1 Lace Diamond Mine DMS Commissioning Derek Lahee Consulmet (Pty) Limited ABSTRACT This paper addresses the Lace Diamond Mine 100tph Fines DMS and 65tph Coarse DMS commissioning. Emphasis has been placed on practical applications versus previous published papers, specifically Hendriena van der Walt and Dr. Kurt Petersen s DMS CYCLONE SIZE VS. CYCLONE EFFICIENCY: THE DE BEERS PERSPECTIVE, and current industry trends. This paper is based on practical experience during operating and commissioning and the observations are open to debate. 1. INTRODUCTION Lace Diamond Mine Phase 1 processing plant was commissioned in August and September The Phase 1 scope was designed for kimberlite tailings re-treatment and the Phase 2 expansion will include for treatment of competent kimberlite from the open pit. The following process difficulties were expected and addressed in the design: 1. Extremely weathered kimberlite tailings with high clay content, therefore feed preparation was a priority. 2. Water recovery: Extensive testwork was done until a flocculent and coagulant was selected for ideal water recovery and clarity conditions. 3. Fine Diamond Recovery was critical due to the nature of the deposit (kimberlite tailings) and the stone size distribution curve, therefore: Importance of DMS Efficiency Re-crush Efficiency Final Recovery Efficiency We will be concentrating on the DMS aspect of the plant.
2 Process Flow Block Diagram 220 TPH ROM VIBRATING GRIZZLY 15 TPH +100MM 205 TPH -100MM SCRUBBER 1 & DOUBLE SKIN TROMMEL 4 TPH +100MM 143 TPH MM 198 TPH MM SCRUBBER 2 & PRIMARY SCREEN 100 TPH DMS FEED 100TPH FINES DMS MM 65 TPH DMS FEED 65TPH COARSE DMS MM 1 TPH SINKS 63 TPH FLOATS 2 TPH SINKS 2 TPH +28MM 3 TPH SINKS 97 TPH -6MM FLOATS COARSE STOCKPILE FINAL RECOVERY (GREASE) FLOATS STOCKPILE 45 TPH -28+6MM 55 TPH -6+1MM 108 TPH FEED RECRUSH (WF CONE CRUSHER) 58 TPH -1MM 31 TPH -1MM 1 TPH -1MM 1 TPH -1MM 8 TPH -1MM 99 TPH -1MM EFFLUENT THICKENER CIRCUIT LACE DIAMOND MINE 220 TPH KIMBERLITE BLOCK FLOW DIAGRAM (PTY) LTD CONSULMET 2. LACE DMS PROCESS The mass balance indicated a 100tph Fines (-8+1.0mm) DMS requirement and 65tph Coarse (-28+8mm) DMS requirement. The Consulmet Standard 100tph module has 2-off 420mm cyclones and the 65tph has a 510mm cyclone. Process bottlenecking was anticipated on the -8+1mm fraction with the 65tph Coarse DMS having a high probability of under-utilisation. A by-pass was designed into the fines bin, enabling feed to the 510mm cyclone plant.
3 DMS Feed Surge Bin This process requirement allowed us the luxury to compare fines recovery efficiencies from both the 420mm cyclones and the 510mm cyclone. DMS Parameters 100tph DMS 65tph DMS Cyclone Feed Pressure 185kPa (17D) 170kPa (13D) C.M. Density FeSi 270D 270D Our general rule of thumb on FeSi selection is as follows: Cyclone 200mm 250mm 300mm 350mm 420mm 510mm 620mm FeSi Cyclone 60 Cyclone D 270D 270D 270D 150D 100D Finer FeSi Coarse FeSi
4 The client requested, if possible, 1-off FeSi selection. From experience, we have had major stability problems using 150D on 420mm cyclones; therefore we selected 270D for both plants, and monitored the viscosity closely on the 510mm plant. The 270D proved to be suitable, in this process case, for the 510 plant. One must take into account the very clean, competent material feed into the DMS due to good feed preparation. Preliminary Tracer Test Results: 2mm tracers were used. Plant D50 EPM 2 x 420mm mm ACTUAL RESULTS We were able to run -8+1mm through the 510mm cyclone for extended periods of time (48 hours +) during commissioning, with two important observations: 1. Diamond recovery (grade in cpht) remained consistent. 2. Diamond size distribution remained consistent. This is important in this case as there were large amounts of mm stones. Actual stone count remained consistent whether feeding through the 420mm cyclones or the 510 cyclone. 4. OBSERVATIONS 1. Y shaped pulp distributor Our 420mm cyclone circuit was considerably improved by the introduction of a Multotec Y shaped pulp distributor. We were the first company to install the prototype and it is a significant development with regard to feed of multiple cyclones. We have had considerable problems with T shaped distributors in the past. These problems have included turbulence, high wear and unequal distribution to the cyclones.
