SIMO CASE STUDY GEOVIA USER CONFERENCE PERTH CHRIS JAMES 31 MAY 2018

Size: px
Start display at page:

Download "SIMO CASE STUDY GEOVIA USER CONFERENCE PERTH CHRIS JAMES 31 MAY 2018"

Transcription

1 SIMO CASE STUDY GEOVIA USER CONFERENCE PERTH CHRIS JAMES 31 MAY 2018

2 2 [GEOVIA: SIMO] [May 2018]

3 WHAT IS VALUE Important to understand potential levers that drive value Value What is it? NPV IRR Payback Max Negative Positive Cash Flow Reserves / Resources Other? All or none? 3 [GEOVIA: SIMO] [May 2018]

4 AGENDA 1. Project History 2. Base Case (Milawa) and SIMO 3. Results and Learnings 4 [GEOVIA: SIMO] [May 2018]

5 HISTORY Massive low grade deposit, has to be large scale Previous studies large scale, large volumes (+23Mtpa), capital intensive Resulted in marginal economics Previous small scale studies did not offer good economics do we understand why? 5 [GEOVIA: SIMO] [May 2018]

6 WHAT DID WE DO DIFFERENT Marginal economics, unaffordability led to rethink Challenged beliefs to see if opportunity exists for smaller scale with strong economics change in mining optimisation methodology 6 [GEOVIA: SIMO] [May 2018]

7 WHAT DID WE DO DIFFERENT AIM TO INCREASE VALUE Geology Costs OPEX CAPEX - Mill throughput / size CAPEX - Infrastructure layout Evaluation method Milawa SIMO 7 [GEOVIA: SIMO] [May 2018]

8 BASE CASE (MILAWA) Generated base case with nested pit shells NPV Pushbacks 3 Pushbacks Mining Width with selected pushbacks Applied limits (mining, processing, VAR) Milawa NPV & Balanced 8 [GEOVIA: SIMO] [May 2018]

9 BASE CASE MILAWA SCHEDULE Three pushbacks chosen Shell selection did not have large influence on results Common high-wall 9 [GEOVIA: SIMO] [May 2018]

10 BASE CASE MILAWA SCHEDULE Mining Movements Mining Movements (t) Millions [GEOVIA: SIMO] [May 2018] waste tonne tonne input Milled Tonnes (t) Millions Feed Grade (g/t) Milled Tonnes Relatively smooth mining profile 15Mtpa mill throughput Mining capped at ~25 Mtpa

11 SIMO USED TO INCREASE VALUE Schedule (Mining Rates and Pushback Sequencing) Cut-off Grades (Grade streaming / High grading) Used SIMO Stockpiles 11 [GEOVIA: SIMO] [May 2018]

12 HOW DID SIMO ADD VALUE SIMO optimises all of these levers simultaneously Split out to show incremental value 12 [GEOVIA: SIMO] [May 2018]

13 SCHEDULE MINING RATES Milawa Balanced schedule up to ~25 Mtpa Incrementally expanded mining capacity by adding additional fully utilised fleet Used 54 Mtpa (combination of value, fleet selection and practicality) 114% 112% 110% 108% 106% 104% 102% 100% 98% 96% Milawa (~25Mt) Mining Limit and NPV 25Mtpa 27Mtpa 36Mtpa 45Mtpa 54Mtpa 63Mtpa 13 [GEOVIA: SIMO] [May 2018]

14 CUT OFF GRADES Blend Bins and NPV Milawa works with economic cut-off grade and feeds all above 120% 115% SIMO groups into defined blend bins, and feeds to gain best value and stockpiles material of future value 110% 105% Started with large number bins, and refined to 5 bins 100% P 1 P 2 P 3 P 4 P 5 P 6 P 7 P 8 P 9 P 10 P 11 P 12 P 13 P 14 P 15 Bin Bin ,260 1,601, ,930 1,254, Bin Bin Bin Bin Bin ,290 0 Bin , ,148 Bin ,563 0 Bin ,290 13,185 Bin ,404,829 1,056,558 Bin ,551 0 Bin ,641,031 0 Bin ,579, ,884 0 Bin ,004,515 5,892,415 0 Bin ,245 1,727, ,406, Bin , ,068 13,185 96, Bin , Bin , , Bin ,120 16, ,754 2,111, Bin , ,626 30, Bin ,417 76,993 1,353, Bin , , , Bin ,778 17, Bin , , Bin , Bin , Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin Bin % Milawa 50 Bins 25 Bins 5 Bins P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 Bin Bin ,415,228 15,000,000 1,584,773 0 Bin ,137,450 1,239,257 4,540,463 2,755, Bin Bin Material from stockpile 14 [GEOVIA: SIMO] [May 2018]

15 STOCKPILES 120% Stockpile Size and Value Limited stockpile space due to terrain 115% 110% Tested unlimited capacity to no capacity Can fit 30Mt stockpile 105% 100% 95% 90% Milawa (none) Unlimited (~135Mt) 120Mt 60Mt 30Mt 15Mt 0Mt Stockpile Size and Mine Life Mine Life Milawa (none) Unlimited (~135Mt) 120Mt 60Mt 30Mt 15Mt 0Mt 15 [GEOVIA: SIMO] [May 2018]

16 RESULTS Increased mining movements Increased early feed grade Shorter mine life (although have expansion potential) Mining Movements and Feed Grade Mining Movements and Feed Grade Milled Tonnes (t) Millions Milled Tonnes (t) Millions input t waste t grade input s'pile t input t ex s'pile waste t s'piled t grade input 16 [GEOVIA: SIMO] [May 2018]

