch length.
5 => Amplitude noise from the Crab Cavities is the issue for HL-LHC. - The target of ~ 5% emittance growth / hour is linked to the fact that it is what is expected for the IBS rate. - Chromaticity: for Themis studies, below ~ 10 units is something not too high. Furthermore, Themis added that the higher the chromaticity the smaller the emittance growth (seems to be due to some sharing between transverse and longitudinal. Still to be looked at in detail). - The ADT is less efficient in the tails (as the distribution enters in the averaging). Furthermore, the ADT excite also in the tails (in opposite direction in head and tail due to the effect of the long bunch => See slide 10 on the left). - Reminder: factor 2 between the amplitude and noise because the sampling is higher by a factor 2 for the latter. - They used 3E-3 for the rms spread. As a first step this spread was introduced in HEADTAIL by playing with the octupoles to approximate the beam-beam tune spread. - Summary: All this need to be measured in the SPS and they could inject deliberately more noise in the Crab Cavities to see something if needed (as there is already quite an important natural emittance growth in the SPS). - Conclusions - Future steps: look at distribution change (not just emittance). - Conduct two-beam simulations to estimate possible reduction of phase noise effect due to beam-beam (with ABP) => Ongoing discussions with beam-beam team (see below). - A wideband transverse damper ( 2 GHz) would help reduce the amplitude noise effects and thus relax the LLRF requirements - Request from Themis and Philippe to ABP - A past work from YuriA (FNAL) indicated a factor ~ 3 improvement with beambeam when the pi-mode is outside of the incoherent spectrum but it seems that with the mode inside the bunch spectrum, this factor 3 could be lost again (this is currently studied in detail by the beam-beam team). PhilippeB mentioned that YuriA s work was done for dipole modes and here this is not the case. => So what Themis and Philippe did seems to be the best approach for the moment. More info will come from the beam-beam team during this summer. - PhilippeB mentioned that all bunches will see the same noise => It is very low frequency and therefore this is where we will have all the gain. - Question from AlexejG: Would we gain something if Qloaded would be bigger? This answer is that no effect is expected.
6 8) Actions to be taken for the next meeting - List of all actions: 9) Miscellaneous - The next (50 th ) meeting will take place on 29/06/2015 => Agenda: 1) General info and follow-up (EliasM) 2) Brief performance reports for the different machines (PSB, PS, SPS, LHC and LEIR) => With ideally a picture of the week! - Important events and dates for HSC: - Preliminary agendas for the next meetings: - List of actions: - Web site: Minutes by E. Metral, 25/06/2015.
Minutes of the HSC section. 5th meeting on Wednesday 26/02/2014 (09:00, 6/2-004)
Minutes of the HSC section 5th meeting on Wednesday 26/02/2014 (09:00, 6/2-004) HSC members: Olav Berrig (OB), Christian Carli (CC), Elias Metral (EM), Giovanni Rumolo (GR), Frank Schmidt (FS), Elena Wildner
More informationTransverse beam stability and Landau damping in hadron colliders
Work supported by the Swiss State Secretariat for Educa6on, Research and Innova6on SERI Transverse beam stability and Landau damping in hadron colliders C. Tambasco J. Barranco, X. Buffat, T. Pieloni Acknowledgements:
More informationHL-LHC OPERATIONAL SCENARIOS
CERN-ACC-NOTE-2015-0009 2015-05-19 Elias.Metral@cern.ch HL-LHC OPERATIONAL SCENARIOS G. Arduini, N. Biancacci, O. Brüning, R. De Maria, M. Giovannozzi, W. Höfle, K. Li, E. Métral, J.E. Muller, Y. Papaphilippou,
More informationCOLLECTIVE EFFECTS IN THE LHC AND ITS INJECTORS
COLLECTIVE EFFECTS IN THE LHC AND ITS INJECTORS E. Métral, G. Arduini, R. Assmann, H. Bartosik, P. Baudrenghien, T. Bohl, O. Bruning, X. Buffat, H. Damerau, S. Fartoukh, S. Gilardoni, B. Goddard, S. Hancock,
More informationTask 2.4 on LHC Collective Effects Studies