5 Y-shaped Distributor The disadvantage of the unit is the relative large size of the distributor and high cost as compared to a conventional distributor, but the process benefits are significant: Turbulence is eliminated Wear is eliminated Significantly stable inlet pressures Equal distribution to cyclones Although the unit is large, the design allows for reductions in platework on the overflow and underflow chute work. We would recommend this unit for all future applications of a similar nature.
6 100tph DMS and 65tph DMS Modules 2. Correct Medium Densification vs Dilute Medium Densification Due to plant layout requirements becoming more compact and movable, Correct Medium (CM) densification with tube densifiers has increasingly become a standard. Consulmet, during numerous plant audits over the last two years, has noticed a trend where clients with Correct Medium tube densification circuits have had problems with medium viscosity. In the past, where Bottom Cut-off Size has been higher ( 1.6mm), this has not had any major impact. With BC0S s dropping to 1.2mm, 1.0mm and even 0.8mm, this viscosity is causing recovery problems. One has to look at the old DMS plants from the 1960 s and early 1970 s to see correct medium tube densifiers installed on DMS modules. Dilute Medium (DM) Densification was subsequently introduced for a reason.
7 From our point of view and practical experience, there is no question that the medium quality provided by a DM circuit is better than a correct medium circuit. With regard to modular, mobile DMS units for alluvial diamond deposits, CM densification is still the way to go for practical purposes. If the DMS unit is to be installed into a permanent location, we would recommend DM densification. This observation was highlighted because the viscosity sensitivity has been particularly evident in 420mm cyclones on various plants. 3. Breakaway Size-Practical Overview We feel that breakaway size is highly dependent on various factors including particle feed size range and FeSi selection and quality with regard to viscosity and stability. A recent plant audit on 2-off 610mm cyclone plants (Fines and Coarse) found the following: ROM throughput and power problems caused the decommissioning of the Fines DMS Module. In conjunction with this the client had dropped the BC0S from the original specification of 1.6mm to 0.8mm. The client had noticed a drop in recovery of up to 10% following the above changes. The plant audit found the following: Entire size range ( mm) through a 610mm cyclone 270D FeSi on the 610mm cyclone. Density differentials indicated viscosity issues Worn vortex finder. A tracer test showed the following anomaly (Highlighted in red below), although still producing a good tromp curve:
8 Tromp Curve Data Sheet 4mm SG No. Added No. in sinks No. in floats Total No.lost % in sinks Cyclone Pressure Kpa Cyclone Size (m) 0.63 Density 2.65 D Achieved D Required % Variance G 9.81 Colour SG % in sinks SG = Cut point Black SG Lime SG Yellow EP value Lilac Blue Buff Green Olive Cinnamon Brown Pink Orange
9 TROMP CURVE 4mm (Density = 2.65 Pressure = 300Kpa) % IN SINKS DENSITY The Fines DMS was recommissioned and the mm classified into mm and mm; The FeSi was changed to 150D; The vortex finder was replaced. Unfortunately all three changes were made at once, but recovery improved by 10%. It is of our opinion that if particle size range differential is kept to a minimum and the FeSi specified not only to the size of the cyclone but to the quality of the feed material, breakaway size as per the Multotec chart is not as critical. A larger diameter cyclone can thus be selected for smaller size fractions.
10 5. CONCLUDING REMARKS 1. Following on H van der Walt and Dr K Petersen s paper DMS CYCLONE SIZE vs CYCLONE FFICIENCY, we have had the opportunity to prove that a 510mm cyclone, under the correct operating parameters, can produce equal or better recoveries as compared to a 420mm cyclone. The same will probably apply to cyclones with a larger diameter than the 510mm cyclone. 2. From our experience in the field, we have found the 420mm cyclone to be more sensitive to operating parameters than the 510mm cyclone. 6. REFERENCES 1. H van der Walt and Dr K Petersen s paper DMS CYCLONE SIZE vs CYCLONE FFICIENCY: THE DE BEERS PERSPECTIVE 2. Multotec Cyclone Division D T Lahee May 2008
DESLIMING OF FINE COAL WHAT IS THE CORRECT CYCLONE?
