FUND THAN THAN ALL CODE YEARS

Similar documents
FUND THAN THAN ALL CODE YEARS

ROADWAY ID: PROJECT LENGTH:.000 LANES EXIST/IMPROVED/ADDED: 0/ 0/ 0 FUND THAN THAN ALL CODE YEARS

TABLE 2 FDOT ADOPTED WORK PROGRAM - VOLUSIA COUNTY PROJECTS FOR FISCAL YEARS 2014/ /19

MIAMI-DADE TRANSPORTATION PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

FY Transportation Improvement Program

MIAMI-DADE METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM REGIONALLY SIGNIFICANT TRANSPORTATION IMPROVEMENTS

Visitation: Recreation and Tourism Model

Information. Information Technology. Geographic. Services (GIS) 119 W Indiana Ave Deland, FL 32720

Transportation Improvement Program

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2015

Transportation Improvement Program

DAMAGE ASSESSMENT. Morgan Gilreath, Volusia County Property Appraiser

TABLE OF CONTENTS ARTICLE I. POLK COUNTY COMPREHENSIVE PLAN VOLUME 1. Page CHAPTER 1. GENERAL... A-1

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING December 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING August 31, 2018

CITY OF SEVEN HILLS OFFICE OF THE DIRECTOR OF FINANCE CURRENT YEAR DETAILED APPROPRIATIONS AND EXPENDITURES FOR THE MONTH ENDING October 31, 2018

I-10 East at Redd closes for 24 hours this Sunday, Feb 11. Then, I-10 West at Resler closes for 27 hours on Feb 25

Managing an Extreme Weather Event of Prolonged Duration May 22, 2013

Technical Memorandum #2 Future Conditions

FLORIDA DIVISION OF EMERGENCY MANAGEMENT STATE WATCH OFFICE DAILY INCIDENT REPORT

COUNTY VOTED ONE CENT GAS TAX COUNTY TRANSPORTATION TRUST LIBRARY

TRB First International Conference on Surface Transportation Resilience

Market Street PDP. Nassau County, Florida. Transportation Impact Analysis. VHB/Vanasse Hangen Brustlin, Inc. Nassau County Growth Management

Prepared for: San Diego Association Of Governments 401 B Street, Suite 800 San Diego, California 92101

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 4B10

DISTRICT ATLANTA 3004 BOWIE US STP 2012(053) $ 4,495, NO AWARD

MINNESOTA SIDE Draft TRANSPORTATION IMPROVEMENT PROGRAM

Expanding the GSATS Model Area into

Xiaoguang Wang, Assistant Professor, Department of Geography, Central Michigan University Chao Liu,

Measuring and GIS Referencing of Network Level Pavement Deterioration in Post-Katrina Louisiana March 19, 2008

BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY

Prepared by the East Central Florida Regional Planning Council Data Provided by the University of Florida GeoPlan Center

Administrative Services

City of Scottsbluff, Nebraska Monday, July 16, 2018 Regular Meeting

City of Scottsbluff. Fund Equity in Cash June 30, 2015

3.0 ANALYSIS OF FUTURE TRANSPORTATION NEEDS

SNOW REMOVAL POLICY ITASCA COUNTY TRANSPORTATION DEPARTMENT

Lessons Learned Using ESRI s Network Analyst to Optimize Snow Treatment Routes in Kentucky

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. PROPOSED OPERATING BUDGET... 3

CITY OF EAST TAWAS Budget

TRAFFIC FORECAST METHODOLOGY

TRANSPORTATION IMPROVEMENT PROGRAM

WORK SESSION AGENDA COMMITTEE-OF-THE-WHOLE APRIL 1, 2019 CITY COUNCIL CHAMBERS IMMEDIATELY FOLLOWING THE COUNCIL MEETING

BRUNSWICK COUNTY. North Carolina State Highway Patrol Coastal Evacuation Plan 1

FY 2018 Ten Year Capital Plan Review Project List

NCTCOG GIS File Locations

Transportation Improvement Program

why is a national or regional context important?

