1 8 March 2018 EASTERN EXTENSION TO AWAK MAS DEPOSIT CONFIRMED Significant Opprtunity t Expand Mineral Resurce Results supprt ptential fr significant explratin upside alng the untested 2 km Mine Crridr between the Awak Mas and Salu Bul depsits. Six-hle explratin drilling prgram int the Awak Mas Highwall area nw cmplete. Assay results frm the first three hles cnfirm significant gld mineralisatin in the eastern prjected extensin f the 1.72 Mz Awak Mas depsit, validating the gelgical mdel. Significant results include: HWD002: 45 m at 1.3 g/t Au frm 257 m, 8 m at 2.0 g/t Au frm 308 m, 41 m at 0.9 g/t Au frm 384 m and 4 m at 2.5 g/t Au frm 421 m RTD023: 6.3 m at 2.1 g/t Au frm 179 m and 6 m at 3.9 g/t Au frm m Asia Pacific gld develpment cmpany Nusantara Resurces Limited ( Nusantara, ASX: NUS) is pleased t prvide the fllwing update n the recently cmpleted Awak Mas Highwall explratin drilling prgram at its 100%-wned lcated in Suth Sulawesi, Indnesia. The explratin prgram was designed t cnfirm the gelgical mdel and therefre ptential fr extensins t the Mineral Resurces at the 1.72 Mz Awak Mas 1 and 0.18 Mz Salu Bul 2 depsits alng the intervening Mine Crridr (refer t Nusantara s ASX annuncement f 20 December 2017 fr further backgrund infrmatin). The initial phase f the explratin prgram fcused n the Awak Mas Highwall eastern extensin, with six diamnd drill hles fr 2,726.5 m cmpleted in early March 2018 t test fr extensins f the Awak Mas depsit mineralisatin t the east and acrss the recgnised Awak Mas Highwall fault. The success f this drill prgram clearly indicates the ptential t further extend mineralisatin within the untested 1.5 km Mine Crridr twards the Salu Bul depsit (Figures 1 and 2). The extremely psitive results returned frm this prgram have validated Nusantara s gelgical mdel by prving that the gld mineralisatin is nt restricted t the immediate current ftprint f the Awak Mas depsit. cmmented Nusantara s Managing Directr and CEO, Mike Spreadbrugh. This prvides cnfidence that further mineralisatin in the immediate eastern Highwall area can be expected frm the remaining three drill hles, all f which have strng visual indicatins, and supprts ur belief f significant explratin upside alng the untested Mine Crridr between the Awak Mas and Salu Bul depsits. Awak Mas Highwall Eastern Extensin Initially, tw diamnd drill hles were planned (HWD001 and HWD002) t test the ptential fr gld mineralisatin t exist in the eastern (ftwall) blck f the Highwall fault at the Awak mas depsit, with a third hle (RTD023, previusly referred t as HWD003) designed t test the interpretatin f a cmplex wedge structure frmed by the cnvergence f the Tanjung and Highwall faults. These hles demnstrated sufficient visual indicatin that quartz veining and sub-vertical breccia structures existed as mdelled and the prgram was subsequently expanded t six hles. This drilling prgram 1 Reference shuld be made t ASX annuncement Awak Mas Resurce Increased by 0.2 Mz dated 31 January Reference shuld be made t ASX annuncement Prject Mineral Resurce Grws t 2.0 Mz dated 27 February 2018.

2 8 March 2018 successfully identified extensins t the mineralisatin at the Awak Mas depsit and validated the explratin mdel. Hles HWD001 and HWD002 bth penetrated the Highwall fault structure within metres f the mdelled psitin and went n t demnstrate cntinuity f the main flat-lying cnfrmable mineralisatin interpreted as the Upper, Middle and Lwer dmains (Figures 3 and 4). HWD002 als intersected an additinal zne f quartz veining at a stratigraphic psitin well abve the Upper dmain this was referred t as the Tp zne; it was subsequently fund t be weakly mineralised (prbably due t the absence f adjacent sub-vertical feeder-structures). Figure 1: Awak Mas Highwall eastern extensin area shwing newly defined mineralisatin shapes, structural interpretatin, US$1400 Optimisatin shells and relative lcatin f Salu Bul. Figure 2: Mdelled structural repetitins shwing interpreted eastern and suth-eastern target areas.

3 8 March 2018 The third hle, drilled as RTD023, targeted an area interpreted t cntain a ptential fault-displaced zne f the higher grade Rante Upper, Middle and Lwer dmains. This hle did nt intersect mineralisatin in the Upper zne and nly narrw mineralisatin at the Middle and Lwer dmain psitins (Figure 5). This led t a reinterpretatin f the cntrlling lcal and depsit-scale reginal fault system, particularly assisted by the recently flwn Lidar tpgraphic survey, which realigned the initial gelgical interpretatin. Thrugh a prcess f cntinual evlutin f the structural mdel, a better understanding nw exists which will, infrm the next phase f explratin drilling. Figure 3: Crss sectin shwing HWD001 results.

4 8 March 2018 Figure 4: Crss sectin shwing HWD002 results. Figure 5: Crss sectin shwing RTD023 results; Nte sectin lking west.

5 8 March 2018 Awak Mas Highwall Eastern Extensin Drilling Results The first three drill hles delivered results which cnfirmed the cntinuatin f the Rante system/dmain mineralisatin acrss the Highwall fault int the previusly untested ftwall blck. Selected results > 0.3 g/t Au fr these hles include: HWD001: 11.1 m at 1.8 g/t Au frm m HWD001: 3.6 m at 0.6 g/t Au frm m HWD001: 5.1 m at 0.4 g/t Au frm m HWD001: 7.9 m at 1.1 g/t Au frm m, including 1 m at 5 g/t Au frm 378 m HWD001: 5 m at 0.5 g/t Au frm m including 0.8 m at 1.7 g/t Au frm m HWD001: 5.3 m at 0.5 g/t Au frm m, including 0.8 m at 2.1 g/t Au frm 427 m HWD002: 45 m at 1.3 g/t Au frm 257 m, including 2 m at 4.8 g/t Au frm 258 m HWD002: 8 m at 2 g/t Au frm 308 m HWD002: 11 m at 0.9 g/t Au frm 330 m HWD002: 41 m at 0.9 g/t Au frm 384 m, including 4m at 2.2 g/t Au frm 384 m and 4 m at 2.5 g/t Au frm 421 m HWD002: 6 m at 0.8 g/t Au frm m RTD023: 6.3 m at 2.1 g/t Au frm 179 m RTD023: 4 m at 0.4 g/t Au frm m RTD023: 6 m at 3.9 g/t Au frm m, including 1 m at 8.2 g/t Au frm m RTD023: 6 m at 1.8 g/t Au frm m, including 1 m at 9.3 g/t Au frm Three further hles have been drilled (HWD003, HWD004 and HWD005) t specifically target the Upper and Middle znes with the intent t gain an intersectin spacing sufficient t allw fr these newly defined znes t be incrprated int the planned April 2018 Mineral Resurce Estimate update. HWD004 has intersected significant visual mineralisatin at a similar stratigraphic psitin t HWD002 Upper t Middle zne (Figure 6). This evidence suggests that gelgical and grade cntinuity can likely be assumed in this area t supprt the classificatin f Indicated Mineral Resurces dwn-dip frm the current suth-eastern limit f the mdelled mineralisatin znes. Visual indicatin frm HWD003 and HWD004 als supprt the interpretatin f the Upper and Middle zne mineralisatin.

6 8 March 2018 Figure 6: Crss sectin shwing HWD004 visual indicatin cmpared t HWD002 result.

7 8 March 2018 APPENDIX 1: AWAK MAS HIGHWALL EASTERN EXTENSION SIGNIFICANT RESULTS > 0.3 g/t Au

8 JORC Cde, 2012 Editin Table 1 Sectin 1 Sampling Techniques and Data (Criteria in this sectin apply t all succeeding sectins.) Sampling Techniques Nature and quality f sampling (eg cut channels, randm chips, r specific specialised industry standard measurement tls apprpriate t the minerals under investigatin, such as dwn hle gamma sndes, r handheld XRF instruments, etc). These examples shuld nt be taken as limiting the brad meaning f sampling. Include reference t measures taken t ensure sample representivity and the apprpriate calibratin f any measurement tls r systems used. Nusantara has cmpleted 6 diamnd hles fr 2,726.5m frm the initial phase f explratin drill sampling fcused n the Highwall eastern extensin at the Awak Mas depsit. Sampling has been carried ut using Diamnd Drill Hle( DDH ) Cre nly. All drill cre was generally sampled n 1m intervals, cntingent n gelgy and cre recvery Cre was cllected directly frm the cre barrel int cre bxes; Cre samples were split in half, with the tp half f the cre analysed and ther half retained as reference cre in the tray; Minimum interval 0.4m and maximum 1m fr mineralised material, and Maximum 2m fr the material that visually lked unmineralised. N specialised measurement tls, e.g. dwnhle gamma sndes, r handheld XRF instruments, etc. were emplyed. During the perid frm 2017 t 2018, sampling was carried ut under Nusantara s prtcls and QAQC prcedures as per industry best practice. Quality Assurance ( QA ) and Quality Cntrl ( QC ) prtcls included the mnitring and analysis f inserted certified reference material, blanks and duplicates samples t ensure sample representivity. Samples were cut abut 5 cm ff the cre rientatin line, and the half-cre with the rientatin line crrectly placed back int the tray and retained. The remaining half-cre was cllected, ensuring that the same side was cnsistently sampled and representative. Fractured and veined cre, that was liable t fall apart when being cut, were wrapped in masking tape prir t cutting. The cre t be retained was placed back in the tray with all the pieces held in place by the masking tape. Cre with veins at a lw angle t the cre axis were cut perpendicular t the veins s that the vein was evenly distributed between the halves. Nusantara Resurces Limited 1

