GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM
|
|
- Susan Francis
- 6 years ago
- Views:
Transcription
1 GIBE II TUNNEL PROJECT - ETHIOPIA - 40 BARS OF MUD ACTING ON THE TBM IL FUTURO DI SELI SPECIAL DESIGNS AND MEASURES IMPLEMENTED TO FACE ONE OF THE MOST DIFFICULT EVENT IN THE HISTORY OF TUNNELING Condivisione di obiettivi e traguardi
2 The Gilgel Gibe II Hydro-Power Plant is located approximately 240km southwest of Addis Ababa, in Ethiopia, between the Gibe and the Omo Rivers. The 25,8 km long tunnel has been excavated by two 7 m diameter Double Shield TBMs. Tab.1 Water Conveyance project main data PURPOSE TUNNEL LENGHT INTERNAL TUNNEL DIAMETER DESIGN DISCHARGE DESIGN INTERNAL PRESSURE Tab.2 Lining geometrical Characteristics SEGMENT TYPE SEGMENT THICKNESS SEGMENTAL LINING OUTSIDE DIAMETER SEGMENTAL LINING FINAL INTERNAL SEGMENT WIDTH HPP (432MW) 25,8 km 6,3 m 100 m 3 /s min.2 bar max.7 bar n.4 HEXAGONAL 25 cm mm mm mm
3 Figure 1. Typical lining section
4 FORESEEN GEOLOGY- OMO BASALSTS AND JIMA VOLCANICS Figure 2. Geological profile
5 EVENT AT THE CHAINAGE FROM INTAKE HEADING At the end of October 2006, the TBM was pushed back as consequence of the sudden extrusion and collapse of the tunnel face against the cutterhead and the front shield. The tunnel face moved towards the TBM mm/hour. The TBM has been pushed back more than 60 cm and displaced laterally more than 40 cm. As consequence, severe damages occurred to the shields, the cylinders and the last 7 segment rings installed behind the TBM.
6 Delta Right (old point) Delta Left Delta Right (new point) [ m m ] /1/07 9/3/07 28/4/07 17/6/07 6/8/07 25/9/07 14/11/07 3/1/08 22/2/08 Day Figure 17. Distometer measurements of Gripper Shield backing Figure 18. Topographic monitoring of TBM displacements
7 Figure 3. Tail TBM Shield damaged and bent
8 Figure 4. Lining segments moved and severely damaged
9 Figure 5. Overview of the TBM Shield left part and installed lining segments
10 Some boreholes through the front shields after the event, were performed with extreme difficulties, in some cases the rod bars were pushed out by the high pressure of the rock (clay and mud poured out with a temperature of about 40 and the pressure raised to 40 bar Figure 6. Mud poured out from one of the borehole
11 BACK CHAMBER DESIGN (BY LOMBARDI CONSULTING ENGINEERS ) Figure 8. Back Chamber Layout
12 Figure 10. State of the intervention on May 2007 (ch )
13 In June 2007 a collapse of the front face started at the left Exploratory Adit, producing three controlled leaching of about 3500 m3 of mud, which filled the all Adit and about 80m of the power tunnel (Figure 11 to 16). Figure 11. Extruding mud in the Exploratory Adit
14 Figure 12. Extruding mud in the Exploratory Adit
15 Figure 13. Extruding mud at the Adit Portal
16 Figure 14. Extruding mud in the Power Tunnel
17 Figure 15. Consolidated mud filling the Power Tunnel
18 The major three events represent the most important leaching of mud in the left Exploratory Adit. Each event was immediately followed by a sudden reduction of the acting pressure and convergence. Important pressure reductions were also obtained after August 2007, when the new boreholes crossed the fault zone, draining water. Water pressure (manometer BH n 2 Back Chamber) 26,0 p [bar] 24,0 22,0 20,0 18,0 16,0 14,0 12,0 1st Event BH-SM-1 BH-SM-3 BH-SM-9 BH-SM-11 BH-SM-15 BH-SM ,0 8,0 6,0 4,0 2,0 2nd Event 3th Event 4th Event 0,0 12/5 22/5 1/6 11/6 21/6 1/7 11/7 21/7 31/7 10/8 20/8 30/8 9/9 19/9 29/9 9/10 19/10 29/10 8/11 18/11 28/11 8/12 18/12 28/12 7/1 17/1 27/1 days Figure 26. Pressure variation measured in the Back Chamber
19 A new strategy was then defined: the Mud was removed from the power tunnel and partly only from the left Exploratory Adit; the Back-Up was extracted from the tunnel; a more powerful drilling equipment was positioned behind the TBM shields (having removed the Back-Up of the TBM); the construction of a new Exploratory Adit on the Right side (40m behind) then started.
