FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Similar documents
Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Sample Procurement Plan

Procurement Plan. Nepal Livestock Sector Innovation Project

Procurement Plan for ETLP (P156590)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Urban Productive Safety Net Project (UPSNP) Procurement Plan

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Sample Procurement Plan

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

GEF Procurement Plan (WARFP LIBERIA)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Procurement Plan for Project of Integrated Urban and Tourism Development

Prior Review Thresholds

Prior Review Thresholds

Sample Procurement Plan

Procurement Plan. I. General

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Procurement Plan National Community Driven Development Project Department of Rural Development

PPA PROCUREMENT PLAN (Textual Part)

Consultants: firms Consultants: individuals

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

Procurement. International Competitive Bidding;

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Sample Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

procurement Plan I. General

The World Bank. Key Dates. Project Development Objectives. Components. Public Disclosure Authorized. Implementation Status & Results Report

Bhutan: FCPF Readiness Grant FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Sample Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Implementation Status & Results Ethiopia Tana & Beles Integrated Water Resources Development (P096323)

Implementation Status & Results Congo, Democratic Republic of Democratic Republic of Congo Emergency Social Action Project (P086874)

Public Disclosure Copy

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

The World Bank. Key Dates. Project Development Objectives. Components. Implementation Status & Results Report. Key Project Dates

PROCUREMENT PLAN (Textual Part)

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

Public Disclosure Copy. Implementation Status & Results Report Somali Core Economic Institutions and Opportunities Program (SCORE) (P152241)

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

Public Disclosure Copy

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

PROCUREMENT PLAN (Textual Part)

Ayeyarwady Integrated River Basin Management Project (P146482)

PROCUREMENT PLAN (Textual Part)

Implementation Status & Results Chad Urban Development Project (P072030)

Mozambique Additional FCPF Funding FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Public Disclosure Copy. Implementation Status & Results Report Ghana FIP - Enhancing Natural Forest and Agroforest Landscapes Project (P148183)

Sudan REDD+ Readiness Preparation Support FCPFR - FOREST CARBON PARTNERSHIP FACILITY

Procurement Plan. Procurement Method Prior Review Threshold Comments

Textual Procurement Plan

Actual Amount (US$) Process Status. Pending Interventions.

Public Disclosure Copy

Public Disclosure Copy

The World Bank Decentralized Community Driven Services Project (P117764)

Public Disclosure Copy. Has the Project Development Objective been changed since Board Approval of the Project Objective?

The World Bank Bangladesh Modern Food Storage Facilities Project (P120583)

Punjab Cities Program (P156972)

The World Bank Health System Performance Reinforcement Project (P156679)

The World Bank Second Irrigation and Drainage Improvement Project (P086592)

Implementation Status & Results Belize Municipal Development (P111928)

Implementation Status & Results Chad Urban Development Project (P072030)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

Zambia Strengthening Climate Resilience (PPCR Phase II) (P127254)

Transcription:

Public Disclosure Authorized FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Project (NEWMAP) PROCUREMENT PLAN I. GENERAL Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized 1. Project information: Country: Nigeria Borrower: Federal Government of Nigeria Project Name: Nigeria Erosion and Watershed Project-(NEWMAP) Loan / Credit No.: PIA: National NEWMAP Coordinating Unit. 2. Bank s approval Date of the procurement Plan: March, 3. Date of General nt Notice: 4. Period covered by this procurement plan: 18 months II. Goods and Works and non-consulting services. 1. Prior Review Threshold: nt Decisions subject to Prior Review by the Bank as stated in Appendix 1 to the Guidelines for nt: nt Method Prior Review Threshold (US$ equivalent) Comments 1. ICB and LIB (Goods and services other > 750,000.00 than consultancy services) ALL 2. NCB 50,000.00 750,000.00 NONE 3. ICB (Works) > 5,000,000.00 ALL 4. NCB (Works) 200,000 5,000,000.00 NONE 5 Shopping-Goods < 50,000.00 NONE 6 Shopping-Works < 100,000.00 NONE 7 Training, Workshops, Study Tours All Values Based on Annual Work Plans & Budgets 2. Prequalification. Bidders for major works shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: Shall apply