9 Histrical sampling was carried ut under the relevant cmpany s prtcls and prcedures and is assumed t be industry standard practice fr the time. Drilling Techniques Drill Sample Recvery Aspects f the determinatin f mineralizatin that are Material t the Public Reprt. In cases where industry standard wrk has been dne this wuld be relatively simple (eg reverse circulatin drilling was used t btain 1 m samples frm which 3 kg was pulverised t prduce a 30 g charge fr fire assay ). In ther cases mre explanatin may be required, such as where there is carse gld that has inherent sampling prblems. Unusual cmmdities r mineralizatin types (eg submarine ndules) may warrant disclsure f detailed infrmatin. Drill type (eg cre, reverse circulatin, pen-hle hammer, rtary air blast, auger, Bangka, snic, etc) and details (eg cre diameter, triple r standard tube, depth f diamnd tails, facesampling bit r ther type, whether cre is riented and if s, by what methd, etc). Methd f recrding and assessing cre and chip sample recveries and results assessed. Measures taken t maximize sample recvery and ensure representative nature f the samples. Whether a relatinship exists between sample recvery and grade and whether sample bias may have ccurred due t preferential lss/gain f fine/carse material. All Nusantara drilling was diamnd cre (PQ3/HQ3/NQ3). Half cre was sampled n nminal 1m intervals, the entire sample crushed t a nminal 2-3mm, and a 1kg sub-sample was pulverised t prduce a 40g fire assay charge. The Highwall eastern extensin drilling has cnsisted f: PQ3/HQ3/NQ3 cre sizes, prgressively decreased as the hle depth apprached the limit f the rigs capability; Wire-line triple/split tube diamnd cre drilling; Cre rientatin Cretell ORIsht (Gen4) multi-sht cre rientatin tl. Hle depths varied frm 338.3m t 575.5m ttal depth, with an average depth f 454.4m. Cre recvery and drill meterage recrded by field gelgists and trained cre checkers at drill site, prir t transfer f the cre t the cre shed, and Recvery percentage (%) was recrded in the getechnical recrds as equivalent t the length f cre recvered, as a percentage f the drill run. Overall recveries within the mineralised znes is >95%. Wireline triple/split tube system and large diameter PQ/HQ cre were utilised (subject t depth restrictins) t maximise recvery and ensure that the samples are representative f the material being sampled. The DDH sample recvery in the transitinal and fresh rck znes is very high and n significant bias is apparent. Recveries in xidised rck are lwer. Nusantara Resurces Limited 2

10 Lgging Whether cre and chip samples have been gelgically and getechnically lgged t a level f detail t supprt apprpriate Mineral Resurce estimatin, mining studies and metallurgical studies. Drill cre was phtgraphed and lgged prir t sampling. Cre has been gelgically and getechnically lgged t a level f detail apprpriate t supprt mineral resurce estimatin and mining studies. Lithlgy, mineralisatin, alteratin, fliatin trend, fracturing, faulting, weathering, depth f sil and ttal xidatin were recrded. Orientatin f fabrics and structural features were lgged. Visually mineralised znes were able t be lgged and interpreted befre the assays were available. These bservatins were used t update the mineralisatin mdel which is a valuable targeting tl fr successive hle planning. Whether lgging is qualitative r quantitative in nature. Cre (r cstean, channel etc) phtgraphy. Lgging has been cnducted bth qualitatively and quantitatively full descriptin f lithlgies, alteratin and cmments are recrded, as well as percentage estimates n veining and sulphide amunt. All Nusantara diamnd cre has been digitally phtgraphed. The ttal length and percentage f the relevant intersectins lgged. Ttal length f the Highwall drilling cmpleted t date is 2,726.5m (6 hles) f which 100% will be lgged. Sub- Sampling Techniques and Sample Preparatin If cre, whether cut r sawn and whether quarter, half r all cre taken. If nn-cre, whether riffled, tube sampled, rtary split, etc and whether sampled wet r dry. All cre was half-cut lengthwise using a diamnd saw parallel t the rientatin line. The half-cre was sampled, generally n metre intervals, dependent n lgged gelgical cntacts. All sampling was frm diamnd cre. Fr all sample types, the nature, quality and apprpriateness f the sample preparatin technique. A sample preparatin facility was cmmissined nsite, where all samples were crushed, pulverised and a 200g assay aliqut shipped t Geservices labratry fr final element analysis. The nsite facility was established by Nusantara and Geservices t clsely replicate (where pssible) the sample preparatin prcess that was cnducted at the Jakarta labratry. Partial sample preparatin cmpleted nsite utilised a LM2 pulveriser rather than an LM5 pulveriser which had previusly been used in Jakarta. The prcess invlved; Samples weighed and dried at 105 C; Nusantara Resurces Limited 3

11 Quality cntrl prcedures adpted fr all sub-sampling stages t maximise representivity f samples. Measures taken t ensure that the sampling is representative f the in situ material cllected, including fr instance results fr field duplicate/secnd-half sampling. Whether sample sizes are apprpriate t the grain size f the material being sampled. Jaw and Byd crushed t nminal 2-3mm; 1kg sub-sample rtary split fr final preparatin; Sub-sample pulverised by LM2 ring mill pulverisers fr lab analysis, and 200g pulp aliqut fr analytical analysis. The final 200g assay pulp was shipped t Geservices (Jakarta) fr gld and ther element analysis. The nature, quality and apprpriateness f the sample preparatin technique is cnsistent with industry standard practices. Fr cre sampling the same side is cnsistently sampled, half-cre with the bttm f hle line retained in the tray. Fractured and veined cre, that was liable t fall apart when being cut, were wrapped in masking tape prir t cutting. The retained cre was placed back in the tray with all the pieces held in place by the masking tape. Cre with veins at a lw angle t the cre axis were cut perpendicular t the veins s that the vein was evenly distributed between the halves. Carse reject duplicate, carse blanks, and bth intra and umpire labratry pulp duplicates were used t ensure the sampling was representative and un-bias. Cntrl duplicate samples cnstitute 10%-15% f the ttal submitted samples Cmparisn f duplicate assays t the primary assay shwed n significant differences were apparent. A sample size f 3-5 kg is cnsidered apprpriate and representative f the material being sampled given the width and cntinuity f the intersectins and the grain size f the material being cllected. Quality f Assay Data and Labratry Tests The nature, quality and apprpriateness f the assaying and labratry prcedures used and whether the technique is cnsidered partial r ttal. Current gld analysis by Nusantara has used a 40g charge fire assay methd with an AAS finish. The primary assay labratry used is PT Geservices in Jakarta. A secndary labratry (PT SGS Ind Assay Labratries, Jakarta) is used fr lwer pririty samples selected n a hle by hle basis t help vercme bttlenecks at the site preparatin facility and at the Geservices labratry. Additinal element analysis included; Aqua Regia digest plus ICP elements (GA102_ICP09); Ag, As, Cu, Mg, M, Pb, Sb, and Zn. Nusantara Resurces Limited 4

12 Lec - Ttal Carbn and Ttal Sulphur (MET_LECO_01); Cyanide Amenability n pulps (MET_CN7), and Mercury frm GAA02 digest (GAA02_CVAA). The gld fire-assay analysis is a ttal assay methd, which is an industry standard fr gld analysis, and an apprpriate assay methd fr this type f depsit. Verificatin f Sampling and Assaying Fr gephysical tls, spectrmeters, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and mdel, reading times, calibratins factrs applied and their derivatin, etc. Nature f quality cntrl prcedures adpted (eg standards, blanks, duplicates, external labratry checks) and whether acceptable levels f accuracy (i.e. lack f bias) and precisin have been established. The verificatin f significant intersectins by either independent r alternative cmpany persnnel. N gephysical tls were used r data analysed. The fllwing QC sampling prtcls and insertin rates have been adpted fr the current diamnd drilling; Certified Refence Material (5%) Carse Blank Material (2.5%) Carse Duplicate Samples (5-10%) Blind pulp assay check duplicates, resubmitted t primary labratry (2%) Umpire pulp assay check duplicates (5%) Randm primary labratry inspectins n a mnthly t quarterly basis. Perfrmance f the cntrl samples are regularly mnitred, with any disparities investigated and remedied, Mnthly QAQC reprting and meetings are held n at least a mnthly basis. Results t date demnstrate an acceptable level f accuracy and precisin. Significant intersectins were reviewed by the Chief and Senir Gelgists fllwing receipt f the assay results. All assay results are prcessed and validated by the GIS/Database Administratr prir t lading int the database. This includes pltting the standard and blank perfrmances, and review f duplicate results. Original assay certificates are issued as PDF s fr all results and cmpared against digital CSV files as part f data lading prcedure int the database. Nusantara Resurces Limited 5

13 The use f twinned hles. Dcumentatin f primary data, data entry prcedures, data verificatin, data strage (physical and electrnic) prtcls. Discuss any adjustment t assay data. The Gelgy Manager reviews all tabulated assay data as the Cmpetent Persn fr the reprting f Explratin Results. N twinned hles have been drilled by Nusantara. Field drilling data is recrded directly int lgging templates in Excel spreadsheet frmat n laptp cmputers. Excel spreadsheets are imprted t MS Access frmat fr validatin and management by the GIS/Database Administratr nsite. All drilling data is upladed and managed via a centralised Drpbx facility with restricted access. Database is audited by an external cnsultant (Cube Cnsulting) prir t reprting f Explratin Results and Mineral Resurce estimates. All data belw detectin limit (<0.01 ppm Au) and 0 values have been entered as a small value f 0.005ppm Au which is half the detectin limit fr the gld analysis. Negative values, missing samples, interval gaps dented by n sample ( NS ) and cavities were assigned as nulls (blanks) and ignred when extracting cmpsites fr grade interplatin. Samples nt received by the labratry, r with insufficient sample weight fr analysis had the interval left blank in the database. Lcatin f Data Pints Accuracy and quality f surveys used t lcate drill hles (cllar and dwn-hle surveys), trenches, mine wrkings and ther lcatins used in Mineral Resurce estimatin. Specificatin f the grid system used. Cllars were initially lcated by hand held Glbal Psitining System ( GPS ) with an accuracy f abut 5-15m, dependent n the satellite cverage. Additinally, hle psitins were validated by tape and cmpass measurement frm nearby surveyed histric drill cllars. All Nusantara drill cllar will be lcated by third party surveyrs using Differential Glbal Psitining System ( DGPS ) r ttal statin Electrnic Distance Measuring ( EDM ) survey equipment t an accuracy f apprximately 0.1m. Dwn-hle surveys were rutinely carried ut, generally n 30m spacings using a digital multi-sht instrument Cretell ORIsht (Gen4). The 3D lcatin f the individual samples is cnsidered t be adequately established, and cnsistent with accepted industry standards. All drillhle data is referenced in the UTM WGS 84 Zne 51 (Suthern Hemisphere) crdinate system. Nusantara Resurces Limited 6

