patersongroup 1.0 Field Observations Consulting Engineers January 20, 2014 File: PG3145-LET.01 City View Curling Club 50 Capilano Drive

Size: px
Start display at page:

Download "patersongroup 1.0 Field Observations Consulting Engineers January 20, 2014 File: PG3145-LET.01 City View Curling Club 50 Capilano Drive"

Transcription

1 January 0, 04 File: P345-LET.0 City View Curling Club 50 Capilano Drive Ottawa, Ontario KE 64 Attention: Ms. Cheryl Carroll Consulting Engineers 54 Colonnade Road South Ottawa, Ontario KE 7J5 Tel: (63) Fax: (63) eotechnical Engineering Environmental Engineering Hydrogeology eological Engineering Materials Testing Building Science Archaeological Services Subject: Supplemental eotechnical Investigation Proposed Curling Club Facility 50 Capilano Drive - Ottawa Dear Sir, Further to your request, Paterson roup (Paterson) was commissioned to conduct a supplemental geotechnical investigation and site specific seismic testing for the proposed curling club facility to be located at the aforementioned site. The following report presents our findings and recommendations..0 Field Observations Field Program The subject site is currently occupied by an existing building, consisting of a slab-on-grade single storey curling rink structure with a two () storey club house within the northwest portion of the site. An asphalt covered parking lot is located to the east of the existing building and a tree covered area within the south portion of the site. The proposed building is to be located within the south portion of the site. Our current geotechnical investigation included excavating seven supplemental test pit locations on December 8, 03 throughout the site to provide additional soils information along with bedrock depth, where encountered. Our original investigation included three test pit locations excavated using a hydraulic shovel on September 8, 0. Ottawa Kingston North Bay

2 Ms. Cheryl Carroll Page File: P345-LET.0 All fieldwork was conducted under the full-time supervision of Paterson personnel under the direction of a senior engineer from the geotechnical division. The testing procedure consisted of excavating to the required depths at the selected locations and regularly sampling the overburden. The approximate locations of the test holes are shown on Drawing P Test Hole Location Plan attached to this report. Subsurface Conditions enerally, the subsoil conditions at the test hole locations consists of topsoil overlying a silty sand fill, silty sand and/or stiff, grey silty clay and glacial till. Bedrock was encountered at depths ranging from. and.8 m depth. Based on geological mapping, the bedrock is part of the ull River Formation and consists of interbedded limestone and dolomite. roundwater infiltration levels were measured in the open test holes upon completion of all test holes. All test pits were dry upon the completion of the field program. It should be noted that groundwater levels are subject to seasonal fluctuations. Therefore, the groundwater level could vary at the time of construction..0 eotechnical Assessment From a geotechnical perspective, the subject site is satisfactory for the proposed building. Site Preparation and Fill Placement Fill used for grading beneath the proposed building footprint, unless otherwise specified, should consist of clean imported granular fill, such as Ontario Provincial Standard Specifications (OPSS) ranular A or ranular B Type II. The fill should be tested and approved prior to delivery to the site. It should be placed in lifts no greater than 300 mm thick and compacted using suitable compaction equipment for the lift thickness. Fill placed beneath the proposed structure should be compacted to at least 98% of its standard Proctor maximum dry density (SPMDD). Existing foundation walls and other construction debris should be entirely removed from within the proposed building perimeter. Under paved areas, existing construction remnants such as foundation walls should be excavated to a minimum of m below final grade.

3 Ms. Cheryl Carroll Page 3 File: P345-LET.0 Non-specified existing fill along with site-excavated soil can be used as general landscaping fill where settlement of the ground surface is of minor concern. These materials should be spread in thin lifts and at least compacted by the tracks of the spreading equipment to minimize voids. If these materials are to be used to build up the subgrade level for areas to be paved, they should be compacted in thin lifts to a minimum density of 95% of their respective SPMDD. Non-specified existing fill and site-excavated soils are not suitable for use as backfill against foundation walls unless used in conjunction with a composite drainage blanket. Bedrock Removal It is expected that line-drilling in conjunction with hoe-ramming or controlled blasting will be required to remove the bedrock, if required. In areas of weathered bedrock and where only a small quantity of bedrock is to be removed, bedrock removal may be possible by hoe-ramming. Prior to considering blasting operations, the effects on the existing services, buildings and other structures should be addressed. A pre-blast or construction survey located in proximity of the blasting operations should be conducted prior to commencing construction. The extent of the survey should be determined by the blasting consultant and sufficient to respond to any inquiries/claims related to the blasting operations. As a general guideline, peak particle velocity (measured at the structures) should not exceed 5 mm/s during the blasting program to reduce the risks of damage to the existing structures. The blasting operations should be planned and conducted under the supervision of a licensed professional engineer who is an experienced blasting consultant. Foundation Design Footings placed on an undisturbed, compact silty sand or glacial till bearing surface can be designed using a bearing resistance value at serviceability limit states (SLS) of 50 kpa and a factored bearing resistance value at ultimate limit states (ULS) of 5 kpa. A geotechnical resistance factor of 0.5 was incorporated into the bearing resistance value at ULS. An undisturbed soil bearing surface consists of one from which all topsoil and deleterious materials, such as loose, frozen or disturbed soil, have been removed, in the dry, prior to the placement of concrete for footings.

4 Ms. Cheryl Carroll Page 4 File: P345-LET.0 Footings bearing on an undisturbed soil bearing surface and designed using the bearing resistance values provided herein will be subjected to potential post-construction total and differential settlements of 5 and 0 mm, respectively. Footings placed on a clean, surface sounded bedrock surface can be designed using a bearing resistance value at SLS of 500 kpa and a factored bearing resistance value at ULS of,500 kpa. A geotechnical resistance factor of 0.5 was applied to the above noted bearing resistance value at ULS. A clean, surface-sounded bedrock bearing surface should be free of loose materials, and have no near surface seams, voids, fissures or open joints which can be detected from surface sounding with a rock hammer. Footings bearing on surface sounded bedrock and designed using the above mentioned bearing resistance values will be subjected to negligible post-construction total and differential settlements. Design for Earthquakes Shear wave velocity testing was completed for the subject site to accurately determine the applicable seismic site classification for the proposed building from Table A of the Ontario Building Code 0. The shear wave velocity testing was completed by Paterson personnel. The results of the shear wave velocity test are attached to the present letter report. Field Program The shear wave testing location is presented in Drawing P Test Hole Location Plan attached to the present letter report. Paterson field personnel placed 4 horizontal geophones in a straight line in roughly a north-south orientation. The 4.5 Hz. horizontal geophones were mounted to the surface by means of two 75 mm ground spikes attached to the geophone land case. The geophones were spaced at 3 m intervals and connected by a geophone spread cable to a eode 4 Channel seismograph.