4. Reference to (if any) Project Operational/nt Manual: shall apply 5. Any Other Special nt Arrangements: Not Applicable 6. nt Packages with Methods and Time Schedule nt of Goods : 1 2 3 4 5 6 7 8 9 Re f. No. Contract (Description) 1 Computer Systems, Office, software and Accessories Computers and Accessories, software packages, Photocopiers, UPS, Printers and Scanners, Fax Machines, Laptops, Stationeries, Consumables, LAN, Telephony,Lasers Software Licenses and Application,. Estimate d Cost US$ 000 684 ) Procure ment Method Prequalificati on (yes/no) Domestic Preference (yes/no) Review by Bank (Prior / ) Expected Bid- Opening Date NCB NO NO POST June 7, Comments at ( USD 85.5) 2 Office Furniture s and Equipment Computer workstations and Office Furniture Water Dispenser, Refrigerators, Airconditioners, Tables, Chairs, etc 3 Operational Vehicles 4-WD Vehicles (32 units) 4 Generator 40KVA Sound-Proof Electricity Generating Set-Purchase and Installation (8 units) 680 ) 1440 ) 240 ) NCB NO NO PRIOR June 7, NCB NO NO PRIOR June 7, NS NO NO PRIOR June 7, at ( USD 85) at (180USD

5 Training Communication, Presentation, Media Equipment and materials, etc Multimedia Projectors, Flip Chart Stands, Boards, GSM TV/Video/Radio/Reco rders and Digital Cameras, Internet Facilities, GPS, Raincoats and Enumerators bags, Program information kit, Program posters Community oriented manual 6 Field Equipment Purchase of Weather Monitoring Stations, GPSs, Laser Measures, Measuring Wheels, 1-2km Range Radios and other survey equipment and tools to gauge and trace watershed, terrestrial carbon and water flow 7 Geographic Information System Purchase of GIS data/satellite Imagery,, Overhead photography, etc 364 ) 2,400 ) 3520 ) Sub Total 9,328.00 NS NO NO PRIOR June 7, NCB NO NO PRIOR June 7, NCB NO NO PRIOR June 7, at (45.5 USD at (300 USD at (440 USD nt of Civil Works 1 2 3 4 5 6 7 8 9 Ref. No. Contract (Description) 1 Civil works, and maintenance of flood and gully erosion sites Cost US$ 000 Procure ment Method Prequalificati on (yes/no) Domestic Preference (yes/no) Review by Bank (Prior / ) Expected Bid- Opening Date 252,000.00 ICB NO YES PRIOR October 12, Comments nt by ICB for all 7 SPMU

2 Office accommodation 240,000 NS NO NO PRIOR July, for 7 FPCU SUB TOTAL 252,240.00 III. of Consultants 1. Prior Review Threshold: decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines and Employment of Consultants: Method Prior Review Threshold Comments 1 Consultant Services-QCBS- All Values International ALL 2 Consultant Services-QCBS-National > 200,000.00 ALL 3 Consultant Services-CQS < 200,000.00 NONE 4 Consultant Services-lC > 50,000.00 ALL 5 Consultant Services-lC < 50,000.00 ToR only but ALL 6 Consultant Services- Single Source All Values ALL Note: All ToRs to be prior review QCBS = Quality and Cost Based SSS = Single Source CQ = Consultant Qualification LCS = Least Cost IC = 2. Short list comprising entirely of national consultants: Short list of consultants for services, to cost less than $200,000.00 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Arrangements: NA 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 7 Ref. No. Description of Assignment Cost. US$ 000 Method Review by Bank (Prior / ) Expected Proposals Submission Date Comments 1 Consultancy for the detailed Engineering designs and data collation for 35 sites 3,395.24 QCBS Prior On-going Consultancy for by each

