Procurement Plan for ETLP (P156590)

Similar documents
Sample Procurement Plan

Procurement Plan for Eth Expressway Project ( P148850)

Procurement Plan Mozambique: P Greater Maputo Water Supply Expansion Project

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not Applicable

Sample Procurement Plan

Procurement Plan. Nepal Livestock Sector Innovation Project

Liberia Additional REDD+ Readiness Preparation Support Procurement Plan (P124073)

UNITED REPUBLIC OF TANZANIA. Procurement Plan

Procurement Plan. 3. Reference to (if any) Project Operational/Procurement Manual: January 28, 2016.

Prior Review Thresholds

Procurement Plan. I. General

Procurement Plan for Ghana Transport Sector Improvement Project (P151026)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines:

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. (Text in italic font is meant for instruction to staff and should be deleted in the final version of the PP)

Procurement Plan. 3. Period covered by this procurement plan: The procurement period of project covered from 18 April 2017 to 17 April 2018

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Sample Procurement Plan

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

Sample Procurement Plan Health System Performance Reinforcement Project (P156679)

PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

KENYA PRIMARY EDUCATION DEVELOPMENT PROJECT PROCUREMENT PLAN YEAR 2016/2017

Liberia Liberia Forest Sector Project Procurement Plan (P154114)

Prior Review Thresholds

GEF Procurement Plan (WARFP LIBERIA)

REPUBLIC OF ANGOLA SOCIAL ACTION FUND FAS LOCAL DEVELOPMENT PROJECT LDP PROJECT PROCUREMENT PLANNING- JANUARY JUNE 2017

Procurement Plan for Project of Integrated Urban and Tourism Development

Sample Procurement Plan

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

procurement Plan I. General

Urban Productive Safety Net Project (UPSNP) Procurement Plan

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

PROCUREMENT PLAN (Textual Part)

Procurement Plan Template (For Contracts not yet initiated to be entered in STEP)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Consultant Services (Firms) 2 Moderate risk 4. Consultant Services (Individual Consultants) 0.4 Moderate risk

1. Project Information: Third National Urban Water Sector Reform Project Bank s approval Date of the Procurement Plan: March 2014

Procurement Plan. Additional Financing for the Water Sector Capacity Building and Advisory Services Project (WCAP)

NILE EQUATORIAL LAKES SUBSIDIARY ACTION PROGRAM (NELSAP PROCUREMENT PLAN 1 st May 2017 to April 2018 I. General

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

PPA PROCUREMENT PLAN (Textual Part)

Sample Procurement Plan

Sample Procurement Plan

Procurement Plan. II. Thresholds for Prior Review, Procurement Approaches and Methods

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: Not applicable

PPA PROCUREMENT PLAN (Textual Part)

PPA PROCUREMENT PLAN (Textual Part)

Bangladesh Weather and Climate Services Regional Project (BWCSRP)

FEDERAL REPUBLIC OF NIGERIA Nigeria Erosion and Watershed Management Project (NEWMAP) PROCUREMENT PLAN

Procurement Plan National Community Driven Development Project Department of Rural Development

Consultants: firms Consultants: individuals

PROCUREMENT PLAN (Textual Part)

Procurement. International Competitive Bidding;

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Procurement Plan. 3. Proposed Procedures for CDD Components (as per paragraph of the Guidelines: NA

Sample Procurement Plan

Sample Procurement Plan

Textual Procurement Plan

Procurement Plan Zambia Strengthening Climate Resilient Project (PPCR Phase II) P127254

PROCUREMENT PLAN (Textual Part)

PROCUREMENT PLAN (Textual Part)

Actual Amount (US$) Process Status. Pending Interventions.

Procurement Plan. I. General

Procurement Plan. I. General

Sample Procurement Plan

Procurement Plan. Procurement Method Prior Review Threshold Comments

Sample Procurement Plan

Procurement Plan. I. General

PE Cusco Transport Improvement Project (P132505) Procurement Plan

Procurement Plan Poverty Alleviation Fund II- AFII

Sample Procurement Plan

The World Bank India: Bihar Integrated Social Protection Strengthening Project (P118826)

Tamil Nadu Sustainable Urban Development Program (TNSUDP) PROCUREMENT PLAN

PE Cusco Regional Development (P117318) Procurement Plan

PROCUREMENT PLAN (Textual Part)

Implementation Status & Results Mozambique Cities and Climate Change (P123201)

The World Bank Ethiopia Geothermal Sector Development Project (P133613)