Task 2.4 on LHC Collective Effects Studies Requested info: Detailed workflow, including milestones, expected deliverables and delivery dates => See also https://espace.cern.ch/hilumi/wp2/task4/ SitePages/Home.aspx
More informationPlans for 2016 and Run 2
Plans for 2016 and Run 2 Mike Lamont An attempt at synthesis Acknowledgements all round After LS1 It s going to be like after a war Serge Claudet Evian 2012 Where are we? 1/2 6.5 TeV, 2*80 cm, 2*levelled
More informationDEBRIEFING AND FOLLOW-UP OF THE LPL REVIEW
DEBRIEFING AND FOLLOW-UP OF THE LPL REVIEW => LPL (LHC Performance Limitations during run I) review on 25-26/09/13: https://indico.cern.ch/conferencedisplay.py? confid=267783 Debriefing More detail of
More informationGianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group
Gianluigi Arduini CERN - Beams Dept. - Accelerator & Beam Physics Group Acknowledgements: O. Brüning, S. Fartoukh, M. Giovannozzi, G. Iadarola, M. Lamont, E. Métral, N. Mounet, G. Papotti, T. Pieloni,
More informationStatus of the LIU project and progress on space charge studies
Status of the LIU project and progress on space charge studies S. Gilardoni CERN BE/ABP In collaboration with: J. Coupard, H. Damerau, A. Funken, B. Goddard, K. Hanke, A. Lombardi, D. Manglunki, M. Meddahi,
More informationOTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE
OTHER MEANS TO INCREASE THE SPS 25 ns PERFORMANCE TRANSVERSE PLANE H. Bartosik, G. Arduini, A. Blas, C. Bracco, T. Bohl, K. Cornelis, H. Damerau, S. Gilardoni, S. Hancock, B. Goddard, W. Höfle, G. Iadarola,
More informationRaising intensity of the LHC beam in the SPS - longitudinal plane
SL-Note-- MD Raising intensity of the LHC beam in the SPS - longitudinal plane Ph. Baudrenghien, T. Bohl, T. Linnecar, E. Shaposhnikova Abstract Different aspects of the LHC type beam capture and acceleration
More informationElias Métral, LHC Collimation Working Group Meeting, 15/03/ /31
Answers to Jeff and Liling concerning the simulations of trapped modes of the SLAC Phase 2 collimator, and news on impedance for the Phase 1 and 2 at CERN Reminder on the trapped modes simulations performed
More informationCHAMONIX WORKSHOP, SESSION 5 LIU SUMMARY
CHAMONIX WORKSHOP, SESSION 5 LIU SUMMARY M. Meddahi and G. Rumolo GOALS AND MEANS OF THE LIU PROJECT The goal of the LHC Injectors Upgrade project (thereafter LIU ) is to increase the intensity/brightness
More informationLHC accelerator status and prospects. Frédérick Bordry Higgs Hunting nd September Paris
LHC accelerator status and prospects 2 nd September 2016 - Paris LHC (Large Hadron Collider) 14 TeV proton-proton accelerator-collider built in the LEP tunnel Lead-Lead (Lead-proton) collisions 1983 :
More informationLHC Luminosity and Energy Upgrade
LHC Luminosity and Energy Upgrade Walter Scandale CERN Accelerator Technology department EPAC 06 27 June 2006 We acknowledge the support of the European Community-Research Infrastructure Activity under
More informationACHIEVABLE SPACE-CHARGE TUNE SHIFT WITH LONG LIFETIME IN THE CERN PS & SPS
Contributed talk (15 + 5 min, 30 slides) ACHIEVABLE SPACE-CHARGE TUNE SHIFT WITH LONG LIFETIME IN THE CERN PS & SPS Elias Métral Elias Métral, HB2008 workshop, Nashville, Tennessee, USA, August 25-29,
More informationSPACE CHARGE EXPERIMENTS AND BENCHMARKING IN THE PS
SPACE CHARGE EXPERIMENTS AND BENCHMARKING IN THE PS E. Métral Crossing the integer or half-integer resonance Montague resonance Static & Dynamic Benchmarking of the simulation codes Space charge driven
More informationBeam-Beam DA Simulations for HL-LHC
Beam-Beam DA Simulations for HL-LHC N. Karastathis G. Arduini, X. Buffat, S. Fartoukh, R. de Maria, Y. Papaphilippou on behalf of the HiLumi LHC WP2 Outline: Brief recap of baseline scenario at collisions
More informationLHC Run 2: Results and Challenges. Roderik Bruce on behalf of the CERN teams
LHC Run 2: Results and Challenges Roderik Bruce on behalf of the CERN teams Acknowledgements A big thanks to all colleagues involved across various teams! Special thanks for material and discussions G.
