Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Central African Republic CF-Support to Vulnerable Groups Community Development Project (P111679) Operation Name: CF-Support to Vulnerable Groups Community Development Project (P111679) Project Stage: Implementation Seq.No: 9 Status: ARCHIVED Archive Date: 18-Aug-2014 Country: Central African Republic Approval FY: 2009 Product Line: IBRD/IDA Region: AFRICA Lending Instrument: Emergency Recovery Loan Implementing Agency(ies): Key Dates Board Approval Date 31-Mar-2009 Original Closing Date 31-Jul-2013 Planned Mid Term Review Date 20-Jun-2012 Last Archived ISR Date 04-Feb-2014 Effectiveness Date 03-Aug-2009 Revised Closing Date 31-May-2015 Actual Mid Term Review Date 05-Jul-2012 Project Development Objectives Project Development Objective (from Project Appraisal Document) The objectives of the Project are to rehabilitate social infrastructure and improve the capacity of local stakeholders to plan and manage local recovery in targeted areas of CAR. Has the Project Development Objective been changed since Board Approval of the Project? Yes No losure Authorized Public Disclosure Authorized Component(s) Component Name Component Cost Component A # Local Development Plan/Plan de Developpement Local (PDL) and Capacity Buidling 1.50 Component B # Priority Actions Fund/Fonds d'actions Prioritaires (FAP) 1.90 Component C # Local Development Fund/Fonds de Developpement Communautaire (FDL) 2.80 Component D # Project Coordination, Monitoring and Evaluation 1.80 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Satisfactory Moderately Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Overall Risk Rating High High Implementation Status Overview At the project level: 1. The Project Coordination Team (UEC), within the Ministry of Social Affairs is operational albeit with limited staff. Page 1 of 5
2. All administrative, fiduciary, and operational manuals have been delivered to the satisfaction of IDA and are being fully utilized. 3. Quarterly operational and financial reports are available (last: April-Jun2 2014). 4. A project mid-term review took place in July 2012. 5. All procurement has been completed. 6. A supervision mission took place in January 2014. At the component level: - Component 1 - Capacity Strengthening: 443 "Comites Villageois de Developpement" (CVD) and 36 "Comites Communal de Developpement" (CCD) have been created/re-activated and trained; 32 'Plans de Developpement Local' (PDL) have already been adopted and two more are ready to be validated as soon as security conditions allow. - Component 2 - Priority Response Fund (FAP): The construction and rehabilitation of 201 infrastructures including 63 water points, 10 health centers, 30 primary schools (90 classrooms), and 36 latrine boxes (51 individual latrines) is almost complete. All infrastructures should be finished and turned over to the communities by the end of August, security permitting. - Component 3 - Local Development Fund (FDL): The implementation of the first 10 PDL has been contracted out to NGOs with the support of decentralized staff from the Ministry of Social Affairs. 10 schools, 13 health centers, 10 latrine boxes (30 individual latrines), 8 drying yards, 13 water points, 4 storage areas, and two children s playing areas will be rehabilitated and/or constructed. - Component 4 - Project Coordination, Monitoring and Evaluation: Decentralized teams of the Ministry of Social Affairs have been equipped with means of transportation (motorbikes) to facilitate access to isolated rural communities; an M and E system has been designed and is rigorously followed, from which monthly reports are now available (last: June 2014). Locations Country First Administrative Division Location Planned Actual Central Afr.Rep Prefecture du Mbomou Prefecture du Mbomou Central Afr.Rep Prefecture de la Basse-Kotto Prefecture de la Basse-Kotto Central Afr.Rep Prefecture de la Sangha-Mbaere Prefecture de la Sangha-Mbaere Central Afr.Rep Not Entered Prefecture de l' Ouham Central Afr.Rep Not Entered Prefecture de l' Ombella-Mpoko Central Afr.Rep Prefecture de la Nana-Mambere Prefecture de la Nana-Mambere Central Afr.Rep Prefecture de la Lobaye Prefecture de la Lobaye Central Afr.Rep Prefecture de la Kemo Prefecture de la Kemo Central Afr.Rep Prefecture de la Mambere-Kadei Prefecture de la Mambere-Kadei Results Project Development Objective Indicators Page 2 of 5
Indicator Name Core Unit of Measure Baseline Current End Target Direct project beneficiaries Number Value 0.00 796058.00 1005314.00 Female beneficiaries Percentage Intermediate Results Indicators Sub Type Supplemental Date 31-Dec-2008 30-Jun-2014 37 communes 31-May-2015 45 communes Value 0.00 238817.00 301594.00 Indicator Name Core Unit of Measure Baseline Current End Target Local Development Plans developed through a Number Value 0.00 32.00 36.00 participatory approach Members of municipal councils and village Number Value 0.00 1737.00 1800.00 councils trained in local development Female participants Percentage Sub Type Supplemental Value 0.00 22.71 30.00 Training days on community recovery for local Number Value 0.00 66.00 220.00 stakeholders in ten targeted communes Number of additional classrooms built or Number Value 0.00 21.00 111.00 rehabilitated at the primary level resulting from project interventions. Improved community water points constructed Number Value 0.00 63.00 76.00 or rehabilitated under the project Health facilities constructed, renovated, and/or Number Value 0.00 3.00 21.00 equipped (number) Improved latrines constructed under the project Number Value 0.00 10.00 47.00 Date 31-Aug-2009 30-Jun-2014 31-May-2015 Page 3 of 5
Other public social infrastructures constructed or rehabilitated under the project Data on Financial Performance (as of 30-Jul-2014) Financial Agreement(s) Key Dates Number Value 0.00 1.00 18.00 Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P111679 IDA-H4640 Effective 31-Mar-2009 09-Apr-2009 03-Aug-2009 31-Jul-2013 31-May-2015 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P111679 IDA-H4640 Effective XDR 5.50 5.50 0.00 4.29 1.21 78.00 Disbursement Graph Key Decisions Regarding Implementation 1. A 10-month extension was granted to the Ministry of Economy and Planning on July 25, 2014. The new closing date is May 31, 2015. 2. The annual audit (year 2013) is available. Restructuring History Page 4 of 5
Level two Approved on 18-Jul-2013, Level 2 CD Decision on 25-Jul-2014 Related Projects There are no related projects. Page 5 of 5