17 RESULTS NPV 14% Brought forward cash flow Increased cash flow in first 5 years by 36% Milawa SIMO Increased NPV by 14% Cum. Disc. Cash Flow Cum. Disc. Cash Flow Cumulative Cash Flow (disc.) Cumulative Cash Flow (disc.) 36% [GEOVIA: SIMO] [May 2018]

18 RESULTS Each element incrementally increased NPV NPV% Milawa 18 [GEOVIA: SIMO] [May 2018]

19 RESULTS Each element incrementally increased NPV NPV% Schedule Milawa 19 [GEOVIA: SIMO] [May 2018]

20 RESULTS Each element incrementally increased NPV NPV% Schedule Cut-off Milawa 20 [GEOVIA: SIMO] [May 2018]

21 RESULTS Each element incrementally increased NPV NPV% Schedule Cut-off Stockpile Milawa 21 [GEOVIA: SIMO] [May 2018]

22 RESULTS Each element incrementally increased NPV 14% NPV% Schedule Cut-off Stockpile SIMO Milawa 22 [GEOVIA: SIMO] [May 2018]

23 KEY TAKEAWAYS Mine life (Reserves) vs. NPV Value? Stockpile Milawa SIMO Mine Life 20 years 15 years NPV +14% Impact of grade streaming Blend Bins and Value Stockpile Size and Value 120% 120% 115% 115% 110% 110% 105% 105% 100% 100% 95% 95% Milawa 50 Bins 25 Bins 5 Bins 90% Milawa (none) Unlimited (~135Mt) 120Mt 60Mt 30Mt 15Mt 0Mt 23 [GEOVIA: SIMO] [May 2018]

24 CONCLUSIONS SIMO was critical tool in realising practical opportunities to increase value Particularly useful when have flexibility (early project) Easy to use one stop shop (any Whittle user can use this) 24 [GEOVIA: SIMO] [May 2018]

25 THANK YOU QUESTIONS

Bisie cannot plot on the axis used for all other projects

Bisie cannot plot on the axis used for all other projects Bisie cannot plot on the axis used for all other projects The New York Times reports: "The exploitation of this mountain is emblematic of the failure to right this sprawling African nation

More information

Oposura Scoping Study Nearing Completion

Oposura Scoping Study Nearing Completion 20 AUGUST 2018 KEY POINTS: Oposura Scoping Study Nearing Completion Mining study with open pit optimisations and underground mine designs completed High grade massive sulphide mineralisation occurs near

More information

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE

EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE 27 th October 2008 EXCELLENT FIRST DRILL RESULTS FROM WELD RANGE Atlas Iron Limited (ASX Code: AGO) is pleased to announce a number of high grade results from the first drilling programme completed at

More information

Practical long-term planning in narrow vein mines a case study

Practical long-term planning in narrow vein mines a case study Underground Design Methods 2015 Y Potvin (ed.) 2015 Australian Centre for Geomechanics, Perth, ISBN 978-0-9924810-3-2 https://papers.acg.uwa.edu.au/p/1511_31_khani/ Practical long-term planning in narrow

More information

TECHNICAL REPORT ON THE PRELIMINARY ECONOMIC ASSESSMENT FOR CASTLE MOUNTAIN PROJECT, SAN BERNARDINO COUNTY, CALIFORNIA, U.S.A.

TECHNICAL REPORT ON THE PRELIMINARY ECONOMIC ASSESSMENT FOR CASTLE MOUNTAIN PROJECT, SAN BERNARDINO COUNTY, CALIFORNIA, U.S.A. CASTLE MOUNTAIN MINING COMPANY LIMITED TECHNICAL REPORT ON THE PRELIMINARY ECONOMIC ASSESSMENT FOR CASTLE MOUNTAIN PROJECT, SAN BERNARDINO COUNTY, CALIFORNIA, U.S.A. NI 43-101 Report Qualified Persons:

More information

King of the Hills Gold Project, Leonora, to commence production in Q2 2011

King of the Hills Gold Project, Leonora, to commence production in Q2 2011 King of the Hills Gold Project, Leonora, to commence production in Q2 2011 St Barbara is pleased to announce the King of the Hills gold project near Leonora (formerly referred to as the Tarmoola higher

More information

Steve Walters Driving Productivity by Increasing Feed Quality Through Application Of Innovative Grade Engineering Technologies

Steve Walters  Driving Productivity by Increasing Feed Quality Through Application Of Innovative Grade Engineering Technologies Steve Walters www.crcore.org.au Driving Productivity by Increasing Feed Quality Through Application Of Innovative Grade Engineering Technologies MINING GEOLOGY 2017-1 MINING HAS WELL KNOWN PRODUCTIVITY

More information

FUTORES II Augmenting Prospectivity Analysis with Mining Criteria: A Test for Viability

FUTORES II Augmenting Prospectivity Analysis with Mining Criteria: A Test for Viability FUTORES II - 2017 Augmenting Prospectivity Analysis with Mining Criteria: A Test for Viability T. Murphy, A. Pratt, M. Hinman, J. Donohue, M. Pirlo, & R. Valenta Townsville, Queensland 5 th June, 2017

More information

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE

MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE MANDALAY RESOURCES CORPORATION INCREASES MINERAL RESOURCES AND RESERVES AT ITS BJÖRKDAL GOLD MINE TORONTO, ON, December 15, 2016 -- Mandalay Resources Corporation ("Mandalay" or the "Company") (TSX: MND)

More information

Replacement: Material Increase to Tuzon Resource

Replacement: Material Increase to Tuzon Resource Replacement: Material Increase to Tuzon Resource RNS Number : 1067C Hummingbird Resources PLC 12 March 2014 Hummingbird Resources plc ("Hummingbird Resources" or the "Company") (AIM: HUM) THE FOLLOWING