More informationMD Landau Damping: Beam Transfer Functions and diffusion mechanisms
CERN-ACC-NOTE-2017-0026 25-04-2017 claudia.tambasco@cern.ch MD 1407 - Landau Damping: Beam Transfer Functions and diffusion mechanisms C. Tambasco, J. Barranco *, A. Boccardi, X. Buffat, M. Crouch, M.
More informationBeam instabilities (I)
Beam instabilities (I) Giovanni Rumolo in CERN Accelerator School, Advanced Level, Trondheim Wednesday 21.08.2013 Big thanks to H. Bartosik, G. Iadarola, K. Li, N. Mounet, B. Salvant, R. Tomás, C. Zannini
More informationThe HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme 7 CapaciBes Specific Programme, Grant Agreement
More informationSimulations of HL-LHC Crab Cavity Noise using HEADTAIL
Simulations of HL-LHC Crab Cavity Noise using HEADTAIL A Senior Project presented to the Faculty of the Physics Department California Polytechnic State University, San Luis Obispo In Partial Fulfillment
More informationMain aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5)
Week 24 Main aim: Preparation for high bunch intensity operation with β*=3.5 m and crossing angle (-100 µrad in IR1 and +100 µrad in IR5) Commission systems required for guaranteeing beam stability as
More informationNumerical Methods II
Numerical Methods II Kevin Li With acknowledgements to: H. Bartosik, X. Buffat, L.R. Carver, S. Hegglin, G. Iadarola, L. Mether, E. Metral, N. Mounet, A. Oeftiger, A. Romano, G. Rumolo, B. Salvant, M.
More informationOPERATIONAL BEAMS FOR THE LHC
OPERATIONAL BEAMS FOR THE LHC Y. Papaphilippou, H. Bartosik, G. Rumolo, D. Manglunki, CERN, Geneva, Switzerland Abstract The variety of beams, needed to set-up in the injectors as requested in the LHC,
More informationSimulations of single bunch collective effects using HEADTAIL
Simulations of single bunch collective effects using HEADTAIL G. Rumolo, in collaboration with E. Benedetto, O. Boine-Frankenheim, G. Franchetti, E. Métral, F. Zimmermann ICAP, Chamonix, 02.10.2006 Giovanni
More information6D weak-strong beam-beam simulations with SixTrack: theory and simulations
6D weak-strong beam-beam simulations with SixTrack: theory and simulations Javier Barranco Garcia Ackowledgements: T. Pieloni, R. De Maria, D. Banfi, R. Tomas, A. Valishev, K. Ohmi,... HSC Meeting 13/08/14
More informationElectron cloud observation in the LHC
Electron cloud observation in the LHC Giovanni Rumolo IPAC 11, San Sebastian (Spain), 8 September 2011 On behalf of the large team of experimenters and simulators G. Arduini, V. Baglin, H. Bartosik, N.
