1 ASX RELEASE 20 December 2012 LUCAPA DIAMOND COMPANY LIMITED (ASX: LOM) QUARTERLY REPORT FOR PERIOD ENDED 30 NOVEMBER 2012 HIGHLIGHTS Lulo Diamond Concession, Angola $5.73 million capital raising completed to fund expanded kimberlite diamond program at Lulo Specialist Bauer kimberlite drilling program commences at Lulo, with processing of samples through DMS diamond plant continuing Fleet of Caterpillar earth moving equipment and tri-axle flat-bed trailer arrive on site at Lulo as Lucapa continues to gear up for kimberlite diamond program Contract finalised with Fugro Airborne Surveys for new aeromagnetic survey at Lulo including a high-priority 70km 2 strip near where carat alluvial diamond recovered First containers with new 50 tonne per hour DMS plant arrive on site, with balance scheduled to arrive early in 2013 Figure 1 Core drilling on Se223 Lucapa Diamond Company Limited abn Page 1
2 OVERVIEW Lucapa Diamond Company (formerly Lonrho Mining Limited) (ASX: LOM) is exploring for diamonds at the Lulo Diamond Concession in Angola. Lulo covers an area of 3,000km 2 and is located in the Cuango River Basin within Angola s Lunda Norte Province. Lulo has world-class diamond exploration potential, with a major kimberlite field identified within the concession and extensive diamond-bearing alluvials occurring along the Cacuilo and Lulo Rivers. After more than four years of regional exploration and surface sampling, Lucapa has commenced the most critical and exciting exploration phase at Lulo. This involves the drilling and bulk sampling of more than 60 priority kimberlite targets to find the source, or sources, of world class alluvial diamonds of up to carats which have been recovered by Lucapa from within the Lulo concession. Lulo is surrounded by concessions held by some of the world s biggest diamond miners and is located about 150km west of the giant Catoca diamond mine. Operated by Russian giant Alrosa, Catoca is ranked the third largest kimberlite mine in the world. The Lulo Project is operated as a joint venture between Lucapa and the Government-owned diamond company Endiama, which is the exclusive concessionary for Angolan diamond mining rights. Under the joint venture arrangement, Lucapa holds a 40 per cent interest in the concession relating to alluvials (39 per cent for kimberlites), with Endiama and private Angolan interests holding the balance. Lucapa is the manager and operator on the concession and funds all exploration activities. KIMBERLITE DIAMOND PROGRAM In September 2012, Lucapa achieved a significant step in its goal of making a world class diamond discovery when the arrival on site of a specialist Bauer drilling rig from South Africa enabled the Company to commence its kimberlite drilling and excavation program. This program aims to find the kimberlite source, or sources, of the large, world class alluvial diamonds recovered from the Lulo concession during 2012, including the rare carat stone found in the BLK_08 alluvial bulk sample. This diamond was independently valued at $US3.5 million. Over a month period, Lucapa plans to test more than 60 priority kimberlite targets at Lulo which were originally identified from aeromagnetic and surface sampling data. The list of priority targets is expected to increase once Lucapa completes a new aeromagnetic survey in 2013 and finalises a detailed review of all the magnetic anomalies close to BLK_08. The kimberlite drilling program is based on a review of the Lulo Project undertaken by international diamond expert Manfred Marx in Mr Marx selected 61 kimberlite targets (out of a total of 247 magnetic anomalies) for drilling (Figure 4). The main component of the kimberlite exploration program is a $2.2 million drilling and sampling program being undertaken by Bauer Technologies. 1 Manfred Marx (2011) The Economic Potential of the Lulo Project, Lunda Norte Province, Angola Lucapa Diamond Company Limited abn Page 2
3 Bauer s Prakla drill is a multi-purpose rig that can drill both narrow-diameter core (or diamond) holes and wide-diameter (44cm) reverse circulation holes. The core holes are designed to locate the kimberlite, while wide-diameter RC holes are drilled to collect small bulk samples of the kimberlite to test for diamonds. An early onset of the Angolan wet season, combined with flooding caused by heavier than usual rainfall, disrupted Lucapa s kimberlite exploration program during the Quarter. These disruptions included road wash-outs which delayed transportation of the Bauer rig between the kimberlite targets. Three kimberlite targets (a Se12, Se222 and Se223) and two alluvial bulk samples (BLK-09 and BLK- 10) were tested during this period. Figure 2 Location of targets examined during the Quarter The first target tested was Se12. This proved to be a kimberlite and was tested with core holes and sampled with wide diameter holes. The material sampled was resedimented volcaniclastic kimberlite (RVK). This coarse grained fragmental sedimentary deposit is typically found near the sides, or base, of a kimberlite crater lake. The rock is formed by slumping of fragmental kimberlitic material back into the volcanic crater. In other African kimberlites (including Catoca) the RVK deposits are commercially diamondiferous with grades often equivalent to, or greater than, the original kimberlite. The sample from Se12 was processed through the Company s Dense Media Separation (DMS) plant but no diamonds were recovered. No further work is planned for this target at this stage. Lucapa Diamond Company Limited abn Page 3