2 Consultancy for the supervision of Civil Works for 35sites 3 Consultancy for the RAP study for 35 sites 4 Consultancy for the ESIA study for 35 sites 5 Consultancy for the Socio- Economic study 35 sites 6 Consultancy for GIS data collection and Mapping for 35 sites 7 Consultancy for the detailed Engineering designs and data collation for additional 35sites 8 Consultancy for the detailed ESIA, RAP and Socio Economic Studies for additional 35 sites 9 Environmental engineering and design consultancy, 10 nt consultancy for support of FPMU and SPMUs 6,824.47 875.00 875.00 875.00 875.00 3500.00 2625.00 QCBS Prior September SPMU each State Proc. Plan). Consultancy for by each SPMU each State Proc. Plan). IC Prior On-going Consultancy for by each SPMU is at (25 USD. IC Prior On-going Consultancy for by each SPMU is at (25 USD. IC Prior On-going Consultancy for by each SPMU is at 25 USD per site IC Prior On-going Consultancy for by each SPMU is at 75 USD per site QCBS Prior August, Consultancy for 5 additional sites by each of the 7 SPMU is at 100 USD per site QCBS Prior June, 2013 Consultancy for 5 additional sites by each of the 7 SPMU is at 75 USD per site 800 QCBS 9 800 QCBS 10 June 1012 11 M&E consultancy 400 QCBS 11 12 Consultancy for the support of SPMUs and FPMU 800.00 QCBS 12 Sept., Consultancy by each at (100 USD 13 Consultancy for Legal Services 800.00 IC 13 Sept., Consultancy by each

14 Consultancy for valuation and resettlement implementation 15 Consultancy for Training and 3500.00 1600.00 16 Consultancy-External Auditor 400.00 17 Consultancy on Community consultation, Public Education and Erosion and awareness Techniques, 800.00 Sub Total 27,744.71 at (100 USD 14 Sept., Consultancy by each SPMU, to cover all sites is at (500 USD per SPMU QCBS Prior August, Consultancy by each at (200 USD QCBS Prior March, 2013 Consultancy by FPMU to cover each SPMU IC Prior Sept., Consultancy by each at (100 USD IV. Implementing Agency Activities with Time Schedule 1. In this section the agreed Activities are listed with time schedule below; No. Expected outcome / Activity Description Cost US$ 000 Duration Start Date Com m e n t s A. TRAINING 1 3. Nos. Training courses for PMU staff; Project Coordinator, nt Specialist, and financial mgt, M&E, Environmental specialists, Communication, Livelihood, Engineering specialists 2 Training of project finance staff(fms, APA, FO, IA) on flexible accounting software 720.00 160.00 2WKS, each 1wk August August at (90 USD

3 4 5 6 7 B. WORKSHOP for key stakeholders ICT Training Professional Seminars/Workshops/ subscriptions 2 Days Sensitization/ Workshop for State and Local Govt. Officials on erosion and watershed management 3 Day workshop for Line Ministries and MDAs on addressing and prevention of Land Degradation 8 3 Day workshop for local Govt. Focal Persons and Community Erosion watch Dogs on prevention of erosion and land degradation 9 10 11 12 13 on use of Metrological and GPS Equipment C. STUDY/TOURS Baseline survey/ Community needs assessment and capacity building Sensitization/ Awareness creation of NEWMAP in the 18 LGA Participation in watershed studies organized by the world bank and FAO Launching of ESIA and RAP for priority sites 240.00 160 120.00 200.00 240.00 240.00 200.00 240.00 240.00 160.00 240.00 3 days 1 wk 2 days 3- days 3-days 5-days times times WB and FAO to determine September September, September October October at (20 USD at (20 USD at (15 USD at (25 USD 2013 at (25 USD October August, December, at (20 USD

14 15 16 17 18 livelihood studies Participation in Biodiversity/forest carbon study organized by the World Bank Recognizance survey of Project sites (Erosion and Watershed) International Training and study tours 160.00 160.00 120.00 2480.00 Attendance of World Bank Organized training, meetings, 800.00 seminar and workshops Sub Total 6,880.00 Oct., at (20 USD World Bank determined at (20 USD 4-days each July at (15 USD 4-wks February., 2013 World Bank determined at (310 USD at (100 USD