More informationULTIMATE LHC BEAM. G. Arduini, CERN, Geneva, Switzerland
Abstract The present status of the nominal LHC beam in the LHC injector complex and the limitations towards the achievement of the ultimate brightness are outlined. ULTIMATE LHC BEAM G. Arduini, CERN,
More informationTUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER
TUNE SPREAD STUDIES AT INJECTION ENERGIES FOR THE CERN PROTON SYNCHROTRON BOOSTER B. Mikulec, A. Findlay, V. Raginel, G. Rumolo, G. Sterbini, CERN, Geneva, Switzerland Abstract In the near future, a new
More informationChallenges and Plans for the Proton Injectors *
Chapter 16 Challenges and Plans for the Proton Injectors * R. Garoby CERN, BE Department, Genève 23, CH-12, Switzerland The flexibility of the LHC injectors combined with multiple longitudinal beam gymnastics
More informationINTENSITY AND ENERGY LIMITATIONS OF THE CERN PS COMPLEX
INTENSITY AND ENERGY LIMITATIONS OF THE CERN PS COMPLEX M.Gourber-Pace, CERN, Geneva, Switzerland Abstract In the next few years, the PS complex (Linac2-PS Booster-PS) will accelerate again very intense
More informationLHC. LHC Crabs, Status. Brief Overview. Status of Technology R&D. Status of Simulations & Experiments. Rama Calaga RFTECH, Dec 2-3, 2010
LHC Crabs, Status Rama Calaga RFTECH, Dec 2-3, 2010 Brief Overview Status of Technology R&D Status of Simulations & Experiments LHC Thanks to all LHC-CC collaborators X-Angle & Crab X-ing Long-Range Beam-Beam
More informationHL-LHC: parameter space, constraints & possible options
HL-LHC: parameter space, constraints & possible options Many thanks to R. Assmann, C. Bhat, O. Brüning, R. Calaga, R. De Maria, S. Fartoukh, J.-P. Koutchouk, S. Myers, L. Rossi, W. Scandale, E. Shaposhnikova,
More informationBeam-beam issues for LHC upgrade phases 1 and 2
Beam-beam issues for LHC upgrade phases 1 and U. Dorda, F. Zimmermann, CERN, Geneva, Switzerland Abstract While long-range beam-beam interaction will not be the limiting effect in the first ears after
More informationHL-LHC ALTERNATIVES SCENARIOS
Proceedings of Chamonix 4 Workshop on LHC Performance HL-LHC ALTERNATIVES SCENARIOS R. Tomás, G. Arduini, D. Banfi, J. Barranco, H. Bartosik, O. Brüning, R. Calaga, O. Dominguez, H. Damerau, S. Fartoukh,
More informationLHC Upgrade Plan and Ideas - scenarios & constraints from the machine side
LHC Upgrade Plan and Ideas - scenarios & constraints from the machine side Frank Zimmermann LHCb Upgrade Workshop Edinburgh, 11 January 2007 Frank Zimmermann, LHCb Upgrade Workshop time scale of LHC upgrade
More informationRun2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002
Run2 Problem List (Bold-faced items are those the BP Department can work on) October 4, 2002 Linac Booster o 4.5-4.8e12 ppp at 0.5 Hz o Space charge (30% loss in the first 5 ms) o Main magnet field quality
More informationMeasurement and Compensation of Betatron Resonances at the CERN PS Booster Synchrotron
Measurement and Compensation of Betatron Resonances at the CERN PS Booster Synchrotron Urschütz Peter (AB/ABP) CLIC meeting, 29.10.2004 1 Overview General Information on the PS Booster Synchrotron Motivation
More informationThe TESLA Dogbone Damping Ring
The TESLA Dogbone Damping Ring Winfried Decking for the TESLA Collaboration April 6 th 2004 Outline The Dogbone Issues: Kicker Design Dynamic Aperture Emittance Dilution due to Stray-Fields Collective
More informationLIS section meeting. PS2 design status. Y. Papaphilippou. April 30 th, 2007
LIS section meeting PS2 design status Y. Papaphilippou April 30 th, 2007 Upgrade of the injector chain (R. Garoby, PAF) Proton flux / Beam power 50 MeV 160 MeV Linac2 Linac4 1.4 GeV ~ 5 GeV PSB SPL RCPSB
More informationSPS LLRF Measurements and lessons learned
SPS LLRF Measurements and lessons learned P. Baudrenghien, CERN, BE-RF T. Mastoridis, California Polytechnic State University, San Luis Obispo, USA E. Yamakawa, University of Lancaster, Lancaster, UK HL-LHC
More informationLUMINOSITY LEVELLING TECHNIQUES FOR THE LHC
Published by CERN in the Proceedings of the ICFA Mini-Workshop on Beam Beam Effects in Hadron Colliders, CERN, Geneva, Switzerland, 18 22 March 2013, edited by W. Herr and G. Papotti, CERN 2014 004 (CERN,
More informationSPS IMPEDANCE BUDGET
SPS IMPEDANCE BUDGET G. Arduini,, H. Medina, E. Métral, B. Salvant and B. Spataro ZBASE Items considered until now Kickers BPMs Pumping ports Theoretical predictions and comparison with measurements of
More informationPBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23,
