Assessment. Assessment

Similar documents
Why Geomorphology for Fish Passage

NATURE OF RIVERS B-1. Channel Function... ALLUVIAL FEATURES. ... to successfully carry sediment and water from the watershed. ...dissipate energy.

Stream Geomorphology. Leslie A. Morrissey UVM July 25, 2012

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

Riparian Assessment. Steps in the right direction... Drainage Basin/Watershed: Start by Thinking Big. Riparian Assessment vs.

GENERAL SUMMARY BIG WOOD RIVER GEOMORPHIC ASSESSMENT BLAINE COUNTY, IDAHO

APPENDIX A REACH DECRIPTIONS. Quantico Creek Watershed Assessment April 2011

NORTHUMBERLAND COUNTY, PA

Why Stabilizing the Stream As-Is is Not Enough

Implementing a Project with 319 Funds: The Spring Brook Meander Project. Leslie A. Berns

Fluvial Driven Alluvial Fans

CR AAO Bridge. Dead River Flood & Natural Channel Design. Mitch Koetje Water Resources Division UP District

Sprague River Basin Restoration Post Project Evaluations: Lessons Learned and Future Applications

ADDRESSING GEOMORPHIC AND HYDRAULIC CONTROLS IN OFF-CHANNEL HABITAT DESIGN

Natural Shoreline Landscapes on Michigan Inland Lakes

Dolores River Watershed Study

Four Mile Run Levee Corridor Stream Restoration

Birch Creek Geomorphic Assessment and Action Plan

CASE STUDIES. Introduction

Flood and Stream Restoration

Step 5: Channel Bed and Planform Changes

PolyMet NorthMet Project

A GEOMORPHOLOGICAL APPROACH TO RESTORATION OF INCISED RIVERS. David L. Rosgen 1

Wetland & Floodplain Functional Assessments and Mapping To Protect and Restore Riverine Systems in Vermont. Mike Kline and Laura Lapierre Vermont DEC

Watershed Assessment of River Stability and Sediment Supply: Advancing the Science of Watershed Analysis

Stream Restoration and Environmental River Mechanics. Objectives. Pierre Y. Julien. 1. Peligre Dam in Haiti (deforestation)

RAILWAYS AND FISH: HOW TO PROTECT AND ENHANCE FISH HABITAT VALUES AT STREAM CROSSINGS THROUGH PROJECT DESIGN AND CONSTRUCTION

Tom Ballestero University of New Hampshire. 1 May 2013

How Do Human Impacts and Geomorphological Responses Vary with Spatial Scale in the Streams and Rivers of the Illinois Basin?

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

Restoring the Napa River:

Conceptual Model of Stream Flow Processes for the Russian River Watershed. Chris Farrar

Lower South Fork McKenzie River Floodplain Enhancement Project

Aquifer an underground zone or layer of sand, gravel, or porous rock that is saturated with water.

Griswold Creek August 22, 2013

May 7, Roger Leventhal, P.E. Marin County Public Works Laurel Collins Watershed Sciences

Minimizing Flood Risks and Habitat Impacts Due to Post-Flood Recovery Efforts

DESCHUTES RIVER BANK STABILIZATION PROJECTS ASSESSMENT

Rosgen Classification Unnamed Creek South of Dunka Road

Ways To Identify Background Verses Accelerated Erosion

Carmel River Bank Stabilization at Rancho San Carlos Road Project Description and Work Plan March 2018

Kootenai River Habitat Restoration Program Update

Hydrologic hazards can be considered in three categories; An indication of flooding potential for areas located

Stream Classification

Solutions to Flooding on Pescadero Creek Road

!"#$%&&'()*+#$%(,-./0*)%(!

River Restoration and Rehabilitation. Pierre Y. Julien

Assignment 1. Measuring River Characteristics- Vernon Creek. Applied Fluvial Geomorphology Field Techniques EESc 435

The last three sections of the main body of this report consist of:

STREAM CORRIDOR ASSESSMENT A PROCESS GUIDE

Review of Riparian Function Riparian Management Riparian Monitoring

Massachusetts Rivers & Roads Training

PHASE 1 STREAM GEOMORPHIC ASSESSMENT. Castleton River, Rutland County Vermont. Final Report

Application of Fluvial Geomorphologic Techniques At Abandoned Mine Sites 1. David A. Greenfield 2 Dennis M. Palladino 3

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Fluvial Geomorphology

Chapter Five. Synopsis

Business. Meteorologic monitoring. Field trip? Reader. Other?