DESLIMING OF FINE COAL WHAT IS THE CORRECT CYCLONE? E. Bekker Multotec ABSTRACT Defining the correct cyclone design or standard for fine coal beneficiation processes seems to differ between various companies
More informationThe history and Development of Dense Medium Cyclones David Woodruff
The history and Development of Dense Medium Cyclones David Woodruff Contents 1.0 Development Dutch State Mines 1940-1960 2.0 Alternative Centrifugal Separation Technologies 3.0 The Demise of DSM and development
More informationAn evaluation of cyclone performance to improve the quality of cyclone underflow material for tailings disposal
Paste 2013 R.J. Jewell, A.B. Fourie, J. Caldwell and J. Pimenta (eds) 2013 Australian Centre for Geomechanics, Perth, ISBN 978 0 9870937 6 9 An evaluation of cyclone performance to improve the quality
More informationProcess Simulations Using Computer Technology. Steve Frankland Dargo Associates Ltd
Process Simulations Using Computer Technology Steve Frankland Dargo Associates Ltd What is a Process Simulations? Mathematical prediction of the outcome of a physical or chemical process Linking of several
More informationThe three-product cyclone: adding value to South African coal processing
The three-product cyclone: adding value to South African coal processing by J. Jacobs*, and G.J. de Korte* Synopsis The three-product cyclone was originally developed in Russia and is now extensively used
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE 16 th August, 2013 ASX:ABU Trial Mining Continues and Commissioning of the Old Pirate Processing Plant is Underway ABM Resources NL ( ABM or The Company ) presents an update
More informationUSING THE SMC TEST TO PREDICT COMMINUTION CIRCUIT PERFORMANCE
USING THE SMC TEST TO PREDICT COMMINUTION CIRCUIT PERFORMANCE INTRODUCTION As the SMC Test produces the JK parameter values A and b as well as estimates the JK parameter ta and crusher model energy matrices,
More informationMagnetic Separation Techniques to Improve Grinding Circuit Efficiency New Trunnion Magnet Technology Provides Significant Cost Savings
Magnetic Separation Techniques to Improve Grinding Circuit Efficiency 2014 New Trunnion Magnet Technology Provides Significant Cost Savings By Jose Marin, Eriez Director-Minerals/Materials Processing Grinding
More informationFor personal use only
ASX ANNOUNCEMENT / MEDIA RELEASE ASX: ABU 21 st September 2015 Operational Update from the Old Pirate Gold Mine and the Coyote Processing Plant ABM Resources NL ( ABM or the Company ) is pleased to announce
More informationHigh Capacity Classification Cyclones
MULTOTEC PROCESS EQUIPMENT High Capacity Classification Cyclones 1 Multotec Pty Ltd The Multotec Group, established more than thirty years ago, is a Johannesburg South African organization with German
More informationOposura Scoping Study Nearing Completion
20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near
More informationThe Recovery of Water from a Colloidally Stable Kimberlite Suspension
The Recovery of Water from a Colloidally Stable Kimberlite Suspension By I. C. R. GILCHRIST,' and M. S. HUNT' De Beers Industrial Diamond Division Diamond Research Laboratory Johannesburg Republic of South
More informationHydrocyclone Model Simulation: A Design Tool for Dewatering Oil Sands Plant Tailings
No. 1998.100 Hydrocyclone Model Simulation: A Design Tool for Dewatering Oil Sands Plant Tailings A.I.A. Salama, CANMET, Devon, Alberta, Canada; and T. Kizior, Syncrude Canada, Fort McMurray, Alberta,
More informationHigh Capacity Classification Cyclones. Stacker Cyclones. The heart of the Multotec cyclone range. General Features. Flapper valve
High Capacity Classification Cyclones The heart of the Multotec cyclone range Maximum separation efficiency, low running costs and innovative designs and technology. Through extensive testing and simulations,
More informationCoal dense medium separation dynamic and steady-state modelling for process control
Coal dense medium separation dynamic and steady-state modelling for process control E.J. Meyer a,b, I.K. Craig b, a Snr Solution Architect, MES & Plant - Business Solution Provision, Exxaro Resources,
More information7 Years of Cutting Edge Technology for the Mining Industry in Canada
7 Years of Cutting Edge Technology for the Mining Industry in Canada Verena Schreiner, BAUER Resources Canada Ltd The Bauer Group The Bauer Group The Bauer Group Segment Resources Three Main Competences
More informationSampling Requirements for Auditing Diamond Recovery
Sampling Requirements for Auditing Diamond Recovery Geoffrey J Lyman Materials Sampling & Consulting Australia Chris Prins De Beers Group Services, South Africa Godfrey Ngaisiue De Beers Marine Namibia
More informationReguibat surface uranium project, Mauritania
International Symposium on Uranium Raw Material for the Nuclear Fuel Cycle: Exploration, Mining, Production, Supply and Demand, Economics and Environmental Issues Reguibat surface uranium project, Mauritania
More informationTrial Mining & Processing Update at the Old Pirate High-Grade Gold Project
