1 The Accelerator System for ReA3 the New Re-accelerated RIBs Facility at MSU Xiaoyu Wu National Superconducting Cyclotron Laboratory Michigan State University on behalf of the NSCL ReA3 team X. Wu, Cyclotrons 21, 9/9/21, Slide 1
2 Acknowledgements Accelerator R&D O. Kester F. Marti M. Doleans C. Compton W. Hartung L. Popielarski J. Popielarski J. Wlodarczak Q. Zhao C. Benatti G. Perdikakis Mechanical Engineering D. Lawton J. Ottarson M. Johnson J. Wenstrom Nuclear Physics D. Bazin G. Bollen S. Schwarz J. Yurkon F. Montes Special thanks to B. Laxdal and colleagues from TRIUMF Facility/Operation D. Sanderson A. Zeller S. Chouhan J. Bierwagen S. Bricker N. Verhanovitz M. Portillo J. Delauter P. Miller G. Machicoane D. Cole Electronics J. Vincent K. Davidson N. Usher K. Holland X. Wu, Cyclotrons 21, 9/9/21, Slide 2
3 Production of RIBs by Projectile Fragmentation at NSCL ReA3 X. Wu, Cyclotrons 21, 9/9/21, Slide 3
4 NSCL Present Facility Layout X. Wu, Cyclotrons 21, 9/9/21, Slide 4
5 Facility for Rare Isotope Beams (FRIB) >2 MeV/u for all ions 4kW Superconducting driver linac Three-stage fragmentation separator Successfully passed DOE CD-1 review To be completed in ~218 X. Wu, Cyclotrons 21, 9/9/21, Slide 5
6 ReA3 Connections to CCF and FRIB ReA3 will be operated as a radioactive beam reaccelerator for the Coupled Cyclotron Facility in the coming years ReA3 will be operated as a radioactive beam reaccelerator for FRIB once the FRIB driver linac is operational and replaces the coupled cyclotrons ReA3 shares similar technology as the FRIB driver linac Low energy beam lines for ion beams RFQ SRF linac ReA3 will provide valuable experience to FRIB for tuning strategies, particularly for SRF linac phasing strategy and development of beam tuning applications X. Wu, Cyclotrons 21, 9/9/21, Slide 6
7 ReA3 platform Q/A-Separator 12 kev/u LEBT RFQ 6 kev/u Higher energies for lighter ions Minimum energy spread 1keV Minimum pulse length 1 ns SRF-linac EBIT charge breeder HEBT Modern ion linac: LEBT with multi-harmonic buncher Radio frequency quadrupole (RFQ) Superconducting RF linac HEBT with rebuncher 238 U.3 3 MeV/u 48 Ca.3 6 MeV/u X. Wu, Cyclotrons 21, 9/9/21, Slide 7
8 ReA3 platform Q/A EBIT RFQ SRF X. Wu, Cyclotrons 21, 9/9/21, Slide 8
9 ReA3 hardware EBIT Charge Breeder Q/A Separator SC Linac LEBT RFQ HEBT X. Wu, Cyclotrons 21, 9/9/21, Slide 9
10 ReA3 EBIT charge breeder Unique features: Continuous injection of ions» high capture rate Variable extraction duty cycle» μs pulse to quasi-continuous Short breeding time (<1 ms) High efficiency > 5% in a single charge state EBIT installation will be completed in October, Simulations are performed to optimize performance, Injection tests end of 21! X. Wu, Cyclotrons 21, 9/9/21, Slide 1
11 Achromatic Q/A-separator Energy collimation slit Resolving power > 1 Beam from EBIT Mass separation slit X. Wu, Cyclotrons 21, 9/9/21, Slide 11
12 Low energy beam transport (LEBT) Stable Ion Source ( 4 He 1+ ) E-Quads Multi-harmonic buncher Triple-Bender X. Wu, Cyclotrons 21, 9/9/21, Slide 12
13 Beam Diagnostics (LEBT) Faraday cup CaF viewer MCP viewer Bunch length monitor Attenuators 45 deg. slit RFQ X. Wu, Cyclotrons 21, 9/9/21, Slide 13
14 Emittance Scans RFQ transverse acceptance > ε n = 1. π-mm-mrad ε g = 2 π-mm-mrad (@ RFQ input energy of 12 kev/u ) Desired twiss parameters α =.6 and β =.6 m Measured beam emittances fit into RFQ transverse acceptance X. Wu, Cyclotrons 21, 9/9/21, Slide 14
15 RT 4-rod 4 RFQ rods (milled from Cu profiles) stem tuning plate New design: Al-tank (no copper plating required) Simple adjustment of tuning plates, no alignment required High power operation RFQ installed in beam line, Conditioning started, Beam tests in September 21! X. Wu, Cyclotrons 21, 9/9/21, Slide 15