4 The second target tested was Se222, a very large (~95 ha) magnetic feature located to the west of Se12 (Figures 2 and 4). This target was also confirmed to be a kimberlite with coarse RVK material recognised in two drill holes. The kimberlite at Se222 was found to be only shallowly buried and for this reason, it was decided to test this pipe using surface excavation. A bulk sample of 130m 3 of weathered RVK material was excavated from Se222 and trucked to the Company s DMS plant for processing. This sample is still being processed. No diamonds have been recovered at this stage. A number of test pits were excavated on Se222 and Calonda-type gravels were identified in several of these. A 120m 3 sample of this material was excavated and trucked to the DMS site. This sample has been designated BLK_10 and is awaiting processing. Figure 3 Core drilling and pitting on the Se222 kimberlite Flooding and other logistical issues caused lengthy delays in moving the Bauer rig from Se222 to the next site, Se223. Se223 is a poorly defined magnetic target located about 2km west of Se222 (Figure 2) and close to Lucapa s diamond processing facility. The anomaly lies within the area where magnetic data is considered unreliable. A core hole was drilled into the Se223 magnetic anomaly (Figure 1) but kimberlite was not recognised. Further work on this target has been postponed until the new magnetic survey is completed in The Bauer drill is currently being moved to the Se002 target located (Figure 4), about 2km west of the DMS plant. Se002 was not originally on the list of 61 priority targets, but was prioritised because of its proximity to the alluvial samples hosting the large diamonds, as well as its location adjacent to an existing all-weather road. The next kimberlite target scheduled to be tested is Se220, which covers approximately ~35 ha and is located 1.5km west of the DMS plant. Lucapa Diamond Company Limited abn Page 4
5 Figure 4 Priority kimberlite targets REVIEW OF PRIORITY KIMBERLITE TARGETS Lucapa is currently reviewing its priority kimberlite list in light of the large diamonds recovered from the alluvial sampling program. Large diamonds (like the carat stone recovered from BLK_08 and the 53.2 carat stone from BLK_06) are rarely transported far from their source, so it is thus likely that the kimberlite or kimberlites which shed these diamonds are located within a few kilometers of where they were recovered. During the original aeromagnetic survey flown in 2008, hostile activities by garimpeiros (artisanal miners) meant that a ~70km 2 strip covering most of the current alluvial sampling area (Figure 5) could not be covered, or otherwise contained data considered unreliable. The garimpeiros have now largely left the area and Lucapa has recently signed a contract with Fugro Airborne Surveys to re-fly the ~70km 2 strip. This work will form the initial part of a larger aeromagnetic survey that will also cover the remaining two-thirds of the Lulo concession not flown during the 2008 program. While the timing of this survey is dependent on weather conditions, Fugro expects to commence flying in late March Lucapa will complete its review of its priority kimberlite list when results of the new aeromagnetic survey become available. Lucapa Diamond Company Limited abn Page 5
6 Figure 5 Fugro aeromagnetic areas ALLUVIAL DIAMOND PROGRAM While Lucapa is continuing to evaluate diamondiferous alluvial gravels within the valley of the Cacuilo River, the program is considered of lower priority than the kimberlite exploration program. Two alluvial samples (BLK_09 and BLK_10) were excavated during the reporting period. Both samples are located near the Se222 kimberlite (Figure 2), with the Calonda-style gravels identified during the kimberlite evaluation program. The Company anticipates that other alluvial deposits will be identified during the kimberlite exploration program and these gravels will also be sampled through the DMS plant to test for diamonds. Processing of the relatively small BLK_09 sample was completed during the quarter. This sample is located immediately to the south of Se222 in a creek that also drains Se12. BLK_09 comprised 53m 3 and processing was completed late in October Two diamonds weighing a total of 0.45ct were recovered from the sample giving it a grade of 0.84 carats per 100m 3. Details of the sample processing are presented in Table 1. BLK_10, another Calonda-style gravel, was excavated from gravels overlying the Se222 kimberlite (Figure 2). Approximately 120m 3 of material was collected and this was trucked to the DMS facility for processing. This sample has not yet been processed. Lucapa Diamond Company Limited abn Page 6
7 Sample Gravel Volume Size Distribution 1 Number of Diamond Weight Average Largest Size Grade 2 Diamond Number (m 3 ) <1ct 1-2ct 2-5ct >5ct Diamonds (ct) (ct) (ct/100m 3 ) (ct) BLK_ <0.5ct Notes: 1) Lucapa is treating gravel in the +2mm -34mm size range. 2) Grade is quoted in carats per 100 cubic metres of gravel. Table 1 Figure 6 Alluvial bulk sample BLK_10 LOGISTICS Another milestone achieved during the Quarter was the arrival of a fleet of additional earth moving equipment purchased by the Company for its kimberlite and alluvial diamond programs. The Caterpillar earth moving equipment included a bulldozer, excavator, articulated dump truck, backhoe and front end loader and was imported from South Africa. In addition, Lucapa has also recently acquired a tri-axle flat-bed trailer, which was sourced locally. Once in service, this flat-bed trailer will allow the Company to move its earth-moving fleet around the concession much quicker. This process has previously been hampered by the limited availability of flat-bed transporters in the district. Earlier in 2012, Lucapa purchased a new 50 tonne per hour DMS plant for the Lulo Project from Bond Industries in South Africa. The front end of this plant (feed hopper, conveyors, scrubber etc) was delivered to site during the Quarter, with the completed DMS module and other sections of the plant expected to arrive early in Lucapa Diamond Company Limited abn Page 7