5 Ms. Cheryl Carroll Page 5 File: P345-LET.0 The seismograph was also connected to a computer laptop and a hammer trigger switch attached to a pound dead blow hammer. The hammer trigger switch sends a start signal to the seismograph. The hammer is used to strike an I-Beam seated into the ground surface, which creates a polarized shear wave. The hammer shots are repeated between five (5) to ten (0) times at each shot location to improve signal to noise ratio. The shot locations are also completed in forward and reverse directions (i.e.- striking both sides of the I-Beam seated parallel to the geophone array). The shot locations are located at the centre of the geophone array, 4.5 and 3 m away from the first and last geophone. Two shear wave velocity profiles from our on site testing are attached to the present report. The methods of testing completed by Paterson are guided by the standard testing procedures used by the expert seismologists at Carleton University and eological Survey of Canada (SC). Data Processing and Interpretation Interpretation for the shear wave velocity results were completed by Paterson personnel. Shear wave velocity measurement was made using reflection/refraction methods. The interpretation is performed by recovering arrival times from direct and refracted waves. The interpretation is repeated at each shot location to provide an average shear wave velocity, Vs 30, of the upper 30 m profile, immediately below the building s foundation. The layer intercept times, velocities from different layers and critical distances are interpreted from the shear wave records to compute the bedrock depth at each location. The bedrock velocity was interpreted using the main refractor wave velocity, which is considered a conservative estimate of the bedrock velocity due to the increasing quality of the bedrock with depth. It should be noted that as bedrock quality increases, the bedrock shear wave velocity also increases. Based on our analysis, the bedrock seismic shear wave velocity was calculated to be,300 m/s. The overburden seismic shear wave velocity was estimated to be approximately 00 m/s based on intercept times from our survey. 30 The Vs was calculated using the standard equation for average shear wave velocity calculation from the Ontario Building Code (OBC) 006, as presented below.

6 Ms. Cheryl Carroll Page 6 File: P345-LET.0 Based on the results of the seismic testing, the average shear wave velocity, Vs30, for the proposed building is,60 m/s when considering the proposed underside of footing elevation. Therefore, a Site Class A is applicable for the proposed building, as per Table A of the OBC 0. The soils underlying the subject site are not susceptible to liquefaction. Basement Slab / Slab on rade Construction With the removal of all topsoil and deleterious fill, such as those containing organic materials, within the footprint of the proposed building, the native soil surface or existing fill approved by the geotechnical consultant at the time of excavation will be considered to be an acceptable subgrade on which to commence backfilling for floor slab construction. It is recommended that the upper 00 mm of sub-slab fill consist of 9 mm clear stone for the basement slab. The upper 00 mm of sub-slab fill should consist of OPSS ranular A crushed stone for slab on grade construction. All backfill material within the footprint of the proposed building should be placed in maximum 300 mm thick loose layers and compacted to at least 98% of its SPMDD. Any soft or poor performing areas should be removed and backfilled with appropriate backfill material prior to placing any fill. OPSS ranular A or ranular B Type II, with a maximum particle size of 50 mm, are recommended for backfilling below the floor slab. All backfill material within the footprint of the proposed building should be placed in maximum 300 mm thick loose layers and compacted to at least 98% of its SPMDD.

7 Ms. Cheryl Carroll Page 7 File: P345-LET.0 Pavement Structure Car only parking areas and access lanes are anticipated at this site. The proposed pavement structures are shown in Tables and. Table - Recommended Pavement Structure - Car Only Parking Thickness mm Material Description 50 WEAR COURSE - Superpave.5 Asphaltic Concrete 50 BASE - OPSS ranular A Crushed Stone 300 SUBBASE - OPSS ranular B Type II SUBRADE - Either in situ soil, fill or OPSS ranular B Type II material placed over in situ soil or fill. Table - Recommended Pavement Structure - Access Lanes Thickness (mm) Material Description 40 Wear Course - HL-3 or Superpave.5 Asphaltic Concrete 50 Binder Course - HL-8 or Superpave 9.0 Asphaltic Concrete 50 BASE - OPSS ranular A Crushed Stone 400 SUBBASE - OPSS ranular B Type II SUBRADE - Either fill, in situ soil, or OPSS ranular B Type I or II material placed over in situ soil or fill Minimum Performance raded (P) asphalt cement should be used for this project. If soft spots develop in the subgrade during compaction or due to construction traffic, the affected areas should be excavated and replaced with OPSS ranular B Type II material. The pavement granular base and subbase should be placed in maximum 300 mm thick lifts and compacted to a minimum of 98% of the material s SPMDD using suitable vibratory equipment.

8 Ms. Cheryl Carroll Page 8 File: P345-LET Design and Construction Precautions Foundation Drainage and Backfill It is recommended that a perimeter foundation drainage system be provided for the proposed structure. The system should consist of a 00 to 50 mm diameter, geotextilewrapped, perforated, corrugated, plastic pipe, surrounded on all sides by 50 mm of 0 mm clear crushed stone, placed at the footing level around the exterior perimeter of the structure. The pipe should have a positive outlet, such as a gravity connection to the storm sewer. Backfill against the exterior sides of the foundation walls should consist of free-draining, non frost susceptible granular materials. The site materials will be frost susceptible and, as such, are not recommended for re-use as backfill unless a composite drainage system (such as system Platon or Miradrain 00N) connected to a drainage system is provided. Protection of Footings Against Frost Action Perimeter footings of heated structures are required to be insulated against the deleterious effect of frost action. A minimum of.5 m thick soil cover (or equivalent) should be provided in this regard. A minimum of. m thick soil cover (or equivalent) should be provided for exterior unheated footings, not thermally connected to a heated space, such as exterior columns and/or wing walls. Therefore, the curling rink perimeter and interior footings (if any) should be treated as unheated footings. Excavation Side Slopes The side slopes of excavations in the soil and fill overburden materials should either be cut back at acceptable slopes or should be retained by shoring systems from the start of the excavation until the structure is backfilled. It is assumed that sufficient room will be available for the greater part of the excavation to be undertaken by open-cut methods (i.e. unsupported excavations). The excavation side slopes above the groundwater level extending to a maximum depth of 3 m should be cut back at H:V or flatter. The flatter slope is required for excavation below groundwater level. The subsoil at this site is considered to be mainly Type and 3 soil according to the Occupational Health and Safety Act and Regulations for Construction Projects.

9 Ms. Cheryl Carroll Page 9 File: P345-LET.0 Excavated soil should not be stockpiled directly at the top of excavations and heavy equipment should be kept away from the excavation sides. Slopes in excess of 3 m in height should be periodically inspected by the geotechnical consultant in order to detect if the slopes are exhibiting signs of distress. It is recommended that a trench box be used at all times to protect personnel working in trenches with steep or vertical sides. It is expected that services will be installed by cut and cover methods and excavations will not be left open for extended periods of time. Pipe Bedding and Backfill Bedding and backfill materials should be in accordance with the most recent Material Specifications & Standard Detail Drawings from the Department of Public Works and Services, Infrastructure Services Branch of the City of Ottawa. At least 50 mm of OPSS ranular A should be used for bedding for sewer and water pipes when placed on soil subgrade. The bedding thickness should be increased to 300 mm when placed over a bedrock subgrade. The bedding should extend to the spring line of the pipe. Cover material, from the spring line to at least 300 mm above the obvert of the pipe should consist of OPSS ranular A (concrete or PSM PVC pipes) or sand (concrete pipe). The bedding and cover materials should be placed in maximum 5 mm thick lifts compacted to a minimum of 95% of the material s SPMDD. enerally, it should be possible to re-use the moist, not wet, silty clay above the cover material if the excavation and filling operations are carried out in dry weather conditions. The wet silty clay should be given a sufficient drying period to decrease its moisture content to an acceptable level to make compaction possible prior to being re-used. Where hard surface areas are considered above the trench backfill, the trench backfill material within the frost zone (about.8 m below finished grade) should match the soils exposed at the trench walls to minimize differential frost heaving. The trench backfill should be placed in maximum 300 mm thick loose lifts and compacted to a minimum of 95% of the material s SPMDD. roundwater Control It is anticipated that groundwater infiltration into the excavations should be low and controllable using open sumps. Pumping from open sumps should be sufficient to control the groundwater influx through the sides of shallow excavations. The contractor should be prepared to direct water away from all bearing surfaces and subgrades, regardless of the source, to prevent disturbance to the founding medium.