16 ReA3 SRF-cryomodules ReA3-3 ReA3 Cryomodules 15 cavities 2 cavity types (QWR) Beta=.41 &.85 Same as FRIB design 8 solenoids Same as used in FRIB First two cryomodules completed, third in progress to be completed Q2FY211 re-buncher β =.41 module β =.85 module X. Wu, Cyclotrons 21, 9/9/21, Slide 16
17 SRF-LINAC infrastructure Clean rooms Lead shield diagnostic boxes X. Wu, Cyclotrons 21, 9/9/21, Slide 17
18 Building cryomodules! Clean room assembly of cold mass required! Cryogenic Distribution System Cold-mass ReA3 Cryomodule Vacuum Vessel ReA3 design Performance tests of cavities and solenoids. Thermal Shield C.K. Gelbke, 9/15/21, Slide 18
19 ReA3 QWRs testing β opt =.41 β opt =.85 Q Q ReA3 FRIB SC236 (BB) SC24 (Ja) SC241 (Ch) SC237 (Fr) SC243 (Dr) SC245 (Nm) SC244 (PH) E p (MV/m) ReA3 FRIB Generation 1st (RIA) 2nd (SC247 Jk) E p (MV/m) X. Wu, Cyclotrons 21, 9/9/21, Slide 19
20 ReA3 High Energy Beam Transport (HEBT) Beam dynamics design completed Design of Re-buncher cryomodule started Completed end of 211 Beam dynamics design completed Mechanical design of S-bend completed Magnets in production Completed end of 21 ReA3 Platform β=.41 QWR Re-buncher X. Wu, Cyclotrons 21, 9/9/21, Slide 2
21 ReA3 Facility Layout Q/A Separator LEBT+RFQ SC Linac EBIT ReA3 Experimental Hall ReA3 Platform HEBT X. Wu, Cyclotrons 21, 9/9/21, Slide 21
22 Strong interests using ReA3 RIBs for nuclear astrophysics experiments ANSEN SeGA CAESAR AT-TPC JENSA SECAR X. Wu, Cyclotrons 21, 9/9/21, Slide 22
23 ReA3 Beam Simulations 4 Energy Ek (MeV/u) Z (m) Beam Envelope 4 Rmax (mm) Z (m) X. Wu, Cyclotrons 21, 9/9/21, Slide 23
24 ReA3 Beam Simulations Erms(x/y) (pi mm-mrad) E995(x/y) (pi mm-mrad) Z (m) Transverse 99.5% emittances Transverse rms emittances Erms(x) Erms(y) E995(x) E995(y) Z (m) Erms(z) (pi kev/u-ns) E995(z) (pi kev/u-ns) Longitudinal rms emittance Z (m) Longitudinal 99.5% emittance Z (m) X. Wu, Cyclotrons 21, 9/9/21, Slide 24
25 ReA3 Beam Simulations 5 5 X (mm) Real Space X (mm) Y (mm) Longitudinal Phase Space Horizontal plane Vertical plane N Phase (degree@8.5mhz) -5 5 X (mm) Bunch length N -5 N N Py (mrad) Y (mrad) Vertical Phase Space 1 DW/W (%) Px (mrad) Horizontal Phase Space Y (mm) Energy spread Time (ns) dek (kev/u) 2 X. Wu, Cyclotrons 21, 9/9/21, Slide 25
26 ReA3 to ReA6 Upgrade β=.85 QWR Re-buncher β=.41qwr Re-buncher β=.85 QWR Accelerating Cryomodule X. Wu, Cyclotrons 21, 9/9/21, Slide 26
27 ReA6 Facility Layout Q/A Separator LEBT+RFQ EBIT SC Linac ReA3 Experimental Hall ReA3 Platform HEBT HEBT X. Wu, Cyclotrons 21, 9/9/21, Slide 27
28 ReA6 to ReA12 Upgrade ReA6 ReA12 β=.85 QWR Re-buncher β=.85 QWR Accelerating Cryomodule ReA3 SRF LINAC on platform X. Wu, Cyclotrons 21, 9/9/21, Slide 28
29 Re-Accelerator Energy Increase with Additional Cryomodules X. Wu, Cyclotrons 21, 9/9/21, Slide 29
30 NSCL Pre-FRIB (216) Facility Layout X. Wu, Cyclotrons 21, 9/9/21, Slide 3
31 Fast, Stopped, and Re-accelerated RIBs at NSCL with FRIB RIBs from FRIB X. Wu, Cyclotrons 21, 9/9/21, Slide 31
32 Summary ReA3 status Test of EBIT electron beam system done, magnet commissioned, assembly ongoing first operation October Q/A-separator beam commissioning completed LEBT beam commissioning is presently performed RFQ tuning completed, conditioning ongoing, first beam tests in early September 21 SRF-linac: re-buncher rf-tests completed, first beam tests in conjunction with RFQ beam commissioning β=.41 module installed, hardware tests are being performed β=.85 under construction Accelerated stable beams end of 21 Reaccelerated beams in 211 X. Wu, Cyclotrons 21, 9/9/21, Slide 32
THE DESIGN AND COMMISSIONING OF THE ACCELERATOR SYSTEM OF THE RARE ISOTOPE REACCELERATOR ReA3 AT MICHIGAN STATE UNIVERSITY*
THE DESIGN AND COMMISSIONING OF THE ACCELERATOR SYSTEM OF THE RARE ISOTOPE REACCELERATOR ReA3 AT MICHIGAN STATE UNIVERSITY* X. Wu#, B. Arend, C. Compton, A. Facco, M. Johnson, D. Lawton, D. Leitner, F.