More information

TELFER PROJECT. Status Report. Graham Howard MANAGER GEOLOGY. Presented by

TELFER PROJECT. Status Report. Graham Howard MANAGER GEOLOGY. Presented by TELFER PROJECT Status Report Presented by Graham Howard MANAGER GEOLOGY Exploration Investor Analysis April 2003 TELFER GOLD MINE Telfer Feasibility Project Peer Review and Audit Telfer Resource Development

More information

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006

GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006 GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006 Our Business Agenda The Gloucester Coal 3 Ticks Rule Operations Profitability Growth Gloucester Coal delivers record profit, sales

More information

Engebø Rutile and Garnet Project

Engebø Rutile and Garnet Project Lighter aircrafts Ti Clean air Pt Engebø Rutile and Garnet Project CEO Ivar S. Fossum, November 1, 2017 Pd MINERALS FOR A SUSTAINABLE FUTURE OAX: NOM Li Electric cars Renewable energy Si 1 Disclaimer This

More information

For personal use only

For personal use only ASX Announcement Moorlands Project Concept Mining Study Update Concept Mining Study confirms the proposed South Pit as initial mining focus at the Moorlands Project with: Strip ratios of 2 to 4 bcm/tonne,

More information

Sierra Rutile Limited. Sierra Rutile to start Gangama Dry Mine Project

Sierra Rutile Limited. Sierra Rutile to start Gangama Dry Mine Project Sierra Rutile Limited Sierra Rutile to start Gangama Dry Mine Project London, UK, 21 April 2015: Sierra Rutile Limited (AIM: SRX) ( Sierra Rutile ) is pleased to announce that it has commenced the construction

More information

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES

MASSAWA GOLD PROJECT. 2.6 Moz 30 % TOTAL RESERVES RANDGOLD RESOURCES MASSAWA GOLD PROJECT TOTAL RESERVES 2.6 Moz 30 % 74 ANNUAL REPORT 2016 Massawa and Sofia are grassroots exploration discoveries located on the Kanoumba permit in eastern Senegal. The project is about 700

More information

INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 7, ISSUE 3, MARCH 2018 ISSN

INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 7, ISSUE 3, MARCH 2018 ISSN Open Pit Optimization Processes Of Okobo Coal Mine - Strategies For Improving The Economics Of Mining Projects With Special Utilization Of Minex Optimizer Programme Nwafor, C. Gideon, Nwafor, O. Michelle

More information

Reservoir Announces Positive PEA results for the Timok JV and Cukaru Peki Deposit in Serbia

Reservoir Announces Positive PEA results for the Timok JV and Cukaru Peki Deposit in Serbia CORPORATE OFFICE: 501 543 Granville Street Vancouver, BC, V6C 1X8 Canada Phone: +1 604 669 4854 Fax: +1 604 688 1157 TSX-V RMC www.reservoirminerals.com info@reservoirminerals.com News Release April 19

More information

Fathom Minerals Ltd. Corporate Presentation (May 2016)

Fathom Minerals Ltd. Corporate Presentation (May 2016) Fathom Minerals Ltd. Corporate Presentation (May 2016) Forward Looking Statements This presentation may contain forward looking statements concerning the Company s plans for its properties, operations

More information

Current Trends in Mining Finance and

Current Trends in Mining Finance and Current Trends in Mining Finance and Reaching The Next Generation Investor X P L O R 2 0 1 7 C H A D W I L L I A M S, M B A, P. E N G. P R E S I D E N T & C E O O C T O B E R 1 8, 2 0 1 7 1 2 I S C L A

More information

LUNDIN MINING ANNOUNCES EAGLE EAST MINERAL RESOURCE, PEA RESULTS AND PROJECT COMMENCMENT

LUNDIN MINING ANNOUNCES EAGLE EAST MINERAL RESOURCE, PEA RESULTS AND PROJECT COMMENCMENT NEWS RELEASE Corporate Office 150 King Street West, Suite 1500 P.O. Box 38 Toronto, ONM5H 1J9 Phone: +1 416 342 5560 Fax: +1 416 348 0303 UK Office Ground Floor Hayworthe House, 2 Market Place, Haywards

More information

Beyond Broken Hill.. Len Jubber Chief Executive Officer. SA Resources & Energy Investment Conference 30 April 2007

Beyond Broken Hill.. Len Jubber Chief Executive Officer. SA Resources & Energy Investment Conference 30 April 2007 Beyond Broken Hill.. Len Jubber Chief Executive Officer SA Resources & Energy Investment Conference 30 April 2007 Agenda Positioning for growth Broken Hill Operation funding growth Flinders zinc project

More information

Metal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project

Metal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project Metal Bulletin Iron Ore Conference 22 November 2005 Koolan Island Iron Ore Project Contents Location Project Outline Project Schedule Corporate Overview History Equipment Geology Resource Development Data

More information

Aureus Mining New Liberty Project Geology

Aureus Mining New Liberty Project Geology Aureus Mining New Liberty Project Geology February 2014 Contents Location and Regional context Deposit geology Resources and Reserves Grade Control Underground potential Near-mine exploration potential

More information

Staffan Sandström Bergforskdagarna May. Boliden Mines Continuing to deliver stable performance

Staffan Sandström Bergforskdagarna May. Boliden Mines Continuing to deliver stable performance Staffan Sandström Bergforskdagarna 2016 24 May Boliden Mines Continuing to deliver stable performance Growth Philosophy Increasing value step-by-step Stable & efficient operations Organic growth investments

More information

Exciting New Developments at Botswana Copper Project. Africa Down Under Conference August, 2018

Exciting New Developments at Botswana Copper Project. Africa Down Under Conference August, 2018 Exciting New Developments at Botswana Copper Project Africa Down Under Conference August, 2018 Disclaimer & Forward Looking Statement Forward Looking Statements The document contains background Information

More information

Coburn Zircon Project

Coburn Zircon Project Coburn Zircon Project Europe/North America Presentation David Harley, 10-21 Capital Structure & Shareholders Finance Cash and Equivalents $A 2.6M Debt nil Hedging nil Markets Issued Capital Issued Shares

More information

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT

FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT September 18 th 2017 Australian Securities Exchange Limited Via Electronic Lodgement 57 139 522 900 FINANCIERS MANDATED FOR THE DALGARANGA GOLD PROJECT Two tier one Australian banks mandated to arrange

More information

NEWS RELEASE LUNDIN MINING ANNOUNCES EAGLE EAST FEASIBILITY STUDY RESULTS AND PROVIDES A PROJECT UPDATE

NEWS RELEASE LUNDIN MINING ANNOUNCES EAGLE EAST FEASIBILITY STUDY RESULTS AND PROVIDES A PROJECT UPDATE Corporate Office 150 King Street West, Suite 1500 P.O. Box 38 Toronto, ON M5H 1J9 Phone: +1 416 342 5560 Fax: +1 416 348 0303 UK Office Ground Floor Hayworthe House, 2 Market Place, Haywards Heath West

More information

FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY

FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY FLEXIBILITY IN ADVERSITY KEY TO SUCCESSFULLY NAVIGATING THE CURRENT ENVIRONMENT STEVE PHIRI Disclaimer The information presented in this presentation is of a general nature and the forward-looking information,

More information

ANGLO AMERICAN PLATINUM CORPORATION LIMITED RUSTENBURG

ANGLO AMERICAN PLATINUM CORPORATION LIMITED RUSTENBURG ANGLO AMERICAN PLATINUM CORPORATION LIMITED RUSTENBURG ANALYST AND FUND MANAGER VISIT 18 November 2004 Agenda Location Safety Strategy Geology Resources and reserves Shaft and project status Production

More information

ZAMBIA. Musengezi Complex. Harare. SMC Hartley. Complex ZIMBABWE. Great Dyke. Selukwe. Complex. Bulawayo. Wedza BOTSWANA SOUTH AFRICA

ZAMBIA. Musengezi Complex. Harare. SMC Hartley. Complex ZIMBABWE. Great Dyke. Selukwe. Complex. Bulawayo. Wedza BOTSWANA SOUTH AFRICA FACT SHEET ZIMPLATS N ZAMBIA ZIMBABWE Musengezi Complex Harare SMC Hartley Ngezi Complex Great Dyke BOTSWANA Bulawayo Selukwe Complex Wedza Complex SOUTH AFRICA Zimplats is 87% owned by Implats. Its Ngezi

More information

FORWARD LOOKING STATEMENT

FORWARD LOOKING STATEMENT Turning Rocks Into Money Global Resources Investing, Switzerland. November 2011 www.explorationinsights.com FORWARD LOOKING STATEMENT Key Factors to Understanding and Profiting in the Junior Exploration

More information

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3.

AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND G/T Au OVER 3. August 2, 2011 AVION GOLD DJAMBAYE II ZONE, TABAKOTO PROJECT, MALI, RETURNS HIGH GRADE INTERCEPTS OF 7.56 G/T Au OVER 7.0 METRES AND 26.39 G/T Au OVER 3.0 METRES Toronto, Ontario -- Avion Gold Corporation

More information

Using Integer Programming for Strategic Underground and Open Pit-to-Underground Scheduling

Using Integer Programming for Strategic Underground and Open Pit-to-Underground Scheduling Using Integer Programming for Strategic Underground and Open Pit-to-Underground Scheduling Barry King Advisor: Alexandra Newman Operations Research with Engineering PhD Program August 5-6, 2016 Cutoff

More information

GOLD MINING IN SENEGAL 1

GOLD MINING IN SENEGAL 1 GOLD MINING IN SENEGAL 1 Important Information Forward Looking Statements Certain information contained in this presentation, including any information on MDL s plans or future financial or operating performance

More information

Introduction to Geology and Geometallurgy

Introduction to Geology and Geometallurgy Introduction to Geology and Geometallurgy Improving Resource Knowledge to Optimise Minerals Processing: Part 1 Mark Noppe mnoppe@srk.com.au 24 May 2018 1 Why Geology? Improving resource knowledge Rocks

More information

Gold Grades and Gold Costs Exploding the High-Grade Myth

Gold Grades and Gold Costs Exploding the High-Grade Myth Allan Trench 12 Matthew Kanakis 23 & John Sykes 12 1. Department of Mineral & Energy Economics, Curtin University 2. Centre for Exploration Targeting, Curtin University & University of Western Australia

More information

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead.

