Woodstock, Route 26 Stream Relocation Project

Similar documents
Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Assessment. Assessment

Template for Sediment and Erosion Control Plan General Instructions. Section Instructions

NORTHUMBERLAND COUNTY, PA

Rosgen Classification Unnamed Creek South of Dunka Road

Template for Sediment and Erosion Control Plan General Instructions

Third Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

Fish Passage at Road Crossings

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

CAUSES FOR CHANGE IN STREAM-CHANNEL MORPHOLOGY

Why Geomorphology for Fish Passage

Project (Project No. US-CA-62-2) Maintenance Inspection and Reports (Subtask 14.1) Inspection Report No.2

Second Annual Monitoring Report Tidal Wetland Restoration 159 Long Neck Point Road, Darien, CT NAE

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

MEANDER MIGRATION MODEL ASSESSMENT FOR THE JANUARY 2005 STORM, WHITMAN PROPERTY, SAN ANTONIO CREEK, VENTURA COUNTY, CALIFORNIA

Black Gore Creek 2013 Sediment Source Monitoring and TMDL Sediment Budget

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

Project Proposal. Lyme Brook. Newcastle-under-Lyme. 3 rd July 2015

Tom Ballestero University of New Hampshire. 1 May 2013

Vermont Stream Geomorphic Assessment. Appendix J. Vermont Regional Hydraulic Geometry Curves

Stephen J. Souza, Ph.D. Princeton Hydro, LLC

Application of Fluvial Geomorphologic Techniques At Abandoned Mine Sites 1. David A. Greenfield 2 Dennis M. Palladino 3

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

1.0 INSPECTION ANNUAL INSPECTION, JUNE 29, 2011 CARMACKS COPPER PROJECT, CARMACKS, YUKON. Dear Mr. West-Sells,

Case Study 2: Twenty-mile Creek Rock Fords

Restoring Meanders to Straightened Rivers 1.7 Reconnecting remnant meanders

PolyMet NorthMet Project

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Business. Meteorologic monitoring. Field trip? Reader. Other?

The River Restoration Centre therrc.co.uk. Understanding Fluvial Processes: supporting River Restoration. Dr Jenny Mant

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Solutions to Flooding on Pescadero Creek Road

B805 TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES - OPSS 805

PHASE 1 STREAM GEOMORPHIC ASSESSMENT. Castleton River, Rutland County Vermont. Final Report

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

Case Study 14. Rocky Creek Vented Box Culvert Ford

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

Forest Service AOP Meeting Objectives of Stream Simulation: Examples and Talking Points

Appendix F Channel Grade Control Structures

Channel Assessments of Selected Watersheds within TFL 52

Session C1 - Applying the Stream Functions Pyramid to Geomorphic Assessments and Restoration Design

PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 3-0

Use of benthic invertebrate biological indicators in evaluating sediment deposition impairment on the Middle Truckee River, California

Fluvial Driven Alluvial Fans

Materials. Use materials meeting the following.

APPENDIX B Hydraulic Considerations for Pipeline Crossings of Stream Channels

DETAILED DESCRIPTION OF STREAM CONDITIONS AND HABITAT TYPES IN REACH 4, REACH 5 AND REACH 6.

Lower South Fork McKenzie River Floodplain Enhancement Project

Geomorphic Assessment of the Middle and Lower Swan Lake Watershed, Calhoun Division of Two Rivers National Wildlife Refuge.

SELBY CREEK STREAM HABITAT RESTORATION AND RIPARIAN REVEGETATION PROJECT: GEOMORPHIC ANALYSIS AND REVIEW

River Nith restoration, cbec UK Ltd, October 2013 APPENDIX A

Dan Miller + Kelly Burnett, Kelly Christiansen, Sharon Clarke, Lee Benda. GOAL Predict Channel Characteristics in Space and Time

Birch Creek Geomorphic Assessment and Action Plan

Savannah District s Revised SOP: Moving Towards A Functional Approach. US Army Corps of Engineers BUILDING STRONG

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

HUMAN IMPACTS AND RIVER CHANNEL ADJUSTMENT, NORTHEASTERN OREGON: IMPLICATIONS FOR RESTORATION. Patricia F. McDowell 1 INTRODUCTION

GEOL 652. Poudre River Fieldtrip

What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash?

Stream Simulation: A Simple Example

!"#$%&&'()*+#$%(,-./0*)%(!

Waterborne Environmental, Inc., Leesburg, VA, USA 2. Syngenta Crop Protection, LLC, North America 3. Syngenta Crop Protection, Int.