More informationStatus of the EBIT in the ReA3 reaccelerator at NSCL
Status of the EBIT in the ReA3 reaccelerator at NSCL ReA3 concept and overview: - Gas stopping EBIT RFQ LINAC EBIT commissioning National Science Foundation Michigan State University S. Schwarz, TCP-2010,
More informationNSCL Operations and ReAcclerator Facility at MSU. Daniela Leitner Michigan State University
NSCL Operations and ReAcclerator Facility at MSU Daniela Leitner Michigan State University CCF Operations In Perspective NSCL is funded by NSF in support of a versatile user program with a historical average
More informationAccelerators for the Advanced Exotic Beam Facility
Accelerators for the Advanced Exotic Beam Facility Peter N. Ostroumov Physics Division Content Facility for Radioactive Ion Beams (FRIB) Short introduction to the current status Major differences from
More informationThe Facility for Rare Isotope Beams
The Facility for Rare Isotope Beams This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661, the State of Michigan and Michigan
More informationProgress of RAON Heavy Ion Accelerator Project in Korea
Progress of RAON Heavy Ion Accelerator Project in Korea Sunchan Jeong Rare Isotope Science Project (RISP) 중이온가속기 사업단 Institute for Basic Science (IBS) May 13, 2016 IPAC2016 Contents Rare Isotope Science
More informationInvestigation of ion capture in an Electron Beam Ion Trap charge-breeder for rare isotopes
Investigation of ion capture in an Electron Beam Ion Trap charge-breeder for rare isotopes Kritsada Kittimanapun ATD seminar August 26, 2014 Outline Electron beam ion source/trap principle EBIT charge
More informationElliptical Cavities: Proven SRF Option
Elliptical Cavities: Proven SRF Option Terry L. Grimm Michigan State University July 2005 Outline Multi-cell elliptical cavities Demonstrated for β > 0.4 Future trends Multi-spoke cavities Limited experimental
More informationStatus & Plans for the TRIUMF ISAC Facility
Status & Plans for the TRIUMF ISAC Facility P.W. Schmor APAC 07, Jan 29-Feb 2 Indore, India TRIUMF ISAC Schematic Layout of TRIUMF/ISAC with H- Driver, ISOL Production & Post Accelerators ISAC-II High
More informationRARE ISOTOPE ACCELERATOR (RIA) PROJECT*
RARE ISOTOPE ACCELERATOR (RIA) PROJECT* R.C. York#, Michigan State University, East Lansing, MI 48824 U.S.A. Abstract The proposed Rare Isotope Accelerator (RIA) Project will provide world-class intensities
More informationNotes on the HIE-ISOLDE HEBT
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH HIE-ISOLDE-PROJECT-Note-13 Notes on the HIE-ISOLDE HEBT M.A. Fraser Abstract The HEBT will need to transfer the beam from the HIE-ISOLDE linac to up to four experimental
More informationNSCL and Physics and Astronomy Department, Michigan State University Joint Institute for Nuclear Astrophysics
National Superconducting Cyclotron Laboratory An overview Ana D. Becerril NSCL and Physics and Astronomy Department, Michigan State University Joint Institute for Nuclear Astrophysics University of North
More informationThe SARAF 40 MeV Proton/Deuteron Accelerator
The SARAF 40 MeV Proton/Deuteron Accelerator I. Mardor, D. Berkovits, I. Gertz, A. Grin, S. Halfon, G. Lempert, A. Nagler, A. Perry, J. Rodnizki, L. Weissman Soreq NRC, Yavne, Israel K. Dunkel, M. Pekeler,
More informationDiagnostics Requirements for the ARIEL Low Energy Beam Transport
Document-121991 Diagnostics Requirements for the ARIEL Low Energy Beam Transport Document Type: Requirement Document Release: 02 Release Date: 2017-03-22 Authors: S. Saminathan, M. Marchetto, C. Barquest
More informationOPTICS IMPROVEMENTS OF THE K500 AXIAL INJECTION LINE
Cyclotrons and Their Applications 27, Eighteenth International Conference OPTICS IMPROEMENTS OF THE K5 AXIAL INJECTION LINE M. Doleans, S. Chouhan, D. Cole, G. Machicoane, F. Marti, P. Miller, J. Moskalik,
More informationSPIRAL 2 Commissioning Status
SPIRAL 2 Commissioning Status Jean-Michel Lagniel (GANIL) for the SPIRAL 2 Team With thanks to the SPIRAL 2 team Page 1 Menu 1- SPIRAL 2 facility (Phase 1) presentation 2- Injector commisionning (Sources
More informationHeavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans. Upgrade Injector
Heavy Ion Accelerators for RIKEN RI Beam Factory and Upgrade Plans RI Beam Factory (1997-) Heavy Ion Beams (2007-) Low intensity Beam now (2008) (Goal: 1pμA U-ion beam) Upgrade Injector H. Okuno, et. al.