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 1st August, 2013 Trial Mining & Processing Update at the Old Pirate High-Grade Gold Project ABM Resources NL ( ABM or The Company ) presents an update on the Trial
More informationASX Announcement ASX Code: MAR 19 June 2018
ASX Announcement ASX Code: MAR 19 June 2018 Lorena Gold Project Update: Additional Gold to be Mined from Open Cut Malachite Resources Limited (ASX Code: MAR) ( Malachite or the Company ) is pleased to
More informationUpgrading Feldspar by WHIMS and Flotation Techniques
Article Upgrading Feldspar by WHIMS and Flotation Techniques Somsak Saisinchai a, *, Thitisak Boonpramote b, and Pinyo Meechumna c Department of Mining and Petroleum Engineering, Faculty of Engineering,
More informationDESIGN OF ULTRA-THIN BONDED HOT MIX WEARING COURSE (UTBHMWC) MIXTURES
Test Procedure for DESIGN OF ULTRA-THIN BONDED HOT MIX WEARING COURSE TxDOT Designation: Tex-247-F Effective Date: August 2008 August 2016. 1. SCOPE 1.1 This test method determines the proper proportions
More informationA comparison of different cyclones in addressing challenges in the classification of the dual density UG2 platinum ore
A comparison of different cyclones in addressing challenges in the classification of the dual density UG2 platinum ore by A. Mainza*, M.S. Powell*, and B. Knopjes Synopsis It is common practice in the
More informationDe-bottlenecking Iron Ore Transportation From Mine to Plant. Corin Holmes MSc Eng. Project Engineer Jenike & Johanson Pty Ltd
De-bottlenecking Iron Ore Transportation From Mine to Plant Corin Holmes MSc Eng. Project Engineer cholmes@jenike.com Jenike & Johanson Pty Ltd What is a bottleneck? Defined as any point in the transport
More informationSiltation of Ore Particles in Leaching Tanks: Causative Factors and Mitigation Measures*
Siltation of Ore Particles in Leaching Tanks: Causative Factors and Mitigation Measures* R. Osei, 2G. B. Abaka-Wood, 1G. Ofori-Sarpong and 1R. K. Amankwah 1 University of Mines and Technology, P.O. Box
More informationWhat is segregation? Gabrie Meesters
What is segregation? Gabrie Meesters Outline of the presentation What is segregation Types of segregation Do s and don ts with respect to segregation .so what is segregation Segregation results when particles
More informationBRC DIAMONDCORE UPDATES EXPLORATION AT SILVERSTREAMS PROJECT
BRC DIAMONDCORE UPDATES EXPLORATION AT SILVERSTREAMS PROJECT Toronto, Canada and Johannesburg, South Africa June 11, 2008: BRC DiamondCore Ltd. (the "Company") (TSX BCD; JSE BCD) is pleased to provide
More informationFor personal use only
ASX RELEASE 20 December 2012 LUCAPA DIAMOND COMPANY LIMITED (ASX: LOM) QUARTERLY REPORT FOR PERIOD ENDED 30 NOVEMBER 2012 HIGHLIGHTS Lulo Diamond Concession, Angola $5.73 million capital raising completed
More informationEffect of Particle Drag on Performance of a Conical Base Classifier
Effect of Particle Drag on Performance of a Conical Base Classifier 1 Bharath N, 2 Swapnil Urankar, 3 Venkatesh L K, 4 Aditya Ramkumar, 5 Rohit Dua Applied Innovation EnSci A Weir Group Company Bangalore,
More informationParticle Density Meter (PDM) Noel Lambert Clean Process Technologies Nicholas Cox Clean Process Technologies Peter Taylor Quality Handling Systems
Particle Density Meter (PDM) Noel Lambert Clean Process Technologies Nicholas Cox Clean Process Technologies Peter Taylor Quality Handling Systems What is Particle Density? Particle Density Bulk Density
More informationAlthough not essential, a good quality hand lens is a valuable addition to your field kit.
Field Sediment Card Sediment characteristics are an important element in understanding marine and estuarine environments.there are thus a wide range of people (perhaps you!) who regularly use measurements
More informationFor personal use only
PRIMARY INTERSECTS BROAD ZONES OF GOLD MINERALISATION AT MOUNT BUNDY INCLUDING 117M AT 1.5G/T GOLD HIGHLIGHTS Initial results from Rustlers Roost shows 117m at 1.5 g/t gold including 8m at 6.9 g/t gold
More informationCoal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects
Coal Loss and Dilution Considerations for Western Canadian Foothills Open Pit Coal Projects Presenter: Mike Allen Manager, Surface Mining April 29, 2015 Outline Terms / Definitions Factors affecting coal
More informationMeasurement and control of grinding circuit performance by real-time particle size measurement on individual cyclones
Measurement and control of grinding circuit performance by real-time particle size measurement on individual cyclones C. V. O Keefe CiDRA Minerals Process Proper control of grinding circuits is essential
More informationINDBOND 3000 Dry Strength Resin for Paper
INDBOND 3000 Dry Strength Resin for Paper INDBOND 3000 Dry Strength Resins are specially formulated polymers designed for better paper making and to improve strength characteristics like burst factor,
More informationGUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT. Course Curriculum. MECHANICAL OPERATIONS (Code: ) Chemical Engineering