14 Quality and adequacy f tpgraphic cntrl. Tpgraphic mapping f the area by Airbrne Laser Scanning ( LIDAR ) survey has been carried ut by P.T. Surtech in Nvember Tpgraphic cntrl nw exists t a vertical and hrizntal accuracy f 0.15m and is incrprated int all mineral resurce estimates. Data Spacing and Distributin Orientatin f Data in Relatin t Gelgical Structure Data spacing fr reprting f Explratin Results. Whether the data spacing and distributin is sufficient t establish the degree f gelgical and grade cntinuity apprpriate fr the Mineral Resurce and Ore Reserve estimatin prcedure(s) and classificatins applied. Whether sample cmpsiting has been applied. Whether the rientatin f sampling achieves unbiased sampling f pssible structures and the extent t which this is knwn, cnsidering the depsit type. If the relatinship between the drilling rientatin and the rientatin f key mineralised structures is cnsidered t have intrduced a sampling bias, this shuld be assessed and reprted if material. Diamnd drilling has been undertaken using varius drill rientatins t define the mineralisatin rientatin in an area that has very limited drilling. Drilling was n a nminal 50m t 75m grid spacing, centred abut histrical drill hle AMD 293 which lies apprximately 110m suth-east f the last drill sectin at Rante. The 6 Highwall drill hles fr the reprting f Explratin Results are extensinal hles targeting areas utside f the currently defined mineralised znes. Sampling f drill cre has generally been at 1m intervals. Drill hle spacing is sufficient t imply gelgical and grade cntinuity with the lateral extents f mineralisatin nt fully defined by the current drilling. Sample cmpsiting has nt been applied. Drilling sectins are rientated perpendicular t the strike f the mineralised hst rcks. Drill hles were inclined between 63 and 76 t ptimise intercepts f mineralisatin with respect t thickness and distributin f the targeted shallw dipping znes. Current diamnd drilling has cnfirmed that the drilling rientatin has nt intrduced any sampling bias. The mineralisatin ccurs in multiple rientatins as a stckwrk system, but has a dminant shallw t mderate N-NE dipping, fliatin parallel rientatin, with less well develped narrw sub-vertical structures. Drilling with steep angled hles in mst instances prvides a representative sample acrss the mineralisatin. Nusantara Resurces Limited 7

15 Sample Security The measures taken t ensure sample security. Chain f Custdy is managed by Nusantara whereby; All samples are placed int calic bags with sample tickets and clear sample ID numbering n the utside; Samples were bagged int plyweave sacks, zip tied, with the sample numbers written n the utside f the sack; Samples were stred nsite within a lcked facility ready fr dispatch; Prir t sample dispatch, the sample numbers, duplicates, standards were checked against the dispatch frm; Samples were freighted by rad t Belpa, and then air freighted t the Geservices labratry in Jakarta, and Geservices in Jakarta ntified Nusantara when the samples had been securely received intact. Audits Reviews r The results f any audits r reviews f sampling techniques and data. The sampling prcedures and drilling data were reviewed and audited by Denny Wijayadi (Cube Cnsulting Senir Gelgist) while nsite frm 11 t 15 September The site visit invlved inspectin f the drilling in prgress, nsite sample preparatin facilities, and an audit f the Geservices labratry in Jakarta. Cube (2017) has previusly independently reviewed, verified and validated data prir t the Mineral Resurce estimate in May There were n adverse material results frm any f the reviews r audits. Sectin 2 Reprting f Explratin Results (Criteria listed in the preceding sectin als apply t this sectin.) Mineral Tenement and Land Tenure Status Type, reference name/number, lcatin and wnership including agreements r material issues with third parties such as jint ventures, partnerships, verriding ryalties, native title interests, histrical sites, wilderness r natinal park and envirnmental settings. The includes the three main depsit areas f Awak Mas, Salu Bul and Tarra fr which current mineral Resurces exist and have been reprted t JORC Cde (2012) guidelines. Nusantara hlds a 100% beneficial interest in the via a 7th Generatin Cntract f Wrk ( CW ) thrugh its whlly wned subsidiary PT Masmind Dwi Area. Nusantara Resurces Limited 8

16 PT Masmind Dwi Area is an Indnesian freign investment cmpany, which wns the explratin and mining rights t the Awak Mas Prject thrugh the CW with the Gvernment f the Republic f Indnesia. The has a lng histry invlving multiple cmpanies thrugh direct wnership, jint venture farm-ins, ptin t purchase agreements, r equity arrangements; Battle Muntain discvered the Awak Mas depsit in 1991 after earning a 60% equity in the riginal partnership between New Hpe and PT Asminc; Lne Star (1994) acquired the equity f bth Battle Muntain and New Hpe; Gascyne structured an agreement which cmbined the varius equities under Masmind; Placer (1998) entered, and then later withdrew frm a Jint Venture ( JV ) with Masmind; Vista Gld (2004) purchased 100% f Masmind; Pan Asia (2009), nw One Asia, acquired a 60% interest via a JV with Vista Gld upn cmpletin f a Feasibility Study ( FS ) and Envirnmental Impact Assessment ( AMDAL ); One Asia (2013) thrugh its subsidiary Awak Mas Hldings purchased 100% f the Prject frm Vista Gld, and Nusantara Resurces Limited (frmerly Awak Mas Hldings) demerged frm One Asia with a 100% interest in the and listed n the Australian Securities Exchange ( ASX ) n the 2nd August, The 7th Generatin CW was granted n 19 February 1998 and cvers an area f 14,390 ha. The CW allws fr 100% wnership, and is lcated within a nn-frested area (APL) Land fr Other Uses. The AMDAL fr the prject has been apprved and Envirnment Permit Issued April The Cmpetent Persn is nt aware f any ther agreements that are material t the Prject. Nusantara Resurces Limited 9

17 The security f the tenure held at the time f reprting alng with any knwn impediments t btaining a licence t perate in the area. The CW defines a cnstructin perid f 3 years and an perating perid f 30 years. The Cmpetent Persn has nt been advised f any envirnmental liabilities assciated with the Awak Mas Prject at this time. Explratin Dne by Other Parties Acknwledgment and appraisal f explratin by ther parties. Since the discvery f the Awak Mas depsit by Battle Muntain in 1991, a number f histrical resurce assessments have been cmpleted. Previus explratin wrk in the prject area includes systematic explratin by several peratrs, including Asminc and New Hpe in 1987, fllwed by Battle Muntain, Lne Star, Gasgyne, JCI, Masmind Mining and Placer Dme between 1991 and Vista Gld and One Asia undertk the mst recent explratin wrk between 2004 and 2013 which included the cmpilatin and catalguing f histric data, cmpletin f significant infill resurce drilling, and re-estimatin f the cntained, classified mineral resurces. A mineral resurce estimate ( MRE ) update was cmpleted by Tetra Tech in 2013 based n the results f the One Asia infill and metallurgical testwrk drilling prgram. The MRE was reprted in accrdance with the JORC Cde (2012) guidelines. Gelgy Depsit type, gelgical setting and style f mineralizatin. Awak Mas Depsit A high level, lw sulphidatin hydrthermal system has develped at Awak Mas which is verprinted by a strng sub-vertical fracture cntrl which has channelled the mineralising fluids. The mineralising fluids have explited these pathways and migrated laterally alng fliatin parallel shallwly dipping favurable strata. In additin t the cnfrmable style f mineralisatin there is a late stage hydrthermal verprint that has als depsited gld in sme f the majr sub vertical structures. The multi-phase gld mineralisatin is characterised by milled and crackle breccias, vuggy quartz infill, and stckwrk quartz veining with distinct sub-vertical feeder structures. Hst lithlgies fr mineralisatin are mainly the cver sequence f metasedimentary rcks and t a lesser degree the underlying basement sequence f Nusantara Resurces Limited 10

18 dirites and bitite dminant schists. The cver and basement sequences are separated by an uncnfrmable and sheared cntact. Recent interpretatin has established the presence f a late stage Highwall Fault at the eastern edge f Rante as evidenced frm mineralisatin in histrical getech hle AMD293. This fault is analgus t the NNE trending bunding faults that separate each depsit area at Awak Mas and have been cnfirmed by drilling. An explratin mdel fr drill targeting was develped based n pssible further fault repetitins f Rante style mineralisatin t the east twards the Salu Bul depsit. The 6 deep Highwall hles have cnfirmed that mineralisatin extends acrss the identified Highwall fault, and indicates the ptential t further develp mineralisatin within the Awak Mas t Salu Bul crridr. Drill hle Infrmatin A summary f all infrmatin material t the understanding f the explratin results including a tabulatin f the fllwing infrmatin fr all Material drill hles: easting and nrthing f the drill hle cllar elevatin r RL (Reduced Level elevatin abve sea level in metres) f the drill hle cllar dip and azimuth f the hle dwn hle length and interceptin depth hle length. The six hle first-pass explratin drilling prgram was designed t test the eastern extensin f the Rante mineralisatin int the Highwall area. A tabulatin f lcatin details fr the six drill hles which frm the basis fr this ASX Release are included in Appendix 1. Assays are currently pending fr the three hles HWD003 t HWD005. The histrical drilling database cnsists f; One Asia Drilling ( ) - 87 drill hles fr 5,956m; Histric cre drilling ( ) f 645 drill hles fr 81,045m, and Histric RC drilling ( ) f 158 hles fr 16,290 metres. If the exclusin f this infrmatin is justified n the basis that the infrmatin is nt Material and this exclusin des nt detract frm the understanding f the reprt, the Cmpetent Persn shuld clearly explain why this is the case. The Phase 1 infill resurce drilling cmpleted by Nusantara in at Awak Mas (25 hles fr 4,263m) has been previusly reprted and incrprated in the mst recent MRE update t the ASX; Awak Mas Resurce Increased by 0.2Mz. Dated 31 January 2018; Table 1, Appendix 1 Awak Mas - Explratin Results Tabulatin. The cmplete histrical dataset f 890 hles at Awak Mas, that were previusly drilled have nt been included as they are nt Material t the reprting f the current Explratin Results. All histrical drilling infrmatin has been previusly reprted in the fllwing ASX release; Nusantara Resurces Limited 11