10 Ms. Cheryl Carroll Page 0 File: P345-LET.0 A temporary MOE permit to take water (PTTW) may be required for this project if more than 50,000 L/day is to be pumped during the construction phase. At least 3 to 4 months should be allowed for completion of the application and issuance of the permit by the MOE. Winter Construction Precautions must be taken if winter construction is considered for this project. The subsoil conditions at this site consist of frost susceptible materials. In the presence of water and freezing conditions, ice could form within the soil mass. Heaving and settlement upon thawing could occur. In the event of construction during below zero temperatures, the founding stratum should be protected from freezing temperatures by the use of straw, propane heaters and tarpaulins or other suitable means. In this regard, the base of the excavations should be insulated from sub-zero temperatures immediately upon exposure and until such time as heat is adequately supplied to the building and the footings are protected with sufficient soil cover to prevent freezing at founding level. Trench excavations and pavement construction are also difficult activities to complete during freezing conditions without introducing frost in the subgrade or in the excavation walls and bottoms. Precautions should be taken if such activities are to be carried out during freezing conditions. Additional information could be provided, if required.

11 Ms. Cheryl Carroll Page File: P345-LET Recommendations It is a requirement for the design data provided herein to be applicable that an acceptable materials testing and observation program, including the aspects shown below, be performed by the geotechnical consultant. Observation of all bearing surfaces prior to the placement of concrete. Sampling and testing of the concrete and fill materials used. Periodic observation of the condition of unsupported excavation side slopes in excess of 3 m in height, if applicable. Observation of all subgrades prior to backfilling. Field density tests to determine the level of compaction achieved. Sampling and testing of the bituminous concrete including mix design reviews. Upon demand, a report confirming that these works have been conducted in general accordance with our recommendations could be issued following the completion of a satisfactory materials testing and observation program by the geotechnical consultant.

12 Ms. Cheryl Carroll Page File: P345-LET Statement of Limitations The recommendations made in this report are in accordance with our present understanding of the project. Our recommendations should be reviewed when the project drawings and specifications are complete. A soils investigation is a limited sampling of a site. Should any conditions at the site be encountered which differ from those at the test locations, we request that we be notified immediately in order to permit reassessment of our recommendations. The present report applies only to the project described in this document. Use of this report for purposes other than those described herein or by person(s) other than City View Curling Club or their agents are not authorized without review by this firm for the applicability of our recommendations to the altered use of the report. Paterson roup Inc. Faisal Abou-Seido, B.Eng. David J. ilbert, P.Eng. Attachments Soil Profile and Test Data Sheets Figure - Key Plan Figures and 3 - Seismic Shear Wave Velocity Profiles Drawing P Test Hole Location Plan Report Distribution City View Curling Club (3 copies) Paterson roup ( copy)

13 % 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Backhoe Consulting Engineers eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. SOIL PROFILE AND TEST DATA DATE December 8, 03 FILE NO. HOLE NO. P345 TP -3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: ravel with roots 0.38 FILL: Brown silty sand, some gravel, trace cobbles Brown SILTY SAND.5 LACIAL TILL: Brown silty sand with gravel, cobbles and boulders, trace clay End of Test Pit.46 TP terminated on inferred bedrock surface at.46m depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

14 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers DATE eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. Backhoe SOIL PROFILE AND TEST DATA December 8, 03 FILE NO. HOLE NO. P345 TP -3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction TOPSOIL 0.8 Brown SILTY SAND LACIAL TILL: Brown silty sand with clay, gravel, cobbles and boulders 93.0 End of Test Pit. TP terminated on inferred bedrock surface at.m depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

15 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers DATE eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. Backhoe SOIL PROFILE AND TEST DATA December 8, 03 FILE NO. HOLE NO. P345 TP 3-3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Brown silty sand with gravel, cobbles, trace boulders LACIAL TILL: Brown silty clay with sand, gravel, cobbles and boulders 93.9 End of Test Pit.6 TP terminated on inferred bedrock surface at.6m depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

16 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers DATE eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. Backhoe SOIL PROFILE AND TEST DATA December 8, 03 FILE NO. HOLE NO. P345 TP 4-3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction TOPSOIL 0.36 Brown SILTY SAND LACIAL TILL: Dense, brown silty sand with gravel, cobbles, boulders, trace clay End of Test Pit.39 TP terminated on inferred bedrock surface at.39m depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

17 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers DATE eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. Backhoe SOIL PROFILE AND TEST DATA December 8, 03 FILE NO. HOLE NO. P345 TP 5-3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Brown silty sand with gravel, cobbles, trace boulders Dense, brown SILT LACIAL TILL: Brown silty sand with gravel, cobbles and boulders, trace clay 5 End of Test Pit.8 TP terminated on inferred bedrock surface at.8m depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

18 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers DATE eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. Backhoe SOIL PROFILE AND TEST DATA December 8, 03 FILE NO. HOLE NO. P345 TP 6-3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Brown silty sand with gravel, cobbles, boulders, trace clay Brown SILTY SAND End of Test Pit.40 (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

19 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers DATE eotechnical Investigation Prop. Curling Club Facility - 50 Capilano Drive Ottawa, Ontario TBM - Finished floor of existing building on threshold of door. eodetic elevation = 95.9m, as per plan provided by D.B. rey Engineering Inc. Backhoe SOIL PROFILE AND TEST DATA December 8, 03 FILE NO. HOLE NO. P345 TP 7-3 SOIL DESCRIPTION ROUND SURFACE STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Brown silty sand with gravel, trace cobbles and brick Brown SILTY SAND with roots End of Test Pit.5 3 (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

20 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY Consulting Engineers round surface elevations at test hole locations are inferred based on topographic mapping provided by D.B. rey Engineering Inc. Backhoe DATE SOIL PROFILE AND TEST DATA eotechnical Investigation Proposed Curling Club Facility - 50 Capilano Drive Ottawa, Ontario September 8, 0 FILE NO. HOLE NO. P655 TP SOIL DESCRIPTION ROUND SURFACE TOPSOIL 0.3 STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Silty sand with gravel, cobbles and boulders Compact SILTY SAND Stiff, grey SILTY CLAY.65 LACIAL TILL: Compact, silty clay with gravel, cobbles and boulders End of Test Pit.54 TP terminated on bedrock depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

21 % 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY round surface elevations at test hole locations are inferred based on topographic mapping provided by D.B. rey Engineering Inc. Backhoe Consulting Engineers SOIL PROFILE AND TEST DATA eotechnical Investigation Proposed Curling Club Facility - 50 Capilano Drive Ottawa, Ontario DATE September 8, 0 FILE NO. HOLE NO. P655 TP SOIL DESCRIPTION ROUND SURFACE TOPSOIL 0.0 STRATA PLOT TYPE SAMPLE NUMBER RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Silty sand with gravel, cobbles and boulders Stiff, grey SILTY CLAY.4 LACIAL TILL: Compact, silty clay with sand gravel, cobbles and boulders End of Test Pit.69 3 TP terminated on bedrock depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

22 54 Colonnade Road South, Ottawa, Ontario KE 7J5 DATUM REMARKS BORINS BY round surface elevations at test hole locations are inferred based on topographic mapping provided by D.B. rey Engineering Inc. Backhoe Consulting Engineers DATE SOIL PROFILE AND TEST DATA eotechnical Investigation Proposed Curling Club Facility - 50 Capilano Drive Ottawa, Ontario September 8, 0 FILE NO. HOLE NO. P655 TP 3 SOIL DESCRIPTION ROUND SURFACE TOPSOIL 0.0 STRATA PLOT TYPE SAMPLE NUMBER % RECOVERY N VALUE or RQD DEPTH 0 ELEV Pen. Resist. Blows/0.3m 50 mm Dia. Cone Water Content % Piezometer Construction FILL: Brown silty sand with gravel and cobbles Stiff, grey SILTY CLAY LACIAL TILL: Compact to dense silty clay with sand, gravel, cobbles and boulders End of Test Pit.39 TP terminated on bedrock depth (TP dry upon completion) Shear Strength (kpa) Undisturbed Remoulded

23 SYMBOLS AND TERMS SOIL DESCRIPTION Behavioural properties, such as structure and strength, take precedence over particle gradation in describing soils. Terminology describing soil structure are as follows: Desiccated - having visible signs of weathering by oxidation of clay minerals, shrinkage cracks, etc. Fissured - having cracks, and hence a blocky structure. Varved - composed of regular alternating layers of silt and clay. Stratified - composed of alternating layers of different soil types, e.g. silt and sand or silt and clay. Well-raded - Having wide range in grain sizes and substantial amounts of all intermediate particle sizes (see rain Size Distribution). Uniformly-raded - Predominantly of one grain size (see rain Size Distribution). The standard terminology to describe the strength of cohesionless soils is the relative density, usually inferred from the results of the Standard Penetration Test (SPT) N value. The SPT N value is the number of blows of a 63.5 kg hammer, falling 760 mm, required to drive a 5 mm O.D. split spoon sampler 300 mm into the soil after an initial penetration of 50 mm. Relative Density N Value Relative Density % Very Loose <4 <5 Loose Compact Dense Very Dense >50 >85 The standard terminology to describe the strength of cohesive soils is the consistency, which is based on the undisturbed undrained shear strength as measured by the in situ or laboratory vane tests, penetrometer tests, unconfined compression tests, or occasionally by Standard Penetration Tests. Consistency Undrained Shear Strength (kpa) N Value Very Soft < < Soft -5-4 Firm Stiff Very Stiff Hard >00 >30

24 SYMBOLS AND TERMS (continued) SOIL DESCRIPTION (continued) Cohesive soils can also be classified according to their sensitivity. The sensitivity is the ratio between the undisturbed undrained shear strength and the remoulded undrained shear strength of the soil. Terminology used for describing soil strata based upon texture, or the proportion of individual particle sizes present is provided on the Textural Soil Classification Chart at the end of this information package. ROCK DESCRIPTION The structural description of the bedrock mass is based on the Rock Quality Designation (RQD). The RQD classification is based on a modified core recovery percentage in which all pieces of sound core over 00 mm long are counted as recovery. The smaller pieces are considered to be a result of closelyspaced discontinuities (resulting from shearing, jointing, faulting, or weathering) in the rock mass and are not counted. RQD is ideally determined from NXL size core. However, it can be used on smaller core sizes, such as BX, if the bulk of the fractures caused by drilling stresses (called mechanical breaks ) are easily distinguishable from the normal in situ fractures. RQD % ROCK QUALITY Excellent, intact, very sound ood, massive, moderately jointed or sound Fair, blocky and seamy, fractured 5-50 Poor, shattered and very seamy or blocky, severely fractured 0-5 Very poor, crushed, very severely fractured SAMPLE TYPES SS - Split spoon sample (obtained in conjunction with the performing of the Standard Penetration Test (SPT)) TW - Thin wall tube or Shelby tube PS - Piston sample AU - Auger sample or bulk sample WS - Wash sample RC - Rock core sample (Core bit size AXT, BXL, etc.). Rock core samples are obtained with the use of standard diamond drilling bits.

25 SYMBOLS AND TERMS (continued) RAIN SIZE DISTRIBUTION MC% - Natural moisture content or water content of sample, % LL - Liquid Limit, % (water content above which soil behaves as a liquid) PL - Plastic limit, % (water content above which soil behaves plastically) PI - Plasticity index, % (difference between LL and PL) Dxx - rain size which xx% of the soil, by weight, is of finer grain sizes These grain size descriptions are not used below mm grain size D0 - rain size at which 0% of the soil is finer (effective grain size) D60 - rain size at which 60% of the soil is finer Cc - Concavity coefficient = (D30) / (D0 x D60) Cu - Uniformity coefficient = D60 / D0 Cc and Cu are used to assess the grading of sands and gravels: Well-graded gravels have: < Cc < 3 and Cu > 4 Well-graded sands have: < Cc < 3 and Cu > 6 Sands and gravels not meeting the above requirements are poorly-graded or uniformly-graded. Cc and Cu are not applicable for the description of soils with more than 0% silt and clay (more than 0% finer than mm or the #00 sieve) CONSOLIDATION TEST p o - Present effective overburden pressure at sample depth p c - Preconsolidation pressure of (maximum past pressure on) sample Ccr - Recompression index (in effect at pressures below p c ) Cc - Compression index (in effect at pressures above p c ) OC Ratio Overconsolidaton ratio = p c / p o Void Ratio Initial sample void ratio = volume of voids / volume of solids Wo - Initial water content (at start of consolidation test) PERMEABILITY TEST k - Coefficient of permeability or hydraulic conductivity is a measure of the ability of water to flow through the sample. The value of k is measured at a specified unit weight for (remoulded) cohesionless soil samples, because its value will vary with the unit weight or density of the sample during the test.

