1 Robert l. McGee, Jr. One Energy Place Regulatory & Pricing Manager Pensacola, Florida Tel Fax GULF«, POWER A SOUTHERN COMPANY February 7, 0 Mr. Thomas Ballinger, Director Division of Engineering Florida Public Service Commission 0 Shumard Oak Boulevard Tallahassee FL ('") 0 n :J: : "" -,...,_ 0 :r::: :;:o (./) - (./) ~ w -.., rrl o;:l N 00 :Po :X 'P. N (a)... - '- m 0 ~T! < m Q I n - -,.,' (J) ( ) Dear Mr. Ballinger: Attached are an original and seven copies of Gulf Power Company's Annual Distribution Service Reliability Report as required by Rule -6.0, along with annual storm hardening initiatives as required in Order No. PSC PAA-EI and the status report on Gulf's Storm Hardening Plan as required by Paragraph 7 of the "Process to Engage Third party Attachers" Stipulated Agreement dated September 6, 007 in Docket No.: EI. Sincerely, \J?. ur//;t(! J /J. Robert L. McGee, Jr~ ~ r Regulatory and Pricing Manager md Attachment Cc w/attach: Ms. Ann Cole, Commission Clerk 0 I 0 9 FEB 8 ~ FPSC -CO MtSSION CLE RK

2 ... GULF POWER COMPANY Reliability and Storm Hardening Initiatives Report March, 0 GULF A POWER A SOUTHERN COMPANY 0 I 0 9 FEB 8 ~ FPSC-COMMISSI OU CLER!~

3 '. I :.. e Table of Contents STATUS REPORT OF IMPLEMENTATION OF STORM HARDENING PLAN... 0 STORM HARDENING ACTIVITIES... WOOD POLE INSPECTION PROGRAM... 6 WOOD POLE INSPECTION DESCRIPTION ACCOMPLISHMENTS... 6 PROJECTED 0 GOALS... 7 VEGETATION MANAGEMENT PROGRAMS...? DISTRIBUTION VEGETATION MANAGEMENT (VM) PLAN OVERVIEW... 7 TRANSMISSION VEGETATION MANAGEMENT PLAN OVERVIEW...? SUPPLEMENTAL VM PROGRAMS...? COMPANY'S OVERALL VEGETATION MANAGEMENT SUMMARY DISTRIBUTION PERFORMANCE METRICS (SYSTEM WIDE)... 8 JOINT USE POLE ATTACHMENT AUDITS... 9 ACTIVITY AND COSTS INCURRED FOR 0 AND 0 PROJECTIONS... 9 JOINT USE An ACHMENT AUDITS- DISTRIBUTION POLES... 0 SIX-YEAR INSPECTION CYCLE FOR TRANSMISSION STRUCTURES... 0 ACTIVITY AND COSTS INCURRED FOR 0 AND 0 PROJECTIONS... 0 TRANSMISSION CIRCUIT, SUBSTATION AND OTHER EQUIPMENT INSPECTIONS... TRANSMISSION METAL POLE AND TOWER INSPECTIONS... TRANSMISSION POLE INSPECTIONS... STORM HARDENING ACTIVITIES FOR TRANSMISSION STRUCTURES... ACTIVITY AND COSTS INCURRED FOR 0 AND 0 PROJECTIONS... HARDENING OF EXISTING TRANSMISSION STRUCTURES (POLES)... DISTRIBUTION SUBSTATIONS... FIVE-YEAR PATIERNSfrRENDS IN RELIABILITY PERFORMANCE OF DISTRIBUTION SUBSTATIONS... DISTRIBUTION SUBSTATION RELIABILITY TRACKING... DISTRIBUTION SUBSTATION RELIABILITY PROBLEM IDENTIFICATION PROCESS... DISTRIBUTION SUBSTATION INSPECTIONS DURING NORMAL OPERATIONS... GEOGRAPHIC INFORMATION SYSTEM (GIS)... ACTIVITY AND COSTS INCURRED FOR 0 AND 0 PROJECTIONS... DISTRIBUTION OVERHEAD DATA INPUT... DISTRIBUTION UNDERGROUND DATA INPUT... POST STORM DATA COLLECTION AND FORENSIC ANALYSIS... ACTIVITY AND COSTS INCURRED FOR 0 AND 0 PROJECTIONS... OUTAGE DATA DIFFERENTIATING BETWEEN OVERHEAD AND UNDERGROUND SYSTEMS... ACTIVITIES AND COSTS INCURRED IN 0 AND 0 PROJECTIONS... COORDINATION WITH LOCAL GOVERNMENTS... 6 ONGOING PROGRAMS... 7 STORM PREPARATION... 8 STORM RESTORATION... 8 COLLABORATIVE RESEARCH... 9 DISASTER PREPAREDNESS AND RECOVERY PLAN... 9

4 :. ACTIVITY AND COSTS INCURRED FOR 0 AND 0 PROJECTIONS DISASTER RECOVERY PLAN ACTIVITY HURRICANE DRILL STORM SEASON READY STATUS RELIABILITY PERFORMANCE.... OVERALL PERFORMANCE.... DATA TRACKING LEVEL.... CRITICAL REVIEW OF DETAILED RELIABILITY DATA..... IDENTIFICATION AND SELECTION OF DETAILED RELIABILITY DATA.... GENERATION EVENTS- ADJUSTMENTS....6 TRANSMISSION EVENTS -ADJUSTMENTS....7 EXTREME WEATHER- ADJUSTMENTS....8 OTHER DISTRIBUTION ADJUSTMENTS ADJUSTED RELIABILITY Outage Event Causes Three Percent Feeder List Regional Reliability Indices OVERHEAD- UNDERGROUND RELIABILITY Five-Year Patterns dentification and Selection/Process Improvements Activities and Budget Allowances Overhead (OH) and Underground (UG) Metrics..... RELIABILITY RELATED CUSTOMER COMPLAINTS Five-Year Patterns..... Correlation of Reliability Related Customer Complaints to lndices......dentification and Selection/Process Improvements....

5 . APPENDICES APPENDIX RELIABILITY DATA APPENDIX ANNUAL WOOD POLE INSPECTION REPORT APPENDIX FEEDER SPECIFIC DATA APPENDIX PURC REPORT ON COLLABORATIVE RESEARCH APPENDIX CROSS REFERENCE INDEX

6 ..0 Status Report of Implementation of Storm Hardening Plan This section is intended to fulfill the requirement for filing a status report of Gulf Power Company's Storm Hardening Plan. A "Stipulation and Agreement" was signed between Gulf Power Company (Gulf) and the Florida Cable Telecommunications Association (FCTA} on November 9, 00. On May, 0 0, Gulf filed its Storm Hardening Plan update as required by Rule -6.0 FAC. Docket No. 006-EI was opened to address the updates. On June 0, 00, the Florida Public Service Commission (FPSC) Staff conducted a workshop to better understand Gulf's plan. In addition to the workshop, the FPSC Staff sent data requests to obtain clarification and additional information. On November, 00 the Florida Public Service Commission approved Gulf's Storm Hardening Plan.. 0 Storm Hardening Activities The following storm hardening activities were initiated and/or completed in the field during 0: Distribution Gulf continued to hold meetings in order to enhance communications between Gulf's field personnel and third party attachers. Meeting notifications were sent to the following third party attachers: AT&T, Cox Communications Gulf Coast, MediaCom, Southern Light, Comcast Joint Holdings, Springfield Cablevision, Knology, CenturyLink, Brighthouse Networks, Century Tel/Madison River Communication, Escambia County School Board, Valparaiso Broadband Communications, Walton County, Level Communications, Community Cable Corporation, Peoples First Community Bank, Verizon, Fairpoint Communications and Windstream KDL. Gulf's permit administrator, ICON Consulting, participated in these meetings as well. Ongoing communication between these parties is vital to the success of Gulf's storm hardening initiatives since detailed. information on actual or proposed attachments is required to complete computer modeling of poles to determine the type and class of pole required. During these meetings, Gulf reviewed () planned major projects (both Company and customer driven) related to the scope of work and the location; () questions related to designing to Grade B standards; () pole inspection program (Osmose); () operational issues; () the pole count project (6) Smart Grid Investment Grant (SGIG) construction

7 . ~ projects; (7) DOT projects and permitting issues; and (8) the 00-0 Storm Hardening Plan. Organizational charts and maps identifying Gulf field personnel responsibility areas were provided to the third party attachers. All participants had the opportunity to ask questions and to clarify any issues. The 0 meetings were held during the first and third quarters of the year. Attendees at the meetings held on February 9th in Panama City and March nd in Pensacola included representation from: o Gulf field personnel, special project engineers, technical services engineers, and their respective supervision and management o AT&T o Mediacom o Cox Communications Gulf Coast o Southern Light o ICON consulting o Century Link o Fairpoint Communications o Davey Resource Group Attendees at the meetings held on September 6th in Panama City and September 8th in Pensacola included representation from: o Gulf field personnel, special project engineers, technical services engineers, and their respective supervision and management o Century Link o AT&T o ICON Consulting o Cox Communications Gulf Coast o Southern Light o Walton County o Knology o Comcast o Brighthouse Networks o Mediacom o Escambia County Schools Prior to the 0 hurricane season, Gulf, SouthernLINC, and AT&T representatives held telephone updates to discuss their respective storm plans in the event of a major event. Since February, 008, Gulf has assigned a liaison to AT&T during storm events and this past year, a liaison was also assigned to Century Link. Conversations related to storm planning have already occurred in 0 thus continuing a smooth

8 . :e. :e and timely flow of information that indicates when Gulf has neared completion of restoration efforts in a particular area so that others can then begin their own restoration work. Gulf has completed all distribution projects contained in its 00-0 Storm Hardening Plan. Distribution Critical infrastructure and major thoroughfares. Underground Network Improvements. Conversion of kv Distribution Feeders. Automated Overhead Faulted Circuit Indicators. Distribution Supervisory Control and Data Acquisition (DSCADA). Transmission All critical lines were aerially inspected. Four separate aerial patrols of the total system were completed. Comprehensive walking/climbing and ground line inspections as part of the six-year inspection program were completed..0 Wood Pole Inspection Program. Wood Pole Inspection Description Gulf's 0 Wood Pole Inspection Program was designed to comply with FPSC Order No. PSC-06-0-PAA-EI (eight-year inspection cycle) and FPSC Order No. PSC PAA-EU (allowed certain deviations regarding CCA poles less than years in age and poles surrounded by concrete and asphalt). In 0, Gulf completed the sixth year of the eight-year inspection cycle, utilizing its existing wood pole inspection matrix. This matrix is based on pole age, treatment type and condition, and allows the selective excavation and boring of newer poles.. 0 Accomplishments In 0, a total of,709 poles were inspected with a rejection rate of.80%. This number of inspections reflects the fact that Gulf was ahead of schedule at the end of 0 and only,709 poles required inspection in 0 to remain on schedule to achieve an eight-year cycle. See Appendix, titled "Annual Wood Pole Inspection Report" for details. 6

9 ~.. Projected 0 Goals Gulf is on schedule to achieve an eight-year pole inspection cycle in 0. The 0 inspections have already begun and are scheduled for completion by mid-year. Gulf is also on schedule in changing out poles identified as rejects from prior inspections. All poles identified as rejects are being changed out or reinforced and poles that are changed out are being upgraded to Grade B construction standards. At the end of 0, Gulf had changed out all but poles identified as rejects from prior inspections. These poles will be changed out in 0..0 Vegetation Management Programs. Distribution Vegetation Management (VM) Plan Overview In 0, the Company continued the Vegetation Management (VM) program approved in PSC 07-0-FOF-EI. The combination of the three year cycle on main line feeders, four year cycle on laterals, and an annual cycle of inspections and correction on main line feeders continued to improve system reliability performance.. Transmission Vegetation Management Plan Overview Vegetation hazard removals continued to be the focus of the Company's 0 Transmission VM programs. Detailed ground patrols were performed on the Company's transmission ROW corridors in an effort to identify vegetation conditions requiring correction. All vegetation conditions identified by the 0 patrols were corrected through vegetation removal or pruning activities. In 0, Gulf was in full compliance with NERC Standard FAC Supplemental VM Programs Gulf continues to use the Distribution Lock-Out Report (DLOR) which is a tracking process developed by the Company to document and track distribution feeder lock-outs. This program continued to be an effective VM tool throughout 0. The data collected during field evaluations by our Company engineers, foresters, and arborists helped identify the root causes of feeder breaker lock-outs. This enabled us to modify and improve our VM management practices employed on Gulf's distribution 7

10 . system. The use of DLOR will continue to be a valued element of our future VM programs. ''Tree Gulf" was continued throughout 0 as a tool to proactively report and address problem vegetation conditions that could pose a future threat to system reliability. ''Tree Gulf" streamlined the internal reporting process and electronically produced work-orders directly to Forestry Services to inspect and correct potential vegetation related risks. This tool enabled every Company employee, including non-field personnel, the ability to easily report vegetation concerns through phone, radio, or communication.. Company's Overall Vegetation Management Summary During 0, Gulf pruned the remaining 0 miles (/ of its 79 total feeder miles) to complete its scheduled three-year cycle, which began in 00. Additionally, the other / (79 miles) of main line primary were inspected and any vegetation conditions found to be out of specification were pruned or removed. Gulf pruned 8 miles in 00 and 9 miles in 0. During 0, Gulf pruned 87 miles of its total,70 miles of lateral lines in the rd year of its four-year cycle, which began in 00. Gulf pruned,060 miles in 00 and,0 miles in 0. In comparing 0 to 0, system performance continued to improve. Outages per mile and customer interruptions per mile all improved in Distribution Performance Metrics (System Wide). Distribution VM Reliability FEEDER LATERAL Outages & Interruptions Unadjusted Adjusted Diff. Unadjusted Adjusted Diff. A) Number of Outages,6 90 B) Customer Interruptions,6,9 9, 7,8,90 C) Outages Per Mile D) Cl Per Mile E) Customer Minutes of Interruption,78,9,6, 7,78 7,676,6 6,07,0,60,0 8

11 .. Distribution Performance VM Miles Cleared and Contractor Cost Plan (mi) Actual (mi) Plan($) Actual($) A) MATS Mainline Annual Trim Schedule ( Year Cycle) 0 0 $08,000 $,6 B) MICS Mainline Inspect & Correct Schedule ( Year Cycle) $90,60 $06, C) SALT Scheduled Annual Lateral Trim ( Year Cycle),9 87 $,6,09 $,,6 D) TICKETS (T) Hot Spot Tickets Feeder (T) Lateral (T) Feeder($) Lateral($) Completed with Contract Cost 0,0 $0 $,06. Total Distribution Vegetation Cost VM Planned Vs Actual Program Costs Plan($) Actual($) A) VM Contractor Costs (MATS, MICS, SALT, and TICKETS) $,97, $,,67 B) VM Other Program Costs (Internal Labor and Miscellaneous) ~,6 S,0 C) Total Distribution Vegetation Cost $,0,000 $,90,.0 Joint Use Pole Attachment Audits Gulf performs its joint use inventory audits, covering the overhead distribution system as required by FPSC Order No. PSC PAA-EI every five years. The most recent audit was completed on December, 0. The next audit is scheduled for 06.. Activity and Costs Incurred for 0 and 0 Projections No additional costs are anticipated in 0. 9

12 Joint Use Attachment Audits -Distribution Poles NOTES: (A) Number of company owned distribution poles (See Note ) 00,776 (B) Number of company distribution poles leased: 8 Telecomm attachers on Gulf's poles (See Note ) 6,870 (C) Number of owned distribution pole attachments: 7 CATV, numerous Government and other rd party attachers on Gulf's poles (See Note ) 9,96 (D) Number of leased distribution pole attachments: Foreign poles Gulf Power is attached to (See Note ) 7,66 (E) Number of authorized attachments: Sum of all attachments to Gulf Power Company poles (See Note ) 96,8 (F) Number of unauthorized attachments: 0 (G) Number of apparent NESC violations involvino electric infrastructure Note (H) Number of apparent NESC violations involving ra party facilities Note Note : Data has been updated based on the 0 year end GIS data. Note : Gulf Power does not collect this type of data as part of the joint use process. When Gulf becomes or is made aware of NESC violations, Gulf takes corrective measures..0 Six-Year Inspection Cycle for Transmission Structures. Activity and Costs Incurred for 0 and 0 Projections In 00, Gulf participated with Georgia Power Company, Alabama Power Company, and Mississippi Power Company to develop and adopt the Southern Company Transmission Line Inspection Standards. Gulf contracts ground line inspections and uses a combination of Company employees and contractors to perform comprehensive walking and aerial inspections. Gulf Power Company's transmission inspection program is based on two alternating twelve-year cycles which result in a structure being inspected at least every six years. As part of the Transmission Line Inspection Standards, Gulf performs at least routine aerial patrols each year. In 0, Gulf Power spent a total of $,07 on a combination of comprehensive walking and ground line treatments for metal poles and towers. In addition to this amount, Gulf spent $,7 on a combination of comprehensive walking inspections and ground line treatments for wood and concrete poles. These amounts are shown in Section. and. respectively. All inspections are on schedule to meet the six-year timeline. Additionally, Gulf performed aerial inspections of its system with an actual cost of $7,6. 0

13 . Transmission Circuit, Substation and Other Equipment Inspections Gulf completed transmission substation inspections during 0 as planned. The costs associated with inspections are not tracked separately from general maintenance expenses. Gulf transmission does not inspect by circuit.. Transmission Metal Pole and Tower Inspections 0 Activity 0 Costs 0 Goal Actual Budget Actual Goal Budget (A) Total Transmission Metal Poles and Towers lnspections(note l -, (B) Transmission Metal Poles and Towers 6 6 $, $,07 $6,699 (C) Percent of transmission Metal Poles and Tower inspections completed - % NOTES: Note : Several structures that were previously classified as multi-pole steel were re-classified as towers. This resulted in a net decrease in the number of metal poles and towers.. Transmission Pole Inspections 0 Activity 0 Costs 0 Goal Actual Budget Actual Goal Budget (A) Total number of Transmission Poles -, (B) Number of transmission poles inspected.,609,68 $96,70 $,7,90 $6,000 (C) Number of transmission poles passing inspection. -, (D) Number of transmission poles failing strength test (overloaded) - N/A (E) Number of transmission poles failing inspection (other reasons) (F) Number of transmission poles corrected (strength failure) (G) Number of transmission poles corrected (other reasons) (H) Total transmission poles replaced N.A (Note ) - NOTES: Note : Gulf uses current year inspections and prior years' inspections in determining the poles to be replaced in the current year. Therefore a goal for poles to be replaced in 0 is not applicable.

14 ,. 6.0 Storm Hardening Activities for Transmission Structures 6. Activity and Costs Incurred for 0 and 0 Projections Gulf Power Company identified two priority hardening activities for transmission structures: installation of guys on H-frame structures and replacement of wooden cross arms with steel cross arms. These activities will add additional strength capacity to the existing structures. Gulf Power Company believes these two activities are the best alternatives for existing transmission assets most at risk. The installation of guys on H-frame structures was completed in 0. The replacement of wooden cross arms with steel cross arms is proceeding on schedule to meet the 07 completion date. 6. Hardening of Existing Transmission Structures (Poles) 0 Activity 0 Costs 0 Goal Actual Budget Actual Goal Budget (A) Transmission structures hardened (Note ) (Note ) 00 (Note ) (B) Percent Transmission structures hardening completed - 0% NOTES: Note : Actual dollars spent are incorporated into a budget for infrastructure replacement projects and not separated by hardening activity. 7.0 Distribution Substations 7. Five-Year Patternsffrends in Reliability Performance of Distribution Substations Gulf reviews each substation related outage, and actions are taken to reduce the possibility of a similar-caused outage occurring in the future. The review of data for the past five years does not show any trends or patterns in items affecting distribution substation reliability. 7. Distribution Substation Reliability Tracking Each abnormal substation related outage is reviewed. Analyses are performed and corrections are made to reduce the potential for future outages as a result of a similar system disturbance.

15 ,. II. ' le 7. Distribution Substation Reliability Problem Identification Process In order to promote substation reliability, inspections are performed. These inspections include visual checks on all equipment including breakers, regulators, transformers and battery banks. The substation is verified to ensure that proper signs are installed. The fence is checked for security and proper grounding. Security lights are checked and weed problems are noted. Any abnormal condition is documented in Gulf Power's existing Standard Transmission Operation and Maintenance Program (STOMP) and scheduled for repair. Along with station inspections, equipment maintenance is performed on a regular cycle to maintain reliability. A detailed battery inspection is completed every six months with impedance tests performed every four years. Preventative diagnostics on Oil Breakers are performed every two years. Preventative diagnostics on kv vacuum breakers are performed every four years. Preventative diagnostics on regulators are performed every year. A dissolved gas analysis is performed on transformers every year and power factor testing is performed every six years. 7. Distribution Substation Inspections during Normal Operations Gulf inspected all of its distribution substations at least once during Geographic Information System (GIS) B. Activity and Costs Incurred for 0 and 0 Projections Gulf completed its distribution facilities mapping transition to its new Distribution Geographic Information Syster:n (DistGIS) in 009. The Transmission system has been completely captured in the Transmission GIS database. Transmission GIS continues to be updated with any additions and changes as the associated work orders for maintenance, system improvements, and new business are completed. 8. Distribution Overhead Data Input All overhead distribution equipment has been captured in Gulf's DistGIS

16 including conductors, regulators, capacitors and switches, protective devices such as reclosers, sectionalizers, fuses and transformers. The DistGIS continues to be updated with any additions and changes as the associated work orders for maintenance, system improvements, and new business are completed. This on-going process provides Gulf sufficient facility information to use with collected forensic data to assess performance of its overhead system in the event of a major storm. 8. Distribution Underground Data Input All underground distribution equipment has been captured in Gulf's DistGIS including conductors, regulators, capacitors and switches, protective devices such as reclosers, sectionalizers, fuses and transformers. The DistGIS continues to be updated with any additions and changes as the associated work orders for maintenance, system improvements, and new business are completed. This on-going process provides Gulf sufficient facility information to use with collected forensic data to assess performance of its underground system in the event of a major storm. 9.0 Post Storm Data Collection and Forensic Analysis 9. Activity and Costs Incurred for 0 and 0 Projections Distribution: While Gulf did feel some effects from Hurricane Isaac in August 0, the event was not significant enough to bring the forensic collection team on the system. The contractor did conduct a refresher training course during 0 to ensure the inspectors stay current on the procedures for forensic collection. Gulf feels confident that it is ready to perform post-storm forensics if needed in the 0 storm season. Transmission: Gulf Power Company's Transmission department's forensics team will be led by the transmission engineering function. Utilizing an aerial patrol with a fixed wing aircraft, the team will capture an initial assessment of the level of damage to the transmission system. A follow-up aerial patrol utilizing helicopters will capture GPS coordinates for each failure and record the failures with the Transmission Line Inspection System (TLIS). When ground crews arrive on the scene, the construction inspector with the crew will be responsible for assessing all damage and making a determination as to the cause of the failure. Gulf's Transmission

17 'e Engineering department will review all findings of the field inspection and determine if additional information should be gathered. Gulf Power's existing Common Transmission Data Base (CTDB) will be utilized to capture all forensic information. The TLIS tool will be used to track all facility failures and create work orders to associate those failures with the affected facilities. TLIS utilizes geographic mapping software to track the location of the facilities. 0.0 Outage Data Differentiating Between Overhead and Underground Systems Gulf did experience outages and damage from several FPSC excludable storms in 0. These storms, although excludable under the FPSC rules, did not produce major storm related data. 0. Activities and Costs Incurred in 0 and 0 Projections As reported previously, Gulf expanded its record keeping and analysis of data associated with overhead and underground outages, some of which is included in Section.0. of this report. Gulf continued collecting the following data on outages as they occur: UG cable is: o direct buried o direct buried but cable injected o in conduit Pole type is: o concrete o wood This data was collected as each outage occurred using the Company's Trouble Call Management System (TCMS). Data collected in 0 is shown in the tables below. This data includes transmission, planned outages, and all exclusions. The costs of collecting this data were minimal as existing systems and processes were utilized.