60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. 30 April 2008 60% upgrade of Flying Doctor Resource to 104,600 tonnes of contained zinc and lead. Perilya Limited (ASX: PEM) is pleased to announce a 60% increase in the mineral resource estimate for the

More information

Sabina Announces More Positive Drill Results from 2012 Drilling at the Back River Gold Project, Nunavut

Sabina Announces More Positive Drill Results from 2012 Drilling at the Back River Gold Project, Nunavut 930 West 1 st Street, Suite 202, North Vancouver, BC V7P 3N4 Tel: (604) 998-4175 Toll Free: (888) 648-4218 www.sabinagoldsilver.com June 4, 2012 SBB NR 12-10 SBB-T Sabina Announces More Positive Drill

More information

For personal use only

For personal use only ABN 52 077 110 304 9 January 2013 TIGER RESOURCES DELIVERS POSITIVE DEFINITIVE FEASIBILITY STUDY FOR STAGE 2 of KIPOI COPPER PROJECT Highlights include: After-Tax Net Present Value of US$378 million Production

More information

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2

Kalana Main Diluted Mineral Resource Estimate Above a 0.9 g/t Au Cut-off Grade 1,2 Avnel Reports that Measured plus Indicated Resource Increases to 2.81 Million Ounces of Gold at a Diluted Grade of 2.85 g/t at Kalana Main Deposit at $1,100/oz ST. PETER PORT, GUERNSEY, OCTOBER 5, 2015

More information

24 October Dear Shareholders, 2014 ANNUAL REPORT

24 October Dear Shareholders, 2014 ANNUAL REPORT Azumah Resources Limited ABN 72 112 320 251 Suite 2, 11 Ventnor Avenue West Perth WA 6005 PO Box 1073 West Perth WA 6872 P +618 9486 7911 F +618 9481 4417 W www.azumahresources.com.au E info@azumahresources.com.au

More information

MineScape Geological modelling, mine planning and design

MineScape Geological modelling, mine planning and design INTELLIGENT MINING SOLUTIONS MineScape Geological modelling, mine planning and design Specifically developed to meet the mining industry s rigorous demands, MineScape is used at more than 200 of the world

More information

ENHANCED PRODUCTION PROJECT SEPTEMBER 2012

ENHANCED PRODUCTION PROJECT SEPTEMBER 2012 ENHANCED PRODUCTION PROJECT SEPTEMBER 2012 OVERVIEW OF ILUKA S ENHANCED PRODUCTION APPROACH Iluka commenced an exercise in 2011, referred to as the Enhanced Production Project (EPP), with the objective

More information

Pancake Model vs Willow Corporate Presentation March 2018

Pancake Model vs Willow Corporate Presentation March 2018 Pancake Model vs Willow Corporate Presentation March 2018 Abacus Mining and Exploration Corporation I TSX:AME I www.amemining.com 1 Forward Looking Information This presentation includes certain statements

More information

For personal use only

For personal use only ASX RELEASE 31 May 2011 Eagle Downs Hard Coking Coal Project Study Results Highlights: The Manager of the Eagle Downs Hard Coking Coal Project (the Project ) has released a Study detailing the outcomes

More information

Minerals for a sustainable future

Minerals for a sustainable future Minerals for a sustainable future OAX: NOM Engebø Rutile and Garnet World TiO 2 Summit, Boston, October 2018 Ivar S. Fossum, CEO Disclaimer This document has been used by Nordic Mining during an oral presentation.

More information

SEARCH MINERALS INC. TECHNICAL REPORT ON THE FOXTROT PROJECT, NEWFOUNDLAND & LABRADOR, CANADA

SEARCH MINERALS INC. TECHNICAL REPORT ON THE FOXTROT PROJECT, NEWFOUNDLAND & LABRADOR, CANADA SEARCH MINERALS INC. TECHNICAL REPORT ON THE FOXTROT PROJECT, NEWFOUNDLAND & LABRADOR, CANADA NI 43-101 Report Qualified Persons: Katharine M. Masun, P.Geo. Ian C. Weir, P.Eng. John R. Goode, P.Eng. April

More information

For personal use only UP TO THE CHALLENGE. March 2016 ASX: WPG

For personal use only UP TO THE CHALLENGE. March 2016 ASX: WPG ASX: WPG March 2016 GOLDEN TRIFECTA 2 Challenger (50%) Challenger mine acquired on 15 March 2016 Production anticipated prior to 30 June 2016 Expected annualised production of 50koz pa Tarcoola (100%)

More information

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA

HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA ASX Release 13 AUGUST 2009 HERON ENTERS OPTION TO PURCHASE A1 GOLD MINE, EASTERN VICTORIA Heron Resources Limited (ASX:HRR, Heron) is pleased to announce it has purchased an Option (Option) to acquire

More information

AGM Presentation Nov 2012 ASX: BLK

AGM Presentation Nov 2012 ASX: BLK AGM Presentation Nov 2012 ASX: BLK BLACKHAM RESOURCES LTD Floated in 2006 on gold project on-sold in 2010 Focused on adding value to the 1.4Moz Matilda gold project with potential for multi million ounce

More information

Mines update. Capital Markets Day November 23rd Jan Moström President, Boliden Mines

Mines update. Capital Markets Day November 23rd Jan Moström President, Boliden Mines Mines update Capital Markets Day November 23rd 2012 Jan Moström President, Boliden Mines Boliden CMD 2012 1 Mines Summary EBIT 842 (1,047) MSEK 726 MSEK in Q2 2012 Write-down in Tara, -79 MSEK Lower average

More information

Nordic Mining. Engebø Rutile and Garnet Project. Prefeasibility Study

Nordic Mining. Engebø Rutile and Garnet Project. Prefeasibility Study Nordic Mining 2017-10-30 0 Approved for Use P de Garis D Nel C Blake I S Fossum Date Rev. Status Prepared By Checked By Approved By Approved By Client Page i Revision History Date Rev No Description Revised

More information

Portia Gold Mine Update

Portia Gold Mine Update 1 Portia Gold Mine Update South Australian Resources & Energy Investment Conference 20 April 2016 Dr Chris Giles Managing Director Havilah Resources LimitedDr Chris Giles, MD 20 April 2016 Dr Chris Giles

More information

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES

MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES ASX ANNOUNCEMENT ASX CODE: MMX 3 September 2009 MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL 400-1000 MILLION TONNES Murchison Metals Limited (Murchison) is

More information

Condor Gold plc. ( Condor or the Company ) La India Project Pre-Feasibility Study and Preliminary Economic Assessment