More informationDesign Integration of the FRIB Driver Linac
Design Integration of the FRIB Driver Linac Yan Zhang On behalf of the FRIB driver linac team IPAC 2013, May 15, 2013, Shanghai This material is based upon work supported by the U.S. Department of Energy
More informationDevelopment of the UNILAC towards a Megawatt Beam Injector
Development of the UNILAC towards a Megawatt Beam Injector W. Barth, GSI - Darmstadt 1. GSI Accelerator Facility Injector for FAIR 2. Heavy Ion Linear Accelerator UNILAC 3. SIS 18 Intensity Upgrade Program
More informationOperation of the Coupled Cyclotron Facility at Michigan State University
Operation of the Coupled Cyclotron Facility at Michigan State University Andreas Stolz Workshop on Accelerator Operations Head, Operations Department SLAC National Accelerator Laboratory NSCL / Michigan
More informationTEST MEASUREMENTS WITH THE REX-ISOLDE LINAC STRUCTURES*
TEST MEASUREMENTS WITH THE REX-ISOLDE LINAC STRUCTURES* O. Kester, D. Habs, T. Sieber, S. Emhofer, K. Rudolph, LMU München, Garching Germany R. von Hahn, H. Podlech, R. Repnow, D. Schwalm, MPI- K, Heidelberg,
More informationPIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements
PIP-II Injector Test s Low Energy Beam Transport: Commissioning and Selected Measurements A. Shemyakin 1, M. Alvarez 1, R. Andrews 1, J.-P. Carneiro 1, A. Chen 1, R. D Arcy 2, B. Hanna 1, L. Prost 1, V.
More informationA PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU
IWAA2004, CERN, Geneva, 4-7 October 2004 A PRELIMINARY ALIGNMENT PLAN FOR RIA AT MSU D. P. Sanderson, NSCL-MSU, 1 Cyclotron Lab, East Lansing, MI 48824, USA 1. INTRODUCTION The Rare Isotope Accelerator
More informationANURIB Advanced National facility for Unstable and Rare Ion Beams
PRAMANA c Indian Academy of Sciences Vol. 85, No. 3 journal of September 2015 physics pp. 505 515 ANURIB Advanced National facility for Unstable and Rare Ion Beams ARUP BANDYOPADHYAY, V NAIK, S DECHOUDHURY,
More informationAn Electron Linac Photo-Fission Driver for the Rare Isotope Program at TRIUMF
CANADA S NATIONAL LABORATORY FOR PARTICLE AND NUCLEAR PHYSICS Owned and operated as a joint venture by a consortium of Canadian universities via a contribution through the National Research Council Canada
More informationFacility for Rare Isotope Beams and National Superconducting Cyclotron Laboratory Overview
Facility for Rare Isotope Beams and National Superconducting Cyclotron Laboratory Overview Paul Mantica, Deputy Laboratory Director and Deputy FRIB Project Manager 22 August 2015 This material is based
More informationReport on PIAVE G. Bisoffi
Report on PIAVE G. Bisoffi International Scientific Committee, Legnaro February 10th, 2005 Context: Upgrade of the LNL Nuclear Physics Facility 3. CRYOGENIC SYSTEM UPGRADE 5. ALPI Energy Upgrade 4 3 4.
More informationCOMMISSIONING OF THE COUPLED CYCLOTRON SYSTEM AT NSCL
COMMISSIONING OF THE COUPLED CYCLOTRON SYSTEM AT NSCL F. Marti, P. Miller, D. Poe, M. Steiner, J. Stetson, X.Y. Wu, NSCL, MSU, East Lansing, MI 48824, USA Abstract The Coupled Cyclotron Facility at Michigan
More informationRare Isotope Accelerator RIA Opportunities & Challenges. Richard C. York October 2004 MIT
Rare Isotope Accelerator RIA Opportunities & Challenges Richard C. York October 2004 MIT 1 RIA Status Strong Nuclear Science community support Nuclear Science Advisory Committee Long Range Plan (April
More informationA high intensity p-linac and the FAIR Project
A high intensity p-linac and the FAIR Project Oliver Kester Institut für Angewandte Physik, Goethe-Universität Frankfurt and GSI Helmholtzzentrum für Schwerionenforschung Facility for Antiproton and Ion
More informationOpportunities to study the SHE production mechanism with rare isotopes at the ReA3 facility
Opportunities to study the SHE production mechanism with rare isotopes at the ReA3 facility Zach Kohley National Superconducting Cyclotron Laboratory Department of Chemistry Michigan State University,
More informationAbstract The Facility for nuclear
FRIB ACCELERATOR BEAM DYNAMICS DESIGN AND CHALLENGES* Q. Zhao #, A. Facco, F. Marti, E. Pozdeyev, M. Syphers, Y. Yamazaki, Y. Zhang, J. Wei, X.Wu, FRIB/MSU, East Lansing, MI 48824, USA Abstract The Facility
More informationOverview of the EURISOL post-accelerator design and studies
Overview of the EURISOL post-accelerator design and studies Patrick BERTRAND On behalf of the TASK 6 team First EURISOL User Group Workshop January 28, Firenze 1 Task 6 Team : EURISOL Post Accelerator
More informationAdvanced Linac Solutions for Hadrontherapy
Workshop on Innovative Delivery Systems in Particle Therapy Torino, 23-24 th February 2017 Advanced Linac Solutions for Hadrontherapy A. Garonna on behalf of Prof. U. Amaldi V. Bencini, D. Bergesio, D.
More informationOVERVIEW OF RECENT RFQ PROJECTS *
OVERVIEW OF RECENT RFQ PROJECTS * A. Schempp Institut für Angewandte Physik, J. W. Goethe-Universität, D-60486 Frankfurt am Main, Germany Abstract RFQs are the new standard injector for a number of projects.