20 A new attempt to reach the TBM cutterhead was carried out from the right side Exploratory Adit but the monitoring of loads and deformations suggested renouncing (Figures 20).
21 On December 2007, monitoring measurements have shown lowering of the rock stresses, while the right Exploratory Adit was crossing the fault zone A further new strategy was considered: Completion of the Back Chamber through a concave shot-concrete wall, reinforced with horizontal steel ribs HEB200 (see figure 21) TBM Dismantling inside the Back Chamber and carrying outside Refurbishing and reconstruction of the TBM (in the external yard) Construction of a new assembly chamber and TBM launching chamber Segmental lining dismantling and casting of a concrete plug in the Power Tunnel Resuming of the Intake drive excavation along a new alignment at ch
22 Figure 21. 3D Model of the Rescue Chamber built to recover the TBM
23 The new Power Tunnel alignment was chosen maintaining a minimum distance from the explorative Right Adit. (Figure 22). Figure 22. Position of TBM assemblylaunching Chamber and By-pass general layout
24 To facilitate TBM steering at the excavation resuming and to reinforce the pillar between the two tunnels, in the transition zone the old tunnel has been filled with concrete (Figure 23) Figure 23. Restarting of excavation and plug in the transition zone
25 The TBM has been refurbished and re-assembled in the tunnel. The excavation diameter was enlarged from 6980mm to 7074mm Peripheral cutter housings (from n 37 to n 44) were re-positioned (figure 24) Figure 24 TBM cutting profile after modification The TBM was re-assembled (Figure 25) excavation along the new alignment restarted on August 1st, 2008 Figure 25. TBM cutterhead
26 The TBM crossed the fault zone along the new alignment during the month of October 2008, performing later excellent production. Figure 28 resumes the monthly TBM excavation from August to December Figure 28. TBM production chart after the excavation resuming
27 The Tunnel excavation has been completed on 6 of June 2009 when the two TBMs meet at the ch.: 8+520,8
28 FINAL CONSIDERATIONS The success of the intervention was possible only after the releasing of the pressure and the stresses acting in the area and surrounding the TBM. Some numbers are significant for the Event n 19: 3500 m3 of mud flowed and removed m3 of water drained during the intervention 230 m of Exploratory Adit excavated with traditional method 1600 m of investigation boreholes
TBM FOR MINING APPLICATIONS
TBM FOR MINING APPLICATIONS TBM DESIGN EVOLUTION NO DESIGN EVOLUTION IN TBM FOR MINING IN SINCE 1960 s TBM DESIGN INNOVATION HAS BEEN FOCUSED ON: SOFT GROUND SLURRY AND EPB SHIELDED TBMS SHIELDED TBM FOR
More informationReal-time prediction during TBM advance.
Real-time prediction during TBM advance. Risk management through the BEAM in Doha Metro Project F. Bove Seli Overseas S.p.A., Rome, Italy. R. Grandori Seli Overseas S.p.A., Rome, Italy. ABSTRACT: The Bore
More informationBoring with no. 3 EPB TBMs in chaotic Lahar formations under variable cover
World Tunnel Congress 2013 Geneva Underground the way to the future! G. Anagnostou & H. Ehrbar (eds) Boring with no. 3 EPB TBMs in chaotic Lahar formations under variable cover (1), R. Grandori (1) (1)
More informationTBM erection chamber HALLANDSÅS TUNNELS. Mid-adit. Hallandsås ridge. Probe hole. 06 June 2009
TBM erection chamber HALLANDSÅS TUNNELS Mid-adit Hallandsås ridge 06 June 2009 Probe hole General project information Part of the West coast line railway project in South Sweden 2 tunnels 8.5 km long with
More informationH A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S. Tyler Sandell The Robbins Company
RISK MANAGEMENT: H A R D R O C K T B M D E S I G N F E AT U R E S F O R D I F F I C U LT G R O U N D C O N D I T I O N S Tyler Sandell The Robbins Company PRESENTATION OUTLINE RISK MANAGEMENT IN DIFFICULT
More informationHard Rock TBM Tunneling Technical Developments and Recent Experience
Hard Rock TBM Tunneling Technical Developments and Recent Experience *Jean-Daniel Brabant 1) and Ruben Duhme 1) 1), Herrenknecht Asia Headquarters, Singapore 1) duhme.ruben@herrenknecht.com ABSTRACT The
More informationKishanganga hydroelectric project (J&K India) head race tunnel tunneling by Tbm under Himalaya mountains dealing with adverse conditions
World Tunnel Congress 2013 Geneva Underground the way to the future! G. Anagnostou & H. Ehrbar (eds) Kishanganga hydroelectric project (J&K India) head race tunnel tunneling by Tbm under Himalaya mountains
More informationOlympic Games 2014 transportation system The TBM tunnelling story
Olympic Games 2014 transportation system The TBM tunnelling story Lars Langmaack 1, Alexander P. Severin 2, André Germann 3 1 BASF Construction Chemicals, Switzerland 2 Bamtonnelstroy, Director General
More informationISTANBUL STRAIT ROAD TUBE CROSSING
ISTANBUL STRAIT ROAD TUBE CROSSING One of the three major projects at cross path of Europe and Asia 3 rd Bosphorous Bridge Crossing New International Airport Eurasia Tunnel Total Length 14.6 km Part 1
More informationPredicting rock conditions ahead of the face
Predicting rock conditions ahead of the face Dr Thomas Dickmann, Product Manager Geophysics, Amberg Technologies AG Seismic methods of predicting rock conditions ahead of the tunnel face have developed
More informationFinal design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain).
