1 How fast can a falcon fly? DEVEX 9 th May 2012 Peter Brand

2 Overview Overview Timeline Appraisal Development Performance Potential Summary / Conclusions

3 Overview - Location Falcon Tern Kestrel Shetland Islands

4 Overview

5 Overview Tern North

6 Timeline 1979 Shell/Esso licensed the area (P296) Shell/Esso discovered Falcon with 210/25a-9 exploration well TAQA bought the Tern field TAQA bought the area containing Falcon Drill 210/25a-10 (explore H block) Drill 210/25a-10Z (appraise Falcon) Commence Run subsea completion development Complete project First oil

7 Timeline Regulatory Enablers Fallow acreage initiative? Field redetermination on economic grounds Possible to carve-out from the Tern PRT area IF Falcon had proved connected to Tern Small Fields Allowance

8 Appraisal Seismic section Well logs RFTs Faulting Appraisal plan Results

9 Appraisal - Seismic section SW Tern Main Field G Block H Block I Block Falcon NE Abercromby Kimmeridge Clay Heather Base Mid Ness Shale Cormorant 1 Paleosol Basement

10 Appraisal Well Logs TA05S1 210/25a-9 Upper Ness Lower Ness /Etive OWC 8500 ft TVDSS ODT 8105 ft TVDSS Plotted in TVD and hung on Base Mid-Ness Shale for thickness comparison

11 Appraisal - RFT data TA05S1 Jan94 Solid = measured Open = simulated Simulation model provides reasonably good match 25a-10z to depletion May10 data 25a-9 May00 Pinit E1 Dec97 P2 Jul01

12 Appraisal - Tern and Tern North faulting F-G and I-Falcon are major sealing faults, with Brent/Brent but no good res connection G-H and H-I faults are lesser faults, with minor good res juxtaposition towards their crests Juxtaposition caused by anticlinal flexure towards fault block crests F G H I Main Tern Field IOWC 8258 Internal faults can seal up to 1200psi ΔP on production G Block IOWC Initial oil fill - Partially sealing fault compartments filled down past their individual spill points fill and spill Partial sealing becomes evident during production Tern initial seal requirement is 120psi (1450 column, ΔP oil/water 0.08pis/ft) Tern North 220 column - seal requirement 18psi Falcon IOWC 8500

13 Appraisal - Plan Updip targets from old well with indications of oil in Upper Ness First branch to H block, upside location Second branch to NE of old well, with higher CoS, planned as keeper Fast Track Appraise while developing Avoids winter working Fast track procurement, based on delivery Significant pre-sanction commitments Approval cycle discussed with DECC Environmental Deliveries discussed with key suppliers

14 Appraisal - Results H-block well wet Falcon N well (210/25a-10Z) 23 shallow to prognosis 20 more net reservoir Slightly higher porosity so higher permeability 5 deeper OWC Falcon S Falcon N Plotted in TVD and hung on Base Mid-Ness Shale for thickness comparison

15 Development Modelling Schematic Development plan Lessons

16 Development - Modelling New seismic interpretation 2 new wells Structurally quite complex 79 faults Property modelling relatively simple 100m x 100m x 20 layers for simulation Primary purpose: Falcon development plan Secondary purposes: Kestrel and G-block development planning Falcon North Falcon South

17 Development - Modelling Oil in place: Falcon South 13 mmbbl Falcon North 18 mmbbl G Block H I Falcon Tern Main L Preliminary initialization of new reservoir model (oil saturation) Kestrel North

18 Development - Schematic Also considered: Tie-in at Kestrel SSIV (near Tern) New riser at Tern

19 Development - Key project risks, May 2010 Approvals schedule not under TAQA control Kestrel back-out estimation Cost growth due to high industry activity Schedule Drill rig availability for 2011 completion Tight schedule to first oil date (tree, controls, pipe, umbilical) Operability/Integrity Limitations of existing subsea umbilical for deploying chemicals for flow assurance Operability/integrity risks on existing Kestrel infrastructure, which had been in use since 2001 Additional risks Uncertainties on the initial flow rate and recoverable reserves After thorough analysis the cheapest route, via Kestrel, was selected

20 Development - Plan Approach Keep it simple Minimise impact on platform Minimise CAPEX Scope Complete well and run subsea xmas tree Install new production and gas lift pipelines and an umbilical

21 Development - Lessons Scope growth in platform modifications Late addition of Kestrel flexible riser replacement Obsolescence of Kestrel controls infrastructure identified late Subsea construction/installation required extra TAQA support Start-up was delayed by incomplete instrumentation commissioning Entire Appraisal-Development project under budget First oil < 1 month late compared to stretch target

22 Performance and forecasts Oil rate Water cut History match: pressure

23 bopd Performance oil rate Has exceeded expectations so far oil rate 'Low' case 'Base' case 'High' case Actual New forecast May-12 Nov-12 May-13 Nov-13 May-14 Nov-14 May-15 Nov-15 May-16 Nov-16 May-17 Nov-17

24 Performance water cut Is similar to predictions water cut 'Low' case 'Base' case 'High' case Actual New Forecast Jul-11 Jan-12 Jul-12 Jan-13 Jul-13 Jan-14 Jul-14 Jan-15 Jul-15 Jan-16 Jul-16 Jan-17 Jul-17

25 Pressure (psia) Performance - pressure Matched with additional aquifer strength and internal reservoir connectivity Well Falcon North Bottom Hole Pressures Model 1000 Actual Jul-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12

26 Potential Plan: Drill Abercromby prospect (next fault block north) Risk 1 fault seal Risk 2 migration Option: Drill Falcon 2 nd producer and/or injector Depending on performance Maintaining history matched model