ILM Business Park Airport Blvd., Suite 12 Wilmington, NC

Standard Highway Sign Border Specifications

New Jersey Department of Transportation Extreme Weather Asset Management Pilot Study

GIS ANALYSIS METHODOLOGY

of the street when facing south and all even numbers south of Railroad Avenue shall be on the righthand side of the street when facing south.

Department: Emergency Management FY 2018/19 Proposed Budget

The Tampa Bay Catastrophic Plan Presentation to CFGIS Users Group FDOT District 5 Urban Offices - Orlando July 30, 2010

CITY OF OSAGE BEACH. Financial Statements

TOWN OF JUPITER. Overview Map. Commuter Mode of Choice QUICK FACTS. 46 Median Age. 61,388 Residents. 19.6% Traditionally Underserved

Hurricane Florence Operations Report 5:00 PM September 15, 2018

INDIANAMAP VIEWING APPLICATION

October 2018 Monthly Financial Statements

City of Scottsbluff. Fund Equity in Cash June 30, 2014

Transit Development Planning: Flagler County Needs Assessment & Implementation Program INTERGOVERNMENTAL MEETING OF FLAGLER COUNTY APRIL 13, 2010

TOWN OF JAMESTOWN TOWN COUNCIL RECOMMENDED BUDGET 2014/2015

Central Florida Regional Planning Model (CFRPM) Version 6.0

EXISTING CONDITIONS : EAST SEGMENT

Prepared by the Lake~Sumter Metropolitan Planning Organization 1616 South 14th Street Leesburg, FL 34748

WELCOME! Meeting 3 July 9, 2014 Wichita, Kansas

THE NEED FOR AN ADDITIONAL SPILLWAY AT THE SANFORD DAM BOILING SPRING LAKES, NC. Presentation for The Brunswick County Commissioners April 20, 2015

State Highway Log. Planning Report Olympic Region. Washington State Department of Transportation. Strategic Planning Division

TRAFFIC ALERT FOR WEEK OF February 4 8, 2008

Updating the Urban Boundary and Functional Classification of New Jersey Roadways using 2010 Census data

CITY OF NEW LONDON WINTER ROAD & SIDEWALK MAINTENANCE POLICY

Study Overview. the nassau hub study. The Nassau Hub

Account... Description Rev combined.. Combined MTD.. Combined YTD.. Combined Unexp Combined Enc.. Prior Excess.. Combined Unenc

Account... Description Rev combined.. Combined MTD.. Combined YTD.. Combined Unexp Combined Enc.. Prior Excess.. Combined Unenc

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

High Speed / Commuter Rail Suitability Analysis For Central And Southern Arizona

SECTION DESCRIPTION PAGE I. BUDGET INTRODUCTION... 1 II. FISCAL YEAR 2017 BUDGET ANALYSIS... 2 III. FINAL OPERATING BUDGET... 3

City of Grand Island Tuesday, August 14, 2018 Council Session

DARE COUNTY. North Carolina State Highway Patrol Coastal Evacuation Plan 1

CITY OF CAPE CORAL STORMWATER MASTER PLAN PHASE II - PART 1 BASINS 4, 10, & 14 SUB-BASIN DRAINAGE IMPROVEMENTS HYDRAULIC ANALYSIS SUMMARY

Interpretive Map Series 24

Project Level Traffic Forecast Report Business 40 Reconstruction Study Forsyth County

Town of Southwest Ranches Statement of Revenues and Expenditures From 10/1/2010 Through 12/31/2010. Current Year Actual Prior Year Actual

Volusia County Emergency Management Division WELCOME. Citizen s s Academy. September 8, 2009