26

27 FIURE KEY PLAN SITE

28 Figure Shear Wave Velocity Profile at Shot Location 3 m

29 Figure 3 Shear Wave Velocity Profile at Shot Location 73.5 m

30

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01

patersongroup Design for Earthquakes Consulting Engineers May 19, 2016 File: PG3733-LET.01 patersongroup May 19, 2016 File: PG3733-LET.01 Hydro Ottawa Limited c/o Cresa Toronto 170 University Avenue, Suite 1 Toronto, Ontario M5H 3B3 Attention: Ms. Barbara Wright Consulting Engineers 154 Colonnade

More information

patersongroup memorandum 1.0 Field Investigation consulting engineers

patersongroup memorandum 1.0 Field Investigation consulting engineers consulting engineers memorandum to: KDSA Development Corporation - Ms. Susan Anglin - susananglin6@gmail.com re: Pavement Structure Recommendations - Shady Maple Road Proposed Braeburn Estates Residential

More information

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01

patersongroup 1.0 Geotechnical Desktop Review Consulting Engineers April 18, 2017 PG4080-LET.01 patersongroup April 18, 2017 PG080-LET.01 2015-2017 RR Ltd 311 Richmond Road, Suite 203 Ottawa, ON K1Z 6X3 Attention: Subject: Mr. Jonah Bonn Geotechnical Desktop Review Proposed Drive-Thru Lanes 2015-2017

More information

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited

patersongroup Geotechnical Investigation Proposed Industrial Building 1670 Comstock Road Ottawa, Ontario Prepared For Simluc Contractors Limited Geotechnical Engineering Environmental Environmental Engineering Engineering Hydrogeology Hydrogeology Geological Engineering Geological Engineering Materials Testing Materials Testing Building Science

More information

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board

patersongroup Geotechnical Investigation Proposed Elementary School 2300 Esprit Drive Ottawa, Ontario Prepared For Ottawa Catholic School Board Geotechnical Engineering Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Elementary School 300 Esprit Drive Archaeological Services Prepared For

More information

February 22, 2016 AG File No

February 22, 2016 AG File No Ainley Graham & Associates Limited 1-50 Grant Timmins Drive, Kingston, Ontario, K7M 8N2 Tel: (343) 266-0002 Fax: (343) 266-0028 E-mail Kingston@ainleygroup.com February 22, 2016 AG File No. 15062-1 Ministry

More information

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3.

Boreholes. Implementation. Boring. Boreholes may be excavated by one of these methods: 1. Auger Boring 2. Wash Boring 3. Implementation Boreholes 1. Auger Boring 2. Wash Boring 3. Rotary Drilling Boring Boreholes may be excavated by one of these methods: 4. Percussion Drilling The right choice of method depends on: Ground

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

patersongroup memorandum

patersongroup memorandum patersongroup memorandum consulting engineers to: David Schaeffer Engineering Limited - Ms. Jennifer Ailey - jailey@dsel.ca to: Richcraft Homes - Mr. Phil Castro - PhilC@Richcraft.com re: Limit of Hazard

More information

SITE INVESTIGATION 1

SITE INVESTIGATION 1 SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS.

B-1 BORE LOCATION PLAN. EXHIBIT Drawn By: 115G BROOKS VETERINARY CLINIC CITY BASE LANDING AND GOLIAD ROAD SAN ANTONIO, TEXAS. N B-1 SYMBOLS: Exploratory Boring Location Project Mngr: BORE LOCATION PLAN Project No. GK EXHIBIT Drawn By: 115G1063.02 GK Scale: Checked By: 1045 Central Parkway North, Suite 103 San Antonio, Texas 78232

More information

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON

Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Final Geotechnical Report Multi-Level Building at 159, 163 and 167 Parkdale Ave. Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa, ON K1G 4K1 Prepared by: Stantec Consulting

More information

Chapter 12 Subsurface Exploration

Chapter 12 Subsurface Exploration Page 12 1 Chapter 12 Subsurface Exploration 1. The process of identifying the layers of deposits that underlie a proposed structure and their physical characteristics is generally referred to as (a) subsurface

More information

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario

Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Updated Subsurface Investigation Block A Heritage Hills Development 124 Battersea Crescent Ottawa, Ontario Submitted to: Brigil Homes 98 rue Lois Gatineau, Quebec J8Y 3R7 Updated Subsurface Investigation

More information

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY

ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY ATTACHMENT A PRELIMINARY GEOTECHNICAL SUMMARY Kevin M. Martin, P.E. KMM Geotechnical Consultants, LLC 7 Marshall Road Hampstead, NH 0384 603-489-6 (p)/ 603-489-8 (f)/78-78-4084(m) kevinmartinpe@aol.com

More information

Gotechnical Investigations and Sampling

Gotechnical Investigations and Sampling Gotechnical Investigations and Sampling Amit Prashant Indian Institute of Technology Gandhinagar Short Course on Geotechnical Investigations for Structural Engineering 12 14 October, 2017 1 Purpose of

More information

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario

GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario GEOTECHNICAL REPORT CBSA Facility Redevelopment Thousand Islands International Crossing Lansdowne, Ontario Prepared For: The Federal Bridge Corporation Limited SPL Project No.: 10001084 Report Date: January

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario

Subsurface Investigation Proposed Commercial Building 528 March Road Ottawa, Ontario Subsurface Investigation Proposed Commercial Building 8 March Road Ottawa, Ontario Houle Chevrier Engineering Ltd. 80 Wescar Lane Ottawa, Ontario K0A L0 www.hceng.ca Submitted to: Broccolini Construction

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT DH 1404-05 ACCOMODATE SPECIALIZED EQUIPMENT, DWYER HILL TRAINING CENTRE RICHMOND, ONTARIO Prepared for: Defence Construction Canada (DCC) Date: February 2016 Report No.:

More information

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as sub surface investigation 2 1 For proper

More information

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado

Geotechnical Engineering Study, Conifer Senior High School Football Field Improvements, Conifer, Colorado 2390 South Lipan Street Denver, CO 80223 phone: (303) 742-9700 fax: (303) 742-9666 email: kadenver@kumarusa.com www.kumarusa.com Office Locations: Denver (HQ), Colorado Springs, Fort Collins, and Frisco,

More information

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods

ENCE 3610 Soil Mechanics. Site Exploration and Characterisation Field Exploration Methods ENCE 3610 Soil Mechanics Site Exploration and Characterisation Field Exploration Methods Geotechnical Involvement in Project Phases Planning Design Alternatives Preparation of Detailed Plans Final Design

More information

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario REPORT February 205 REPORT ON Geotechnical Investigation Proposed Retirement Residence Goulbourn Forced Road Ottawa, Ontario Submitted to: Dan Roach, AIA Hawthorne Development LLC c/o Lenity Architecture

More information

SOIL CLASSIFICATION CHART COARSE-GRAINED SOILS MORE THAN 50% RETAINED ON NO.200 SIEVE FINE-GRAINED SOILS 50% OR MORE PASSES THE NO.200 SIEVE PRIMARY DIVISIONS GRAVELS MORE THAN 50% OF COARSE FRACTION RETAINED

More information

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx

Civil Engineering, Surveying and Environmental Consulting WASP0059.ltr.JLS.Mich Ave Bridge Geotech.docx 2365 Haggerty Road South * Canton, Michigan 48188 P: 734-397-3100 * F: 734-397-3131 * www.manniksmithgroup.com August 29, 2012 Mr. Richard Kent Washtenaw County Parks and Recreation Commission 2330 Platt

More information

Eastgate Parking Lot Geotechnical Investigation

Eastgate Parking Lot Geotechnical Investigation Eastgate Parking Lot Geotechnical Investigation Cambium Reference No.: 336- March 4, 24 Prepared for: City of Peterborough Cambium Inc. P.O. Box 325 52 Hunter Street East, Peterborough Ontario, K9H G5

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed Salt Storage Shed Majestic Hills Drive Hamilton Township, Ontario Hamilton Township 7 Pido Road Peterborough Ontario K9J 6X7 Canada 568 0 Report No June 08 Table

More information

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON

Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Final Geotechnical Report Proposed Tower B Multi-Level Building at the Corner of Parkdale Avenue and Bullman Street Ottawa, ON Prepared for: Richcraft Group of Companies 2280 St. Laurent Blvd, Ottawa,