Chapter 3 Erosion in the Las Vegas Wash

STREAM RESTORATION AWRA Summer Specialty Conference, GIS and Water Resources IX

Addressing the Impact of Road-Stream Crossing Structures on the Movement of Aquatic Organisms

Avoiding Geohazards in the Mid-Atlantic Highlands by Using Natural Stream Principles

Forest Service AOP Meeting Objectives of Stream Simulation: Examples and Talking Points

EAGLES NEST AND PIASA ISLANDS

Fish Passage at Road Crossings

Fish Passage and Abundance around Grade Control Structures on Incised Streams in Western Iowa

Stream Simulation: A Simple Example

Case Study 2: Twenty-mile Creek Rock Fords

Best Management Practices for Coldwater Fisheries Enhancement and Restoration

HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE

New Approaches to Restoring NH s Rivers Natural Channel Design and Dam Removal

Field Methods to Determine/ Verify Bankfull Elevation, XS Area & Discharge

Columbia Estuary Province

Island Design. UMRS EMP Regional Workshop. Presentation for the

Rapid Geomorphic Assessments: RGA s

Upper Mississippi River Basin Environmental Management Program Workshop

Appendix E Rosgen Classification

Perspectives on river restoration science, geomorphic processes, and channel stability

Diagnostic Geomorphic Methods for Understanding Future Behavior of Lake Superior Streams What Have We Learned in Two Decades?

Identifying, Understanding and Addressing Flood-Related Hazards

Use of benthic invertebrate biological indicators in evaluating sediment deposition impairment on the Middle Truckee River, California

Consequences of river regulation works: altered fluvial processes + increasing flood hazard

Alternatives for River Corridor Management Vermont DEC River Management Program Position Paper

Dam Removal Analysis Guidelines for Sediment

Elwha River response to dam removals through four years and a big flood:

Overview of fluvial and geotechnical processes for TMDL assessment

OBJECTIVES. Fluvial Geomorphology? STREAM CLASSIFICATION & RIVER ASSESSMENT

Appendix I: The Summit-at-Snoqualmie Master Development Plan Proposal FEIS Physical and Biological Resource Data Tables

NATURAL RIVER. Karima Attia Nile Research Institute

Integrated methodology for assessing the effects of geomorphological river restoration on fish habitat and riparian vegetation

Gully Erosion Part 1 GULLY EROSION AND ITS CAUSES. Introduction. The mechanics of gully erosion

When Creek Meets Valley Wall: Prioritizing Erosion Mitigation alongside the Oshawa Landfill

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

Limitation to qualitative stability indicators. the real world is a continuum, not a dichotomy ~ 100 % 30 % ~ 100 % ~ 40 %

2. Background/Overview of Conditions

The Refugia Concept: Using Watershed Analysis to Prioritize Salmonid Habitat for Conservation and Restoration

Carex nudata, a native sedge, as facilitator of restoration goals following passive restoration

Session C1 - Applying the Stream Functions Pyramid to Geomorphic Assessments and Restoration Design

GEOMORPHIC CHANGES IN LOWER CACHE CREEK 2012

Degradation Concerns related to Bridge Structures in Alberta

Transcription:

2001 SPRINGBROOK CREEK RESTORATION - THREE YEAR POST-CONSTRUCTION REVIEW - Presented by Bruce Henderson and Andy Harris 2005 River Restoration Northwest Symposium Skamania Lodge, Washington www.hendersonlandservices.com Project Overview Project Goal Restore stream health and natural stream functions 2001 1

Assessment Urbanized Watershed Residential Commercial Community Parks Natural Resource Areas Assessment Springbrook Basin 1.95 square mile basin 2.9 miles long 31 % impervious ½ mile project length 2001 2

Assessment Site Conditions Severe Bank Erosion Loss of Bed Materials Assessment Site Conditions Severe Bank Erosion Loss of Bed Materials Channel Incision 2001 3

Assessment Site Conditions Severe Bank Erosion Loss of Bed Materials Channel Incision Channel Containment of Flood Flows Assessment Site Conditions Severe Bank Erosion Loss of Bed Materials Channel Incision Channel Containment of Flood Flows Loss of Riparian Habitat and Diversity 2001 4