19 Resurce Update. Dated 9 May 2017, Mineral Resurce (JORC 2012) 1.74 Mz, New Gelgical Mdel; Table 1, Appendix 2 Awak Mas Drillhle Intersectin Listing. Table 1, Appendix 2 Salu Bul Drillhle Intersectin Listing. Data Aggregatin Methds Relatinship between Mineralizatin Widths and Intercept Lengths Diagrams In reprting Explratin Results, weighting averaging techniques, maximum and/r minimum grade truncatins (eg cutting f high grades) and cut-ff grades are usually Material and shuld be stated. Where aggregate intercepts incrprate shrt lengths f high grade results and lnger lengths f lw grade results, the prcedure used fr such aggregatin shuld be stated and sme typical examples f such aggregatins shuld be shwn in detail. The assumptins used fr any reprting f metal equivalent values shuld be clearly stated. These relatinships are particularly imprtant in the reprting f Explratin Results. If the gemetry f the mineralizatin with respect t the drill hle angle is knwn, its nature shuld be reprted. If it is nt knwn and nly the dwn hle lengths are reprted, there shuld be a clear statement t this effect (eg dwn hle length, true width nt knwn ). Apprpriate maps and sectins (with scales) and tabulatins f intercepts shuld be included fr any significant discvery Explratin results are reprted as length weighted averages f the individual sample intervals. The fllwing criteria have been applied in reprting f the Explratin results: Intercepts reprted are intervals f Au >1g/t with intervals f <1g/t Au up t 3m included; Where n individual intercepts >1g/t exist, the intercepts reprted are intervals f Au >0.1g/t with intervals f <0.1g/t Au up t 3m included; N high-grade capping has been applied, r was necessary, and All dwnhle intersectin lengths and grades are reprted t ne decimal place. Any znes f significantly high-grade gld mineralisatin have been separately reprted in Appendix 1. Metal equivalent values have nt been used. The mineralisatin gemetry is cmplex and variable, but generally has a main shallw rientatin parallel t the fliatin at ~30º twards the nrtheast. A secndary mineralisatin rientatin is steeply east dipping t sub-vertical nrthsuth feeder structures The drilling rientatin is a cmprmise t target bth mineralisatin rientatins, and generally the dwnhle length apprximates the true width fr the dminant brad and shallw dipping mineralised znes. Dwnhle intercepts f the steep sub-vertical structures will have a dwnhle length significantly lnger than the true width. Relevant drill hle lcatin plans, representative drill sectins are included within the main text f this release. Nusantara Resurces Limited 12

20 being reprted These shuld include, but nt be limited t a plan view f drill hle cllar lcatins and apprpriate sectinal views. All mineralised intersectins used fr the reprting f the Explratin Results are tabulated in Appendix 1. Balanced Reprting Other Substantive Explratin Data Further Wrk Where cmprehensive reprting f all Explratin Results is nt practicable, representative reprting f bth lw and high grades and/r widths shuld be practiced t avid misleading reprting f Explratin Results. Other explratin data, if meaningful and material, shuld be reprted including (but nt limited t): gelgical bservatins; gephysical survey results; gechemical survey results; bulk samples size and methd f treatment; metallurgical test results; bulk density, grundwater, getechnical and rck characteristics; ptential deleterius r cntaminating substances. The nature and scale f planned further wrk (eg tests fr lateral extensins r depth extensins r large-scale step-ut drilling). Diagrams clearly highlighting the areas f pssible extensins, including the main gelgical interpretatins and future drilling areas, prvided this infrmatin is nt cmmercially sensitive. All explratin results frm the current drilling prgram that relate t the Awak Mas Highwall eastern extensin have been reprted. Metallurgical testwrk fr the Awak Mass Gld Prject by Minnv (2017) has indicated imprved gld recveries f 92%-98% based n Whle f Ore ( WOL ) leaching n samples cmpsited frm nsite drill cre. Full details n the WOL testwrk been reprted in the fllwing ASX release; Awak Mas Gld DFS Optimisatin Metallurgical Breakthrugh, dated 10 Octber The is an active grwth prject with additinal areas identified fr infill (25m x 25m) and extensinal drilling, including targets at depth and utside f the current mineral resurce limits. Drilling has fcussed n upgrading the majrity f the current Inferred Mineral Resurces t the Indicated categry, as well as grwth f the Mineral Resurce utside f the currently delineated mineralised dmains. Planned future drilling will cntinue t target extensins t the east, and at depth at Rante, in areas where the trend f mineralisatin is pen and untested by histrical drilling. The main bjective is grwth f the Mineral Resurce utside f the currently delineated mineralised dmains. All drill cllars frm the current drill prgram will be surveyed using DGPS r ttal statin EDM equipment. Further detailed cre re-lgging and develpment f a structural mdel will help prgress the current gelgical mdel and enable its use as a drill targeting tl bth fr resurce delineatin and definitin f new explratin targets within the CW. Nusantara Resurces Limited 13

21 An updated Awak Mas mineral resurce estimate will be cmpleted nce all assay, survey and lgging data frm the additinal Metallurgical testwrk hles and Phase 2 explratin drill prgram is finalised, the gelgical interpretatin refined and an updated gelgical mdel is available. Nusantara Resurces Limited 14

22 EXPLORATION RESULTS REPORTING CRITERIA Reprting Criteria: Intercepts reprted are intervals f Au >1g/t with intervals f <1g/t Au up t 3m included. Where n individual intercepts >1 g/t exist, the intercepts reprted are intervals f Au >0.1g/t with intervals f <0.1g/t Au up t 3m included. Dwnhle and estimated true thickness reprted t ne decimal place. Au and Ag grades reprted t tw significant figures. Samples are generally frm diamnd cre drilling which is HQ diameter. Sme intercepts may be f larger r smaller than HQ due t drilling lgistics. Cre is phtgraphed and lgged by the gelgy team befre being cut in half. Half cre samples are prepared fr assay and the ther half is retained in the cre farm fr future reference. Each assay batch is submitted with duplicates and standards t mnitr labratry quality. Samples analysed fr gld using the fire assay (FAA40) technique and analysis fr silver multi-acid digest with AAS finish (GAI02) technique Nusantara Resurces Limited 15

23 APPENDIX 1 Explratin Drill Hle Details Hle ID Hle Type Easting UTM (m) Nrthing UTM (m) RANTE - HIGHWALL EASTERN EXTENSION Elevatin (m) Ttal Depth (m) Azimuth (Mag) Dip Frm (m) T (m) Interval (m) HWD001 DDH 180,225 9,627,368 1, Au g/t Ag g/t Including Including Including Including HWD002 DDH 180,524 9,627,395 1, Including Including Including Including na Nusantara Resurces Limited 16

24 Hle ID Hle Type Easting UTM (m) Nrthing UTM (m) Elevatin (m) Ttal Depth (m) Azimuth (Mag) Dip Frm (m) T (m) Interval (m) RTD023 DDH 180,225 9,627,368 1, Au g/t Ag g/t Including Including HWD003 DDH 180,500 9,627, Assays Pending HWD004 DDH 180,522 9,627, Assays Pending HWD005 DDH 180,475 9,627, Assays Pending Nusantara Resurces Limited 17

25 8 March 2018 Abut Nusantara Resurces Nusantara is an ASX-listed gld develpment cmpany with its flagship prject cmprising the 2.0 millinunce lcated in Sulawesi, Indnesia. Discvered in 1988, the Prject has ver 135 km f drilling cmpleted in ver 1,100 hles. The Prject is currently 100%-wned thrugh a 7th Generatin Cntract f Wrk ( CW ) with the Indnesian Gvernment. Nusantara s develpment strategy is fr cnstructin f a large-scale, lw strip rati pen pit peratin with re t be prcessed by Whle-f-Ore CIL leach. Envirnmental apprval has already been received fr the Prject, which is favurably lcated in nn-frestry land clse t established rads, prts and grid pwer, enabling the Prject t quickly advance twards develpment upn cmpletin f the DFS by mid Nusantara s secnd strategy is t grw the resurce base and supprt a mining peratin beynd the initial targeted life f 10 years. Multiple drill-ready targets have already been utlined extending frm the three main depsits and in ther areas f the 140km2 CW. Website: LinkedIn:

26 8 March 2018 Cmpetent Persns Statement The infrmatin in this annuncement that relates t the explratin results and Mineral Resurces f Nusantara Resurces is summarised frm publicly available reprts as released t the ASX f the respective cmpanies. The results are duly referenced in the text f this reprt and the surce dcuments nted abve. Explratin and Resurce Targets Any discussin in relatin t the ptential quantity and grade f Explratin Targets is nly cnceptual in nature. While Nusantara Resurces may reprt additinal JORC cmpliant resurces fr the, there has been insufficient explratin t define mineral resurces in additin t the current JORC cmpliant Mineral Resurce inventry and it is uncertain if further explratin will result in the determinatin f additinal JORC cmpliant Mineral Resurces. Explratin Results The infrmatin in this reprt which relates t Explratin Results is based n, and fairly represents, infrmatin cmpiled by Mr Clin McMillan, (BSc) fr Nusantara Resurces. Mr McMillan is an emplyee f Nusantara Resurces and is a Member f the Australian Institute f Mining and Metallurgy (AusIMM N: ). Mr McMillan has sufficient experience that is relevant t the style f mineralisatin and type f depsit under cnsideratin and t the activity being undertaken t qualify as a Cmpetent Persn as defined in the 2012 Editin f the Australasian Cde fr Reprting f Explratin Results, Mineral Resurces and Ore Reserves. Mr McMillan cnsents t the inclusin in the reprt f the matters based n this infrmatin in the frm and cntext in which it appears. Mineral Resurces The infrmatin in this reprt that relates t the Mineral Resurce Estimatin fr the is based n and fairly represents infrmatin cmpiled by Mr Adrian Shepherd, Senir Gelgist, (BSc), MAusIMM CP(Ge), fr Cube Cnsulting Pty Ltd. Mr Shepherd is an emplyee f Cube Cnsulting Pty Ltd and is a Chartered Prfessinal gelgist and a current Member f the Australian Institute f Mining and Metallurgy (AusIMM N: ). Mr Shepherd has sufficient experience that is relevant t the style f mineralisatin and type f depsit under cnsideratin and t the activity being undertaken t qualify as Cmpetent Persn as defined in the 2012 Editin f the Australasian Cde fr Reprting f Explratin Results, Mineral Resurces and Ore Reserves. Mr Shepherd cnsents t the inclusin in the reprt f the matters based n this infrmatin in the frm and cntext in which it appears. New Infrmatin r Data Nusantara Resurces cnfirms that it is nt aware f any new infrmatin r data that materially affects the infrmatin included in the riginal market annuncements and, in the case f estimates f Mineral Resurces and Ore Reserves, that all material assumptins and technical parameters underpinning the estimates in the relevant market annuncement cntinue t apply and have nt materially changed. The Cmpany cnfirms that the frm and cntext in which the Cmpetent Persn s findings are presented have nt materially changed frm the riginal market annuncement.