Sample Procurement Plan

Sample Procurement Plan

GHANA MINISTRY OF ROADS AND HIGHWAYS URBAN TRANSPORT PROJECT 4334-GH P DEPARTMENT OF URBAN ROADS. Serial No. Component Description*

Sample Procurement Plan

Implementation Status & Results Brazil ELETROBRAS Distribution Rehabilitation (P114204)

Implementation Status & Results Djibouti Djibouti Power Access and Diversification Project (P086379)

Public Disclosure Copy

Public Disclosure Copy

WB No objection for shortlist & RFP. Expected Proposal Submission Date. Finalizatio n of Shortlist. Issuance of RFP

Ayeyarwady Integrated River Basin Management Project (P146482)

Implementation Status & Results Congo, Democratic Republic of Democratic Republic of Congo Emergency Social Action Project (P086874)

Implementation Status & Results Ghana GH:Sustainable Rural Water & Sanit Serv (P120026)

Implementation Status & Results Ethiopia Electricity Network Reinforcement and Expansion Project (ENREP) (P119893)

PROCUREMENT PLAN (Textual Part)

Implementation Status & Results Belize Municipal Development (P111928)

P Safety Nets Project Procurement Plan June 1 st 2017

The World Bank Heilongjiang Cold Weather Smart Public Transportation System (P133114)

Implementation Status & Results Brazil BR APL Integrated Water Management In Metropolitan Sao Paulo (P006553)

Transcription:

I. General Plan for ETLP (P156590) 1. Bank s approval Date of the procurement Plan [Original: January 2017: Revision 1 of Updated Plan, March 2017] 2. Date of General Notice: January 2017 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2017 II. Goods and Works and non-consulting services. 1. Review Threshold: Decisions subject to Review by the Bank as stated in Appendix 1 to the Guidelines for : Method Review Threshold US$ 1. ICB and LIB (Goods) Above US$ 1.5 Million All 2. NCB (Goods) NA - 3. ICB (Works) Above US$ 7 million All 4. NCB (Works) NA - 5. (Non- Services) Above US$ 1.5 Million All 2.. Bidders shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Reference to (if any) Project Operational/ Manual: Project Manual for World Bank Loan Project P156590 as issued by ETLP. 4. Summary of the Packages planned during the first 18 months after project effectiveness (including those that are subject to retroactive financing and advanced procurement) March, 2017

1 2 3 4 5 6 7 Ref. No. Description Cost US$ million Packages Domestic Preference (yes/no) Review by Bank ( / ) Summary of the ICB (Works) $ 88.13 1 Yes Summary of the ICB (Goods) $ 46.53 3 No III. of s 1. Review Threshold: decisions subject to Review by Bank as stated in Appendix 1 to the Guidelines and Employment of s: Method Review Threshold 1. Competitive Methods (Firms) Above US$ 500,000 2. Single Source (Firms) All 3. Individual Above US$ 200,000 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than US$ 200,000 equivalent per contract and US$ 300, 000 for engineering & construction supervision, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Guidelines. 3. Any Other Special Arrangements: a. In addition, the justification for all contracts to be issued on the basis of LIB, single source or direct contracting (except for contracts less than US$100,000 in value) will be subject to prior review. 4. Consultancy Assignments with Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Cost US$ million Summary of number of contracts that will be let under QCBS Summary of number of contracts that will be let under other methods Packages Review by Bank ( / ) $ 1.35 3 $ 0.61 18 March, 2017