More informationThe SARAF CW 40 MeV Proton/Deuteron Accelerator
The SARAF CW 40 MeV Proton/Deuteron Accelerator A. Nagler, D. Berkovits, I. Gertz, I. Mardor, J. Rodnizki, L. Weissman Soreq NRC, Yavne, Israel K. Dunkel, M. Pekeler, F. Kremer, C. Piel, P. vom Stein Accel
More informationSLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland
SLS at the Paul Scherrer Institute (PSI), Villigen, Switzerland Michael Böge 1 SLS Team at PSI Michael Böge 2 Layout of the SLS Linac, Transferlines Booster Storage Ring (SR) Beamlines and Insertion Devices
More informationChopping High-Intensity Ion Beams at FRANZ
Chopping High-Intensity Ion Beams at FRANZ C. Wiesner, M. Droba, O. Meusel, D. Noll, O. Payir, U. Ratzinger, P. Schneider IAP, Goethe-Universität Frankfurt am Main Outline 1) Introduction: The FRANZ facility
More informationSPES Conceptual Design Report
Source TRIPS 5MeV BNCT Be converter U target RFQ ISCL Ion source 100 MeV Isotope separator Charge breeder SPES Conceptual Design Report TECHNICAL COMMITTEE A. Pisent (Technical Coordinator) M. Comunian
More informationStudy of scintillation stability in KBr, YAG:Ce, CaF2:Eu and CsI:Tl irradiated by various-energy protons
Study of scintillation stability in KBr, YAG:Ce, CaF2:Eu and CsI:Tl irradiated by various-energy protons Ling-Ying Lin National Superconducting Cyclotron Laboratory, U.S.A. Ling-Ying Lin, 9/17/2014, Slide
More informationDiagnostic Systems for Characterizing Electron Sources at the Photo Injector Test Facility at DESY, Zeuthen site
1 Diagnostic Systems for Characterizing Electron Sources at the Photo Injector Test Facility at DESY, Zeuthen site Sakhorn Rimjaem (on behalf of the PITZ team) Motivation Photo Injector Test Facility at
More informationWish-List for Large-Scale Simulations for Future Radioactive Beam Facilities
Wish-List for Large-Scale Simulations for Future Radioactive Beam Facilities International Computational Accelerator Physics Conference Oct. 2-6, 2006 Chamonix, France Jerry Nolen, Physics Division Outline
More informationSRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE*
SRF GUN CHARACTERIZATION - PHASE SPACE AND DARK CURRENT MEASUREMENTS AT ELBE* E. Panofski #, A. Jankowiak, T. Kamps, Helmholtz-Zentrum Berlin, Berlin, Germany P.N. Lu, J. Teichert, Helmholtz-Zentrum Dresden-Rossendorf,
More informationSuperconducting Magnets for the FRIB Fragment Separator. Al Zeller, Shailendra Chouhan, Rick Swanson, Dan Cole
Superconducting Magnets for the FRIB Fragment Separator Al Zeller, Shailendra Chouhan, Rick Swanson, Dan Cole History of rare isotope science at Michigan State University leads to FRIB Unique FRIB framework:
More informationDesign Note TRI-DN Low Energy Beam Transport Line for the CANREB Charge State Breeder
Design Note Low Energy Beam Transport Line for the CANREB Charge State Breeder Document Type: Design Note Release: 03 Release Date: 2016/09/09 Author(s): S. Saminathan & R. Baartman Author(s): Reviewed
More informationTomographic transverse phase space measurements at PITZ.
Tomographic transverse phase space measurements at PITZ. > Photo-Injector Test facility at DESY in Zeuthen - PITZ > Tomography in beam diagnostics > Hardware > Measurements & evaluation Georgios Kourkafas,
More informationExotic Beam Summer School: Accelerators and Beams
Exotic Beam Summer School: Accelerators and Beams 26 July, 2011 Bradley M. Sherrill FRIB Chief Scientist Brad Sherrill EBSS July 2011, Slide 1 Slid 1! Accelerators are used to produce important isotopes
More informationRFQ Status. Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005
RFQ Status Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005 RFQ Status & Testing of the RFQ Mathew Smith: UBC/TRIUMF TITAN Collaboration meeting June 10th 2005 Overview TITAN Background
More informationLawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory
Lawrence Berkeley National Laboratory Lawrence Berkeley National Laboratory Title A high transmission analyzing magnet for intense high charge state beams Permalink https://escholarship.org/uc/item/25g1x3b4
More informationMaterials issues in design, construction and operation of FRIB
Materials issues in design, construction and operation of FRIB Georg Bollen Slid 1 Facility for Rare Isotope Beams World-leading next-generation rare isotope beam facility in the US Fragment separator
More informationSPIRAL-2 FOR NEUTRON PRODUCTION
SPIRAL-2 FOR NEUTRON PRODUCTION X. Ledoux and the NFS collaboration Outline The SPIRAL-2 facility The Neutrons For Science Facility OUTLINE SPIRAL-2 The Neutrons For Science facility The SPIRAL-2 project
More informationOperational Experience in PIAVI-ALPI Complex. E. Fagotti INFN-LNL
Operational Experience in PIAVI-ALPI Complex E. Fagotti INFN-LNL Operational Experience in PIAVI-ALPI Complex E. Fagotti INFN-LNL Machine History Operational Experience in PIAVI-ALPI Complex E. Fagotti
More informationAlignment requirement for the SRF cavities of the LCLS-II injector LCLSII-TN /16/2014
