Soft Ground Coupled Consolidation

Similar documents
Cubzac-les-Ponts Experimental Embankments on Soft Clay

Modified Cam-clay triaxial test simulations

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Rapid Drawdown

Consolidation of a 1D column

GEO-SLOPE International Ltd, Calgary, Alberta, Canada Wick Drain

Settlement due to Pumping Well

Verification of the Hyperbolic Soil Model by Triaxial Test Simulations

A Pile Pull Out Test

Seepage through a dam embankment

Calculation of 1-D Consolidation Settlement

Example Application 12. Embankment Loading on a Cam-Clay Foundation

Tutorial 12 Excess Pore Pressure (B-bar method) Undrained loading (B-bar method) Initial pore pressure Excess pore pressure

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Compressibility & Consolidation

Time Rate of Consolidation Settlement

Filling Pond Head vs Volume Functions

Permafrost Thawing and Deformations

Hyperbolic Soil Bearing Capacity

The process of consolidation and settlement

Tikrit University. College of Engineering Civil engineering Department CONSOILDATION. Soil Mechanics. 3 rd Class Lecture notes Up Copyrights 2016

Calculation types: drained, undrained and fully coupled material behavior. Dr Francesca Ceccato

Triaxial Shear Test. o The most reliable method now available for determination of shear strength parameters.

NUMERICAL ANALYSIS OF DAMAGE OF RIVER EMBANKMENT ON SOFT SOIL DEPOSIT DUE TO EARTHQUAKES WITH LONG DURATION TIME

Advanced model for soft soils. Modified Cam-Clay (MCC)

OPTIMAL SENSOR LOCATION FOR PARAMETER IDENTIFICATION IN SOFT CLAY

Instructor : Dr. Jehad Hamad. Chapter (7)

SHEAR STRENGTH OF SOIL

GEOMENGTER - Geomechanical and Geotechnical Engineering

Lateral Earth Pressure

Attachment D-7: Rebound and Uplift of the Stilling Basin, Deep Soil Mixing Design

Use of Instrumented Test Fill to Assess Static Liquefaction of Impounded Fly Ash

Determination of Excess Pore Pressure in Earth Dam after Earthquake

Table of Contents Chapter 1 Introduction to Geotechnical Engineering 1.1 Geotechnical Engineering 1.2 The Unique Nature of Soil and Rock Materials

Deep Foundations 2. Load Capacity of a Single Pile

The Effect of Impervious Clay Core Shape on the Stability of Embankment Dams

EU Creep (PIAG-GA )

1.8 Unconfined Compression Test

CONSOLIDATION OF SOIL

Monitoring of underground construction

(Refer Slide Time: 02:18)

REINFORCED PILED EMBANK- MENT FOR A HIGH-SPEED RAILWAY OVER SOFT SOIL: A NUMERICAL AND ANALYTI- CAL INVESTIGATION

SOIL MODELS: SAFETY FACTORS AND SETTLEMENTS

TIME-DEPENDENT BEHAVIOR OF PILE UNDER LATERAL LOAD USING THE BOUNDING SURFACE MODEL

Laboratory Testing Total & Effective Stress Analysis

FUNDAMENTALS SOIL MECHANICS. Isao Ishibashi Hemanta Hazarika. >C\ CRC Press J Taylor & Francis Group. Taylor & Francis Group, an Informa business

Consolidation. Hsin-yu Shan Dept. of Civil Engineering National Chiao Tung University

CPT: _CPTU1. GEOTEA S.R.L. Via della Tecnica 57/A San Lazzaro di Savena (BO)

A Constitutive Framework for the Numerical Analysis of Organic Soils and Directionally Dependent Materials

On equal settlement plane height in piled reinforced embankments

SOIL MECHANICS: palgrave. Principles and Practice. Graham Barnes. macmiiian THIRD EDITION

CHARACTERISTICS OF VACUUM CONSOLIDATION COMPARING WITH SURCHARGE LOAD INDUCED CONSOLIDATION

Chapter 7 Permeability and Seepage

*** ***! " " ) * % )!( & ' % # $. 0 1 %./ +, - 7 : %8% 9 ) 7 / ( * 7 : %8% 9 < ;14. " > /' ;-,=. / ١

Geotechnical Modeling Issues

OP-13. PROCEDURES FOR DESIGN OF EMBANKMENT

Benefits of Collaboration between Centrifuge Modeling and Numerical Modeling. Xiangwu Zeng Case Western Reserve University, Cleveland, Ohio

Dynamic Analysis Contents - 1

Finite-Element Parametric Study of the Consolidation Behavior of a Trial Embankment on Soft Clay

Soil and Rock Strength. Chapter 8 Shear Strength. Steel Strength. Concrete Strength. Dr. Talat Bader May Steel. Concrete.

2.11 Overburden Management

Numerical model comparison on deformation behavior of a TSF embankment subjected to earthquake loading

Procedures and Methods for a Liquefaction Assessment using GeoStudio 2007

Finite Deformation Analysis of Dynamic Behavior of Embankment on Liquefiable Sand Deposit Considering Pore Water Flow and Migration

Consolidation Properties of NAPL Contaminated Sediments

Civil Engineering Department College of Engineering

Geotechnical Properties of Soil

A practical method for extrapolating ambient pore pressures from incomplete pore pressure dissipation tests conducted in fine grained soils

Seismic Stability of Tailings Dams, an Overview

EFFECTS OF PARALLEL GRADATION ON STRENGTH PROPERTIES OF BALLAST MATERIALS. Domenica Cambio 1, and Louis Ge 2

Chapter 7: Settlement of Shallow Foundations

Soils. Technical English - I 10 th week

Negative Skin Friction on Large Pile Group New Wembley Stadium. Mei Cheong

Finite Element Investigation of the Interaction between a Pile and a Soft Soil focussing on Negative Skin Friction

Pore pressures during stone column installation

Seismic Design of a Hydraulic Fill Dam by Nonlinear Time History Method

Modified Dry Mixing (MDM) a new possibility in Deep Mixing

Modelling the Construction of a High Embankment Dam

Destructuration of soft clay during Shield TBM tunnelling and its consequences

Testing of an expansive clay in a centrifuge permeameter

Computers and Geotechnics

Chapter (5) Allowable Bearing Capacity and Settlement

Soil strength. the strength depends on the applied stress. water pressures are required

Back analysis of staged embankment failure: The case study Streefkerk

DMT-predicted vs measured settlements under a full-scale instrumented embankment at Treporti (Venice, Italy)

POST-CYCLIC RECOMPRESSION CHARACTERISTICS OF A CLAY SUBJECTED TO UNDRAINED UNI-DIRECTIONAL AND MULTI-DIRECTIONAL CYCLIC SHEARS

Effects of D~edghag Technical Notes

FUNDAMENTALS OF CONSOLIDATION

Numerical analysis of effect of mitigation measures on seismic performance of a liquefiable tailings dam foundation

Shear Strength of Soils

Prof. B V S Viswanadham, Department of Civil Engineering, IIT Bombay

Finite Element Analysis of Embankments. on Soft Ground. Incorporating Reinforcement and Drains

Universitat Politècnica de Catalunya BARCELONATECH Escola Tècnica Superior d Enginyers de Camins, Canals i Ports. Soil Mechanics.

STUDY ON CONSOLIDATION OF ALLUVIAL CLAY IN NORTHERN QUEENSLAND

Module 9 : Foundation on rocks. Content

A multi-cell extension to the Barcelona Basic Model

Review of static and seismic stability of a cross-valley sand tailings embankment in a high rainfall, high seismicity setting

- As the water drains from the soil pores, the load increment is gradually shifted to the soil structure.

Theory of Shear Strength

CPTu in Consolidating Soils PAULUS P. RAHARDJO. PROFESSOR OF GEOTECNICAL ENGINEERING, UNIVERSITAS KATOLIK PARAHYANGAN - INDONESIA

TC211 Workshop CALIBRATION OF RIGID INCLUSION PARAMETERS BASED ON. Jérôme Racinais. September 15, 2015 PRESSUMETER TEST RESULTS

Transcription:

1 Introduction Soft Ground Coupled Consolidation This example is about constructing an embankment in delayed stages on a soft foundation so that some of the excess pore-pressure is allowed to dissipate before subsequent lifts are placed. The soft foundation is modeled using the non-linear Modified Cam-Clay (MCC) constitutive relationship. 2 Problem configuration and setup The problem configuration is presented in Figure 1. The embankment is five metres high and the side slope is 3h:1v. The embankment is to be constructed in five lifts, each one metre thick. 14 File Name: Soft ground coupled consolidation.gsz 12 Elevation - m 8 6 4 2 0-2 -2 0 2 4 6 8 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Figure 1 Problem configuration Distance - m The upper metre of the foundation is considered to be desiccated, fractured and over-consolidated. The fractured nature of this crust is believed to be such that it gives the soil a high permeability, and is porous enough that the water table will at all times remain 1 m below the original ground surface. The foundation soil is slightly over-consolidated. The OCR ratio is 1.2 and the initial void ratio is 1.5. The embankment material is considered to be granular and will not develop any excess pore-pressure due to loading. 3 Insitu conditions Since the foundation soil will be modeled using the MCC soil model, it is mandatory to establish the state of stress in the ground before the embankment loading starts. Remember that the past stress conditions are required to establish the starting yield surface for the MCC model. The initial starting pore-pressure conditions are defined with a watertable 1 m below the original ground surface. For the insitu analysis, the foundation soil is treated as being linear elastic with Poisson s ratio equal to 0.334. This converts to a K o value of 0.5. SIGMA/W Example File: Soft ground coupled consolidation.docx (pdf) (gsz) Page 1 of 6