For personal use only

For personal use only COPPER MOUNTAIN ANNOUNCES POSITIVE DRILL RESULTS AT NEW INGERBELLE Vancuver, British Clumbia July 23, 2018 Cpper Muntain Mining Crpratin (TSX: CMMC ASX:C6C) (the Cmpany r Cpper Muntain ) is pleased t annunce

More information

MAJOR 40,000m GOLD EXPLORATION DRILLING PROGRAM COMMENCES

MAJOR 40,000m GOLD EXPLORATION DRILLING PROGRAM COMMENCES 2 Nvember 2016 MAJOR 40,000m GOLD EXPLORATION DRILLING PROGRAM COMMENCES Highlights A majr explratin drilling prgram has cmmenced n the Tampia Gld Prject t scpe the extent f the knwn gld resurce thrugh

More information

SIGNIFICANT GOLD RESULTS FROM BARLEE

SIGNIFICANT GOLD RESULTS FROM BARLEE A Level 2, 46 Ord Street West Perth WA 6005 P 08 9476 9200 F 08 9476 9099 E admin@beacnminerals.cm ASX ANNOUNCEMENT 20 March 2007 The Manager Cmpany Annuncements Office Australian Stck Exchange Limited

More information

FIRST NIFTY STEP-OUT HOLE SHOWS POTENTIAL 1KM EXTENSION OF ORE SYSTEM

FIRST NIFTY STEP-OUT HOLE SHOWS POTENTIAL 1KM EXTENSION OF ORE SYSTEM ASX RELEASE 9 AUGUST 2017 FIRST NIFTY STEP-OUT HOLE SHOWS POTENTIAL 1KM EXTENSION OF ORE SYSTEM Metals X Limited (Metals X r the Cmpany) is pleased t advise that its first step-ut drill hle 1km dwn plunge

More information

For personal use only

For personal use only 24 June 2013 HIGH GRADE COPPER RESULTS AT THE LONGONJO PROJECT Crprate Directry Bard f Directrs: Gabriel Chiappini Nn- Executive Chairman Highlights Surface sampling returns extensive high grade cpper

More information

FURTHER SIGNIFICANT PHOSPHATE INTERSECTIONS FROM SURFACE AT JOCA TAVARES PROJECT IN SOUTHERN BRAZIL

FURTHER SIGNIFICANT PHOSPHATE INTERSECTIONS FROM SURFACE AT JOCA TAVARES PROJECT IN SOUTHERN BRAZIL ASX RELEASE ASX: AGR 5 th August 2013 FURTHER SIGNIFICANT PHOSPHATE INTERSECTIONS FROM SURFACE AT JOCA TAVARES PROJECT IN SOUTHERN BRAZIL Summary Previusly reprted auger assay results f up t 14.7m grading

More information

Drill Core Assay Results to 5m of g/t Gold and Further Drilling Planned

Drill Core Assay Results to 5m of g/t Gold and Further Drilling Planned ADDRESS PHONE EMAIL Office J, Level 2, 1139 Hay St. +61 8 9486 4036 pmcneil@frntierresurces.cm.au West Perth, WA, 6005, Australia ABN WEBSITE 96 095 684 389 www.frntierresurces.cm.au ASX Limited Market

More information

QUARTERLY ACTIVITIES REPORT. For the quarter ended 30 June 2015

QUARTERLY ACTIVITIES REPORT. For the quarter ended 30 June 2015 HIGHLIGHTS Masn Valley Cpper Prject QUARTERLY ACTIVITIES REPORT ASX ANNOUNCEMENT 30 July 2015 ASX: MBK Fr the quarter ended 30 June 2015 Large, untested cpper system recgnised and centered n histric Bluestne

More information

MEDIA / ASX RELEASE JORC TABLE 1 ANNEXURE - REVISED. Tuesday 22 April 2014

MEDIA / ASX RELEASE JORC TABLE 1 ANNEXURE - REVISED. Tuesday 22 April 2014 MEDIA / ASX RELEASE Tuesday 22 April 2014 JORC TABLE 1 ANNEXURE - REVISED Regal Resources Limited ( Regal or the Company ) (ASX:RER) releases a revised JORC Table 1 Annexure which relates to the announcement

More information

HIGHFIELD RESOURCES DRILL HOLE LIKELY TO INCREASE RESOURCE SIZE AND LIFE OF MINE AT MUGA PROJECT

HIGHFIELD RESOURCES DRILL HOLE LIKELY TO INCREASE RESOURCE SIZE AND LIFE OF MINE AT MUGA PROJECT ASX Release 18 December 2015 HIGHFIELD RESOURCES DRILL HOLE LIKELY TO INCREASE RESOURCE SIZE AND LIFE OF MINE AT MUGA PROJECT Highlights Getechnical drill hle J15-02 intersected 31 metres f ptash mineralisatin

More information

ODIN METALS EXECUTES BINDING OPTION AGREEMENT WITH FIRST QUANTUM MINERALS

ODIN METALS EXECUTES BINDING OPTION AGREEMENT WITH FIRST QUANTUM MINERALS ASX Annuncement Wednesday, 7 February 2018 Fast Facts ASX: ODM Shares n Issue: 138.7M Cash (as at 31 Dec): $2.1m ODIN METALS EXECUTES BINDING OPTION AGREEMENT WITH FIRST QUANTUM MINERALS Bard f Directrs

More information

DEFENSE OCCUPATIONAL AND ENVIRONMENTAL HEALTH READINESS SYSTEM (DOEHRS) ENVIRONMENTAL HEALTH SAMPLING ELECTRONIC DATA DELIVERABLE (EDD) GUIDE

DEFENSE OCCUPATIONAL AND ENVIRONMENTAL HEALTH READINESS SYSTEM (DOEHRS) ENVIRONMENTAL HEALTH SAMPLING ELECTRONIC DATA DELIVERABLE (EDD) GUIDE DEFENSE OCCUPATIOL AND ENVIRONMENTAL HEALTH READINESS SYSTEM (DOEHRS) ENVIRONMENTAL HEALTH SAMPLING ELECTRONIC DATA DELIVERABLE (EDD) GUIDE 20 JUNE 2017 V1.0 i TABLE OF CONTENTS 1 INTRODUCTION... 1 2 CONCEPT

More information

FURTHER HIGH-GRADE ASSAY RESULTS CONTINUE TO EXTEND MINERALIZATION AT THE PIEDMONT LITHIUM PROJECT

FURTHER HIGH-GRADE ASSAY RESULTS CONTINUE TO EXTEND MINERALIZATION AT THE PIEDMONT LITHIUM PROJECT ASX RELEASE Nvember 29, 2017 ASX:PLL; OTC-Nasdaq:PLLLY FURTHER HIGH-GRADE ASSAY RESULTS CONTINUE TO EXTEND MINERALIZATION AT THE PIEDMONT LITHIUM PROJECT Assay results frm a further 26 drill hles f the

More information

JORC Code, 2012 Edition Table 1

JORC Code, 2012 Edition Table 1 JORC Code, 2012 Edition Table 1 Section 1 Sampling Techniques and Data (Criteria in this section apply to all succeeding sections.) Sampling techniques Drilling techniques Drill sample recovery Logging

More information

MARKET UPDATE: SIGNIFICANT HIGH-GRADE INTERCEPTS FROM RECENT UNDERGROUND AND SURFACE DRILLING

MARKET UPDATE: SIGNIFICANT HIGH-GRADE INTERCEPTS FROM RECENT UNDERGROUND AND SURFACE DRILLING ASX Release 16 th February 2010 MARKET UPDATE: SIGNIFICANT HIGH-GRADE INTERCEPTS FROM RECENT UNDERGROUND AND SURFACE DRILLING EXCELLENT START TO QUARTER WITH APPROXIMATELY 14,500 OUNCES PRODUCED TO-DATE

More information

For personal use only

For personal use only Crprate Details Ordinary Shares: 780,917,069 Market Capitalisatin: ~$150 millin Cash and bullin at 30 June 2017: ~$27.7 millin Debt: NIL ASX Cde: MOY Bard f Directrs Greg Bittar Nn-Executive Chairman Michael

More information

Prospective OIIP volumes in near field exploration prospects at Cliff Head

Prospective OIIP volumes in near field exploration prospects at Cliff Head ASX Annuncement 10 July 2018 ASX:TEG Prspective OIIP vlumes in near field explratin prspects at Cliff Head HIGHLIGHTS Triangle s static mdel includes seven prspective targets acrss fur near field explratin

More information

High grade gold intersected at Lucky Strike

High grade gold intersected at Lucky Strike L efry ASX Annuncement LEFROY EXPLORATION LIMITED A Western Australian Fcused Gld Explrer ASX Cde: LEX Shares n Issue: 64.8m Current Share Price: 13c Market Capitalisatin: $8.4m Bard f Directrs Chairman

More information

For personal use only

For personal use only ASX Media Release 4 Octber 2017 Springfield Explratin Update Drill testing f new target areas during December Quarter Highlights Springfield Jint Venture explratin budget apprved fr the three-mnth perid

More information

JORC Code, 2012 Edition Table 1 Report of Exploration Results for Waihi Operations Section 1 Sampling Techniques and Data