BRANDON LAKES AVENUE PRE AND POST CONDITIONS DRAINAGE REPORT

Ellis County-Midlothian to Waxahachie Trail Corridor Research

The Impact of Hurricane Irma on the Coast of Florida

Portable Changeable Message Sign (PCMS) Speed Study

John Laznik 273 Delaplane Ave Newark, DE (302)

2 0 1 EMERGENCY PROCEDURES FOR HURRICANES

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

AWOS Level Descriptions

2014 UTP Public Meeting July 18, 2013

Surviving the Big One: Understanding and Preparing for a Major Earthquake in Western Oregon

SECTION 7 RAMP TERMINAL SIGNS

West Tennessee Construction June 14-21, 2017

CONGLETON INDUSTRIAL PARK LT 6 EX W 300' & E 350' LT 7 BLK 1, a subdivision of land in the City of Overland Park, Johnson County, Kansas.

1. Major streets, Central Business District (CBD) and school bus routes. 2. Local streets 3. Downtown parking lots

CLAREMONT MASTER PLAN 2017: LAND USE COMMUNITY INPUT

Transcription:

PAGE 1 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS ITEM NUMBER:434452 1 PROJECT DESCRIPTION:SR 11 (MOODY BLVD) RAIL CROSSING # 271908-S REHABILITATION *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:RAIL SAFETY PROJECT ROADWAY ID:73050000 PROJECT LENGTH:.002MI LANES EXIST/IMPROVED/ADDED: 2/ 0/ 0 PHASE: RAILROAD & UTILITIES / RESPONSIBLE AGENCY: MANAGED BY FDOT DS 90,000 0 0 0 0 0 0 90,000 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT DIH 0 2,500 0 0 0 0 0 2,500 TOTAL 434452 1 90,000 2,500 0 0 0 0 0 92,500 TOTAL PROJECT: 90,000 2,500 0 0 0 0 0 92,500 ITEM NUMBER:435561 1 PROJECT DESCRIPTION:OLD KINGS RD EXT PH II FROM MATANZAS WOODS PARKWAY TO OLD KINGS RD *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:NEW ROAD CONSTRUCTION ROADWAY ID:73000003 PROJECT LENGTH:.600MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY CITY OF PALM COAST GRSC 0 40,000 0 0 0 0 0 40,000 TRIP 0 0 0 1,742,525 0 0 0 1,742,525 TRWR 0 0 0 2,757,475 0 0 0 2,757,475 TOTAL 435561 1 0 40,000 0 4,500,000 0 0 0 4,540,000 TOTAL PROJECT: 0 40,000 0 4,500,000 0 0 0 4,540,000 ITEM NUMBER:438325 2 PROJECT DESCRIPTION:NATURAL DISASTER FLAGLER STATE HIGHWAYS EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438325 2 0 202 0 0 0 0 0 202 ITEM NUMBER:438325 3 PROJECT DESCRIPTION:NATURAL DISASTER FLAGLER OFF STATE ON FED EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438325 3 0 202 0 0 0 0 0 202

PAGE 2 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS ITEM NUMBER:438325 4 PROJECT DESCRIPTION:NATURAL DISASTER FLAGLER OFF STATE OFF FED EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438325 4 0 202 0 0 0 0 0 202 ITEM NUMBER:438325 5 PROJECT DESCRIPTION:NATURAL DISASTER FLAGLER INTERSTATE EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438325 5 0 202 0 0 0 0 0 202