San Joaquin River Tributary Sediment Transport and Geomorphology Study

Elevation (ft) Slope ( ) County CONDITION CATEGORY. Parameter Natural Condition Slightly impacted Moderately Impacted Heavily Impacted

Crows Landing Naval Base Easement

Appendix G. Meso-Habitat Surveys. DRAFT Annual Technical Report

Overview of fluvial and geotechnical processes for TMDL assessment

Long Valley Meadow Restoration Project

Perspectives on river restoration science, geomorphic processes, and channel stability

Factors Governing Successful Tidal Wetland Mitigation. Walter I. Priest, III Wetland Design and Restoration ASWM Webinar 16 July 2018

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Kootenai River Habitat Restoration Program Update

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %

Columbia Estuary Province

COLUSA BASIN WATERSHED ASSESSMENT. Final. Prepared by: H. T. Harvey & Associates. In Collaboration With:

River Restoration and Rehabilitation. Pierre Y. Julien

Habitat Assessment. Peggy Compton UW-Extension Water Action Volunteers Program Coordinator

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

FUTURE MEANDER BEND MIGRATION AND FLOODPLAIN DEVELOPMENT PATTERNS NEAR RIVER MILES 200 TO 191 OF THE SACRAMENTO RIVER PHASE III REPORT

Waterbury Dam Disturbance Mike Fitzgerald Devin Rowland

Restoration Goals TFG Meeting. Agenda

Technical Supplement 3E. Rosgen Stream Classification Technique Supplemental Materials. (210 VI NEH, August 2007)

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

3. MARINE HABITAT RESTORATION

Gateway Trail Project

Dams, sediment, and channel changes and why you should care

December 11, 2006 File:

Black Gore Creek Sediment Source Monitoring and TMDL Sediment Budget

Stream Classification

Important Copyright Information

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

Geomorphology Studies

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT

U-Shaped Sediment Traps

The Effects of Geomorphology and Watershed Land Use on Spawning Habitat

Sediment Deposition LET THE RIVER RUN T E A C H E R. Activity Overview. Activity at a Glance. Time Required. Level of Complexity.

STREAM MODULES: SPREADSHEET TOOLS FOR RIVER EVALUATION, ASSESSMENT AND MONITORING **

1 INTRODUCTION AND MAJOR FINDINGS... 1

Transcription:

MAINE DEPARTMENT OF TRANSPORTATION 2006 POST - CONSTRUCTION MONITORING REPORT: Woodstock, Route 26 Stream Relocation Project Year 1 of 5 Compensation for the Woodstock, Route 26 Highway Reconstruction Project (MDOT PIN 10021.00) ACOE Permit Number: NAE-2005-227 DEP Permit Number: L-22223-2G-A-N March 2007 Prepared by The Maine Department of Transportation Natural Resource Mitigation Unit State House Station 16 Augusta, Maine 04333 1

2006 Post-Construction Monitoring Report: Woodstock, 10021.00 CONTENTS Section Title Page 1.0 Introduction 3 2.0 Stream Restoration Summary 3 3.0 Monitoring Inspections 4 4.0 Mitigation Goals and Performance Standards 4 5.0 Monitoring Methods 5 6.0 Results and Discussion 5 7.0 Recommendations 7 8.0 References 7 Figure 1 Project Location Map 3 Table 1 Performance Standards Results 5 Appendix A - Photographs 8 2

1.0 Introduction This report presents the results of the 2006 post-construction monitoring at the stream relocation project in Woodstock, Oxford County (Figure 1). The site provides compensation for 48,552 square feet of wetland impacts associated with the reconstruction of Route 26 in Woodstock by the Maine Department of Transportation (MaineDOT), as described in Wetland Mitigation Plan for the project submitted in January 2005. Compensation at the site consisted of relocating a roadside stream and removing road sand sediment from a small pond and restoring the riparian plantings at both sites. See Figure 1 for project location. Proposed Stream Relocation Area Figure 1 Project Location Map 3

2.0 Stream Mitigation Summary The stream relocation and dredging work was completed from July 7- August 18, 2005 by T. Buck Construction of Auburn, Maine. Peter Newkirk and Deane Van Dusen from MaineDOT s ENV Office prepared the design and provided construction oversight. The stream relocation moved the channel approximately 35 from the roadside ditch to a created cobble lined channel with adjacent riparian vegetation. The reconstructed stream channel was rebuilt with a series of pools and riffles. Within the riffle features, keystones were implanted in rows across the channel to form small cascades, thereby controlling the grade and anchoring the riffle structure. We expect that small pools will be scoured below each series of larger stones, thereby creating a variety of microhabitat niches that will benefit macroinvertebrates. Plantings of indigenous winterberry, alder, chokeberry, nannyberry, arrowwood, pussy willow and shadblow were installed in the riparian buffer along the stream course. In the pond where excess road sand had deposited at the end of a drainage culvert, the sediment was removed down to the existing wetland substrate. This area was re-graded with a pit and mound microtopography and planted with pussy willow, alder, and buttonbush. Wetland seed mix was planted in the re-graded areas. (see before and after photos, Appendix A). 3.0 Monitoring Inspections MaineDOT staff visited the site on April 9, 2006 to check site conditions during spring flooding; on August 21, 2006 to assess the establishment of the planted woody species; and on September 26, 2006 to determine the presence and number of European Alder (Alnus glutinosa) a non native species that was installed by the landscape contractor. 4.0 Mitigation Goals and Performance Standards The restoration goal is to improve the habitat value of the stream course by moving it out of the roadside ditch, and removing the sediment deposit from the small pond and planting riparian buffers. 4