8 The new DMS plant will be assembled and commissioned on site and will be used to process the much larger bulk samples required for diamond resource evaluation. Importantly, the new 50tph DMS plant has been designed to cope with clayey samples. The scrubbing capacity of the front end should enable 50tph throughput with clayey samples and much higher throughput of less clayey samples. The large scrubber will also facilitate rapid and efficient treatment of weathered kimberlitic material. Earth moving equipment arriving at Lulo Lucapa Diamond Company Limited abn Page 8
9 CORPORATE In December 2012, Lucapa successfully completed a capital raising of $5.73 million, less costs. This capital raising leaves Lucapa well positioned to pursue its kimberlite and alluvial diamond programs, complete the new aeromagnetic survey and to fund licence renewals, applications for which have been lodged by the Company. The capital raising involved a pro-rata non-renounceable 1for 4 entitlement issue of ordinary Lucapa shares at an issue price of $0.009 per share. The Company received acceptances totalling $2,508,324 from eligible shareholders. On 13 December 2012, the Company advised that the shortfall of approximately $3.22 million had been placed with professional and sophisticated investors in consultation with lead manager Indian Ocean Capital Pty Ltd. On 18 October 2012, the Company s name changed from Lonrho Mining Limited to Lucapa Diamond Company Limited to better reflect its interests and operations near Lucapa in eastern Angola. Lucapa established an Employee Option Plan (EOP) during the Quarter as an incentive to help align the long term interests of key employees with those of management and shareholders. A total of 62.5 million unlisted $0.019 options were issued during the period and a further tranche of 62.5 million unlisted $0.019 options is to be granted to participants of the EOP, subject to shareholder approval at a meeting to be held on 21 December Further movements in the Company s issued capital related to million unlisted $0.50 options which expired without exercise and 30,000 listed $0.02 options which were exercised during the period. For further information, contact: MILES KENNEDY MANAGING DIRECTOR LUCAPA DIAMOND COMPANY LIMITED Tel: Competent Person s Statement - Information in this announcement that relates to exploration results, mineral resources or ore reserves is based on information compiled by David Jones BSc (Hons) MSc who is a Corporate Member of the Australasian Institute of Mining and Metallurgy. Mr Jones is a director of Lucapa Diamond Company Limited. Mr Jones has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves. Mr Jones consents to the inclusion in the announcement of the matters based on this information in the form and context in which it appears. Lucapa Diamond Company Limited abn Page 9
For personal use only. A DIAMOND EXPLORER WITH WORLD CLASS POTENTIAL Investor Presentation December 2011
A DIAMOND EXPLORER WITH WORLD CLASS POTENTIAL Investor Presentation December 2011 The writer believes that Angola is one of the most attractive diamond exploration targets in the world and that the Lulo
More informationASX Release 2 December 2010 LONRHO MINING LIMITED (ASX: LOM) QUARTERLY REPORT FOR PERIOD ENDED 30 NOVEMBER 2010 HIGHLIGHTS
ASX Release 2 December 2010 LONRHO MINING LIMITED (ASX: LOM) HIGHLIGHTS Lulo Diamond Concession, Angola (LOM 39%) Impressive results encountered from the first alluvial gravels treated through the Dense
More informationFor personal use only. An Exciting New Diamond Province
An Exciting New Diamond Province Investor Presentation December 2013 Slide: 2 Company Overview Chairman: Gordon GILCHRIST Former MD of Argyle Diamonds and head of Rio Tinto s global diamond operations
More informationHighlights. Wa Project. Kandia Prospect. South Wa. Julie West Jang Trend. Corporate
29 th July 2010 June December 2010 Quarterly Report Report 2008 Highlights Wa Project Kandia Prospect» RC drilling defines open ended zones of sediment hosted gold mineralisation at the site of the Kandia
More informationFor personal use only
24 October 2018 Pensana metals Quarterly Activities Report For the Period Ended 30 September 2018 Pensana Metals Ltd (ASX: PM8) (the Company or Pensana) is pleased to present its quarterly activities report
More informationFor personal use only
DIRECTORS Mr Martin Blakeman Executive Chairman Mr Winton Willesee Non-Executive Director Mr Eric de Mori Non-Executive Director COMPANY SECRETARY Mr Winton Willesee ASX Release 28 August 2012 Newera Commences
More informationFor personal use only
18 April 2018 ASX Announcement DRILLING UNDERWAY AT SLATE DAM GOLD PROJECT HIGHLIGHTS 2nd Phase Drilling Program underway at Slate Dam - 9 RC holes for ~1,000m completed to date Program designed to expand
More informationFor personal use only
HIGHLIGHTS THIS QUARTER EXPLORATION Very strong zinc-silver-lead (Zn-Ag-Pb) mineralisation confirmed in 2 sampling programs (Program 1 and Program 2) at the Riqueza Project. Two highly prospective Zn-Ag-Pb
More informationStrong gold values at Drake s Seimana Gold Project in Guinea
ASX Announcement 30 July 2012 Strong gold values at Drake s Seimana Gold Project in Guinea Major regional soil & termite mound geochemical programme completed at Seimana, Guinea Many strong gold anomalies
More informationFor personal use only
INTEGRATED RESOURCES GROUP LIMITED REPORT ON ACTIVITIES, MARCH 2012 QUARTER HIGHLIGHTS Announcement of company transforming Maryborough Basin project acquisition, expected to be completed in June 2012.