18 . ~ e. e... ~,~t<'"'. _ ; ~.:?:.'*-, ";" :t:~x..ura IOf)~'t;,~: ~,,,,,.~.~}- ~-.;..., ")'t, : "~, ~,,,. ~"" ~.,,. ".a.jj+,7 Overhead 6,0 776,86 69,797,76,788, ,7 URD - Direct Burial 68 7,98,7,8 6, ,7 URD - In Conduit 69,77 7, 6, ,7 URD - Injected 9, ,7 URD- Undetermined 0 0,970,0,070 0, Coordination with Local Governments Gulf Power Company is committed to coordinating with local governments on major projects and storm preparedness. For all major projects, Gulf Power meets with governmental entities as appropriate to discuss the scope of the projects and coordinate activities involved with project implementation. Gulf Power also works very closely with the county Emergency Operation Centers (EOC) in its service area for storm preparedness and restoration activities as needed. In 007, Gulf initiated an ongoing survey with the four active EOCs in Northwest Florida to gauge the company's collaboration with the EOCs. In the surveys, the Directors for the Escambia County, Santa Rosa County, Okaloosa County, and Bay County EOCs are asked to gauge Gulf Power's participation level, responsiveness, presence in the EOC, and overall information exchange. Three surveys of this type have been conducted since 007. In all cases, all four EOCs rated Gulf Power's coordination efforts as "Outstanding." The surveys show that Gulf Power values and actively pursues a positive and cooperative relationship with the leadership in every community served. In addition, Gulf maintains year-round contact with city and county officials to ensure cooperation in planning, good communications and coordination of activities. Gulf Power has hosted Community Leader Forums in the three geographic districts. Community, government, education and business leaders are invited to these half-day events where Gulf Power gives an update on the company's plans and activities and asks for input from the community. Working with the community leaders, two or three key community issues are identified and

19 :e brought to the forum for leaders to listen to each other and build consensus on how to address the issues. Gulf Power hosts an annual economic symposium where relationships with these key officials are nurtured. Gulf Power also has designated employees in every community whose job is to keep in regular contact with city, county and business leadership.. Ongoing Programs Gulf Power Company has several employees with local government liaison responsibilities in Northwest Florida. District managers are located in Pensacola, Ft. Walton, and Panama City. Local managers, who report to the district managers, are located in Milton, Crestview, Niceville, and Chipley. These employees interact with city and county personnel on a daily/weekly basis regarding numerous issues, including emergency preparedness as needed. These employees are also actively involved in specific government/business committees that focus on emergency preparedness needs in Northwest Florida. Examples of those include: Member of BRACE (Be Ready Alliance for Coordinating for Emergencies). BRACE is an Escambia County organization unique to Florida but part of a federal government directive that encourages communities to develop more effective preparedness programs for various types of disasters. Member of Okaloosa County Emergency Management Committee. This Committee is a coordinated effort between government and business to address emergency preparedness issues on a monthly basis. Gulf Power Line Clearance Specialists and Forestry Services Technicians also communicate routinely with members of the community, government officials, and military leaders concerning area vegetation management projects and other issues such as: () new customer and Company construction projects; () utility right-of-way maintenance; () major initial clearing projects (i.e. road additions and re-sizing projects, new distribution feeders, water and sewer projects, military projects and missions, etc.); and () storm preparation and recovery activities. Routine communications range from office and field visits to phone and radio conversations. In addition to numerous planning meetings with the EOCs, Gulf Power personnel also participated in the following hurricane activities with government entities during 0: 7

20 ~-~--~-~---~- ~. Storm Preparation. Storm Restoration Escambia County EOC Hurricane Drill - All EOC Activations EOC Representative Training Santa Rosa Co. EOC Hurricane Drill - All EOC Activations EOC Representative Training Okaloosa County EOC - Hurricane Drill EOC Representative Training - Storm response training in North and South Okaloosa County where we met with local disaster preparedness officials to go over storm readiness and response plans and to get their feedback. Bay County EOC - All EOC Activations - First responder recognition Florida Division of Emergency Management - Geomagnetic Storm Exercise (Region workshop and statewide exercise). Thirteen employees are assigned to the county EOCs throughout Northwest Florida. Each of those employees received federal certification under the National Incident Management System (NIMS) through FEMA. The EOC Representatives assist city and county agencies and officials during emergencies that warrant activation of the county EOCs. Gulf Power provides -hour coverage throughout the duration of the EOC activation. All actions are based on the Company's central Emergency Operations Plan. Gulf Power's Emergency Operations Plan includes ongoing communications, pre-storm communications, and post-storm communications supplied by the Corporate Communications Department. Company News Releases are delivered to the County EOCs at least twice daily during storm restoration events to keep local government agencies and officials apprised of the latest Company restoration activities. Gulf Power maintains an active communication link with the activated EOCs for storm events. Assigned Gulf Power representatives coordinated pre-storm activities with the County EOCs to establish emergency communication links 8

21 e with local and state officials, the media, and restoration crews for all 0 EOC activations. Gulf Power strives to restore emergency services as quickly as possible. In addition, Gulf Power has completed storm-hardened pilot projects for feeder lines that serve critical infrastructures such as hospitals, water treatment facilities, and fuel depots to minimize outages of these facilities during major storm events. Gulf's service area was affected by Hurricane Isaac in August 0. Restoration of the resulting outages was handled by the local district offices working with the Company Emergency Management Center (CEMC) staff to allocate resources as needed. It was therefore not necessary to fully activate Gulf's CEMC. Personnel were assigned to the local EOC's to facilitate communications..0 Collaborative Research As a member of the Public Utility Research Center (PURC), Gulf participates in the research activities for Storm Hardening as described by PURC management in Appendix..0 Disaster Preparedness and Recovery Plan Gulf's 0 Disaster Preparedness and Recovery Plan had no major revisions from what was submitted in the Company's March, 0 0 annual filing. A copy can be provided upon request.. Activity and Costs Incurred for 0 and 0 Projections Gulf continues to provide annual refresher training (instructor lead and computer based) in the area of storm preparedness for various storm roles at minimal cost.. Disaster Recovery Plan Activity Gulf's 0 Storm Procedures Manual is currently being revised and reviewed by management. Any revisions will be returned and incorporated in the Manual by June, 0. Storm assignments and training schedules are being finalized with plans for training to be completed prior to hurricane season. 9

22 Hurricane Drill. e. A mock hurricane drill was conducted on May, 0, at Gulf's Corporate Office. The purpose of this drill was to raise awareness and continue a culture of preparedness both at work and at home. All participants rehearsed departmental readiness plans in response to a natural disaster. Discussions focused on: The importance of a drill as it related to the preparedness cycle of () updating plans and procedures () organizing, training, and equipping personnel () conducting exercises to test our thought processes and plans and to identify and correct any gaps and () evaluating and improving processes The importance of employees preparing their homes and family both prior to and after landfall Safety precautions both before, during, and after a storm at home and at work Lessons learned from off system restoration efforts Worst case scenarios The importance of internal and external communications The drill scenario called for a tornado event similar to the April 0 Tuscaloosa occurrence. Unlike a hurricane, advance notice was hours rather than days. Participants tested their responses and the quality of existing plans on issues related to employee availability and notification to impact. Gulf Power Company's next hurricane drill is scheduled for May, 0..0 Storm Season Ready Status Storm Recovery Plan Gulf uses the strategy described in its Storm Recovery Plan to respond to any natural disaster that may occur in our service area. The plan has previously proven to be very effective in recovering from multiple storms that have impacted Gulf and its customers. As part of its annual operations, Gulf has developed and refined its planning and preparations for the possibility of a natural disaster in the Florida panhandle. This planning is updated annually to build on what works well and to improve in areas that do not work as well as intended. In these updates, Gulf strives for continuous improvement by building on experiences from recovery efforts within northwest Florida as well as from lessons learned while assisting other utilities that have experienced natural disasters. 0

23 :e,. Gulf's plan has been encapsulated within a detailed and proprietary Storm Recovery Plan procedure manual as an element of its Natural Disaster Preparedness and Recovery program. The manual will follow the guidelines and philosophy set forth in the Storm Recovery Plan. The restoration procedure establishes a plan of action to be utilized for the operation and restoration of generation, transmission, and distribution facilities during major disasters. Such disasters include hurricanes, tornadoes, and storms that could cause widespread outages to Gulf's customers. The overall objective is to restore electric service to Gulf's customers as quickly as possible while protecting the safety of everyone involved. The company acquires support from a number of resources including but not limited to the Southeastern Electric Exchange (SEE) Mutual Assistance Group and Southern Company for distribution, logistics and the Transmission Emergency Restoration Plan. In the logistics and support areas, contracts are negotiated and confirmed with vendors for services such as food, lodging, materials, transportation, fuel and other support functions. Staging sites are secured, and if needed, agreements are negotiated and signed. Gulf's Supply Chain Management department ensures that materials on hand, along with available supplies from the material vendors, are sufficient to meet the anticipated demands of the storm season..0 0 Reliability Performance. Overall Performance Gulf's 0 Adjusted System Average Interruption Duration Index (SAIDI) is reported as minutes, which is a slight increase of minutes over 0 results. The Adjusted System Average Interruption Frequency Index (SAIFI) decreased from. in 0 to.6 interruptions. The Customer Average Interruption Index (CAIDI) increased to 98 minutes compared to the 89 minutes in 0. Momentary Interruptions that Gulf's customers experienced decreased to. momentary interruptions in 0 compared to.0 momentary interruptions in 0. In 0 the percent of customers experiencing more than interruptions decreased to. percent compared to.87 percent in 0. Also, while certain indices show an increase compared to 0, Gulf logged 0 reliability related customer complaints in 0 as seen in the FPSC Complaint Activity Tracking System.

24 :e The increase in SAlOl, CAIOI, and LBAR is primarily due to a nonexcludable severe thunderstorm event on July 6th and ih which resulted in SAlOl minutes and.06 interruptions. Without this event Gulf's SAlOl would be 98 minutes, CAIOI would be 89. minutes and LBAR would be 6.69 minutes. See event characteristics below: Non Excludable Severe Thunderstorm Event: July ath_ih, 0 N = 6 Cl =,699 CMI = 6,99, SAlOl= SAIFI = 0.06 CAIOI = 9 Gulf's top five causes of outages are animal, deterioration, lightning, trees, and unknown. Of the top five outage causes, unknown was the only outage cause which showed a decrease from 0. Outages due to animal activity increased 9% in 0 driven by the large number of grey squirrels in Gulf's service area. The population of squirrels is affected by nut bearing trees (high in Gulf's service territory), food availability (0's bumper crop), seasonal weather (a warm winter promoted higher activity), frequency of hurricanes (or current lack thereof), and other factors. These factors and other indicators point to squirrel activity being significantly higher than in 0. In 0, thunderstorm activity increased 0% which contributed to an increase in tree and lightning outages by % and %, respectively, and this 0% increase also included a severe thunderstorm event that Gulf experienced in July 0. Additionally in 0, thunderstorm activity was a source of a % increase in deterioration outages experienced. Gulf had several distribution weather exclusions for 0. These are listed in section.7. In 0, Gulf continued to seek improvements in the company's distribution reliability through continued focus on "root" causes and added distribution automation. See Appendix for 0 actual data and adjusted data.

25 . Data Tracking Level Gulf continues to collect outage data down to the customer meter level using the Trouble Call Management System {TCMS).. Critical Review of Detailed Reliability Data System Level In 0, Gulf was impacted by several storm events which did meet the FPSC exclusion criteria. The main non-excludable event occurred on July 6th- ih. As mentioned earlier, without this event Gulf's 0 system SAlOl, CAIOI, and LBAR would have equaled or been lower than 0 indices results as seen in the following table. 0 vs. 0 without July 0 Severe Thunderstorm DATE DISTRICT SAlOl SAlOl CAIDI CAIDI LBAR LBAR CENTRAL EASTERN WESTERN SYSTEM District Level The July storm is the driver behind the Western district SAlOl and CAIOI increase for 0. The Central district was impacted by the July storm as well as other storms in 0. As a result of the increased storm and squirrel activity in the Central district, SAlOl increased by 7.9 minutes for animal outages,.7 minutes for unknown outages,.09 minutes for wind/rain outages, and. minutes for deterioration outages. Number of Outages Gulf's adjusted system outages increased % which was predominately driven by animal related outages and the increase in weather related events. The major increases in 0 compared to 0, are 7 animal outages, 9 deterioration outages, 8 lightning outages, and 07 wind/rain outages.

26 . :e le The July storm accounts for 0 of the 8 lightning outages and 6 SAlOl minutes and 69 tree outages and SAlOl minutes. The number of outages for animal, deterioration, lightning, trees and wind/rain outages all show an increase, but SAlOl for these outages did not increase equally except for animal outages as seen in the table below. Outages Compared to SAlOl Year N N %Inc. SAID I SAID I %Inc. Animal 0 7% % Deterioration 98 9 % % Lightning 7 87 % % Trees 7 9 % % Wind/Rain 7 8 9% % The number of animal outages has risen since the hurricanes of 00 for the reasons described above. The majority of the animal outages are not recurring at the same devices. Gulf has continued to resolve this issue by installing animal protection where the outages occur and on new installations or when performing maintenance work. The animal outages are isolated events that mainly occur at the transformer level and Gulf is confident that the animal protection being installed will ultimately reduce the number outages caused by animals in the future. Percent Feeder List In 0 Gulf did not have any feeders on the adjusted % feeder list from 0. Gulf did have two feeders to reoccur within the last five years. One of the re-occurring feeders decreased from 6 outages in 008 to outages in 0. The other re-occurring feeders had outages in 008 and outages in 0, with different outage causes from 008 compared to 0. Also, both feeders show decreased LBAR and CAIDI in 0 compared to 008 as seen in the table below. 0 Adjusted % Feeder List Analysis Year Feeder N 6 L-Bar 7 6 CAIDI 7

27 . :e ~ I - I Planned Outages Gulf Power has again recorded more Planned Outages in 0 than in previous years. Since the implementation of AMI, the AMI meter reports an outage at the time of the outage thus helping to capture these types of outages more consistently. The implementation across Gulf's system is now complete.. Identification and Selection of Detailed Reliability Data The identification and selection of detailed reliability data continues to be a part of Gulf's TCMS process. Gulf's outage data collection captures information down to the customer meter level. As a result, Gulf can review data and the resulting reliability indices at the system level and by its three districts- Western, Central, and Eastern.. Generation Events -Adjustments There were no generation events excluded from distribution reliability reporting in 0..6 Transmission Events -Adjustments See Appendix for transmission excluded events and associated outage causes and resolutions..7 Extreme Weather- Adjustments May - Tornado indices are as follows: N = Cl =,08 CMI = 6,7 SAlOl = 0.78 SAIFI = CAIOI = 0.7 June 9-0 EOC Opened due to severe flooding, indices as follows: N = Cl =,6 CMI =,86,7 SAlOl =.7 SAIFI = 0.0 CAIOI = 0.7

28 ., Hurricane Isaac indices are as follows: N = 99 Cl = 0,999 CMI =,9,76 SAIDI =.87 SAIFI = 0.09 CAIDI = 6. December 0th Tornado indices are as follows: N = Cl = 0 CMI = 6,8 SAIDI = 0.0 SAIFI = CAIDI = 6.9 Tropical Storm Debby indices are as follows: N = 9 Cl =,800 CMI = 69, SAIDI =.60 SAIFI = CAIDI = Other Distribution Adjustments Please see Appendix for Planned Outage excluded events..9 Adjusted Reliability.9. Outage Event Causes.9.. Five-Year Patterns Below are trend tables showing the percentage of change inn and separate tables for SAIDI and SAIFI showing the percentage change for five years for the top ten outage causes. Gulf is still in the process of analyzing the 0 data to determine the need for any specific improvement activities beyond current programs and storm hardening initiatives which are underway. 6

29 . :e Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company {All) Data N %Change N %Change N %Change N %Change Animal Data N %Change N %Change N %Change N %Change Deterioration Data N %Change N %Change N %Change N %Change ,67,89 7% 0%,97, -6% %,66 6,8 % 9% 9,90, % % ,009 9% 8% 0-6% 7%,0,006 7% 98%,089,7 0% 6% % -% % 6%,8, % %,88,00 % % ,98,9,7,80 6% -6% -% 9%,96,9,7,98-8% -% -8% % 6,9,99,6 6,8 -% -6% -8% %, 0,7 9,89 0,90 -% -8% -7% % ,7-7% -0% 0% 9% % 0% -% %,86,77,8,0-7% -% % %,,96,0,8-9% -% % 9% % -9% -0% % 9 9-0% 0.0% % 8%,,,0,9 -% 0.08% -% %,,,98,9 % -% -% %

30 . Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Lightning Data 007 N 7 %Change % N 78 %Change -8% N,87 %Change -9% N, %Change -8% Tree Data 007 N 9 %Change % N %Change % N 87 %Change 6% N,9 %Change 0% Unknown Data 007 N %Change % N %Change -% N 67 %Change -6% N 7 %Change -% % 8% -6% 9% -% 0 8 % -9% -% -8% %,, ,98 % -% -% -% 9%,,080,69,7,87 % -% -% -% % % % -% % % % -6% -% % 9% % -% -7% % -%,,9 ',7,9-7% -% -% % % % % -% 8% % % % -% % % % % -% % -8% % % -% 8% -% 8

31 Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Vehicle Data N %Change N %Change N o/o Change N %Change Other Data N % Chal}9e N o/o Change N %Change N %Change Contamination /Corrosion Data N %Change N o/o Change N %Change N o/o Change % 0% % 8% % -8% % -% % -8% 7 6-7% -% 6 9-9% -% 7-7% -6% % 9% 7 8% % % 9% 0 % % % -% 0% % % -% % -% 60 -% 6% -% 8% % -% -6% 0% % 9% -% 7% o/o 9% -8% 0% 9 6 % 7% -% 6% % 7% -% % % % -% 7% % % -7% 9% % % -% % 66 0 % % -% 9%

32 Cause Wind/Rain Region Data Central N 7 6 %Change -78% -% 79% -% -8% 600% Eastern N %Change -8% 0% -0% % -% % Western N %Change -6% % -% -7% -9% % Company N Cause %Change -7% -% -% -6% -% % Vines Region Data Central N 0 0 %Change 88% 0% -% 7% -9% -% Eastern N %Change -% % -% % 0% -6% Western N %Change % % % % -% -0% Company N %Change % 7% -7% 6% -% -% The SAlOl and SAIFI Trend Tables showing the percentage change for five years for the top ten causes are shown below. Cause (All) Region Data Central SAID I %Change -7% -0% 8% 8% -% % Eastern SAID I %Change -70% 0% 0% -% -7% -0% Western SAID I %Change -8% 0% 8% 7% -7% % Company SAID I %Change -9% 6% 6% % -% % 0

33 i. Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company (All) Data SAIFI %Change SAIFI %Change SAIFI %Change SAIFI %Change Animal Data SAID I %Change SAID I %Change SAID I %Change SAID I %Change Animal Data SAIFI %Change SAIFI %Change SAIFI %Change SAIFI %Change % 0%..7 -% %..9 % 0% % 0% % -6%.0. -7% 0%.. 6% 09% % 6% % 8% % -8% % 9% % 9% % 6% -% 7% % 6% -0% -9% % 8% -% -% % 8% -8% -7% % -% -% 9% % 7% -60% 0% % -% -% % % % -0% % % % -8% 7% % % -% -% % 9% -0% 8% % % -8% 9%

34 Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Deterioration Data SAID I %Change SAID I %Change SAlOl %Change SAID I %Change Deterioration Data SAIFI %Change SAIFI %Change SAIFI %Change SAIFI %Change Lightning Data SAID I %Change SAID I %Change SAID I %Change SAlOl %Change % -% % 7% % % % 9% % 8% % 0% % 0% % % % -8% % % % 8% % % % 0.0% -9% % % 6% -% -% % 9% -% 8% % 6% -9% 0% % 9% -8% % % 9% % -9% % 0% -7% % % % -% -% % -8% 69% -% % -6% 67% -% % -6% -6% 0% % -% % 9%

35 . Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Reo ion Central Eastern Western Company Lightning Data SAIFI %Change SAIFI %Change SAIFI %Change SAIFI %Change Tree Data SAIDI %Change SAID I %Change SAIDI %Change SAID I %Change Tree Data SAIFI %Change SAIFI %Change SAIFI %Change SAIFI %Change % -% % -8% % % % -9% % -8%.0 % % % -6% % -8% % -0% % % % -7% % -6% % -7% % -0% % -6% 98% 6% % -6% -% 8% % -0% 6% 7% % 9% 0% -9% % -% -% 6% % % -% -% % % -8% -% % -% 7% -6% % -% -9% -7% % % % -9% % % -% -9%

36 Cause Unknown Re ion Data Central SAID I %Chane 7% -0% -% 6% -% 7% Eastern SAlOl %Chane -6% -6% 7% 7% % -67% Western SAlOl %Chan e -9% 9% -0% 7% % -% Company SAlOl %Chan e -9% -% -% 7% 8% -0% Cause Unknown Re ion Data Central SAIFI %Chane -6% 77% -8% 68% -% 8% Eastern SAIFI %Chan e % -6% 6% 9% 6% -7% Western SAIFI %Chane -7% % -9% % -% -8% Company SAIFI %Chan e -% % -% % 7% -% Cause Vehicle Re ion Data Central SAlOl %Chan e -% % -9% -0% -7% % Eastern SAID I %Chan e -% % % -66% % -7% Western SAID I %Chan e % -% -8% 6% -7% % Company SAID I %Chan e % % -% -7% -% 0%