Alignment requirement for the SRF cavities of the LCLS-II injector LCLS-II TN-14-16 12/16/2014 R. K. Li, C. Papadopoulos, T. O. Raubenheimer, J. F. Schmerge, and F. Zhou December 16, 2014 LCLSII-TN-14-16
More informationSmall Isochronous Ring (SIR) project at NSCL, MSU. Eduard Pozdeyev NSCL, Michigan Sate University
Small Isochronous Ring (SIR) project at NSCL, MSU Eduard Pozdeyev NSCL, Michigan Sate University Talk Outline Isochronous regime in accelerators, application to Isochronous Cyclotrons Space charge effects
More informationLinac JUAS lecture summary
Linac JUAS lecture summary Part1: Introduction to Linacs Linac is the acronym for Linear accelerator, a device where charged particles acquire energy moving on a linear path. There are more than 20 000
More informationCommissioning of the SNS Beam Instrumentation
Commissioning of the SNS Beam Instrumentation Commissioning of the SNS Beam Instrumentation Tom Shea for the SNS Diagnostics Team Oak Ridge National Laboratory (ORNL), Oak Ridge, TN, USA The Spallation
More informationDEVELOPMENT OF JINR FLNR HEAVY-ION ACCELERATOR COMPLEX IN THE NEXT 7 YEARS
Ó³ Ÿ. 2010.. 7, º 7(163).. 827Ä834 ˆ ˆŠ ˆ ˆŠ Š ˆ DEVELOPMENT OF JINR FLNR HEAVY-ION ACCELERATOR COMPLEX IN THE NEXT 7 YEARS G. Gulbekyan, B. Gikal, I. Kalagin, N. Kazarinov Joint Institute for Nuclear
More informationDEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES*
Proceedings of Hadron Beam 8, Nashville, Tennessee, USA DEVELOPMENT OF LARGE SCALE OPTIMIZATION TOOLS FOR BEAM TRACKING CODES* B. Mustapha # and P. N. Ostroumov Argonne National Laboratory, 97 S. Cass
More informationReview of ISOL-type Radioactive Beam Facilities
Review of ISOL-type Radioactive Beam Facilities, CERN Map of the nuclear landscape Outline The ISOL technique History and Geography Isotope Separation On-Line Existing facilities First generation facilities
More informationReaction rates in the Laboratory
Reaction rates in the Laboratory Example I: 14 N(p,γ) 15 O slowest reaction in the CNO cycle Controls duration of hydrogen burning Determines main sequence turnoff glob. cluster ages stable target can
More informationSpoke and other TEM-class superconducting cavities. J.L. Muñoz, ESS-Bilbao Academy-Industry Matching Event CIEMAT, Madrid, 27.May.
Spoke and other TEM-class superconducting cavities J.L. Muñoz, ESS-Bilbao Academy-Industry Matching Event CIEMAT, Madrid, 27.May.2013 Outline Introduction Basic design of TEM cavities Cavity design issues
More informationFront end, linac upgrade, and commissioning of J-PARC. Y. Liu KEK/J-PARC, Japan
KEK Front end, linac upgrade, and commissioning of J-PARC j-parc Y. Liu KEK/J-PARC, Japan ICFA mini-workshop on Beam Commissioning for High Intensity Accelerators Dongguan, China, June 8-10, 2015 Outlines
More informationIFMIF High energy beam line design and beam expansion using non-linear multipole lenses and "step-like" magnet
IFMIF High energy beam line design and beam expansion using non-linear multipole lenses and "step-like" magnet N. Chauvin 1 R. Duperrier 1 P.A.P. Nghiem 1 J. Y. Tang 2 D. Uriot 1 Z.Yang 2 1 Commissariat
More informationBEAM DYNAMICS ISSUES IN THE SNS LINAC
BEAM DYNAMICS ISSUES IN THE SNS LINAC A. Shishlo # on behalf of the SNS Accelerator Group, ORNL, Oak Ridge, TN 37831, U.S.A. Abstract A review of the Spallation Neutron Source (SNS) linac beam dynamics
More informationBeam Diagnostics for Low Energy Proton and H - Accelerators. Vic Scarpine Fermilab 2012 BIW April 16-19, 2012
Beam Diagnostics for Low Energy Proton and H - Accelerators Vic Scarpine Fermilab 2012 BIW April 16-19, 2012 Outline High-power proton/h- accelerator future Generic accelerator front-ends Typical diagnostic
More informationIn-Flight Fragment Separator and ISOL Cyclotron for RISP
In-Flight Fragment Separator and ISOL Cyclotron for RISP Jong-Won Kim Daejeon, May 9, 2012 Scope of Presentation in the RI Science Project Area of the IF Separator and ISOL cyclotron Two kinds of beam
More informationLCLS Injector Prototyping at the GTF
LCLS Injector Prototyping at at the GTF John John Schmerge, SLAC SLAC November 3, 3, 23 23 GTF GTF Description Summary of of Previous Measurements Longitudinal Emittance Transverse Emittance Active LCLS
More informationActivity Report on ANPhA (in place of Dong-Pil Ming)
2014 WG.9 @ GSI July 11, 2014 Activity Report on ANPhA (in place of Dong-Pil Ming) H. Sakai ANPhA Observer RIKEN As of today Member countries and regions alphabetical order Australia China Ind ia Jap an
More informationProton LINAC for the Frankfurt Neutron Source FRANZ
Proton LINAC for the Frankfurt Neutron Source FRANZ - IAEA - International Topical Meeting on Nuclear Research Applications and Utilization of Accelerators Oliver Meusel 4-8 May 2009 Vienna, Austria Motivation
More informationDevelopment and application of the RFQs for FAIR and GSI Projects