PAGE 3 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS ITEM NUMBER:422627 1 PROJECT DESCRIPTION:SR 600 / US 92 FROM I-4 EAST BOUND RAMP TO TOMOKA FARMS ROAD *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:ADD LANES & RECONSTRUCT ROADWAY ID:79060000 PROJECT LENGTH: 2.197MI LANES EXIST/IMPROVED/ADDED: 4/ 4/ 2 PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT DC 210 0 0 0 0 0 0 210 DDR 335,154 0 0 0 0 0 0 335,154 DIH 439,340 8,775 0 0 0 0 0 448,115 SA 199,260 0 0 0 0 0 0 199,260 ST10 599,897 0 0 0 0 0 0 599,897 SU 1,326,624 0 0 0 0 0 0 1,326,624 PHASE: RIGHT OF WAY / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 0 0 0 650,000 3,600,000 4,088,305 0 8,338,305 DIH 0 0 0 70,000 50,200 0 0 120,200 PHASE: ENVIRONMENTAL / RESPONSIBLE AGENCY: MANAGED BY FDOT ACSA 0 300,000 0 0 0 0 0 300,000 RED 0 797,265 0 0 0 0 0 797,265 TALL 0 402,735 0 0 0 0 0 402,735 TOTAL 422627 1 2,900,485 1,508,775 0 720,000 3,650,200 4,088,305 0 12,867,765 TOTAL PROJECT: 2,900,485 1,508,775 0 720,000 3,650,200 4,088,305 0 12,867,765 ITEM NUMBER:434453 1 PROJECT DESCRIPTION:SR 421 (DUNLAWTON AV ) RAIL CROSSING #271958V REHABILITION *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:RAIL SAFETY PROJECT ROADWAY ID:79230000 PROJECT LENGTH:.002MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 PHASE: RAILROAD & UTILITIES / RESPONSIBLE AGENCY: MANAGED BY FDOT DS 117,000 0 0 0 0 0 0 117,000 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT DIH 0 2,500 0 0 0 0 0 2,500 TOTAL 434453 1 117,000 2,500 0 0 0 0 0 119,500 TOTAL PROJECT: 117,000 2,500 0 0 0 0 0 119,500 ITEM NUMBER:434871 1 PROJECT DESCRIPTION:SR 600 US 92 INT'L SPEEDWAY BLVD FROM WILLIAMSON TO MIDWAY AVE *SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:PEDESTRIAN SAFETY IMPROVEMENT ROADWAY ID:79060000 PROJECT LENGTH: 1.350MI LANES EXIST/IMPROVED/ADDED: 8/ 0/ 0 PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 80,000 0 0 0 0 0 0 80,000 DIH 194,489 11,443 0 0 0 0 0 205,932 DS 85,138 0 0 0 0 0 0 85,138 PHASE: RAILROAD & UTILITIES / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 0 233,200 0 0 0 0 0 233,200 PHASE: CONTRACT INCENTIVES / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 850,000 0 0 0 0 0 0 850,000 PHASE: ENVIRONMENTAL / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 43,700 0 0 0 0 0 0 43,700

PAGE 4 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS PHASE: DESIGN BUILD / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 18,157,027 48,670 0 0 0 0 0 18,205,697 DIH 36,863 169,380 0 0 0 0 0 206,243 DS 2,427 0 0 0 0 0 0 2,427 TOTAL 434871 1 19,449,644 462,693 0 0 0 0 0 19,912,337 TOTAL PROJECT: 19,449,644 462,693 0 0 0 0 0 19,912,337 ITEM NUMBER:436960 1 PROJECT DESCRIPTION:I-95 @ US 1 INTERCHANGE *SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:SKID HAZARD OVERLAY ROADWAY ID:79002000 PROJECT LENGTH:.200MI LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT DIH 0 10,000 0 0 0 0 0 10,000 TOTAL 436960 1 0 10,000 0 0 0 0 0 10,000 TOTAL PROJECT: 0 10,000 0 0 0 0 0 10,000 ITEM NUMBER:437054 1 PROJECT DESCRIPTION:SR 15/600 (US17-92) FROM EAST PLYMOUTH AVE TO MERCERS FERNERY RD *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:LIGHTING ROADWAY ID:79040000 PROJECT LENGTH: 1.505MI LANES EXIST/IMPROVED/ADDED: 4/ 0/ 0 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY CITY OF DELAND /FINANCE DEPT DS 0 250,000 0 0 0 0 0 250,000 TOTAL 437054 1 0 250,000 0 0 0 0 0 250,000 TOTAL PROJECT: 0 250,000 0 0 0 0 0 250,000 ITEM NUMBER:437346 1 PROJECT DESCRIPTION:SR 44/E NEW YORK AVE FROM SR44/CR 4139 TO EAST OF GRIMM LANE *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:RESURFACING ROADWAY ID:79070000 PROJECT LENGTH:.655MI LANES EXIST/IMPROVED/ADDED: 2/ 2/ 0 PHASE: PRELIMINARY ENGINEERING / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 0 125,000 0 0 0 0 0 125,000 DIH 0 30,000 0 0 0 0 0 30,000 PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT DDR 0 0 0 63,838 0 0 0 63,838 DS 0 0 0 653,664 0 0 0 653,664 TOTAL 437346 1 0 155,000 0 717,502 0 0 0 872,502 TOTAL PROJECT: 0 155,000 0 717,502 0 0 0 872,502

PAGE 5 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 HIGHWAYS ITEM NUMBER:438340 2 PROJECT DESCRIPTION:NATURAL DISASTER VOLUSIA STATE HIGHWAYS EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438340 2 0 202 0 0 0 0 0 202 ITEM NUMBER:438340 3 PROJECT DESCRIPTION:NATURAL DISASTER VOLUSIA OFF STATE ON FED EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438340 3 0 202 0 0 0 0 0 202 ITEM NUMBER:438340 4 PROJECT DESCRIPTION:NATURAL DISASTER VOLUSIA OFF STATE OFF FED EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438340 4 0 202 0 0 0 0 0 202 ITEM NUMBER:438340 5 PROJECT DESCRIPTION:NATURAL DISASTER VOLUSIA INTERSTATE EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438340 5 0 202 0 0 0 0 0 202 TOTAL DIST: 05 22,557,129 2,433,084 0 5,937,502 3,650,200 4,088,305 0 38,666,220 TOTAL HIGHWAYS 22,557,129 2,433,084 0 5,937,502 3,650,200 4,088,305 0 38,666,220

PAGE 6 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 MAINTENANCE ITEM NUMBER:436960 1 PROJECT DESCRIPTION:I-95 @ US 1 INTERCHANGE *SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:SKID HAZARD OVERLAY ROADWAY ID:79002000 PROJECT LENGTH:.200MI LANES EXIST/IMPROVED/ADDED: 6/ 0/ 0 PHASE: BRDG/RDWY/CONTRACT MAINT / RESPONSIBLE AGENCY: MANAGED BY FDOT D 333,385 0 0 0 0 0 0 333,385 TOTAL 436960 1 333,385 0 0 0 0 0 0 333,385 TOTAL PROJECT: 333,385 0 0 0 0 0 0 333,385 TOTAL DIST: 05 333,385 0 0 0 0 0 0 333,385 TOTAL MAINTENANCE 333,385 0 0 0 0 0 0 333,385

PAGE 7 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 AVIATION ITEM NUMBER:437025 1 PROJECT DESCRIPTION:FLAGLER-FLAGLER CO TERMINAL BUILDING *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:AVIATION REVENUE/OPERATIONAL PHASE: CAPITAL / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE DPTO 0 5,000 0 0 0 0 0 5,000 LF 0 75,000 0 0 0 0 0 75,000 TOTAL 437025 1 0 80,000 0 0 0 0 0 80,000 TOTAL PROJECT: 0 80,000 0 0 0 0 0 80,000