PBL (Problem-Based Learning) scenario for Accelerator Physics Mats Lindroos and E. Métral (CERN, Switzerland) Lund University, Sweden, March 19-23, 2007 As each working day, since the beginning of the
More informationOperational Experience with HERA
PAC 07, Albuquerque, NM, June 27, 2007 Operational Experience with HERA Joachim Keil / DESY On behalf of the HERA team Contents Introduction HERA II Luminosity Production Experiences with HERA Persistent
More informationBeam. RF antenna. RF cable
Status of LEP2 J. Wenninger, SL Operation for the SL division LEPC September 1998 Outline Optics and RF for 1998 Beam current limitations Injection and ramp Performance at high energy Conclusions LEPC/15-09-98
More informationFY04 Luminosity Plan. SAG Meeting September 22, 2003 Dave McGinnis
FY04 Luminosity Plan SAG Meeting September 22, 2003 Dave McGinnis FY03 Performance Accelerator Issues TEV Pbar Main Injector Reliability Operations Study Strategy Shot Strategy Outline FY04 Luminosity
More informationHigh performance computing simulations. for multi-particle effects in the synchrotons
High performance computing simulations for multi-particle effects in the synchrotons Content What is the HSC section doing? Physics basics PyHEADTAIL software Simulations of the PS Simulations of instabilities
More informationElectron cloud effects for PS2, SPS(+) and LHC
Electron cloud effects for PS2, SPS(+) and LHC G. Rumolo CERN, Geneva, Switzerland Abstract Electron cloud effects are expected to be enhanced and play a central role in limiting the performance of the
More informationInstabilities Part III: Transverse wake fields impact on beam dynamics
Instabilities Part III: Transverse wake fields impact on beam dynamics Giovanni Rumolo and Kevin Li 08/09/2017 Beam Instabilities III - Giovanni Rumolo and Kevin Li 2 Outline We will close in into the
More informationOpen Issues from the SPS Long-Range Experiments
Open Issues from the SPS Long-Range Experiments Frank Zimmermann US-LARP Beam-Beam Workshop SLAC, 2007 Gerard Burtin, Ulrich Dorda, Gijs de Rijk, Jean-Pierre Koutchouk, Yannis Papaphilippou, Tannaji Sen,
More informationTRANSVERSE IMPEDANCE OF LHC COLLIMATORS
Contributed talk WEOAC03 (12 + 3 min, 14 slides) TRANSVERSE IMPEDANCE OF LHC COLLIMATORS Elias Métral Work in collaboration with G. Arduini,, R. Assmann,, A. Boccardi,, T. Bohl, F. Caspers,, M. Gasior,,
More informationLHC upgrade based on a high intensity high energy injector chain
LHC upgrade based on a high intensity high energy injector chain Walter Scandale CERN AT department PAF n. 6 CERN, 15 September 2005 luminosity and energy upgrade Phase 2: steps to reach maximum performance
More informationCorrection of β-beating due to beam-beam for the LHC and its impact on dynamic aperture
Correction of β-beating due to beam-beam for the LHC and its impact on dynamic aperture WEOAB2 Luis Medina1,2, R. Toma s2, J. Barranco3, X. Buffat1, Y. Papaphilippou1, T. Pieloni3 1 Universidad de Guanajuato,
More informationStudies of trapped modes in the new extraction septum of the CERN Proton Synchrotron
Studies of trapped modes in the new extraction septum of the CERN Proton Synchrotron Serena Persichelli CERN Impedance and collective effects (BE-ABP-ICE) LIU LHC Injectors Upgrade project Università di
More informationPlans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams
Plans for ions in the injector complex D.Manglunki with the help of I-LHC and LIU-PT teams Special acknowledgements to T.Bohl, C.Carli, E.Carlier, H.Damerau, L.Ducimetière, R.Garoby, S.Gilardoni, S.Hancock,
More informationFirst propositions of a lattice for the future upgrade of SOLEIL. A. Nadji On behalf of the Accelerators and Engineering Division
First propositions of a lattice for the future upgrade of SOLEIL A. Nadji On behalf of the Accelerators and Engineering Division 1 SOLEIL : A 3 rd generation synchrotron light source 29 beamlines operational
More informationSunday morning: Beam Dynamics Issues. Session highlights and outstanding questions. M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University
Sunday morning: Beam Dynamics Issues Session highlights and outstanding questions M. Pivi and D. Rubin ECLOUD10 October 8-12 Cornell University Summary -Electron cloud induced instabilities observed for
More informationUPDATE OF THE SPS KICKERS
UPDATE OF THE SPS KICKERS B. Salvant and E. Métral APC action (0//06): The Committee but it stressed the importance of evaluating the effect of the resonance peaks observed at low frequency on the longitudinal
More informationOn behalf of: F. Antoniou, H. Bartosik, T. Bohl, Y. Papaphilippou (CERN), N. Milas, A. Streun (PSI/SLS), M. Pivi (SLAC), T.