37 Cause Reo Central Eastern Company Cause Region Central Eastern Western Company Cause ion Western Reoion Eastern Western Company Central v ehicle D ata s AIFI o/c o Chan e s AIFI o/c o Chan e s AIFI o/c o Chan e s AIFI o/c o Chan e 0 ther D ata s AIDI o/c o Chan e s AID I o/c o Chan e s AID I o/c o Chan e s AIDI o/c o Chan e 0 ther D ata s AIFI o/c o Chan e s AIFI o/c o Chan e s AIFI % Chan e s AIFI % Chane % % 0.7 8% 0.06 % %.7 -%.96 9%.7 0% % % 0.0 8% % % -% % 7% 0% % % -9% 67% -78% % -% % -9% % % -% % -% -9% % -79% % -80% -8% % % 76% -88% -% % 9% -0% % -6% % 0% 6% -6% -% % -7% 0% -7% -0% % 9% 00% -89% -6% % 87% 9% -% -0% % 06% % -6% -0%

38 Cause Reo ion Central Eastern Western Company Cause Region Central Eastern Western Company Cause Reo ion Central Eastern Western Company Contamination /Corrosion Data SAID I %Change SAID I %Change SAID I %Change SAID I %Change Contamination /Corrosion Data SAIFI %Change SAIFI %Change SAIFI %Change SAIFI %Change Wind/Rain Data SAID I %Change SAID I %Change SAID I %Change SAID I %Change % -8% % 000% % -6% % 96% % -7% % 7% % 8% % 8% % -% % 6% % -% % % % % -6% -8% % -% -6% 0% % 8% -% -% % % -6% % % 97% -% -8% % -% -89% 7% % -0% -% -0% % 7% -6% 0% % % -87% 87% % % -6% -8% % -% % 9% % -% -% 87%

39 Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Cause Region Central Eastern Western Company Wind/Rain Data SAIFI o/o Change SAIFI o/o Change SAIFI o/o Change SAIFI o/o Change Vines Data SAID I o/o Change SAID I o/o Change SAID I o/o Change SAIDI o/o Change Vines Data SAIFI o/o Change SAIFI o/o Change SAIFI o/o Change SAIFI o/o Change % -% % 8 o/o % -8% % -% % 8% % 00% % 0% % 9% % 00% % 00% % -0% % 00% % -6% -9% 00% % % -79% % % -66% % % % -% -% 78% % -0% % -8% % -7% 98% -0% % -8% % % % -6% % -8% % -0% 00% -67% % -0% 00% -60% % -87% 0% 00% % -7% 0% 0%

40 .9.. Identification and Selection/Process Improvements Gulf continues to focus its process improvement efforts on the system wide top ten outage causes through its existing programs and the new storm hardening efforts Activities and Budget Allowances In general, it is not practical to provide an itemized list of all activities that Gulf has included in its budget that are related to distribution reliability. Gulf's budget and accounting systems do not separately categorize and track capital expenditures or 0 & M expenses on the basis that they are related specifically to distribution reliability. Virtually all distribution functional capital projects and 0 & M expenses have been or will be undertaken as part of Gulf's commitment to provide customers with reliable and high quality electric service. Gulf's Vegetation Management Program is an exception to the above. The activities and budgets associated with this program are provided in Section Three Percent Feeder List.9.. Five-Year Patterns Gulf had two feeders in the Actual report, and zero feeders in the adjusted report which were listed in last year's report. The initial review of the reports showed that in all cases, the associated feeder problems were corrected at the same time of the outage. Additional reviews of the feeders will be conducted to determine if there are any specific improvements that can be performed to avoid having these feeders becoming repeats..9.. Identification and Selection/Process Improvements Gulf continues to focus its process improvement efforts on the system wide top ten outage causes through its existing programs and the new storm hardening efforts. 8

41 ! Activities and Budget Allowances Please see the response to Section.9.. for 0 activities and budget allowances..9. Regional Reliability Indices.9.. Five-Year Patterns Please see tables given in Section Identification and Selection/Process Improvements Gulf continues to focus its process improvement efforts on the system wide top ten outage causes through its existing programs and the new storm hardening efforts Activities and Budget Allowances.0 Overhead- Underground Reliability.0. Five-Year Patterns NOTE: % Change is from one year to the next. System Overhead Please see the response to.9.. for 0 Activities and Budget allowances. Region Data Central N-,,98,67,07,097,9 %Change % % 7% -7% -% % Eastern N-,77,9,79,667, ',78 %Change -7% % -9% -% -9% % Western N-,96,96,80,,09,9 %Change 8% 0% -% -7% -7% % Company N- 8,9 0,76 0, 9,88 8,67 9,8 %Change % 6% -% -9% -7% % 9

42 .. :e System Region Central Eastern Western Company System Region Central Eastern Western Company System Region Central Eastern Western Company Underground Data N %Change N %Change N %Change N %Change Overhead Data SAID I %Change SAID I %Change SAID I %Change SAID I %Change Underground Data SAID I %Change SAID I %Change SAID I %Change SAID I %Change % -6% % % 0 7-6% %,06,07 -% % % 0% % % % 0%.7.7 -% 9% % -% % -% % % % -% % -8% -% % 6 % 8% -% % 7 6 -% % -% % 99,09 9,009-6% 6% -9% 6% % 7% -% % % -0.0% -0% 8% % 6% -7% 66% % 7% -% 7% % -8% 8% 7% % -6% % 66% % % -% 99% % -% -7% 77%

43 ,. i. ~,. :e le ' System Region Central Eastern Western Company System Region Central Eastern Western Company Overhead Data SAIFI %Change -9% 8% -% % -% 98% SAIFI %Change -% % % 9% -% % SAIFI %Change 6% % 0% 8% -% 6% SAIFI %Change -8% 0% 6% 9% -9% 7% Underground Data SAIFI %Change % % -% -% -9% 86% SAIFI %Change -% -% 7% 8% -89% % SAIFI %Change -9% -% 9% % -% 8% SAIFI %Change -6% % -% % -9% %. 0. Identification and Selection/Process Improvements Gulf continues to focus its process improvement efforts on the top ten outage causes system wide through its existing programs and the new storm hardening efforts Activities and Budget Allowances Please see Section Overhead (OH) and Underground (UG) Metrics Please see Appendix for specific feeder data for Gulf's overhead and underground lines. The tables below represent reliability metrics for Gulf's overhead and underground system for 0.

44 -... _!~_?,g_8 EASTERN..., j 6Q,9...,78, 8,89, 8,,8,. 9,6, wesfi~:rn- -,a9 i.~o9t,9...76~8- T--~6.,7.T 9,o ; C f r~ M_ ---~--~ r ~---~."[~~~[.~~g~~r-:.~~~~ii.. :_i~i~~i-_r_-~~!?i@:s:~~-i~i.~~~fj, : CENTRAL. l 0, ,79 99,86. 7,87. ', EASTERN. - a:oeo - -' ,9'6 -,68-:6 6;-. Underground WESTERN. 9 i 7,08 ; 7,.,78,700 0, Note: Total Customers above are from Gulfs Trouble Call Management System, which does not include nonmetered accounts.... J. ~f ft~.-= =].~g~_r=.ittii~~== -~~~~= L~? ~~-.. ~-~!-~L!~~~:~.?_.t... 7!~~f. 89. :.0 i Overhead.96' r '{7T WESTERN 9~ S6.6T. 6.6, 97. J,,,,,,'"'""'"'''''", ~~--,--...,.,,... ~ t ''''"''""''' l SYSTEM l 76.9 I.88 i 0.0 ; 9;98 I 8. [ 9.00! j ".,_ ' " "...,, ,...!...,., """t""''" --..., : CENTRAL i 0.0 ' U n d ergroun d, ' Vo.'E:! BN ! 7.. SY~JEM. ():.~~--- _. - Q~Q'f-l EASTERN t - o.o :oei " 6.6 A review of the above data continues to reinforce observations made in Gulf's March, 0 report. There are several difficulties with comparing overhead outage statistics and underground outage statistics. The first is trying to ensure a true "apples to apples" comparison. This is very difficult to do given that historically the construction standard for Gulf's system has been overhead and as a result is approximately three times that of Gulf's underground system. The main difficulty is that the comparison suffers from problems of scale. The growth of Gulf's underground system is driven by customer demand based on aesthetic reasons. This results in the construction of underground subdivisions, commercial developments and conversion of overhead lines that are spread across Gulf's distribution system, in neighborhoods and near businesses. Over time the effect of this growth pattern on the distribution system results in the development of an overhead backbone serving "pockets" of underground distribution facilities. A review of the data in the tables above continues to bring out the same important points.

45 : le e First, Gulf has less than one-fourth of its system installed as underground. This means that overhead is over three times as. exposed to outage-causing events and hence should experience more outages than underground, which it does. The result of dividing the SAlOl by miles of OH or by miles of UG indicates that both overhead and underground are comparable when you compare their SAlOl on a per mile basis as shown in the bottom chart. Second, comparing the L-Bar of overhead and underground shows that underground outages last nearly twice as long as overhead outages. This continues to support the long held assertion that underground outages require more time to locate the problem and restore power than overhead outages. Third, comparing the calculation of CI/N for overhead and underground which gives the average number of customers affected by an outage indicates that underground outages typically affect fewer customers than an overhead outage, in fact, about half as many. This supports the observation of an overhead backbone serving "pockets" of underground. Thus the data available to Gulf for underground outages, at this time, continues to be limited to mostly small-scale outages, whereas Gulf's overhead outage data includes both small-scale and large-scale outages. Fourth, comparing the CAIDI calculation for overhead and underground shows underground has a CAIDI value that is about times that of overhead's, which continues to be consistent with Gulf's previous observations that underground outages have longer durations and fewer customers affected. As discussed in last year's Reliability Report, the problem of scale is raised in attempting to answer the question, 'Would Gulf Power be more or less reliable if their entire system was underground?" Gulf's underground is currently located in isolated "pockets" served from an overhead backbone. This limits Gulf's underground outage data to mostly small-scale outages, which, in turn, limits the number of customers that can be affected by any single underground outage. This places an upper limit on underground's SAIDI. If that limitation were to be removed by creating a system with an underground backbone, the analysis of L-Bar and CAIDI predicts that Gulf's reliability could degrade significantly simply due to the extended duration of each outage that occurs. In addition, Gulf's experience after major storms has shown that there is a higher failure rate for underground facilities

46 that may have been subjected to high water due to a major storm. In summary, without taking into consideration the recognized high cost of underground, continued analysis of available overhead and underground metrics at this time does not support using underground as a storm hardening option. It will be re-evaluated each year, as more data is accumulated, and technology evolves. Gulf's installation of underground distribution facilities continues to outpace overhead due to customer demand based on aesthetic reasons.. Reliability Related Customer Complaints.. Five-Year Patterns Gulf Power management reviews a monthly report which supplies data on FPSC complaints and inquiries. Gulf Power's complaint activity as reflected in the FPSC Consumer Activity Report has remained at very low levels. The graph below, based on the FPSC Consumer Activity Report, is provided to illustrate Gulf Power's customer complaint trend. The numbers represent Service complaints only and are from the FPSC Complaint Activity Tracking System. Gulf's logged complaints for 0 decreased to 0. Customer Service Complaint History

47 .. Correlation of Reliability Related Customer Complaints to Indices Gulf Power has not determined a correlation of reliability related customer complaints to indices. Management continues to review complaints as they occur to determine if there are any deficiencies and if so, takes action to correct them... Identification and Selection/Process Improvements Due to Gulf's very low FPSC Consumer Activity Report complaints and no apparent correlation of reliability-related customer complaints to outage indices, Gulf has not implemented any programs to identify and select systemic actions to improve reliability based on customer complaints. Gulf will continue to review complaints as they occur to determine if there are any deficiencies and will take the needed action to correct them.

48 > \,'tj "'C (I) ::J c. - X ~

49 ., Form 0- Actual Data Appendix 0 Distribution Service Reliability Reports- Actual Service Reliability Indices- Actual Gulf Power Company District or Service Area SAID I CAIDI SAIFI MAl Fie CEMI (a) (b) (c) (d) (e) (f) Central % Eastern % Western % System Averages % I

50 Appendix 0 Distribution Reliability Reports - Actual CENTRAL EASTERN WESTERN SYSTEM SAID I= System Average Interruption Index Total Number of Customer Minutes of Interruption (CMI) 7,87, ,76, ,680, ,8,97 7. Total Number of Customers Served (C),8,8,6,7 CAIDI = Customer Average Interruption Duration Index Total Number of Customer Minutes of Interruption (CMI) 7,87, ,76, ,680, ,8, Total Number of Customer Interruptions (CI),88 8,78,98 8ll,0 SAIFI =System Average Interruption Frequency Index Total Number of Customer Interruptions (CI), ,78.6, ,0.866 Total Number of Customers Served (C),8,8,6,7 MAIFie= Momentary Average Interruption Frequency Index Total Number of Customer Momentary Interruption Events (CME) 7,89.99,6.80,,90.,99,.9 Total Number of Customers Served (C),8,8,6,7 CEMIS = Customers Experiencing More Interruptions than Number of Customers Experiencing More Interruptions than,8.%,67.8% 0,6.86% 7,76.09% Total Number of Customers Served (C),8,8,6,7 L-Bar Minutes of Interruption,0,9 ll.9 Total Number of Outages 7,7

51 Appendix 0 Distribution Services Reliability Reports -Actual Causes of Outage Events - Actual Gulf Power Company Number of Outage Average Duration Cause Events (N) (L-Bar) (a) (b) (c) Planned Outage,8 8. Animal, Deterioration,7 6.0 Lightning, Tree,6. Unknown Wind/Rain Vehicle Contamination/Corrosion 7.7 Other All Others System Totals 7,7.9 Average Restoration Time (CAIDI) (d)

52 Appendix 0 Distribution Service Reliability Reports- Actual Utility Name: Gulf Power Company Year: 0 Percent Feeder List - Actual Number of Customers Primary Circuit No. of ld. No. Outage Avg Listed Years Corrective Action or Sub-station Events Duration Last in the Completion Name Origin Location Residential Commercial Industrial Other Total (N) (L-Bar) CAIDI Year? LastS Date (a) (b) (C) (d) (e) (f) (g) (h) (i) (i) (k) (I) (m) (n) 790 Glendale Road CENTRAL,, N December Laurel Hill CENTRAL y December 0 8 Bayou Marcus WESTERN,70 6, N 0 December 0 9 Live Oak WESTERN,7 79, N 0 December Devilliers WESTERN N 0 December 0 7 Gulf Breeze WESTERN,9 09,0 0 0 N 0 December 0 78 Scenic Hills WESTERN,80 87, N 0 December Miramar CENTRAL, 70,9 0 N 0 December 0 97 Destin CENTRAL,7 7,9 0 N 0 December 0

53 ..) e., District or Service Area (a) Central Eastern Western System Averages Appendix Form 0 -Adjusted Data 0 Distribution Service Reliability Reports- Adjusted Service Reliability Indices- Adjusted Gulf Power Company SAID I CAIDI SAIFI MAl Fie CEMI (b) (c) (d) (e). (f) % % % %

54 Appendix 0 Distribution Reliability Reports - Adjusted CENTRAL EASTERN WESTERN SYSTEM SAID I= System Average Interruption Index Total Number of Customer Minutes of Interruption (CMI),0, ,86, ,06, 8.0 9,9,.0 Total Number of Customers Served (C),8,8,6,7 CAIDI = Customer Average Interruption Duration Index Total Number of Customer Minutes of Interruption (CMI),0, 9.6 9,86, ,06, ,9, 97.6 Total Number of Customer Interruptions (CI) 0, 0,97 69,70 0,79 SAIFI = System Average Interruption Frequency Index Total Number of Customer Interruptions (Cl) 0,.6 0, , ,79.9 Total Number of Customers Served (C),8,8,6,7 MAIFie= Momentary Average Interruption Frequency Index Total Number of Customer Momentary Interruption Events (CME) 08,789. 0,.70 99,9.69,80,0. Total Number of Customers Served (C),8,8,6,7 CEMIS = Customers Experiencing More Interruptions than Number of Customers Experiencing More Interruptions than,6.% 8 0.7%,7.0%,8.% Total Number of Customers Served (C),8,8,6,7 L-Bar Minutes of Interruption,0, Total Number of Outages 0,90 6

55 - -- i Appendix 0 Distribution Service Reliability Reports -Adjusted Causes of Outage Events - Adjusted Gulf Power Company Number Average of Outage Average Duration Restoration Cause Events (N) (L-Bar) Time (CAIDI) (a) (b) (c) (d) Animal, Deterioration, Lightning, Tree, Unknown Vehicle Other. 9.7 Contamination/Corrosion Wind/Rain 8..8 Vines All Others System Totals 0,

56 Appendix 0 Distribution Service Reliability Reports- Adjusted Utility Name: Gulf Power Company Year: 0 Percent Feeder List - Adjusted Primary Number of Customers Circuit No. of ld. No. Outage Avg Listed Years Corrective A~tion or Sub-station Events Duration Last in the Completion Name Origin Location Residential Commercial Industrial Other Total (N) (L-Bar) CAIDI Year? Lasts Date (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (I) _(_m} (n) 8 Bayou Marcus WESTERN,70 6, N 0 December 0 77 Bayou Marcus WESTERN,9 0, N December 0 78 Scenic Hills WESTERN,80 87, N 0 December Glendale Road CENTRAL,,967 N December 0 8 Hathaway EASTERN,6,87 N 0 December Miramar CENTRAL, 70,9 6 9 N 0 December Devilliers WESTERN N 0 December 0 79 Century WESTERN N 0 December 0 77 Bayou Marcus WESTERN,0, N 0 December 0 8

57 e. e Appendix 0 Excluded Transmission Events Resulting in Customer Outages //0 Transmission, Tree Cut - Public Manual //0 Transmission,7.. Tree Cut - Public Manual /0/0 Transmission 7,8.87,9 77. Failed Equipment Manual /0/0 Transmission 0,98.0, Failed Equipment Manual /0/0 Transmission 8,.9,7 77. Failed Equipment Manual /7/0 Transmission,80.00, Failed Equipment Manual /7/0 Transmission, Failed Equipment Manual /7/0 Transmission 9,896.80,96.7 Failed Equipment Manual /7/0 Transmission 97,00.0, Failed Equipment Manual /7/0 Transmission 8,80., Failed Equipment Manual /7/0 Transmission 8, Failed Equipment Manual /7/0 Transmission,6.97,06.6 Failed Equipment Manual /7/0 Transmission 77,9.8, Failed Equipment Manual /7/0 Transmission, Failed Equipment Manual /7/0 Transmission 9, Failed Equipment Manual /7/0 Transmission 8, Failed Equipment Manual /0/0 Transmission 8,0.0, Lightning Supervisory /0/0 Transmission 0,69.0,9 6.7 Lightning Supervisory //0 Transmission 8,7.87, 7.7 Deterioration Manual //0 Transmission 6,9.67, Deterioration Manual //0 Transmission, Deterioration Manual //0 Transmission,60.0, Deterioration Manual 9

58 Appendix 0 Excluded Transmission Events Resulting in Customer Outages 896 //0 Transmission 9,98.0,8 7. Deterioration 896 //0 Transmission 6,.,96 6. Deterioration 89 //0 Transmission 99,98.90, Deterioration Relay 8977 //0 Transmission 89,9., 7.67 Misoperation Relay //0 Transmission,797.0,0 6. Misoperation Relay //0 Transmission 60,0.67,70 6. Misoperation Relay 8978 //0 Transmission,07.0,0 6. Misoperation Relay 8978 //0 Transmission 79,9.00, Misoperation Relay //0 Transmission 0,0.0,70. Misoperation Relay 898 //0 Transmission 76, Misoperation Relay 898 //0 Transmission 8, Misoperation /0/0 Transmission 9, Deterioration /0/0 Transmission, Deterioration 8997 /6/0 Transmission 0,88.9,.07 Deterioration /9/0 Transmission 7, Tree 9006 /9/0 Transmission Tree //0 Transmission,780.00, Deterioration 908 //0 Transmission, Lightning /9/0 Transmission 9,76.8, 8.98 Relay Failure /9/0 Transmission 6,0., Relay Failure //0 Transmission 60,8.86,8.00 Animal //0 Transmission 08,6.,0 8.7 Animal 909 6//0 Transmission 6,.,6. Deterioration //0 Transmission 7,89.7,87.8 Deterioration /7/0 Transmission Lightning /7/0 Transmission,7.60,8.0 Lightning 0 Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Supervisory Manual Manual Manual Manual Supervisory Supervisory Supervisory Supervisory

59 Appendix 0 Excluded Transmission Events Resulting in Customer Outages 7/7/0 Transmission, Lightning Supervisorv 7/7/0 Transmission LightnillR Supervisory 7//0 Transmission 0, Deterioration Manual 7//0 Transmission 8,.9,7 0.7 Deterioration Manual 7//0 Transmission,.,6.8 Deterioration Manual 7//0 Transmission 6,09., Deterioration Manual 7//0 Transmission,.7,6.7 Deterioration Manual 7//0 Transmission 97,07.87, Deterioration Manual 7//0 Transmission,8.60,.6 Unknown Supervisory 7//0 Transmission 907.0,76.6 Unknown Supervisorv 7//0 Transmission,66.0,6.70 Unknown Supervisory 7/0/0 Transmission, Tree Manual 7/0/0 Transmission 8, Tree Manual 7/0/0 Transmission 0,6.0,98.80 Tree Manual 7/0/0 Transmission 8, Tree Manual 7/0/0 Transmission 8,6.8,8.78 Tree Manual 7/0/0 Transmission, Tree Manual 8//0 Transmission,686.70,.70 Deterioration Supervisory 8//0 Transmission 6,98., Deterioration Supervisory 8//0 Transmission,6.00,77.00 Deterioration Supervisory 8//0 Transmission, Deterioration Supervisory 8//0 Transmission,8.00,7.00 Deterioration Supervisory 8//0 Transmission,8.00, Deterioration Suoervisory 8//0 Transmission,060.00,0.00 Deterioration Supervisory 8/0/0 Transmission 6, LightnillR Supervisory 8/0/0 Transmission,0.00,9.0 Lightning Supervisory