Final design of Belesar III and Los Peares III Hydropower Projects. (Galicia, Spain). J. Baztán and A. Martín Gas Natural Fenosa Engineering, S.L.U, Madrid, Spain. J. M. Galera and D. Santos Subterra Ingeniería
More informationMoglicë HPP - Albania. Jorge Terron
Moglicë HPP - Albania Jorge Terron DEVOLL MOGLICË PROJECT Background Location Project Summary Sweco duties Plant overview Geology Cavern complex Layout Site investigations Rock mass characterization Geology
More informationPLEASE DOWNLOAD THE FULL PRESENTATION AT
PLEASE DOWNLOAD THE FULL PRESENTATION AT http://www.telt-sas.com/en/asia-roadshow NEXT: CALLS FOR TENDERS HISTORY BENCHMARKING: THE GOTTHARD TUNNEL TELT: WHO WE ARE THE PROJECT GEOLOGICAL FRAMEWORK The
More informationLogistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel
Logistics and Performance of a Large-Diameter Crossover TBM for the Akron Ohio Canal Interceptor Tunnel Pablo Salazar Robbins Connor Maxon Kenny-Obayashi JV ABSTRACT: The Ohio Canal Interceptor Tunnel
More informationNUMERICAL MODELLING OF THE BRUSNICE TUNNEL
NUMERICAL MODELLING OF THE BRUSNICE TUNNEL Matouš Hilar 1, Jakub Nosek 2 1 D2 Consult Prague and FCE CTU, Zelený pruh 95/97, Prague 4, 140 00, Czech Republic 2 D2 Consult Prague, Zelený pruh 95/97, Prague
More informationCASE STUDY BINGA, PHILIPPINES
SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume
More informationDESIGN AND CONSTRUCTION OF LARGE
DESIGN AND CONSTRUCTION OF LARGE TUNNELS IN SOIL AND FAULTED ROCK SENTVID TUNNEL MOTORWAY BYPASS OF LJUBLJANA Josef Daller, ic consulenten, Vienna - Austria International NATM Workshop Singapore 2010 LAYOUT
More informationPressurised TBMs and their interaction with weathered rock. Nick Shirlaw
Pressurised TBMs and their interaction with weathered rock Nick Shirlaw Pressurised TBMs Two basic types: slurry or Earth Pressure Balance (EPB) Fundamental differences in how they provide pressure to
More informationChallenge to the tunnel construction that supports national resilience
Technical Seminar on Road Transportation Infrastructure for ASEAN Integration Tunnel Session Challenge to the tunnel construction that supports national resilience Teppei Tomita Project Manager Department
More informationFormation Stratigraphy and Interfingering at the Port of Miami
Formation Stratigraphy and Interfingering at the Port of Miami AUGUST 6, 2012 PROJECT PARTNERS Public Sponsors 90% Equity Partner Contractor 10% Equity Partner VMS Operator Federal Support FUNDING PARTNERS
More informationGEOLOGY OF PRAGUE ITS INTERACTION WITH THE PRAGUE METRO
Underground M3 meeting, November 3-5, 2008, Prague GEOLOGY OF PRAGUE ITS INTERACTION WITH THE PRAGUE METRO Svatoslav Chamra Department of Geotechnics Faculty of Civil Engineering Czech Technical University
More informationScoping Calculations of TBM Advancement in Flysch and Breccias of Strait-of-Gibraltar Tunnel
EURO:TUN 2009 2 nd International Conference on Computational Methods in Tunnelling Ruhr University Bochum, 9-11 September 2009 Aedificatio Publishers, 369-376 Scoping Calculations of TBM Advancement in
More informationGEOLOGY, SOILS, AND SEISMICITY
4.9 GEOLOGY, SOILS, AND SEISMICITY 4.9.1 Introduction Information about the geological conditions and seismic hazards in the study area was summarized in the FEIR, and was based on the Geotechnical Exploration
More informationTAKING THE MYSTERY OUT OF USACE S ER DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES
TAKING THE MYSTERY OUT OF USACE S ER 1110-1-1807 DRILLING IN EARTH EMBANKMENT DAMS AND LEVEES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65
More informationCASE STUDY NATHPA JHAKRI, INDIA
SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reduce sediment production (watershed management); upstream sediment trapping; bypass
More informationExtreme Excavation in Fault Zones and Squeezing Ground at the Kargi HEPP in Turkey
Jim CLARK (*) SEE Tunnel : Promoting Tunneling in SEE Region ITAWTC 2015 Congress and 41 st General Assembly May 22-28, 2015, Lacroma Valamar Congress Center, Dubrovnik, Croatia Extreme Excavation in Fault
More informationCONVERGENCE MEASUREMENTS IN THE SOUTH TUNNEL WHILE NORTH TUNNEL EXCAVATION
Boortunnel Pannerdensch Kanaal Document nummer CONVERGENCE MEASUREMENTS IN THE SOUTH TUNNEL WHILE NORTH TUNNEL EXCAVATION Kandia dam Revision C Document nr.:f502-o-03-093 Datum: 09/02/06 Revisie: C Page
More informationEngineer. Engineering. Engineering. (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer
Engineer (in-ja-neer ) A person trained and skilled in any of the various branches of engineering: a civil engineer (Random House Webster s College Dictionary, 1991) CE100 Introduction to Civil Geotechnical
More informationGeological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN
ATS11-02113 ABSTRACT Geological evidences of collapse zones in TBM tunneling; a case study of Ghomroud water conveyance tunnel, IRAN Mahdi Zolfaghari, Ehsan Mokhtari, Massoud Morsali Sahel consultant engineers,
More informationCarlos Baião Cenorgeo DESIGN AND CONSTRUCTION OF THE MACHICO-CANIÇAL CANIÇAL EXPRESSWAY TUNNELS
Carlos Baião Cenorgeo carlos.baiao@cenor.pt DESIGN AND CONSTRUCTION OF THE MACHICO-CANIÇAL CANIÇAL EXPRESSWAY TUNNELS PRESENTATION LAYOUT Overall considerations Geological conditions Geological-geotechnical
More informationCASE STUDY BINGA, PHILIPPINES
SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower
More informationSignificance of of Fault Zones
Significance of of Fault Zones Geotechnical Relevant Characterization of Brittle Faults! Faults are elongated complex zones of deformation, ranging from decimeters to kilometers in magnitude! A significant
More information2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS
2 OVERVIEW OF SHALLOW BOREHOLE INVESTIGATIONS Preparation for MSB-2 started in April 2002. Drilling and planned field work in both MSB-2 and 4 were carried out at the same time. After completion of the
More informationExcavating Turkey s Most Challenging Project: The Gerede Water Transmission Tunnel
Excavating Turkey s Most Challenging Project: The Gerede Water Transmission Tunnel Brad Grothen 1, Yunus Alpagut 2 1 The Robbins Company, 5866 S. 194 th St., Kent, WA, 98032 USA, grothenb@robbinstbm.com
More informationDeep tunnelling in hardrock with large diameter TBM: What s up? An experience from the Gotthard Base Tunnel
Underground Space the 4 th Dimension of Metropolises Barták, Hrdina, Romancov & Zlámal (eds) 2007 Taylor & Francis Group, London, ISBN 978-0-415-40807-3 Deep tunnelling in hardrock with large diameter
More informationPractical aspects of dam break analysis
Practical aspects of dam break analysis Louis C Hattingh Hattingh Anderson Associates CC Dam break analysis It is a model You need to understand what you model & have an idea of the answers that you expect
More informationA Unique Metro Accident in Brazil Caused by Multiple Factors
A Unique Metro Accident in Brazil Caused by Multiple Factors 1 MAIN CAUSES OF ACCIDENT Ridge of jointed rock exactly along cavern roof Ridge of rock missed by drilling due to low spot Weathering of sides
More informationHARD ROCK TBMs. Levent Ozdemir. Tunneling Consultant
HARD ROCK TBMs Levent Ozdemir Tunneling Consultant HARD ROCK TBM TYPES Main-Beam (open, gripper) Single Shield Double Shield MAIN-BEAM HARD ROCK TBM MAIN-BEAM HARD ROCK TBM SINGLE SHIELD CROSS-SECTION
More information1. Rock Mechanics and mining engineering
1. Rock Mechanics and mining engineering 1.1 General concepts Rock mechanics is the theoretical and applied science of the mechanical behavior of rock and rock masses; it is that branch of mechanics concerned
More informationCASE STUDY NATHPA JHAKRI, INDIA
SEDIMENT MANAGEMENT CASE STUDY NATHPA JHAKRI, INDIA Key project features Name: Nathpa Jhakri Country: India Category: reforestation/revegetation; upstream sediment trapping; bypass channel/tunnel; reservoir
More informationYoshinori KAWAMURA, Oriental Consultants Global Co., Ltd.
Landslides along National Roads in Central Highland in Sri Lanka: Review on Current Situation and Suggestion for Further Development of Landslide Mitigation along Highways in Sri Lanka Yoshinori KAWAMURA,
More informationHard rock extreme conditions in the first 10 km of TBM driven Brenner Exploratory Tunnel
Hard rock extreme conditions in the first 1 km of TBM driven Brenner Exploratory Tunnel Remo Grandori S.E.L.I Spa, Rome, Italy Z. T. Bieniawski Bieniawski Design Enterprises, Prescott, Arizona, USA Dario
More informationThe Mine Geostress Testing Methods and Design
Open Journal of Geology, 2014, 4, 622-626 Published Online December 2014 in SciRes. http://www.scirp.org/journal/ojg http://dx.doi.org/10.4236/ojg.2014.412046 The Mine Geostress Testing Methods and Design
More informationTHE SPEAR3 UPGRADE PROJECT AT SLAC *
IWAA2004, CERN, Geneva, 4-7 October 2004 THE SPEAR3 UPGRADE PROJECT AT SLAC * Catherine Le Cocq, Brian Fuss, Michael Gaydosh Stanford Linear Accelerator Center, Stanford, CA, USA 1. INTRODUCTION The Stanford
More informationIntroduction to Oil&Gas Well Drilling
Introduction to Oil&Gas Well Drilling Drilling Introduction to Oil&Gas Well Drilling The term drilling indicates the whole complex of operations necessary to construct wells of circular section applying
More informationOpen Access Support Technique of Horse Head in Weakly Cemented Soft Rock
Send Orders for Reprints to reprints@benthamscience.ae 852 The Open Civil Engineering Journal, 2015, 9, 852-856 Open Access Support Technique of Horse Head in Weakly Cemented Soft Rock Li Haixia *, Wang
More informationLarge deformations in squeezing ground in the Saint-Martin La Porte gallery along the Lyon-Turin Base Tunnel
Underground Space the 4 th Dimension of Metropolises Barták, Hrdina, Romancov & Zlámal (eds) 2007 Taylor & Francis Group, London, ISBN 978-0-415-40807-3 Large deformations in squeezing ground in the Saint-Martin
More informationON THE PREDICTION OF EXPERIMENTAL RESULTS FROM TWO PILE TESTS UNDER FORCED VIBRATIONS
Transactions, SMiRT-24 ON THE PREDICTION OF EXPERIMENTAL RESULTS FROM TWO PILE TESTS UNDER FORCED VIBRATIONS 1 Principal Engineer, MTR & Associates, USA INTRODUCTION Mansour Tabatabaie 1 Dynamic response
More information1 Introduction. Abstract
Abstract This paper presents a three-dimensional numerical model for analysing via finite element method (FEM) the mechanized tunneling in urban areas. The numerical model is meant to represent the typical
More informationStudy of Soft Rock Roadway Support Technique
Available online at www.sciencedirect.com Procedia Engineering 26 (2011) 321 326 First International Symposium on Mine Safety Science and Engineering Study of Soft Rock Roadway Support Technique Haifeng
More informationENGINEERING GEOLOGY AND ROCK ENGINEERING
1 ENGINEERING GEOLOGY AND ROCK ENGINEERING HANDBOOK NO. 2 Norwegian Group for Rock Mechanics (NBG) www.bergmekanikk.com Prepared in co-operation with Norwegian Tunnelling Society (NFF) Issued in 2000 SECRETARIAT:
More informationGEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA
GEOTECHNICAL CONTROL DURING THE EXCAVATION OF THE TUNNEL OF GUADARRAMA Isidoro Tardáguila Geocontrol S.A. Benjamín Celada Geocontrol S.A. José Miguel Galera Geocontrol S.A. ABSTRACT: The tunnels of Guadarrama
More informationSession 3 - Case histories KARIBA DAM
ICOLD COMMITTEE ON CONCRETE DAMS SPANISH COMMITTEE ON CONCRETE FOR DAMS INTERNATIONAL JOURNAL ON HYDROPOWER & DAMS WORKSHOP October 18 & 19, 2007 Granada, Spain CHEMICAL EXPANSION OF CONCRETE IN DAMS &
More informationHorizontal Directional Drilling: An Approach to Design and Construction. Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE
Horizontal Directional Drilling: An Approach to Design and Construction Presenter: John Briand, PE Co-Author: Danielle Neamtu, PE Presentation Outline General HDD overview Conceptual-level evaluation Detailed
More informationIAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6
IAEA SAFETY STANDARDS Geotechnical Aspects of Site Evaluation and Foundations in NPPs, NS-G-3.6 Regional Workshop on Volcanic, Seismic, and Tsunami Hazard Assessment Related to NPP Siting Activities and
More informationHOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization
HOOVER DAM: Grout Curtain Failure and Lessons Learned in Site Characterization J. David Rogers Dams Symposium Association of Engineering Geologists Annual Meeting Las Vegas, Nevada September 22, 2005 The
More informationQualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam
Qualitative Foundation Rock Block Stability Evaluation Performed for Green Peter Dam Todd N. Loar, CEG Senior Geological Engineer USACE Risk Management Center AAARRR!!!... Peck, Peck, Terzaghi, Goodman,
More informationBack Calculation of Rock Mass Modulus using Finite Element Code (COMSOL)
Back Calculation of Rock Mass Modulus using Finite Element Code (COMSOL) Amirreza Ghasemi 1. Introduction Deformability is recognized as one of the most important parameters governing the behavior of rock
More informationCharacteristics on Rock Fractures Induced by Different Excavation Methods of Deep tunnels
International Meeting of CSRME 14th Biennial National Congress, 14-17 December 2016, Hong Kong, China Characteristics on Rock Fractures Induced by Different Excavation Methods of Deep tunnels Shaojun Li
More informationSwelling Pressure Due to volumetric Expansion of a rock mass having swelling minerals when comes in contact with water
Basic Definitions Swelling Pressure Due to volumetric Expansion of a rock mass having swelling minerals when comes in contact with water Primitivestress Stress in the state of equilibrium Induced stress
More informationDesign and Implementation of a Large-Diameter, Dual-Mode Crossover TBM for the Akron Ohio Canal Interceptor Tunnel
Design and Implementation of a Large-Diameter, Dual-Mode Crossover TBM for the Akron Ohio Canal Interceptor Tunnel E. Comis The Robbins Company D. Chastka Kenny/Obayashi JV ABSTRACT The Ohio Canal Interceptor
More informationGeotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study
The 31st International Symposium on Automation and Robotics in Construction and Mining (ISARC 2014) Geotechnical Monitoring for Safe Excavation of Large Rock Cavern: A Case Study A.Mandal a, C. Kumar b,
More informationGUIDELINE FOR HAND HELD SHEAR VANE TEST
GUIDELINE FOR HAND HELD SHEAR VANE TEST NZ GEOTECHNICAL SOCIETY INC August 2001 CONTENTS Page 1.0 Introduction 2 2.0 Background 2 3.0 Recommended Practice 3 4.0 Undrained Shear Strength 3 5.0 Particular
More informationCollaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS (CH)
SELFRAC Fractures and self-healing within the excavationdisturbed zone in clays Type of test: Clay characterisation Collaborating partners: NAGRA (CH), L3S (FR), G3S (FR), KUL (B), EPFL (CH), SOLEXPERTS
More informationUnderground Excavation Design Classification
Underground Excavation Design Underground Excavation Design Classification Alfred H. Zettler alfred.zettler@gmx.at Rock Quality Designation Measurement and calculation of RQD Rock Quality Designation index
More informationGotechnical Investigations and Sampling
Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of
More informationTBM "Boreability" in Hard Rock
JMConsulting-Rock Engineering TBM "Boreability" in Hard Rock Javier Macias, PhD Rock Engineering Consultant and Researcher JMConsulting-Rock Engineering AS Anvendt bergmekanikk 10.01.2018, Trondheim Outline
More informationASSESSING THE INTERACTION BETWEEN THE EXCAVATION OF A LARGE CAVERN AND EXISTING TUNNELS IN THE ALPS.
www.systra.com ASSESSING THE INTERACTION BETWEEN THE EXCAVATION OF A LARGE CAVERN AND EXISTING TUNNELS IN THE ALPS SYSTRA: SEMERARO Martino, MISANO Edoardo, SCHIVRE Magali, BOCHON Alain ASSESSING THE
More informationGROUNDBREAKING K-5
GROUNDBREAKING 02.24.17 04.16.17 K-5 table of contents Lesson Overview.......................................... Core Curriculum Tie-Ins...................................... About..................................................