More informationRC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season
29 th October 2010 September December Quarterly 2010 Quarterly Report 2008 Report Highlights RC drilling begins at Akoko Project marking commencement of 2010/11 exploration field season Major drill programs
More informationNi-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED
ABN 28 122 180 205 www.juttholdings.com ASX ANNOUNCEMENT (ASX Code: JUT) 29 February 2008 Ni-Cu-Au-U TYPE AIRBORNE ANOMALIES OUTLINED Tay - Munglinup Project: near Ravensthorpe in the SW of Western Australia
More informationMAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY
24 April 2013 ASX: AOH, FSE: A2O MAJOR EXPLORATION PROGRAMME TO COMMENCE AT ROSEBY 1,000 hole RAB drilling programme directed at large copper-gold anomalies Altona Mining Limited ( Altona ) has commenced
More informationFor personal use only
ASX Release 7 December 2016 t 08 9485 2836 10 Outram Street f 08 9321 6571 WEST PERTH WA 6005 PO Box 963 WEST PERTH WA 6872 www.meteoric.com.au METEORIC RESOURCES NL abn 64 107 985 651 Webb Diamond Project
More informationFor personal use only
Niuminco Group Suite 50, 14 Narabang Way, Austlink Corporate Centre, Belrose NSW 2085, Australia Tel: (02) 9450 0828 Fax: (02) 9450 0877 Email: info@niuminco.com.au ABN 44 009 163 919 QUARTERLY ACTIVITIES
More informationHERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA
ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire
More informationLUCAPA DIAMOND COMPANY LIMITED (ASX: LOM) QUARTERLY REPORT FOR PERIOD ENDED 31 DECEMBER 2013
ASX Announcement 30 January 2014 LUCAPA DIAMOND COMPANY LIMITED (ASX: LOM) QUARTERLY REPORT HIGHLIGHTS Lulo Diamond Concession, Angola Two more large exceptional diamonds - weighing 95.45 carats and 32.2
More informationFOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE
ASX ANNOUNCEMENT 2 MARCH 2018 FOUR EAGLES MINERALISATION REPORT ACCEPTED AND DRILLING TO RECOMMENCE Mineralisation Report for Four Eagles Gold Project accepted by DEDJTR RC and Diamond drilling to recommence
More informationThe Company was admitted to the Official List on 12 November 2010 and its shares commenced trading
ASX ANNOUNCEMENT ST GEORGE MINING LIMITED ASX: SGQ ACN 139 308 973 Level 1, 115 Cambridge Street PO Box 1305, West Leederville WA 6007 www.stgeorgemining.com.au Phone +618 9322 6600 Facsimile +618 9322
More informationFor personal use only
17 December 2012 ASX ANNOUNCEMENT Mining at Zeta Pit ASX/BSE: DML MARKET CAPITALISATION Shares on Issue 487m Share Price A$1.62 Market Cap A$789m Cash (7 Dec) US$72.8m Debt (7 Dec) US$205m ABN 29 104 924
More informationP ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT
2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter
More informationFor personal use only
ASX and Media Release 22 June 2018 CÁRMENES COBALT-COPPER PROJECT SPAIN DRILLING APPROVALS GRANTED AND NEW HIGH- PRIORITY TARGETS GENERATED NEAR PROFUNDA COBALT-COPPER MINE ACN 143 042 022 Suite 1, 6 Richardson
More informationSepola Project Area in Mali Extended
ASX Release 4 June 2009 Golden Rim Resources Ltd ABN 39 006 710 774 www.goldenrim.com.au Head Office Level 2 10 Outram Street WEST PERTH WA 6872 AUSTRALIA T: + 61 8 9481 5758 F: + 61 8 9481 5759 Exploration
More informationKURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE
ABN 61 119 966 353 17 June 2008 ASX RELEASE KURUNDI PROJECT EXPANDED TO INCLUDE PHOSPHATE Northern Uranium Limited (ASX: NTU) will immediately commence an investigation of phosphate potential at its Kurundi
More informationNew Drilling Program Commences at Mutiny s Deflector Deposit
New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern
More information704,000 OUNCE MIYABI GOLD PROJECT UPDATE
704,000 OUNCE MIYABI GOLD PROJECT UPDATE ASX/ RELEASE 21 April 2016 ASX code RVY Board of Directors: Geoff Gilmour Managing Director Greg Cunnold Technical Director Graeme Clatworthy Non-Executive Director
More informationASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018
ASX ANNOUNCEMENT Date: 03 October 2018 Number: 604/031018 TRIAL BULK SAMPLING PROGRAMME COMPLETED AT BLACKRIDGE CONGLOMERATE-HOSTED GOLD PROJECT QUEENSLAND Approx 8.5 tonnes of samples collected covering
More informationJune 2017 Quarterly Report
ASX ANNOUNCEMENT Date: 31 July 2017 June 2017 Quarterly Report Victory Mines Limited (ASX:VIC) ( Victory or the Company ) provides a review of its activities during the June 2017 quarter. Exploration Western
More informationASX Announcement. New economic gold results confirm Dave East as an exciting new discovery. Highlights. 4 July 2011
4 July 2011 ASX Announcement New economic gold results confirm Dave East as an exciting new discovery Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com
More informationQuarterly Report Quarter ended 30 June 2010
28 July 2010 The Company Announcement Officer Australian Securities Exchange Ltd via electronic lodgement Quarterly Report Quarter ended 30 June 2010 Highlights PhosEnergy - Uranium Extraction Technology
More informationMore growth at Wa Gold Project as Julie-Collette resource increases to 410,700 ounces
ASX / Media Release ASX Code AZM Friday 10 th September 2010 More growth at Wa Project as Julie-Collette resource increases to 410,700 ounces Further rise expected www.azumahresources.com.au Investment
More informationHIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT
The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 22 December 2010 HIGH-GRADE GOLD MINERALISATION CONTINUES ALONG STRIKE AT THE BODDINGTON SOUTH GOLD PROJECT New true-width
More informationASX announcement. Mylo-Frontier Pilbara Gold Project acquisition. 27 November Summary
ASX announcement 27 November 2017 Andromeda Metals Limited ABN: 75 061 503 375 Mylo-Frontier Pilbara Gold Project acquisition Corporate details: Summary ASX Code: ADN Cash: $0.546 million (at 30 June 2017)
More informationAdditional Significant Gold Intercepts Obtained in Sweden
ASX/Media Announcement 18 November 2009 Additional Significant Gold Intercepts Obtained in Sweden Golden Rim Resources Ltd (ASX: GMR, Golden Rim) today announced it had received additional significant
More information60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.
30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the
More informationMARCH 2012 QUARTERLY REPORT. Highlights. Exploration Activities. Wyloo Iron Ore & Gold Project. Fast Facts
MARCH 2012 QUARTERLY REPORT Highlights Magnetic and radiometric survey acquired for Wyloo Anomalous gold zones identified at Wyloo from desktop study Ongoing exploration program completed at Wyloo Application
More informationHigh Grade Gold Intercepts at Bangaba
20th March 2012 ASX Announcement High Grade Gold Intercepts at Bangaba Level 2, 9 Colin Street West Perth WA 6005 ABN 11 127 171 877 p (08) 9216 1000 f (08) 9481 7939 w www.predictivediscovery.com e info@predictivediscovery.com
More information$2.5 Million Resource Drilling Program Commences at Siberia Mining Centre
ASX ANNOUNCEMENT 14 June 2016 $2.5 Million Resource Drilling Program Commences at Siberia Mining Centre Eastern Goldfields Limited (ASX: EGS) (Eastern Goldfields or the Company) is pleased to announce
More informationASX RELEASE / MEDIA RELEASE 2,810 ppb gold in shallow auger samples Four new parallel zones defined up to 1500m in strike
ACN 121 539 375 Principal Office: Level 2, 23 Ventnor Avenue West Perth 6005 Western Australia Phone: + 61894817344 Fax: + 61894817355 Email: info@westafricanresources.com Web: www.westafricanresources.com
More informationNew Zone of High Grade Gold Discovered at Balogo
ASX/Media Announcement 12 November 2013 New Zone of High Grade Gold Discovered at Balogo A broad zone of high grade gold mineralisation (Panga Lodes) has been discovered 600m north of the Netiana Lodes.
