Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Similar documents
Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Procurement Plan for ETLP (P156590)

Procurement Plan for Eth Expressway Project ( P148850)

Sample Procurement Plan

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Sample Procurement Plan

Prior Review Thresholds

Procurement Plan for Project of Integrated Urban and Tourism Development

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

Sample Procurement Plan

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan. I. General

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Procurement Plan. Nepal Livestock Sector Innovation Project

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Sample Procurement Plan

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Sample Procurement Plan

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

GEF Procurement Plan (WARFP LIBERIA)

Sample Procurement Plan

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

procurement Plan I. General

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PROCUREMENT PLAN (Textual Part)

Prior Review Thresholds

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Textual Procurement Plan

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PPA PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Implementation Status & Results Vietnam Danang Sustainable City Development Project (SCDP) (P123384)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

Consultants: firms Consultants: individuals

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

The World Bank Can Tho Urban Development and Resilience (P152851)

Actual Amount (US$) Process Status. Pending Interventions.

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. I. General

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Implementation Status & Results Belize Municipal Development (P111928)

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

PROCUREMENT PLAN (Textual Part)

Public Disclosure Copy

PROCUREMENT PLAN (Textual Part)

Procurement Plan. I. General

Sample Procurement Plan

Procurement Plan. Procurement Method Prior Review Threshold Comments

Sample Procurement Plan

Procurement Plan National Community Driven Development Project Department of Rural Development

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Implementation Status & Results Central African Republic CAR - Emergency Urban Infrastructure Rehabilitation & Maintenance (P104595)

Cities and Climate Change (P123201)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Implementation Status & Results Chad Urban Development Project (P072030)

The World Bank Second Ho Chi Minh City Environmental Sanitation Project (P127978)

Public Disclosure Copy

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

Public Disclosure Copy

The World Bank Cities and Climate Change (P123201)

The World Bank. Key Dates. Project Development Objectives. Components. Overall Ratings. Public Disclosure Authorized

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Implementation Status & Results Burkina Faso TRANSPORT SECTOR PROJECT (P074030)

Public Disclosure Copy

Punjab Cities Program (P156972)

Implementation Status & Results China China: Anhui Medium Cities Urban Transport Project (P111421)

Sri Lanka Strategic Cities Development Project (P130548)

Implementation Status & Results Chad Urban Development Project (P072030)

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

Public Disclosure Copy

Sample Procurement Plan

Implementation Status & Results Morocco Strengthening micro-entrepreneurship for disadvantaged youth (P144134)

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

CAN THO URBAN DEVELOPMENT AND RESILIENCE PROJECT

Investigation, assessment and warning zonation for landslides in the mountainous regions of Vietnam

The World Bank Indonesia National Slum Upgrading Project (P154782)

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

Sample Procurement Plan

Public Disclosure Copy

The World Bank China: Qinghai Xining Urban Transport Project (P127867)

The World Bank Transport Connectivity and Asset Management Project (P132833)

Transcription:

Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Plan 1. Bank s approval Date of the procurement Plan September 28, 2015 2. Date of General Notice: August 10, 2016 3. Period covered by this procurement plan: The procurement period of project covered from year June 2016 to December 2018. II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Method Review Threshold 1. ICB and LIB (Goods) All 2. NCB (Goods) Above 2,000,000 3. ICB (Works) All 4. NCB (Works) Above 10,000,000 2. Pre-qualification. Not applicable. Comments 3. Reference to (if any) Project Operational/ Manual: January 28, 2016. 4. Any Other Special Arrangement: None 5. Summary of the Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) 1 2 3 4 5 6 7 Ref. Description Packages Domestic Review Comments No. Cost million Preference (yes/no) by Bank ( / ) 1 Summary of the 21.91 1 No ICB (Works) 2 Summary of the NCB (Works) 119.12 11 No / III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: March 29, 2017 Method Review Threshold Comments 1. Competitive Methods (Firms) Above 1,000,000 2. Single Source (Firms) For SSS, USD50,000 (Para 3.9 of Guidelines,

January 2011) and all other SSS contracts. 3. Individual Individuals USD 0.3 million; and for essential assignments (procurement / legal consultant). For SSS, USD20,000 (Para 5.6 of Guidelines, January 2011) 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than 500,000 equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: Not applicable. 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods Cost million Packages Review by Bank ( / ) Comments 5.91 5 QCBS 1.04 5 / CQS/IC March 29, 2017