More informationCalculation and analysis of internal force of piles excavation supporting. based on differential equation. Wei Wang
International Conference on Energy and Environmental Protection (ICEEP 016) Calculation and analysis of internal force of piles excavation supporting based on differential equation Wei Wang School of Prospecting
More informationExperimental Investigation of Soil-Pipe Friction Coefficients for Thermoplastic Pipes Installed in Selected Geological Materials
North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 MM-T6-03 Experimental Investigation of Soil-Pipe Friction Coefficients for Thermoplastic
More informationExperimental study of sand deformations during a CPT
3 rd International Symposium on Cone Penetration Testing, Las Vegas, Nevada, USA - 2014 Experimental study of sand deformations during a CPT A.V. Melnikov & G.G. Boldyrev Penza State University of Architecture
More informationMonitoring of underground construction
Monitoring of underground construction Geotechnical Aspects of Underground Construction in Soft Ground Yoo, Park, Kim & Ban (Eds) 2014 Korean Geotechnical Society, Seoul, Korea, ISBN 978-1-138-02700-8
More informationObservational Methods and
Observational Methods and NATM System for Observational approach to tunnel design Eurocode 7 (EC7) includes the following remarks concerning an observational method. Four requirements shall all be made
More information3/8/17. #20 - Landslides: Mitigation and Case Histories. Questions for Thought. Questions for Thought
#20 - Landslides: Mitigation and Case Histories Web Exercise #3 (Volcanoes) Due Wednesday There is a 2-point penalty for every day the assignment is late. Exam 1 Scores Scores and exam key are posted Vaiont
More informationEstimation of Water Seepage from Upper Reservoir of Rudbar Pumped Storage Power Plant
Estimation of Water Seepage from Upper Reservoir of Rudbar Pumped Storage Power Plant T. Abadipoor a and H. Katibeh a and A. Alianvari b a Dept. of Mining & Metallurgical Engineering, Amirkabir University
More informationInfluence of rock mass properties on TBM penetration rate in Karaj-Tehran water conveyance tunnel
Journal of Geology and Mining Research Vol. (), pp. -, October Available online http://www.academicjournals.org/jgmr ISSN 97 Academic Journals Full Length Research Paper Influence of rock mass properties
More informationAnalysis of Soil Machine Interactions (Part 1): Processing of TBM-Machine-Data and Extraction of excavation-specific Data
EURO:TUN 2013 3 rd International Conference on Computational Methods in Tunnelling and Subsurface Engineering Ruhr University Bochum, 17-19 April 2013 Analysis of Soil Machine Interactions (Part 1): Processing
More informationCanada Line Project. Stability of the Twin Bored Tunnels Under False Creek. Vancouver, British Columbia
Canada Line Project Stability of the Twin Bored Tunnels Under False Creek Vancouver, British Columbia By: Catherine Paul, Jen Ramesch, Matt Gellis, Matthew Yip, and Rhaul Sharma Canada Line Canada Line
More informationGeology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.
Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating
More informationMixed Face Conditions and the Risk of Loss of Face in Singapore
Mixed Face Conditions and the Risk of Loss of Face in Singapore J.N. Shirlaw, Golder Associates (Singapore) Pte. Ltd. ABSTRACT: Tunnelling using pressurised face Tunnel Boring Machines (PTBM), such as
More informationGeotechnical Engineering and Dams
Geotechnical Engineering and Dams Solving Geotechnical Challenges for Hydropower and Water Resources Projects Geological and geotechnical challenges are often very demanding when planning hydraulic structures.
