UAS Student Residence

Similar documents
Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF



PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

APPENDIX C HYDROGEOLOGIC INVESTIGATION

PLATE 6 FEB G r o v e l a n d F l o o d w a l l - B o r e h o l e M a p. Legend. Groveland Floodwall Boreholes. Contour Lines.

Appendix G GEOLOGICAL INVESTIGATION


B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

APPENDIX C. Borehole Data

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

ADDENDUM 1 FISHER SLOUGH RESTORATION PROJECT SKAGIT COUNTY, WASHINGTON

Dashed line indicates the approximate upper limit boundary for natural soils. C L o r O L C H o r O H

DRILL HOLE # BH-BGC13-FN-01

Project No: 68R3056 Client: City of Frederick Project: RFQ 14-H Future North Side Water Tank City/State: 7516 Hayward Road, Frederick, MD


DATE: 5/17/2012. LOGGED BY: Geoff Richards. COMPANY: Tetra Tech EM, Inc. DRILL FOREMAN: Walter

Appendix A. Producer Statement Advisory Note

Dry Muliwai Sample Location Map

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

GEOTECHNICAL EXPLORATION REPORT

CITY OF VALDEZ Project Title: East Pioneer Reconstruction Project No.: Contract No.: TO: All Recipients Date: April 14, 2014

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

ENGINEERING ASSOCIATES

Chapter 12 Subsurface Exploration

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

Geotechnical Investigation

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

SUBSURFACE EXPLORATION REPORT FOR THE MARITIME INFRACTURE REHABILITATION AT WHISKEY ISLAND BULK TERMINAL CLEVELAND, OHIO PGI PROJECT NO.

Standards and Procedures for Site Specific Soil Mapping in Rhode Island. Pg 1

PARQUE COLON AGUADILLA (LAND PROPERTY OF MUNICIPIO AGUADA) LOT PROPERTY OF SUNC. ESTEVEZ BW-1 BW-5 BW-2 DB1 BW-3 DB2 BW-4 DB3 GWS-1

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

PREPARED FOR MR. JOE WOOD CARTER & SLOOPE, INC PEAKE ROAD MACON, GEORGIA PREPARED BY

Reference No S072 APRIL 2012

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

APPENDIX A GEOTECHNICAL REPORT

New WW Hastings Hospital Geotechnical Investigation RFP Addendum #1

Geotechnical Data Report

Appendix F Laboratory test results

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

May 8, Mr. Jeff Dingman Abundant Land Partners LLC P.O. Box 471 Genoa, Nevada 89411

5. Which surface soil type has the slowest permeability rate and is most likely to produce flooding? A) pebbles B) sand C) silt D) clay A) B) C) D)

GZA GeoEnvironmental, Inc.

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

REPORT. Explorations and Geotechnical Engineering Services

GEOTECHNICAL ENGINEERING REPORT HARPER VALLEY SANITARY LIFT STATION AND FORCEMAIN KIRTLAND, NEW MEXICO. Submitted To:

Geotechnical Data Report

Town of Brunswick, Maine

Geotechnical Engineering Subsurface Exploration The Proposed LAPLAWD Phase 2B 12 Main Water Line Durango, Colorado

Figure 1 The map shows the top view of a meandering stream as it enters a lake. At which points along the stream are erosion and deposition dominant?

B-1 SURFACE ELEVATION

3.0 SUMMARY OF FINDINGS

Geotechnical Engineering Report

APÉNDICE F. Evaluación Geotécnica

APPENDIX E SOILS TEST REPORTS

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

THREE TEETH. ONE HOLDER.

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

Northern Colorado Geotech

Existing Bridge Proposed Bridge 66003

From - To 0,00-4,90 4,90-6,40 6,40-8,60 8,60-9,60 9,60-10,50 10,50-12,00 12,00-14,80 14,80-15,80 15,80-19,30 19, ,00

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

Parsons APPENDIX A BORING LOGS AND DEVELOPMENT LOG

Cabarrus County, NC Construction and Demolition Debris Landfill Phase 1L Expansion Project Bidder's List CDM Project No.