JORC Code, 2012 Edition Table 1 Report of Exploration Results for Waihi Operations Section 1 Sampling Techniques and Data JORC Cde, 2012 Editin Table 1 Reprt f Explratin Results fr Waihi Operatins Sectin 1 Sampling Techniques Data (Criteria in this sectin apply t all succeeding sectins.) Criteria Sampling techniques Drilling

More information

Awak Mas Resource Expansion Drilling Update

Awak Mas Resource Expansion Drilling Update 17 October 2017 Awak Mas Resource Expansion Drilling Update Encouraging initial results of targeted drill program to validate Exploration Target of 0.3 Moz to 0.5 Moz, in addition to the previously published

More information

Significant Cu-Au Discovery at Munarra Gully

Significant Cu-Au Discovery at Munarra Gully 30 th August 2018 Significant Cu-Au Discvery at Munarra Gully Munarra Gully - M51-0122 White Rse Prspect Cu-Au Discvery Significant disseminated sulphide mineralisatin in mafic intrusive rcks at the White

More information

EXPLORATION UPDATE CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS

EXPLORATION UPDATE CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS EXPLORATION UPDATE CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS 18 June 2015 1 CHANNEL SAMPLING AT HORN ISLAND CONFIRMS PREVIOUS HIGH GRADE RESULTS Rock channel sampling and rock

More information

INFERRED RESOURCE AT THE STORMONT DEPOSIT (TASMANIA) ESTIMATED TO CONTAIN 13,430 OUNCES OF GOLD GRADING 4.57 GRAMS/TONNE,

INFERRED RESOURCE AT THE STORMONT DEPOSIT (TASMANIA) ESTIMATED TO CONTAIN 13,430 OUNCES OF GOLD GRADING 4.57 GRAMS/TONNE, ADDRESS PHONE EMAIL PO Bx 35 +61 (8) 9295 0388 inf@frntierresurces.cm.au Nrth Perth FAX WEBSITE WA 6906 Australia +61 (8) 9295 3480 www.frntierresurces.cm.au ABN 96 095 684 389 ASX : FNT 29th July 2009

More information

Narembeen Drilling Result. Assay results have been received from the diamond drilling program at Narembeen.

Narembeen Drilling Result. Assay results have been received from the diamond drilling program at Narembeen. Date: 31 July 2014 Narembeen Drilling Result Highlights Assay results have been received from the diamond drilling program at Narembeen. Assay Results International Resources Ltd () is pleased to announce

More information

Mt Carrington Gold Silver Project Exploration Update

Mt Carrington Gold Silver Project Exploration Update ASX and Media Release: 4 May 2012 ASX Cde: WRM Mt Carringtn Gld Silver Prject Explratin Update New Near Mine Silver Discvery at Mzart Prspect Drill results f 33m @ 97g/t silver, including 10m @ 248g/t

More information

HIGH GRADE DRILL RESULTS FROM SALU BULO

HIGH GRADE DRILL RESULTS FROM SALU BULO HIGH GRADE DRILL RESULTS FROM SALU BULO 16 January 2018 Significant results from Salu Bulo drilling increase confidence in geological model and extend mineralisation beyond Mineral Resource boundaries.

More information

Western Queen Gold Project Drilling Results

Western Queen Gold Project Drilling Results Exploration Office Level 3, 100 Pirie Street ADELAIDE SA 5000 ABN: 96 110 336 733 Tel: +61 8 8232 8320 Fax: +61 8 8232 8811 www.monaxmining.com.au 4 January 2018 Western Queen Gold Project Drilling Results

More information

For personal use only

For personal use only ACN 092 471 513 27 December 2017 ASX Release HIGH GRADE OPEN-PIT GOLD CONFIRMED AT EMPIRE S PENNY S FIND GOLD MINE Further in-pit high grade gold has been confirmed by gold miner, Empire Resources Ltd

More information

Recently Completed Bulago Exploration Program a Resounding Success

Recently Completed Bulago Exploration Program a Resounding Success CONTACTS PHONE EMAIL PO Bx 52 +61 (08) 9295 0388 infffrntierresurces.cm.au West Perth FAX WEBSITE WA 6872 Australia +61 (08) 9295 3480 www.frntierresurces.cm.au ABN: 96 095 684 389 ASX : FNT ASX Limited

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 15th March 2017 ASSAY RESULTS CONFIRM NICKEL-COPPER-COBALT SULPHIDE MINERALISATION AT FRASER LAKE COMPLEX Drill assay results frm Fraser Lake Cmplex reveal mine-grade Ni-Cu-C mineralisatin

More information

For personal use only

For personal use only ASX Annuncement 24 March 2017 Mre impressive zinc results in final batch f assays t be included in Grn Definitive Feasibility Study Latest drilling includes hits f up t 17% Zn+Pb with wrk well underway

More information

For personal use only

For personal use only 04 April 2018 SIGNIFICANT RESULTS FROM AWAK MAS EXTENSION DRILLING Awak Mas Salu Bulo Exploration Model Validated Results from the final three eastern extension drill holes confirm significant extension

More information

Exploration Update. RC and Diamond Drilling Continues to Deliver Excellent Results. 29 th June 2018

Exploration Update. RC and Diamond Drilling Continues to Deliver Excellent Results. 29 th June 2018 ASX Cde: KIN 29 th June 2018 Management Andrew Muncktn Chief Executive Officer Glenn Graysn Explratin Manager Bard f Directrs Explratin Update RC and Diamnd Drilling Cntinues t Deliver Excellent Results

More information

Technical Bulletin. Generation Interconnection Procedures. Revisions to Cluster 4, Phase 1 Study Methodology

Technical Bulletin. Generation Interconnection Procedures. Revisions to Cluster 4, Phase 1 Study Methodology Technical Bulletin Generatin Intercnnectin Prcedures Revisins t Cluster 4, Phase 1 Study Methdlgy Release Date: Octber 20, 2011 (Finalizatin f the Draft Technical Bulletin released n September 19, 2011)

More information

NEWS RELEASE Mineral Resource Update for Block 14 Gold Project, High-Grade Underground Potential, and Positive Results on Liseiwi Target

NEWS RELEASE Mineral Resource Update for Block 14 Gold Project, High-Grade Underground Potential, and Positive Results on Liseiwi Target Orca Gld Inc. 2000-885 West Gergia St. Vancuver, B.C., V6C 3E8, Canada Tel: +1 604 689 7842 Fax: +1 604 689 4250 NEWS RELEASE Mineral Resurce Update fr Blck 14 Gld Prject, High-Grade Undergrund Ptential,

More information

For personal use only

For personal use only Tanga Resources Limited Ground Floor 63 Hay Street Subiaco WA 6008 t: +61 (8) 9 381 5686 ASX Code : TRL ASX Announcement 03 March 2016 Singida Project Update Winston Prospect Results of Detailed Ground

More information

Rio Tinto s Ore Reserves and Mineral Resources are set out in full in its 2016 Annual report.

Rio Tinto s Ore Reserves and Mineral Resources are set out in full in its 2016 Annual report. Ntice t ASX Increase t Jadar Prject Mineral Resurces 2 March 2017 Included in Ri Tint s annual Mineral Resurces and Ore Reserves tables, released t the market tday as part f its 2016 Annual reprt, are

More information

For personal use only

For personal use only ASX RELEASE 18 December 2014 ASX Code: CAE High Gold Results from Recent Stream Sediment Sampling Program Stream sediment sampling identified 3 catchments of highly anomalous gold results including a new

More information

Applied Structural Geology in Exploration and Mining: A Practical Workshop

Applied Structural Geology in Exploration and Mining: A Practical Workshop 1 Applied Structural Gelgy in Explratin and Mining: A Practical Wrkshp Overview Presenter: Lcatin: SRK Kazakhstan SRK Kazakhstan SRK Cnsulting (Kazakhstan) Ltd 2015. All rights Wrkshp Intrductin 2 Technical

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 31 July 2018 For personal use only ASX: ASN, ASNOB Anson Application to Drill for Lithium Brine Approved Highlights: Notice of Intent (NOI) to drill Long Canyon A1 site approved by BLM

More information

130% RESOURCE UPGRADE AT TITIRIBI COAL PROJECT

130% RESOURCE UPGRADE AT TITIRIBI COAL PROJECT Perth Office: Asct Resurces Ltd 512 Hay Street Subiac WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: inf@asctresurces.cm W: www.asctresurcs.cm ASX ANNOUNCEMENT 24 January 2014 The Manager Cmpany Annuncements

More information

Highly Promising Extensional Results from Awak Mas Drilling Program

Highly Promising Extensional Results from Awak Mas Drilling Program 14 November 2017 Highly Promising Extensional Results from Awak Mas Drilling Program Assay results from a further 11 drill holes support tenor and extent of mineralisation both within and beyond the existing

More information

For personal use only

For personal use only HIGH IMPACT EXPLORATION DRILLING PROGRAM UNDERWAY 20 December 2017 Mine Corridor exploration drilling program commences targeting extensions to the Awak Mas and Salu Bulo deposits Final assay results from

More information

For personal use only

For personal use only 2 March 2016 Company Announcements Office Australian Securities Exchange 10 th Floor, 20 Bond Street SYDNEY NSW 2000 DRILLING EXPANDS AREA OF KNOWN HEAVY MINERAL SAND CONCENTRATION MANNAR ISLAND, REPUBLIC

More information

For personal use only

For personal use only Miyabi Gold Project Update Rift Valley Resources Limited ( Rift Valley or Company ) (ASX: RVY) is pleased to announce first assay results from current drilling at its 100% owned Miyabi Gold Project in

More information

Web-based GIS Systems for Radionuclides Monitoring. Dr. Todd Pierce Locus Technologies

Web-based GIS Systems for Radionuclides Monitoring. Dr. Todd Pierce Locus Technologies Web-based GIS Systems fr Radinuclides Mnitring Dr. Tdd Pierce Lcus Technlgies Lcus Technlgies 2014 Overview What is the prblem? Nuclear pwer plant peratrs need t mnitr radinuclides t safeguard the envirnment

More information

For personal use only

For personal use only 8 June 2017 Company Announcements Office ASX Limited Exchange Centre Level 4, 20 Bridge Street SYDNEY NSW 2000 HIGH GRADE GOLD ASSAYS, PANAMA HAT EL8024 Carbine Tungsten Limited (ASX: CNQ, Carbine or the