60 Appendix 0 Excluded Transmission Events Resulting in Customer Outages 9 8/0/0 Transmission,980.80,0.0 Lightning 98 8/0/0 Transmission,9.8,7. Lightning 97 8/0/0 Transmission,0.80,99.0 Lightning 98 8/0/0 Transmission, Lightning 96 8/0/0 Transmission, Lightning //0 Transmission,66.60,09.0 Switching Error /7/0 Transmission 8,.60,8.0 Tree /7/0 Transmission,0.9,9. Tree /7/0 Transmission,89.07, Tree /7/0 Transmission 7, Tree 996 9//0 Transmission,.07,66 7. Deterioration 99 9//0 Transmission,8.00,7.00 Deterioration 998 9//0 Transmission 9,77.,9 9. Deterioration 990 9//0 Transmission,80.,98.7 Deterioration 99 9//0 Transmission,07.00,0. Deterioration 99 9//0 Transmission,76.8,7.7 Deterioration 99 9//0 Transmission, Deterioration 996 9//0 Transmission,708., 8. Deterioration 999 9//0 Transmission 6,., Deterioration 90 9//0 Transmission 0,06.00, Deterioration 98 9//0 Transmission 8,8.7,0 6. Deterioration 909 9//0 Transmission 0,79., 0.9 Deterioration 909 9//0 Transmission 6,98.0, 0.8 Deterioration 906 9//0 Transmission 0,6.07, 'Deterioration 96 9//0 Transmission 6,89.07, 0.9 Deterioration 960 8/0/0 Transmission 9,7.00, Lightning Supervisory Supervisory Supervisory Supervisory Supervisory Manual Supervisory Supervisory Supervisory Supervisory Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Manual Supervisory

61 Appendix 0 Excluded Transmission Events Resulting in Customer Outages 0//0 Transmission Deterioration Supervisory 0//0 Transmission Deterioration Supervisory 0/9/0 Transmission 88,89.00, Animal Manual 0/9/0 Transmission,678.00, Animal Manual 0/9/0 Transmission 97,07.00, Animal Manual //0 Transmission, Deterioration Supervisory //0 Transmission Deterioration Manual Relay //0 Transmission,8.00, MisoQ_eration Manual Relay //0 Transmission,80.00, Misoperation Manual Relay //0 Transmission 7,.00, Misoperation Manual Relay //0 Transmission, Misoperation Manual Relay //0 Transmission 6,7.00,8.00 Misoperation Manual Relay //0 Transmission, Misoperation Manual Relay //0 Transmission, Misoperation Manual Relay //0 Transmission,06.00,06.00 Misoperation Manual Relay //0 Transmission,6.90,698. Misoperation Manual Relay //0 Transmission Misoperation Manual //0 Transmission 67,8.00, Animal Manual //0 Transmission 6,7.00, Animal Manual

62 Appendix 0 Planned Outages Table // Planned //0 Planned // // //0.88 //0 6 // // // //0 9 Planned //0 Planned 0.0 0

63 ~ Appendix 8877 //0 887 // //0 887 //0 887 //0 887 // //0 887 //0 887 // // // // // // //0 888 //0 888 // // //0 888 // //0 888 //0 888 // //0 888 //0 888 //0 0 Planned Outages Table Planned Outag_e 6.00 Planned Outage.00 Planned Outage Planned Outage.00 Planned Outage Planned Outage 0.00 Planned Outage Planned Outage 6.00 Planned Outage 9.8 Planned Outage 76.0 Planned Outage 6.6 Planned Outage Planned Outage 6.00 Planned Outage. Planned Outage.0 Planned Outage 6.00 Planned Outage 8,7.7 Planned Outage 6.90 Planned Outage 8.8 Planned Outage 7.67 Planned Outage 8. Planned Outage 78. Planned Outage.8 Planned Outage.00 Planned Outage 6.0 Planned Outage

64 r Appendix 0 Planned Outages Table //0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /7/0 Planned Outage, /7/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned OutaQe /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned OutaQe /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage

65 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage 79.7 Planned Outage 9.00 Planned Outage 9.00 Planned Outage.00 Planned Outage.00 Planned Outage 7.00 Planned Outage,0.0 Planned Outage 6.00 Planned Outage.90 Planned Outage.7 Planned Outage 8.0 Planned Outage Planned Outage 8. Planned Outage.80 Planned Outage 7.98 Planned Outage Planned Outage.87 Planned Outage Planned Outage 7.0 Planned Outage.7 Planned Outage 86.9 Planned Outage,88. Planned Outage Planned Outage 89.8 Planned Outage 7.6 Planned Outage

66 Appendix 0 Planned Outages Table 888 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage.0 88 //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage, //0 Planned Outage //0 Planned Outage /0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe 0, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage,

67 , //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage.7 Planned Outage,09.00 Planned Outage.90 Planned Outage 6.00 Planned Outage.00 Planned Outage Planned Outage 8.00 Planned Outage.00 Planned Outage.00 Planned Outage Planned Outage 8.90 Planned Outage Planned Outage.0 Planned Outage.00 Planned OutaQe 8.7 Planned Outage,60.00 Planned Outage 7.97 Planned Outage 6,7.00 Planned OutaQe,0.00 Planned Outage 8.00 Planned Outage.0 Planned Outage 8.00 Planned Outage 8.00 Planned Outage. Planned Outage 7. Planned Outage

68 Appendix 0 Planned Outages Table 888 //0 Planned Outage /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage 0, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage,

69 i.. I 880 /7/0 880 /7/0 888 /8/0 88 /8/0 886 /8/0 880 /8/0 88 /8/0 886 /8/0 88 /8/0 88 /8/0 887 /8/0 886 /8/ /8/ /8/0 88 /9/0 88 /9/0 886 /9/0 88 /9/0 88 /9/0 888 /9/0 889 /9/0 880 /9/0 88 /9/0 88 /9/0 88 /9/0 889 /9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outaoe Planned Outage 6, Planned Outage Planned Outaoe, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outage. 0.7 Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage.. Planned Outage.7.7

70 Appendix 0 Planned Outages Table 88 /9/0 Planned Outage. 886 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outaoe /9/0 Planned Outage /9/0 Planned Outaoe. 88 /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage.7 88 /0/0 Planned Outage /0/0 Planned Outage

71 /0/0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage 7. Planned Outage,86.0 Planned Outage.60 Planned Outage, Planned Outage 8.80 Planned Outage.9 Planned Outage 8.00 Planned Outage 7.0 Planned Outage 8.9 Planned Outage 8.0 Planned Outage 87. Planned Outaae.00 Planned Outage 6.0 Planned Outage.87 Planned Outage 6.00 Planned Outaae,708.6 Planned Outage 66. Planned Outage Planned Outage 9.78 Planned Outage Planned Outage 08.8 Planned Outage 97.0 Planned Outage 7.6 Planned Outage Planned Outage 9.7 Planned Outage

72 8877 // // // // // // // // //0 888 //0 888 // // // // // // // // // //0 889 // /6/ /6/ /6/ /6/ /6/0 Appendix 0 Planned Outages Table Planned Outage 88.7 Planned Outage 6. Planned Outage 9.8 Planned Outage 9.8 Planned Outage 8.90 Planned Outage 79.7 Planned Outage.0 Planned Outage 0.8 Planned Outage 9.60 Planned Outage.0 Planned Outage 8.00 Planned Outage. Planned Outage.7 Planned Outage,9.0 Planned Outage 8.0 Planned Outage 0.0 Planned Outage Planned Outage 9.60 Planned Outage 8.00 Planned Outage 7. Planned Outage 8,. Planned Outage,9.00 Planned Outage.0 Planned Outage 6.00 Planned Outage 8. Planned Outage L _

73 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 Appendix 0 Planned Outages Table Planned Outage 9.00 Planned Outage 7.7 Planned Outage.6 Planned Outage 7.7 Planned Outage 6.7 Planned Outage 676. Planned Outage 70. Planned Outage 6. Planned Outage.7 Planned Outage. Planned Outage 9.0 Planned Outage.0 Planned Outage 0.60 Planned Outage 8.00 Planned Outage 9.0 Planned Outage 66.7 Planned Outage 7.7 Planned Outage 8.77 Planned Outage.8 Planned Outage 9.87 Planned Outage 9.0 Planned Outage 07.7 Planned Outage 6. Planned Outage 76.0 Planned Outage 8.7 Planned Outage

74 Appendix 0 Planned Outages Table 8860 /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 888 //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

75 /0 /0 /0 /0 //0 /0 /0 /0 /0 // / /0 /0 0 /0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage 79. Planned Outage. Planned Outage 8.0 Planned Outage Planned Outage Planned Outage.00 Planned Outage.7 Planned Outage Planned Outage. Planned Outage Planned Outage 6.7 Planned Outage 9.7 Planned Outage.7 Planned Outage,78.7 Planned Outage.9 Planned Outage 06.7 Planned Outage 9.6 Planned Outage 67.0 Planned Outage 7.0 Planned Outage. Planned Outage.7 Planned Outage.8 Planned Outage 79.0 Planned Outage

76 Appendix 0 Planned Outages Table 8869 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 886 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage

77 888 /6/ /6/0 888 /6/0 888 /6/0 888 /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/0 889 /6/0 Appendix 0 Planned Outages Table Planned Outage.9 Planned Outage 7,699.6 Planned Outage,.00 Planned Outage 0.0 Planned Outage 9.8 Planned Outage,6.0 Planned Outage 9.90 Planned Outage 6.00 Planned Outage.7 Planned Outage 7.6 Planned Outage. Planned Outage 69.7 Planned Outage Planned Outage,7.87 Planned Outage 8.00 Planned Outage 9. Planned Outage,7.67 Planned Outage.00 Planned Outage 8.80 Planned Outage Planned Outage 7.00 Planned Outage 6.00 Planned Outage 6.00 Planned Outage.0 Planned Outage Planned Outage

78 Appendix 0 Planned Outages Table 889 /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned OutaQe /7/0 Planned Outage /0 Planned Outage, /0 Planned Outage /0 Planned Outage 6, /0 Planned OutaQe, /0 Planned Outage /0 Planned Outage, /7/0 Planned Outage /0 Planned Outage /0 Planned OutaQe /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned OutaQe /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage

79 880 /8/0 880 /8/0 880 /8/0 880 /8/ /8/ /8/0 880 /8/0 880 /8/ /8/ /8/ /8/0 880 /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/0 Appendix 0 Planned Outages Table Planned Outage 0.6 Planned Outage 6.7 Planned Outage 0. Planned Outage 6.00 Planned Outage 08.6 Planned Outage 9.00 Planned Outage,8.80 Planned Outage 6.00 Planned Outage 9.6 Planned Outage 9.7 Planned Outage. Planned Outage 66. Planned Outage.90 Planned Outage.0 Planned Outage Planned Outage. Planned Outage 7. Planned Outage 0.6 Planned Outage.7 Planned Outage 9. Planned Outage 8.7 Planned Outage 97.7 Planned Outage 0.00 Planned Outage 6.7 Planned Outage 8.80 Planned Outage,

80 Appendix 0 Planned Outages Table 8809 /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outag_e /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage. 888 /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage.0 88 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage

81 ~. 880 /0/ /0/0 880 /0/0 88 /0/0 88 /0/0 88 /0/0 888 /0/0 88 /0/0 886 /0/0 88 /0/0 88 /0/ //0 886 // // //0 886 // //0 888 // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage Planned OutaQe Planned Outage Planned Outage,9.7.7 Planned OutaQe Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned OutaQe Planned Outage Planned OutaQe Planned Outage 9, Planned Outage, Planned OutaQe Planned Outage Planned OutaQe Planned Outage, Planned OutaQe Planned Outage Planned Outage.00.7 Planned Outage Planned OutaQe Planned Outage Planned Outage.7.8

82 Appendix 0 Planned Outages Table 8899 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

83 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 /0 6/0 6/0 6/0 6/0 6/0 6/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outage.9 7. Planned Outaoe Planned Outage, Planned Outaoe Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage 7, Planned Outaoe Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage

84 Appendix 0 Planned Outages Table 8867 /6/0 Planned Outage /0 Planned Outage /0 Planned Outage /7/0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /7/0 Planned Outage /0 Planned Outage /0 Planned Outage, /0 Planned Outage /0 Planned Outage, /0 Planned Outage 0, /0 Planned Outage 6, /0 Planned Outage /0 Planned Outage, /0 Planned Outage /0/0 Planned Outage /0 Planned Outage, /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage.n /0 Planned Outage /0/0 Planned Outage /0 Planned Outage,68.7 6, n

85 8868 /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage Planned Outage.9.98 Planned Outage Planned Outage.70. Planned Outage.0..7 Planned Outage Planned Outage 6..8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage,.. Planned Outage 6,

86 Appendix 0 Planned Outages Table 8869 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage, //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe, //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage

87 8877 // // // // // // // // // // // // // //0 887 //0 887 //0 887 // // //0 887 //0 887 // //0 887 //0 887 //0 887 //0 887 //0 Appendix 0 Planned Outages Table Planned Outage.90 Planned Outage 6.00 Planned Outage.78 Planned Outage Planned Outage 6.00 Planned Outage 7.60 Planned Outage,67.00 Planned Outage Planned Outage.80 Planned Outage.97 Planned Outage,76.0 Planned Outage 9.00 Planned Outage Planned Outage.60 Planned Outage Planned Outage 0.00 Planned Outage.80 Planned Outage.00 Planned Outage, Planned Outage Planned Outage 9.97 Planned Outage 6.00 Planned Outage 0.9 Planned Outage.8 Planned OutaQe 0.00 Planned Outage

88 Appendix 0 Planned Outages Table 8876 //0 Planned Outaoe //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outaqe //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage n //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage, //0 Planned Outage,

89 //0 //0 //0 //0 //0 /6/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 7/0 Appendix 0 Planned Outages Table Planned Outage 6, Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage 6, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage, Planned Outage Planned Outage Planned Outage. 6.7

90 Appendix 0 Planned Outages Table /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outa~e /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage

91 /8/0 /8/0 /8/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage.9.98 Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage.8.8 Planned Outage 7.0. Planned Outage Planned Outage.. Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

92 Appendix 0 Planned Outages Table /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned OutaQe /0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe, //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 889 /0 Planned Outage /0 Planned OutaQe //0 Planned Outage '

93 // // // // // // // // //0 889 // // //0 889 // // //0 889 // //0 889 // // // // // //0 889 // // //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage 8.80 Planned Outage 6.08 Planned Outage 6.0 Planned Outage 8.97 Planned Outage 7.80 Planned Outage 7. Planned Outage 0.0 Planned Outage. Planned Outage.9 Planned Outage Planned Outage. Planned Outage 0.8 Planned Outage 8. Planned Outage 9.7 Planned Outage.00 Planned Outage 0.67 Planned Outage 7.6 Planned Outage 6.70 Planned Outage 8.7 Planned Outage 76. Planned Outage 0.0 Planned Outage 7.7 Planned Outage 6.60 Planned Outage.0 Planned Outage

94 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage 8, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage

95 . ~ e /6/ /6/ /6/ /6/ /6/ /6/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage.0.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.9.9 Planned Outage Planned Outage Planned Outage.8.8 Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage

96 Appendix 0 Planned Outages Table /7/0 Planned Outage /7/0 Planned Outaae 66, /8/0 Planned Outage /8/0 Planned Outaae /8/0 Planned Outaae /8/0 Planned Outage /8/0 Planned Outaae /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outaae /8/0 Planned Outage /8/0 Planned Outaae /8/0 Planned Outage /8/0 Planned Outaae /8/0 Planned Outaae /8/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outage

97 ~ 890 // // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage.6.6 Planned Outaoe Planned Outage, Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage.7.7 Planned Outaoe, Planned Outage Planned Outage,

98 Appendix 0 Planned Outages Table //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

99 : 8906 // // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage. 8.8 Planned Outage Planned Outage..8 Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage.7.8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

100 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage

101 896 /9/0 896 /9/ /9/0 897 /9/0 897 /9/ /9/ /9/0 89 /9/0 89 /9/0 897 /9/0 899 /9/0 896 /9/ /9/0 897 /0/0 899 /0/ /0/0 896 /0/0 896 /0/ /0/ /0/ /0/ /0/ /0/ /0/0 897 /0/ /0/0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage 6.0 Planned Outage 7.8 Planned Outage Planned Outage,86.0 Planned Outage,0.00 Planned Outage.87 Planned Outage 9.0 Planned Outage,67.7 Planned Outage.8 Planned Outage 0.98 Planned Outage 7.07 Planned Outage,00.0 Planned Outage 0.00 Planned Outage 6.0 Planned Outage.80 Planned Outage 6.98 Planned Outage.00 Planned Outage.00 Planned Outage,08. Planned Outage 6.60 Planned Outage. Planned Outage 6. Planned Outage 0.0 Planned Outage. Planned Outage

102 Appendix 0 Planned Outages Table 8970 /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage. 897 /0/0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outaae

103 89907 //0 899 //0 899 //0 899 //0 899 // // // // // // // // // // // // //0 890 //0 89 //0 896 //0 898 //0 899 // //0 896 //0 896 //0 896 //0 Appendix 0 Planned Outages Table Planned Outage.9.9 Planned Outage Planned Outage Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

104 Appendix 0 Planned Outages Table 897 //0 Planned OutaQe 7, //0 Planned Outage //0 Planned Outaqe //0 Planned Outage. 899 //0 Planned Outaqe //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage /6/0 Planned Outaqe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage,

105 898 /6/ /6/0 898 /6/0 898 /6/0 898 /6/ /6/ /6/0 898 /6/0 898 /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/0 899 /7/ /7/ /7/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage 6.7. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage. 0.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage..67 Planned Outage.6.6 Planned Outage Planned Outage.9.9 Planned Outage Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage.67. Planned Outage

106 Appendix 0 Planned Outages Table 8996 /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outaqe, /7/0 Planned Outage /7/0 Planned Outaqe /7/0 Planned Outage, /7/0 Planned Outaqe /7/0 Planned Outage 9, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outaqe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage 6, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outaqe /7/0 Planned Outage

107 !.,.,. :e 8909 /7/0 890 /7/0 890 /7/ /7/0 89 /7/0 89 /7/0 899 /7/0 89 /7/0 890 /7/0 _,, 8967 /8/0 897 /8/0 897 /8/0 897 /8/0 897 /8/ /8/0 898 /8/0 898 /8/ /8/ /8/ /8/0 899 /8/0 899 /8/0 890 /8/ /8/0 890 /8/0 89 /8/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage. 8. Planned Outage Planned Outage 7, Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage

108 Appendix 0 Planned Outages Table 896 /8/0 Planned OutaQe /8/0 Planned Outage /8/0 Planned OutaQe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage 6. ' 89 /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned OutaQe /9/0 Planned Outage, /9/0 Planned OutaQe /9/0 Planned Outage /9/0 Planned Outage. 899 /9/0 Planned OutaQe /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage.7 89 /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe ~

109 , /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage 8.7 Planned Outage. Planned Outage 8. Planned Outage 7. Planned Outage.67 Planned Outage 8.0 Planned Outage 7.0 Planned Outage 6.0 Planned Outage 6.7 Planned Outage.87 Planned Outage 7,6.9 Planned Outage,7.70 Planned Outage. Planned Outage 7. Planned Outage,9.67 Planned Outage 7.88 Planned Outage Planned Outage,0. Planned Outage.7 Planned Outage 8.00 Planned Outage.87 Planned Outage.07 Planned Outage,0.00 Planned Outage Planned Outage Planned Outage

110 Appendix 0 Planned Outages Table 8907 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

111 89 //0 89 //0 898 //0 896 //0 898 //0 898 //0 897 //0 897 //0 890 //0 89 //0 896 //0 898 //0 899 //0 890 //0 89 //0 89 //0 898 //0 896 // //0 890 //0 89 //0 89 //0 89 //0 897 //0 89 //0 89 //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outag_e Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.9.9 Planned Outage Planned Outage Planned Outag_e Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage.7 8. Planned Outage.8.8 6

112 r Appendix 0 Planned Outages Table 896 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage

113 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /7/0 /7/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outaoe Planned Outage Planned Outage, Planned Outaoe.8.8 Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 9.0. Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage

114 Appendix 0 Planned Outages Table 8900 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outaae /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outaae /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage

115 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outag_e Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

116 Appendix 0 Planned Outages Table 89 //0 Planned Outage //0 Planned Outage. 89 //0 Planned Outage.7 89 //0 Planned Outage, //0 Planned Outage.0 89 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 89 //0 Planned Outaae //0 Planned Outage //0 Planned. Outaae. 896 //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, /0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage 7,

117 89 //0 89 //0 89 //0 896 // // //0 898 //0 898 // // // //0 896 // // // // // // // // // //0 898 //0 898 /6/ /6/ /6/ /6/0 Appendix 0 Planned Outages Table Planned Outaae Planned Outage Planned Outage.7.78 Planned Outage, Planned Outage ;97 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outaae.7.7 Planned Outage Planned Outaae Planned Outage Planned Outaae Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outaae

118 Appendix 0 Planned Outages Table /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned OutaQe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage

119 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage..7 Planned Outage Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage.0.0 Planned Outage Planned Outaae.9.9 Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaae 6.7. Planned Outage Planned Outage.7 7. Planned Outage, Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage

120 Appendix 0 Planned Outages Table 896 /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage. 896 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outa.ge /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage

121 .; /0/0 /0/0 /0/0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage Planned Outage, Planned Outage Planned Outage..7 Planned Outage Planned Outage Planned Outage Planned Outage 6.. Planned Outage Planned Outage Planned Outage Planned Outage. 6.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned.Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage

122 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned OutaQe //0 Planned Outage, //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned OutaQe //0 Planned Outage, //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage 6, //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned OutaQe ~

123 e // // // // // // // // // // //0 898 //0 898 //0 898 // // // // // // // // // /6/ /6/ /6/ /6/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage, Planned Outaoe 6, Planned Outage Planned Outage Planned Outage, Planned Outage 7, Planned Outage Planned Outaae Planned Outage.0.0 Planned Outage, Planned Outage.7.7 Planned Outaoe 0.. Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage

124 Appendix 0 Planned Outages Table 898 /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage

125 , /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/ /0/0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage.6. Planned Outage Planned Outage 66.. Planned Outage.07.0 Planned Outag_e.0.0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.9.9 Planned Outage.. Planned Outage 6.. Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

126 Appendix 0 Planned Outages Table /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage

127 ., 8990 // // // // //0 899 //0 899 // //0 899 //0 899 //0 899 // // // // // / // //0 899 //0 899 //0 899 //0 899 // // // // //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage Planned Outage

128 Appendix 0 Planned Outages Table 8997 //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage, //0 Planned Outage ,

129 //0 //0 //0 //0 //0 //0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 /7/0 Appendix 0 Planned Outages Table Planned Outaoe.. Planned Outage.0.0 Planned Outage Planned Outage.7.7 Planned Outage, Planned Outaoe Planned Outage 7.6. Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outaoe Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage

130 Appendix 0 Planned Outages Table /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outag_e /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage 7, /8/0 Planned Outage /8/0 Planned Outage. 900 /8/0 Planned Outage,. 900 /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage

131 e 900 /8/0 900 /8/0 900 /8/0 900 /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/0 900 /9/0 900 /9/ /9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.8.8 Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage.8.8 Planned Outage, Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage 6,87.. Planned Outage Planned Outage Planned Outage.. Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outag_e.8.8 8

132 Appendix 0 Planned Outages Table 9008 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned. Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage

133 e /0/ /0/ // //0 900 // //0 900 //0 900 // // //0 900 //0 900 /0 900 // //0 900 //0 900 //0 900 // // // // // //0 90 //0 907 // //0 906 //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage,6.7 Planned Outage 0.00 Planned Outage 6.0 Planned Outag_e,0.7 Planned Outage,80. Planned Outage,60.00 Planned Outage 6. Planned Outage Planned Outage 0. Planned Outage.97 Planned Outage 0.00 Planned Outage 7.00 Planned Outage 7. Planned Outage Planned Outage 9.8 Planned Outage.67 Planned Outage 9.60 Planned Outage 8.67 Planned Outage.00 Planned Outage Planned Outag_e 78.7 Planned Outage.80 Planned Outage 8.70 Planned Outage 7.6 Planned Outage ,

134 Appendix 0 Planned Outages Table 9067 //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage 6, //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

135 ( //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage 7.00 Planned Outage 8.70 Planned Outage Planned Outage 6. Planned Outage.07 Planned Outage. Planned Outage.6 Planned Outage 0.8 Planned Outage 6.00 Planned Outage 67.0 Planned Outage 8.00 Planned Outage 76.0 Planned Outage.67 Planned Outage 8.0 Planned Outage 89.9 Planned Outage.07 Planned Outage 97. Planned Outage. Planned Outage 0. Planned Outage 0.00 Planned Outage 7.0 Planned Outage 6.0 Planned Outage 78.7 Planned Outage 8.7 Planned Outage 6.80 Planned Outage

136 Appendix 0 Planned Outages Table 9080 //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage ; //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe. 909 //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage

137 //0 //0 //0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 Appendix 0 Planned Outages Table Planned Outa!le Planned Outage Planned Outage Planned Outaoe Planned Outage, Planned Outage Planned Outaoe Planned Outage.7 0. Planned Outage.80.0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.8.8 Planned Outage Planned Outage.. Planned Outage 6..7 Planned Outage Planned Outage,

138 Appendix 0 Planned Outages Table 907 /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outaae /7/0 Planned Outage /7/0 Planned Outaae /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage

139 .. ~. ::.., 9006 /7/ /7/0 900 /7/0 90 /7/0 90 /7/0 90 /7/0 907 /7/0 908 /7/0 90 /7/0 90 /7/0 900 /7/0 90 /7/0 906 /7/0 900 /7/0 90 /7/ /7/ /7/ /8/ /8/ /8/ /8/ /8/ /8/ /8/0 906 /8/ /8/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outaoe.7.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage

140 Appendix 0 Planned Outages Table 906 /8/0 Planned Outaoe /8/0 Planned Outaae /8/0 Planned Outaae /8/0 Planned Outage /8/0 Planned Outaae /9/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage //0 Planned Outaae 6, //0 Planned Outaae //0 Planned Outaae, //0 Planned Outaae, //0 Planned Outage //0 Planned Outaae, //0 Planned Outaae //0 Planned Outaae //0 Planned Outaae //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outaae //0 Planned Outaae //0 Planned Outage //0 Planned Outaae, //0 Planned Outaae, //0 Planned Outage '

141 9006 // // //0 900 // // //0 900 //0 900 //0 900 // // //0 900 // // // // // // // // // //0 90 //0 907 //0 909 //0 906 //0 906 //0 Appendix 0 Planned Outages Table Planned Outage 89. Planned Outage 9.00 Planned Outage 89.0 Planned Outage 9.8 Planned Outage 7. Planned Outage 7.90 Planned Outage 0. Planned Outage 7.0 Planned Outage 0. Planned Outage 9. Planned Outage 8.80 Planned Outage.7 Planned Outage 0.90 Planned Outage.0 Planned Outage Planned Outage 96.8 Planned Outage Planned Outage 8.7 Planned Outage Planned Outage 89. Planned Outage 8.0 Planned Outage.7 Planned Outage 0.6 Planned Outage 66. Planned Outage 0.0 Planned Outage

142 Appendix 0 Planned Outages Table 909 //0 Planned Outage //0 Planned Outage. 900 //0 Planned Outage //0 Planned Outage 6, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Out~g_e //0 Planned Outage //0 Planned Outage //0 Planned Outage

143 . 'e 900 //0 900 //0 900 //0 900 //0 900 // // //0 90 //0 90 //0 90 //0 90 //0 906 //0 907 //0 909 //0 90 //0 90 //0 90 //0 906 //0 90 //0 906 //0 900 //0 90 //0 90 //0 90 //0 908 //0 906 //0 Appendix 0 Planned Outages Table Planned Outage 8. Planned Outage.00 Planned Outage.00 Planned Outage 0.08 Planned Outage.0 Planned Outage 0.7 Planned Outage 7.70 Planned Outage 6.7 Planned Outage Planned Outage 0.90 Planned Outage 6.7 Planned Outage 8.0 Planned Outage Planned Outage 0. Planned Outage 8.78 Planned Outage 8.0 Planned Outage 9,68. Planned Outage 9.0 Planned Outage 0.78 Planned Outage 6. Planned Outage 96.7 Planned Outage.0 Planned Outage.0 Planned Outage.88 Planned Outage 9.67 Planned Outage 7.0 ' :

144 Appendix 0 Planned Outages Table 9069 //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage 8, //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage

145 /7/0 /8/0 /8/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 Appendix 0 Planned Outages Table Planned Outage 7. Planned Outage 7,8.0 Planned Outage 8.0 Planned Outage 9.77 Planned Outage,09.67 Planned Outage 9.8 Planned Outage 0.0 Planned Outage, Planned Outage 9.67 Planned Outage Planned Outage 7.0 Planned Outage,78.0 Planned Outage,0.0 Planned Outage. Planned Outage Planned Outage Planned Outage 0.00 Planned Outage. Planned Outage,.0 Planned Outage.60 Planned Outage Planned Outage.90 Planned Outage 9. Planned Outage 70.9 Planned Outa~e,9.0 Planned Outage

146 Appendix 0 Planned Outages Table 9070 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage. 900 /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage. 906 /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage ,

147 /0/0 /0/0 /0/0 /0/0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage, Planned Outage.0.0 Planned Outage 6, Planned Outage Planned Outage Planned Outage.6.6 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 7..7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage

148 Appendix 0 Planned Outages Table 9066 //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage 6, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

149 Appendix 0 Planned Outages Table I 90 6// //0 90 6//0 90 6//0 90 6// // // // // // // // // // // // // //0 90 6// // //0 90 6//0 90 6// //0 90 6//0 90 6//0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage, Planned Outage Planned Outage.7.6 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outag_e Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

150 Appendix 0 Planned Outages Table 908 6//0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage,

151 //0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6/6/0 6/6/0 6/6/0 6/6/0 6/6/0 6/6/0 Appendix. 0 Planned Outages Table Planned Outaoe.87 Planned Outage 6.0 Planned Outage 8. Planned Outaoe.6 Planned Outage,00.0 Planned Outage 0.00 Planned Outage Planned Outage 79. Planned Outage.80 Planned Outaoe 9.0 Planned Outage 9.7 Planned Outaoe 0.0 Planned Outage Planned Outaoe,697.9 Planned Outage. Planned Outage 6.60 Planned Outaoe Planned Outage 0.0 Planned Outaoe 96. Planned Outage.80 Planned Outaoe Planned Outage 9.0 Planned Outage 87.0 Planned Outage 0.0 Planned Outaoe 8.60 Planned Outage

152 Appendix 0 Planned Outages Table 907 6/6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outaoe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /7/0 Planned Outaoe /7/0 Planned Outage

153 /7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/7/0 6/8/0 6/8/0 6/8/0 Appendix 0 Planned Outages Table Planned Outaoe Planned Outage Planned Outaoe 9. Planned Outaoe 8. Planned Outage 96.6 Planned Outaoe,7.7 Planned Outage,.8 Planned Outage 8.8 Planned Outage 87.7 Planned Outaoe 8.00 Planned Outage 88.0 Planned Outage 8.0 Planned Outage.8 Planned Outage.0 Planned Outage 8. Planned Outage 09.0 Planned Outaoe 6. Planned Outage 0.0 Planned Outage 7.7 Planned Outage 9.60 Planned Outaoe. Planned Outage 0.00 Planned Outage 8. Planned Outage 8. Planned Outaoe 8.9 Planned Outage

154 Appendix 0 Planned Outages Table /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

155 //0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage 9.00 Planned Outage Planned Outage 8.90 Planned Outage 0.7 Planned Outage 98. Planned Outage 9.7 Planned Outage. Planned Outage,69.9 Planned Outage 0.0 Planned Outage 9.7 Planned Outage.8 Planned Outage 6.00 Planned Outage Planned Outage.8 Planned Outage 9.90 Planned Outage 9.00 Planned Outage.8 Planned Outage 06.0 Planned Outage. Planned Outage 8. Planned Outage 9. Planned Outage.00 Planned Outage 8.90 Planned Outage 6.00 Planned Outage

156 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage 7, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage

157 : //0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 Appendix 0 Planned Outages Table Planned Outage 7.0 Planned Outage 76.8 Planned Outage Planned Outage 0. Planned Outage 6.90 Planned Outage 8.7 Planned Outage,70.0 Planned Outage 8.07 Planned Outage Planned Outage Planned Outage 0.00 Planned Outage.00 Planned Outage 8. Planned Outage,77.7 Planned Outage,.00 Planned Outage 8.00 Planned Outage 7.00 Planned Outage 670. Planned Outage 0.87 Planned Outage.80 Planned Outage 8.00 Planned Outage 7.00 Planned Outage Planned Outage 60.7 Planned Outage Planned Outage

158 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outaoe /6/0 Planned Outage, /7/0 Planned Outaoe, /8/0 Planned Outage 0, /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage., /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outaoe, /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outage

159 9007 6/8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /9/ /9/0 90 6/9/0 90 6/9/ /9/0 90 6/9/0 90 6/9/0 90 6/9/ /9/ /9/ /9/0 90 6/9/ /9/0 90 6/9/0 90 6/9/0 90 6/9/ /9/ /9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7. Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 7..8 Planned Outage Planned Outage.7.7 Planned Outage Planned Outage, Planned Outage, Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage

160 Appendix 0 Planned Outages Table /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage 9, /0/0 Planned Outage /0/0 Planned Outage

161 I. I. ~ /0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6/0/0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 Appendix 0 Planned Outages Table Planned Outage, Planned OutaQe Planned Outage Planned Outage Planned OutaQe.0 6. Planned Outage Planned OutaQe, Planned Outage Planned OutaQe 8..7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outa!le Planned Outage Planned Outa!le Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 8..8 Planned Outage Planned Outage..08

162 Appendix 0 Planned Outages Table 90 6//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaqe //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

163 //0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 6//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage.8.8 Planned Outage Planned Outage, Planned Outage Planned Outage, Planned Outage Planned Outage.70.8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage

164 Appendix 0 Planned Outages Table 96 6//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 98 6/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage

165 967 6/6/0 96 6/6/0 96 6/6/ /6/0 96 6/6/0 96 6/6/0 96 6/6/0 96 6/6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/0 98 6/6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/0 99 6/6/0 Appendix 0 Planned Outages Table Planned Outage. 8. Planned Outage Planned Outage Planned Outage.0.0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outag_e Planned Outage Planned Outage Planned Outage Planned Outag_e Planned Outage Planned Outage ' 6.67 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7 7. Planned Outage Planned Outage Planned Outage Planned Outage,

166 Appendix 0 Planned Outages Table 99 6/6/0 Planned Outage /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outaoe /7/0 Planned Outage, /7/0 Planned Outaoe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outaoe /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outaoe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage.8 9 6/7/0 Planned Outage /7/0 Planned Outage

167 99 6/7/0 9 6/7/0 96 6/7/0 97 6/7/0 98 6/7/0 9 6/7/0 99 6/7/0 90 6/7/0 9 6/7/0 9 6/7/0 96 6/7/0 9 6/7/ /8/ /8/ /8/0 90 6/8/ /8/ /8/0 90 6/8/0 9 6/8/0 9 6/8/0 9 6/8/0 97 6/8/0 99 6/8/0 9 6/8/0 96 6/8/0 Appendix 0 Planned Outages Table Planned Outage 6.00 Planned Outage.0 Planned OutaQe 77.9 Planned Outage.08 Planned Outage 7.68 Planned Outage 6.0 Planned Outage.0 Planned Outage,68.0 Planned Outage 69.0 Planned OutaQe,.0 Planned Outage 9. Planned Outage 0.0 Planned Outage 8. Planned Outage 9.87 Planned OutaQe.0 Planned Outage 6.0 Planned Outage 90.7 Planned Outage.0 Planned OutaQe 8.0 Planned Outage,9.88 Planned Outage 66.9 Planned Outage.07 Planned Outage 87.7 Planned Outage 69. Planned Outage 8.0 Planned Outage ;0

168 Appendix 0 Planned Outages Table 97 6/8/0 Planned Outage /8/0 Planned Outage 7, /8/0 Planned Outage, /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

169 ~. I. ~.,. i //0 99 7//0 99 7// // // // // // // // // // // //0 90 7//0 90 7// // /6/ /7/ /7/ /7/ /9/0 96 7/9/ /9/0 96 7/9/0 96 7/9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage, Planned Outage.70. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage.9 8. Planned Outage Planned Outage Planned Outage 7.7. Planned Outage.00. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

170 Appendix 0 Planned Outages Table 96 7/9/0 Planned Outage /9/0 Planned Out~ge /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outaoe /9/0 Planned Outage, /9/0 Planned Outaoe /9/0 Planned Outage /0/0 Planned Outaoe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage I /0/0 Planned Outage /0/0 Planned Outaoe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outaoe /0/0 Planned Outage /0/0 Planned Outaoe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outaoe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage

171 /0/0 7/0/0 7/0/0 7/0/0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 Appendix 0 Planned Outages Table Planned Outage 6.6. Planned Outage Planned Outage Planned Outage.6 8. Planned Outage Planned Outage Planned Outage Planned Outage,.7. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7.07 Planned Outage Planned Outaae 0.0. Planned Outage Planned Outage.0.0 Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage

172 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0. Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

173 // // // // // // // // // // // // // // // // // /6/ /6/ /6/ /6/ /6/ /6/0 97 7/6/0 97 7/6/ /6/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.6. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage 8..7 Planned Outage Planned Outage

174 Appendix 0 Planned Outages Table 978 7/6/0 Planned Outage, /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage

175 9790 7/6/ /6/ /6/ /6/ /6/0 97 7/6/0 97 7/6/ /6/0 97 7/6/0 97 7/6/ /6/ /6/0 97 7/6/0 97 7/6/ /6/ /6/0 97 7/6/0 97 7/6/ /6/ /6/ /6/0 97 7/6/ /6/ /6/ /6/ /7/0 Appendix 0 Planned Outages Table Planned Outag_e.80 Planned Outage 97.7 Planned Outage,067.0 Planned Outage.60 Planned Outage 8.0 Planned Outage 88. Planned Outage 8.0 Planned Outage 8.0 Planned Outage,.08 Planned Outage 7. Planned Outage.7 Planned Outage 77. Planned Outage. Planned Outage 98. Planned Outage 7.08 Planned Outage.90 Planned Outag_e.70 Planned Outage.7 Planned Outage Planned Outage 6.6 Planned Outage 78.0 Planned Outage 9.0 Planned Outage 8. Planned Outage 6.80 Planned Outage,9.08 Planned Outage

176 Appendix 0 Planned Outages Table /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage. 97 7/7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage. 97 7/7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage

177 /7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/7/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 Appendix 0 Planned Outages Table Planned Outage Planned OutaQe Planned Outage.9.9 Planned Outage 8..7 Planned OutaQe Planned Outage Planned OutaQe Planned Outage Planned OutaQe.9.9 Planned Outage, Planned Outage Planned Outage Planned Outage, Planned Outage, Planned Outage Planned OutaQe Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage. 7.8 Planned Outage Planned Outage Planned Outage

178 , Appendix 0 Planned Outages Table 980 7/8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outaoe

179 /8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 7/8/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage.9.9 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage. 6.8 Planned Outage Planned Outage.8.8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage.8.8 Planned Outage

180 Appendix 0 Planned Outages Table 98 7/8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned OutaQe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned OutaQe /8/0 Planned Outage /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage

181 I. : /9/0 98 7/9/0 98 7/9/ /9/ /9/ /9/0 98 7/9/0 98 7/9/ /9/ /9/ /9/ /9/0 98 7/9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /0/ /0/ /0/ /0/ /0/ /0/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage Planned Outage.8 7. Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Ot.iage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.8.8

182 Appendix 0 Planned Outages Table 988 7/0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage //0 Planned OutaQe //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage 8, //0 Planned Outage

183 , // // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage.. Planned Outaae Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaae.0.0 Planned Outage Planned Outaae Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outaae.0.0 Planned Outage Planned Outaae.87.9 Planned Outage Planned Outage

184 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0?. Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage 9.8 ' //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage ,, ,.,,

185 //0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 Appendix 0 Planned Outages Table Planned Outage 9.88 Planned Outage.98 Planned Outage 9.0 Planned Outage 88.7 Planned Outage 0.0 Planned Outage 9.00 Planned Outage 6.00 Planned Outage 8.00 Planned Outage Planned Outage 0.00 Planned Outage 6.9 Planned Outage 0.7 Planned Outage 6.97 Planned Outage Planned Outage 0.0 Planned Outage 6. Planned Outage 90.0 Planned Outage 8.00 Planned Outage.00 Planned Outage.67 Planned Outage 9.0 Planned Outage 96. Planned Outage 0.0 Planned Outage,708.0 Planned Outage 8. Planned Outage

186 9988 7// // // // // // // // // // // // // // // // // // // // // // // // //0 90 7// Appendix 0 Planned Outages Table Planned Outage. Planned Outage 9. Planned Outage 87.6 Planned Outage 6. Planned Outage 68. Planned Outage. Planned Outage 77.6 Planned Outage 67. Planned Outage Planned Outaae 9.6 Planned Outage.67 Planned Outage 8.7 Planned Outage. Planned Outage.0 Planned Outage 9. Planned Outage.87 Planned Outage 7.6 Planned Outage.00 Planned Outage.7 Planned Outage 0.7 Planned Outage 7.70 Planned Outage 6. Planned Outage.8 Planned Outage 8. Planned Outage 7.0 Planned Outage ,

187 e //0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 7//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage Planned Outage 9..8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.0 7. Planned Outage.9.9 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

188 Appendix 0 Planned Outages Table 900 7//0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outaae //0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage. 90 7/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage

189 e.:, e i 90 7/6/ /6/ /6/ /6/ /6/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /8/ /8/ /8/ /8/0 9 7/0/0 9 7/0/0 97 7/0/0 99 7/0/0 9 7/0/0 9 7/0/0 9 7/0/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 6, Planned Outage 7. 7.

190 Appendix 0 Planned Outages Table 9 7/0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage /0/0 Planned Outage. 99 7/0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0. Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage //0 Planned OutaQe, //0 Planned Outage //0 Planned Outage //0 Planned OutaQe i

191 9879 7// //0 99 7//0 99 7//0 99 7// // // // // // //0 90 7//0 90 7//0 90 7//0 90 7// //0 90 7// // // //0 90 7//0 90 7// //0 90 7//0 9 7//0 96 7//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 78.. Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage.7 7.9

192 Appendix 0 Planned Outages Table 96 7//0 Planned Outage //0 Planned Outage. 96 8//0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaae 8, //0 Planned Outage, //0 Planned Outaoe //0 Planned Outage, //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, ; ,.

193 ., //0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage.7. Planned Outage Planned Outage Planned Outage Planned Outage.0.0 Planned Outage..07 Planned Outage 0.0. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.8.8 Planned Outage Planned Outage Planned Outage Planned Outage.60 8.

194 Appendix 0 Planned Outages Table 987 8//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 9 8//0 Planned Outage.0 9 8//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage 80.9 ' 97 8//0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage ,

195 //0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8/0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 Appendix 0 Planned Outages Table Planned Outaoe Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage, Planned Outaoe Planned Outage Planned Outaoe Planned Outage ' Planned Outage Planned Outage Planned Outage Planned Outaae Planned Outage.0.0 Planned Outage Planned Outage.. Planned Outage Planned Outaoe

196 Appendix 0 Planned Outages Table 966 8/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outa.ge /6/0 Planned Outage no Planned Outage no Planned Outage no Planned Outage

197 \. 99 8/7/0 99 8/7/ /7/ /7/0 99 8/7/ /7/ /7/0 99 8/7/0 99 8/7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/ /7/0 90 8/7/0 90 8/7/ /7/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.8.8 Planned Outage Planned Outaae Planned Outage Planned Outage 6.. Planned Outage Planned Outaae Planned Outage Planned Outaae Planned Outage Planned Outage.7. Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

198 Appendix 0 Planned Outages Table 90 8/7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage.7 9 8/8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage,

199 ,. I 96 8/8/0 96 8/8/0 96 8/8/ /8/ /8/ /8/ /8/0 97 8/8/0 97 8/8/0 97 8/8/ /8/ /8/0 98 8/8/ /8/ /8/0 99 8/8/ /8/ /8/0 96 8/8/0 96 8/8/0 96 8/8/ /8/ /8/ /8/ /8/ /8/0 Appendix 0 Planned Outages Table Planned Outage..6 Planned Outage Planned Outaae Planned Outage 6.7. Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage..6 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outaae.8.8 Planned Outage Planned Outage Planned Outage Planned Outaae..0 Planned Outage

200 Appendix 0 Planned Outages Table 969 8/8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /9/0 Planned Outage 6, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage 8: /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage ' ,.