More information

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO

SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO SLOPE STABILITY ASSESSMENT PROPOSED RESIDENTIAL SUBDIVISION 161 LAKESHORE ROAD EAST TOWN OF THE BLUE MOUNTAINS, ONTARIO PETO MacCALLUM LTD. 19 CHURCHILL DRIVE BARRIE, ONTARIO L4N 8Z5 PHONE: (705) 734-3900

More information

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF

Depth (ft) USCS Soil Description TOPSOIL & FOREST DUFF Test Pit No. TP-6 Location: Latitude 47.543003, Longitude -121.980441 Approximate Ground Surface Elevation: 1,132 feet Depth (ft) USCS Soil Description 0 1.5 1.5 5.0 SM 5.0 8.0 SM Loose to medium dense,

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 529-2017 Template Version: C420170317 - RW APPENDIX A GEOTECHNICAL REPORT Quality Engineering Valued Relationships KGS Group 2017 Industrial Street Rehabilitation

More information

FROST HEAVE. GROUND FREEZING and FROST HEAVE

FROST HEAVE. GROUND FREEZING and FROST HEAVE FROST HEAVE The temperature of soils near the ground surface reflects the recent air temperatures. Thus, when the air temperature falls below 0 C (32 F) for extended periods, the soil temperature drops

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1Page) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-Page) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For:

PRELIMINARY GEOTECHNICAL ENGINEERING REPORT. Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts. Prepared For: PRELIMINARY GEOTECHNICAL ENGINEERING REPORT Proposed Re-Development 44 Old Worcester Road Charlton, Massachusetts Prepared For: Meridian Associates, Inc. 500 Cummings Center, Suite 5950 Beverly, Massachusetts

More information

APPENDIX C. Borehole Data

APPENDIX C. Borehole Data APPENDIX C Borehole Data MAJOR DIVISIONS SOIL CLASSIFICATION CHART SYMBOLS GRAPH LETTER TYPICAL DESCRIPTIONS ADDITIONAL MATERIAL

More information

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7

Prepared for. Mr. Denis A. Verdon 445, Wilson Road Rockland, Ontario K4K 1K7 GEOTECHNICAL INVESTIGATION Proposed Verdon Subdivision Part of Lot 16, Concession I (Old Survey) Geographic Township of Clarence Now City of Clarence-Rockland Prepared for Mr. Denis A. Verdon 445, Wilson

More information

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario

Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario September 6 REPORT ON Geotechnical Investigation Proposed Retirement Residence Timberwalk Ottawa, Ontario Submitted to: Claridge Homes Corporation - Gladstone Avenue Ottawa, ON KP Y6 REPORT Report Number:

More information

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1 Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet. Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2

Ottawa, June 5, Ms. Monica Dashwood Director of Development Viva Retirement Communities 3845 Bathurst Street, Suite 206 Toronto, Ontario M3H 3N2 REPORT: T020846-A2 VIVA RETIREMENT COMMUNITIES Geotechnical Investigation Report Five-Story Retirement Home Strandherd Drive and Tartan Drive Ottawa, Ontario June 5, 2013 Ottawa, June 5, 2013 Ms. Monica

More information

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky

Preliminary Geotechnical Investigation Cadiz / Trigg County I-24 Business Park. Cadiz, Kentucky Environmental & Geoscience, LLC 834 Madisonville Road Hopkinsville, KY 440 70.44.000 FAX 70.44.8300 www.wedrill.com A member of Trinity Energy & Infrastructure Group, LLC Preliminary Geotechnical Investigation

More information

Geotechnical Investigation Proposed Commercial Development 1095 Algoma Road Ottawa, Ontario

Geotechnical Investigation Proposed Commercial Development 1095 Algoma Road Ottawa, Ontario February 2016 REPORT ON Geotechnical Investigation Proposed Commercial Development 1095 Algoma Road Ottawa, Ontario Submitted to: 1095 Algoma Road Inc. 1294 Algoma Road Ottawa, Ontario K1B 3W8 REPORT Report

More information

Reference No S072 APRIL 2012

Reference No S072 APRIL 2012 A REPORT TO SOLMAR DEVELOPMENT CORP. A PRELIMINARY SOIL INVESTIGATION FOR PROPOSED SUBDIVISION DEVELOPMENT NORTHEAST OF SIDEROAD 5 AND 0 LINE TOWN OF ERIN Reference No. 202-S072 APRIL 202 DISTRIBUTION

More information

FINAL REPORT, GEOTECHNICAL INVESTIGATION, NORTHWEST RIVER BRIDGE RECONSTRUCTION, TERRA NOVA NATIONAL PARK, NL. File No:

FINAL REPORT, GEOTECHNICAL INVESTIGATION, NORTHWEST RIVER BRIDGE RECONSTRUCTION, TERRA NOVA NATIONAL PARK, NL. File No: FINAL REPORT, GEOTECHNICAL INVESTIGATION, NORTHWEST RIVER BRIDGE RECONSTRUCTION, TERRA NOVA NATIONAL PARK, NL File No: 6847 Prepared for: Harbourside Engineering Consultants 9 Waverly Road, Suite Dartmouth

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1BPage)

Geotechnical Engineering Subsurface Investigation Report 13-SI-7-BH-1BPage) Geotechnical Engineering Subsurface Investigation Report 3-SI-7-BH-BPage) Canadian Shield Avenue, Kanata, ON, K2K H4 Abstract: This report present the findings of the geotechnical investigation completed

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

APPENDIX E SOILS TEST REPORTS

APPENDIX E SOILS TEST REPORTS Otsego County, NY Site Work Specifications APPENDIX E SOILS TEST REPORTS Blue Wing Services, Inc. July 1, 2010 Blue Wing Services May 20, 2010 Page 2 the site, was not made available to Empire at this

More information

DRAFT GEOTECHNICAL INVESTIGATION REPORT

DRAFT GEOTECHNICAL INVESTIGATION REPORT DRAFT GEOTECHNICAL INVESTIGATION REPORT PROPOSED NEW SEWER INSTALLATION CITY OF CLARENCE-ROCKLAND, ONTARIO Prepared for: City of Clarence-Rockland 151-03483-00 Date: July 2015 WSP Canada Inc. 500 Greber

More information

KDOT Geotechnical Manual Edition. Table of Contents

KDOT Geotechnical Manual Edition. Table of Contents KDOT Geotechnical Manual 2007 Edition The KDOT Geotechnical Manual is available two volumes. Both volumes are very large electronic (pdf) files which may take several minutes to download. The table of

More information

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica.