More information

Nye County Groundwater Evaluation Drilling Program. Levi Kryder Nye County NWRPO May 5, 2011

Nye County Groundwater Evaluation Drilling Program. Levi Kryder Nye County NWRPO May 5, 2011 Nye Cunty Grundwater Evaluatin Drilling Prgram Levi Kryder Nye Cunty NWRPO May 5, 2011 Outline Grundwater Evaluatin prgram Drilling prgram bjectives Brehle lcatins Data cllectin Results by gegraphic lcatin

More information

For personal use only

For personal use only ACN 092 471 513 6 November 2017 ASX Release HIGH GRADE GOLD DEFINED IN TARGETED UNDERGROUND EXTENSION OF NEW PENNY S FIND OPEN PIT MINE High grade gold mineralisation confirmed by assays has been outlined

More information

High grade cobalt confirms Polinga Project as a significant new discovery

High grade cobalt confirms Polinga Project as a significant new discovery ABN 64 123 993 233 ASX Announcement 22 February ABN 64 123 2017 993 233 High grade cobalt confirms Polinga Project as a significant new discovery Highlights First drill holes assayed at Polinga Project

More information

SARAMA RESOURCES COMPLETES SUCCESSFUL INITIAL SCOUT DRILL PROGRAM IN WESTERN LIBERIA

SARAMA RESOURCES COMPLETES SUCCESSFUL INITIAL SCOUT DRILL PROGRAM IN WESTERN LIBERIA NEWS RELEASE SEPTEMBER 8, 2014 SARAMA RESOURCES COMPLETES SUCCESSFUL INITIAL SCOUT DRILL PROGRAM IN WESTERN LIBERIA VANCOUVER, CANADA. Sarama Resurces Ltd. ( Sarama r the Cmpany ) is pleased t annunce

More information

Land Information New Zealand Topographic Strategy DRAFT (for discussion)

Land Information New Zealand Topographic Strategy DRAFT (for discussion) Land Infrmatin New Zealand Tpgraphic Strategy DRAFT (fr discussin) Natinal Tpgraphic Office Intrductin The Land Infrmatin New Zealand Tpgraphic Strategy will prvide directin fr the cllectin and maintenance

More information

Comprehensive Exam Guidelines Department of Chemical and Biomolecular Engineering, Ohio University

Comprehensive Exam Guidelines Department of Chemical and Biomolecular Engineering, Ohio University Cmprehensive Exam Guidelines Department f Chemical and Bimlecular Engineering, Ohi University Purpse In the Cmprehensive Exam, the student prepares an ral and a written research prpsal. The Cmprehensive

More information

ASX Release. Exploration Commences at High Grade Cobalt Projects

ASX Release. Exploration Commences at High Grade Cobalt Projects ASX Release Exploration Commences at High Grade Cobalt Projects Commenting on the completion of the stakeholder engagement activities and commencement of exploration, Managing Director, Mr David Riekie

More information

EXPLORATIONINUPDATE. 4 July 2011 FURTHER SIGNIFICANT COAL INTERSECTIONS ASX: GUF FURTHER SIGNIFICANT INTERSECTIONS ON SOUTH GOBI COAL PROJECT

EXPLORATIONINUPDATE. 4 July 2011 FURTHER SIGNIFICANT COAL INTERSECTIONS ASX: GUF FURTHER SIGNIFICANT INTERSECTIONS ON SOUTH GOBI COAL PROJECT EXPLORATIONINUPDATE FURTHER SIGNIFICANT COAL INTERSECTIONS MONGOLIA 4 July 2011 ASX: GUF SHARE INFORMATION Issued Shares: 413m Listed Optins: N/A Unlisted Optins: N/A BOARD OF DIRECTORS Chairman: C. Ransley

More information

African Barrick Gold plc (the Company or ABG ) Nyanzaga Resource Continues to Grow. Total Resource now 3.75Moz Au Indicated and 0.

African Barrick Gold plc (the Company or ABG ) Nyanzaga Resource Continues to Grow. Total Resource now 3.75Moz Au Indicated and 0. 3 rd April 2012 African Barrick Gld plc (the Cmpany r ABG ) Nyanzaga Resurce Cntinues t Grw Ttal Resurce nw 3.75Mz Au Indicated and 0.85Mz Au Inferred ABG is pleased t annunce a further uplift t the previusly

More information

For personal use only

For personal use only 9 November 2016 Mineralisation Confirmed at Inca s Zn-Ag-Pb Cerro Rayas Project PROGRAM HIGHLIGHTS Inca completes first mapping and sampling program at its Zn-Ag-Pb Cerro Rayas Project Vilcapuquio and

More information

Fission Targets R600W, Triple R and High-Priority Regional Drilling with 35 Hole Program

Fission Targets R600W, Triple R and High-Priority Regional Drilling with 35 Hole Program Suite 700 1620 Dicksn Ave. Kelwna, BC V1Y 9Y2 rich@fissinuranium.cm www.fissinuranium.cm TSX SYMBOL: FCU OTCQX SYMBOL: FCUUF January 21, 2016 FRANKFURT SYMBOL: 2FU Fissin Targets R600W, Triple R and High-Pririty

More information

Principles of Carbonate Reservoirs

Principles of Carbonate Reservoirs Online In-Service Training and Supprt Prgram Hands-n technical presentatins and exercises, tls, techniques, wrkflws, vide recrdings, and case studies Principles f Carbnate Reservirs Understand the micr

More information

INTERNAL AUDITING PROCEDURE

INTERNAL AUDITING PROCEDURE Yur Cmpany Name INTERNAL AUDITING PROCEDURE Originatin Date: XXXX Dcument Identifier: Date: Prject: Dcument Status: Dcument Link: Internal Auditing Prcedure Latest Revisin Date Custmer, Unique ID, Part

More information

For personal use only

For personal use only Exploration Office Level 3, 100 Pirie Street ADELAIDE SA 5000 ABN: 96 110 336 733 Tel: +61 8 8232 8320 Fax: +61 8 8232 8811 www.monaxmining.com.au 11 January 2017 Further Significant Sampling Results at

More information

Developing the +1.0Moz Pilbara Gold Project. Diamond Drilling confirms Thick High Grade Gold Zones. Highlights

Developing the +1.0Moz Pilbara Gold Project. Diamond Drilling confirms Thick High Grade Gold Zones. Highlights Developing the +1.0Moz Pilbara Gold Project ASX Announcement 22 August 2017 ASX Code DEG FRA Code WKN 633879 ABN 65 094 206 292 Diamond Drilling confirms Thick High Grade Gold Zones Highlights DIRECTORS

More information

REGULUS EXTENDS HIGH GRADE COPPER-GOLD MINERALIZATION TO THE NORTH AT THE ANTAKORI PROJECT, PERU

REGULUS EXTENDS HIGH GRADE COPPER-GOLD MINERALIZATION TO THE NORTH AT THE ANTAKORI PROJECT, PERU REGULUS EXTENDS HIGH GRADE COPPER-GOLD MINERALIZATION TO THE NORTH AT THE ANTAKORI PROJECT, PERU 473.2 metres with 1.16 Cu, 0.21 Au 8.4 Ag (1.39 CuEq) including 88.0 metres with 1.50 Cu, 0.38 Au 19.3 Ag

More information

For personal use only

For personal use only ASX ANNOUNCEMENT Date: 6 January 2015 Exploration Programme Update Highlights Initial geochemical soil sampling programmes completed Elevated copper and nickel anomalies defined on interpreted geological

More information

For personal use only

For personal use only ASX RELEASE 25 August 2017 ASX Code: CAE FURTHER EXTENSIONS OF GOLD MINERALISATION AT PICCADILLY New results confirm gold grades extending further to the west. Identification of further significant widths

More information

COMPLETION OF INITIAL COPPER/GOLD DRILLING PROGRAM AT MILLENIUM LARGE MINERAL SYSTEM IDENTIFIED

COMPLETION OF INITIAL COPPER/GOLD DRILLING PROGRAM AT MILLENIUM LARGE MINERAL SYSTEM IDENTIFIED Chinalco Yunnan Copper Resources Limited ABN 29 070 859 522 Level 5, 10 Market Street Brisbane QLD 4000 GPO Box 216 Brisbane QLD 4001 Tel: +61 7 3212 6204 Fax: +61 7 3212 6250 ASX Release 4 December 2013

More information

Bulago Porphyry Copper - Gold Hole GCZ002 Drilling Information

Bulago Porphyry Copper - Gold Hole GCZ002 Drilling Information ADDRESS PHONE EMAIL Unit 5, Grund Flr +61 (8) 9486 4036 pmcneil@frntierresurces.cm.au 1 Centr Ave, Subiac ABN WEBSITE WA, 6005 Australia 96 095 684 389 www.frntierresurces.cm.au Market Annuncements Platfrm

More information

How do scientists measure trees? What is DBH?