Page 1 PROCUREMENT PLAN Ethiopia : Ethiopia Trade Logistics Project General Information Country: Ethiopia Banks Approval Date of the Original Plan: 2017-01-16 Revised Plan Date(s): (comma delineated, leave blank if none) 2018-05-28 Project ID: P156590 GPN Date: Project Name: Ethiopia Trade Logistics Project Loan / Credit No:, Executing Agency(ies): Ethiopia Maritime Affairs Authority WORKS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / ET-EMAA-4946-CW-RFB / Construction of dry port expansion and upgrading of hub facilities. 88,125,000.00 0.00 Pending 2017-08-01 2017-08-10 2017-09-26 2017-10-26 2017-12-05 2018-06-03 GOODS Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / ET-EMAA-4947-GO-RFB / of Different Types Port Machineries and Equipment. 24,300,000.00 0.00 Canceled 2017-01-02 2017-10-06 2017-01-11 2017-10-14 2017-02-27 2017-11-28 2017-03-29 2017-05-08 2017-08-06 ET-EMAA-4948-GO-RFB / of mobile crane, forklift and Coil Handler Boom for port. 10,175,000.00 0.00 Pending 2017-01-30 2017-02-04 2017-03-20 2017-04-19 2017-05-24 2017-08-23 ET-EMAA-4949-GO-RFB / of Information & Communication Technology: Lot 1: Software and Lot 2: hardware and networking infrastructure Enhancing coordination through investments in IT systems 12,050,000.00 0.00 Pending 2017-02-01 2017-02-06 2017-03-20 2017-04-19 2017-05-24 2017-08-23 ET-EMAA-16894-GO-RFQ / of different IT equipment 45,000.00 0.00 Under 2017-06-24 2017-07-12 2017-08-12 2017-09-28 ET-EMAA-16895-GO-RFQ / of different Office Furniture 48,000.00 0.00 Pending 2017-06-24 2017-08-12 2017-09-22 ET-EMAA-16897-GO-RFQ / of different Office Supplies 30,000.00 0.00 Pending 2017-06-24 2017-08-19 2017-09-30 ET-EMAA-16900-GO-RFQ / of different Office Equipment 45,000.00 0.00 Pending 2017-07-01 2017-08-26 2017-09-28 ET-EMAA-19668-GO-RFQ / of vehicle for field works 300,000.00 0.00 Canceled 2017-07-12 2017-09-06 2018-03-05 ET-EMAA-4947-GO-RFB-2 / of Different Types of Port Machineries and Equipment. 34,175,000.00 0.00 Canceled 2018-03-30 2018-04-04 2018-05-16 2018-06-15 2018-07-20 2019-03-18 ET-EMAA-56662-GO-RFB / of Firefighting Truck Improvement of infrastructure at Bids Open - National 490,000.00 0.00 Pending 2018-04-11 2018-04-16 2018-05-28 2018-06-27 2018-08-01 2019-01-28 ET-EMAA-56677-GO-UN / of Vehicles for PIU field work (1 Pick up, 2 Automobiles, and 1 Minibus) through UNOPS UN Agencies (Direct) Direct 300,000.00 0.00 Pending 2018-05-16 2018-05-21 2018-06-25 2018-12-22 ET-EMAA-62392-GO-RFB / of Port Machineries and Equipment 22,175,000.00 0.00 Pending 2018-05-15 2018-05-20 2018-07-01 2018-07-31 2018-09-04 2019-03-03 ET-EMAA-62394-GO-RFB / of Rubber Tired Gantry cranes (RTGs) 12,000,000.00 0.00 Pending 2018-06-20 2018-06-25 2018-08-06 2018-09-05 2018-10-10 2019-04-08 NON CONSULTING SERVICES Draft Pre-qualification Draft Bidding Document Specific Bidding Documents as Proposal Submission / CONSULTING FIRMS Contract Type Combined Evaluation Expression of Interest Short List and Draft Proposals Opening of Technical Evaluation of Technical Terms of Reference Report and Draft Signed Contract Contract Completion Notice Proposals as Proposals / Minutes Proposal Negotiated Contract ET-EMAA-4950-CS-QCBS / feasibility study design, and supervision of Construction Works of Dry Port Development Based Open - International 650,000.00 0.00 Under Review 2017-01-09 2017-08-10 2017-01-24 2017-08-17 2017-03-09 2018-03-10 2017-03-16 2018-05-07 2017-03-30 2017-04-26 2017-05-24 2017-07-25