PAGE 8 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 AVIATION ITEM NUMBER:420862 1 PROJECT DESCRIPTION:VOLUSIA-ORMOND BEACH WILDLIFE HAZARD ASSESSMEN T *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:AVIATION ENVIRONMENTAL PROJECT PHASE: CAPITAL / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE DPTO 0 8,800 0 0 0 0 0 8,800 FAA 0 99,900 0 0 0 0 0 99,900 LF 0 2,220 0 0 0 0 0 2,220 TOTAL 420862 1 0 110,920 0 0 0 0 0 110,920 TOTAL PROJECT: 0 110,920 0 0 0 0 0 110,920 ITEM NUMBER:437030 1 PROJECT DESCRIPTION:VOLUSIA-NEW SMYRNA BCH CONSTRUCT HANGARS *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:AVIATION REVENUE/OPERATIONAL PHASE: CAPITAL / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE DDR 0 306,911 0 0 0 0 0 306,911 DPTO 0 250,000 0 0 0 0 0 250,000 LF 0 139,228 0 0 0 0 0 139,228 TOTAL 437030 1 0 696,139 0 0 0 0 0 696,139 TOTAL PROJECT: 0 696,139 0 0 0 0 0 696,139 ITEM NUMBER:437033 1 PROJECT DESCRIPTION:VOLUSIA-ORMOND BEACH BUSINESS PARK DEVELOPMENT *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:AVIATION REVENUE/OPERATIONAL PHASE: CAPITAL / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE DPTO 0 718,677 0 0 0 0 0 718,677 LF 0 945,000 0 0 0 0 0 945,000 TOTAL 437033 1 0 1,663,677 0 0 0 0 0 1,663,677 TOTAL PROJECT: 0 1,663,677 0 0 0 0 0 1,663,677 ITEM NUMBER:437035 1 PROJECT DESCRIPTION:VOLUSIA-DELAND MUNI FUEL FARM *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:AVIATION REVENUE/OPERATIONAL PHASE: CAPITAL / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE DPTO 0 296,800 0 604,000 0 0 0 900,800 LF 0 155,420 0 151,000 0 0 0 306,420 TOTAL 437035 1 0 452,220 0 755,000 0 0 0 1,207,220 TOTAL PROJECT: 0 452,220 0 755,000 0 0 0 1,207,220

PAGE 9 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 AVIATION ITEM NUMBER:437037 1 PROJECT DESCRIPTION:DAYTONA BEACH INTERNATIONAL AIRPORT REHABILITATE RUNWAY 7R-25L *SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:AVIATION PRESERVATION PROJECT PHASE: CAPITAL / RESPONSIBLE AGENCY: RESPONSIBLE AGENCY NOT AVAILABLE DDR 0 987,061 0 0 0 0 0 987,061 LF 0 987,061 0 0 0 0 0 987,061 TOTAL 437037 1 0 1,974,122 0 0 0 0 0 1,974,122 TOTAL PROJECT: 0 1,974,122 0 0 0 0 0 1,974,122 TOTAL DIST: 05 0 4,977,078 0 755,000 0 0 0 5,732,078 TOTAL AVIATION 0 4,977,078 0 755,000 0 0 0 5,732,078