GUJARAT TECHNOLOGICAL UNIVERSITY, AHMEDABAD, GUJARAT Course Curriculum MECHANICAL OPERATIONS (Code: 3330502) Diploma Programme in which this course is offered Chemical Engineering Semester in which offered
More informationTHINK FLUID DYNAMIX CFD Simulation of Clarifiers. THINK Fluid Dynamix
THINK FLUID DYNAMIX CFD Simulation of Clarifiers Provided by: THINK Fluid Dynamix Am Pestalozziring 21 D-91058 Erlangen (Germany) Tel. +49 (0)9131 69098-00 http://www.think-fd.com CFD ENGINEERING & CONSULTING
More informationCOPYRIGHT AND DISCLAIMER
COPYRIGHT AND DISCLAIMER Copyright (and any other applicable intellectual property rights) in this document and any accompanying data or models is reserved by SRK Consulting (UK) Limited ("SRK") and is
More informationHow to Interpret Mining Company Drill Reports & Announcements
How to Interpret Mining Company Drill Reports & Announcements A Simple Guide amscot Stockbroking Pty Ltd A division of State One Stockbroking Ltd (AFSL 247 100) Disclaimer: All information in this document
More informationPortia Gold Mine Update
1 Portia Gold Mine Update South Australian Resources & Energy Investment Conference 20 April 2016 Dr Chris Giles Managing Director Havilah Resources LimitedDr Chris Giles, MD 20 April 2016 Dr Chris Giles
More informationDevelopment of a best-practice mineral resource classification system for the De Beers group of companies
http://dx.doi.org/10.17159/2411-9717/2017/v117n12a6 Development of a best-practice mineral resource classification system for the De Beers group of companies by S. Duggan*, A. Grills*, J. Stiefenhofer,
More informationGowest Gold Ltd. Selective Arsenopyrite-Pyrite Flotation
Gowest Gold Ltd. Selective Arsenopyrite-Pyrite Flotation CMP Ottawa January 2012 G. Wilcox / D. Koningen / R. Jackman (SGS Canada Ltd.) TSX-V:GWA www.gowestgold.com 1.877.363.1218 18/01/12 Frankfield East
More informationDRILLING AT ASCOT S PREMIER PROPERTY EXTENDS GOLD MINERALIZATION 150 METRES WEST TOWARDS UNDERGROUND PORTAL
Ascot Resources Ltd. Suite 1550-505 Burrard St. Vancouver, B.C., V7X 1M5 T: 778-725-1060 F: 778-725-1070 TF: 855-593-2951 www.ascotgold.com For Immediate Release NR18.17 DRILLING AT ASCOT S PREMIER PROPERTY
More informationPOSITIVE METALLURGICAL RESULTS FROM KHARMAGTAI
By electronic lodgement Page 1 of 6 1 September 2016 POSITIVE METALLURGICAL RESULTS FROM KHARMAGTAI HIGHLIGHTS Preliminary flotation test work on high-grade tourmaline breccia samples produces excellent
More informationModelling of oil shale concentration processes in Estonian mines
International Journal of Mining, Reclamation and Environment, 2014 http://dx.doi.org/10.1080/17480930.2014.962807 Modelling of oil shale concentration processes in Estonian mines Juri-Rivaldo Pastarus*,
More informationEffect of Initial Pulp Concentration on Particles Settling Velocity in various regions of Thickeners
Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 3 (2) January 214: 253-257 214 Academy for Environment and Life Sciences, India Online ISSN 2277-188 Journal
More informationBlast Fragmentation Modelling of the Codelco-Andina Open Pit Expansion
Blast Fragmentation Modelling of the Codelco-Andina Open Pit Expansion F. Mardones GeoBlast S. A., Chile C. Scherpenisse GeoBlast S. A., Chile I. Onederra The University of Queensland, Sustainable Minerals
More informationXstrata Process Support (XPS) Falconbridge, Ontario COM 2009 Geometallurgy Short Course August 22 23, Peter J. Whittaker, Ph.D., P.Geo.
Xstrata Process Support (XPS) Falconbridge, Ontario COM 2009 Geometallurgy Short Course August 22 23, 2009 Peter J. Whittaker, Ph.D., P.Geo. 1 Process Mineralogy at Xstrata Process Support: Outline Introduction
More informationFor personal use only
ASX Announcement 3 January 2014 Lucapa Diamond Company Limited (ASX: LOM) is pleased to announce the recovery of a 32.2 carat Type 2A diamond from its Lulo Concession in Angola. The D colour, 32.2 carat,
More informationBlock Flow Chart of a Typical Particle Processing System
Block Flow Chart of a Typical Particle Processing System Raw materials (R) uxiliary materials (H) Balance boundary of material, energy, information and costs flows Raw materials E I E I E I E I E I E I
More informationA strategy for improving water recovery in kimberlitic diamond mines
http://dx.doi.org/10.17159/2411-9717/2019/v119n2a9 A strategy for improving water recovery in kimberlitic diamond mines by A.J. Vietti* Drought conditions and the possible lack of sufficient raw water
More informationDISCUSSION ON THE INFLUENCE OF MINERALOGY ON THE RHEOLOGY OF TAILINGS SLURRIES
ABSTRACT 61 DISCUSSION ON THE INFLUENCE OF MINERALOGY ON THE RHEOLOGY OF TAILINGS SLURRIES Gordon McPhail SLR Consulting Australia Pty Ltd Marco Becerra ASMIN Chile Sergio Barrera IVAN Chile ABSTRACT The
More informationTelecommunications Pipe
Telecommunications Pipe About Poly Pipe Pty Ltd Located in the Hunter Valley, NSW, Australia, Poly Pipe Pty Ltd (Poly Pipe) has an ultra modern extrusion, high tech manufacturing facility. It supplies
More informationWhat do I need to know to pass an Advanced Industrial Wastewater License Test?