Assessment Site Conditions Severe Bank Erosion Loss of Bed Materials Channel Incision Channel Containment of Flood Flows Loss of Riparian Habitat and Diversity Excessive Sediment and Phosphorous Deposition into Lake Design Design Objectives Restore Stable Natural Channel Form Geomorphic Approach to Restoration Stable Channel Dimension, Pattern, and Profile Equilibrium with Basin Conditions 2001 5

Design Design Objectives Restore Stable Natural Channel Form Re-Connect Channel to Historic Floodplain Construct New Meandering Channels Abandon and Fill Old Straightened Channels Elevate Stream to the level of the Historic Floodplain Design Design Objectives Restore Stable Natural Channel Form Restore Channel on Historic Floodplain Elevate the Localized Water Table Enhance Native Riparian Vegetation and Wetlands 2001 6

Design Design Objectives Restore Stable Natural Channel Form Restore Channel on Historic Floodplain Elevate the Localized Water Table Improve Water Quality Bank Stability, Filtration, Shade, and Riffles Design Design Objectives Restore Stable Natural Channel Form Restore Channel on Historic Floodplain Elevate the Localized Water Table Improve Water Quality Enhance Riparian Habitat for Fish and Wildlife Increased Vegetative Cover and Species Diversity Restoration of Pool and Riffle Features Recruitment of Bed Material and Large Wood 2001 7

Fall 2004 2001 8

Pre-Construction Deeply Incised Channel High Bank Stress / Embankment Failure Partially-Occluded Channel Sediment Transport to Oswego Lake Loss of Bed Materials Fall 2001 2001 9

Post-Construction Stream Channel Elevated Stable Natural Channel Form and Sinuosity Bed Materials Restored Flows Re-Connected to Historic Floodplain Fall 2001 Pre-Construction Abandoned Double Culvert Deeply Incised Channel High Bank Stress / Embankment Failure Loss of Mature Riparian Habitat along Embankment 2001 10

Fall 2001 Fall 2002 2001 11

December 2004 December 2004 Post-Construction Removed Stream Constriction Elevated Stream Channel Stable Channel Alignment Overtightend Meander Improved Aquatic Community Enhanced Riparian Habitat 2001 12

Pre-Construction Channel Straightened 1960 s Sanitary Sewer Main Adjacent to Stream Channel Double Culvert Establishes Grade Control at Spring Lane Moderately Incised Channel Riparian Habitat Dominated by Invasive Species Summer 2001 2001 13

January 2002 December 2004 Post-Construction Elevated Stream Channel Stable Channel Dimensions Stream Flows Reacquire Historic Floodplain Enhanced Riparian Habitat Re-Encroaching Invasive Species underline Need for Maintenance and Long-Term Monitoring 2001 14

Pre-Construction Straightened and Rip-Rapped Rapped Eroded/Failing Embankments Undersized Culvert/Pathway Restricting Channel Flows Peak Flows Overtop Channel Flooding Adjacent Residences Fall 2001 2001 15

Fall 2003 Fall 2003 Post-Construction In-Stream Boulder Barbs Redirect Stream Flows Embankments/Public Utilities Protected from further Erosion Deposition of Sediment Native Riparian Vegetation Established at Bankfull Stage 2001 16

Summer 2001 Fall 2001 2001 17

January 2002 Fall 2002 2001 18

Fall 2003 December 2004 2001 19

Pre-Construction Incised Stream Channel Highly Eroded Embankments Abandoned Floodplain Poor Riparian Habitat Quality Dominated by Invasive Species 2001 20

Fall 2001 Fall 2003 2001 21

December 2004 Lessons Learned Restoration of degraded urban stream employing a geomorphic design approach proven very successful December 2004 2001 22

Lessons Learned Restoration of degraded urban stream employing a geomorphic design approach proven very successful Elevating incised channel proves excellent technique for reconnecting stream flows to historic floodplain December 2004 Lessons Learned Do not sacrifice stream design alignment and patterns December 2004 2001 23

Lessons Learned Do not sacrifice stream design alignment and patterns Elevated stream channel and local water table may have negative impact on adjacent mature vegetation December 2004 Lessons Learned Do not sacrifice stream design alignment and patterns Elevated stream channel and local water table may have negative impact on adjacent mature vegetation Establish long-term monitoring and maintenance plans December 2004 2001 24

Lessons Learned Community Stream Stewardship Effort Established Lessons Learned Build upon success 2001 25

Questions? 2001 26