Page 1 PROCUREMENT PLAN Vietnam : Can Tho Urban Development and Resilience General Information Country: Vietnam Banks Approval Date of the Original Plan: 2016-08-15 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-07-08 Project ID: P152851 GPN Date: 2016-08-10 Project Name: Can Tho Urban Development and Resilience Loan / Credit No:,, TF / A3723 Executing Agency(ies): Can Tho PMU for ODA funded Construction and Investment Projects WORKS Amount () () Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CT3 PW 1 7 / Construction of tide sluice gates on route connection with Cach Mang Thang 8 Street to Provincial road 918 6,041,900.00 3,931,259.66 Under 2016-10-04 2017-05-23 2016-12-06 2017-01-05 2017-11-29 2017-02-19 2018-05-18 2017-04-20 2018-08-18 CT3 PW 2 1 / Construction of Quang Trung Bridge, module 2 and extension of the span of module 1 and reinforcement of existing bridge, lighting system and architecture rehabilitation of the Quang Trung Bridge, approach roads at the both sides of the Bridge 16,872,300.00 9,684,289.28 Signed 2016-10-14 2017-04-14 2016-12-16 2017-01-16 2017-05-24 2017-03-02 2017-10-17 2017-05-01 2017-11-08 2019-02-25 CT3 PW 2 3 / Construction of the parallel road form Tran Hoang Na street to the IC3 intersection and approach road from intersection to the bus station including the intersection with NH1A 8,081,800.00 5,441,627.67 Signed 2016-10-04 2016-12-06 2017-01-05 2017-10-05 2017-02-20 2017-12-08 2017-04-20 2017-12-18 2018-08-18 CT3 PW 2 7 / Construction An Binh Resettlement Site for Phase 1 5,471,240.00 0.00 2016-09-01 2016-11-03 2016-12-02 2017-01-17 2017-03-18 2017-11-13 CT3 PW 2 2 / Construction of Tran Hoang Na road from Nguyen Van Cu road to Tran Hoang Na Bridge. 10,927,100.00 8,445,162.03 Signed 2016-10-27 2017-09-11 2016-12-29 2017-02-06 2017-10-17 2017-03-23 2017-12-26 2017-05-14 2017-12-28 2018-09-11 CT3 PW 2 5 / Construction of Provincial road 918 16,012,000.00 0.00 Canceled 2016-10-14 2016-12-16 2017-01-16 2017-03-01 2017-04-28 2018-06-27 CT3 PW 2 6 / Construction of Provincial road 918: road from intersection of Vo Van Kiet Road to Provincial road 918 (Km1+820 - Km 5+ 333). 12,502,890.00 0.00 Under 2018-01-27 2017-11-28 2018-02-12 2018-03-19 2018-01-10 2018-04-14 2018-05-23 2020-01-13 CT3 PW 1 1 / Construction of the Can Tho River Revetment from Km 0+00 to Km 1+600 8,121,572.00 0.00 2018-04-21 2018-04-26 2018-05-26 2018-06-30 2018-07-14 2020-03-13 CT3 PW 1 2 / Construction of the Can Tho River Revetment, road at the rear of revetment from Km 1+600 to Km 3+000 16,319,594.00 0.00 2018-05-14 2018-05-22 2018-06-21 2018-08-12 2018-08-28 2020-08-27 CT3 PW 1 5 / Construction of Dau Sau Water Lock 6,659,300.00 0.00 2018-04-11 2018-04-16 2018-05-16 2018-06-20 2018-07-03 2020-03-02 CT3 PW 1 6 / Construction of tide sluice gates on route at the rear of Can Tho River revetment 2,385,200.00 0.00 2018-04-24 2018-04-30 2018-05-30 2018-07-04 2018-07-17 2019-11-15 CT3 PW 1 8 / Construction of Cai Khe Water Lock 12,768,000.00 0.00 2018-09-15 2018-09-22 2018-10-22 2018-12-11 2018-12-28 2020-12-27 CT3 PW 1 9 / Construction of Hang Bang Water Lock 6,762,200.00 0.00 2018-09-17 2018-09-22 2018-10-22 2018-12-03 2018-12-17 2020-08-17 CT3 PW 1 10 / Improving and upgrading the infrastructure of Hoang Quoc Viet Street 6,528,500.00 0.00 2018-09-19 2018-09-24 2018-10-26 2018-12-05 2018-12-19 2020-03-19 CT3 PW 1 11 / Improving Water Drainage system at Central area in Ninh Kieu District 7,812,100.00 0.00 2018-09-14 2018-09-20 2018-10-20 2018-11-30 2018-12-15 2020-05-16 CT3 PW 2 4 / Construction of Bridge over Can Tho River connection Tran Hoang Na Road with approaching road of Can Tho Bridge. Request for Bids Open - International 33,107,763.00 0.00 2018-06-25 2018-07-02 2018-08-20 2018-11-08 2018-11-26 2021-03-26 CT3 PW 2 5 / Construction of Provincial road 918: road from CMT8 Street to intersection of Vo Van Kiet Road (Km0+00 - Km1+820). 9,243,973.00 0.00 2017-10-28 2017-11-14 2017-12-18 2018-01-13 2018-02-22 2019-04-18 CT3 PW 1 3 / Construction of the Can Tho River Revetment from km 3+00 to end of route 9,932,348.00 0.00 2017-03-01 2017-05-03 2017-06-02 2017-07-17 2017-09-15 2019-02-12