27 Summary / Conclusions First oil schedule met (almost). On budget On reflection the schedule was very aggressive in a busy market This timeline would not be achievable today (longer regulatory timeframes, even tighter services markets) Better than expected performance (better reservoir) Encouraged to explore further Considering further development Key project risks: Approvals schedule not under TAQA control Kestrel back-out estimation Cost growth due to high industry activity Schedule Drill rig availability for 2011 completion Tight schedule to first oil date (tree, controls, pipe, umbilical) Operability/Integrity Limitations of existing subsea umbilical for deploying chemicals for flow assurance Operability/integrity risks on existing Kestrel infrastructure, which has been in use since 2001 Additional risks Uncertainties on the initial flow rate and recoverable reserves

28 Acknowledgements TAQA Bratani Ltd TAQA - project team ADIL - development planning support DECC - fast turnaround of approvals

29 Finally, by the way How fast can a Falcon fly? RSPB: 60 mph (level flight) BBC: >180 mph (diving) National Geographic: 242 mph (diving) TAQA: acquisition to first oil in 22 months Bill Buchanan/USFWS

30

31 Performance Pressure Build-up Analysis Well Location Kh : mdft K : 148 md Pwsi : 2970 psia (July 2011) Rectangle with const. Pressure Boundary Rectangle Size: 2220 x 7620 ft Rectangle Pore volume 170 MMbbl Const Pressure (Kestrel)

Plumbing the Depths of the Pelican Field

Plumbing the Depths of the Pelican Field Plumbing the Depths of the Pelican Field Thurza Frenz Pelican Talk Objectives To discuss the development of the northern area of the Pelican Field, in particular: The relationship between reservoir quality,

More information

The Howe Field. A Jurassic Interpod producing above expectation. Chris Bugg, Geologist on behalf of the Howe subsurface team

The Howe Field. A Jurassic Interpod producing above expectation. Chris Bugg, Geologist on behalf of the Howe subsurface team The Howe Field A Jurassic Interpod producing above expectation Use this area for cover image (Maximum height 6.5cm & width 8cm) Chris Bugg, Geologist on behalf of the Howe subsurface team 1 Overview "

More information

Serica Energy (UK) Limited. P.1840 Relinquishment Report. Blocks 210/19a & 210/20a. UK Northern North Sea

Serica Energy (UK) Limited. P.1840 Relinquishment Report. Blocks 210/19a & 210/20a. UK Northern North Sea Serica Energy (UK) Limited P.1840 Relinquishment Report Blocks 210/19a & 210/20a UK Northern North Sea January 2013 1 Header Licence: P.1840 Round: Licence Type: 26th Round Traditional "Drill-or-Drop"

More information

GAMINGRE 8/1/ of 7

GAMINGRE 8/1/ of 7 FYE 09/30/92 JULY 92 0.00 254,550.00 0.00 0 0 0 0 0 0 0 0 0 254,550.00 0.00 0.00 0.00 0.00 254,550.00 AUG 10,616,710.31 5,299.95 845,656.83 84,565.68 61,084.86 23,480.82 339,734.73 135,893.89 67,946.95

More information

DEVEX Moving in the Right Direction; Realising Upside Potential in a Mature Field Using Real Time 3D Geo-Steering Technology

DEVEX Moving in the Right Direction; Realising Upside Potential in a Mature Field Using Real Time 3D Geo-Steering Technology DEVEX 2010 Moving in the Right Direction; Realising Upside Potential in a Mature Field Using Real Time 3D Geo-Steering Technology Authors: Lisa Chisholm, Chevron Upstream Europe David Holbrough, Baker

More information

P.1619 License Relinquishment Report

P.1619 License Relinquishment Report P.1619 License Relinquishment Report Effective Date: 14 th October 2015 1. Licence Information License Number: P.1619 License Round: 25 th License Type: Traditional Block Number(s): 21/27b Operator: MOL

More information

Corporate Presentation September Coastal Energy Company 2013 All Rights Reserved

Corporate Presentation September Coastal Energy Company 2013 All Rights Reserved Corporate Presentation September 2013 Coastal Energy Company 2013 All Rights Reserved Forward Looking Statements This presentation contains forward-looking statements as defined by the applicable securities

More information

TAQA Bratani Limited & INEOS Clipper South C Limited

TAQA Bratani Limited & INEOS Clipper South C Limited [1] TAQA Bratani Limited and INEOS Clipper South C Limited UKCS Licence Block 211/27e [2] Table of Contents 1. Licence Information... 3 2. Licence Synopsis... 3 3. Work Programme Summary... 6 4. Database...

More information

RELINQUISHMENT REPORT. UK Traditional Licence P Blocks 12/16b & 12/17b. First Oil Expro Limited (Operator, 46.67%)

RELINQUISHMENT REPORT. UK Traditional Licence P Blocks 12/16b & 12/17b. First Oil Expro Limited (Operator, 46.67%) RELINQUISHMENT REPORT UK Traditional Licence P.1887 Blocks 12/16b & 12/17b First Oil Expro Limited (Operator, 46.67%) Nautical Petroleum Limited (26.67%) North Sea Energy (UK NO2) Limited (26.67%) February

More information

TAQA Bratani Ltd. TAQA BRATANI LTD. P1995 RELINQUISHMENT DOCUMENT

TAQA Bratani Ltd. TAQA BRATANI LTD. P1995 RELINQUISHMENT DOCUMENT TAQA BRATANI LTD. P1995 RELINQUISHMENT DOCUMENT Contents 1.0 Licence Information... 3 2.0 Licence Synopsis... 3 Firm Commitment... 3 Contingent Commitment... 3 Commitment Status... 4 3.0 Work Programme

More information

Appraising a late-middle-aged Brent Group field

Appraising a late-middle-aged Brent Group field Appraising a late-middle-aged Brent Group field Reservoir learnings after nearly 20 years of Pelican field production Jill Marriott The Pelican Field The Pelican oil field is nearly 20 years old It is

More information

Licence P1368: Relinquishment Report (end of 2 nd term) Hurricane Exploration PLC

Licence P1368: Relinquishment Report (end of 2 nd term) Hurricane Exploration PLC Licence P1368: Relinquishment Report (end of 2 nd term) Hurricane Exploration PLC March 2012 1. Header Licence Number: P1368 Licence Round: 23 rd Licence Type: Frontier Block Numbers: 202/4, 202/5, 204/30,

More information

Relinquishment Report for Licence P.1265, Block 12/28

Relinquishment Report for Licence P.1265, Block 12/28 Relinquishment Report for Licence P.1265, Block 12/28 1. Licence Information Licence Number: P.1265 Licence Round: 23 rd Round Awarded 22 December 2005 Licence Type: Traditional Block Number(s): 12/28

More information

DEVEX 2015, ABERDEEN : EDRADOUR & GLENLIVET DEVELOPMENT

DEVEX 2015, ABERDEEN : EDRADOUR & GLENLIVET DEVELOPMENT Marc Roussel / Total DEVEX 2015, ABERDEEN : & GLENLIVET DEVELOPMENT Nicolas Wawresky & Richard Ward, Total ACKNOWLEDGEMENTS The authors would like to acknowledge - - The contributions of colleagues at

More information

Norway Grants. Activity 2. Building a 3D static geological model of the storage site and storage complex

Norway Grants. Activity 2. Building a 3D static geological model of the storage site and storage complex Preparation for a pilot project of CO2 geological storage in the Czech Republic Activity 2 Norway Grants Juraj Francu Oldřich Krejčí Czech Geological Survey Brno Building a 3D static geological model of

More information

Licence P Relinquishment Report

Licence P Relinquishment Report Licence P.1762 Relinquishment Report February 2014 Relinquishment Report P.1762 1 Licence Information 1 2 Licence Synopsis 2 3 Work Programme Summary 3 4 Database 4 5 Prospectivity Update 5 6 Additional

More information

1. LICENCE INFORMATION. P209 Block 9/29a ALL. U.K. Block 9/29a (Part Block) Operator/Partners TAQA Bratani Ltd 81%, RWE DEA UK 19%

1. LICENCE INFORMATION. P209 Block 9/29a ALL. U.K. Block 9/29a (Part Block) Operator/Partners TAQA Bratani Ltd 81%, RWE DEA UK 19% 1. LICENCE INFORMATION Licence P209 Block 9/29a ALL Licence Round 4th round Blocks U.K. Block 9/29a (Part Block) Licence Type Traditional (Production) Well Operator TAQA Bratani Ltd Operator/Partners TAQA

More information

Relinquishment Report

Relinquishment Report Relinquishment Report Licence P.089 Block 22/15a 2 nd Round Traditional Licence Award (Operator): 100.0% Disclaimer No representation or warranty, express or implied, is or will be made in relation to

More information

Relinquishment Report. Licence P2016 Block 205/4c

Relinquishment Report. Licence P2016 Block 205/4c Relinquishment Report Licence P2016 Block 205/4c September 2016 JX Nippon Exploration and Production (U.K.) Limited Idemitsu Petroleum UK Ltd. Table of Contents 1. Licence Information... 1 2. Licence Synopsis...

More information

1 Licence Information 4. 2 Licence Synopsis 4. 3 Work Programme Summary 5. 4 Database 6. 5 Prospectivity Update 8

1 Licence Information 4. 2 Licence Synopsis 4. 3 Work Programme Summary 5. 4 Database 6. 5 Prospectivity Update 8 Table of Contents 1 Licence Information 4 2 Licence Synopsis 4 3 Work Programme Summary 5 4 Database 6 5 Prospectivity Update 8 6 Further technical work undertaken 16 7 Clearance 16 P1610 Page 2 of 16

More information

Relinquishment Report. for. Licences: P.1596 (Blocks 205/3, 205/4a) P.1836 (Block 205/2b) P.1837 (Block 205/5b)

Relinquishment Report. for. Licences: P.1596 (Blocks 205/3, 205/4a) P.1836 (Block 205/2b) P.1837 (Block 205/5b) Relinquishment Report for Licences: P.1596 (Blocks 205/3, 205/4a) P.1836 (Block 205/2b) P.1837 (Block 205/5b) November 2013 1 of 9 CONTENT 1. Header 2. Synopsis 3. Exploration Activities 4. Prospectivity

More information

EnQuest, 2 ION Geophysical

EnQuest, 2 ION Geophysical De-risking Drill Decisions - A case study on the benefit of re-processing conventionally acquired seismic data with the latest broadband processing technology. Ed Knight 1, James Raffle 2, Sian Davies

More information

The Waitsia Field. Onshore North Perth Basin, Western Australia. APPEA Conference, Brisbane 6 June 2016

The Waitsia Field. Onshore North Perth Basin, Western Australia. APPEA Conference, Brisbane 6 June 2016 Photograph by Roger Xiang The Waitsia Field Onshore North Perth Basin, Western Australia N. Tupper, E. Matthews, G. Cooper, A. Furniss, T. Hicks and S. Hunt APPEA Conference, Brisbane 6 June 2016 1 Disclaimer

More information

Licence P.185, Blocks 30/11b and 30/12b Relinquishment Report February 2015

Licence P.185, Blocks 30/11b and 30/12b Relinquishment Report February 2015 1. General Licence: P.185 Round: 4 th (1972) Licence Type: Traditional Blocks: 30/11b (part) and 30/12b (part) Equity: Talisman Sinopec Energy UK Limited 60%, Centrica North Sea Oil Limited 40% Work Programme:

More information

BLACK PLATINUM ENERGY LTD

BLACK PLATINUM ENERGY LTD Black Platinum Energy Ltd ( BPE or the Company ) Announces a Material Increase in the Discovered Dara East Gas Field Resources and Upside Potential Resources in Nearby Features Dara East Assessed Gas Resource

More information

An Overview of the Tapia Canyon Field Static Geocellular Model and Simulation Study

An Overview of the Tapia Canyon Field Static Geocellular Model and Simulation Study An Overview of the Tapia Canyon Field Static Geocellular Model and Simulation Study Prepared for Sefton Resources Inc. Jennifer Dunn, Chief Geologist Petrel Robertson Consulting Ltd. Outline Background

More information

LICENCE RELINQUISHMENT REPORT UKCS LICENCE P.1084 SUB-BLOCK 13/27a DEE DANA PETROLEUM (E&P) LIMITED UK EXPLORATION

LICENCE RELINQUISHMENT REPORT UKCS LICENCE P.1084 SUB-BLOCK 13/27a DEE DANA PETROLEUM (E&P) LIMITED UK EXPLORATION LICENCE RELINQUISHMENT REPORT UKCS LICENCE P.1084 SUB-BLOCK 13/27a DEE DANA PETROLEUM (E&P) LIMITED UK EXPLORATION December 2011 TABLE OF CONTENTS LIST OF TABLES & FIGURES... 3 LICENCE INFORMATION... 4

More information

P057 Relinquishment Report Apache North Sea Ltd PLEASE WITHOLD PUBLISHING UNTIL AFTER THE 27 TH ROUND LICENSES HAVE BEEN AWARDED

P057 Relinquishment Report Apache North Sea Ltd PLEASE WITHOLD PUBLISHING UNTIL AFTER THE 27 TH ROUND LICENSES HAVE BEEN AWARDED PLEASE WITHOLD PUBLISHING UNTIL AFTER THE 27 TH ROUND LICENSES HAVE BEEN AWARDED 1 1. License Information License Number: P057 License Round: 2nd Round License Type: Traditional Block Number: 21/9 (see

More information

Integrating Weather Forecasts into Folsom Reservoir Operations

Integrating Weather Forecasts into Folsom Reservoir Operations Integrating Weather Forecasts into Folsom Reservoir Operations California Extreme Precipitation Symposium September 6, 2016 Brad Moore, PE US Army Corps of Engineers Biography Brad Moore is a Lead Civil

More information

Zama Discovery Interim Update. 13th July 2017

Zama Discovery Interim Update. 13th July 2017 Zama Discovery Interim Update 13th July 2017 Mexico: 111 years of E&P history, 78 years under state monopoly Premier screening high-graded Sureste Basin as best fit for entry Burgos Onshore, Mature Gas,

More information

Robust Appraisal Planning Link Between Discovered Resource and Field Development

Robust Appraisal Planning Link Between Discovered Resource and Field Development Robust Appraisal Planning Link Between Discovered Resource and Field Development Kolade Adeleye June, 2016 NAPE TECHNICAL MEETING Outline Introduction Business case for an appraisal program Scope of an

More information

Relinquishment Report. for. Licence P1578. Block 13/22b including Phoenix Discovery

Relinquishment Report. for. Licence P1578. Block 13/22b including Phoenix Discovery Relinquishment Report for Licence P1578 Block 13/22b including Phoenix Discovery Top Phoenix Reservoir level Depth ft TVDSS Phoenix N March 2015 Licence P.1578 Relinquishment Report - March 2015 Page 1

More information

For personal use only. Leverage exposure to conventional, shale and tight oil and gas exploration April 2012

For personal use only. Leverage exposure to conventional, shale and tight oil and gas exploration April 2012 Leverage exposure to conventional, shale and tight oil and gas exploration April 2012 Disclaimer This presentation contains forward looking statements that are subject to risk factors associated with oil

More information

Developing Colorado s Next Major Oilfield

Developing Colorado s Next Major Oilfield Developing Colorado s Next Major Oilfield FPL Oil & Gas Production & Development Company Operate in Fremont County CO Florence Oilfield Overview Shares on issue (ASX:FPL) 197 million Fremont Petroleum

More information

Locating the Remaining Oil in a Complex Field: The Pierce Field Redevelopment

Locating the Remaining Oil in a Complex Field: The Pierce Field Redevelopment Locating the Remaining Oil in a Complex Field: The Pierce Field Redevelopment Presenter: Michael Porter Team: David Bateman, Thaddeus Ehighebolo, Fiona Haldane, Ash Holland, Jackie Kechichian & Ewan Robertson

More information

Horizontal well Development strategy

Horizontal well Development strategy Horizontal well Development strategy Pakawas Mangkang Team Member Yoseph Partono Stephan Otero Duangdao Chutanukarn Warin Lobtong Suarporn Ketpreechasawat B8/32 Asset, Thailand Chiangmai, 11 th Nov-13

More information

The Deployment of an Azimuthal Resistivity Tool for Geosteering - A Case Study from the Foinaven Field (North Sea)*

The Deployment of an Azimuthal Resistivity Tool for Geosteering - A Case Study from the Foinaven Field (North Sea)* The Deployment of an Azimuthal Resistivity Tool for Geosteering - A Case Study from the Foinaven Field (North Sea)* Martin Bedrock 1 and Darren Moody 1 Search and Discovery Article #40540 (2010) Posted

More information

The Ruru discovery. New Zealand Petroleum Conference Roland Swift Ruru Technical Lead. NZ Petroleum Conference 2017

The Ruru discovery. New Zealand Petroleum Conference Roland Swift Ruru Technical Lead. NZ Petroleum Conference 2017 The Ruru discovery New Zealand Petroleum Conference 2017 Roland Swift Ruru Technical Lead NZ Petroleum Conference 2017 March 2017 1 The Ruru discovery 1. Introduction 2. 2013-2014 Operations 3. Results

More information

For personal use only

For personal use only An African Story Jon Keall Chief Geologist FAR Limited Good Oil Conference Fremantle September 2014 Disclaimer This presentation has been prepared by FAR Limited ( FAR ). It should not be considered as

More information

3D Oil. Investor Update July Noel Newell

3D Oil. Investor Update July Noel Newell 3D Oil Investor Update July 2008 Noel Newell Presentation disclaimer Important notice This presentation contains certain statements which may constitute te "forward-looking statements". Such statements

More information

Tim Carr - West Virginia University

Tim Carr - West Virginia University Tim Carr - West Virginia University Role of Geology in Field Development Develop static geological model of the reservoir(s) Analyze relevant geoscience and engineering data, integrate them into model

More information

How are adding integers and subtracting integers related? Work with a partner. Use integer counters to find 4 2. Remove 2 positive counters.

How are adding integers and subtracting integers related? Work with a partner. Use integer counters to find 4 2. Remove 2 positive counters. . How are adding integers and subtracting integers related? ACTIVITY: Work with a partner. Use integer counters to find 4. Start with 4 positive counters. Remove positive counters. What is the total number

More information

PETROLEUM 101. Mark Shrimpton Jacques Whitford

PETROLEUM 101. Mark Shrimpton Jacques Whitford PETROLEUM 101 Mark Shrimpton Jacques Whitford PRESENTATION STRUCTURE The Offshore Petroleum Industry Petroleum Geology Petroleum Technology: Exploration agreements Geophysical exploration Drilling Development

More information

Introduction to Forecasting

Introduction to Forecasting Introduction to Forecasting Introduction to Forecasting Predicting the future Not an exact science but instead consists of a set of statistical tools and techniques that are supported by human judgment

More information

P1794 Relinquishment Document Blocks 22/2d, 22/3c & 22/4c

P1794 Relinquishment Document Blocks 22/2d, 22/3c & 22/4c P1794 Relinquishment Document Blocks 22/2d, 22/3c & 22/4c 1. Licence Information Licence Number: P1794 Licence Round: 26 th Round- Awarded January 2011 Licence Type: Traditional; (Drill or Drop within

More information

Relinquishment report P.1190 & P Blocks: 204/13, 204/14b

Relinquishment report P.1190 & P Blocks: 204/13, 204/14b Relinquishment report P.1190 & P.1262 Blocks: 204/13, 204/14b CONTENTS 1: LICENCE DETAILS... 2 2: LICENCE SYNOPSIS... 2 3: WORK PROGRAMME SUMMARY... 3 4. DATABASE... 5 5: PROSPECTIVITY UPDATE... 6 6. RESERVE

More information

Unlocking and Developing the Potential of Exciting Core Plays. Manu Wope South and East Africa Capital Markets Day 1

Unlocking and Developing the Potential of Exciting Core Plays. Manu Wope South and East Africa Capital Markets Day 1 Unlocking and Developing the Potential of Exciting Core Plays Manu Wope South and East Africa 1 Tullow s Footprint in South and East Africa Overview Largest exposure to fledging East African Rift exploration

More information

F. Bacciotti K. D Amore J. Seguin

F. Bacciotti K. D Amore J. Seguin The Role of 4D Seismic Interpretation and Dynamic Modelling in the Successful Drilling of a Late Stage Development Well in the West Brae Field, North Sea F. Bacciotti K. D Amore J. Seguin Introduction

More information

Developments in Storage and Monitoring for CCUS

Developments in Storage and Monitoring for CCUS Developments in Storage and Monitoring for CCUS Steve Whittaker Director Energy Research & Development Illinois State Geological Survey 4 th Beijing International Forum on Carbon Capture, Utilization and

More information

Relinquishment Report for Licence P1980

Relinquishment Report for Licence P1980 Relinquishment Report for Licence P1980 Estimates, statistics, opinions and forecasts contained in this document are based on TOTAL s own information and knowledge. They are provided in good faith, but,

More information

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION

SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION SPE DISTINGUISHED LECTURER SERIES is funded principally through a grant of the SPE FOUNDATION The Society gratefully acknowledges those companies that support the program by allowing their professionals

More information

Figure 1: PEDL 155 Location Map

Figure 1: PEDL 155 Location Map Licence Details UK Onshore Licence PEDL 155 October 2014 Licence Number: PEDL 155 Licence Round: UK 12 th Onshore Licensing Round Effective Date: 1 October 2004 Licence Type: Petroleum Exploration and

More information

Pioneer Natural Resources

Pioneer Natural Resources Pioneer Natural Resources Falcon & Harrier Development August 28, 2003 J. D. Hall Who is Pioneer Natural Resources?? Pioneer Natural Resources 2 Pioneer Natural Resources Company was formed through the

More information

Niadar A Rotliegendes opportunity missed?