SOIL INVESTIGATION REPORT. PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. SOIL INVESTIGATION REPORT PROPOSED HOUSING DEVELOPMENT PROJECT Coral Spring, Trelawny, Jamaica. Prepared for: FCS Consultants 7a Barbados Avenue Kingston 5, Jamaica Prepared by: NHL Engineering Limited

More information

GEOTECHNICAL INVESTIGATION REPORT

GEOTECHNICAL INVESTIGATION REPORT GEOTECHNICAL INVESTIGATION REPORT SOIL INVESTIGATION REPORT FOR STATIC TEST FACILITY FOR PROPELLANTS AT BDL, IBRAHIMPATNAM. Graphics Designers, M/s Architecture & Engineering 859, Banjara Avenue, Consultancy

More information

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario

Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Geotechnical Investigation Proposed Richmond Home Hardware Addition 6379 Perth Street Richmond, Ontario Houle Chevrier Engineering Ltd. 180 Wescar Lane Ottawa, Ontario K0A 1L0 www.hceng.ca Submitted to:

More information

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING

Appendix H. Geotechnical Investigation Report. Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Krosno Creek Flood Reduction Project PROJECT FILE REPORT CITY OF PICKERING Appendix H Geotechnical Investigation Report TMIG THE MUNICIPAL INFRASTRUCTURE GROUP LTD Report on Geotechnical Investigation

More information

Soils. Technical English - I 10 th week

Soils. Technical English - I 10 th week Technical English - I 10 th week Soils Soil Mechanics is defined as the branch of engineering science which enables an engineer to know theoretically or experimentally the behavior of soil under the action

More information

R-1 Conveyor Relocation Project Legend 0 500 1000 1500 ft. This map is a user generated static output from an Internet mapping site and is for general reference only. Data layers that appear on this map

More information

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No.

PRELIMINARY GEOTECHNICAL REPORT. State College Redevelopment State College Borough, Centre County, Pennsylvania. CMT Laboratories File No. PRELIMINARY GEOTECHNICAL REPORT State College Redevelopment State College Borough, Centre County, Pennsylvania CMT Laboratories File No. 1638700 Prepared for: National Development Council One Battery Park

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

REPORT ON SUPPLEMENTAL GEOTECHNICAL INVESTIGATION ABBOTT FERNBANK HOLDINGS INC. PROPERTY FERNBANK ROAD OTTAWA, ONTARIO.

REPORT ON SUPPLEMENTAL GEOTECHNICAL INVESTIGATION ABBOTT FERNBANK HOLDINGS INC. PROPERTY FERNBANK ROAD OTTAWA, ONTARIO. 8 escar Lane R.R. Carp, Ontario, KA L Tel: (6) 86- Fax: (6) 86-97 www.hceng.ca REPT ON SUPPLEMENTAL GEOTECHNICAL INVESTIGATION ABBOTT FERNBANK HOLDINGS INC. PROPERTY FERNBANK ROAD OTTAA, ONTARIO Submitted

More information

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION

REPORT. Site Plan Application Pace Redevelopment Stouffville, Ontario. June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION June 7, 2012 PRELIMINARY GEOTECHNICAL INVESTIGATION Site Plan Application Pace Redevelopment Stouffville, Ontario Submitted to: Mr. Terry Chapman Pace Savings & Credit Union Limited 8111 Jane Street, Unit

More information

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E.

Soil Mechanics Brief Review. Presented by: Gary L. Seider, P.E. Soil Mechanics Brief Review Presented by: Gary L. Seider, P.E. 1 BASIC ROCK TYPES Igneous Rock (e.g. granite, basalt) Rock formed in place by cooling from magma Generally very stiff/strong and often abrasive

More information

APPENDIX A. Borehole Logs Explanation of Terms and Symbols

APPENDIX A. Borehole Logs Explanation of Terms and Symbols APPENDIX A Borehole Logs Explanation of Terms and Symbols Page 153 of 168 EXPLANATION OF TERMS AND SYMBOLS The terms and symbols used on the borehole logs to summarize the results of field investigation

More information

(C) Global Journal of Engineering Science and Research Management

(C) Global Journal of Engineering Science and Research Management GEOTECHNCIAL ASSESSMENT OF PART OF PORT HARCOURT, NIGER DELTA FOR STRUCTURAL ANALYSIS Warmate Tamunonengiyeofori Geostrat International Services Limited, www.geostratinternational.com. *Correspondence

More information

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION

Preliminary Geotechnical Evaluation Gooseberry Point Pedestrian Improvements Whatcom County, Washington SITE AND PROJECT DESCRIPTION File No. 12-100 Geotechnical & Earthquake Engineering Consultants Mr. Kevin Brown, P.E. Gray & Osborne, Inc. 3710 168 th Street NE, Suite B210 Arlington, Washington 98223 Subject: Draft Report Preliminary

More information

Geotechnical Investigation

Geotechnical Investigation Geotechnical Investigation Slope Stability Analysis for the Existing Slope Southwest of the Proposed Condo Developments 50 Ann Street, Bolton, Ontario Prepared For: Brookfield Homes (Ontario) Limited GeoPro

More information

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS

DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS DATA REPORT GEOTECHNICAL INVESTIGATION GALVESTON CRUISE TERMINAL 2 GALVESTON, TEXAS SUBMITTED TO PORT OF GALVESTON 123 ROSENBERG AVENUE, 8TH FLOOR GALVESTON, TEXAS 77553 BY HVJ ASSOCIATES, INC. HOUSTON,

More information

Module 1 : Site Exploration and Geotechnical Investigation

Module 1 : Site Exploration and Geotechnical Investigation Objectives In this section you will learn the following Displacement borings Wash boring Auger boring Rotary drilling Percussion drilling Continuous sampling Boring methods of exploration The boring methods

More information

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC

GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC GEOTECHNICAL SITE INVESTIGATION REPORT SUBDIVISION - SELECTED LOTS AKISQNUK FIRST NATION WINDERMERE, BC Prepared For: Akisqnuk First Nation Windermere, BC Box 688 Fernie, BC V0B 1M0 250 423 4829 August

More information

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation

File: Highway 1 Admirals/McKenzie Interchange, Saanich, BC Pavement Drilling / Coring Geotechnical Investigation TECHNICAL MEMO To: Mr. Salem Bahamdun, P.Eng. Date: February 2, 2017 c: Memo No.: From: Ms. Susanne Ouellet, E.I.T. Mr. Andrew Walker, P.Eng. File: 704TRN.PAVE0303807 ISSUED FOR USE Subject: Highway 1

More information

Introduction to Soil Mechanics Geotechnical Engineering-II

Introduction to Soil Mechanics Geotechnical Engineering-II Introduction to Soil Mechanics Geotechnical Engineering-II ground SIVA Dr. Attaullah Shah 1 Soil Formation Soil derives from Latin word Solum having same meanings as our modern world. From Geologist point

More information

Geotechnical Investigation Proposed Residential Development 99 Beechwood Avenue Ottawa, Ontario

Geotechnical Investigation Proposed Residential Development 99 Beechwood Avenue Ottawa, Ontario REPORT REPORT ON Geotechnical Investigation Proposed Residential Development 99 Beechwood Avenue Ottawa, Ontario Submitted to: Claridge Homes 210 Gladstone Avenue, Suite 2001 Ottawa, Ontario K2P 0Y6 Report

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

Table of Contents. Description

Table of Contents. Description Table of Contents Description Page A. Introduction... 1 A.1. Project Description... 1 A.2. Site Conditions and History... 2 A.3. Purpose... 3 A.4. Background Information and Reference Documents... 4 A.5.