Page 2 CT3 PW 1 4 / Construction of the park at the rear of Can Tho River Revetment 2,846,400.00 0.00 Canceled 2017-09-29 2017-12-01 2017-12-29 2018-02-12 2018-04-13 2019-05-13 GOODS Amount () () Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / NON CONSULTING SERVICES Amount () () Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CONSULTING FIRMS Contract Type Amount () () Combined Evaluation Expression of Interest Short List and Draft Request for Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Request for Proposals as Proposals / Minutes Proposal Negotiated Contract CT3 CS TV03 / Construction supervision and contract management for of Resettlement area phase 1 (CT3- PW-2.7) Open - National 175,500.00 0.00 2016-10-24 2016-11-01 2016-12-26 2017-02-16 2017-04-03 2018-01-27 CT3 CS TV01 / Construction management for packages under Component 1 (Can Tho River Revetment: CT3- PW-1.1, CT3-PW-1.2, CT3-PW- 1.3, CT3-PW-1.4, CT3-PW-1.5, CT3-PW-1.6, CT3-PW-1.8 and CT3-PW-1.9) Based Open - International 3,804,300.00 0.00 Under Review 2016-07-15 2016-08-30 2016-07-20 2016-11-21 2016-10-13 2017-09-06 2016-12-13 2017-10-09 2017-01-24 2018-05-15 2017-02-20 2017-05-05 2019-07-04 CT3 CS TV05 / Independent consultant for monitoring environment on project Under Open - National 200,000.00 0.00 2016-10-13 2017-04-12 2016-10-21 2016-12-16 2017-02-06 2017-03-22 2021-10-21 CT3 CS TV07 / Independent for auditing Open - National 250,000.00 0.00 Under 2016-08-29 2017-01-24 2016-09-05 2016-10-31 2018-04-26 2016-12-21 2018-07-08 2017-02-06 2020-01-31 CT3 CS TV11 / Construction management for packages of Improving and upgrading the infrastructure of Hoang Quoc Viet Street and Improving Water Drainage system at Central area in Ninh Kieu District: CT3-PW-1.10, CT3- PW-1.11. Open - National 295,800.00 0.00 2017-02-06 2017-02-13 2017-04-10 2017-05-24 2017-07-10 2019-05-06 CT3 CS TV12 / Assistant technical (TA) for doing Bidding documents and Bid evaluation for all packages under the procurement plan for the first 18 months and Bidding documents for Phase 2 Open - National 280,000.00 0.00 Under 2016-07-24 2016-12-13 2016-07-31 2016-12-18 2018-03-06 2017-05-23 2018-04-26 2017-07-23 2019-07-23 CT3 CS TV02 / Construction management for packages under Component 2 and tide sluice gates on route connection with Cach Mang Thang 8 Street to Provincial road 918 (CT3-PW-2.1, CT3-PW-2.2, CT3-PW-2.3, CT3-PW-2.4, CT3- PW-2.5 and CT3-P Based Under Open - International 3,381,800.00 1,824,224.96 2016-07-15 2016-08-30 2016-07-21 2016-11-21 2016-10-13 2017-09-09 2016-11-10 2017-10-18 2016-12-22 2018-04-07 2017-02-20 2018-05-28 2017-04-20 2020-04-19 CT3 CS TV06 / Independent consultant for resettlement supervision on project Open - National 150,000.00 0.00 2016-08-24 2016-08-31 2016-10-26 2018-04-16 2018-04-28 2022-04-27 CT3 CS TV13 / of communication on the project. Open - National 94,000.00 0.00 2018-04-05 2018-04-24 2018-05-30 2018-07-19 2018-08-06 2020-02-04 CT3-CS-TV08 / Establishing Flood Risk Management TF / A3723 Information System (FRMIS) for can Tho City Based Open - International 1,700,000.00 0.00 2018-04-26 2018-07-12 2018-10-19 2018-12-14 2019-03-06 2019-04-20 2019-05-23 2021-01-20 CT3-CS-TV10 / Spatial Planning Platform (SPP) TF / A3723 Based Open - International 1,634,000.00 0.00 2018-07-05 2018-08-08 2018-11-15 2019-01-11 2019-04-05 2019-05-20 2019-06-20 2020-12-18 CT3-CS-TV14 / Consultancy Service for the Design, Development and of Integrated Social Assistance (ISA) System Open - National 267,000.00 0.00 2018-06-30 2018-08-03 2018-11-16 2019-01-14 2019-02-15 2019-11-15

Page 3 CT3 CS TV04 / Consulting service for monitoring and evaluation on implementation of project Consultancy Open - National 150,000.00 0.00 Canceled 2016-08-24 2016-09-01 2016-10-27 2016-12-17 2017-02-06 2022-02-05 CT3-CS-TV09 / Sustainable Urban Public Transport & Central Area Traffic Management Study for Can Tho City Based Open - International 475,000.00 0.00 2018-06-12 2018-07-16 2018-10-23 2018-12-19 2019-03-13 2019-04-26 2019-05-28 2021-01-25 CT3-CS-TV15 / Consulting Service to carry out a Geo- Referenced Households Vulnerability Survey and data update against Flood in Can Tho City Based Open - National 295,000.00 0.00 2018-07-06 2018-07-27 2018-11-05 2018-12-12 2019-02-08 2019-03-25 2019-04-29 2021-12-28 INDIVIDUAL CONSULTANTS Contract Type Amount () () Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual