10 5.2 APPENDIX D2 Geotechnical Report

11 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014 Prepared for: Lukhanji Municipality Private Bag X 7111 Queenstown 5320 Tel: agaji@lukhanji.co.za Prepared by: Jeffares and Green (Pty) Ltd 1 st Floor, Block 5 Greenacres Office Park Second Avenue, Newton Park 6045 PO Box 27308, Greenacres 6057 Tel: Fax: parfittl@jgi.co.za PM/TS 3524 ILLINGE AND LESSEYTON CEMETERY DEVELOPMENT_Final September 2014

12

13 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page i Table of Contents 1 Introduction and Scope of Report Scope of Work Available Information Site Description General Site Description Regional Geology Site Drainage Climatic Conditions Fieldwork Results Ilinge Site Profile Summary Lesseyton Site Profile Summary Laboratory Testing Soil Testing Cemetery Site Selection Criteria Site Topography Soil Excavatibility Site Drainage Soil Permeability Positioning in Respect of Domestic Water Supplies Positioning in Respect of Drainage Features Basal Buffer Zone Grave Stability Soil Workability Cemetery Size Conclusions General Selected Bibliography Appendices Appendix A.: Figures Appendix B.: Trial Pit Profiles Appendix C.: Dynamic Cone Penetrometer Results Appendix D.: Laboratory Results PM/TS 3524 ILLINGE AND LESSEYTON CEMETERY DEVELOPMENT_Final September 2014

14 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 2 1 Introduction and Scope of Report Jeffares & Green Pty (Ltd) were appointed by the Lukhanji Local Municipality (Lukhanji) to conduct geotechnical investigations to determine the suitability of two sites for proposed cemetery developments. The sites are located near the villages of Illinge and Lesseyton, near Queenstown. The proposed Illinge cemetery site is located west of the village on Erf No. 218 and has a footprint of m 2. The proposed Lesseyton cemetery site is located adjacent to the National Route N6 on Erf No. 100 and has a footprint of m 2. The following report presents the finding of the invasive geotechnical investigation and laboratory testing conducted in July, August and September 2014, attempts to classify the site in terms of suitability for the proposed cemetery developments. 2 Scope of Work The following work was completed during the geotechnical investigation for the proposed Ilinge and Lesseyton Cemeteries: Test Pits o o A total of ten test pits, labelled ITP1 to ITP10, were excavated to depths ranging between 1.30m and 3.50m below natural ground level, at selected locations across the Municipal site near Illinge using a TLB; A total of five test pits, labelled LTP1 to LTP5, were excavated to depths ranging between 3.00m and 3.20m below natural ground level, at selected locations across the Municipal site near Lesseyton using a TLB Laboratory Testing o Six (6No.) and three (3No.) representative, disturbed subsoil samples were retrieved from the test pits excavated across the Municipal sites at Illinge and Lesseyton, respectively, and were submitted to LABCO Material Investigations Laboratory in Port Elizabeth for the following laboratory testing and analysis: Particle Size Distribution; Atterberg Limits Determination; and Potential Expansiveness Testing. Modified AASHTO California Bearing Ratio (CBR) Ilinge Cemetery Development.docx September 2014

15 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 3 3 Available Information The following information was used during the compilation of this report: 1: scale 3125 Geological Map Sheet for Queenstown 1: scale 3127CC Topographical Map Sheet for Queenstown; 1: scale 3126DD Geotechnical Map Sheet for Queenstown; The document entitled Geotechnical Investigation Guidelines for Cemetery Site Selection drafted by the Council for Geosciences in 2004 (Richards and Croukamp, 2004). 4 Site Description 4.1 General Site Description Illinge: The proposed Municipal Cemetery site under investigation are located within the village of Ilinge, which lies approximately 20km south-east of Queenstown City Centre. At present this site is of open fields and are surrounded by sparse semi-rural residential dwellings. Short grass and abundant ant heaps dominate the study area. The site is accessed via the Ilinge village turnoff from the National Route N6. There after site access is gained via a farm gate onto the proposed gravesite. The site is buffered by a mountain range in the north and tar road in the south. The elevation at site ranges from 1169mamsl (meters above mean sea level) to 1175mamsl (Google Imagery, 2014). Lesseyton: The proposed Municipal Cemetery site under investigation are located within the village of Lesseyton, which lies approximately 15km north-west of Queenstown City Centre. At present this site is of open fields and are surrounded by sparse semi-rural residential dwellings. Short grass, shrubs and trees dominate the study area. The site is accessed via the Lesseyton village turnoff from the National Route N6. There after site access is gained from the unsurfaced road onto the proposed gravesite. The site is buffered by a stream to the north and tar road in the south. The elevation at site ranges from 1111mamsl (meters above mean sea level) to 1113mamsl (Google Imagery, 2014) Ilinge Cemetery Development.docx September 2014

16 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page Regional Geology According to the 1: Queenstown scaled Geological Map Sheet, the site is underlain by the Burgersdorp Formation (Trb). This formation is represented by brownish, red and grey mudstone and sandstone. The Burgersdorp Formation has since be intruded numerous times by post-karoo dykes and sills (Jd). A Geological map is provided in Figure 3, Appendix A. 4.3 Site Drainage Illinge: No major surface water bodies were noted within the site boundary during the geotechnical investigation. However, a stream was identified during the investigation which lies approximately 100m east. Lesseyton: No major surface water bodies were noted within the site boundary during the geotechnical investigation. However, a perennial river was identified during the investigation which lies approximately 150m to the north. 4.4 Climatic Conditions Table 4-1 below indicates the general climatic conditions experienced within the Queenstown area. Table 4-1: Climatic Data for Queenstown Month Average Rainfall Average Maximum Average Minimum Temperature (mm) Temperature (ºC) (ºC) Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Information extracted from saexplorer.co.za Annual average midday temperatures ranging from 16.8ºC to 27.6ºC have been recorded within the Queenstown area. The area experiences the coldest temperatures during July with an average night temperature of 2ºC Ilinge Cemetery Development.docx September 2014

17 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 5 In general the Queenstown area receives approximately 399mm of rainfall per annum with the highest rainfall recorded during the summer months. On average the lowest rainfall of approximately 3mm is recorded July which are considered the dry months while the highest rainfall value of 67mm is recorded in March. 5 Fieldwork Results 5.1 Ilinge Site Profile Summary A summary of the subsoils encountered within the investigation site has been described in the table below, with the detailed field logs presented in Appendix B of this report. The approximate locations of the test pits excavated are shown in Appendix A, Figure 1. Table 5-1: Ilinge Site Condensed Log Trial Pits ITP1 Silty Sand sis Sandy silt ssi Sandy Clay scl Silty Clay sicl Depth (m) Description T sis C sis ITP2 R scl H sicl R scl ITP3 T sis R cls H sis ITP4 T sis C cls MW Mudrock ITP5 T sis R scl SW Mudrock R sis THICKNESS OF SOIL LAYERS (m) TOPSOIL T / COLLUVIUM C / HILLWASH H / RESIDUAL R Clayey Sand cls ITP6 T sis R scl R MW Mudrock ITP7 T sis R scl MW to SW Mudrock R scl ITP8 T cls HW Dolerite R cls R scl ITP9 T sis R scl CW Dolerite ITP10 T sis R cls R scl Clayey Silt clsi Gravelly Clay ROCK SW - Slightly Weathered / MW - Moderately Weathered / HW - Highly Weathered / CW - Completely Weathered Ilinge Cemetery Development.docx September 2014

18 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page Lesseyton Site Profile Summary A summary of the subsoils encountered within the investigation site has been described in the table below, with the detailed field logs presented in Appendix B of this report. The approximate locations of the test pits excavated are shown in Appendix A, Figure 2. Table 5-2: Trial Pits Lesseyton Site Condensed Log THICKNESS OF SOIL LAYERS (m) TOPSOIL T / ALLUVIAL A Silty Sand sis Clayey Sand cls Sandy silt ssi Sandy Clay scl LTP1 T sis A cls A cls LTP2 T sis A cls A sis LTP3 T ssi A cls A cls LTP4 T ssi A cls A cls LTP5 T ssi A cls A sis 6 Laboratory Testing 6.1 Soil Testing The tables below display the results of the soil testing that was conducted on six subsoil samples retrieved from the test pits excavated within the Illinge Cemetery site boundary and three subsoil samples retrieved from the Lesseyton Cemetery site boundary. The laboratory test results obtained during testing have been summarised below. A full set of results has been included in Appendix D of this report Ilinge Cemetery Development.docx September 2014

19 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 7 Table 6-1: Foundation Indicator Results Soil Mortar Analysis (%) Atterberg Limits (%) Sample Trial Potential Depth (m) Description Coarse Medium Fine Passing GM No. Pit No. Coarse Expansion Fine Fine Fine LL PI LS Sand sand Sand Sand mm Illinge ITP1 ITP Silty Sand LOW ITP2 ITP Sandy Clay LOW ITP5 ITP Sandy Clay LOW ITP6 ITP Gravelly Clay LOW ITP7 ITP Sandy Clay LOW ITP10 ITP Sandy Clay LOW Lesseyton LTP1 LTP Silty Clayey Sand LOW LTP4 LTP Silty Clayey Sand LOW LTP5 LTP Silty Clayey Sand LOW According to the soil mortar analysis the Sediments passing <0.075mm form the bulk components of soils retrieved from the trial pits at both the Illinge and Lesseyton Cemetery sites (49 66 %). The clay (< mm diameter) component ranged between 4 10 % at the Illinge site and between 3 5 % at the Lesseyton site. The sampled material had Plasticity Index (PI) values of % and 6 8 % with Linear Shrinkage (LS) values of % and % for the Illinge and Lesseyton sites, respectively. These soil parameters suggest a low potential for expansion and moisture-related shrinkage for the samples. Table 6-2: MoD/CBR Results Maximum CBR Swell Sample No. Trial Pit No. Depth (m) Description MDD kg/m 3 OMC % 90% 93% 95% 98% 100% MAASHTO % TRH 14 Classification Illinge ITP1 ITP Silty Sand <G10 ITP2 ITP Sandy Clay <G10 ITP5 ITP Sandy Clay <G10 ITP6 ITP Gravelly Clay <G10 ITP7 ITP Sandy Clay <G10 ITP10 ITP Sandy Clay <G10 Lesseyton LTP1 LTP Silty Clayey Sand <G10 LTP4 LTP Silty Clayey Sand <G10 LTP5 LTP Silty Clayey Sand <G10 Where: MDD is maximum dry density Ilinge Cemetery Development.docx September 2014

20 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 8 OMC is optimum moisture content CBR is California bearing ratio The results from the MOD/ CBR tests are fairly conclusive in their representation of in situ materials sampled from the investigation sites. The classification of materials reflects the composition and strengths of the in situ soil. The materials on both the Illinge and Lesseyton sites are of a very poor (>G10) quality according to TRH 14 (1985). The very poor quality material is not suitable for use as fill and/ or in layerworks, and should be spoiled. All material classifications were assessed in accordance with TRH 14 (1985). 7 Cemetery Site Selection Criteria 7.1 Site Topography Site observations along with the topographic data reviewed indicates that both the Illinge and Lesseyton Cemetery sites generally exhibit consistent topography. The Illinge site generally dips gently towards the south-east at a slope of approximately 5. The site is located at the foot of a mountain. The Lesseyton site is generally flat with minor ridges evident on the site. Richards and Croukamp (2004) classifies the slope categories for cemetery site selection as follows: Most Suitable/Favourable: Less than 6. Intermediate: Between 6 and 9 Unsuitable/ Unfavourable: More than 9 Using the above slope categories the Illinge and Lesseyton Cemetery sites have been evaluated in terms of the suitability of the topography for a cemetery development below: Illinge Site o The Illing Cemetery site is dominated by favourable topography i.e. gentle topography with slope angles of less than 6 ; o The proposed site is located at the foot of a mountain. Unsutable/ Unfavourable topography is located immediately to the north of the site i.e. moderate to steep topography with slope angles in excess of 9. Lesseyton Site o The Lesseyton Cemetery site is dominated by favourable topography i.e. gentle topography with slope angles of less than Ilinge Cemetery Development.docx September 2014

21 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page Soil Excavatibility Whilst a TLB was used during the excavation of the test pits during the geotechnical investigation, according to Richards and Croukamp (2004) the ease of excavation for a cemetery should be defined by in terms of ease of excavation by manual methods due to the difficulty associated with obtaining machinery for grave excavation. Excavation depths of at least 1.8m are considered suitable for cemetery site selection however depths of at least 3.0m are preferred to ensure that an adequate soil horizon is present below the graves to act as an aeration zone (Richards and Croukamp, 2004). This impedes groundwater pollution, and enables the possibility of duplex or multiple graves as required by certain religious sects or as a space saving measure in city cemeteries. The ease with which the soil and/or rock materials encountered across the sites can be excavated are largely dependent on their consistencies and the presence and size of rock boulders within a subsoil horizon. The consistencies of the materials observed during the profiling of the test pits within the Illinge and Lesseyton Cemetery site boundaries have been summarised in Table 7-1 below. Table 7-1: Soil and Rock Materials and Relative Consistencies Encountered Across the Cemetery Study Areas Test Pit Reference Depth (m) Soil Type Consistency Illinge Cemetery Site Excavation Class ITP Silty SAND: Topsoil Silty SAND: Colluvium Loose to Medium Silty CLAY: Hillwash Firm ITP CLAY: Residual Firm Sandy CLAY: Residual to Firm Silty SAND: Topsoil Medium ITP Silty SAND: Hillwash Loose to Medium Clayey SAND: Residual Medium Ilinge Cemetery Development.docx September 2014

22 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 10 Test Pit Reference Depth (m) Soil Type Consistency Excavation Class ITP Silty SAND: Topsoil Clayey SAND: Colluvium Loose Loose to Medium MUDROCK: Burgersdorp Fm to Medium Hard Rock Hard Silty SAND: Topsoil Medium Silty SAND: Residual Loose to Medium ITP Sandy CLAY: Residual Firm to Stiff MUDROCK: Burgersdorp Fm Rock Hard Silty SAND: Topsoil Sandy CLAY: Residual Firm ITP Gravelly CLAY: Residual Firm MUDROCK: Burgersdorp Fm Medium Hard Rock Hard Silty SAND: Topsoil Medium Sandy CLAY: Residual Firm ITP Sandy CLAY: Residual to Firm MUDROCK: Burgersdorp Fm Medium Hard Rock Hard Ilinge Cemetery Development.docx September 2014

23 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 11 Test Pit Reference Depth (m) Soil Type Consistency Excavation Class Silty Clayey SAND: Topsoil Medium to ITP Clayey SAND: Residual Sandy CLAY: Residual Medium to Firm DOLERITE: Intrusive to Medium Hard Rock Intermediate to Hard ITP Silty SAND: Topsoil Sandy CLAY: Residual to Very to Firm DOLERITE: Intrusive Rock Intermediate to Hard ITP Silty SAND: Topsoil Clayey SAND: Residual Medium Sandy CLAY: Residual Firm to Stiff Intermediate Lesseyton Cemetery Site Silty SAND: Topsoil Medium LTP Clayey SAND: Alluvial Clayey SAND: Alluvial Medium to Clayey Silty SAND: Topsoil Medium LTP Clayey Silty SAND: Alluvial Ilinge Cemetery Development.docx September 2014

24 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 12 Test Pit Reference Depth (m) Soil Type Consistency Excavation Class (Refusal) Silty Clayey SAND: Alluvial Medium to Sandy SILT: Topsoil LTP Silty Clayey SAND: Alluvial Medium to Silty Clayey SAND: Alluvial Medium to Sandy SILT: Topsoil Firm LTP Clayey SAND: Alluvial Medium Clayey SAND: Alluvial Medium to Sandy SILT: Topsoil Firm LTP Silty SAND: Alluvial Medium Silty Clayey SAND: Alluvial Medium to Illinge Cemetery Site Table 7-1 indicates that the material consistencies were generally consistent across the site with refusal by means of mechanical excavation occurring from a depth of 1.30m to a depth of 2.90m below natural ground level. Refusal of the TLB was encountered within test pits ITP4 through ITP7 as a result of the presence of MUDROCK. Near refusal was encountered in residual dolerite at trial pit ITP10, at a depth of 2.90m. Trial pits ITP8 and ITP9 indicated the presence of DOLERITE, however no excavation refusal was encountered to depths of 3.10m. No excavation refusal was encountered within test pits ITP1 through ITP3 and ITP8 and ITP9 to depths of m. The following excavation classes in terms of ease of Ilinge Cemetery Development.docx September 2014

25 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 13 excavation by manual means for the materials present across the Illinge cemetery site have been defined below: o o o Topsoil, Colluvium, Hillwash and Residual material: Excavation Class Materials; Dolerite (soft to medium hard rock): Intermediate to Hard Excavation Class Materials; and Mudrock: Hard Excavation Class Materials. Residual dolerite, as exhibited at ITP10, may require excavation techniques utilised for Intermediate Excavation Class Materials. Lesseyton Cemetery Site Table 7-1 indicates that the material consistencies were fairly consistent across the site. No refusal by means of mechanical excavation was encountered. No excavation refusal was encountered at the site to depths of m. The following excavation classes in terms of ease of excavation by manual means for the materials present across the Lesseyton cemetery site have been defined below: o Topsoil and Alluvial material: Excavation Class Materials; 7.3 Site Drainage It is imperative that adequate site drainage measures be implemented to assist in the removal of excess surface water and storm water run-off within a cemetery site to prevent the following: Rapid erosion which may result in the degradation of the overall appearance of the cemetery; Excessive ponding of water and ingress into the subsoil thereby causing groundwater pollution; and The flooding of grave sites which would in turn result in the destabilisation of the grave sides. While no specific hydrological study has yet been conducted for the Illinge and Lesseyton cemetery sites, the observations made during the geotechnical investigations have been used to determine the possible factors that could affect site drainage within these sites. It should be noted that while significant rainfall has been recorded within this area during the summer months i.e. November to December and January to February, the geotechnical investigation was conducted during what is considered to be the dry season and therefore the presence of storm water and surface water could not be significantly commented on Ilinge Cemetery Development.docx September 2014

26 Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development Page 14 During the geotechnical investigation conducted in July 2014 the moisture content of the soils present within the study areas were slightly moist across the Illinge site and predominantly dry to slightly moist in sections across the Lesseyton site. No groundwater seepage was encountered in any of the test pits profiled on either of the sites. The abundance of clay horizons within the subsoil profile together with the shallow depth of mudrock at the Illinge site could result in the formation of a perched water table during elevated rainfall conditions. The location of the Illinge site at the foot of a mountain could inturn result in increased surface run-off during seasonal rainfall. A suitable drainage system will be a pre-requisite to ensure minimal damage to the proposed Illinge cemetery. The generally flat topography encountered at the Lesseyton site could result in poor drainage conditions and the subsequent ponding of surface water during seasonal rainfall. It is thus recommended that a suitable drainage system be installed to minimalize any potential damage to the proposed Lesseyton cemetery. The presence of shallow mudrock and dolerite bedrock encountered within the Illinge cemetery site is also a cause for concern as this indicates that the buffer zone or zone of aeration is negligible. This increases the potential for groundwater pollution as a result of the concentration of pathogens and other pollutants in the discontinuities of the bedrock materials (Richards and Croukamp, 2004). The areas of the site in which the mudrock and dolerite bedrock were encountered at shallow depths are therefore considered to be unsuitable for cemetery development and should be avoided. The presence of mudrock and dolerite indicates a geological contact zone on the site. The older Triassic aged mudrock was intruded by the younger Jurassic aged dolerite, forming a natural conduit along which pollutants can freely enter the groundwater. The areas of the site where the contact between the mudrock and dolerite was encountered are therefore considered to be unsuitable for cemetery development and should be avoided. 7.4 Soil Permeability The permeability of the soil and or rock materials present across the site proposed for cemetery development is imperative in determining the suitability of the site for this land use. According to Richards and Croukamp (2004) the permeability of the soils must fall within a predetermined range in order to be suitable for cemetery site development, namely from a minimum of 1x10-7 cms -1 to a maximum of 5x10-5 cms -1. These minimum and maximum permeability values not only ensure that microbial pollutants are adequately contained but also serve to inhibit dispersion of waste products into the soil, thereby preventing the creation of an anaerobic environment which reduces the rate of decomposition Ilinge Cemetery Development.docx September 2014

5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

5.2 APPENDIX D2 Geotechnical Report

5.2 APPENDIX D2 Geotechnical Report 5.2 APPENDIX D2 Geotechnical Report Jeffares & Green: 03524: Ilinge and Lesseyton Cemetery Development ILINGE AND LESSEYTON CEMETERY DEVELOPMENT - GEOTECHNICAL INVESTIGATION FINAL REPORT SEPTEMBER 2014

More information

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION

REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL INVESTIGATION FOR THE PROPOSED SOLAR PHOTOVOLTAIC FACILITY, GROOTVLEI POWER STATION Consulting Geotechnical Engineers & Engineering Geologists P.O.Box 3557 Cramerview 2060. Tel: (011) 465-1699. Fax: (011) 465-4586. Cell 082 556 7302 & 076 966 8445 REPORT NO 12/115/D NOVEMBER 2012 GEOTECHNICAL

More information

GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE

GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE GEOTECHNICAL INVESTIGATION FOR REDHOUSE CHELSEA ARTERIAL AND WALKER DRIVE EXTENSION, PORT ELIZABETH, EASTERN CAPE MAY 2010 Prepared for: Prepared by: BKS (PTY) LTD TERRATEST (PTY) LTD P.O. Box 272 P.O.

More information

Telephone : G. Ntaka : Fax : M. Bénet :

Telephone : G. Ntaka : Fax : M. Bénet : Our Ref: P 24058 Your Ref: Drennan Maud cc. CK 95/54198/23 Consulting Geotechnical Engineers & Engineering Geologists VAT Reg ¹ 4770223594 P.O. Box 22997 Unit 7, Gayridge Business Park ¹ 2 MARGATE 13 Wingate

More information

DRENNAN, MAUD & PARTNERS

DRENNAN, MAUD & PARTNERS DRENNAN, MAUD & PARTNERS Consulting Civil Engineers and Engineering Geologists Registered Member : S.A. Association of Consulting Engineers PARTNERS: R.D. COLLYER, Pr.Eng.,B.Sc.(Eng.),M.Sc.(Eng.),MSAICE.

More information

GEOTECHNICAL PHASE 1

GEOTECHNICAL PHASE 1 GEOTECHNICAL PHASE 1 FOR PROPOSED SKUKUZA SAFARI LODGE FOR KRUGER NATIONAL PARK MPUMALANGA PROVINCE SEPTEMBER 2014 Report No: G14-0902 Issue 2 Prepared by: Conic North Consulting Engineers PO Box 11862

More information

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet.

Geology and Soil Mechanics /1A ( ) Mark the best answer on the multiple choice answer sheet. Geology and Soil Mechanics 55401 /1A (2003-2004) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

MERCURY - PERSEUS TRANSMISSION LINE ENGINEERING GEOLOGICAL ASSESSMENT FOR ROUTE 1

MERCURY - PERSEUS TRANSMISSION LINE ENGINEERING GEOLOGICAL ASSESSMENT FOR ROUTE 1 MERURY - PERSEUS TRANSMISSION LINE ENGINEERING GEOLOGIAL ASSESSMENT FOR ROUTE 1 Prepared by: I KLEINHANS KNIGHT HALL HENDRY P.O. Box 72292 Lynnwood Ridge 0040 Prepared for: STRATEGI ENVIRONMENTAL FOUS

More information

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN

16 January 2018 Job Number: RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN 16 January 2018 Job Number: 50595 RICHARD NEWMAN C\- CLARK FORTUNE MCDONALD AND ASSOCIATES PO BOX 553 QUEENSTOWN CHANSEN@CFMA.CO.NZ STORMWATER DISPOSAL ASSESSMENT Dear Richard, RDAgritech were requested

More information

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON.

REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON. Contract Report CSIR/BE/TIE/SKA/59E2214 August 2018 REPORT ON THE ASSESSMENT OF TRENCHING INTHE ROAD RESERVE OF THE ROAD BETWEEN BEAUFORT WEST AND CARNAVON. Authors: Dave Ventura Anele Sambo Michael Roux

More information

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1

A. V T = 1 B. Ms = 1 C. Vs = 1 D. Vv = 1 Geology and Soil Mechanics 55401 /1A (2002-2003) Mark the best answer on the multiple choice answer sheet. 1. Soil mechanics is the application of hydraulics, geology and mechanics to problems relating

More information

Report to Tyris Realty on a Geotechnical Investigation for a Proposed Warehouse Development at Sprite Place, Westmead

Report to Tyris Realty on a Geotechnical Investigation for a Proposed Warehouse Development at Sprite Place, Westmead Report to Tyris Realty on a Geotechnical Investigation for a Proposed Warehouse Development at Sprite Place, Westmead Reference : 11-358 Dated : February 2012 MOORE SPENCE JONES (PTY) LTD Consulting Geotechnical,

More information

Table 1 - Infiltration Rates

Table 1 - Infiltration Rates Stantec Consulting Ltd. 100-300 Hagey Boulevard, Waterloo ON N2L 0A4 November 14, 2017 File: 161413228/10 Attention: Mr. Michael Witmer, BES, MPA, MCIP, RPP City of Guelph 1 Carden Street Guelph ON N1H

More information

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1.

Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION. 1. February 10,2017 25506400 Ontario Ltd. Foxboro, ON Attention: Brad Newbatt Re: Hydrogeological Assessment for Part of Lots 2 and 3, Concession 5, Township of Thurlow, County of Hastings 1.0 INTRODUCTION

More information

Project No.: R01

Project No.: R01 Report to Voigts Construction on a Geotechnical Investigation carried out for the Royal Albert Lodge, Albert Falls Dam, KwaZulu-Natal Project No.: 18-156R01 Date Issued: November 2018 Report to Voigts

More information

APPENDIX 6: GEOTECHNICAL FEASIBILITY INVESTIGATION

APPENDIX 6: GEOTECHNICAL FEASIBILITY INVESTIGATION APPENDIX 6: GEOTECHNICAL FEASIBILITY INVESTIGATION ENVIRONMENTAL SCIENCE ASSOCIATES SAMANCOR CHROME, MIDDELBURG GEOTECHNICAL FEASIBILITY INVESTIGATION FOR NEW CHROME PLANT FACILITY J VAN TONDER (PrSciNat)

More information

Reference: R01. Dated: 18 July 2013 LEVEL 1 BEE SUPPLIER

Reference: R01. Dated: 18 July 2013 LEVEL 1 BEE SUPPLIER Geotechnical Engineering Services Engineering Geology Environmental and Groundwater Pile Integrity Testing Civil Engineering Laboratory Earthworks/Materials Supervision & Control Geotechnical Monitoring

More information

University of Fort Hare, Alice Campus

University of Fort Hare, Alice Campus University of Fort Hare, Alice Campus Geotechnical Investigation COMPILED FOR: MBB Consulting Engineers P O Box 509 Grahamstown 6140 Telephone: +27 (0)46 622 7223 Facsimile: +27 (0)86 570 7844 COMPILED

More information

ECoast Homes Pty Ltd: Proposed 76-lot subdivision, Penquite Road, Newstead GEOTECHNICAL ASSESSMENT 7 April 2009

ECoast Homes Pty Ltd: Proposed 76-lot subdivision, Penquite Road, Newstead GEOTECHNICAL ASSESSMENT 7 April 2009 99 Attachment 11 (8 pages including this page) Interpretation of site geology and soils, laboratory test results, and generalised AS2870 classifications 100 Geological setting The proposed subdivision

More information

Project: ITHACA-TOMPKINS REGIONAL AIRPORT EXPANSION Project Location: ITHACA, NY Project Number: 218-34 Key to Soil Symbols and Terms TERMS DESCRIBING CONSISTENCY OR CONDITION COARSE-GRAINED SOILS (major

More information

Proposed Cemetery Thornhill Road. Tier One Hydrogeological Risk Assessment. Peter Mitchell Associates

Proposed Cemetery Thornhill Road. Tier One Hydrogeological Risk Assessment. Peter Mitchell Associates Proposed Cemetery Thornhill Road Tier One Hydrogeological Risk Assessment Peter Mitchell Associates January 2015 Executive Summary This report uses a desk-based risk assessment technique published by the

More information

SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY

SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY REPORT On contract research for Bohlweki Environmental SOIL INFORMATION FOR PUMPED WATER STORAGE SCHEME, STEELPOORT VALLEY February 2007 By D.G. Paterson ARC-Institute for Soil, Climate and Water, Private

More information

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E:

Field Exploration. March 31, J-U-B ENGINEERS, Inc. 115 Northstar Avenue Twin Falls, Idaho Attn: Mr. Tracy Ahrens, P. E. E: March 31, 201 11 Northstar Avenue 83301 Attn: Mr. Tracy Ahrens, P. E. E: taa@jub.com Re: Geotechnical Data Report Preliminary Phase 1 Field Exploration Revision No. 1 Proposed Rapid Infiltration Basin

More information

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE

UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE UNDP HARARE HOSPITAL PROPOSED NATPHARM WAREHOUSE January 17 2016 TO CARRY OUT IN-SITU SOIL SURVEY, LABORATORY TESTS AND GEOTECHNICAL REPORTING. GEOTECHNICAL INVESTIGATIONS REPORT 1 2 Re: GEOTECHNICAL INVESTIGATIONS

More information

Appendix A. Producer Statement Advisory Note

Appendix A. Producer Statement Advisory Note Appendix A Producer Statement Advisory Note Ref. No. 17095 26 May 2017 PRODUCER STATEMENT CONSTRUCTION REVIEW (PS4) IMPORTANT ADVISORY NOTE The Building Consent Authority (BCA) frequently requires Producer

More information

Appendix F Geotechnical Investigation

Appendix F Geotechnical Investigation Appendix F Geotechnical Investigation Cie Sucriere de Bel Ombre Ltee Residential Development at Bel Ombre Environmental Impact Assessment F1 Geotechnical Investigation This appendix includes the Factual

More information

Geostatistical Analysis of Rainfall Temperature and Evaporation Data of Owerri for Ten Years

Geostatistical Analysis of Rainfall Temperature and Evaporation Data of Owerri for Ten Years Atmospheric and Climate Sciences, 2012, 2, 196-205 http://dx.doi.org/10.4236/acs.2012.22020 Published Online April 2012 (http://www.scirp.org/journal/acs) Geostatistical Analysis of Rainfall Temperature

More information

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC This threat overview relies on projections of future climate change in the Mekong Basin for the period 2045-2069 compared to a baseline of 1980-2005.

More information

DRENNAN MAUD (PTY) LTD

DRENNAN MAUD (PTY) LTD DRENNAN MAUD (PTY) LTD GEOTECHNICAL ENGINEERS AND ENGINEERING GEOLOGISTS Incorporating Drennan Maud & Partners (Est.1975) and GAP Consulting Reg. No. 2014/038872/07 Durban Head Office Info@drennanmaud.com

More information

The Soils and Land Capability for Agriculture. Land North of Aberdeen, Aberdeenshire

The Soils and Land Capability for Agriculture. Land North of Aberdeen, Aberdeenshire The Soils and Land Capability for Agriculture Of Land North of Aberdeen, Aberdeenshire Report prepared for Peter Radmall Associates May 2012 Reading Agricultural Consultants Ltd Beechwood Court, Long Toll,

More information

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B)

Which map shows the stream drainage pattern that most likely formed on the surface of this volcano? A) B) 1. When snow cover on the land melts, the water will most likely become surface runoff if the land surface is A) frozen B) porous C) grass covered D) unconsolidated gravel Base your answers to questions

More information

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES

Soil Mechanics. Chapter # 1. Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak INTRODUCTION TO SOIL MECHANICS AND ITS TYPES Soil Mechanics Chapter # 1 INTRODUCTION TO SOIL MECHANICS AND ITS TYPES Prepared By Mr. Ashok Kumar Lecturer in Civil Engineering Gpes Meham Rohtak Chapter Outlines Introduction to Soil Mechanics, Soil

More information

APPENDIX H SOIL SURVEY

APPENDIX H SOIL SURVEY Environmental Impact Statement Beryl Solar Farm APPENDIX H SOIL SURVEY Beryl Solar Farm 16 347 Final V1 H i Geotechnical Engineers & Engineering Geologists NATA Accredited Laboratories for Asphalt, Aggregate,

More information

University of Pretoria. Matthys Dippenaar and Louis van Rooy Engineering Geology and Hydrogeology, Geology Department July 2017, Livingstone, Zambia

University of Pretoria. Matthys Dippenaar and Louis van Rooy Engineering Geology and Hydrogeology, Geology Department July 2017, Livingstone, Zambia University of Pretoria Contributions to the Characterisation of the Vadose Zone f or Hydrogeological and Geotechnical Applications Matthys Dippenaar and Louis van Rooy Engineering Geology and Hydrogeology,

More information

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD.

Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan 25579, W6M, KDYD. OEL File 1563-1 May 30, 2017 Doug Wall PO Box 774 Salmon Arm, BC V1E 4N7 Re: Steep Slope Assessment for 2465 Waverly Drive, Blind Bay, BC; Legal Address: Lot 39, Section 18, Township 22, Range 10, Plan

More information

PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER

PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER PREDICTING SOIL SUCTION PROFILES USING PREVAILING WEATHER Ronald F. Reed, P.E. Member, ASCE rreed@reed-engineering.com Reed Engineering Group, Ltd. 2424 Stutz, Suite 4 Dallas, Texas 723 214-3-6 Abstract

More information

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report

REPORT. Housing Re-Zone. Middle Road and Iona Road - Geotechnical Investigation Report REPORT Housing Re-Zone Middle Road and Iona Road - Geotechnical Investigation Report Prepared for Hastings istrict Council Prepared by Tonkin & Taylor Ltd ate April 06 Job Number 464.000 istribution: Hastings

More information

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation

ABP Southampton. Environmental Statement for Port of Southampton: Berth 201/202 Works. Appendix B. Dredge Material Characterisation ABP Southampton Environmental Statement for Port of Southampton: Berth 201/202 Works Appendix B Dredge Material Characterisation Appendix B Dredge Material Characterisation Environmental Statement for

More information

Project No India Basin Shadow Study San Francisco, California, USA

Project No India Basin Shadow Study San Francisco, California, USA Project No. 432301 India Basin Shadow Study San Francisco, California, USA Numerical Modelling Studies 04 th June 2018 For Build Inc. Report Title: India Basin Shadow Study San Francisco, California, USA

More information

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.

patersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP. Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson

More information

January 25, Summary

January 25, Summary January 25, 2013 Summary Precipitation since the December 17, 2012, Drought Update has been slightly below average in parts of central and northern Illinois and above average in southern Illinois. Soil

More information

Construction Exits Rock pads

Construction Exits Rock pads Construction Exits Rock pads SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow [1] Clayey Soils Type 3 System Supplementary Trap Dispersive Soils [1] Minor

More information

REPORT TO TGC ENGINEERS CC. ON A GEOTECHNICAL INVESTIGATION FOR A PROPOSED NEW LANDFILL, CANDIDATE SITE 1 KRANTZ FONTEIN FARM KOKSTAD

REPORT TO TGC ENGINEERS CC. ON A GEOTECHNICAL INVESTIGATION FOR A PROPOSED NEW LANDFILL, CANDIDATE SITE 1 KRANTZ FONTEIN FARM KOKSTAD REPORT TO TGC ENGINEERS CC. ON A GEOTECHNICAL INVESTIGATION FOR A PROPOSED NEW LANDFILL, CANDIDATE SITE 1 KRANTZ FONTEIN FARM KOKSTAD 1. INTRODUCTION Drennan, Maud and Partners was requested by Mr Graham

More information

MAFF Ministry of IfiriLE Agriculture Fisheries and Food

MAFF Ministry of IfiriLE Agriculture Fisheries and Food MAFF Ministry of IfiriLE Agriculture Fisheries and Food STATEMENT OF PHYSICAL CHARACTERISTICS AND AGRICULTURAL LAND CLASSIFICATION UPSLAND, KIRKLINGTON NORTH YORKSHIRE EXTRACTION OF SAND AND GRAVEL MARCH

More information

AN ENGINEERING GEOLOGICAL INVESTIGATION

AN ENGINEERING GEOLOGICAL INVESTIGATION AN ENGINEERING GEOLOGICAL INVESTIGATION FOR A PROPOSED NEW CEMETERY AT STORMS RIVER PREPARED BY: PREPARED FOR: SETPLAN SETTLEMENT PLANNING SERVICES CONSULTING TOWN PLANNERS P.O. BOX 2446 NORTH END 6056

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure)

Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure) Geotechnical Investigation and Monitoring Results of a Landslide Failure at Southern Peninsular Malaysia (Part 1: Investigating Causes of Failure) Liew, S. S., Gue, S. S., Liong, C. H. Director, Gue &

More information

Report on Site Classification & Construction Testing

Report on Site Classification & Construction Testing Report on Site Classification & Construction Testing Northlakes Estate Stage 29, Cameron Park CGS1871 CGS1871 Prepared for Northlakes Pty Ltd C/- McCloy Group Pty Ltd December 2013 Report on Site Classification

More information

C) D) 3. Which graph best represents the relationship between soil particle size and the rate at which water infiltrates permeable soil?

C) D) 3. Which graph best represents the relationship between soil particle size and the rate at which water infiltrates permeable soil? 1. Which earth material covering the surface of a landfill would permit the least amount of rainwater to infiltrate the surface? A) silt B) clay C) sand D) pebbles 2. Which graph best represents the relationship

More information

1.0 Introduction 1.1 Geographic Location 1.2 Topography 1.3 Climate and Rainfall 1.4 Geology and Hydrogeology 1.5 Water Availability 1.

1.0 Introduction 1.1 Geographic Location 1.2 Topography 1.3 Climate and Rainfall 1.4 Geology and Hydrogeology 1.5 Water Availability 1. 1.0 1.1 Geographic Location 1.2 Topography 1.3 Climate and Rainfall 1.4 Geology and Hydrogeology 1.5 Water Availability 1.6 Demography 1.0 1.1 Geographic Location St. Lucia forms part of an archipelago

More information

(C) Global Journal of Engineering Science and Research Management

(C) Global Journal of Engineering Science and Research Management GEOTECHNCIAL ASSESSMENT OF PART OF PORT HARCOURT, NIGER DELTA FOR STRUCTURAL ANALYSIS Warmate Tamunonengiyeofori Geostrat International Services Limited, www.geostratinternational.com. *Correspondence

More information

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

Land subsidence due to groundwater withdrawal in Hanoi, Vietnam Land Subsidence (Proceedings of the Fifth International Symposium on Land Subsidence, The Hague, October 1995). 1AHS Publ. no. 234, 1995. 55 Land subsidence due to groundwater withdrawal in Hanoi, Vietnam

More information

REPORT ON A GEOTECHNICAL INVESTIGATION FOR THE PROPOSED NEW ESKOM GENERAL LANDFILL AND HAZARDOUS WASTE FACILITY, LEPHALALE

REPORT ON A GEOTECHNICAL INVESTIGATION FOR THE PROPOSED NEW ESKOM GENERAL LANDFILL AND HAZARDOUS WASTE FACILITY, LEPHALALE Inroads Consulting 1 REPORT ON A GEOTECHNICAL INVESTIGATION FOR THE PROPOSED NEW ESKOM GENERAL LANDFILL AND HAZARDOUS WASTE FACILITY, LEPHALALE 1. TERMS OF REFERENCE This report has been prepared at the

More information

DRENNAN MAUD (PTY) LTD

DRENNAN MAUD (PTY) LTD DRENNAN MAUD (PTY) LTD GEOTECHNICAL ENGINEERS AND ENGINEERING GEOLOGISTS Incorporating Drennan Maud & Partners (Est.1975) and GAP Consulting Reg. No. 2014/038872/07 Durban Head Office Info@drennanmaud.com

More information

Correlation of unified and AASHTO soil classification systems for soils classification

Correlation of unified and AASHTO soil classification systems for soils classification Journal of Earth Sciences and Geotechnical Engineering, vol. 8, no. 1, 2018, 39-50 ISSN: 1792-9040 (print version), 1792-9660 (online) Scienpress Ltd, 2018 Correlation of unified and AASHTO classification

More information

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON

June 9, R. D. Cook, P.Eng. Soils Engineer Special Services Western Region PUBLIC WORKS CANADA WESTERN REGION REPORT ON PUBLIC WORKS CANADA WESTERN REGION REPORT ON GEOTECHNICAL INVESTIGATION PROPOSED MARTIN RIVER BRIDGE MILE 306.7 MACKENZIE HIGHWAY Submitted by : R. D. Cook, P.Eng. Soils Engineer Special Services Western

More information

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014)

Hydro One (Sept 2014) Hydro One (Sept 2014) Hydro One (Sept 2014) TABLE 1 WELL CONSTRUCTION DETAILS MOE WWR No Well ID Location Installation Date Status Easting Coordinates Northing Source Elevation Screened Interval Screened Material Borehole Well Stick-up Ground Top

More information

Appendix I SOIL RATING CHART. (Storie soil Index Rating = factor A* factor B* factor C* factor X) FACTOR A- Rating on character of Physical Profile

Appendix I SOIL RATING CHART. (Storie soil Index Rating = factor A* factor B* factor C* factor X) FACTOR A- Rating on character of Physical Profile Appendix I SOIL RATING CHART (Storie soil Index Rating = factor A* factor B* factor C* factor X) FACTOR A- Rating on character of Physical Profile Sr. No Particulars Percentage I Soil on recent alluvial

More information

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities

WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and Rainfall For Selected Arizona Cities WHEN IS IT EVER GOING TO RAIN? Table of Average Annual Rainfall and 2001-2002 Rainfall For Selected Arizona Cities Phoenix Tucson Flagstaff Avg. 2001-2002 Avg. 2001-2002 Avg. 2001-2002 October 0.7 0.0

More information

Stream Discharge and the Water Budget

Stream Discharge and the Water Budget Regents Earth Science Unit 6: Water Cycle & Climate Name: Lab # Stream Discharge and the Water Budget Introduction: The United States Geological Survey (USGS) measures and publishes values for the daily

More information

Soil Formation. Lesson Plan: NRES B2-4

Soil Formation. Lesson Plan: NRES B2-4 Soil Formation Lesson Plan: NRES B2-4 1 Anticipated Problems 1. What are five different factors that affect soil formation? 2. What are some different types of parent material that affect soils? 3. What

More information

Photo 1 - Southerly view across 2700 parking lot toward existing building. Multi-residential building borders western side of property in upper right of view. Photo 2 - Southerly view across 2750 parking

More information

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii)

HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR (c)(1)(i) (xii) HISTORY OF CONSTRUCTION FOR EXISTING CCR SURFACE IMPOUNDMENT PLANT GASTON ASH POND 40 CFR 257.73(c)(1)(i) (xii) (i) Site Name and Ownership Information: Site Name: E.C. Gaston Steam Plant Site Location:

More information

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT

Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Milford Centre Ltd. Private Plan Change GEOTECHNICAL ASSESSMENT Final 15 April 2008 Sinclair Knight Merz 25 Teed Street

More information

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate.

Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate. Groundwater Investigation SOUTHGATE GRAVEL PIT Part of Lot 15, Concession 15 (formerly Township of Proton), Township of Southgate County of Grey October, 2014 Prepared for: Drysdale Aggregate Consulting

More information

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive

patersongroup Consulting Engineers April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive patersongroup April 20, 2010 File: PG1887-LET.01R Novatech Engineering Consultants Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Attention: Mr. Adam Thompson Consulting Engineers 28 Concourse

More information

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate

2. PHYSICAL SETTING FINAL GROUNDWATER MANAGEMENT PLAN. 2.1 Topography. 2.2 Climate FINAL GROUNDWATER MANAGEMENT PLAN 2. PHYSICAL SETTING Lassen County is a topographically diverse area at the confluence of the Cascade Range, Modoc Plateau, Sierra Nevada and Basin and Range geologic provinces.

More information

Superficial Geology Map - Slice A. Order Details: Order Number: Customer Reference: National Grid Reference: Slice: Site Area (Ha): Search Buffer (m):

Superficial Geology Map - Slice A. Order Details: Order Number: Customer Reference: National Grid Reference: Slice: Site Area (Ha): Search Buffer (m): Superficial Geology Superficial Deposits are the youngest geological deposits formed during the most recent period of geological time, the Quaternary, which extends back about 1.8 million years from the

More information

CATCHMENT DESCRIPTION. Little River Catchment Management Plan Stage I Report Climate 4.0

CATCHMENT DESCRIPTION. Little River Catchment Management Plan Stage I Report Climate 4.0 CATCHMENT DESCRIPTION Little River Catchment Management Plan Stage I Report Climate 4. Little River Catchment Management Plan Stage I Report Climate 4.1 4. CLIMATE 4.1 INTRODUCTION Climate is one of the

More information

TECHNICAL SUPPORT DOCUMENT # 1 COMPARATIVE EVALUATION OF ALTERNATIVE SITES APPENDIX TSD#1-H. Design & Operations Component

TECHNICAL SUPPORT DOCUMENT # 1 COMPARATIVE EVALUATION OF ALTERNATIVE SITES APPENDIX TSD#1-H. Design & Operations Component TECHNICAL SUPPORT DOCUMENT # 1 COMPARATIVE EVALUATION OF ALTERNATIVE SITES APPENDIX TSD#1-H Design & Operations Component February 2013 February 2013 Design & Operations Component Appendix TSD#1-H COMPARATIVE

More information

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2

Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method. S. Soleymani 1, A. Akhtarpur 2 Seepage Analysis for Shurijeh Reservoir Dam Using Finite Element Method S. Soleymani 1, A. Akhtarpur 2 1 Group of Dam Construction, Toossab Company, P.O. Box 917751569, Mashhad City, Iran, PH (+98) 511-7684091;

More information

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS

IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS IV. ENVIRONMENTAL IMPACT ANALYSIS E. GEOLOGY/SOILS Except where otherwise noted, the following Section is based on the Preliminary Geotechnical Investigation, Proposed Medical Office Buildings and Mixed-Use

More information

Environmental Impact Report for the proposed establishment of a New Coal-Fired Power Station in the Lephalale Area, Limpopo Province

Environmental Impact Report for the proposed establishment of a New Coal-Fired Power Station in the Lephalale Area, Limpopo Province 8. GEOLOGY, SOILS AND AGRICULTURAL POTENTIAL 8.1. Geology 8.1.1. Preferred Site Geology Naauwontkomen 509 LQ The geology on Naauwontkomen is similar to that of the neighbouring farm, Eenzaamheid 512 LQ.

More information

Variability in Some Geotechnical Properties of Three Lateritic Sub-Base Soils Along Ibadan Oyo Road

Variability in Some Geotechnical Properties of Three Lateritic Sub-Base Soils Along Ibadan Oyo Road IOSR Journal of Applied Geology and Geophysics (IOSR-JAGG) e-issn: 2321 0990, p-issn: 2321 0982.Volume 2, Issue 5 (Jul-Aug. 2014), PP 76-81 Variability in Some Geotechnical Properties of Three Lateritic

More information

GEOLOGICAL PROCESSES AND MATERIALS SGM210

GEOLOGICAL PROCESSES AND MATERIALS SGM210 University of Pretoria GEOLOGICAL PROCESSES AND MATERIALS SGM210 23 April 2014 1 SOIL PROFILING According to Jennings, Brink & Williams (1973) Very important part of a geotechnical site investigation.

More information

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES

ARCH 1250 APPLIED ENVIRONMENTAL STUDIES John Seitz, RA, LEED AP Assistant Adjunct Professor Professor Paul C. King, RA, AIA, ARA Assistant Professor Geology Geology is the scientific study of the structure and composition of the earth s surface

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

Study of Hydrometeorology in a Hard Rock Terrain, Kadirischist Belt Area, Anantapur District, Andhra Pradesh

Study of Hydrometeorology in a Hard Rock Terrain, Kadirischist Belt Area, Anantapur District, Andhra Pradesh Open Journal of Geology, 2012, 2, 294-300 http://dx.doi.org/10.4236/ojg.2012.24028 Published Online October 2012 (http://www.scirp.org/journal/ojg) Study of Hydrometeorology in a Hard Rock Terrain, Kadirischist

More information

Evaluation/Monitoring Report No. 152

Evaluation/Monitoring Report No. 152 Evaluation/Monitoring Report No. 152 150m west of 7 Portmore Rd. Portmore Lower Ballinderry County Antrim LICENCE NO.: AE/07/241 David McIlreavy 1 Site Specific Information Site Name Townland County :

More information

Chapter 2. Regional Landscapes and the Hydrologic Cycle

Chapter 2. Regional Landscapes and the Hydrologic Cycle Chapter 2. Regional Landscapes and the Hydrologic Cycle W. Lee Daniels Department of Crop and Soil Environmental Sciences, Virginia Tech Table of Contents Introduction... 23 Soils and landscapes of the

More information

CASE STUDY ON THE REMEDIATION OF WATER INGRESS TO OLD GOLD WORKINGS LINKED TO ACTIVE MINING AREAS IN SOUTH AFRICA 1

CASE STUDY ON THE REMEDIATION OF WATER INGRESS TO OLD GOLD WORKINGS LINKED TO ACTIVE MINING AREAS IN SOUTH AFRICA 1 CASE STUDY ON THE REMEDIATION OF WATER INGRESS TO OLD GOLD WORKINGS LINKED TO ACTIVE MINING AREAS IN SOUTH AFRICA 1 Mike Palmer 2, Chris Waygood, Irene Lea Abstract. Grootvlei Mine is located in the Far

More information

Appendix J. Geological Investigation

Appendix J. Geological Investigation Appendix J Geological Investigation Appendix J Geological Environment Table of Contents Page 1 INTRODUCTION...J-1 1.1 Purpose of the Investigation...J-1 1.2 Scope of the Investigation...J-1 2 METHODO OF

More information

Geotechnical Level 1 Supervision Report Muller Street, Redland Bay.

Geotechnical Level 1 Supervision Report Muller Street, Redland Bay. TGE15051-1 Geotechnical Level 1 Supervision Report Frostdale Civil Contractors 24/03/2015 TOTAL GEOTECHNICS Adelaide, Ballarat, Brisbane, Hallam, Hoppers Crossing, Traralgon, Warrnambool Report No: TGE15051-1

More information

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement

Central Queensland Coal Project Appendix 4b Geotechnical Assessment. Environmental Impact Statement Central Queensland Coal Project Appendix 4b Geotechnical Assessment Environmental Impact Statement GEOTECHNICAL ASSESSMENT OF OPEN CUT MINING ADJACENT TO THE BRUCE HIGHWAY, CENTRAL QUEENSLAND COAL PROJECT

More information

APPALACHIAN COLLUVIAL

APPALACHIAN COLLUVIAL LANDSLIDE PROBLEMS ON APPALACHIAN COLLUVIAL SLOPES Geohazards in Transportation in the Appalachian Region Charleston, WV August 5 7, 2008 RICHARD E. GRAY DIGIOIA, GRAY & ASSOCIATES, LLC. 570 BEATTY ROAD

More information

Impact : Changes to Existing Topography (Less than Significant)

Impact : Changes to Existing Topography (Less than Significant) 4.2 Land Resources 4.2.1 Alternative A Proposed Action Impact 4.2.1-1: Changes to Existing Topography (Less than Significant) Development of the project site would involve grading and other earthwork as

More information

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation

General. DATE December 10, 2013 PROJECT No TO Mary Jarvis Urbandale/Riverside South Development Corporation DATE December 10, 201 PROJECT No. 10-1121-0260- TO Mary Jarvis Urbandale/Riverside South Development Corporation CC Justin Robitaille, Urbandale Jonathan Párraga, J.L. Richards & Associates Limited FROM

More information

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake Prepared by: Allan Chapman, MSc, PGeo Hydrologist, Chapman Geoscience Ltd., and Former Head, BC River Forecast Centre Victoria

More information

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel

MEMORANDUM. wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... Mr. Webster contends that prior to excavation of the gravel TO... J. C. Foweraker 2... Head Gr o w a t er S e c t i on... Hyar....og~~~.~.~vis.ion... wa.tsr..-z.n~.e.s-t.i~at.i.o.ns... Branch... eernment OF BRITISH COLUMBIA MEMORANDUM II 0 PROM A. P. Kohut, Geological

More information

URBAN HYDROLOGY: WATER IN THE CITY OF TSHWANE Plant Sciences Auditorium, University of Pretoria January 2014 URBAN HYDROGEOLOGY

URBAN HYDROLOGY: WATER IN THE CITY OF TSHWANE Plant Sciences Auditorium, University of Pretoria January 2014 URBAN HYDROGEOLOGY URBAN HYDROLOGY: WATER IN THE CITY OF TSHWANE Plant Sciences Auditorium, University of Pretoria 23 24 January 2014 URBAN HYDROGEOLOGY MATTHYS A. DIPPENAAR DEPARTMENT GEOLOGY, UNIVERSITY OF PRETORIA HYDROGEOLOGY

More information

APPENDIX B SIDRA INTERSECTION LOS RESULTS

APPENDIX B SIDRA INTERSECTION LOS RESULTS 32 33 APPENDIX B SIDRA INTERSECTION LOS RESULTS 34 FIGURE B.1.A: Level of Service (LOS). Intersection: TR04504/MR00504 Design year Without improvements 2015 2020 Peak NA AM (without development trips)

More information

The Climate of Oregon Climate Zone 4 Northern Cascades

The Climate of Oregon Climate Zone 4 Northern Cascades /05 E55 Unbound issue No. 9/ is Does not circulate Special Report 916 May 1993 The Climate of Oregon Climate Zone 4 Property of OREGON STATE UNIVERSITY Library Serials Corvallis, OR 97331-4503 Agricultural

More information

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI

M E M O R A N D U M. Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI M E M O R A N D U M TO: FROM: Mr. Mark Schilling Gulf Interstate Engineering Mr. Jonathan K. Thrasher, P.E., Mr. Ian Kinnear, P.E. (FL) PSI DATE: November 11, 2014 RE: Summary of Findings Geotechnical

More information

3.0 GEOLOGY AND HYDROGEOLOGY

3.0 GEOLOGY AND HYDROGEOLOGY 3.0 GEOLOGY AND HYDROGEOLOGY 3.1 Methodology The Geological Survey of Ireland (GSI) publication Geology of South Cork was consulted to establish the nature of the bedrock lithology and Quaternary sediments.

More information

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey

Soil Map Boulder County Area, Colorado (Planet Blue Grass) Web Soil Survey National Cooperative Soil Survey 475910 476000 476090 476180 476270 476360 105 16' 21'' W 476450 476540 476630 476720 476810 4453350 4453440 4453260 4453350 4453170 4453260 4453080 4453170 4453080 475820 475910 4452990 476000 476090 476180

More information

Artificial Recharge to Alluvial Aquifer, Northeastern Nuba Mountains, Sudan.

Artificial Recharge to Alluvial Aquifer, Northeastern Nuba Mountains, Sudan. International Journal of Research in Engineering and Science (IJRES) ISSN (Online): 2320-9364, ISSN (Print): 2320-9356 Volume 3 Issue 1 ǁ January. 2015 ǁ PP.62-66 Artificial Recharge to Alluvial Aquifer,

More information

Site 3: Park Road, Katikati: field logs, stratigraphic description, and site description

Site 3: Park Road, Katikati: field logs, stratigraphic description, and site description Appendix 4.2 Site 3: Park Road, Katikati: field logs, stratigraphic description, and site description Criteria suitability The third site selected was at Park Road Reserve, Katikati (Figure 1). This site

More information

Freshwater. 1. The diagram below is a cross-sectional view of rain falling on a farm field and then moving to the water table.

Freshwater. 1. The diagram below is a cross-sectional view of rain falling on a farm field and then moving to the water table. Name: ate: 1. The diagram below is a cross-sectional view of rain falling on a farm field and then moving to the water table. 3. Which conditions produce the most surface water runoff? A. steep slope,

More information

3.12 Geology and Topography Affected Environment

3.12 Geology and Topography Affected Environment 3 Affected Environment and Environmental Consequences 3.12 Geology and Topography 3.12.1 Affected Environment 3.12.1.1 Earthquakes Sterling Highway MP 45 60 Project Draft SEIS The Kenai Peninsula is predisposed

More information