201 ~ /9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/9/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage.8.8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage.7.7 Planned Outage Planned Outage Planned Outage.9.9 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage

202 Appendix 0 Planned Outages Table 906 8/0/0 Planned Outaoe /0/0 Planned Outage //0 Planned Outaoe //0 Planned Outage, /0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outaoe, //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage c

203 - a // // // // // // // // // // // // // // // // // // // // // // // //0 96 8//0 96 8//0 Appendix 0 Planned Outages Table Planned Outaoe Planned Outage >.0.0 Planned Outage Planned Outaoe Planned Outage.. Planned Outaoe, Planned Outage Planned Outaoe Planned Outage.9 0;7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaoe Planned Outage Planned Outage Planned Outaoe Planned Outage.0.0 Planned Outaoe Planned Outage Planned Outage.7 6. Planned Outage.. Planned Outaoe Planned Outage Planned Outage Planned Outaoe

204 Appendix 0 Planned Outages Table 966 8//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage _.. ~

205 . 'v e 96 8// // // // // // // // // // //0 96 8// // // //0 96 8// //0 96 8// // // //0 96 8// //0 96 8// // //0 Appendix 0 Planned Outages Table Planned Outage,88.00 Planned Outage 0.7 Planned Outage 6.87 Planned Outage.0 Planned Outage.0 Planned Outage 8.8 Planned Outage,98. Planned Outage 7.70 Planned Outage. Planned Outage.0 Planned Outage 9.80 Planned Outage 0.87 Planned Outage 6.80 Planned Outage 60.0 Planned OutaQe 8.7 Planned Outage.7 Planned Outage Planned Outage.0 Planned Outage.60 Planned Outage.80 Planned Outage.0 Planned Outage,6.67 Planned Outage Planned Outage,6.0 Planned Outage 7. Planned Outage,

206 Appendix 0 Planned Outages Table 966 8//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage 7, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe, ~ v

207 968 8// // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage,00. Planned Outage.80 Planned Outaoe. Planned Outage 6.90 Planned Outage 9.00 Planned Outage 7.00 Planned Outage. Planned Outage.60. Planned Outage 0.8 Planned Outage 7.7 Planned Outag_e 8.00 Planned Outage Planned Outaoe 89.0 Planned Outage Planned Outaoe.0 Planned Outage.97 Planned Outage 6.00 Planned Outage.0 Planned Outage 0. Planned Outage.7 Planned Outage 99.7 Planned Outaoe.90 Planned Outage 6.07 Planned Outage 8.9 Planned Outage.0 Planned Outage

208 Appendix 0 Planned Outages Table 8//0 Planned Outage //0 Planned Outage.00 8//0 Planned Outage 7. 8//0 Planned Outage.00 8//0 Planned Outage 0.0 8//0 Planned Outage 9. 8//0 Planned Outage //0 Planned Outage //0 Planned Outage. 8//0 Planned Outage 89. 8//0 Planned Outage //0 Planned Outage.80 8//0 Planned Outage 0.0 8//0 Planned Outage. 8//0 Planned Outage 97. 8//0 Planned Outage 8. 8//0 Planned Outage 8.7 8//0 Planned Outage. 8//0 Planned Outage 0.0 8/6/0 Planned Outage.90 8/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage.00 8/6/0 Planned Outage /6/0 Planned Outage

209 , /6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 8/6/0 Appendix 0 Planned Outages Table Planned Outage 6.00 Planned Outage.0 Planned Outage 8.00 Planned Outage 9.00 Planned Outage 8.00 Planned Outage,88.00 Planned Outage 9. Planned Outage 8.00 Planned Outage 0.00 Planned Outage Planned Outage 99.0 Planned Outage 67.8 Planned Outage.7 Planned Outage,60. Planned Outage Planned Outage.00 Planned Outage Planned Outage 70. Planned Outage 6,8.7 Planned Outage 9.0 Planned Outage Planned Outage 7.00 Planned Outage 0. Planned Outage 6.00 Planned Outaoe 8.78 Planned Outage

210 Appendix 0 Planned Outages Table /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outaae /7/0 Planned Outage, /7/0 Planned Outaae /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /8/0 Planned Outaae /9/0 Planned Outage /0/0 Planned Outaae /0/0 Planned Outage /0/0 Planned Outage

211 /0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8/0/0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 Appendix 0 Planned Outages Table Planned Outage,66.7 Planned Outage 9.60 Planned Outage Planned Outage.0 Planned Outage 6.00 Planned Outage 7. Planned Outage.67 Planned Outage 68.7 Planned Outage 7.8 Planned Outage 6. Planned Outage,8.9 Planned Outage 8.60 Planned Outage 0,6.00 Planned Outage.9 Planned Outage 98.7 Planned Outage Planned Outage 8. Planned Outage 0.00 Planned Outage,.00 Planned Outage,98.0 Planned Outage 7,79.0 Planned Outage 9. Planned Outage 9.00 Planned Outage. Planned Outage.00 Planned Outage

212 Appendix 0 Planned Outages Table 987 8//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

213 //0 8//0 8//0 8//0 8//0 8//0 8//0.. 8//0 8//0 8/0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 8//0 Appendix 0 Planned Outages Table Planned Outage 7.00 Planned Outaoe 0.0 Planned Outage,7.0 Planned Outage 6.77 Planned Outaoe.87 Planned Outage 77. Planned Outaoe 77.0 Planned Outage. Planned Outage 89. Planned Outage Planned Outage 7. Planned Outage 0.88 Planned Outage.68 Planned Outage Planned Outage 6,77.7 Planned Outaoe 76.0 Planned Outage 9.00 Planned Outage Planned Outage 7.00 Planned Outaoe.7 Planned Outage 7. Planned Outage 8.9 Planned Outage 9.60 Planned Outage 0.00 Planned Outage.8 Planned Outage "'

214 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outaae, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outaae 8, //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outa_g_e //0 Planned Outage 78; //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage

215 // // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage.0 Planned Outage 8.7 Planned Outage 6. Planned OutaQe 6.60 Planned Outage,9.8 Planned Outage 9.00 Planned Outage 8.07 Planned Outage 8.00 Planned Outage 8.00 Planned OutaQe.70 Planned Outage 9.00 Planned Outage Planned Outage,.67 Planned Outage,06.87 Planned Outage 9.07 Planned Outage,0.80 Planned OutaQe,0.00 Planned Outage 0.00 Planned OutaQe 0.60 Planned Outage 9. Planned OutaQe 7.0 Planned Outage,.90 Planned OutaQe.88 Planned Outage 9.97 Planned OutaQe,0.80 Planned Outage

216 Appendix 0 Planned Outages Table 997 8/7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage

217 /7/0 8/7/0 8/7/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 8/8/0 Appendix 0 Planned Outages Table Planned Outage 0.87 Planned Outage 77.0 Planned Outage.7 Planned Outage. Planned Outage. Planned Outage Planned Outage 7.0 Planned Outage 7.7 Planned Outage 86. Planned Outage 6.6 Planned Outage 6.80 Planned Outage.0 Planned Outage.88 Planned Outage 0.08 Planned Outage 69.7 Planned Outage 6.9 Planned Outage 0. Planned Outage 7. Planned Outage 9.0 Planned Outage 7.0 Planned Outage 7.87 Planned Outage 8,6.70 Planned Outage.7 Planned Outage. Planned Outage Planned Outage

218 Appendix 0 Planned Outages Table 999 8/8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage. 97 8/9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage

219 :e. 97 8/0/ /0/0 90 8/0/0 9 8/0/0 90 8/0/0 90 8/0/ /0/ /0/ /0/ // //0 97 8// //0 97 8//0 97 8// // // //0 97 8// // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage 0.0 Planned Outage 0. Planned Outage.9 Planned Outage.67 Planned Outage Planned Outage Planned Outage 78.0 Planned Outage 67. Planned Outage 0.00 Planned Outaae Planned Outage Planned Outage. Planned Outage,697.8 Planned Outage 9. Planned Outage 8.7 Planned Outage 8.8 Planned Outage 6.88 Planned Outage.97 Planned Outage. Planned Outage 7.8 Planned Outage 8.7 Planned Outage 6.7 Planned Outage 6. Planned Outage 7.0 Planned Outag_e,7. Planned Outage

220 Appendix 0 Planned Outages Table 980 8//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage,.0 9 9//0 Planned Outaae //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outaae //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outage

221 97 9//0 97 9// // // // // // // // // // // // // // // // //0 98 9// //0 98 9//0 98 9// // //0 98 9//0 98 9//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 6.6. Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage, Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7. Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage

222 Appendix 0 Planned Outages Table 98 9//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 99 9//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 99 9//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

223 99 9// // // // // //0 90 9/6/0 90 9/6/0 90 9/6/0 90 9/6/0 90 9/6/ /6/0 90 9/6/ /6/ /6/0 90 9/6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage.97.8 Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage

224 Appendix 0 Planned Outages Table 908 9/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage. 90 9/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage.0 9 9/7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage 7, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage ~

225 /7/0 9/7/0 9/7/0 9/7/0 9/7/0 9/7/0 9/7/0 9/7/0 9/9/0 9/9/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 9/0/0 Appendix 0 Planned Outages Table Planned Outage.0 Planned Outage,8.00 Planned Outage 6.8 Planned Outage 6.68 Planned Outage 9.00 Planned Outage Planned Outage. Planned Outage,9.87 Planned Outage 9. Planned Outage Planned Outage 8.00 Planned Outage.0 Planned Outage 88. Planned Outage Planned Outage 76.0 Planned Outage.68 Planned Outage 6.9 Planned Outage,086.7 Planned Outage 99.7 Planned Outage Planned Outage.9 Planned Outage 68.7 Planned Outage.87 Planned Outage. Planned Outage 8.9 Planned Outage

226 Appendix 0 Planned Outages Table 969 9/0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 < Planned Outage /0/0 Planned Outag_e /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

227 908 9//0 90 9//0 90 9// // //0 90 9//0 90 9// // // // // // // // // // // // // // //0 90 9//0 90 9// //0 90 9//0 9 9//0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outaae.77.8 Planned Outage, Planned Outaae ' Planned Outage 00.0 ',, 7.0 Planned Outaae Planned Outage, Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

228 Appendix 0 Planned Outages Table 9 9//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage.0 9 9//0 Planned Outage.8 9 9//0 Planned Outage //0 Planned Outage 6, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage, ; e:.,.i

229 . e ' I I. 98 9//0 9 9//0 9 9//0 98 9// //0 96 9// // //0 97 9// // // //0 98 9// //0 99 9//0 99 9// //0 9 9//0 98 9//0 99 9//0 90 9//0 9 9//0 96 9//0 9 9//0 96 9//0 97 9//0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage Planned Outage Planned Outage.67.8 Planned Outage 69. :6 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7.08 Planned Outage, Planned Outage, Planned Outage 0.. Planned Outage,. 6. Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage 8.00 t 8.00 Planned Outage Planned Outage Planned Outage

230 Appendix 0 Planned Outages Table 97 9//0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outage //0 Planned Outage.9 9 9//0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

231 999 9// // // // //0 96 9//0 96 9//0 96 9// // //0 96 9//0 96 9// // //0 96 9// // //0 97 9// // /7/ /7/ /7/0 99 9/7/0 99 9/7/ /7/0 99 9/7/0 Appendix 0 Planned Outages Table Planned Outage 0.00 Planned Outage,9.00 Planned Outage.00 Planned Outage 7.00 Planned Outage. Planned Outage 98.0 Planned Outage.00 Planned Outage 6.00 Planned Outage 90. Planned Outage 07.0 Planned Outage.00 Planned Outage. Planned Outage 8.0 Planned Outage 8.7 Planned Outage Planned Outage.9 Planned Outage,.87 Planned Outage 7,798. Planned Outage ' 0.70 Planned Outage 6.7 Planned Outage 6,8.87 Planned Outage Planned Outage. Planned Outage 6.0 Planned Outage ' Planned Out~ge, H

232 Appendix 0 Planned Outages Table 998 9/7/0 Planned Outage, /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage. 96 9/8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, H

233 /9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 9/9/0 Appendix 0 Planned Outages Table Planned Outage 767. Planned Outage '8.00 Planned Outage 9.00 Planned Outage 8.00 Planned Outage 89. Planned Outage,79.0 Planned Outage 8.8 Planned Outage 6.6 Planned Outage 76. Planned Outage.97 Planned Outage,87.90 Planned Outage.0 Planned Outage.00 Planned Outage.0 Planned Outage 7.70 Planned Outage 6.0 Planned Outage.00 Planned Outage 07.7 Planned Outage 7,6.00 Planned Outage 6.0 Planned Outage,.6 Planned Outage 8.0 Planned Outage Planned Outage Planned Outage. Planned Outage

234 Appendix 0 Planned Outages Table /9/0 Planned Outage /9/0 Planned OutaQe /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage, /0/0 Planned OutaQe /0/0 Planned Outage, /0/0 Planned OutaQe, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outa.g_e

235 /0/0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 9//0 Appendix 0 Planned Outages Table Planned Outage 86.0 Planned Outage 6.00 Planned Outage 6. Planned Outage.0 Planned Outaqe,0.9 Planned Outage 0.00 Planned Outaqe.0 Planned Outage 9. Planned Outaqe,.60 Planned Outage.6 Planned Outage 7,. Planned Outage 88. Planned Outage,80.0 Planned Outage.00 Planned Outage 9.0 Planned Outaqe.00 Planned Outage 7. Planned Outaqe 6, Planned Outage 6.80 Planned Outaqe 7.0 Planned Outage.8 Planned Outage. Planned Outage 8.00 Planned Outaqe 8.0 Planned Outage 7.67 Planned Outage

236 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage

237 // // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 8.7. Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

238 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outa.ge //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0.Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage

239 9809 9/6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/ /6/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outa~e Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 7.. Planned Outage

240 Appendix 0 Planned Outages Table 98 9/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe. 98 9/6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned OutaQe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned OutaQe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned OutaQe /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage

241 /7/0 9/7/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/8/0 9/9/0 9/0/0 9/0/0 0//0 Appendix 0 Planned Outages Table Planned Outage Planned Outage..7 Planned Outage Planned Outage Planned Outage.9.6 Planned Outage, Planned Outage 6, Planned Outage, Planned Outage Planned Outage Planned Outage, Planned Outage 7.0 ;7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.0 0. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

242 Appendix 0 Planned Outages Table 99 0//0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /0 Planned Outage //0 Planned Outage //0 Planned Outage

243 :e le e 99 0// // // //0 99 0//0 99 0// //0 99 0// //0 99 0// // //0 99 0// // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage.0.77 Planned Outage Planned Outaae Planned Outage Planned Outage.0 0;7. Planned Outage Planned Outage Planned Outage Planned Outaae Planned Outage. 7.0 Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outaae Planned Outage Planned Outage Planned Outage Planned Outaae Planned Outage,

244 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

245 9970 0// // // // // // // // // // // // // // // // // // // // // // // // // //0 Appendix 0 Planned Outages Table Planned Outage 79.9 Planned Outage, Planned Outage 0. Planned Outage.07 Planned Outage 88.8 Planned Outage 9. Planned Outage 89.0 Planned Outage 68.0 Planned Outage 7.88 Planned Outage 0.80 Planned Outage 9.6 Planned Outage 79.7 Planned Outage.00 Planned Outage,0.67 Planned Outage 6.8 Planned Outage 6.9 Planned Outage Planned Outage.0 Planned Outage 8. Planned Outage 6.0 Planned Outage 6.00 Planned Outage,067.6 Planned Outage Planned Outag~,7.00 Planned Outage 8.8 Planned Outage

246 Appendix 0 Planned Outages Table //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outaoe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outag_e /8/0 Planned Outage /8/0 Planned Outaoe /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage

247 9007 0/8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/ /8/0 90 0/8/0 90 0/8/0 90 0/9/ /9/ /9/ /9/ /9/ /9/0 90 0/9/0 90 0/9/0 90 0/9/ /9/ /9/ /9/ /9/0 Appendix 0 Planned Outages Table Planned Outage.8 Planned Outage 80.7 Planned Outage,60.00 Planned Outage 60.6 Planned Outage.. Planned Outage,78.00 Planned Outage. Planned Outage Planned Outage 9.88 Planned Outage 6.07 Planned Outage.8 Planned Outage 07.9 Planned Outage Planned Outage. Planned Outage 7,7. Planned Outage.67 Planned Outage 6.78 Planned Outage 06. Planned Outage 80. Planned Outage 96.0 Planned Outage,06.8 Planned Outage 09.0 Planned Outage,709.7 Planned Outage 09.7 Planned Outage.0 Planned Outage :

248 Appendix 0 Planned Outages Table 906 0/9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage

249 /9/0 0/9/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 6, Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage 6, Planned Outage 6, ;00 Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage

250 Appendix 0 Planned Outages Table 90 0/0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned OutaQe //0 Planned Outage, //0 Planned OutaQe, //0 Planned Outage 8, //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage

251 .) // // // // // // // // // // // // / / / / // / / / / / / // / /0 Appendix 0 Planned Outages Table Planned Outage Planned Outage, Planned Outage.6.6 Planned Outage.. Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.8. Planned Outage Planned Outage, Planned Outage

252 Appendix 0 Planned Outages Table //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage. 98 0//0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outag_e //0 Planned Outage, //0 Planned Outage //0 Planned Outage

253 986 0// //0 99 0// //0 9 0/6/ /6/ /6/ /6/0 98 0/6/0 98 0/6/0 98 0/6/ /6/0 99 0/6/0 99 0/6/0 96 0/6/0 98 0/6/0 90 0/6/0 9 0/6/0 9 0/6/0 96 0/6/0 96 0/6/ /6/0 97 0/6/0 97 0/6/ /6/ /6/0 Appendix 0 Planned Outages Table Planned Outage 9.8 Planned Outage.9 Planned Outage Planned Outage 6.00 Planned Outage,70. Planned Outage 9.9 Planned Outage,08.0 Planned Outage 7.00 Planned Outage 6.0 Planned Outage 8.8 Planned Outage 6.00 Planned Outage 8.00 Planned Outage 97.0 Planned Outage 9. Planned Outage,89.0 Planned Outage.68 Planned Outage 0.6 Planned Outage,09.70 Planned Outage.0.7 Planned Outage 7.80 Planned Outage.0 Planned Outage.77 Planned Outage 0.00 Planned Outage.7 Planned Outage 9. Planned Outage ;

254 Appendix 0 Planned Outages Table 98 0/6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage, /7/0 Planned Outage. 99 0/7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage ,

255 e 9 0/7/0 9 0/7/0 9 0/7/0 99 0/7/ /7/ /7/0 98 0/7/ /8/0 96 0/8/0 96 0/8/ /8/ /8/ /8/ /8/ /8/ /8/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/ /9/0 Appendix 0 Planned Outages Table Planned OutaQe Planned Outage.. Planned Outage Planned OutaQe Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.6.6 Planned OutaQe Planned Outage Planned Outage, Planned Outage Planned Outage Planned OutaQe Planned Outage.. Planned OutaQe, Planned Outage Planned Outage ' Planned Outage

256 Appendix 0 Planned Outages Table 989 0/9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage. 9 0//0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage 0, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage ' ,

257 //0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 Appendix 0 Planned Outages Table Planned Outage,9.0 Planned Outage.90 Planned Outage 00.9 Planned Outage 8. Planned Outage.7 Planned Outage.7 Planned Outage Planned Outage 6.90 Planned Outage 9.00 Planned Outage 67. Planned Outage 0. Planned Outage 7. Planned Outage 68.0 Planned Outage 8.0 Planned Outage Planned Outage Planned Outage 77.6 Planned Outage 9.8 Planned Outage,6.87 Planned Outage 8.0 Planned Outage 7.6 Planned Outage 9.0 Planned Outage 79.7 Planned Outage 8.8 Planned Outage 96.9 Planned Outage

258 Appendix 0 Planned Outages Table 970 0//0 Planned Outaae //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outaae, //0 Planned Outaae //0 Planned Outaae //0 Planned Outaae //0 Planned Outaae //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outaae //0 Planned Outaae, //0 Planned Outage //0 Planned Outaae //0 Planned Outaae //0. Planned Outage //0 Planned Outaae, //0 Planned Outage //0 Planned Outaae //0 Planned Outage //0 Planned Outaae //0 Planned Outage, //0 Planned Outaae //0 Planned Outage

259 e le //0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0/6/0 0/6/0 0/6/0 0/6/0 0/6/0 Appendix 0 Planned Outages Table Planned Outage, Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage.0.78 Planned Outage., Planned Outage.6. Planned Outage Planned Outage Planned Outage 6, Planned Outage 8, Planned Outage Planned Outage Planned Outage.7.9 Planned Outage Planned Outage, Planned Outage Planned Outage.0.6 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

260 Appendix 0 Planned Outages Table 99 0/6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outaae /6/0 Planned Outage /7/0 Planned Outaae /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outaae /8/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outaae, /9/0 Planned Outage /9/0 Planned Outaae, /9/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage, /0/0 Planned Outaae /0/0 Planned Outage 0, /0/0 Planned Outaae /0/0 Planned Outage

261 /0/0 0/0/0 0/0/0 0/0/0 0/0/0 0/0/0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 0//0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage 76.0 Planned Outage Planned Outage 78.0 Planned Outage 6.0 Planned Outage,0.0 Planned Outage.00 Planned Outage 6.70 Planned Outage 9.97 Planned Outage Planned Outage 70. Planned Outage 8.9 Planned Outage.0 Planned Outage 07.7 Planned Outage 7.7 Planned Outage 7,00.7 Planned Outage 6.9 Planned Outage,86.00 Planned Outage 0.7 Planned Outage.9 Planned Outage 0.00 Planned Outage,89.60 Planned Outage,0.67 Planned Outage,.00 Planned Outage.77 Planned Outage Planned Outage

262 Appendix 0 Planned Outages Table 960 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 96 //0 Planned Outage //0 Planned Outage 8, //0 Planned Outage //0 Planned Outage /0 Planned Outage /0 Planned Outage. 970 /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage /0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

263 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /6/0 /7/0 /7/0 /7/0 /7/0 Appendix 0 Planned Outages Table Planned Outage 8. Planned Outage 0.7 Planned Outage 7.0 Planned Outage.9 Planned Outage 8.0 Planned Outa.ge 8.7 Planned Outage 6. Planned Outage 6.90 Planned Outage 86.0 Planned Outage. Planned Outage.0 Planned Outage,8.90 Planned Outage,.7 Planned Outage,9.00 Planned Outage Planned Outage.0 Planned Outage.67 Planned Outage,8.60 Planned Outage Planned Outage Planned Outage.9 Planned Outage.67 Planned Outage 07.0 Planned Outage 86.9 Planned Outage,.8 Planned Outage

264 Appendix 0 Planned Outages Table 99 /7/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage.7 96 /7/0 Planned Outage, /7/0 Planned Outage /7/0 Planned Outage 9. 9 /7/0 Planned Outage /7/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage. 90 /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage.0 9 /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage,89. 9 /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage '

265 e /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage.60.0 Planned Outage Planned Outage.6.6 Planned Outage Planned Outage 7..7 Planned Outage.7.07 e /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /0/0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Planned Outage Planned Outage Planned Outage 8.0. Planned Outage.. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 96.. Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage

266 Appendix 0 Planned Outages Table 976 //0 Planned Outage 6, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage.7 98 //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage,

267 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage 8.60 Planned Outage 8.7 Planned Outage,.00 Planned Outage,.8 Planned Outage 70.7 Planned Outage 6.0 Planned Outage 8. Planned Outage.0 Planned Outage,79.67 Planned Outage,88.00 Planned Outage 9,80.00 Planned Outage 7.90 Planned Outage 7.7 Planned Outage 8.7 Planned Outage 0.8 Planned Outage.67 Planned Outage Planned Outage Planned Outage 9.00 Planned Outage 8.0 Planned Outage,0.07 Planned Outage. Planned Outage Planned Outage 8.00 Planned Outage 8.0 Planned Outage ;

268 89.60 Appendix 0 Planned Outages Table 9080 //0 Planned Outage //0 Planned Outage //0 Planned Outage.0 9 /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage.7 9 /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /7/0 Planned Outage /7/0 Planned Outage.6 98 /7/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage,8.0 9 /9/0 Planned Outage /9/0 Planned Outage > /9/0 Planned Outage, /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage >' 977 /9/0 Planned Outage

269 ., 98 /9/0 98 /9/0 99 /9/0 997 /9/0 998 /9/0 999 /9/0 909 /9/0 99 /0/0 90 /0/0 9 /0/0 9 /0/0 98 /0/0 96 /0/0 966 /0/0 97 /0/0 97 /0/0 97 /0/0 980 /0/0 98 /0/0 98 /0/0 99 /0/0 997 /0/0 90 /0/0 90 /0/0 99 /0/0 99 /0/0 Appendix 0 Planned Outages Table Planned Outage 9.67 Planned Outage 6.7 Planned Outage 08. Planned Outage Planned Outage 0.8 Planned Outage 09.0 Planned Outage.67 Planned Outage 0.70 Planned Outage,8.00 Planned Outage 09.0 Planned Outage 86. Planned Outage,98.67 Planned Outage 8.8 Planned Outage 9.97 Planned Outage 7.0 Planned Outage,779.0 Planned Outage 9.0 Planned Outage,8.00 Planned Outage 8.80 Planned Outage Planned Outage 0.0 Planned Outage 6.90 Planned Outage. Planned Outage. Planned Outage Planned Outage

270 Appendix 0 Planned Outages Table 90 /0/0 Planned Outage.0 96 /0/0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage. 98 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage

271 :e /6/0 /6/0 /7/0 /7/0 /7/0 /7/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0,. /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 /8/0 Appendix 0 Planned Outages Table Planned Outage 9.9 Planned Outage Planned Outage 0.70 Planned Outage 9,0.0 Planned Outage 6. Planned Outage.77 Planned Outage. Planned Outage 6. Planned Outage 7.8 Planned Outage 9,9.8 Planned Outa.ge,09.00 Planned Outage 9,7.80 Planned Outage 9.8 Planned Outage 78.7 Planned Outage.07 Planned Outage 0.8 Planned Outage 8.00 Planned Outage 70.7 Planned Outage 8.80 Planned Outage 70.0 Planned Outage 68.0 Planned Outage 7.0 Planned Outage.00 Planned Outage.00 Planned Outage 6.80 Planned Outage,

272 Appendix 0 Planned Outages Table 9680 /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outaae, /8/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage. 968 /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outaae /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outage /9/0 Planned Outage, /9/0 Planned Outag_e

273 /9/0 /9/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage,76.7 6;0 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned OutaQe Planned Outage Planned OutaQe Planned Outage, Planned Outage Planned Outage..