More informationFor personal use only
Quarterly Report for quarter ended 30 September 2016 Meteoric Resources NL ABN 64 107 985 651 ASX Code: MEI Ground Floor 10 Outram Street West Perth WA 6005 T +61 8 9485 2836 F +61 8 9321 6571 E info@meteoric.com.au
More informationNews Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY
June 29, 2007 ASX & TSX: WSA News Release DRILLING STEPPED UP AT FORRESTANIA NICKEL PROJECT AND UPDATE ON DIGGERS SOUTH PRE - FEASIBILITY STUDY The Board of Western Areas is pleased to announce that the
More informationASX Announcement 24 December Drilling results confirm depth potential of Lamboo Project
Bulletin Resources is the 100% owner of the Lamboo and Golden Crown Gold Projects located near Halls Creek in the East Kimberley region of Western Australia. The projects have a combined open pit and underground
More informationOvoot Coking Coal Project (100%)
NEW MAJOR MONGOLIAN COAL RESOURCE Ovoot Coking Coal Project (100%) ASX Announcement 13/10/2010 14/10/2010 ASPIRE MINING LIMITED ABN 46 122 417 243 Unit 2, 454 Roberts Road Subiaco, WA, 6008 P.O. Box 1918
More informationFor personal use only
MEDIA RELEASE 10 October 2016 CITADEL PROJECT 2016 RC DRILLING PROGRAMME Highlights Reverse-Circulation (RC) drilling programme up to approximately 6,000m testing 20km corridor of Induced Polarisation
More informationHits of up to 123gpt show Chesterfield emerging as a high grade gold project
ASX ANNOUNCEMENT 22 August 2013 General Mining Corporation ABN: 95 125 721 075 Hits of up to 123gpt show Chesterfield emerging as a high grade gold project Prospects are ideally located close to existing
More informationKing of the Hills Gold Project, Leonora, to commence production in Q2 2011
King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher
More informationNew Gold Anomalies Outlined at Yako, Burkina Faso
ASX/Media Announcement 21 March 2013 New Gold Anomalies Outlined at Yako, Burkina Faso Significant new gold-in-soil anomalies identified. Highly-anomalous results with auger samples returning grades up
More informationTANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE
ASX ANNOUNCEMENT 21 APRIL 2017 TANDARRA GOLD PROJECT DRILLING COMMENCES AND FOUR EAGLES GOLD PROJECT DRILLING UPDATE RC Blade drilling commences at Tandarra Gold Project Up to 3,800 metres planned in 67
More informationFor personal use only
MEDIA RELEASE 12 April 2017 CITADEL PROJECT RIO TINTO FUNDED 2017 EXPLORATION PROGRAMME Highlights Proposed Rio Tinto Exploration Pty Limited ( Rio Tinto ) funded Exploration Programme for 2017 calendar
More informationFor personal use only
ACN 092 471 513 28 November 2016 ASX Release PENNY S FIND GOLD MINE UPGRADED POTENTIAL FOR MINE LIFE EXTENSION Empire Resources Limited ( Empire, ASX code: ERL) is pleased to give an update on the progress
More informationThe Manager Companies ASX Limited 20 Bridge Street
ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors
More informationFor personal use only
Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory
More informationFor personal use only
ASX Announcement 3 January 2014 Lucapa Diamond Company Limited (ASX: LOM) is pleased to announce the recovery of a 32.2 carat Type 2A diamond from its Lulo Concession in Angola. The D colour, 32.2 carat,
More informationNew Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso
ASX/Media Announcement 24 May 2013 New Zone of High Grade Gold Mineralisation Discovered at Balogo, Burkina Faso A new zone of high grade gold mineralisation has been discovered 1km NE along strike from
More informationFor personal use only
MOZAMBI COAL LTD (ASX: MOZ, Company or Mozambi ) ASX RELEASE 7 SEPTEMBER 2011 EXPLORATION PROGRAMME UPDATE is pleased to announce an update on exploration activities in Mozambique including the results
More informationFor personal use only
13 October 2011 ASX Announcement MOD TO EXPLORE NEW ZEALAND S LARGEST UNDEVELOPED GOLD RESOURCE (ASX: MOD) MOD to earn up to 80% of New Zealand s largest undeveloped gold resource, Sams Creek Sams Creek
More informationAcquisition agreement to move to 100% ownership of the Ashford Coking Coal Project
Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 GPO Box 1164, Brisbane QLD 4001 Telephone: 07 3108 3500 Fax: 07 3108 3501 Email: admin@lanewayresources.com.au www.lanewayresources.com.au ASX ANNOUNCEMENT
More informationQUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018
ASX Announcement ASX & NSX: DYL / OTCQX: DYLLF 23 October 2018 QUARTERLY ACTIVITIES REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2018 HIGHLIGHTS REPTILE PROJECT New zone of significant uranium mineralisation
More informationGOULAMINA DRILLING AND GENERAL PROGRESS UPDATE
21 November 2017 GOULAMINA DRILLING AND GENERAL PROGRESS UPDATE HIGHLIGHTS RC drilling at Danaya and Yando completed. RC drilling at Danaya intersects very wide (>117m) spodumene bearing pegmatite zone.
More informationRock chip sampling confirms high grade quartz vein 500m long and up to 20m wide
9 th July 2008 Rock chip sampling confirms high grade quartz vein 500m long and up to 20m wide Castle Minerals Limited (ASX:CDT) is pleased to advise that further sampling at its Wa project has confirmed
More informationASX Release. 16 December 2010 LIMITED. EXPLORATION UPDATE Highlights
ASX Release EXPLORATION UPDATE Highlights Bonsiega Joint Venture tenements minimum expenditure commitment met by 30 November 2010 Commencement of power auger bedrock drilling program at Fouli Prospect
More informationLake Resources N L, Quarterly Report, January - March 2013 LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013
LAKE RESOURCES NL QUARTERLY REPORT JANUARY MARCH 2013 SUMMARY During the quarter ended 31 st March 2013, no exploration work was undertaken in Pakistan pending the granting of new security clearances for
More informationASX announcement 16 May 2016
ASX announcement 16 May 2016 Adelaide Resources Limited ABN: 75 061 503 375 Corporate details: ASX Code: ADN Cash: $0.701million (at 31 Mar 2016) Issued Capital: 357,922,352 ordinary shares 37,222,104
More informationCORPORATE UPDATE. Feasibility Study being finalised for completion towards the end of April.