Condor Gold plc. ( Condor or the Company ) La India Project Pre-Feasibility Study and Preliminary Economic Assessment Condor Gold plc 7 th Floor 39 St. James s Street London SW1A 1JD Telephone +44 020 74081067 Fax: +44 020 74938633 14 th November 2014 Condor Gold plc ( Condor or the Company ) La India Project Pre-Feasibility

More information

MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017

MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017 14 July 2017 ASX ANNOUNCEMENT MINERAL RESOURCE AND ORE RESERVE STATEMENT AS AT 31 MARCH 2017 HIGHLIGHTS Group Ore Reserves increased by 3% from 2.13 million ounces to 2.18 million ounces after accounting

More information

Papua New Guinea University of Technology Department of Mining Engineering Lesson Plan MN 332 Mining Geology

Papua New Guinea University of Technology Department of Mining Engineering Lesson Plan MN 332 Mining Geology Papua New Guinea University of Technology Department of Mining Engineering Lesson Plan MN 332 Mining Geology Subject Mining Geology Subject Code MN 332 Semester/year 2/2017 Date 04/07/2017 Lecturer(s)

More information

Investor Presentation October 2012

Investor Presentation October 2012 Investor Presentation October 2012 2 Forward Looking Statements This presentation contains "forward-looking information" (also referred to as "forward looking statements") which may include, but are not

More information

Annual General Meeting

Annual General Meeting November 2012 Annual General Meeting ASX: TAM 1 Milestones 2011-12 Central Tanami Project Resource Growth Groundrush 203 koz to + 1.0 Moz @ 4.3g/t Au (1) 390% increase Ripcord - Maiden Resource - 89 koz

More information

ASX announcement 16 May 2016

ASX announcement 16 May 2016 ASX announcement 16 May 2016 Adelaide Resources Limited ABN: 75 061 503 375 Corporate details: ASX Code: ADN Cash: $0.701million (at 31 Mar 2016) Issued Capital: 357,922,352 ordinary shares 37,222,104

More information

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA

COKAL ANNOUNCES POSITIVE RESULTS FROM SCOPING STUDY OF UNDERGROUND MINING AT BBM COAL PROJECT INDONESIA T +61 7 3312 6299 E info@cokal.com.au Level 10, 110 Mary Street, Brisbane QLD 4000 PO Box 7122, Brisbane QLD 4001 ABN 55 082 541 437 (ASX: CKA) www.cokal.com.au ASX ANNOUNCEMENT 30 September 2016 COKAL

More information

For personal use only

For personal use only Marg Scoping Study confirms potential for an economically viable project. Highlights Ø Ø Ø Ø Ø Ø Ø Ø Ø MinQuest s strategy of acquiring high grade multi element base metal projects during the low point

More information

LOCATION. Mine. Aguablanca. Huelva SPAIN

LOCATION. Mine. Aguablanca. Huelva SPAIN Aguablanca Mine 1 LOCATION Aguablanca Mine SPAIN Huelva Aguablanca Located in mining-friendly EU country Excellent infrastructures (roads, ports, airport, power, airport, etc.) 75 Km from Seville Close

More information

The World s Newest Mineral Sands Producer Presentation to TZMI Conference 18 November 2015

The World s Newest Mineral Sands Producer Presentation to TZMI Conference 18 November 2015 The World s Newest Mineral Sands Producer Presentation to TZMI Conference 18 November 2015 Trevor Matthews Managing Director What makes MZI and Keysbrook compelling MZI is the world s newest producer of

More information

Annual General Meeting

Annual General Meeting 2017 - Annual General Meeting A compelling opportunity in the Australian gold sector November 2017 Disclaimer & Competent Persons Statement CAUTIONARY STATEMENT FORWARD LOOKING STATEMENTS This announcement

More information

Forward-looking Statements

Forward-looking Statements BJÖRKDAL Forward-looking Statements The information given in this presentation and during Mandalay Resources Corporation s September 12, 2016 Investor Day contain "forwardlooking statements" within the

More information

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia

News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia News Release B2Gold Announces Updated Higher Grade Gold Resource at Wolfshag Zone, Otjikoto Mine, Namibia Vancouver, January 20, 2015 - B2Gold Corp. (TSX: BTO, NYSE MKT: BTG, NSX: B2G) ( B2Gold or the

More information

For personal use only

For personal use only 17 February 2011 ASX ANNOUNCEMENT SCOPING STUDY IDENTIFIES PLATFORM FOR OPEN PIT AND UNDERGROUND DEVELOPMENT OF THE SANDIEGO DEPOSIT Anglo Australian Resources NL ( AAR ) is pleased to report The Scoping

More information

The Platreef Project. Ivanhoe s Platinum Mining Game-changer. By Gerick Mouton. 2 June 2016

The Platreef Project. Ivanhoe s Platinum Mining Game-changer. By Gerick Mouton. 2 June 2016 The Platreef Project Ivanhoe s Platinum Mining Game-changer By Gerick Mouton 2 June 2016 Disclaimer/Forward Looking Statements Certain statements in this presentation constitute "forward-looking statements"

More information

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY

TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY TROILUS GOLD CORP. INITIATES 30,000 METRE DRILL PROGRAM ON TROILUS PROPERTY February 5, 2018, Toronto, Ontario Troilus Gold Corp. (TSX- V: TLG) ( Troilus or the Company ) is pleased to announce the commencement

More information

For personal use only

For personal use only Alloy Regains Control of the Horse Well Gold Project ASX Release 29 January 2018 Capital Structure ABN 20 109 361 195 ASX Code AYR Issued Shares 1,266,993,360 Unlisted Options 29,000,000 Corporate Directory

More information

For personal use only

For personal use only ASX Announcement 21 October 2015 BOARD OF DIRECTORS Paul Murphy (Non-Executive Chairman) Bryan Dixon (Managing Director) Alan Thom (Executive Director) Greg Miles (Non-Executive Director) Peter Rozenauers

More information

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. July 21, May 2013

A New Direction. Developing Copper Assets in Canada s North TSX.V:COL. July 21, May 2013 A New Direction Developing Copper Assets in Canada s North July 21, 2016 May 2013 TSX.V:COL FORWARD LOOKING STATEMENTS This presentation includes certain forward-looking information or forward-looking

More information

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au

San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au SAN GOLD CORPORATION TSX: SGR OTCQX: SGRCF FOR IMMEDIATE RELEASE October 15, 2014 San Gold Drills New Mine Horizon Adjacent to Rice Lake Mine, Returns 10.4 Metres Grading 25.7 g/t Au WINNIPEG, MANITOBA

More information

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au

Mimosa MSZ 6E metal ratio (%) Harare Hartley Complex. Bulawayo ZAMBIA ZIMBABWE BOTSWANA SOUTH AFRICA Pt Pd Rh Ru Ir Au FACT SHEET MIMOSA N ZAMBIA Musengezi Complex ZIMBABWE Harare Hartley Complex Great Dyke Bulawayo Mimosa BOTSWANA Selukwe Complex Wedza Complex SOUTH AFRICA Mimosa is jointly held by Implats and Sibanye.

More information

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE

CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE NEWS RELEASE DNT: TSX DNT: BVL WKN: GW4 CANDENTE UPDATES CAÑARIACO NORTE MINERAL RESOURCE ESTIMATE Vancouver, British Columbia, May 29 th, 2008. Candente Resource Corp. (DNT:TSX and BVL) ( Candente or

More information

Pre-Feasibility Study demonstrates potential for Kin to become a high margin producer at the Leonora Gold Project

Pre-Feasibility Study demonstrates potential for Kin to become a high margin producer at the Leonora Gold Project ASX Code: KIN KIN 15 December 2016 Pre-Feasibility Study demonstrates potential for Kin to become a high margin producer at the Leonora Gold Project Low forecast capital cost of A$35M underpins robust

More information

76,000 Ounce Gold Resource at Akoko North

76,000 Ounce Gold Resource at Akoko North 31 st March 2009 76,000 Ounce Gold Resource at Akoko North 76,000 ounce Indicated and Inferred Mineral Resource estimated for Akoko North gold deposit Scoping study (assuming toll milling) estimates $A24M

More information

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011

PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 PRESS RELEASE WESDOME PLANS AGGRESSIVE DRILLING AND DEVELOPMENT PROGRAM IN 2011 Toronto, Ontario March 30, 2011 Wesdome Gold Mines Ltd (WDO: TSX) has initiated an aggressive exploration, development and

More information

Saramacca Project Updates September 2017 Suriname Exploration Team September 12 th, 2017

Saramacca Project Updates September 2017 Suriname Exploration Team September 12 th, 2017 Saramacca Project Updates September 2017 Suriname Exploration Team September 12 th, 2017 TSX: IMG NYSE: IAG Qualified Persons & Technical Information The mineral resource estimate, including verification

More information

Addressing the Deficit Tom O Leary Managing Director, Iluka Resources. 13 November 2018

Addressing the Deficit Tom O Leary Managing Director, Iluka Resources. 13 November 2018 Addressing the Deficit Tom O Leary Managing Director, Iluka Resources 13 November 2018 Disclaimer Forward Looking Statements This presentation has been prepared by Iluka Resources Limited (Iluka). By accessing/attending

More information

TECHNICAL REPORT AND PRELIMINARY ECONOMIC ASSESSMENT ON THE NASH CREEK AND SUPERJACK PROJECT NEW BRUNSWICK FOR CALLINEX MINES INC.

TECHNICAL REPORT AND PRELIMINARY ECONOMIC ASSESSMENT ON THE NASH CREEK AND SUPERJACK PROJECT NEW BRUNSWICK FOR CALLINEX MINES INC. TECHNICAL REPORT AND PRELIMINARY ECONOMIC ASSESSMENT ON THE NASH CREEK AND SUPERJACK PROJECT NEW BRUNSWICK FOR CALLINEX MINES INC. NI 43-101 & 43-101F1 TECHNICAL REPORT NASH CREEK PROPERTY RESTIGOUCHE

More information

impala Fact sheet TIVE VISION CREA

impala Fact sheet TIVE VISION CREA impala Fact sheet mpala is Implats primary operational unit and has operations situated I on the Impala lease area on the western limb of the world-renowned Bushveld Complex near Rustenburg, and in Springs,

More information

For personal use only

For personal use only ASX Announcement 16 November 2015 ASX Code: MRP Contact Details PO Box 10977 109 Maritana Street Kalgoorlie WA 6430 T +61 (0) 8 9068 1300 F +61 (0) 8 9068 1310 E info@mrpresources.com.au ABN 98 139 357

More information

ASX Small to Mid Cap Conference Singapore. KEITH BARKER Managing Director. 27 May ASX Code: NEC ABN:

ASX Small to Mid Cap Conference Singapore. KEITH BARKER Managing Director. 27 May ASX Code: NEC ABN: ASX Small to Mid Cap Conference Singapore 27 May 2010 KEITH BARKER Managing Director 0 ASX Code: NEC ABN: 00 123 456 789 www.northernenergy.com.au Disclaimer While based on information from sources considered

More information

Audit 2014 Volume 8 Technical Economics Koza Altın İşletmeleri A.Ş. Turkey. Koza Altın İşletmeleri A.Ş.