More informationCollaborating partners Smet Tunnelling
Second shaft The construction of a second access shaft Type of test: Technical feasibility construction of a shaft. Study of the geomechanical behaviour of Boom Clay Collaborating partners Smet Tunnelling
More informationDestructuration of soft clay during Shield TBM tunnelling and its consequences
Destructuration of soft clay during Shield TBM tunnelling and its consequences Hirokazu Akagi Abstract It is very important to prevent ground settlement associated with shield TBM tunnelling in soft ground
More informationSEISMIC REFRACTION SURVEY RIPPABILITY STUDY
SEISMIC REFRACTION SURVEY RIPPABILITY STUDY US 95A SILVER SPRINGS to FERNLEY LYON COUNTY August 2008 E.A. 73455 MATERIALS DIVISION SEISMIC REFRACTION SURVEY RIPPABILITY STUDY LYON COUNTY US 95A SILVER
More informationEquilibrium in Three Dimensions
C h a p t e r 7 Equilibrium in Three Dimensions In this chapter, you will learn the following to World Class standards: Forces in Three Different Axis Wind Load on the Antennae Pole Practice Problem -
More informationSTRESS MEASUREMENT IN ROCK MASS
IGC 2009, Guntur, INDIA Measurement in Rock Mass STRESS MEASUREMENT IN ROCK MASS D.V. Sarwade Research Officer, CSMRS, New Delhi 110 016, India. E-mail: sarwadedv@rediffmail.com K.K. Mishra Research Assistant,
More informationThe Velenje mining method
The Velenje mining method The Velenje mining method Introduction Velenje Coal Mine is a technologically highly-developed company, strongly integrated in the Slovenian energy industry and environment with
More informationGeoscientific Instrumentation in River Valley Projects
J. Ind. Geophys. Union ( July 2008 ) Vol.12, No.3, pp.141-147 Geoscientific Instrumentation in River Valley Projects G.C.Pargaien Energy Infratech Private Limited, 145-146, Udyog Vihar, Phase IV, Gurgaon
More information25th International Conference on Ground Control in Mining
ANALYTICAL INVESTIGATION OF SHAFT DAMAGES AT WEST ELK MINE Tim Ross, Senior Associate Agapito Associates, Inc. Golden, CO, USA Bo Yu, Senior Engineer Agapito Associates, Inc. Grand Junction, CO, USA Chris
More informationStrength of Material. Shear Strain. Dr. Attaullah Shah
Strength of Material Shear Strain Dr. Attaullah Shah Shear Strain TRIAXIAL DEFORMATION Poisson's Ratio Relationship Between E, G, and ν BIAXIAL DEFORMATION Bulk Modulus of Elasticity or Modulus of Volume
More informationComputational modelling of a TBM tunnelling through alluvial ground at design stage
Computational modelling of a TBM tunnelling through alluvial ground at design stage Rohola Hasanpour 1, Jamal Rostami 2, Jürgen Schmitt 1, and Babak Sohrabian 3 1 Hochschule Darmstadt University of Applied
More informationControl of surface settlements with Earth pressure balance method (EPB) for Istanbul metro
ATS11-02327 Control of surface settlements with Earth pressure balance method (EPB) for Istanbul metro Hamid Chakeri 1, Bahtiyar Ünver 2, Alireza Talebinejad 3 1 Phd student, Hacettepe University, Dept.
More informationLecture 15: Subsidence
Lecture 15: Subsidence Key Questions 1. How does removal of groundwater cause subsidence on a regional scale? 2. Under what conditions does a building sink into sediment? 3. Why do clays consolidate more
More informationWhat is Failure? What is Failure? unplanned outcome. results in loss. and why do failures occur? John Atkinson. Failure to learn from failure.
What is Failure? and why do failures occur? John Atkinson Professor of Soil Mechanics City University, London. What is Failure? unplanned outcome. results in loss. Inconvenient Loss of life Fit for purpose?
More informationFukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation
Fukushima Daiichi Nuclear Power Station Unit 2 Primary Containment Vessel Internal Investigation April 26, 2018 Tokyo Electric Power Company Holdings, Inc. 1. Primary containment vessel internal investigation
More informationPractical long-term planning in narrow vein mines a case study
Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow
More informationCrags, Cracks, and Crumples: Crustal Deformation and Mountain Building
Crags, Cracks, and Crumples: Crustal Deformation and Mountain Building Updated by: Rick Oches, Professor of Geology & Environmental Sciences Bentley University Waltham, Massachusetts Based on slides prepared
More informationPRELIMINARY INVESTIGATION ON THE FAILURE OF THE BA-LING CHECK DAM IN THE WATERSHED OF SHI-MEN RESERVOIR IN TAIWAN
PRELIMINARY INVESTIGATION ON THE FAILURE OF THE BA-LING CHECK DAM IN THE WATERSHED OF SHI-MEN RESERVOIR IN TAIWAN Su-Chin Chen. 1 *, Yu-Hsan Chang 2, Ben-Kang Chen 3, Yi-Chuan Liu 4, Zheng-Yi Feng, 5*,
More informationComparative study of TBM performance prediction models
Comparative study of TBM performance prediction models *Tae Young KO 1), Seung Mo SON 2) and Taek Kon KIM 3) 1), 2, 3) SK Engineering & Construction, Seoul, 04534, Korea * tyko@sk.com ABSTRACT In this
More information