16 March 2018 Company Announcement Officer ASX Limited 20 Bridge Street SYDNEY NSW 2000 Highlights CORPORATE UPDATE Inaugural Bowdens Reserve Statement due early April. Feasibility Study being finalised
More informationFor personal use only
15 October 2010 ASX/Media Release 17 July 2012 Paste Fill Approval and New Drilling Program at Dargues Reef Initial focus on high priority near-mine gold targets Approval received for use of paste-fill
More informationDIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT
ASX ANNOUNCEMENT 17 OCTOBER 2017 DIAMOND AND AIR CORE DRILLING TO COMMENCE ON WHITELAW GOLD BELT Reconnaissance Air Core drilling to commence at Macorna Bore and Sebastian Projects Diamond drilling planned
More informationFor personal use only
22 May 2012 Thick, high-grade copper intersection from First Extension Hole Assays at A-Zone, reaffirming the growth potential of the Viscaria Project Highlights Drill hole VDD0125 intersects 18.6m @ 1%
More informationROX DEFINES STRONG IP ANOMALIES AT PHA LUANG
ASX/MEDIA RELEASE ROX DEFINES STRONG IP ANOMALIES AT PHA LUANG Rox Resources (ASX: RXL, Rox ) has completed Induced Polarisation ( IP ) surveys at its Pha Luang zinc project in Laos. The survey was conducted
More informationEXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO
ASX/Media Announcement 26 April 2017 EXPLORATION ACTIVITY TO RECOMMENCE AT KOURI GOLD PROJECT IN BURKINA FASO Exploration program targeting the definition of a maiden JORC Mineral Resource by the end of
More informationEXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT
The Manager ASX Company Announcements PO Box H224, Australia Square Sydney NSW 2001 20 September 2010 EXPLORATION UPDATE: BODDINGTON SOUTH GOLD PROJECT AND DOOLGUNNA STATION PROJECT Boddington South Gold
More informationFor personal use only
ASX/Media Announcement 16 May 2011 Major Copper-Gold Discovery at Balogo in Burkina Faso Broad high grade copper and gold intercepts obtained from reverse circulation drilling program at the Balogo Project.
More informationFor personal use only
23 September 2013 Exploration Target for Sambas Project set at 58,500 to 87,750 Tonnes of Tin 1 Following a review of available geological and government data, Stratos Resources Ltd (ASX: SAT) is pleased
More informationLATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT
ASX ANNOUNCEMENT 8 March 2011 LATEST DRILL RESULTS REVEALS MINERALISATION OPEN AT STRIKE AND DEPTH AT KATANNING GOLD DEPOSIT New true-width intercepts along strike from Katanning Deposit include: o BSRC0050-10m
More informationFor personal use only
12 September 2012 ASX RELEASE ASX Code: WAC FIRST PASS FIELD WORK COMPLETED AT PERU IOCG TARGETS Site visits and reconnaissance sampling has been completed at the Yauca and Chaparra Iron Oxide Copper Gold
More informationEXCELLENT FIRST DRILL RESULTS FROM WELD RANGE
27 th October 2008 EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE Atlas Iron Limited (ASX Code: AGO) is pleased to announce a number of high grade results from the first drilling programme completed at
More informationHIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT
8 February 2016 HIGHLY SUCCESSFUL SEISMIC SURVEY DOUBLES SIZE OF DEEP PALAEOVALLEY AT LAKE WELLS POTASH PROJECT Results further confirm Lake Wells Potash Project has potential to host a major potash resource
More informationDiversification into the exciting South Africa Platinum Industry
MORNING STAR HOLDINGS (AUSTRALIA) LTD ASX/Media Release 18 November 2009 Key Points Diversification into the exciting South Africa Platinum Industry The company is completing the acquisition of three platinum
More informationFor personal use only
March 22 nd, 2011 ASX & TSX: WSA News Release MUSTANG MINERALS ANNOUNCES NEW PLATINUM AND PALLADIUM DISCOVERY IN MANITOBA Mustang Minerals Corp ( Mustang ) has today announced a potentially significant
More informationBass Metals records further positive drill results & progress at 3 prospects.