Niadar A Rotliegendes opportunity missed? A Rotliegendes opportunity missed? May 2016 Licence details (Block 49/19b) Block: 49/19b Licence: P.1914 awarded in 26 th Round, 4 year term Effective date: 01/02/12, extended to end Dec 2017 Equity: SR

More information

Relinquishment Report

Relinquishment Report Relinquishment Report Licence P1403 Block 13/22d Chevron North Sea Limited Korean National Oil Company Chevron North Sea Limited December 2009 1 SYNOPSIS... 3 2 INTRODUCTION. 3 2.1 Licence Terms.. 3 2.2

More information

Hague and London Oil Plc

Hague and London Oil Plc Hague and London Oil Plc Exploiting Shallow Gas Offshore Netherlands De-Gassing Shallow Hazards or De-Risking Shallow Gas November 2016 The Shallow Gas Play can be Summarized as Schematic evolution of

More information

Winter Season Resource Adequacy Analysis Status Report

Winter Season Resource Adequacy Analysis Status Report Winter Season Resource Adequacy Analysis Status Report Tom Falin Director Resource Adequacy Planning Markets & Reliability Committee October 26, 2017 Winter Risk Winter Season Resource Adequacy and Capacity

More information

UK P2060, Block 29/06b Licence Relinquishment

UK P2060, Block 29/06b Licence Relinquishment ENDEAVOUR ENERGY UK LIMITED UK P2060, Block 29/06b Licence Relinquishment ISSUE RECORD SUMMARY Dec 2015 Final Graham Tegerdine Rev Date Description Document Owner Review Required By Table of Contents 1

More information

OVERPRESSURED FORT UNION PROSPECT IN THE WASHAKIE BASIN, GGRB DESOLATION ROAD UNIT (DRU)

OVERPRESSURED FORT UNION PROSPECT IN THE WASHAKIE BASIN, GGRB DESOLATION ROAD UNIT (DRU) OVERPRESSURED FORT UNION PROSPECT IN THE WASHAKIE BASIN, GGRB DESOLATION ROAD UNIT (DRU) Energy, Ethics, Environment. NAPE SUMMIT BOOTH # 1325 PROSPECT PREVIEW -- NAPE 2016 Jacinda N. Brown INTRODUCTION

More information

OPL 226 ShoreCan s 80% Shareholding of Essar Nigeria E&P Limited Geology/Geophysics, Appraisal and Development Scenarios

OPL 226 ShoreCan s 80% Shareholding of Essar Nigeria E&P Limited Geology/Geophysics, Appraisal and Development Scenarios OPL 226 ShoreCan s 80% Shareholding of Essar Nigeria E&P Limited Geology/Geophysics, Appraisal and Development Scenarios January 2017 1 SUMMARY Shoreline Canadian Overseas Petroleum Development Corporation

More information

Monthly Trading Report July 2018

Monthly Trading Report July 2018 Monthly Trading Report July 218 Figure 1: July 218 (% change over previous month) % Major Market Indicators 2 2 4 USEP Forecasted Demand CCGT/Cogen/Trigen Supply ST Supply Figure 2: Summary of Trading

More information

In Centre, Online Classroom Live and Online Classroom Programme Prices

In Centre, Online Classroom Live and Online Classroom Programme Prices In Centre, and Online Classroom Programme Prices In Centre Online Classroom Foundation Certificate Bookkeeping Transactions 430 325 300 Bookkeeping Controls 320 245 225 Elements of Costing 320 245 225

More information

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 25, 2016 Sacramento Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG

More information

NORTHEAST EL HAMD BLOCK

NORTHEAST EL HAMD BLOCK NORTHEAST EL HAMD BLOCK NORTHEAST EL HAMD BLOCK LOCATION : The block is locating in the eastern side of the central part of the Gulf of Suez basin west and south of Belayim fields. NORTHEAST EL HAMD BLOCK

More information

OPL 226 ShoreCan s 80% Shareholding of Essar Nigeria E&P Limited Geology/Geophysics, Appraisal and Development Scenarios

OPL 226 ShoreCan s 80% Shareholding of Essar Nigeria E&P Limited Geology/Geophysics, Appraisal and Development Scenarios SHORELINE CANOVERSEAS PETROLEUM DEVELOPMENT CORPORATION JANUARY 2017 OPL 226 ShoreCan s 80% Shareholding of Essar Nigeria E&P Limited Geology/Geophysics, Appraisal and Development Scenarios Summary Shoreline

More information

A New Force in E&P Macquarie Oil & Gas Explorers Conference January 2013

A New Force in E&P Macquarie Oil & Gas Explorers Conference January 2013 A New Force in E&P Macquarie Oil & Gas Explorers Conference January 2013 EXPLORATION STRATEGY Kurdistan Region of Iraq (KRI) Material prospects remain: Taq Taq Deep, Tawke Deep, Chia Surkh, Deep Miran

More information

Relinquishment Report. Block 48/11c

Relinquishment Report. Block 48/11c Relinquishment Report Petroleum Production Licence No. P.1008 Block 48/11c EOG Resources United Kingdom Limited List of Contents 1. Licence information 2. Synopsis 3. Exploration Activities 4. Prospectivity

More information

Click to edit Master title style

Click to edit Master title style Click to edit Master title style 1-2-1 Conference, Hong Kong March 2017 ASX:PNR Rapidly Click to Growing edit Master Gold Production title style Pantoro is a gold production company which owns 100% of

More information

5 ORIGINAL HYDROCARBONS IN PLACE

5 ORIGINAL HYDROCARBONS IN PLACE 5 ORIGINAL HYDROCARBONS IN PLACE The deterministic estimation of oil in place for the White Rose Field was completed using 3-D geological modelling in the RMS software package. This procedure involves

More information

2018 Annual Review of Availability Assessment Hours

2018 Annual Review of Availability Assessment Hours 2018 Annual Review of Availability Assessment Hours Amber Motley Manager, Short Term Forecasting Clyde Loutan Principal, Renewable Energy Integration Karl Meeusen Senior Advisor, Infrastructure & Regulatory

More information

Building for the Future with Global Knowledge and Dedicated Skills. Jan Maier North Africa Capital Markets Day

Building for the Future with Global Knowledge and Dedicated Skills. Jan Maier North Africa Capital Markets Day Building for the Future with Global Knowledge and Dedicated Skills Jan Maier North Africa 1 Core Plays: Recent and Current Exploration in North Africa Sirte Basin Matruh Basin CORE PLAYS Fold Belts Rift