274 Appendix 0 Planned Outages Table 9666 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

275 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 //0 Appendix 0 Planned Outages Table Planned Outage Planned Outage 6,0.0.8 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage 7..7 Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage,

276 Appendix 0 Planned Outages Table 979 //0 Planned Outage //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned OutaQe //0 Planned Outage, //0 Planned OutaQe //0 Planned Outage //0 Planned OutaQe, //0 Planned Outage //0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage /6/0 Planned OutaQe, /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned OutaQe /6/0 Planned Outage

277 e /6/ /6/ /6/ /6/ /6/ / /7/ / / / / / / / / / / / / / /8/ /8/ /9/ /0/ /0/ /0/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage.0 6. Planned Outage Planned Outage..08 Planned Outage Planned Outage, Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage 7..8 Planned Outage

278 Appendix 0 Planned Outages Table 9789 /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage, /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage, /0/0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage

279 980 //0 980 // // // // // // // // // //0 98 //0 98 //0 986 //0 98 //0 980 //0 986 //0 988 //0 989 // //0 986 //0 986 //0 986 //0 986 //0 986 // //0 Appendix 0 Planned Outages Table Planned OutaQe 6.88 Planned Outage 87.6 Planned Outage 9.0 Planned OutaQe.0 Planned Outage,90. Planned Outage,60.00 Planned Outage 6.70 Planned Outage.7 Planned Outage Planned Outa!le 77.0 Planned Outage. Planned OutaQe.88 Planned Outage,.0 Planned OutaQe. Planned Outage 0.0 Planned OutaQe 08.0 Planned Outa!le,08.00 Planned Outage 99.0 Planned Outage 6.00 Planned Outage 76.6 Planned Outa!le...0 Planned Outage Planned Outa!le.00 Planned Outage Planned Outage.7 Planned OutaQe ;

280 Appendix 0 Planned Outages Table 9868 //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage,.0 98 //0 Planned Outage //0 Planned Outage, //0 Planned Outage. 986 //0. Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage

281 9898 // //0 980 //0 980 //0 98 // // //0 988 /7/0 988 /7/0 989 /7/ /7/0 98 /7/0 98 /7/0 98 /7/0 98 /7/0 986 /7/ /7/ /7/ /8/ /8/ /8/ /8/ /8/ '/8/ /8/ /8/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage Planned Outage. 8.8 Planned Outage Planned OutaQe Planned Outage Planned Outage.7.87 Planned Outage Planned Outa!le.0.0 Planned Outage Planned Outage Planned Outage Planned Outage.7.7 Planned Outage 0, Planned Outage Planned OutaQe, Planned Outage Planned OutaQe Planned Outage Planned OutaQe Planned Outage Planned Outage Planned Outage Planned OutaQe Planned Outage Planned Outage

282 Appendix 0 Planned Outages Table 9879 /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage, /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage 6, /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage

283 , /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /9/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 /0/0 Appendix 0 Planned Outages Table Planned Outage 0. Planned OutaQe,.00 Planned Outage Planned Outage 79.0 Planned OutaQe 90.7 Planned Outage Planned Outage 8.00 Planned Outage 7.9 Planned OutaQe 8.7 Planned Outage Planned OutaQe Planned Outage 96.7 Planned OutaQe 9,0.60 Planned Outage 8. Planned OutaQe 6.00 Planned Outage 8.00 Planned Outage Planned Outage 86. Planned Outage 9.68 Planned Outage. Planned Outage 9.00 Planned Outage Planned Outage 8.6 Planned Outage.7 Planned Outage 8.90 Planned Outage ,

284 Appendix 0 Planned Outages Table 997 /0/0 Planned Outage /0/0 Planned Outage /0/0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage, //0 Planned Outage, //0 Planned Outage //0 Planned Outage //0 Planned Outage //0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage /6/0 Planned Outage, /6/0 Planned Outage /6/0 Planned Outage

285 90 /6/ /7/ /7/ /7/0 908 /7/ /7/0 909 /7/0 909 /7/ /7/0 900 /7/0 900 /7/0 900 /7/0 90 /7/0 90 /7/0 90 /7/0 90 /7/0 906 /8/0 907 /8/0 907 /8/0 907 /8/ /8/ /8/0 909 /8/ /8/ /8/0 90 /8/0 Appendix 0 Planned Outages Table Planned Outage Planned Outage, Planned Outage, Planned Outage Planned Outage Planned. Outage Planned Outage Planned Outage.7.7 Planned Outage.7 8. Planned Outage Planned Outage Planned Outage Planned Outage.. Planned Outage Planned Outage Planned Outage 8.. Planned Outage Planned Outage Planned Outage Planned Outage, Planned Outage Planned Outage Planned Outage Planned Outage.9.9 Planned Outage 0, Planned Outage

286 Appendix 0 Planned Outages Table 907 /8/0 Planned OutaQe.0 90 /8/0 Planned Outage /8/0 Planned OutaQe /8/0 Planned Outage /9/0 Planned Outage /9/0 Planned Outage /0/0 Planned Outage, //0 Planned OutaQe //0 Planned Outage //0 Planned Outage //0 Planned OutaQe

287 . e I,. - )( N

288 APPENDIX Gulf Power Company Annual Wood Pole Inspection Report. (Reporting Year 0) a c d e h j Total# of Wooden Poles in the Company Inventory #of Poles Inspected this Annual Inspection #of Poles Failing Inspection this Annual Inspection Pole #of Poles Failure Requiring #of Poles Rate (%) Minor Overloaded this Follow-up this Annual Annual this Annual Inspection Inspection Inspection Method(s) V=VISual E = Excavation P =Prod S=Sound B =Bore R = Resistograph 08,7 709 (Note ) 8.80 V,E,S,B If b - c > 0, provide explanation If d - g > 0, provide explanation Note : Gulf was ahead of schedule on inspection and the amount inspected was required to maintain the 8 year cycle. Note : Pole inspections were completed in 0/0 and remaining repairs have been scheduled for 0. Description of selection criteria for inspections Gulf is systematically moving across its system. Poles are selected for inspection on a geographical basis.

289 . le - )( ~

290 APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (i) (j) Automatic line Automatic line Number of Number of CMifor Clfor Number of Number of CMifor Clfor Sectlonallzing. Sectlonalizing (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeecleriD SubRegion Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder WESTERN WESTERN EASTERN CENTRAL CENTRAL. 0, WESTERN WESTERN WESTERN WESTERN WESTERN WESTERN WESTERN 90. 0,689,7. 88, WESTERN 7.87, , WESTERN 6., , WESTERN 0 o.oo WESTERN WESTERN.66 08,6, WESTERN 60.60,78, WESTERN WESTERN so 8.0, WESTERN 76., , 9 WESTERN 0., ,6 WESTERN , , WESTERN ,86, ,6 7 7 WESTERN 0.8 6, ,7 8 8 WESTERN , , WESTERN 7.8, , 0 60 WESTERN ,67,.6,96 6 WESTERN ,0 6, WESTERN ,9 6.70, WESTERN ,97, ,69 6 CENTRAL ,8, CENTRAL , , CENTRAL ,89, WESTERN , , WESTERN ,788 ', , WESTERN , WESTERN ,, , WESTERN ,7,.08,86 0

291 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers the Feeder Length of portion of portion of the Customers served on served on (t) (u) (v) (w) (a) (b) Circuit Is the Feeder the Feeder Feeder served by Overhead Underground CMifor Cltor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Unes Unes Feeders Feeders Growth% LoadMVA WESTERN No WESTERN No EASTERN No CENTRAL No CENTRAL No , WESTERN No WESTERN No WESTERN Yes WESTERN Yes WESTERN No WESTERN Yes WESTERN Yes ,0 77,77 9,000, WESTERN Yes , ,876, WESTERN Yes , WESTERN No WESTERN No WESTERN No ,89,798 9,96, WESTERN No ,8, WESTERN No WESTERN Yes , WESTERN No ,76,07 0 9, WESTERN Yes , WESTERN Yes ,89,7,8 0, WESTERN Yes ,09,76 0,7 6, WESTERN No , , WESTERN Yes , ,900, WESTERN Yes , 0,0 67, WESTERN Yes ,9,8 68,, WESTERN Yes ,,00 678,7 6, WESTERN Yes , , WESTERN Yes ,069,60,68 67,666, CENTRAL No ,9, ,8, CENTRAL No ,8,6,09 8, CENTRAL No.7 0.., 889 7,89, WESTERN Yes ,, , WESTERN Yes ,99 99,00 78,0, WESTERN Yes , WESTERN Yes ,,89 0 8,9, WESTERN No ,809,7 8 8,60,.00.00

292 APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (i) (j) Automatic line Automatic line Number of Number of CMifor Clfor Number of Number of CMifor Clfor Sectionalizlng Sectionallzlng (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD SubRegion Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder 8 WESTERN 00. 6, ,6 6 8 WESTERN ,96, WESTERN 6. 9, ,07 8 WESTERN , WESTERN 7.6,97 7.0, CENTRAL 9. 8,0 9.0, CENTRAL ,, ,79 90 WESTERN 0 7.,8 7.98, WESTERN.9, WESTERN ,7,6 7.0, WESTERN ,99, , 86 9 WESTERN ,90,8 8.9, WESTERN 7 0.8, , WESTERN.68 7, , WESTERN , , 7 60 WESTERN 6.6 0, , WESTERN ,9, WESTERN 8.00,7,7.8 7, WESTERN , WESTERN , , WESTERN ,6,00 7.8, WESTERN 0. 8, , WESTERN ,9, , WESTERN , 79., WESTERN WESTERN WESTERN CENTRAL ,77, CENTRAL 7., CENTRAL 6., WESTERN 0. 6, , WESTERN WESTERN 6.7,89,66.8 7,6 6 6 WESTERN ,80, WESTERN , WESTERN.6 89,96, WESTERN ,6, S9 WESTERN 0. 7, , WESTERN ,

293 APPENDIX FEEDER SPECIFIC DATA {o) (p) {r) {s) {m) {n) Length of Length of {q) Number of Number of Whether Total Overhead Underground Number of Customers Customers the Feeder Length of portion of portion of the Customers served on served on {t) {u) {v) {w) {a) {b) Circuit is the Feeder the Feeder Feeder served by Overhead Underground CMitor Clfor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Unes Unes Feeders Feeders Growth% LoadMVA 8 WESTERN Yes ,88,8 7,89, WESTERN Yes ,8,9 89 6,96, WESTERN No ,, ,6, WESTERN Yes ,, WESTERN No , , CENTRAL No ,60, , CENTRAL No ,9,00,8,9, WESTERN Yes , WESTERN Yes , WESTERN Yes ,6 677,69 8,979, WESTERN Yes ,009, ,9, WESTERN No ,6 60,6 86,776, WESTERN No , , WESTERN No ,68 969,99 9, WESTERN No ,68 68,06 96, WESTERN Yes , , WESTERN Yes ,7, ,9, WESTERN Yes ,6,,,69, WESTERN Yes ,8,7, WESTERN Yes.6.0.8,90,9,66 8, 6, WESTERN Yes ,8, 986,7, WESTERN Yes ,87 8,0 88,69, WESTERN Yes ,,, 87,, WESTERN Yes. 0.9., , WESTERN No WESTERN No 0.9 o.oo WESTERN No CENTRAL Yes ,, CENTRAL No , CENTRAL Yes , WESTERN Yes ,0 8,9, WESTERN Yes WESTERN No ,968,0 6,06, WESTERN No ,067,76 0,88, WESTERN No ,68,0 8 0, WESTERN No ,88, ,60, WESTERN Yes ,6,97 9,6, WESTERN No , WESTERN Yes ,96, 0.0.0

294 APPENDIX FEEDER SPECIFIC DATA (k) Number of {I} Number of (c) (d) {e) {f) {g) {h) (i) (j) Automatic line Automatic line Number of Number of CMitor Clfor Number of Number of CMifor Clfor Sectionalizing Sectionallzing (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD Sub Region Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder 66 WESTERN , WESTERN 7.8 6, WESTERN , WESTERN , WESTERN ,60, WESTERN 8 7.8,8,9.8 0,8 so WESTERN 7. 0,7,8.6, WESTERN ,0 7.0, WESTERN ,069,78.9 9, WESTERN.8 78,7, WESTERN ,7,6 7., WESTERN WESTERN WESTERN 9.6 8, , WESTERN , WESTERN , WESTERN 9.,69,9.87, WESTERN.78 6,6, WESTERN ,69, WESTERN 0.6 7,9,76. 6, 0 69 WESTERN 7.6,7,8., WESTERN WESTERN 8 9.9, WESTERN ,666, 9.8, 70 WESTERN.87,, WESTERN , WESTERN ,7.8, WESTERN ,9,96 7., WESTERN 7. 88,0 6.9, WESTERN.,0, ,9 0 7 WESTERN , WESTERN WESTERN 7 6., WESTERN 97. 0,96,88 so 8.,0 7 WESTERN ,86, WESTERN ,06, , WESTERN , WESTERN ,8, WESTERN ,, ,8 0

295 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers (a) the Feeder Length of portion of portion of the Customers served on served on {t) (u) (v) (w) {b) Circuit Is the Feeder the Feeder Feeder served by Overhead Underground CMifor Clfor Load Peak FeederiD Sub Region Loop Circuit Circuit Circuit Feeders Unes Unes Feeders Feeders Growth% LoadMVA 66 WESTERN Yes ,7, 8, WESTERN Yes , WESTERN Yes , WESTERN Yes , WESTERN Yes ,09,7 60,9, WESTERN Yes.0.6.8, ,867, WESTERN No ,6,60 706,6, WESTERN Yes ,980, WESTERN Yes ,6,9 9 88,89, WESTERN No ,7, WESTERN Yes , ,6, WESTERN No WESTERN No WESTERN Yes.7. 7.,689, 6 00,, WESTERN No , WESTERN No ,668,07 6 6, WESTERN No ,70,7, 8,80, WESTERN Yes , ,697, WESTERN Yes ,7,68 06,97, WESTERN No , ,76, WESTERN Yes ,89,6 6,0, WESTERN No WESTERN No , WESTERN Yes ,0,00,0 880, 7, WESTERN No ,06, ,77, WESTERN Yes , WESTERN No , WESTERN Yes , ,07, WESTERN Yes ,6, , WESTERN Yes , ,680, WESTERN Yes , ,88, WESTERN No WESTERN Yes , 89 9, WESTERN Yes ,,87 0 8,7, WESTERN Yes ,9,8,0 6,78, WESTERN Yes ,98,60,88 7, WESTERN Yes ,0,78,, WESTERN Yes ,88,7 0,8, WESTERN Yes ,9, 0,9,

296 APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (i) (j) Automatic line Automatic line Number of Number of CMifor Cl for Number of Number of CMifor Clfor Sectlonallzlng Sectlonallzlng (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD SubR~on Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder 70 WESTERN WESTERN 7 7.6, ,8 7 WESTERN 9. 9,86,08 7.,8 0 7 WESTERN.7 0, , WESTERN.9,86, 6.8 0, WESTERN 66.8, , WESTERN WESTERN ,889.6, WESTERN 8. 98, WESTERN.7, WESTERN WESTERN WESTERN , WESTERN 7. 6,7, , WESTERN ,880, WESTERN , , WESTERN 9. 7, , WESTERN , WESTERN 7. 9,8, WESTERN ,879, 6.8, WESTERN 9.7 8, , WESTERN ,0,7., 8 76 WESTERN ,007,0 9. 9, WESTERN 9.6 0, WESTERN , , WESTERN.0 8, , WESTERN , , WESTERN ,880, , WESTERN 7., WESTERN 7.7, , WESTERN , WESTERN.0 96, WESTERN 9.,60 8.8, WESTERN ,8, , WESTERN so.06 9, WESTERN 6. 97,7,97.8, WESTERN 78.76,98 97., WESTERN 9.7 9,90, , WESTERN 7.9, ,90 0 7

297 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers the Feeder Length of portion of portion of the Customers served on served on (t) (u) (v) (w) (a) (b) Circuit is the Feeder the Feeder Feeder served by Overhead Underground CMifor Clfor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Unes Lines Feeders Feeders Growth% LoadMVA 70 WESTERN No WESTERN Yes , ,98, WESTERN Yes.9 6..,,07,78 70,767, WESTERN Yes.6. 7., 996,9 67,88, WESTERN Yes ,99 0,6,, WESTERN Yes ,7 8,889 9, WESTERN Yes WESTERN Yes , WESTERN Yes ,6, ,0, WESTERN Yes , WESTERN Yes WESTERN Yes WESTERN No , WESTERN No ,97, WESTERN Yes ,689, 6,00, WESTERN Yes.6. 0., , WESTERN Yes.6..9,88 6, 79, WESTERN Yes , WESTERN No.7 9..,,9 7,88, WESTERN Yes ,, WESTERN No , WESTERN Yes ,8,7 76 6,7, WESTERN Yes.0.87., ,0, WESTERN No ,9,0 0, WESTERN No , , WESTERN Yes , WESTERN No ,9,6 79 7, WESTERN No ,,08,07,9, WESTERN Yes , WESTERN Yes , , WESTERN Yes , WESTERN Yes ,069,0 8,0, WESTERN Yes.6..8,07,79 8 9,6, WESTERN Yes ,08, ,6 9, WESTERN Yes ,97, 6,900, WESTERN Yes ,969, WESTERN Yes ,60,008 7, WESTERN Yes ,07, ,679, WESTERN No ,8,

298 APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (I) 0) Automatic line Automatic line Number of Number of CMifor Clfor Number of Number of CMifor Clfor Sectlonalizlng Sectionalizlng (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD Sub Region Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder 78 WESTERN 6.98,068, WESTERN ,00 8, 9.6, WESTERN 9.6 0,,00.6 8, WESTERN.77, WESTERN.88,9, , WESTERN CENTRAL 8. 96,890,0.0 7, CENTRAL , WESTERN ,8, WESTERN ,608, , WESTERN.8 0, CENTRAL 9. 7, CENTRAL , EASTERN , EASTERN EASTERN.09, EASTERN o.oo EASTERN 6.9 8, ,66 8 EASTERN ,677 7,9. 6, EASTERN 0.96,6 0.97, EASTERN 8.6, ,6,6 86 CENTRAL 8.,6,67.0, CENTRAL. 6,8, , CENTRAL ,67,06.9 8, EASTERN ,79, EASTERN EASTERN o.oo EASTERN EASTERN ,88 EASTERN.6 90, , EASTERN , , EASTERN , , EASTERN , , EASTERN , 07.9, EASTERN EASTERN , EASTERN , EASTERN , EASTERN , ,8 0 9

299 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers the Feeder Length of portion of portion of the Customers served on served on (t) (u) (v) (w) (a) (b) Circuit is the Feeder the Feeder Feeder served by Overhead Underground CMifor Clfor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Lines Unes Feeders Feeders Growth% LoadMVA 78 WESTERN No ,890,69 690,6 6, WESTERN No ,9,788,7 6,97 8, WESTERN No ,69,67 97,6 7, WESTERN Yes , WESTERN Yes ,, WESTERN No , CENTRAL No ,967, , 7, CENTRAL No ,79,88 9 7, WESTERN No ,00 98,7 00,98, WESTERN No ,98,06 968,0 7, WESTERN Yes , CENTRAL No , CENTRAL No , EASTERN Yes ,96,0 6 7, EASTERN No EASTERN No , EASTERN No EASTERN No , EASTERN Yes...07,87,9,98 80,089, EASTERN Yes ,60,78 9,078, EASTERN No 7...0,6 7,9 7,7, CENTRAL No ,,66 7,68, CENTRAL Yes ,8,80 8,, CENTRAL Yes ,6 -,6 7,0, EASTERN Yes ,007, 7 70,90, EASTERN No EASTERN No EASTERN No EASTERN No EASTERN No ,78,9 776,90, EASTERN Yes ,080,76, 9,9, EASTERN Yes ,9,986 8, EASTERN No ,88,,70 70, EASTERN No ,888 78,0 7, EASTERN Yes EASTERN Yes , EASTERN Yes ,78,0 77 0, EASTERN No ,708,9 6 8,6, EASTERN Yes.9.7.9,6, 8,