More information

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests

APPENDIX F CORRELATION EQUATIONS. F 1 In-Situ Tests APPENDIX F 1 APPENDIX F CORRELATION EQUATIONS F 1 In-Situ Tests 1. SPT (1) Sand (Hatanaka and Uchida, 1996), = effective vertical stress = effective friction angle = atmosphere pressure (Shmertmann, 1975)

More information

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE

Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE August 14, 2017 Site Investigations and Geotechnical Risk For Underground Construction Greg Raines, PE Gregory.Raines@Stantec.com Develop Preliminary Geologic / Geotech Conceptual Model for the Project

More information

ROCK EXCAVATION (GRADING) OPSS 206 INDEX

ROCK EXCAVATION (GRADING) OPSS 206 INDEX 206-2 - OPSS 206 INDEX 206-2.1 GENERAL 206-2.1.1 Classification of Rock Materials 206-2.1.2 Tender Items 206-2.1.3 Other Excavation Tender Items 206-2.1.4 Specifications 206-2.1.5 Special Provisions 206-2.1.6

More information

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1

Submitted to: Clublink Corporation ULC & Clublink Holdings Limited Dufferin Street King City, ON L4M 6Y1 October 0 PRELIMINARY GEOTECHNICAL INVESTIGATION Glen Abbey Golf Club Redevelopment Oakville, Ontario Submitted to: Clublink Corporation ULC & Clublink Holdings Limited 7 Dufferin Street King City, ON

More information

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD

GEOTECHNICAL INVESTIGATION REPORT INFRASTRUCTURE PVT LTD GEOTECHNICAL INVESTIGATION REPORT Client : TAEIN CONSTRUCTION & INFRASTRUCTURE PVT LTD Office address : Flat No.104, A -Wing,1st floor,gloria Park, Paranjape Scheme, Bavdhan Khurd, Chandni Chowk, Pune

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming

Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus Laramie, Wyoming Limited Geotechnical Engineering Evaluation Classroom Additions Albany County Campus 2300 Missile Drive, Cheyenne, Wyoming 82001 Phone 307-635-0222 www.stratageotech.com Limited Geotechnical Engineering

More information

Conventional Field Testing & Issues (SPT, CPT, DCPT, Geophysical methods)

Conventional Field Testing & Issues (SPT, CPT, DCPT, Geophysical methods) Conventional Field Testing & Issues (SPT, CPT, DCPT, Geophysical methods) Ajanta Sachan Assistant Professor Civil Engineering IIT Gandhinagar Conventional Field Testing 1 Field Test: In-situ shear strength

More information

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal

Safe bearing capacity evaluation of the bridge site along Syafrubesi-Rasuwagadhi road, Central Nepal Bulletin of the Department of Geology Bulletin of the Department of Geology, Tribhuvan University, Kathmandu, Nepal, Vol. 12, 2009, pp. 95 100 Safe bearing capacity evaluation of the bridge site along

More information

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION

REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION REPORT OF PRELIMINARY GEOTECHNICAL EXPLORATION ENKA INTERMEDIATE SCHOOL Sand Hill Road Candler, North Carolina Prepared For: BUNCOMBE COUNTY SCHOOLS Prepared By: AMEC ENVIRONMENT & INFRASTRUCTURE, INC.

More information

Pierce County Department of Planning and Land Services Development Engineering Section

Pierce County Department of Planning and Land Services Development Engineering Section Page 1 of 7 Pierce County Department of Planning and Land Services Development Engineering Section PROJECT NAME: DATE: APPLICATION NO.: PCDE NO.: LANDSLIDE HAZARD AREA (LHA) GEOLOGICAL ASSESSMENT REPORT

More information

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska.

GEOTECHNICAL REPORT. Matanuska-Susitna Borough. Parks Highway Connections Museum Drive. Matanuska-Susitna Borough, Alaska. Matanuska-Susitna Borough GEOTECHNICAL REPORT Parks Highway Connections Museum Drive Matanuska-Susitna Borough, Alaska March 2, 20 Prepared By: John Thornley, PE Geotechnical Engineer 333 Arctic Blvd.,

More information

Geotechnical Data Report

Geotechnical Data Report Geotechnical Data Report Downtown Greenville Future Conveyance Study December 1, 2015 Terracon Project No. 86155032 Prepared for: Prepared by: Terracon Consultants, Inc. December 1, 2015 561 Mauldin Road

More information

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303

Date: April 2, 2014 Project No.: Prepared For: Mr. Adam Kates CLASSIC COMMUNITIES 1068 E. Meadow Circle Palo Alto, California 94303 City of Newark - 36120 Ruschin Drive Project Draft Initial Study/Mitigated Negative Declaration Appendix C: Geologic Information FirstCarbon Solutions H:\Client (PN-JN)\4554\45540001\ISMND\45540001 36120

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Richland Creek Trunk Sewer Greenville, South Carolina March 31, 2014 Terracon Project No. 86145008 Prepared for: Renewable Water Resources Greenville, South Carolina Prepared

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS G. GEOLOGY AND SOILS The following section is a summary of the geotechnical report conducted for the proposed project. The Report of Geotechnical Investigation Proposed

More information

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPT CAPITAL REGION RESOURCE RECOVERY CENTRE APPENDIX A Borehole Records December Report No. //vol III LIST OF ABBREVIATIONS The abbreviations coonly employed

More information

The attitude he maintains in his relation to the engineer is very well stated in his own words:

The attitude he maintains in his relation to the engineer is very well stated in his own words: Su bsurface Soil Exploration, 53: 139 Foundation Engineering Geotechnical companies that have a history of experience in a given region usually have extensive boring logs and maps telling where the borings

More information

Hydraulic uplift forces on basements subject to liquefaction

Hydraulic uplift forces on basements subject to liquefaction Hydraulic uplift forces on basements subject to liquefaction N.S. Luxford Babbage Consultants Ltd 2014 NZSEE Conference ABSTRACT: As a result of the 22 February 2011 earthquake in Christchurch a building

More information

Northern Colorado Geotech

Northern Colorado Geotech PRELIMINARY GEOTECHNICAL ENGINEERING REPORT PROPOSED CECIL FARMS DEVELOPMENT WELD COUNTY ROAD 7, BETWEEN ROADS 7 AND 7 SEVERANCE, COLORADO NORTHERN COLORADO GEOTECH PROJECT NO. 0-6 APRIL 0, 06 Prepared

More information

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough

Geotechnical Investigation. Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario. City of Peterborough Geotechnical Investigation Trent University Arena Complex Nassau Mills Road and Pioneer Road Peterborough, Ontario City of Peterborough September, 0 Pido Road, Unit, Peterborough, Ontario, Canada KJ X

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for:

REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO. Prepared for: REPORT ON SLOPE STABILITY INVESTIGATION DON MILLS ROAD AND EGLINTON AVENUE EAST TORONTO, ONTARIO Prepared for: TORONTO AND REGION CONSERVATION AUTHORITY Prepared By: SIRATI & PARTNERS CONSULTANTS LIMITED

More information

GEOTECHNICAL REPORT. 405 Fire Road No. 3, Lot 2, Whitson Lake, Val Caron, ON. October 14, 2016 TULLOCH Project #:

GEOTECHNICAL REPORT. 405 Fire Road No. 3, Lot 2, Whitson Lake, Val Caron, ON. October 14, 2016 TULLOCH Project #: GEOTECHNICAL REPORT 405 Fire Road No. 3, Lot 2, Whitson Lake, Val Caron, ON October 14, 2016 TULLOCH Project #: 16-1116 October 14, 2016 The City of Great Sudbury P.O. Box 3700, Station A, Sudbury, ON

More information