Page 1 PROCUREMENT PLAN Nigeria : Nigeria Erosion and Watershed Project General Information Country: Nigeria Banks Approval Date of the Original nt Plan: 2017-06-12 Revised Plan Date(s): (comma delineated, leave blank if none) 2017-06-12 Project ID: P124905 GPN Date: Project Name: Nigeria Erosion and Watershed Project Loan / Credit No: Executing Agency(ies): CROSS RIVER STATE NEWMAP SPMU WORKS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach nt Prequalification (Y/N) Amount (US$) Actual Amount (US$) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific nt Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRS/NEWMAP/WKS/NCB/14/01-001 / Ikot Ekpo Gulley Construction Works (Preliminary Earthworks and Soil Stabilization) Watershed Bids 394,730.00 0.00 Pending 2013-04-08 2013-04-08 2013-04-08 2014-03-03 2014-05-09 2017-03-31 CRS/NEWMAP/WKS/NCB/14/01-002 / Atakpa Gulley Construction (Preliminary Earthworks and Soil Stabilization) Watershed Bids 3,545,240.00 0.00 Pending 2013-04-08 2013-04-08 2013-04-08 2014-03-03 2014-05-09 2017-03-31 CRS/NEWMAP/WKS/NCB/14/01-003 / Nyagasang Gulley Construction Works (Preliminary Earthworks and Soil Stabilization) Watershed Bids 2,204,030.00 0.00 Pending 2013-04-07 2013-04-07 2013-04-07 2014-03-03 2014-05-09 2017-03-31 CRS/NEWMAP/WKS/NCB/14/01-004 / Edim Otop Gulley Construction Works (Preliminary Earthworks and Soil Stabilization) - Additional Works Watershed Bids 6,385.00 0.00 Pending 2017-02-24 2017-02-24 2017-03-10 2017-03-10 2017-09-15 2018-10-12 CRS/NEWMAP/WKS/NCB/14/02 / Ikot Anwatim Gulley Construction Works (Preliminary Earthworks and Soil Stabilization) Watershed Bids 6,818,150.00 0.00 Pending 2013-04-29 2013-04-29 2013-06-10 2013-06-10 2013-10-21 2017-03-31 CRS/NEWMAP/WKS/NCB/16/02 / Ikot Nkebre Gulley Construction Works (Preliminary Earthworks and Soil Stabilization) Watershed Bids 7,419,350.00 0.00 Pending 2016-09-06 2016-09-06 2016-11-08 2016-11-08 2017-05-02 2019-03-21 CRS/NEWMAP/WKS/NCB/16/03 / Lemna/Fed Agric. Gulley Construction Works (Preliminary Earthworks and Soil Stabilization) Watershed Bids 1,741,980.00 0.00 Pending 2016-06-22 2016-06-22 2016-12-13 2017-03-14 2017-05-02 2019-03-21 CRS/NEWMAP/WKS/NS/15/01 / Construction Maintenance Works at Ikot Ekpo Intervention Erosion site Watershed Direct Direct 170,000.00 0.00 Pending 2017-09-12 2017-09-12 2018-02-20 2018-03-22 CRS/NEWMAP/WKS/NS/15/02 / Construction Maintenance Works at Atakpa Intervention Erosion site Watershed Direct Direct 130,000.00 0.00 Pending 2017-09-12 2017-09-12 2018-01-30 2018-03-22 CRS/NEWMAP/WKS/NS/15/03 / Construction Maintenance Works at Nyagasang Intervention Erosion site Watershed Direct Direct 150,000.00 0.00 Pending 2017-09-12 2017-09-12 2018-01-30 2018-03-22 CRS/NEWMAP/WKS/NS/14/05 / Construction Maintenance Works at Ikot Anwatim Intervention Erosion site Watershed Direct Direct 180,000.00 0.00 Pending 2017-10-15 2017-10-15 2018-03-26 2018-04-24 CRS/NEWMAP/WKS/NCB/16/05 / Construction and Installation of Household and Community Rain Water Harvesting Facilities Watershed Bids 300,000.00 0.00 Pending 2017-11-13 2017-11-13 2017-12-27 2017-12-27 2018-04-16 2020-03-11 GOODS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach nt Prequalification (Y/N) Amount (US$) Actual Amount (US$) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific nt Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRSPMU/NS/GD/16/01-001 / nt of office Equipements 30,000.00 0.00 Pending 2017-04-19 2017-04-19 2017-04-19 CRSPMU/NS/GD/16/01-002 / nt of office Consumables 5,000.00 0.00 Pending 2017-04-19 2017-05-24 2017-07-07 CRSPMU/NS/GD/16/01-003 / nt of office Stationaries 15,000.00 0.00 Pending 2017-04-19 2017-05-17 2017-06-23 CRSPMU/NS/GD/15/02 / Production of Newspaper and Magazine(on-going) Quaterly Production 20,000.00 0.00 Pending 2016-01-25 2016-02-15 2017-06-23