On behalf of: F. Antoniou, H. Bartosik, T. Bohl, Y. Papaphilippou (CERN), N. Milas, A. Streun (PSI/SLS), M. Pivi (SLAC), T. Demma (LAL) HB2010, Institute of High Energy Physics, Beijing September 17-21
More informationarxiv: v1 [physics.acc-ph] 21 Oct 2014
SIX-DIMENSIONAL WEAK STRONG SIMULATIONS OF HEAD-ON BEAM BEAM COMPENSATION IN RHIC arxiv:.8v [physics.acc-ph] Oct Abstract Y. Luo, W. Fischer, N.P. Abreu, X. Gu, A. Pikin, G. Robert-Demolaize BNL, Upton,
More informationNUMERICAL MODELING OF FAST BEAM ION INSTABILITIES
NUMERICAL MODELING OF FAST BEAM ION INSTABILITIES L. Mether, G. Iadarola, G. Rumolo, CERN, Geneva, Switzerland Abstract The fast beam ion instability may pose a risk to the operation of future electron
More informationStatus of the LHC Beam Cleaning Study Group
Status of the LHC Beam Cleaning Study Group R. Assmann, SL BI Review 19.11.2001 BI Review 19.11.01, R. Assmann 1 LHC Beam Cleaning Study Group: Mandate: Study beam dynamics and operational issues for the
More informationLHC commissioning. 22nd June Mike Lamont LHC commissioning - CMS 1
LHC commissioning Mike Lamont AB-OP nd June 005.06.05 LHC commissioning - CMS 1 Detailed planning for 7-87 8 and 8-18 005 006 Short Circuit Tests CNGS/TI8/IT1 HWC LSS.L8.06.05 LHC commissioning - CMS Sector
More informationFrequency and time domain analysis of trapped modes in the CERN Proton Synchrotron
Frequency and time domain analysis of trapped modes in the CERN Proton Synchrotron Serena Persichelli CERN Impedance and collective effects BE-ABP-ICE Abstract The term trapped mode refers to a resonance
More informationCesrTA Status Report Mark Palmer for the CesrTA Collaboration March 4, 2009 ESR
CesrTA Status Report Mark Palmer for the CesrTA Collaboration March 4, 2009 ESR Outline Recent Updates January run/february Down Overview Optics & LET xbsm Electron Cloud Studies Tune Data-Simulation Comparisons
More informationBeam Optics & Dynamics Studies for LHC
Beam Optics & Dynamics Studies for LHC Alexander Koschik ETH Zurich, Integrated Systems Laboratory (Swiss Federal Institute of Technology Zurich) SLAC, Aug. 2010 0 Background Information Master s degree
More informationCommissioning of the SNS Beam Instrumentation
Commissioning of the SNS Beam Instrumentation Commissioning of the SNS Beam Instrumentation Tom Shea for the SNS Diagnostics Team Oak Ridge National Laboratory (ORNL), Oak Ridge, TN, USA The Spallation
More informationOperational performance of the CERN injector complex with transversely split beams
PHYSICAL REVIEW ACCELERATORS AND BEAMS 20, 014001 (2017) Operational performance of the CERN injector complex with transversely split beams S. Abernethy, 1,2 A. Akroh, 2 H. Bartosik, 2 A. Blas, 2 T. Bohl,
More informationThe Luminosity Upgrade at RHIC. G. Robert-Demolaize, Brookhaven National Laboratory
The Luminosity Upgrade at RHIC G. Robert-Demolaize, Brookhaven National Laboratory RHIC accelerator complex: IPAC'15 - May 3-8, 2015 - Richmond, VA, USA 2 The Relativistic Heavy Ion Collider (RHIC) aims
More informationLHC Injection Kicker Magnets - An Overview of heating and beam screen changes in LHC-MKI8d
LHC Injection Kicker Magnets - An Overview of heating and beam screen changes in LHC-MKI8d H. Day, M. Barnes, B. Salvant, F. Caspers, E. Metral October 9, 2012 Contents Introduction Contents Background
More informationLHC Status and CERN s future plans. Lyn Evans
LHC Status and CERN s future plans Lyn Evans Machine layout L. Evans EDMS document no. 859415 2 Cryodipole overview 1250 1000 Equivalent dipoles 750 500 250 0 01-Jan-01 01-Jan-02 01-Jan-03 01-Jan-04 01-Jan-05