5.0 Monitoring Methods Stream morphology will be monitored using a pre-determined reference reach that is located approximately 200 downstream of the project area. This reach will be compared to the re-constructed areas in and around the new channel. The following performance standards will be used to monitor the success of the new stream channel: stabilize banks in the work area; establishment of riparian vegetation; no significant siltation in stream pools; no significant post-construction changes in stream planform configuration; and no significant re-arrangement of stream-bed material. The pond area where sediment was removed and a pit and mound micro-topography was developed and planted will be monitored for riparian establishment, invasive species and the presence of siltation. 6.0 Results and Discussion The restored stream channel was developed according to landscape setting and topography. The new channel used characteristics borrowed from the reference reach to address grade changes and the placement of riffles and pools. The new channel consists of a cobble substrate with large boulder placement to encourage sinuosity. Because the stream is classified as high-gradient in this newly created section, there are a number of knick-points or drops with associated scour holes. All of these grade control structures were designed according to those natural structures in the reference reach. This stream does not support any fishery, so fish passage was not of concern. Channel morphology remained constant through the 05-06 winter and 06 growing season with no changes to the channel planform. Minimal siltation was observed in the newly constructed pools. It was believed that the siltation that was observed was generated through the construction process and early flushing of the new stream channel. Stream banks remained stable through the same period. Riparian plantings consisting of: winterberry, alder, chokeberry, nannyberry, arrowwood, pussy willow and shadblow were installed in a 15 wider buffer on either side of the channel. Adjacent mixed hardwood and softwood forest will provide a seed source for volunteer stock within this riparian buffer. All planted stock was 5

monitored for survival and of the 1013 installed plants, 15 were determined unacceptable and tagged for replacement. See Table 1 Performance Standards Results. Prior to sediment dredging, the pond site was acting as a sediment trap for road sand and there was a considerable alluvial deposit at the end of the culvert that drained the road ditches. The road project installed a sediment basin, above the pond outlet, to capture this material. The restoration work removed the sediment plume down to existing wetland substrate, and re-developed a pit and mound microtopography and installed riparian plantings. The presence of invasive species to include common reed (Phragmites australis), purple loosestrife (Lythrum salicaria) and buckthorn (Frangula alnus syn. Rhamnus frangula) was reviewed and none were present. The site was monitored for siltation and was found to be stable with no sediment from the restoration site or the culvert. The 178 riparian plantings were all found to be in acceptable condition. It came to our attention during this first year of monitoring that 53 European Alder (Alnus glutinosa) were planted in place of Speckled Alder (Alnus incana ssp. rugosa) in the restored pond area riparian plantings. The landscape contractor was notified and we requested that they replace this non-native species with the species requested in the contract. The contractor is currently negotiating with their supplier and will complete these replacements in spring 07. Table 1: Performance Standards Results Performance Standard Stream banks stable 2006 Findings (Year 1) Banks appear to be well vegetated and stable. Presence of siltation in stream pools Establishment of planted riparian buffers Some minor siltation in pools that appear to be the result of the construction activities from 2006. Planted woody vegetation is doing very well. The 53 European Alder that were planted will be removed Spring 07 and replaced with native Speckled Alder. 6

Changes in stream planform Re-arragement of stream bed material Invasive species control Stream planform has not changed since the stream channel construction. The new channel is accommodating the flows successfully. Stream bed material appears to be very stable with some movement of siltation during high flows. No re-arrangement of bed material is occurring. No invasive species were present. 7.0 Recommendations Continue monitoring the channel morphology and performance standards. The second year of monitoring will occur during the 07 growing season. To date, all the performance standards are being met on this restoration project. 8.0 References Harrelson, Cheryl C.; Rawlins, C.L.; Potyondy, John P. 1994. Stream channel reference sites: an illustrated guide to field technique. Gen. Tech. Rep. RM-245. Fort Collins, CO: U.S. Department of Agriculture, Forest Service, Rocky Mountain Forest and Range Experiment Station. 61 pp. Parish Geomorphic Ltd. 2001. South Bog Stream and Bemis Stream Fluvial Geomorphological Assessment (Memo to F. Bonney). 10 pp. Pfankuch, D.J. 1975. Stream reach inventory and channel stability evaluation. USDA Forest Service, RI-75-002. Government Printing Office #696-260/200, Washington, D.C. 26 pp. Rosgen, Dave. 1996. Applied River Morphology. Wildland Hydrology, Pagosa Springs, Colorado. 7

Appendix A Photographs 8

Reference Reach Photographs: Existing channel at Station 2+345 L Existing channel drop point at Station 2+345 9

Existing channel at Station 2+380 L 10

Photographs prior to Construction: Granite culvert at Station 2+340 L Sediment plume at culvert outlet into pond at Station 2+480 R 11

Stream channel at Station 2+160 R Old road bed and site of granite culvert at Station 2+300 L 12

Rte 26 road ditch stream at Station 2+270 L 13

Photographs after Construction: Restored pit and mound topography at pond area Station 2+480 R Restored stream channel at Station 2+460 R 14

Restored stream channel in old road bed at Station 2+320 L 15

New stream channel at Station 2+080 L New stream channel at Station 2+160 R 16

New stream channel at Station 2+280 R New stream channel at Station 2+100 L 17