Development and application of the RFQs for FAIR and GSI Projects Stepan Yaramyshev GSI, Darmstadt Facility for Antiproton and Ion Research at Darmstadt The FAIR Accelerator Complex GSI Today SIS 100 SIS18
More informationDevelopments of the RCNP cyclotron cascade
CYCLOTRONS 2007 The 18th International Conference on Cyclotrons and Their Applications Developments of the RCNP cyclotron cascade K. Hatanaka,, M. Fukuda, T. Saito, T. Yorita,, H. Tamura, M. Kibayashi,
More informationNovel, Hybrid RF Injector as a High-average. Dinh Nguyen. Lloyd Young
Novel, Hybrid RF Injector as a High-average average-current Electron Source Dinh Nguyen Los Alamos National Laboratory Lloyd Young TechSource Energy Recovery Linac Workshop Thomas Jefferson National Accelerator
More informationLHC Status and CERN s future plans. Lyn Evans
LHC Status and CERN s future plans Lyn Evans Machine layout L. Evans EDMS document no. 859415 2 Cryodipole overview 1250 1000 Equivalent dipoles 750 500 250 0 01-Jan-01 01-Jan-02 01-Jan-03 01-Jan-04 01-Jan-05
More informationUPGRADE OF THE HIT INJECTOR LINAC-FRONTEND
UPGRADE OF THE HIT INJECTOR LINAC-FRONTEND S. Yaramyshev, W. Barth, M. Maier, A. Orzhekhovskaya, B. Schlitt, H. Vormann, GSI, Darmstadt R. Cee, A. Peters, HIT, Heidelberg Abstract The Therapy Linac in
More informationLinac4: From Initial Design to Final Commissioning
Linac4: From Initial Design to Final Commissioning Alessandra M Lombardi for the LINAC4 Team 1 Oliver.Abevrle,Davide.Aguglia,Luca.Arnaudon,Philippe.Baudrenghien, Giulia.Bellodi Caterina.Bertone,Yannic.Body,Jan.Borburgh,Enrico.Bravin,Olivier.Brunner,Jean-
More informationSystem Integration. E. Fagotti
System Integration E. Fagotti Outline Starting status Interface Management Workflow & Documentation PBS interfaces Some results 2 Dec 14 SPES TAC2 2 Starting Status (February 2014) Interfaces identification
More informationRADIO-FREQUENCY QUADRUPOLE LINACS
RADIO-FREQUENCY QUADRUPOLE LINACS A. Schempp Johann Wolfgang Goethe University, Frankfurt am Main, Germany 1. INTRODUCTION Abstract Radio-Frequency Quadrupole (RFQ) linacs are efficient, compact, lowenergy
More informationarxiv: v1 [physics.acc-ph] 20 Jun 2013
Beam dynamics design of the main accelerating section with KONUS in the CSR-LINAC arxiv:1306.4729v1 [physics.acc-ph] 20 Jun 2013 ZHANG Xiao-Hu 1,2;1) YUAN You-Jin 1 XIA Jia-Wen 1 YIN Xue-Jun 1 DU Heng
More informationPresent ISOLDE facility Aims of HIE-ISOLDE upgrade First steps towards HIE-ISOLDE
The HIE-ISOLDE ISOLDE Project Alexander Herlert, CERN Present ISOLDE facility Aims of HIE-ISOLDE upgrade First steps towards HIE-ISOLDE Hirschegg Workshop 2008 B. Jonson s talk at the last ISOLDE workshop
More informationFACET-II Design Update
FACET-II Design Update October 17-19, 2016, SLAC National Accelerator Laboratory Glen White FACET-II CD-2/3A Director s Review, August 9, 2016 Planning for FACET-II as a Community Resource FACET-II Photo
More informationGitai Feinberg. November Thesis submitted for the degree of "Doctor of Philosophy" Submitted to the Senate of the Hebrew University of Jerusalem
Study of the 7 Li(p,n) Reaction Towards Measurements of Neutron-Capture Cross Sections in the Astrophysical s-process With the SARAF Accelerator and a Liquid-Lithium Target Thesis submitted for the degree
More informationLaser Based Diagnostics for Measuring H - Beam Parameters
Laser Based Diagnostics for Measuring H - Beam Parameters Yun Liu on behalf of Beam Instrumentation Group Research Accelerator Division Spallation Neutron Source Oak Ridge National Laboratory OUTLINE Overview
More informationStatus of the ESR And Future Options
Status of the ESR And Future Options M. Steck for the Storage Ring Division (C. Dimopoulou, A. Dolinskii, S. Litvinov, F. Nolden, P. Petri, U. Popp, I. Schurig) Outline 1) New Old ESR 2) Slow (Resonant)
More informationThe FAIR Accelerator Facility
The FAIR Accelerator Facility SIS300 existing GSI proton linac SIS18 UNILAC SIS100 HESR pbar target SuperFRS goals: higher intensity (low charge states) higher energy (high charge states) production of
More informationBeam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI)
Beam Diagnostics and Instrumentation JUAS, Archamps Peter Forck Gesellschaft für Schwerionenforschnung (GSI), 2003, A dedicated proton accelerator for 1p-physics at the future GSI Demands facilities for
More informationPIAVE THE LEGNARO NEW POSITIVE ION INJECTOR BASED ON SUPERCONDUCTING RFQS
PIAVE THE LEGNARO NEW POSITIVE ION INJECTOR BASED ON SUPERCONDUCTING RFQS A. Lombardi, G. Bisoffi, A. Pisent, V. Andreev, L. Badan, G. Bassato, A. Battistella, L. Bertazzo, G. Bezzon, E. Bissiato, N. Dainese,
More informationAcceleration of Heavy Ions generated by ECR and EBIS
Acceleration of Heavy Ions generated by ECR and EBIS R.Becker, Goethe-Universität, Frankfurt, Germany O. Kester, NSCL, MSU, USA OUTLINE Ion production in ECR and EBIS is governed by the same collision
More informationGANIL STATUS REPORT. B. Jacquot, F. Chautard, A.Savalle, & Ganil Staff GANIL-DSM/CEA,IN2P3/CNRS, BP 55027, Caen Cedex, France.