PAGE 10 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 TRANSIT ITEM NUMBER:419373 2 PROJECT DESCRIPTION:VOLUSIA CO COUNCIL (VOTRAN) SECTION # 5307 REPLACE/EQUIP/VEHICLES *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:CAPITAL FOR FIXED ROUTE PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY VOLUSIA COUNTY FTA 0 7,800,000 0 0 0 0 0 7,800,000 LF 0 1,950,000 0 0 0 0 0 1,950,000 TOTAL 419373 2 0 9,750,000 0 0 0 0 0 9,750,000 TOTAL PROJECT: 0 9,750,000 0 0 0 0 0 9,750,000 ITEM NUMBER:431533 1 PROJECT DESCRIPTION:VOLUSIA-SECTION 5307 CAPITAL FOR FIXED ROUTE *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:CAPITAL FOR FIXED ROUTE PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY VOLUSIA COUNTY FTA 0 16,000,000 8,000,000 8,000,000 8,000,000 8,240,000 0 48,240,000 LF 0 4,000,000 2,000,000 2,000,000 2,000,000 2,060,000 0 12,060,000 TOTAL 431533 1 0 20,000,000 10,000,000 10,000,000 10,000,000 10,300,000 0 60,300,000 TOTAL PROJECT: 0 20,000,000 10,000,000 10,000,000 10,000,000 10,300,000 0 60,300,000 ITEM NUMBER:434759 1 PROJECT DESCRIPTION:VOTRAN VOLUSIA CTY FTA SECTION 5317-NEW FREE DOM PROGRAM SMALL URBAN *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:OPERATING/ADMIN. ASSISTANCE PHASE: OPERATIONS / RESPONSIBLE AGENCY: MANAGED BY VOLUSIA COUNTY DU 0 1,050 0 0 0 0 0 1,050 LF 0 985 0 0 0 0 0 985 TOTAL 434759 1 0 2,035 0 0 0 0 0 2,035 TOTAL PROJECT: 0 2,035 0 0 0 0 0 2,035 ITEM NUMBER:435713 1 PROJECT DESCRIPTION:COUNTY OF VOLUSIA DBA VOTRAN *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:CAPITAL FOR FIXED ROUTE PHASE: CAPITAL / RESPONSIBLE AGENCY: MANAGED BY VOLUSIA COUNTY FTA 0 1,994,139 540,555 556,771 573,474 0 0 3,664,939 LF 0 249,137 135,139 139,193 143,369 0 0 666,838 TOTAL 435713 1 0 2,243,276 675,694 695,964 716,843 0 0 4,331,777 TOTAL PROJECT: 0 2,243,276 675,694 695,964 716,843 0 0 4,331,777 TOTAL DIST: 05 0 31,995,311 10,675,694 10,695,964 10,716,843 10,300,000 0 74,383,812 TOTAL TRANSIT 0 31,995,311 10,675,694 10,695,964 10,716,843 10,300,000 0 74,383,812

PAGE 11 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 MISCELLANEOUS ITEM NUMBER:438324 1 PROJECT DESCRIPTION:NATURAL DISASTER FLAGLER COUNTYWIDE *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:EMERGENCY OPERATIONS PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT D 0 303 0 0 0 0 0 303 FEMA 0 202 0 0 0 0 0 202 TOTAL 438324 1 0 707 0 0 0 0 0 707 TOTAL PROJECT: 0 707 0 0 0 0 0 707 ITEM NUMBER:438325 1 PROJECT DESCRIPTION:NATURAL DISASTER FLAGLER COUNTYWIDE EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:FLAGLER TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438325 1 0 202 0 0 0 0 0 202

PAGE 12 FLORIDA DEPARTMENT OF TRANSPORTATION DATE RUN: 07/01/2016 MISCELLANEOUS ITEM NUMBER:438339 1 PROJECT DESCRIPTION:NATURAL DISASTER VOLUSIA COUNTYWIDE *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:EMERGENCY OPERATIONS PHASE: CONSTRUCTION / RESPONSIBLE AGENCY: MANAGED BY FDOT D 0 303 0 0 0 0 0 303 FEMA 0 202 0 0 0 0 0 202 TOTAL 438339 1 0 707 0 0 0 0 0 707 TOTAL PROJECT: 0 707 0 0 0 0 0 707 ITEM NUMBER:438340 1 PROJECT DESCRIPTION:NATURAL DISASTER VOLUSIA COUNTYWIDE EMERGENCY SIGN REPAIR *NON-SIS* DISTRICT:05 COUNTY:VOLUSIA TYPE OF WORK:EMERGENCY OPERATIONS TOTAL 438340 1 0 202 0 0 0 0 0 202 TOTAL DIST: 05 0 1,818 0 0 0 0 0 1,818 TOTAL MISCELLANEOUS 0 1,818 0 0 0 0 0 1,818 GRAND TOTAL 22,890,514 39,407,291 10,675,694 17,388,466 14,367,043 14,388,305 0 119,117,313