4 Embankment material The embankment material is treated as a relatively soft Linear-Elastic material with an activation porepressure (suction) of - kpa. The properties of the embankment material are not considered to be all that relevant, and therefore are kept to be fairly simple. The prime purpose here is to look at the pore-pressure in and consolidation of the soft foundation. There is no need to unnecessarily complicate the analysis with a non-linear soil model for the embankment soil. 5 Hydraulic boundary conditions The hydraulic boundary condition is specified around the perimeter of the desiccated crust, as illustrated in Figure 2. The boundary condition is H = 8 m. This makes the pore-pressure zero at the initial watertable position and - kpa at the original ground surface. This boundary condition is maintained for all the loading analyses. File Name: Soft ground coupled consolidation.gsz Figure 2 Hydraulic boundary condition 6 Analysis tree The analysis sequencing and steps are illustrated by the analysis tree in Figure 3. Figure 3 Analysis tree The duration for each lift is 6 days. The lift is placed on the first day, and then an additional 5 days are allowed for consolidation. The final lift is placed on Day 25 and then pore-pressures are allowed to dissipate for 35 days. SIGMA/W Example File: Soft ground coupled consolidation.docx (pdf) (gsz) Page 2 of 6

7 Pore-pressure response The pore-pressure response 1 m below the desiccated crust and 1 m off the center-line is shown in Figure 4. As is clearly evident, the pore-pressure rises as each lift is placed and then dissipates with time. Eventually, the pore pressure would revert back to the initial insitu conditions, but the analysis has not been run long enough here to reach that position. Of interest is the response that the maximum pore-pressure actually occurs when the 4 th lift is placed, not when the final and 5 th lift is placed. The difference is small, but it is of interest because it is likely for most counter-intuitive. 45 PWP beneath center 40 Pore-Water Pressure (kpa) 35 30 25 20 15 5 0 20 30 40 50 60 Time (day) Figure 4 Pore-pressure response beneath the center of the embankment Figure 5 presents the pore-pressure build-up along a profile at the center-line of the embankment. Worth noting is that the pore-pressure remains zero at the original watertable position and the pore-pressure in the embankment soil is equal to the specified activation pressure equal to - kpa. Figure 6 shows the final dissipation stage as the conditions migrate back to the initial hydrostatic conditions. SIGMA/W Example File: Soft ground coupled consolidation.docx (pdf) (gsz) Page 3 of 6

PWP profile 14 12 Y (m) 8 6 4 2 0-20 0 20 40 60 80 0 120 140 160 Pore-Water Pressure (kpa) Figure 5 Pore-pressure build up along center-line profile. 14 PWP profile 12 Y (m) 8 6 4 2 0-20 0 20 40 60 80 0 120 140 160 Pore-Water Pressure (kpa) Figure 6 Final dissipation stage 8 Settlements The settlement along the original ground surface on Day 6 is shown in Figure 7. Of interest is that the maximum settlement is not under the center of the embankment, but about 5 m in from the embankment toe. This is due to the two-dimensional flow or two-dimensional consolidation as indicated by the flow vectors in Figure 8. There is some lateral flow where the settlement is the maximum but under the centerline the flow is all upward. This illustrates the benefits of a 2-D consolidation analysis. Eventually, the settlement is the maximum at the center-line, as shown in Figure 9. SIGMA/W Example File: Soft ground coupled consolidation.docx (pdf) (gsz) Page 4 of 6

Settlement 0.04 Y-Displacement (m) 0.00-0.04-0.08 0 5 15 20 25 X (m) Figure 7 Settlement along original ground surface Figure 8 Two-dimensional flow vectors on Day 6 0.7 Settlement Y-Displacement (m) 0.0-0.7 0 5 15 20 25 X (m) Figure 9 Settlement with time along the original ground surface SIGMA/W Example File: Soft ground coupled consolidation.docx (pdf) (gsz) Page 5 of 6

9 Excess pore-pressures A movie is included that shows how the excess pore-pressures develop and dissipate with time. Watching the movie provides a good mental image of the time-dependent process. Concluding remarks This example clearly demonstrates the power of doing a coupled consolidation analysis with staged loading and dissipation. The pore-pressures at any stage could now be used in SLOPE/W to check on the stability. Also, an analysis could be done by placing all the fill at once, and then checking on the stability. These types of analyses are left up to the reader as an exercise. SIGMA/W Example File: Soft ground coupled consolidation.docx (pdf) (gsz) Page 6 of 6