How do scientists measure trees? What is DBH? Hw d scientists measure trees? What is DBH? Purpse Students develp an understanding f tree size and hw scientists measure trees. Students bserve and measure tree ckies and explre the relatinship between

More information

KHARMAGTAI JORC TABLE 1

KHARMAGTAI JORC TABLE 1 SECTION 1 - SAMPLING TECHNIQUES AND DATA (Criteria in this section apply to all succeeding sections). Sampling techniques Nature and quality of sampling. Include reference to measures taken to ensure sample

More information

Anson Successfully Samples Clastic Zone 31 Brine

Anson Successfully Samples Clastic Zone 31 Brine 30 January 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Successfully Samples Clastic Zone 31 Brine Highlights: Brine successfully extracted from Clastic Zone 31 during Gold Bar Unit 2 drilling Samples collected

More information

Spargoville Resource Definition Drilling Delivers Further High Grade Gold Results

Spargoville Resource Definition Drilling Delivers Further High Grade Gold Results ASX Announcement 25 August 2016 Spargoville Resource Definition Drilling Delivers Further High Grade Gold Results HIGHLIGHTS Significant, shallow gold intersections reported in several holes including

More information

THERMAL TEST LEVELS & DURATIONS

THERMAL TEST LEVELS & DURATIONS PREFERRED RELIABILITY PAGE 1 OF 7 PRACTICES PRACTICE NO. PT-TE-144 Practice: 1 Perfrm thermal dwell test n prtflight hardware ver the temperature range f +75 C/-2 C (applied at the thermal cntrl/munting

More information

Bootstrap Method > # Purpose: understand how bootstrap method works > obs=c(11.96, 5.03, 67.40, 16.07, 31.50, 7.73, 11.10, 22.38) > n=length(obs) >

Bootstrap Method > # Purpose: understand how bootstrap method works > obs=c(11.96, 5.03, 67.40, 16.07, 31.50, 7.73, 11.10, 22.38) > n=length(obs) > Btstrap Methd > # Purpse: understand hw btstrap methd wrks > bs=c(11.96, 5.03, 67.40, 16.07, 31.50, 7.73, 11.10, 22.38) > n=length(bs) > mean(bs) [1] 21.64625 > # estimate f lambda > lambda = 1/mean(bs);

More information

WRITING THE REPORT. Organizing the report. Title Page. Table of Contents

WRITING THE REPORT. Organizing the report. Title Page. Table of Contents WRITING THE REPORT Organizing the reprt Mst reprts shuld be rganized in the fllwing manner. Smetime there is a valid reasn t include extra chapters in within the bdy f the reprt. 1. Title page 2. Executive

More information

For personal use only

For personal use only 12 July 2018 ASX ANNOUNCEMENT ASX: ASN, ASNOB Anson Produces First LCE Product Highlights: First lithium carbonate product extracted from Cane Creek 32-1 brine LCE produced by precipitation process Test

More information

Verification of NIMs Baseline Data Reports and Methodology Reports

Verification of NIMs Baseline Data Reports and Methodology Reports hzkwekdd/^^/ke /ZdKZd 'EZ> >/Ddd/KE / D ' d h d^ dddd Verificatin f NIMs Baseline Data Reprts and Methdlgy Reprts & dd dddd d d /EdZKhd/KE d > Z d / d K d d ZK'E/d/KEK&sZ/&/Z^ d d e d d,sz/&/d/kewzk^^

More information

De Grey Mining Ltd. High Grade Zinc mineralisation defined at Tabba Tabba Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. High Grade Zinc mineralisation defined at Tabba Tabba Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX Announcement 12 September 2016 ASX Code DEG ABN 65 094 206 292 COMPANY DIRECTORS Simon Lill Executive Chairman Davide Bosio Non-executive Director Steve Morris Non-executive Director

More information

For personal use only

For personal use only 22 December 2016 Tyranna reports further consistent gold grades, strengthening Greenewood Prospect with Phase II drill program completed Highlights Consistent gold results strengthens geological model

More information

Anson Stakes Additional Claims at its Paradox Brine Project

Anson Stakes Additional Claims at its Paradox Brine Project 30 November 2017 ASX ANNOUNCEMENT ASX: ASN, ASNOB Highlights: Anson Stakes Additional Claims at its Paradox Brine Project 217 claims staked for an additional 1,756 hectares New claims only 120m south of

More information

Standard Title: Frequency Response and Frequency Bias Setting. Andrew Dressel Holly Hawkins Maureen Long Scott Miller

Standard Title: Frequency Response and Frequency Bias Setting. Andrew Dressel Holly Hawkins Maureen Long Scott Miller Template fr Quality Review f NERC Reliability Standard BAL-003-1 Frequency Respnse and Frequency Bias Setting Basic Infrmatin: Prject number: 2007-12 Standard number: BAL-003-1 Prject title: Frequency

More information

ADDITIONAL SHALLOW GOLD ZONES INTERSECTED IN DRILLING AT THE MASSIGUI PROJECT, MALI

ADDITIONAL SHALLOW GOLD ZONES INTERSECTED IN DRILLING AT THE MASSIGUI PROJECT, MALI Suite 9, 5 Centro Ave, Subiaco WA 6008 P.O. Box 457, West Perth, WA 6872, Australia Ph+61 8 9286 3045 Fax: +61 8 9226 2027 info@birimiangold.com ABN 11 113 931 105 23 December 2013 The Company Announcements

More information

, which yields. where z1. and z2

, which yields. where z1. and z2 The Gaussian r Nrmal PDF, Page 1 The Gaussian r Nrmal Prbability Density Functin Authr: Jhn M Cimbala, Penn State University Latest revisin: 11 September 13 The Gaussian r Nrmal Prbability Density Functin

More information

For personal use only

For personal use only ASX Announcement (ASX: MDS) Date: January 17 2014 High-Grade Copper Hits at Overlander North and South HIGHLIGHTS RC drilling at both Overlander North and Overlander South confirmed further high-grade

More information

Hypothesis Tests for One Population Mean

Hypothesis Tests for One Population Mean Hypthesis Tests fr One Ppulatin Mean Chapter 9 Ala Abdelbaki Objective Objective: T estimate the value f ne ppulatin mean Inferential statistics using statistics in rder t estimate parameters We will be

More information

Weathering. Title: Chemical and Mechanical Weathering. Grade Level: Subject/Content: Earth and Space Science

Weathering. Title: Chemical and Mechanical Weathering. Grade Level: Subject/Content: Earth and Space Science Weathering Title: Chemical and Mechanical Weathering Grade Level: 9-12 Subject/Cntent: Earth and Space Science Summary f Lessn: Students will test hw chemical and mechanical weathering can affect a rck

More information

HIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES

HIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES 22 February 2017 HIGH-GRADE LITHIUM CONFIRMED IN MINCOR S WIDGIEMOOLTHA PEGMATITES Initial results support interpretation of 4.5km long LCT corridor at Widgiemooltha Presence of lithium-rich pegmatites

More information

BRYAH BASIN DRILLING JORC UPDATE

BRYAH BASIN DRILLING JORC UPDATE ASX Announcement 16 August 2016 BRYAH BASIN DRILLING JORC UPDATE Further to the ASX announcement of 11 August 2016, RNI NL (ASX: RNI) provides the following JORC Code table on the diamond hole drilled

More information

For personal use only

For personal use only ASX ANNOUNCEMENT 20th November 207 WWW.NTMGOLD.COM.AU ASX: NTM ABN: 24 9 494 772 NTM INCREASES LEONORA TENURE WITH ACQUISITION OF EXPLORATION LICENCES Recent gold nugget discoveries support regional approach

More information

Subject description processes

Subject description processes Subject representatin 6.1.2. Subject descriptin prcesses Overview Fur majr prcesses r areas f practice fr representing subjects are classificatin, subject catalging, indexing, and abstracting. The prcesses

More information

Unit 1 Review. Vocabulary: Match the Definition on the left with the term on the right.

Unit 1 Review. Vocabulary: Match the Definition on the left with the term on the right. Name: KEY Unit 1 Review Vcabulary: Match the Definitin n the left with the term n the right. 1. A pssible explanatin fr an bservatin that can be tested. H 2. The same experiment is set up multiple times

More information

Extensions confirmed at Wingina and Amanda

Extensions confirmed at Wingina and Amanda ASX Announcement 08 March 2019 Extensions confirmed at Wingina and Amanda Extensions beyond existing resource model defined at both Wingina and Amanda Potential to expand resources with further drilling

More information

AGM PRESENTATION 22 nd MAY Exploration Opportunities in Tanzania: Why Aminex believes in the potential of the Nyuni and Ruvuma PSAs

AGM PRESENTATION 22 nd MAY Exploration Opportunities in Tanzania: Why Aminex believes in the potential of the Nyuni and Ruvuma PSAs AGM PRESENTATION 22 nd MAY 2013 Explratin Opprtunities in Tanzania: Why Aminex believes in the ptential f the Nyuni and Ruvuma PSAs Intrductin Aminex has been in Tanzania since 2002 when the East African

More information

For personal use only

For personal use only Global Geoscience NEWS RELEASE 26 May, 2014 ASX Code: GSC OXIDE GOLD-SILVER MINERALISATION FROM GLOBAL S FLAGSHIP TOKOP PROJECT (NEVADA, USA) CONFIRMED AS LEACHABLE Global Geoscience Ltd ABN 76 098 564

More information

Guide to Using the Rubric to Score the Klf4 PREBUILD Model for Science Olympiad National Competitions

Guide to Using the Rubric to Score the Klf4 PREBUILD Model for Science Olympiad National Competitions Guide t Using the Rubric t Scre the Klf4 PREBUILD Mdel fr Science Olympiad 2010-2011 Natinal Cmpetitins These instructins are t help the event supervisr and scring judges use the rubric develped by the

More information

High Grade Lithium Samples from Solonopole

High Grade Lithium Samples from Solonopole ASX/Media Release 2 October 2017 High Grade Lithium Samples from Solonopole Results returned from first pass mapping, rock chip, soil and grab sampling of the Solonopole Lithium Project, Brazil 10 small

More information

Significant Gold Anomaly Identified at 100% owned Davies Bore Gold Prospect

Significant Gold Anomaly Identified at 100% owned Davies Bore Gold Prospect ASX Announcement 7 April 2016 Significant Gold Anomaly Identified at 100% owned Davies Bore Gold Prospect HIGHLIGHTS 1km long significant gold anomaly identified 3km from Regis Resources Rosemont Mine

More information

For personal use only

For personal use only ION MINERALS INCREASES ASHBURTON PRESCENCE WITH OPTION OVER PROSPECTIVE COBALT GROUND Greenpower Energy Limited (ASX:GPP) is pleased to announce that its subsidiary, Ion Minerals Pty Ltd has signed an

More information

I. Analytical Potential and Field of a Uniform Rod. V E d. The definition of electric potential difference is

I. Analytical Potential and Field of a Uniform Rod. V E d. The definition of electric potential difference is Length L>>a,b,c Phys 232 Lab 4 Ch 17 Electric Ptential Difference Materials: whitebards & pens, cmputers with VPythn, pwer supply & cables, multimeter, crkbard, thumbtacks, individual prbes and jined prbes,

More information

Remaining assay results Tisová Co Au Cu Project Czech Republic

Remaining assay results Tisová Co Au Cu Project Czech Republic 8 January 2018 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Remaining assay results Tisová Co Au Cu Project Czech Republic Auroch Minerals Limited (Auroch