16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret
More informationNew High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
More informationNew zones of mineralisation found close to flagship deposits at Wa Gold Project
New zones of mineralisation found close to flagship deposits at Wa Project ASX / Media Release ASX Code AZM Tuesday 6 th July 2010 Aircore drilling program commences at Kjersti prospect RC drilling continues
More informationFor personal use only
6 February 2012 Australian Securities Exchange Exchange Centre 20 Bridge Street Sydney NSW 2000 SIGNIFICANT MAIDEN JORC COMPLIANT RESOURCE FOR EUCLA WEST MINERAL SANDS PROJECT Forge Resources Ltd (ASX:FRG,
More informationSECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT
ABN 17 124 444 122 9 November 2009 SECOND ADVANCED GOLD PROJECT IDENTIFIED AT THREE RIVERS PROJECT HIGHLIGHTS Non-JORC code compliant gold resource of 553,000t @ 2.5g/t gold identified as being hosted
More informationSITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA
ASX Release 4 th November 2009 SITE WORKS COMMENCE AT A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce commencement of site works at the A1 Gold Mine in eastern
More informationFor personal use only
ASX/MEDIA ANNOUNCEMENT 16 NOVEMBER 2012 ASX Code: HOR Management Mr Jeremy Shervington Non Executive Chairman Mr Neil Marston Managing Director Mr Michael Fotios Non Executive Director Mr Stuart Hall Non
More informationASX Announcements & Media Release
ASX Announcements & Media Release October 15, 2010 Fast Facts ASX Code: RNS Shares on issue: 62.2 million Cash at bank: $5 million (Sept 2010) Board & Management Rick Hart, Chairman Justin Tremain, Managing
More informationFor personal use only
About Artemis Resources Artemis Resources is an ASX-listed mineral exploration company with a focus on gold: Key Projects Gold Mt Clement (WA) Yandal (WA) Rare Metals Yangibana (WA) Buchanan's Creek (QLD)
More informationAdditional significant gold and copper intercepts obtained in Sweden
18 November 2009 Additional significant gold and copper intercepts obtained in Sweden Drake Resources (ASX: DRK, Drake ) is pleased to announce that additional significant assays for the drilling programme
More informationASX/Media Announcement
ASX/Media Announcement 25 March 2013 MAIDEN HIGH-GRADE JUDY LODE RESOURCE INDICATES POTENTIAL TO INCREASE ANDY WELL MINE LIFE 106,000 ounce high-grade resource (Indicated & Inferred) Judy South (137,000t
More informationASX Release and Media Announcement 27 September Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion
ASX Release and Media Announcement 27 September 2011 Central Eyre Iron Project 2011 Stage VI Drilling Programme Completion Iron Road Limited (Iron Road, ASX: IRD) is pleased to advise that Stage VI drilling
More informationFor personal use only
BOARD OF DIRECTORS Mr Oscar Aamodt Non-Executive Chairman Ms Sofia Bianchi Non-Executive Director Mr Lindsay Dudfield Non-Executive Director Mr Anthony Ho Non-Executive Director ISSUED CAPITAL SHARES 156,852,955
More informationCANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights
Canyon Resources Limited ACN 140 087 261 Suite 2 Ground Floor 10 Outram Street West Perth WA 6005 ASX RELEASE 2 September 2010 CANYON TO ACQUIRE TWO GOLD PROJECTS IN BURKINA FASO Highlights Canyon has
More informationFor personal use only
11 MAY 2011 ASX : NAE ASX ANNOUNCEMENT Acquisition of Coal Concessions in Cesar Basin, Colombia New Age Exploration Limited ( NAE ) announces that it has entered into binding agreements to acquire two
More informationMore High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso
ASX/Media Announcement 10 July 2012 More High Grade Gold Intercepts from the Netiana Lodes at Balogo, Burkina Faso New reverse circulation (RC) hole intersections include: o 12m at 20.5 g/t gold from 73m,
More information2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage
ASX, AIM and Media Release 8 October Mineral Resources and Ore Reserves Statement SUMMARY The recently acquired Toliara Project has an estimated Mineral Resource of 857 million tonnes at 6.2% Heavy Mineral
More informationATLAS GOLD LIMITED ABN QUARTERLY REPORT FOR THE PERIOD ENDED 31 MARCH 2005
ABN 63 110 396 168 FOR THE PERIOD ENDED 31 About Atlas Gold Limited The Company has four projects at varying stages of exploration located at Farrel Well, Pardoo, Mt Minnie and Pearana in the Pilbara region,
More informationROE HILLS COBALT AND GOLD DRILLING ADVANCES
ASX ANNOUNCEMENT 22 June 2017 ROE HILLS COBALT AND GOLD DRILLING ADVANCES Aircore drilling completed to test ROE-1 cobalt prospect with assays awaited; RC drilling now underway targeting three high-priority
More informationAirborne EM Survey Confirms Multiple VMS Targets at Collerina
ASX Announcement 2 February 2017 Airborne EM Survey Confirms Multiple VMS Targets at Collerina A 600 line kilometre VTEM Max helicopter borne geophysics survey has been completed over the 25 kilometres
More informationOption agreement with Randgold set to commercialise Massigui Gold Project
ASX Announcement 4 November 2016 Option agreement with Randgold set to commercialise Massigui Gold Project Option agreement with the Morila mine-operator provides potential low risk and low cost processing
More information