More informationPlans for the LHC Luminosity Upgrade Summary of the CARE-HHHAPD-LUMI-05 workshop
Plans for the LHC Luminosity Upgrade Summary of the APD-LUMI-05 workshop Walter Scandale CERN AT department LHC project seminar Geneva, 10 November 2005 We acknowledge the support of the European Community-Research
More informationStatusreport. Status of the GSI accelerators for FRS operation. Jens Stadlmann (FAIR Synchrotrons)
Statusreport Status of the GSI accelerators for FRS operation Jens Stadlmann (FAIR Synchrotrons) Overview Intensities reached and "candidates" for experiments. Uranium? Upgrade program New developments:
More informationSTUDIES ON CONTROLLED RF NOISE FOR THE LHC
STUDIES ON CONTROLLED RF NOISE FOR THE LHC H. Timko, P. Baudrenghien, E. Shaposhnikova, CERN, Geneva, Switzerland T. Mastoridis, California Polytechnic State University, San Luis Obispo, USA Abstract RF
More informationTurn-around improvements
LHC Performance Workshop - Chamonix 2012 Hotel Les Aiglons, Chamonix, France February 6 th -10 th, 2012 Turn-around improvements S. Redaelli, BE-ABP (formerly BE-OP) and W. Venturini Delsolaro, BE-RF (formerly
More informationStatus and Outlook of the LHC
Status and Outlook of the LHC Enrico Bravin - CERN BE-BI J-PARC visit seminar 6 July 2017 Outlook Overview of LHC Objectives for run2 Parameters for 2016/2017 and differences w.r.t. 2015 Summary of commissioning
More informationSummary of Group A: Beam Dynamics in High- Intensity circular machines
Summary of Group A: Beam Dynamics in High- Intensity circular machines --Giuliano Franchetti, Elias Metral, Rick Baartman (reporter) There were 32 excellent talks. I will not go through them one by one,
More informationLuminosity Goals, Critical Parameters
CAS Zürich 22 nd February 2018 Luminosity Goals, Critical Parameters Bruno Muratori, STFC Daresbury Laboratory & Cockcroft Institute Werner Herr, CERN Goals At the end of this lecture you should be able
More informationSPPC Study and R&D Planning. Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST
SPPC Study and R&D Planning Jingyu Tang for the SPPC study group IAS Program for High Energy Physics January 18-21, 2016, HKUST Main topics Pre-conceptual design study Studies on key technical issues R&D
More informationCommissioning of the LHC collimation system S. Redaelli, R. Assmann, C. Bracco, M. Jonker and G. Robert-Demolaize CERN, AB department
39 th ICFA Advance Beam dynamics Workshop High Intensity High Brightness Hadron Beams - HB 2006 Tsukuba, May 29 th - June 2 nd, 2006 Commissioning of the LHC collimation system S. Redaelli, R. Assmann,
More informationEs#ma#ons of Collec#ve Instabili#es for JLEIC
Es#ma#ons of Collec#ve Instabili#es for JLEIC Rui Li JLEIC Collabora#on Mee#ng 4-3-2016 Collec#ve Effects in JLEIC Electron Ring Ion Rings Electron Cooler Incoherent: LasleD tune shie, emidance growth
More informationLCLS Accelerator Parameters and Tolerances for Low Charge Operations
LCLS-TN-99-3 May 3, 1999 LCLS Accelerator Parameters and Tolerances for Low Charge Operations P. Emma SLAC 1 Introduction An option to control the X-ray FEL output power of the LCLS [1] by reducing the
More informationSPIRAL 2 Commissioning Status
SPIRAL 2 Commissioning Status Jean-Michel Lagniel (GANIL) for the SPIRAL 2 Team With thanks to the SPIRAL 2 team Page 1 Menu 1- SPIRAL 2 facility (Phase 1) presentation 2- Injector commisionning (Sources
More informationBeam-Beam Tune Spectra in RHIC and LHC
Beam-Beam Tune Spectra in RHIC and LHC T. Pieloni Laboratory of Particle Accelerators Physics EPFL Lausanne and CERN - AB - ABP In collaboration with: R.Calaga and W. Fischer for RHIC BTF measurements
More informationUPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH European Laboratory for Particle Physics Large Hadron Collider Project LHC Project Report 1110 UPGRADE ISSUES FOR THE CERN ACCELERATOR COMPLEX R. Garoby CERN,
More informationA Project to convert TLS Booster to hadron accelerator 1. Basic design. 2. The injection systems:
A Project to convert TLS Booster to hadron accelerator 1. Basic design TLS is made of a 50 MeV electron linac, a booster from 50 MeV to 1.5 GeV, and a storage ring. The TLS storage ring is currently operating
More informationOn-axis injection into small dynamic aperture
On-axis injection into small dynamic aperture L. Emery Accelerator Systems Division Argonne National Laboratory Future Light Source Workshop 2010 Tuesday March 2nd, 2010 On-Axis (Swap-Out) injection for
More informationEmittance blow-up and loss maps in LHC using the transverse damper as exciter
CERN-ATS-Note-2012-034 MD (LHC) September 5, 2014 Wolfgang.Hofle@cern.ch Emittance blow-up and loss maps in LHC using the transverse damper as exciter W. Hofle, D. Valuch, R. Assmann, S. Redaelli, R. Schmidt,
More informationBEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM
JINR BEAM TESTS OF THE LHC TRANSVERSE FEEDBACK SYSTEM W.Höfle, G.Kotzian, E.Montesinos, M.Schokker, D.Valuch (CERN) V.M. Zhabitsky (JINR) XXII Russian Particle Accelerator Conference 27.9-1.1. 21, Protvino
More informationRF System Calibration Using Beam Orbits at LEP
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH CERN SL DIVISION CERN-SL-22-28 OP LEP Energy Working Group 2/1 RF System Calibration Using Beam Orbits at LEP J. Wenninger Abstract The target for beam energy
More informationFCC-hh Final-Focus for Flat-Beams: Parameters and Energy Deposition Studies
FCC-hh Final-Focus for Flat-Beams: Parameters and Energy Deposition Studies Jose L. Abelleira, Leon Van Riesen Haupt, Andrei Seryi, Emilia Cruz Alaniz (JAI-FCC team) Thanks to the CERN FLUKA team 10 th
More informationAccelerators for Beginners and the CERN Complex
Accelerators for Beginners and the CERN Complex Rende Steerenberg CERN, BE/OP 2 Contents Why Accelerators and Colliders? The CERN Accelerator Complex Cycling the Accelerators & Satisfying Users The Main
More informationPBL SCENARIO ON ACCELERATORS: SUMMARY
PBL SCENARIO ON ACCELERATORS: SUMMARY Elias Métral Elias.Metral@cern.ch Tel.: 72560 or 164809 CERN accelerators and CERN Control Centre Machine luminosity Transverse beam dynamics + space charge Longitudinal
More information1.1 Electron-Cloud Effects in the LHC
11 1.1 Electron-Cloud Effects in the LHC F. Zimmermann, E. Benedetto 1 mail to: frank.zimmermann@cern.ch CERN, AB Department, ABP Group 1211 Geneva 23, Switzerland 1.1.1 Introduction The LHC is the first
More informationAccelerator Physics. Accelerator Development
Accelerator Physics The Taiwan Light Source (TLS) is the first large accelerator project in Taiwan. The goal was to build a high performance accelerator which provides a powerful and versatile light source
More informationFemto-second FEL Generation with Very Low Charge at LCLS
Femto-second FEL Generation with Very Low Charge at LCLS Yuantao Ding, For the LCLS commissioning team X-ray Science at the Femtosecond to Attosecond Frontier workshop May 18-20, 2009, UCLA SLAC-PUB-13525;
More informationSpace Charge Studies on the ISIS Ring
Space Charge Studies on the ISIS Ring C M Warsop, D J Adams, B Jones, S J Payne, B G Pine, H V Smith, C C Wilcox, R E Williamson, ISIS, RAL, UK with contributions from S Machida, C R Prior, G H Rees &
More information