June 13, 2018 Project No E001. Issaquah School District 565 Northwest Holly Street Issaquah, Washington 98027

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

GEOLOGIC/GEOTECHNICAL INVESTIGATION FOR TENTATIVE MAP LAVENIDA SUBDIVISION (APN # ) ORINDA, CALIFORNIA

IN SITU SPECIFIC GRAVITY VS GRAIN SIZE: A BETTER METHOD TO ESTIMATE NEW WORK DREDGING PRODUCTION

APPENDICES. Appendix A City Standard Details Appendix B Engineering Geology Report

CITY OF CAPE CORAL NORTH 2 UTILITIES EXTENSION PROJECT CONTRACT 3

SD-100 SD-200 SITE AND EXPLORATION PLAN SODO SEGMENT. FIG. 3 Sheet 4 of 9. Seattle Monorail Project Seattle, Washington Scale in Feet

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

December 3, Work Plan, ECL Pond Soil Investigatio n Santa Susana Field Laboratory Rockwell International Corporation,

East Land Quality Forum Drilling Techniques; Old and New

Name: KEY OBJECTIVES HYDROLOGY:

Report of Preliminary Geotechnical Exploration. CSO-012 Sewer Separation Cincinnati, Hamilton County, Ohio. February, 2011

LEGEND ODOT CLASS A-3. A-3a. A-4a. A-6a. A-6b TOTAL VISUAL VISUAL VISUAL BORING LOCATION - PLAN VIEW


patersongroup memorandum 1.0 Field Investigation consulting engineers

DYREGROV ROBINSON INC.

Don Elsenheimer, Ph.D Glenn Melchert Minnesota Dept. Natural Resources

SOIL FORMATION SOIL CLASSIFICATION FOR GEOTECHNICAL ENGINEERS. Soil Properties and Classification

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL ENGINEERING REPORT LOWER VALLEY LAGOON PHASE I AND II SAN JUAN COUNTY, NEW MEXICO. Submitted To:

SITE INVESTIGATION 1

FINAL GEOTECHNICAL INVESTIGATION BURNS BRIDGE REPLACEMENT COLORADO RIVER ROAD BURNS, COLORADO. December 12, 2012

AN EMPLOYEE OWNED COMPANY

REPORT OF PRELIMINARY SUBSURFACE EXPLORATION. VCU Basketball Practice Facility 1300/1328 West Marshall Street City of Richmond, Virginia.

December 5, Junction Gateway, LLC 7551 W. Sunset Boulevard #203 Los Angeles, CA Mr. James Frost P: Dear Mr.

Geotechnical Engineering Report

Soil Profiles (West, Ch. 8)

3.0 SITE COMPARISON GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL 3.1 Comparison of Sites

Assistant Chief-Bureau of Structures and Geotechnical Services

Transcription:

General Notes, Abbreviations and Symbols C100

MATCH LINE - SEE SHEET L6 Existing Site Topographic Conditions C101

MATCH LINE - SEE SHEET L5 Existing Site Topographic Conditions C102

DEPTH(FT.) 5 FROZEN SOIL GRAPH LOCATION SAMPLED T.P.-1 SOIL DESCRIPTION HITACHI EX 150 EXCAVATOR 0'-1.75' Black Organics, includes moss, roots and surface vegetation. H2O seeps @ 1.5' 7-28-12 1.75'-3.5' Wet, loose gray Glacial Till with Silty Sand and 1 Bs Gravel. 2 Bs 3.5'-7.0' Medium dense gray Gravel, Sandy Silt to Silty Sand (Glacial Till) with trace of Beach Shells and Cobbles, dry and very dense at 7.0'. - End of Test Pit at 7.0' - Bucket Refusal DEPTH(FT.) 5 FROZEN SOIL GRAPH LOCATION SAMPLED T.P.-2 SOIL DESCRIPTION HITACHI EX 150 EXCAVATOR 7-28-12 0'-2.0' Black Organics, includes moss, roots and surface vegetation. Large Boulder 3'X2',12" below surface with cobbles. H2O seeps @ 2.5' 2.0'-3.5' Wet brown Silty Sand with Gravel. 1 Bs 3.5'-4.5' Loose moist to wet, light brown Sandy/Gravel, Gravelly Sand. 4.5'-6.0' Medium dense to very dense dry gray Gravelly 2 Bs Sandy Silt (Glacial Till) with Cobbles and Beach Shells. - End of Test Pit at 6.0' - Bucket Refusal DEPTH(FT.) 5 FROZEN EXPLANATION 5 UNFROZEN GROUND Little Visible Ice 0-10 V x A.B. ICE DESCRIPTION SAMPLE NUMBER 1 Ss, 72, 57.1%, 85.9pcf DRY DENSITY WATER CONTENT BLOWS/FOOT SAMPLER TYPE FROZEN GROUND TYPICAL SOILS LOG Ss Sz Sh Sp A Ts Tm Bs ORGANIC MATERIAL W.D. WATER TABLE APPROX. STRATA CHANGE BEDROCK 1.4" SPLIT SPOON WITH 140 LB. HAMMER 1.4" SPLIT SPOON WITH 340 LB. HAMMER 2.5" SPLIT SPOON WITH 340 LB. HAMMER 2.5" SPLIT SPOON, PUSHED AUGER SAMPLE SHELBY TUBE MODIFIED SHELBY TUBE BULK SAMPLE SAMPLER TYPE SYMBOLS MRV ARCHITECTS ORGANIC MATERIAL CLAY SILT SAND SOIL SYMBOLS SOIL GRAPH LOCATION SAMPLED T.P.-3 SOIL DESCRIPTION HITACHI EX 150 EXCAVATOR 7-28-12 0'-2.5' Black Organics, includes moss, roots and surface vegetation and stumps. Trace of Boulders at 20" below surface. 2.5'-4.5' Light brown Sandy Gravel, moist. 1 Bs 4.5'-5.5' Medium dense to very dense gray Gravelly Sandy 2 Bs Silt (Glacial Till) with Cobbles and Boulders, dry. 5 - End of Test Pit at 5.5' - Bucket Refusal DEPTH(FT.) FROZEN SOIL GRAPH LOCATION SAMPLED T.P.-4 SOIL DESCRIPTION HITACHI EX 150 EXCAVATOR 0'-3.0' Black Organics, includes moss, roots, surface vegetation and stumps. 3.0'-5.0' Loose, damp, brown, Sandy Gravel with Cobbles at 4'. Weathered Gravels observed. 1 Bs 5.0'-6.0' Medium dense brown Sandy Gravel. H2O seeps @ 5.5' 7-28-12 6.0'-7.0' Dense gray Gravelly Sandy Silt (Glacial Till) with 2 Bs Cobbles, Boulders and Beach Shells. - End of Test Pit at 7.0' - Bucket Refusal W.D.-WHILE DRILLING/DIGGING A.B.-AFTER BORING GRAVEL COBBLES & BOULDERS BEDROCK SAND & GRAVEL BEACH SHELLS SHALE Test Pit Location and Test Pit Logs C103

MATCH LINE - SEE SHEET C201 Site Demolition Plan 586-1333 C200

MATCH LINE - SEE SHEET C202 MRV ARCHITECTS MATCH LINE - SEE SHEET C200 Site Demolition Plan 586-1333 C201

MATCH LINE - SEE SHEET C201 Site Demolition Plan 586-1333 C202

MATCH LINE - SEE SHEET C301 Site Plan 586-1333 C300

MATCH LINE - SEE SHEET C300 MATCH LINE - SEE SHEET C302 Site Plan 586-1333 C301

MATCH LINE - SEE SHEET C301 MATCH LINE - SEE SHEET C303 Site Plan 586-1333 C302

MATCH LINE - SEE SHEET C302 MATCH LINE - SEE SHEET C304 Site Plan 586-1333 C303

MATCH LINE - SEE SHEET C303 Site Plan 586-1333 C304

Site Cross Sections C305

MATCH LINE - SEE BELOW MRV ARCHITECTS MATCH LINE - SEE ABOVE Sanitary Sewer Profile C306

Construction Details C400

Construction Details C401

Construction Details C402

Construction Details C403

Construction Details C404