Audit 2014 Volume 8 Technical Economics Koza Altın İşletmeleri A.Ş. Turkey. Koza Altın İşletmeleri A.Ş. Audit 2014 Volume 8 Technical Economics Koza Altın İşletmeleri A.Ş. Turkey Report Prepared for Koza Altın İşletmeleri A.Ş. Report Prepared by SRK Consulting (U.S.), Inc. SRK Project Number 173600.130 January

More information

Open-pit mining problem and the BZ algorithm

Open-pit mining problem and the BZ algorithm Open-pit mining problem and the BZ algorithm Eduardo Moreno (Universidad Adolfo Ibañez) Daniel Espinoza (Universidad de Chile) Marcos Goycoolea (Universidad Adolfo Ibañez) Gonzalo Muñoz (Ph.D. student

More information

A1 Minerals Limited EXPLORER TO MINER. Presented by John Williams - Managing Director A1 Minerals Limited

A1 Minerals Limited EXPLORER TO MINER. Presented by John Williams - Managing Director A1 Minerals Limited A1 Minerals Limited EXPLORER TO MINER Presented by John Williams - Managing Director A1 Minerals Limited 1 Disclaimer This presentation contains certain forward-looking information and forecasts which

More information

Preliminary Economic Assessment Delivers Strong Business Case for the Woodlawn Zinc-Copper Project

Preliminary Economic Assessment Delivers Strong Business Case for the Woodlawn Zinc-Copper Project ASX/TSX Release 22 April 2015 Level 1, 37 Ord Street, West Perth WA 6005 heron@heronresources.com.au +61 8 6500 9200 / +61 2 9119 8111 ABN: 30 068 263 098 Preliminary Economic Assessment Delivers Strong

More information

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project

Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project NEWS RELEASE June 11, 2015 Red Pine Releases Inferred Resource Report Improves Grade and Tonnage for Wawa Gold Project Toronto, Ontario June 11, 2015 Red Pine Exploration Inc. (TSX-V: RPX) (the Company

More information

EXCELLENT ECONOMICS FOR TAMPIA GOLD PROJECT SCOPING STUDY

EXCELLENT ECONOMICS FOR TAMPIA GOLD PROJECT SCOPING STUDY 3 November 2017 EXCELLENT ECONOMICS FOR TAMPIA GOLD PROJECT SCOPING STUDY Explaurum Limited (ASX:EXU) ( the Company or Explaurum ) is pleased to announce the results of the scoping study ( Scoping Study

More information

For personal use only

For personal use only ASX Announcement ASX: ERM ABN: 53 117 086 745 June 18, 2015 Seismic Survey to underpin future gold discoveries at Tennant Creek First application of seismic geophysics to the Tennant Creek Mineral Field

More information

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7)

FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) FOR IMMEDIATE RELEASE August 9 th, 2018 (VTT2018 NR #7) Vendetta Increases Pegmont Lead-Zinc Mineral Resource to 5.8 Million Tonnes and 8.3 Million Tonnes of. Open Pit Constrained Mineral Resource now

More information

DOMINION DIAMOND CORPORATION DOMINION TO PROCEED WITH JAY DEVELOPMENT BASED ON POSITIVE FEASIBILITY STUDY AND PROVIDES UPDATED LIFE OF MINE PLAN

DOMINION DIAMOND CORPORATION DOMINION TO PROCEED WITH JAY DEVELOPMENT BASED ON POSITIVE FEASIBILITY STUDY AND PROVIDES UPDATED LIFE OF MINE PLAN DOMINION DIAMOND CORPORATION DOMINION TO PROCEED WITH JAY DEVELOPMENT BASED ON POSITIVE FEASIBILITY STUDY AND PROVIDES UPDATED LIFE OF MINE PLAN Jay Feasibility Study Results July 2016 Forward Looking

More information

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL

QUEEN SHEBA - RESOURCE TABLE: AUGUST 2011 RESOURCE CATEGORY. Tonnes Au Ag Cu (000) g/t g/t % GLOBAL RESOURCE TABLE: CONTAINED METAL ASX ANNOUNCEMENT 16 SEPTEMBER 2011 Phillips River Mining NL ABN 61 004 287 790 Unit 46/328 Albany Highway VICTORIA PARK WA 6100 T: 08 6250 4600 F: 08 6250 4699 info@phillipsriver.com.au CONTACT Jason Stirbinskis

More information

COMINCO RESOURCES LIMITED ( Cominco or the Company ) Successful Scoping Study for Hinda Phosphate Project, Congo Brazzaville

COMINCO RESOURCES LIMITED ( Cominco or the Company ) Successful Scoping Study for Hinda Phosphate Project, Congo Brazzaville 14 th November 2012 COMINCO RESOURCES LIMITED ( Cominco or the Company ) Successful Scoping Study for Hinda Phosphate Project, Congo Brazzaville Economic and technical merit of a World-Class, Tier 1 mine

More information

Doornhoek Fluorspar Project The worlds largest known fluorspar exploration project

Doornhoek Fluorspar Project The worlds largest known fluorspar exploration project Doornhoek Fluorspar Project The worlds largest known fluorspar exploration project SA Fluorite (Pty) Ltd and Southern Palace (Pty) Ltd Northwest Province - South Africa 1/ Forward Looking Statements This

More information

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012

For personal use only OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 OZ MINERALS CARRAPATEENA COPPER GOLD PROJECT SOUTH AUSTRALIA 27 MARCH 2012 WWW.OZMINERALS.COM DISCLAIMER This presentation has been prepared by OZ Minerals Limited ( OZ Minerals ) and consists of written

More information