Page 2 CRSPMU/NS/GD/17/02 / nt of Office Furniture and Installation of Wooden Office Shelve 15,000.00 0.00 Pending 2017-02-16 2017-03-17 2017-04-24 CRSPMU/NS/GD/16/03 / nt and Installation of shade cover and purchase of bucket covers for 2nos. Pickup Vehicles 12,000.00 0.00 Pending 2017-02-16 2017-03-10 2017-04-24 CRSPMU/NS/GD/16/05 / Procurment of Project Vehicle for Focal NGO 60,000.00 0.00 Pending 2017-02-20 2017-03-20 2017-04-26 CRSPMU/NS/GD/16/06 / nt and Installation of 5nos. Bill board for the 5 priority sites of CRS-NEWMAP. 5,000.00 0.00 Pending 2016-07-14 2016-08-04 2016-09-19 CRSPMU/NS/GD/16/04 / nt of a 30KVA Backup Generator for the Project Office 15,000.00 0.00 Pending 2017-09-12 2017-10-10 2017-11-16 CRSPMU/NS/GD/17/08 / nt of Environmental Portable Equipments (Pulser Nose Meter, Mephelo meter, Air Quality monitoring Detector, Water 31,570.00 0.00 Pending 2017-03-20 2017-04-17 2017-05-24 CRSPMU/NS/GD/17/09 / nt of Personal Protective Equipments (PPEs) 16,500.00 0.00 Pending 2017-03-20 2017-04-17 2017-05-24 NON CONSULTING SERVICES Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach nt Prequalification (Y/N) Amount (US$) Actual Amount (US$) Status Bid Evaluation Report Draft Pre-qualification Prequalification Draft Bidding Document Specific nt Bidding Documents as Proposal Submission / and Recommendation Signed Contract Contract Completion Documents Evaluation Report / Justification Notice / Invitation Issued Opening / Minutes for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CONSULTING FIRMS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Amount (US$) Actual Amount (US$) Status Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Issued Proposals / Minutes Proposal Negotiated Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRS/NEWMAP/QCBS/13/01 / Consultancy for Design and Supervision of Civil works Prior Quality And Cost- Based 1,975,400.00 0.00 Pending 2013-02-04 2013-03-26 2013-03-26 2013-03-26 2013-07-22 2014-01-26 2014-03-09 2017-08-24 CRS/NEWMAP/QCS/15/01 / Consultancy for GIS upgrade and mapping of erosion and water shed sites in the State Consultant Qualification Pending 188,000.00 0.00 2015-06-15 2015-06-15 2016-03-08 2016-03-15 2016-06-02 2016-07-07 CRS/NEWMAP/QCS/14/01 / Contract Renewal - Engagement of focal NGO to support SPMU activities in all intervention sites. Watershed Consultant Qualification Pending 100,000.00 0.00 2014-05-01 2014-05-14 2015-01-09 2015-01-23 2016-10-24 2017-10-23 CRS/NEWMAP/CQ/16/02 / Consultancy for Sensitisation, Design and Supervision of Household and Community Water Harvesting for new sites Consultant Qualification 200,000.00 0.00 Pending 2017-03-06 2017-03-06 2017-03-06 2017-03-06 2017-03-06 2017-03-06 CRS/NEWMAP/CQS/17/01 / Consultancy of design for six additional sites Watershed Consultant Qualification Pending 300,000.00 0.00 2017-02-20 2017-02-20 2017-04-17 2017-05-01 2017-05-22 2019-06-19 INDIVIDUAL CONSULTANTS Activity Reference No. / Description Loan / Credit No. Component Review Type Method Market Approach Contract Type Amount (US$) Actual Amount (US$) Status Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Consultant Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual CRS/NEWMAP/IC/14/29 / Consultancy for the engagement of SPMU Consultant Open 50,000.00 0.00 Pending 2016-06-07 2016-06-07 2016-06-07 2016-06-07 2017-06-07 CRS/NEWMAP/IC/16/03 / Conduct needs assesment of livelihood options in Ikot Nkebre/ Lemna/ Fed. Agric Invention sites Open 50,000.00 0.00 Pending 2016-08-19 2016-09-15 2016-09-19 2016-09-26 2016-09-30 CRS/NEWMAP/IC/16/04/001 / Consultancy for M & E Baseline data for Ikot Nkebre Gully Site Open 24,060.00 0.00 Pending 2016-08-16 2016-10-18 2016-11-01 2016-12-13 2017-03-15 CRS/NEWMAP/IC/16/05/001 / Safeguards (ESMP) studies for Ikot Nkebre Gully site Open 23,000.00 0.00 Pending 2016-03-18 2016-04-25 2016-05-13 2016-06-24 2017-03-20 CRS/NEWMAP/IC/16/06/001 / Safeguards (RAP) studies for Ikot Nkebre Gully site Open 23,000.00 0.00 Pending 2016-03-18 2016-04-25 2016-05-13 2016-06-24 2017-03-20 CRS/NEWMAP/IC/16/05/002 / Safeguards (ESMP) studies for LEMNA Agric Gully Erosion site Open 20,000.00 0.00 Pending 2016-10-31 2016-11-16 2017-02-02 2017-02-14 2017-04-06