GANIL STATUS REPORT B. Jacquot, F. Chautard, A.Savalle, & Ganil Staff GANIL-DSM/CEA,IN2P3/CNRS, BP 55027, 4076 Caen Cedex, France Abstract The GANIL-Spiral facility (Caen, France) is dedicated to the acceleration
More informationUNILAC Status and Upgrade Plans
UNILAC Status and Upgrade Plans L. Groening, A. Adonin, W. Barth, X. Du, C. Düllmann, R. Hollinger, E. Jäger, M. Maier, S. Mickat, A. Orzhekhovskaya, P. Scharrer, B. Schlitt, G. Schreiber, H. Vormann,
More informationCHOPPING HIGH-INTENSITY ION BEAMS AT FRANZ
CHOPPING HIGH-INTENSITY ION BEAMS AT FRANZ C. Wiesner, M. Droba, O. Meusel, D. Noll, O. Payir, U. Ratzinger, P. Schneider, IAP, Goethe-University, Frankfurt am Main, Germany Abstract The accelerator-driven
More informationIntroduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton and ion beams. High in
2009/12/16 Proton Linac for the Frankfurt Neutron Source Christoph Wiesner Introduction Frankfurt Neutron Source at Stern-Gerlach-Zentrum FRANZ Development of new accelerator concepts for intense proton
More informationUPGRADE OF THE HIT INJECTOR LINAC-FRONTEND
UPGRADE OF THE HIT INJECTOR LINAC-FRONTEND S. Yaramyshev, W. Barth, M. Maier, A. Orzhekhovskaya, B. Schlitt, H. Vormann, GSI, Darmstadt R. Cee, A. Peters, HIT, Heidelberg Abstract The Therapy Linac in
More informationHIE-ISOLDE, the project and the physics opportunities
Eur. Phys. J. A (2016) 52: 334 DOI 10.1140/epja/i2016-16334-4 Review THE EUROPEAN PHYSICAL JOURNAL A HIE-ISOLDE, the project and the physics opportunities M.J.G. Borge 1,2,a and K. Riisager 3 1 ISOLDE,
More informationFrom the Midwest to the World the Joint Institute for Nuclear Astrophysics Hendrik Schatz Michigan State University
From the Midwest to the World the Joint Institute for Nuclear Astrophysics Hendrik Schatz Michigan State University 15 Years of Nuclear Astrophysics with JINA It started all at Notre Dame National and
More informationThe accelerators at LNS - INFN and diagnostics aspects of the radioactive beams
The accelerators at LNS - INFN and diagnostics aspects of the radioactive beams L. Cosentino, P. Finocchiaro, A. Pappalardo LNS INFN Catania J. Harasimowicz Univ. of Liverpool Cockroft Institute LNS INFN
More informationCornell Injector Performance
Cornell Injector Performance Adam Bartnik 1 Cornell Injector Performance as an ERL injector 2 Cornell Injector Performance as an ERL injector as an FEL injector (e.g. LCLS-II) as an injector for EIC applications
More informationBeam dynamics studies of H-beam chopping in a LEBT for project X
Beam dynamics studies of H-beam chopping in a LEBT for project X Qing Ji, David Grote, John Staples, Thomas Schenkel, Andrew Lambert, and Derun Li Lawrence Berkeley National Laboratory, 1 Cyclotron Road,
More informationStatus of Proof-of-Principle Experiment of Coherent Electron Cooling at BNL
Status of Proof-of-Principle Experiment of Coherent Electron Cooling at BNL Outline 2 Why we doing it? What is Coherent electron Cooling System description Subsystem performance Plan for Run 18 e-n Luminosity
More informationProton LINAC for the Frankfurt Neutron Source FRANZ
1 Proton LINAC for the Frankfurt Neutron Source FRANZ O. Meusel 1, A. Bechtold 1, L.P. Chau 1, M. Heilmann 1, H. Podlech 1, U. Ratzinger 1, A. Schempp 1, C. Wiesner 1, S. Schmidt 1, K. Volk 1, M. Heil
More informationHITRAP Low Energy Diagnostics and Emittance Measurement
HITRAP Low Energy Diagnostics and Emittance Measurement Jochen Pfister 1, Oliver Kester 2, Ulrich Ratzinger 1, Gleb Vorobjev 3 1 Institut für Angewandte Physik, JW Goethe-University Frankfurt, Germany
More information