More information

Good Oil Conference September 2012

Good Oil Conference September 2012 ASX : OEL Good Oil Conference September 2012 Gregor McNab, Chief Executive Officer Disclaimer This presentation does not constitute an offer to sell securities and is not a solicitation of an offer to

More information

Relinquishment Report

Relinquishment Report Relinquishment Report Licence P421 Block 21/20b Centrica North Sea Oil Ltd Shell UK Ltd May 2013 Disclaimer No liability whatsoever is accepted and no representation, warranty or undertaking, express or

More information

Relinquishment Report Licence P1834

Relinquishment Report Licence P1834 Valiant Causeway Limited, March 2013 1. Header Licence Number: P1834 Licence Round: 26th Round Licence Type: Traditional Block Number: 204/21, 22b, 23b & 26a Partners: Valiant 100% (Operator) 2. Synopsis

More information

Bounty Oil and Gas NL Presentation to: Excellence in Oil and Gas March 11 12, 2014

Bounty Oil and Gas NL Presentation to: Excellence in Oil and Gas March 11 12, 2014 Bounty Oil and Gas NL Presentation to: Excellence in Oil and Gas March 11 12, 2014 ASX Code: BUY Philip F Kelso - CEO Cooper Basin - Drilling Utopia 14 Bounty Oil & Gas NL Major Growth Projects with Production

More information

Corn Basis Information By Tennessee Crop Reporting District

Corn Basis Information By Tennessee Crop Reporting District UT EXTENSION THE UNIVERSITY OF TENNESSEE INSTITUTE OF AGRICULTURE AE 05-13 Corn Basis Information By Tennessee Crop Reporting District 1994-2003 Delton C. Gerloff, Professor The University of Tennessee

More information

Mungo Case Study: Unlocking the late-life field development with HDOBC seismic. Mark Williams DEVEX, Thursday 10 th May, 2012

Mungo Case Study: Unlocking the late-life field development with HDOBC seismic. Mark Williams DEVEX, Thursday 10 th May, 2012 Mungo Case Study: Unlocking the late-life field development with HDOBC seismic Mark Williams DEVEX, Thursday 10 th May, 2012 Mungo: Outline Introduction to the Mungo field Location within N.Sea Structure

More information

Key Elements of the Petroleum Systems of the Rockall and Slyne-Erris Basins

Key Elements of the Petroleum Systems of the Rockall and Slyne-Erris Basins Key Elements of the Petroleum Systems of the Rockall and Slyne-Erris Basins Bandon Corrib Dooish Atlantic Ireland Conference, Dublin, 1 st - 2 nd November 2016 Rockall and Slyne-Erris Basins Only 11 exploration

More information

ENGINE SERIAL NUMBERS

ENGINE SERIAL NUMBERS ENGINE SERIAL NUMBERS The engine number was also the serial number of the car. Engines were numbered when they were completed, and for the most part went into a chassis within a day or so. However, some

More information

Pre-Calc Chapter 1 Sample Test. D) slope: 3 4

Pre-Calc Chapter 1 Sample Test. D) slope: 3 4 Pre-Calc Chapter 1 Sample Test 1. Use the graphs of f and g to evaluate the function. f( x) gx ( ) (f o g)(-0.5) 1 1 0 4. Plot the points and find the slope of the line passing through the pair of points.

More information

AGM Presentation 26 November 2014 MD Kevin Wilson. Investor Update Augu013

AGM Presentation 26 November 2014 MD Kevin Wilson. Investor Update Augu013 AGM Presentation 26 November 2014 MD Kevin Wilson Investor Update Augu013 Disclaimer Certain statements contained in this presentation, including information as to the future financial or operating performance

More information

Saudi Arabia. July present. Desert Locust Information Service FAO, Rome Red Sea coast outbreak

Saudi Arabia. July present. Desert Locust Information Service FAO, Rome   Red Sea coast outbreak Saudi Arabia July 2016 - present coast outbreak Desert Locust Information Service FAO, Rome www.fao.org/ag/locusts Keith Cressman (Senior Locust Forecasting Officer) updated: 24 January 2017 undetected

More information

RELINQUISHMENT REPORT FOR LICENCE P.1663, BLOCK 29/4b and 29/5e

RELINQUISHMENT REPORT FOR LICENCE P.1663, BLOCK 29/4b and 29/5e RELINQUISHMENT REPORT FOR LICENCE P.1663, BLOCK 29/4b and 29/5e Licence: P.1663 Blocks: 29/4b & 29/5e 25th Round Traditional Licence Operator: Ithaca Energy UK(Ltd) 100% Work Programme Summary The agreed

More information

MIDDLE DEVONIAN PLAY MICHIGAN BASIN OF ONTARIO. Duncan Hamilton

MIDDLE DEVONIAN PLAY MICHIGAN BASIN OF ONTARIO. Duncan Hamilton MIDDLE DEVONIAN PLAY MICHIGAN BASIN OF ONTARIO Duncan Hamilton 1 Middle Devonian Pools of the Michigan Basin 375+ Million Barrels Michigan 45+ million Barrels Ontario 2 Outline of Presentation History

More information

EAST BLINA-1 UPDATE RIG CONTRACT EXECUTED

EAST BLINA-1 UPDATE RIG CONTRACT EXECUTED 18 September 2012 ASX Markets Announcements Australian Stock Exchange Limited 10 th Floor, 20 Bond Street Sydney NSW 2000 Dear Sirs EAST BLINA-1 UPDATE RIG CONTRACT EXECUTED Further to the earlier ASX

More information

Tim Carr - West Virginia University

Tim Carr - West Virginia University GEOGRAPHIC EXTENT OF PETROLEUM SYSTEM A Trap Trap Trap A STRATIGRAPHIC EXTENT OF PETROLEUM SYSTEM Petroleum accumulation Top of oil window Bottom of oil window Overburden Seal Reservoir Source Underburden

More information

Monthly Trading Report Trading Date: Dec Monthly Trading Report December 2017

Monthly Trading Report Trading Date: Dec Monthly Trading Report December 2017 Trading Date: Dec 7 Monthly Trading Report December 7 Trading Date: Dec 7 Figure : December 7 (% change over previous month) % Major Market Indicators 5 4 Figure : Summary of Trading Data USEP () Daily

More information

The Oyster Bayou CO 2 Flood Case History. Alton Ahrens, Denbury Resources

The Oyster Bayou CO 2 Flood Case History. Alton Ahrens, Denbury Resources The Oyster Bayou CO 2 Flood Case History Alton Ahrens, Denbury Resources N Y S E : D N R w w w. d e n b u r y. c o m Table of Contents o Highlights of the CO2 Flood o Pre-CO 2 History o o o Location and

More information

Atlantic Rim Coalbed Methane Play: The Newest SuccessfulCBM Play in the Rockies

Atlantic Rim Coalbed Methane Play: The Newest SuccessfulCBM Play in the Rockies Atlantic Rim Coalbed Methane Play: The Newest SuccessfulCBM Play in the Rockies Robert A. Lamarre Lamarre Geological, Denver, Colorado Stephen K. Ruhl Anadarko Petroleum Corporation, The Woodlands, Texas

More information

The Alba Field: Improved Reservoir Characterisation using 4D Seismic Data. Elaine Campbell Oliver Hermann Steve Dobbs Andrew Warnock John Hampson

The Alba Field: Improved Reservoir Characterisation using 4D Seismic Data. Elaine Campbell Oliver Hermann Steve Dobbs Andrew Warnock John Hampson The Alba Field: Improved Reservoir Characterisation using 4D Seismic Data Elaine Campbell Oliver Hermann Steve Dobbs Andrew Warnock John Hampson Chevron 2005 Alba Field Location Equity: Chevron 23% (operator)

More information

P1645 Fig 1: Licence P1645 Introduction

P1645 Fig 1: Licence P1645 Introduction Licence Number: P.1645 commenced 12 th November 2008 Licence Round: 25 th Licence Type: Traditional Block Number: 9/8b Operator: EnQuest (60%) Partners: Norwegian Energy Company (Noreco) UK Ltd 40% Work

More information

PETE/GEOS 445/645 Petroleum Geology 3 credits

PETE/GEOS 445/645 Petroleum Geology 3 credits PETE/GEOS 445/645 Petroleum Geology 3 credits Tuesday, Thursday 3:40-5:10 Reichardt 233 Hydrocarbons fuel today s economy, but remain a relatively rare natural resource. The objective of this course is

More information

Main Challenges and Uncertainties for Oil Production from Turbidite Reservoirs in Deep Water Campos Basin, Brazil*

Main Challenges and Uncertainties for Oil Production from Turbidite Reservoirs in Deep Water Campos Basin, Brazil* Main Challenges and Uncertainties for Oil Production from Turbidite Reservoirs in Deep Water Campos Basin, Brazil* Carlos H. Bruhn 1, Antonio Pinto 1, and Paulo R. Johann 1 Search and Discovery Article

More information

P Edward Knight 1, James Raffle 2, Sian Davies 2, Henna Selby 2, Emma Evans 2, Mark Johnson 1. Abstract

P Edward Knight 1, James Raffle 2, Sian Davies 2, Henna Selby 2, Emma Evans 2, Mark Johnson 1. Abstract P1-3-10 De-risking Drill Decisions. A case study on the benefit of re-processing conventionally acquired seismic data with the latest broadband processing technology Edward Knight 1, James Raffle 2, Sian

More information

PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER

PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER Ronald F. Reed, P.E. Member, ASCE rreed@reed-engineering.com Reed Engineering Group, Ltd. 2424 Stutz, Suite 4 Dallas, Texas 723 214-3-6 Abstract

More information

The Maule Field: An Economic Small Field Development

The Maule Field: An Economic Small Field Development AUSTRALIA ARGENTINA CANADA EGYPT NORTH SEA U.S. CENTRAL U.S. GULF The Maule Field: An Economic Small Field Development J. Pyle*, K. Koster, G. Barker and P. Rose Introduction 2 Eocene penetrations with

More information

Relinquishment Report for Licence Number P1435, Block 30/25a March 2009

Relinquishment Report for Licence Number P1435, Block 30/25a March 2009 Relinquishment Report for Licence Number P1435, Block 30/25a March 2009 Endeavour Energy UK Ltd Relinquishment Report for Licence Number P1435 Block 30/25a 1 Table of Contents 1.0 Header...3 2.0 Synopsis...3

More information

The World Bank Community Development Program Support Project-Phase III (P144637)

The World Bank Community Development Program Support Project-Phase III (P144637) Public Disclosure Authorized AFRICA Cameroon Social, Urban, Rural and Resilience Global Practice Global Practice IBRD/IDA Investment Project Financing FY 2016 Seq No: 5 ARCHIVED on 21-Dec-2017 ISR30226

More information

Ensign, Unravelling the Enigma DEVEX 2016

Ensign, Unravelling the Enigma DEVEX 2016 Ensign, Unravelling the Enigma DEVEX 2016 Introduction Sole Pit area of UK SNS Discovered 1986, developed 2012 View and understanding evolved over time Ensign 2 The Facts Structure Fault bound 3-way dip

More information

Annual General Meeting

Annual General Meeting Karoon Gas Australia Ltd Annual General Meeting 22 October 2015 Rodrigo Hill / Amago Images Olinda Star Semi Submersible Drilling Rig, Echidna-1 Production Test Disclaimers This presentation has been prepared

More information