What do I need to know to pass an Advanced Industrial Wastewater License Test? [Activated sludge, metals finishing, sedimentation/clarification with chemicals, DAF] All of the Basic Industrial Wastewater
More informationMANGANESE DISCOVERY AT KONONGO PROJECT
ASX Release Wednesday 8 September 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill Oliver (Managing Director) E-mail:
More informationDrilling Commences at Bolivian Tin Sites
ASX ANNOUNCEMENT 17 October 2017 Drilling Commences at Bolivian Tin Sites Highlights Drilling and sampling has commenced at Victory s tin tail deposits in Bolivia. Approximately 105m of drilling has been
More informationRecovery Slime Waste from Feldspar Flotation Plant at Attanee International Co. Ltd., Tak Province, Thailand
Article Recovery Slime Waste from Feldspar Flotation Plant at Attanee International Co. Ltd., Tak Province, Thailand Natatsawas Soonthornwiphat *, Somsak Saisinchai, and Pornthip Parinayok Department of
More informationSPECIFYING THE METHODOLOGY FOR THE CALCULATION OF VIBRATORY FEEDERS
JOURNAL OF MINING AND GEOLOGICAL SCIENCES, Vol. 60, Part, Mechanization, electrification and automation in mines, 2017 SPECIFYING THE METHODOLOGY FOR THE CALCULATION OF VIBRATORY FEEDERS Hristo Sheiretov
More informationRedmoor Project Presentation. Beer & Co Tin Conference (2 Nov 2016)
Redmoor Project Presentation Beer & Co Tin Conference (2 Nov 2016) NAE Company Summary Strong Multi-Commodity Project Portfolio Melbourne Based, ASX Listed Experienced management and board; Gary Fietz
More informationFeasibility Report of Madhuban coal washery
Feasibility Report of Madhuban coal washery September 2018 DESIGN DATE OF MADHBAN WASHERY 1. Feed rate 625 2. Primary Gyratory crusher section- 1100 Tph ( output- 200mm) 3. Secondary Double Roll crusher
More informationYour teacher will show you a sample or diagram of each, and show you a settling column. Draw these, and label your diagrams (8 pts) Ungraded:
From Sand to Stone: How do we recognize and interpret sedimentary rocks in the rock record? (Based closely on the University of Washington ESS 101 Lab 5: Sedimentary Rocks) Introduction: This lab consists
More informationIn-channel coarse sediment trap Best Management Practice
In-channel coarse sediment trap Best Management Practice By Henry R. Hudson July 2002 Environmental Management Associates Ltd., Christchurch Complexity Environmental Value Cost Low Moderate High Low Moderate
More informationSIMO CASE STUDY GEOVIA USER CONFERENCE PERTH CHRIS JAMES 31 MAY 2018
SIMO CASE STUDY GEOVIA USER CONFERENCE PERTH CHRIS JAMES 31 MAY 2018 2 [GEOVIA: SIMO] [May 2018] WHAT IS VALUE Important to understand potential levers that drive value Value What is it? NPV IRR Payback
More informationASX Release 2 December 2010 LONRHO MINING LIMITED (ASX: LOM) QUARTERLY REPORT FOR PERIOD ENDED 30 NOVEMBER 2010 HIGHLIGHTS
ASX Release 2 December 2010 LONRHO MINING LIMITED (ASX: LOM) HIGHLIGHTS Lulo Diamond Concession, Angola (LOM 39%) Impressive results encountered from the first alluvial gravels treated through the Dense
More informationThese subclasses are to be used according to the following general rules:
CPC - B03D - 2017.08 B03D FLOTATION; DIFFERENTIAL SEDIMENTATION (sedimentation in general B01D 21/00; in combination with other separation of solids B03B; sink-float separation B03B 5/28; detergents, soaps
More informationIluka Resources. Murray Basin Site Visit September 2013
Iluka Resources Murray Basin Site Visit September 2013 Australian Operations Overview 2 Australian Operations Overview Western Australia Narngulu MSP processes Jacinth-Ambrosia concentrate 4 synthetic
More informationMERLIN DIAMOND PROJECT The Home Stretch
Mining the Territory 2009 MERLIN DIAMOND PROJECT The Home Stretch Tom Reddicliffe CEO CORPORATE INFORMATION Incorporated: 1991 Shares Listed: ASX Code: NAD Issued capital: 1,980 million Share price: 2.4c
More informationContents 1 Introduction 2 Basic Ideas 3 How Cyclones Work
Contents 1 Introduction 1 1.1 Removal of Particles from Gases 1 1.1.1 Filtration 2 1.1.2 Wet Scrubbers 5 1.1.3 Centrifugal/Cyclonic Devices 5 1.1.4 Knock-out Vessels and Settling Chambers 6 1.2 A Closer
More informationThe Art of Mixing, Anaerobic Digesters
The Art of Mixing, Anaerobic Digesters Dr Hara Papachristou Process Engineer hpapachristou@bhrgroup.co.uk 25th October 2011 BHR Group 2011 BHR Group is a trading name of VirtualPiE Limited www.bhrgroup.com
More informationIntroduction of Equivalent shape factors for investigating settling Velocity in thickeners
Bulletin of Environment, Pharmacology and Life Sciences Bull. Env. Pharmacol. Life Sci., Vol 3 (2) January 2014: 246-252 2014 Academy for Environment and Life Sciences, India Online ISSN 2277-1808 Journal
More informationBlueRock Diamonds PLC / AIM: BRD / Sector: Natural Resources
22 January 2019 BlueRock Diamonds PLC / AIM: BRD / Sector: Natural Resources BlueRock Diamonds PLC ( BlueRock or the Company ) Update to Kareevlei Cluster Inferred Mineral Resource BlueRock Diamonds PLC,
More informationNOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3. These notes must not be included in the Contract Documents.
TNZ M/3 Notes : 1986 NOTES ON SUBBASE AGGREGATE SPECIFICATION TNZ M/3 These notes must not be included in the Contract Documents. 1. INTRODUCTION There is no standard TNZ M/3 Specification for subbase
More informationSECTION 1 SAMPLING TECHNIQUES AND DATA
Table 1 The following table provides a summary of important assessment and reporting criteria used at for the reporting of Mineral Resources and Ore Reserves in accordance with the Table 1 checklist in
More informationFor personal use only
21 November 2017 ASX Code: POZ Maiden JORC Exploration Target for Blina Diamond Project, WA HIGHLIGHTS POZ Minerals Limited (ASX: POZ) has estimated a maiden JORC compliant Exploration Target for alluvial
More informationBalogo Exploration Update
ASX/Media Announcement 4 October 2013 Balogo Exploration Update Field exploration work has re-commenced at Balogo, following the wet season. A 2,500m infill auger drilling program has commenced over the
More informationLOGGING AND SAMPLING PROTOCOL
LOGGING AND SAMPLING PROTOCOL The following discussion will address a number of issues including; the physical taking of the samples, geological descriptions, sample numbering and handling, and the dispatch
More informationRock Sizing for Small Dam Spillways
Rock Sizing for Small Dam Spillways STORMWATER MANAGEMENT PRACTICES Photo 1 Rock-lined spillway on a construction site sediment basin Photo 2 Rock-lined spillway on a small farm dam 1. Introduction A chute
More informationAggregates. AAPA training
Aggregates AAPA training Topics Aggregate sources and rock types Aggregate Production Aggregate Properties Coarse and fine aggregates in Asphalt Mixes Aggregates in Sprayed Seals Filler in asphalt mixes
More informationMetal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project
Metal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project Contents Location Project Outline Project Schedule Corporate Overview History Equipment Geology Resource Development Data
More informationHow to Check Your G4 Spread Pattern
How to Check Your G4 Spread Pattern MANUAL NUMBER: EFFECTIVE 04/0 0 6TH AVE SW CEDAR RAPIDS, IA 5404-05 PHONE FAX (9) 86-50 www.new-leader.com Copyright 0 Highway Equipment Company, Inc. Spread HeaderPattern
More informationAureus Mining New Liberty Project Geology
Aureus Mining New Liberty Project Geology February 2014 Contents Location and Regional context Deposit geology Resources and Reserves Grade Control Underground potential Near-mine exploration potential
More informationCyclones. Vane Axial Cyclone 10/30/2013. EVE 402 Air Pollution Generation and Control. Chapter #5 Lectures (Part 4) A mechanical gas cleaning device
EVE 402 Air Pollution Generation and Control Chapter #5 Lectures (Part 4) Cyclones A mechanical gas cleaning device Gas is spun (centrifugal force) to separate particles Two types Vane axial A ring of
More informationInvestigation of the flow in a flat bottom cyclone
Investigation of the flow in a flat bottom cyclone by B. Chiné (1) and F. Concha (2) (1) Catholic University of Concepción, Faculty of Engineering Campus San Andrés, Paicavi 000, Concepción, Chile E-mail:
More informationMARCH 2010 QUARTERLY REPORT
MARCH 2010 QUARTERLY REPORT ASX Release HIGHLIGHTS Friday 30 April 2010 SIGNATURE METALS LIMITED Level 1 / 33 Richardson Street WEST PERTH Australia Tel: +61 8 9481 0101 Fax: +61 8 9200 4469 Contact: Bill
More informationFor personal use only. A DIAMOND EXPLORER WITH WORLD CLASS POTENTIAL Investor Presentation December 2011
A DIAMOND EXPLORER WITH WORLD CLASS POTENTIAL Investor Presentation December 2011 The writer believes that Angola is one of the most attractive diamond exploration targets in the world and that the Lulo
More informationA MODIFICATION OF THE WILSON & JUDGE DEPOSIT VELOCITY EQUATION, EXTENDING ITS APPLICABILITY TO FINER PARTICLES AND LARGER PIPE SIZES.