Page 2 ET-EMAA-4951-CS-QCBS / Dry port network study. Based Open - National 650,000.00 0.00 Under Review 2017-02-01 2017-02-22 2017-04-07 2017-04-27 2017-05-23 2017-06-27 2017-08-01 2017-08-31 ET-EMAA-4955-CS-QCBS / Baseline survey 0.00 Under Open - National 50,000.00 2017-01-25 2018-03-05 2017-02-15 2017-03-31 2017-04-30 2017-06-04 2017-07-12 ET-EMAA-4953-CS-INDV / Environment and Social Management Framework (ESMF) Preparation Open - National 50,000.00 0.00 Pending 2017-01-24 2017-02-07 2017-03-23 2017-04-22 2017-05-27 2017-07-19 ET-EMAA-4954-CS-INDV / Preparation of Project Manual Open - National 50,000.00 0.00 Under 2017-01-24 2017-08-01 2017-02-07 2017-08-15 2017-03-14 2017-04-05 2017-05-03 2017-06-13 ET-EMAA-4956-CS-INDV / Gender Assessment Open - National 50,000.00 0.00 Pending 2017-01-24 2017-02-07 2017-03-16 2017-04-07 2017-05-05 2017-06-08 ET-EMAA-4957-CS-INDV / Preparation of Financial Management Manual Open - National 30,000.00 0.00 Pending 2017-01-17 2017-01-31 2017-03-02 2017-03-17 2017-04-14 2017-05-17 ET-EMAA-56663-CS-QCBS / an Intermodal Freight Network Study Based Under Open - National 190,000.00 0.00 2018-04-26 2018-05-17 2018-06-30 2018-07-28 2018-08-27 2018-10-01 2018-11-05 2019-11-05 ET-EMAA-56665-CS-CQS / Dry Port Governance Structure Study Under Open - National 150,000.00 0.00 2018-04-06 2018-04-27 2018-04-26 2018-06-10 2018-07-10 2018-08-14 2019-02-10 ET-EMAA-56667-CS-CQS / Establishment of One Stop Border s (OSBP) in the Ethio-Djibouti Corridor Open - National 150,000.00 0.00 Under 2018-04-06 2018-04-27 2018-04-26 2018-06-10 2018-07-10 2018-08-14 2019-02-10 INDIVIDUAL CONSULTANTS Contract Type Invitation to Draft Negotiated Terms of Reference Identified/Selected Signed Contract Contract Completion Contract Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual ET-EMAA-4952-CS-INDV / Social Impact Assessment 2017-01-02 2017-02-06 2017-02-27 2017-04-03 2017-06-05 ET-EMAA-4959-CS-INDV / of PIU Coordinator 2017-01-02 2017-01-17 2017-02-06 2017-02-20 2017-04-03 2017-03-13 2017-09-08 ET-EMAA-4960-CS-INDV / of project Engineer Review 2017-01-03 2017-02-07 2017-02-21 2017-03-28 2017-09-24 ET-EMAA-4962-CS-INDV / of M&E Advisor 2017-01-04 2017-02-15 2017-03-01 2017-04-05 2017-10-02 ET-EMAA-4963-CS-INDV / of Safeguard Advisor 2017-01-06 2017-01-17 2017-02-11 2017-02-27 2017-04-03 2017-04-03 2017-09-30 ET-EMAA-4961-CS-INDV / of Logistics Specialist 2017-01-16 2017-02-22 2017-02-13 2017-02-22 2017-02-20 2017-03-20 2017-09-16 ET-EMAA-4964-CS-INDV / of Financial Management advisor 2017-01-17 2017-02-07 2017-02-21 2017-03-21 2017-09-17 ET-EMAA-4965-CS-INDV / of procurement advisor Open 35,000.00 0.00 Under 2017-01-17 2017-02-07 2017-02-22 2017-02-17 2017-03-17 2017-09-13 ET-EMAA-5701-CS-INDV / of Logistics Specialist 2017-01-17 2017-02-22 2017-02-14 2017-02-22 2017-02-28 2017-03-28 2017-09-24 ET-EMAA-5702-CS-INDV / of Financial Management advisor 2017-01-17 2017-02-22 2017-02-21 2017-02-22 2017-03-07 2017-04-03 2017-03-28 2017-09-24 ET-EMAA-5703-CS-INDV / of procurement advisor Open 35,000.00 5,089.03 Signed 2017-01-17 2017-04-25 2017-02-28 2017-05-10 2017-03-07 2017-06-30 2017-03-28 2017-05-10 2017-09-24 ET-EMAA-4958-CS-INDV / Preparation of procurement Management Manual Open 30,000.00 0.00 Pending 2017-07-04 2017-09-08 2017-09-29 2017-10-31 ET-EMAA-39718-CS-INDV / of Expert 35,000.00 2,500.00 Signed 2017-12-11 2017-12-20 2017-12-16 2018-01-03 2017-12-23 2018-01-17 2018-01-06 2018-02-01 2018-07-05 ET-EMAA-56669-CS-INDV / and Employment of ICT Specialist Enhancing coordination through investments in IT systems Open 60,000.00 0.00 Under ET-EMAA-56670-CS-INDV / and Employment of Contract Administration Specialist

Page 3 ET-EMAA-56671-CS-INDV / Rail Spur ARAP and Livelihoods Support and LRRP implementation completion review and audit ET-EMAA-56672-CS-INDV / Environment and Social Review