Page 3 CRS/NEWMAP/IC/16/06/002 / Safeguards (RAP) studies for LEMNA Agric Gully Erosion site Open 18,000.00 0.00 Pending 2016-03-18 2016-12-15 2017-01-30 2017-02-14 2017-04-21 CRS/NEWMAP/IC/16/04/002 / Consultancy for M & E Baseline data for LEMNA Agric Gully Site Open 23,750.00 0.00 Pending 2017-03-13 2017-05-08 2017-05-22 2017-06-12 2017-08-23 CRS/NEWMAP/IC/16/04/012 / Engagement of Media Consultant for coverage of Project activities for production and airing of documentaries on Radio and Tv Open 70,000.00 0.00 Pending 2017-03-20 2017-05-15 2017-05-30 2017-06-19 2017-08-07 CRS/NEWMAP/IC/16/15 / Support to Communities to establish Nurseries, Plant trees, grasses of assorted Indegenous species for Catchment areas Open 100,000.00 0.00 Pending 2017-05-15 2017-06-12 2017-07-10 2017-08-14 2017-10-18 CRS/NEWMAP/IC/16/13 / Consultancy for Design and Hosting and management of interactive website ion of Civil works Watershed Open 10,000.00 0.00 Pending 2017-03-27 2017-03-27 2017-03-27 2017-03-27 2017-03-27 CRS/NEWMAP/IC/16/14 / Impact Assessment of CRSNEWMAP Gully works intervention activities from inception till date Open 10,000.00 0.00 Pending 2017-07-06 2017-08-17 2017-08-21 2017-10-05 2017-11-23 CRS/NEWMAP/IC/17/01 / Consultancy Study to develop and produce a soil map to determine soil vulnerability to Erosion in Cross River State Open 30,000.00 0.00 Pending 2017-05-15 2017-06-28 2017-07-24 2017-08-14 2017-10-18