ISBN 978-83-927084-8-3 ISSN 0867-7964 A MODIFICATION OF THE WILSON & JUDGE DEPOSIT VELOCITY EQUATION, EXTENDING ITS APPLICABILITY TO FINER PARTICLES AND LARGER PIPE SIZES Allan Thomas Slurry Systems Pty
More informationMount Gibson Iron Limited ABN
Mount Gibson Iron Limited ABN 87 008 670 817 Level 1, 2 Kings Park Road West Perth 6005, Western Australia PO Box 55, West Perth WA 6872 Telephone: 61-8-9426-7500 Facsimile: 61-8-9485 2305 E-mail: admin@mtgibsoniron.com.au
More informationFurther Research into Methods of Analysing the October 2000 Stability of Deep Open Pit Mines EXECUTIVE SUMMARY
EXECUTIVE SUMMARY This report presents the results of a program of further research into the use of a combined approach of numerical and centrifuge modeling in assessing the stability of deep open pit
More informationGraphite from discovery to resource Heilongjiang under the microscope
Graphite from discovery to resource Heilongjiang under the microscope 5 th Graphite & Graphene Conference 8-9 December 2015 London Andrew Scogings, PhD Geology CSA Global Pty Ltd; KlipStone Pty Ltd Natural
More informationSITE INVESTIGATION 1
SITE INVESTIGATION 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally referred to as site investigation.
More informationInformation Technology Solutions Neptune Datasheet
Information Technology Solutions Neptune Datasheet Suspended Solids Analyzer Neptune is the first purpose built in-situ analyzer for measuring the suspended solids of slurries. Specifically developed for
More informationPresentation to Investors London. March 2012
Presentation to Investors London March 2012 Disclaimer This presentation and any oral presentation accompanying it has been prepared by Latin Resources Ltd ( LRS or the Company ). It should not be considered
More informationA1 Minerals Limited EXPLORER TO MINER. Presented by John Williams - Managing Director A1 Minerals Limited
A1 Minerals Limited EXPLORER TO MINER Presented by John Williams - Managing Director A1 Minerals Limited 1 Disclaimer This presentation contains certain forward-looking information and forecasts which
More informationHighlights. 9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY
9 November 2018 DRILLING UPDATE - SORBY HILLS Pb-Ag-Zn PROJECT CORPORATE DIRECTORY Managing Director Simon Noon Directors Richard Monti (Chairman) Peter Harold (Non-exec.) Andrew Parker (Non-exec.) Company
More informationFor Immediate Release ASCOT DRLLING AT UNICORN INTERSECTS MORE HIGH-GRADE GOLD
Ascot Resources Ltd. Suite 1550-505 Burrard St. Vancouver, B.C., V7X 1M5 T: 778-725-1060 F: 778-725-1070 TF: 855-593-2951 www.ascotgold.com For Immediate Release NR18.22 ASCOT DRLLING AT UNICORN INTERSECTS
More informationpatersongroup Mineral Aggregate Assessment 3119 Carp Road Ottawa, Ontario Prepared For Mr. Greg LeBlanc March 7, 2014 Report: PH2223-REP.
Geotechnical Engineering Environmental Engineering group Hydrogeology Geological Engineering Archaeological Studies Materials Testing 3119 Carp Road Prepared For Mr. Greg LeBlanc March 7, 2014 Paterson
More informationASX Release 29 November 2017
Middle Island Resources Ltd ACN 142 361 608 ASX code: MDI www.middleisland.com.au ASX Release 29 November 2017 Substantial Exploration Target announced for key deposit at Sandstone gold project, WA Capital
More informationGRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN ROAD AREA GRAVEL INVESTIGATION NORTHEASTERN, BC. Submitted to:
AMEC Earth & Environmental Limited 610 Richard Road, Prince George, BC Canada V2K 4L3 Tel +1 (250) 564-3243 Fax +1 (250) 562-7045 www.amec.com GRAVEL INVESTIGATION AREA 9 (KIMEA PIT) SIERRA-YOYO-DESAN
More informationThe utilisation of a coiled plug flow reactor for the flocculation of kaolin slurry
The utilisation of a coiled plug flow reactor for the flocculation of kaolin slurry Tutun Nugraha Andy Fourie School of Civil and Resource Engineering University of Western Australia Yee Kwong Leong Lavanya
More informationFLORIDA PHOSPHATE BENEFICIATION PRACTICE IN Glen Oswald Minerals Process Eng. Supt. Mosaic
FLORIDA PHOSPHATE BENEFICIATION PRACTICE IN 2012 Glen Oswald Minerals Process Eng. Supt. Mosaic Presentation at AICHE Conference Clearwater, Fl June 9, 2012 1 Abstract The Florida phosphate ore, or matrix
More information