300 ~~~~~~~ APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (I) (j) Automatic line Automatic line Number of Number of CMifor Clfor Number of Number of CMifor Cl for Sectionalizlng Sectionalizlng (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD Sub Region Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder 8 EASTERN ,908, EASTERN 9 6., , EASTERN ,66, EASTERN , EASTERN , EASTERN 7. 98, ,9 0 8 EASTERN.0 6, EASTERN. 6, , EASTERN , , EASTERN 6.8,8, , EASTERN 6.0, ,, EASTERN.8 89,00, EASTERN 7.7 9,9, , EASTERN EASTERN 0. 9, ,9 86 EASTERN 9.86, EASTERN , , EASTERN ,,6 0., EASTERN ,06, , EASTERN.7 7,6, , 870 EASTERN 70 8., EASTERN 7., EASTERN ,7,0.6 0, EASTERN ,0,0 9., EASTERN , , EASTERN ,67, EASTERN 8., , EASTERN 7 7., , EASTERN , , CENTRAL , EASTERN , , CENTRAL 7.7, CENTRAL.6 906,80,6 8.68, CENTRAL , , CENTRAL , CENTRAL EASTERN EASTERN 8.,08, , EASTERN 88.0,7,08. 7,88 79

301 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers the Feeder Length of portion of portion of the Customers served-on served on (t) (u) (v) (w) (a) (b) Circuit is the Feeder the Feeder Feeder served by Overhead Underground CMifor Clfor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Lines Lines Feeders Feeders Growth% LoadMVA 8 EASTERN Yes ,9,00 7 8,908, EASTERN Yes , EASTERN Yes ,9, ,66, EASTERN No ,7, EASTERN Yes , EASTERN No , EASTERN No ,66 67,979 6, EASTERN No ,770,67 6, EASTERN Yes ,9,7 6, EASTERN Yes ,9 98,6 89,7 8, EASTERN Yes ,6 66,698 6,67 6, EASTERN Yes ,6, ,, EASTERN Yes ,0,9,87 0,89, EASTERN No EASTERN No ,69,,, EASTERN Yes , EASTERN Yes ,8 69 7, EASTERN No..9 0.,8,,0 9,6, EASTERN Yes , 0,8 8,6, EASTERN No ,97,6,97 0,9, EASTERN Yes ,8,769 8, EASTERN Yes ,7,00 7, EASTERN Yes ,, ,6, EASTERN Yes.0.0.6,,09 0 6,, EASTERN Yes , EASTERN Yes ,00,60 8 6,9, EASTERN No ,78,7,07 6,06, EASTERN Yes ,86,8,, EASTERN No ,8,,70 70, CENTRAL Yes , EASTERN Yes.9.6.0,67,06 0, CENTRAL No , CENTRAL Yes ,77 67,0 9,, CENTRAL Yes ,7 0,897,00,7, CENTRAL No ,070, CENTRAL No EASTERN No , EASTERN No ,8,9,60 7,69, EASTERN No ,8,87 9 9,8,

302 APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (I) (j) Automatic line Automatic line Number of Number of CMifor Clfor Number of Number of CMifor Clfor Sectionallzlng Sectionalizing (a) (b) Overhead Overhead Overhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD SubRegion Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines Lateral Miles Lateral Lines Lateral Lines Lateral Lines the Feeder 898 CENTRAL.9 9,00,7.90, CENTRAL , , CENTRAL 6 0.7,08,8.7, CENTRAL 6.68,69, CENTRAL ,70, ,76, EASTERN EASTERN ,0,70.80,967 9 EASTERN 6.9, CENTRAL ,70, , CENTRAL ,7, CENTRAL , , 0 96 CENTRAL 8.00,6 88.6, CENTRAL ,8, , 0 98 CENTRAL , CENTRAL 8 6.9,0,97 0.7, EASTERN , EASTERN ,99, EASTERN 6. 7, CENTRAL ,, CENTRAL ,8, , CENTRAL , , CENTRAL.9,9, CENTRAL 6. 99,78,08 9.0, CENTRAl ,687, ,7 0 9 CENTRAL 0.0,07,08 8.9, CENTRAL , CENTRAL ,0,79 0.9, CENTRAL 70. 7, , CENTRAL ,0, , CENTRAL 6 8., , CENTRAL.9 9,8, CENTRAl 8.0, , CENTRAL 7.9 9, , CENTRAL ,99,6.6, CENTRAL 7. 0,96,.89, CENTRAL 6., EASTERN ,7,6.69, CENTRAL., , CENTRAL., ,09 9 0

303 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers the Feeder Length of portion of portion of the Customers served on served on (t) (u) (v) (w) (a) (b) Circuit is the Feeder the Feeder Feeder served by Overhead Underground CMifor Clfor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Lines Unes Feeders Feeders Growth% LoadMVA 898 CENTRAL Yes ,97, CENTRAL Yes ,67 86,87 0, CENTRAL Yes ,8, 7 6,6, CENTRAL No ,89, CENTRAL Yes ,9 8,,096,9 0, EASTERN No EASTERN No , ,99, EASTERN No , CENTRAL Yes , 87,98 0,67, CENTRAL Yes ,099,6 6 9,7, CENTRAL No ,78,97,0, CENTRAL No ,7 78 7,6, CENTRAL No ,68, ,80, CENTRAL No , CENTRAL Yes ,7,09 8,8, EASTERN Yes ,677, EASTERN No ,666,9 7,67, EASTERN Yes , , CENTRAL No ,86, ,06, CENTRAL Yes , ,7, CENTRAL Yes ,8,9 9,78, CENTRAL No.7..0,7, ,68, CENTRAL Yes ,09, ,08, CENTRAL Yes ,09,0 9 7,60, CENTRAL Yes 6..9.,6,0 9 6,0, CENTRAL No ,0, 8 9, CENTRAL Yes ,87,7 0 88,09, CENTRAL Yes ,70,0 7, CENTRAL Yes ,8,0 8 6,9, CENTRAL Yes , ,09, CENTRAL Yes ,680 79,886 9,8, CENTRAL Yes ,099 8,66, CENTRAL Yes ,9, CENTRAL No ,8, ,878, CENTRAL No ,,0,0,77, CENTRAL Yes , ,, EASTERN No ,70,67 6,, CENTRAL Yes ,68,, CENTRAL Yes , ,

304 APPENDIX FEEDER SPECIFIC DATA (k) Number of (I) Number of (c) (d) (e) (f) (g) (h) (I) (j) Automatic line Automatic line Number of Number of CMifor Clfor Number of Number of CMifor Clfor Sectionallzlng Sectionalizlng (a) (b) Overhead Overhead OVerhead Overhead Underground Underground Underground Underground devices on the devices on FeederiD SubRegion Lateral Unes Lateral Miles Lateral Lines Lateral Unes Lateral Unes Lateral Miles Lateral Unes Lateral Lines Lateral Unes the Feeder 97 CENTRAL.76 88,7, , EASTERN 8.7,6 8., CENTRAL , CENTRAL ,89,08., CENTRAL , CENTRAL 8.0 0, CENTRAL 7.9 9,976, CENTRAL , CENTRAL ,6,.7 6,0 970 EASTERN o.oo CENTRAL 9.9, EASTERN.7 8, CENTRAL ,698,8 8.0, CENTRAl 9.0, EASTERN ,66,77 8., EASTERN o.oo EASTERN CENTRAl 0 o.oo WESTERN o.oo WESTERN EASTERN 0.0 0, CENTRAl CENTRAl 0., , CENTRAl 0.6, EASTERN o.oo EASTERN

305 APPENDIX FEEDER SPECIFIC DATA (o) (p) (r) (s) (m) (n) Length of Length of (q) Number of Number of Whether Total Overhead Underground Number of Customers Customers (a) the Feeder Length of portion of portion of the Customers served on served on (t) (u) (v) (w) (b) Circuit is the Feeder the Feeder Feeder served by Overhead Underground CMifor Clfor Load Peak FeederiD SubRegion Loop Circuit Circuit Circuit Feeders Lines Lines Feeders Feeders Growth% LoadMVA 97 CENTRAL Yes ,9,99 86,9 6, EASTERN No ,0 7 7, CENTRAL Yes , , CENTRAL Yes ,, ,078, CENTRAL Yes , , CENTRAL Yes , CENTRAL No ,86, ,976, CENTRAL Yes , , CENTRAL Yes ,8, ,66, EASTERN No CENTRAL Yes ,, 799, EASTERN No , CENTRAL No ,60 968,66 0,7, CENTRAL No , EASTERN No ,7,9 88,09,, EASTERN No EASTERN No CENTRAL No WESTERN No WESTERN No EASTERN No , CENTRAL Yes CENTRAL Yes , CENTRAL Yes , EASTERN No EASTERN No ,

2016 HURRICANE SEASON PREPARATION. March 30, 2016

2016 HURRICANE SEASON PREPARATION. March 30, 2016 2016 HURRICANE SEASON PREPARATION March 30, 2016 Hurricane Season Plan Preparation Communication Restoration Distribution Vegetation Management Mainline Trimming (3 Year Cycle) Mainline Annual Trim Schedule

More information

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida Review of Florida s Investor-Owned Electric Utilities 2 0 1 2 Service Reliability reports N O V E M B E R 2 0 1 3 State of Florida Florida Public Service Commission Division of ENGINEERING Review of Florida

More information

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida

Review of. Florida s Investor-Owned Electric Utilities Service Reliability reports. State of Florida Review of Florida s Investor-Owned Electric Utilities 2 0 1 1 Service Reliability reports N O V E M B E R 2 0 1 2 State of Florida Florida Public Service Commission Division of ENGINEERING Review of Florida

More information

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. September Review of Florida s Investor-Owned Electric Utilities 2 0 1 5 Service Reliability Reports September 2 0 1 6 State of Florida Florida Public Service Commission Division of Engineering Review of Florida

More information

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November

Review of Florida s Investor-Owned Electric Utilities Service Reliability Reports. November Review of Florida s Investor-Owned Electric Utilities 2 0 1 6 Service Reliability Reports November 2 0 1 7 State of Florida Florida Public Service Commission Division of Engineering Review of Florida

More information

f<~~ ~ Gulf Power April16, 2018

f<~~ ~ Gulf Power April16, 2018 ~ Gulf Power Rhonda J. Alexander One Energy Place I 1anage' Pensacola. ~l 32520-0780 Regulatory Fooecastmg & Procong 850 444 67,13 tel 850.:144 6026 fax r jale>xad @~out her nro com April16, 2018 Ms. Carlotta

More information

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS 2014 STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS FILED: March 2, 2015 REVISED: August 17, 2015 2014 Storm Implementation Plan & Annual Reliability Performance Reports EXECUTIVE SUMMARY...

More information

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS

STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS 2015 STORM IMPLEMENTATION PLAN & ANNUAL RELIABILITY PERFORMANCE REPORTS FILED: March 1, 2016 REVISED: August 24, 2016 2015 Storm Implementation Plan & Annual Reliability Performance Reports Tampa Electric

More information

AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET. P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301

AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET. P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301 AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301 (8501 224-9115 FAX (8501 222-7560 March I, 2018 VIA: ELECTRONIC MAIL Mr. Tom

More information

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5

Peterborough Distribution Inc Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 Peterborough Distribution Inc. 1867 Ashburnham Drive, PO Box 4125, Station Main Peterborough ON K9J 6Z5 November 15, 2017 Ontario Energy Board PO Box 2319 27 th Floor, 2300 Yonge St Toronto ON M4P 1E4

More information

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS

DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS EB-- Exhibit D Page of DISTRIBUTION SYSTEM ELECTRIC INFRASTRUCTURE RELIABILITY PERFORMANCE INDICATORS FIVE-YEAR HISTORICAL RELIABILITY PERFORMANCE THESL tracks System Average Interruption Frequency Index

More information

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES

PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018 1 PACIFIC GAS AND ELECTRIC COMPANY PUBLIC SAFETY POWER SHUTOFF POLICIES AND PROCEDURES SEPTEMBER 2018

More information

Southern California Edison Wildfire Mitigation & Grid Resiliency

Southern California Edison Wildfire Mitigation & Grid Resiliency Southern California Edison Wildfire Mitigation & Grid Resiliency California State Legislative Conference Committee on Wildfire Preparedness and Response August 7, 2018 CALIFORNIA S WILDFIRE RISK Year-Round

More information

BVES Annual Reliability Public Presentation 2016 Performance

BVES Annual Reliability Public Presentation 2016 Performance BVES Annual Reliability Public Presentation 2016 Performance December 13, 2017 Agenda Company Overview What is Electric Utility Reliability? Requirements & Definitions Reliability Indices 2016 Reliability

More information

Director, Operations Services, Met-Ed

Director, Operations Services, Met-Ed Director, Operations Services, Met-Ed Pennsylvania House Republican Policy Committee Hearing on Storm Response Tobyhanna Township Municipal Building Pocono Pines, Pa. August 9, 2018 Planning and Forecast

More information

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016.

Staging for Utility Personnel and Mutual Aid. 1. Hermine- Meeting dates were August 29th_31 st, 2016 and September 1st, 2016. Town of Havana, Fl. Response to Review of Electric Utility Hurricane Preparedness and Restoration Actions- Applies only to Hermine and Irma. Maria and Nate posed no serious threat to Havana. Staging for

More information

Winter Ready DC District of Columbia Public Service Commission

Winter Ready DC District of Columbia Public Service Commission Winter Ready DC District of Columbia Public Service Commission Presented by: Michael Poncia, Vice President, Customer Operations, Pepco Holdings October 26, 2017 Preparing our System Improving our system

More information

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Heidemarie C. Caswell

BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP. Direct Testimony of Heidemarie C. Caswell Application No. -0- Exhibit No. Witness: Heidemarie C. Caswell BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA PACIFICORP April 0 Caswell/i TABLE OF CONTENTS WITNESS QUALIFICATIONS...

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

URD Cable Fault Prediction Model

URD Cable Fault Prediction Model 1 URD Cable Fault Prediction Model Christopher Gubala ComEd General Engineer Reliability Analysis 2014 IEEE PES General Meeting Utility Current Practices & Challenges of Predictive Distribution Reliability

More information

Superstorm Sandy What Risk Managers and Underwriters Learned

Superstorm Sandy What Risk Managers and Underwriters Learned Superstorm Sandy What Risk Managers and Underwriters Learned Gary Ladman Vice President, Property Underwriting AEGIS Insurance Services, Inc. Superstorm Sandy Change in the Weather Recent years appears

More information

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT

Hurricane Preparation and Recovery. October 11, 2011 Jon Nance, Chief Engineer, NCDOT Hurricane Preparation and Recovery October 11, 2011 Jon Nance, Chief Engineer, NCDOT North Carolina & Severe Weather Our state often bears the brunt of storms, which include: Ice storms Snow storms Heavy

More information

AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET. P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301

AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET. P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301 AUSLEY MCMULLEN ATTORNEYS AND COUNSELORS AT LAW 123 SOUTH CALHOUN STREET P.O. BOX 391 (zip 32302) TALLAHASSEE, FLORIDA 32301 (8501 224-9115 FAX (8501 222-7560 April16, 2018 VIA: ELECTRONIC FILING Ms. Carlotta

More information

Aid to Critical Infrastructure and Key Resources During a Disaster. Pete Grandgeorge MidAmerican Energy Company

Aid to Critical Infrastructure and Key Resources During a Disaster. Pete Grandgeorge MidAmerican Energy Company Aid to Critical Infrastructure and Key Resources During a Disaster Pete Grandgeorge MidAmerican Energy Company MidAmerican Energy Company Approximately 3,000 employees and 100 staffed facilities 1.4 million

More information

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE?

IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE? IS YOUR BUSINESS PREPARED FOR A POWER OUTAGE? Keeping your power on is our business Whether your business is large, small or somewhere in between, we understand that a power outage presents special challenges

More information

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT

ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT ELECTRIC SYSTEM RELIABILITY ANNUAL REPORT 2015 LIBERTY UTILITIES (CALPECO ELECTRIC) LLC (U 933 E) -- PUBLIC VERSION -- Prepared for California Public Utilities Commission July 15, 2016 EXECUTIVE SUMMARY

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: March 7, 2006 Agenda Item # *10 Company: Docket Nos. Minnesota Power Northwestern Wisconsin Electric Company Interstate Power and

More information

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects

Debbie Lee, Communications and Public Affairs Officer. Update on Southern California Edison s Capital Improvement Projects Information Item Date: June 22, 2015 To: From: Subject: Mayor and City Council Debbie Lee, Communications and Public Affairs Officer Update on Southern California Edison s Capital Improvement Projects

More information

Lake Lure Community Meeting with Duke Energy

Lake Lure Community Meeting with Duke Energy Lake Lure Community Meeting with Duke Energy A community meeting was held on February 11, 2019 at Lake Lure Town Hall to discuss electric service to the town and surrounding areas. Lake Lure staff worked

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared November 13, 2015 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared November 13, 2015 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

Vegetation Related Transmission Outage Report

Vegetation Related Transmission Outage Report Vegetation Related Transmission Outage Report Third Quarter 0 5 Peachtree Road NE Suite 00, North Tower Atlanta, GA 0 404-44-50 www.nerc.com The NERC Board of Trustees Compliance Committee has reviewed

More information

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017

President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 President s Day Weekend Storm Community Meeting and Workshop April 17, 2017 Meeting outline 1. Progress update on the City of San Jose s recovery efforts 2. Water district presentation on: Weather situation

More information

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013

Report on Reliability of ComEd Electrical Service within Downers Grove. Prepared September 1, 2013 Report on Reliability of ComEd Electrical Service within Downers Grove Prepared September 1, 2013 1 Executive Summary Since 2011, the Village of Downers Grove has worked closely with ComEd to improve electrical

More information

Review of Florida s Electric Utility Hurricane Preparedness and Restoration Actions 2018

Review of Florida s Electric Utility Hurricane Preparedness and Restoration Actions 2018 Review of Florida s Electric Utility Hurricane Preparedness and Restoration Actions 2018 June 2 0 1 8 State of Florida Florida Public Service Commission Division of Engineering Table of Contents Table

More information

PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011

PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011 PSEG Long Island LLC 111 Eighth Avenue, 13th Floor New York, NY 10011 December 31, 2013 Mr. John D. McMahon Chief Operating Officer Long Island Lighting Company d/b/a/ LIPA 333 Earle Ovington Boulevard,

More information

A Utility s Response and Recovery. Marc Butts Southern Company 03/19/2014

A Utility s Response and Recovery. Marc Butts Southern Company 03/19/2014 A Utility s Response and Recovery Marc Butts Southern Company 03/19/2014 Service territory across four states: 120,000 square miles Serves approximately 4 million customers Other Subsidiaries: Southern

More information

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015

Electric Distribution Storm Hardening Initiatives. Paul V. Stergiou Distribution Engineering October 14 th, 2015 Consolidated Edison Company of New York, Inc. Electric Distribution Storm Hardening Initiatives Paul V. Stergiou Distribution Engineering October 14 th, 2015 Energy For New York City And Westchester 3.3

More information

The Hardening of Utility Lines Implications for Utility Pole Design and Use

The Hardening of Utility Lines Implications for Utility Pole Design and Use NORTH AMERICAN WOOD POLE COUNCIL TECHNICAL BULLETIN The Hardening of Utility Lines Implications for Utility Pole Design and Use Prepared by: Martin Rollins, P.E. Abstract The hurricanes of 2005 caused

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

Business Continuity Planning (BCP)

Business Continuity Planning (BCP) Business Continuity Planning (BCP) Eric Holdeman, Principal Why Have a Business Continuity Plan? } Bad things happen unexpectedly and pre-event planning is part of disaster preparedness } Your community

More information

2014 Russell County Hazard Mitigation Plan Update STAKEHOLDERS AND TECHNICAL ADVISORS MEETING 2/6/14

2014 Russell County Hazard Mitigation Plan Update STAKEHOLDERS AND TECHNICAL ADVISORS MEETING 2/6/14 2014 Russell County Hazard Mitigation Plan Update STAKEHOLDERS AND TECHNICAL ADVISORS MEETING 2/6/14 Welcome and Introductions We cannot direct the wind, but we can adjust our sails. 44 CFR 201.6; Local

More information

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician

How Power is Restored After a Severe Storm. Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician How Power is Restored After a Severe Storm Presented by Stacy Shaw, Safety Director & Nolan Hartzler, GIS Mapping Technician Hurricanes, ice storms, tornadoes One inch of ice on a single span of electric

More information

Timeframe. Crow Wing County, Baxter, Brainerd, Breezy Point, Crosby, Crosslake, Cuyuna, Deerwood, Emily, Fifty

Timeframe. Crow Wing County, Baxter, Brainerd, Breezy Point, Crosby, Crosslake, Cuyuna, Deerwood, Emily, Fifty Table G - 13. s Identified for by the () (From Crow Wing County Master Chart) 1 5 9 All- Hazards All- Hazards Winter Work to ensure that all Crow Wing County residents are aware of and sign-up for the

More information

Internal Audit Report

Internal Audit Report Internal Audit Report Right of Way Mapping TxDOT Internal Audit Division Objective To determine the efficiency and effectiveness of district mapping procedures. Opinion Based on the audit scope areas reviewed,

More information

Page G Crow Wing County Multi-Hazard Mitigation Plan, 2017

Page G Crow Wing County Multi-Hazard Mitigation Plan, 2017 Table G - 10. s Identified by the () (From Crow Wing County Master Chart) 1 5 All- Hazards All- Hazards Work to ensure that all Crow Wing County residents are aware of and sign-up for the County s Emergency

More information

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA

BEFORE THE CORPORATION COMMISSION OF OKLAHOMA BEFORE THE CORPORATION COMMISSION OF OKLAHOMA IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR AN ORDER OF THE COMMISSION ) CAUSE NO. PUD 20110008 AUTHORIZING APPLICANT TO

More information

2014 Annual Mitigation Plan Review Meeting

2014 Annual Mitigation Plan Review Meeting 2014 Annual Mitigation Plan Review Meeting Highland County EMA MEETING OBJECTIVES Understand Your Natural Disaster Risk Review of Previous Plans Current Plan Status Future Activity Plan/Needs of Each Community

More information

Docket No EU Review of electric utility hurricane preparedness and restoration actions.

Docket No EU Review of electric utility hurricane preparedness and restoration actions. Arthur J. Grant Lacerte, Jr. Vice President & General Counsel 1701 W. CARROLL STREET KISSIMMEE, FLORIDA 34742-3219 407/933-7777 FAX 407/933-2655 December 15, 2017 Wesley Taylor, Esquire Public Service

More information

APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA

APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA APPLICATIONS OF EARTHQUAKE HAZARD MAPS TO LAND-USE AND EMERGENCY PLANNING EXAMPLES FROM THE PORTLAND AREA O. Gerald Uba Metro, Portland, Oregon OVERVIEW The extent to which we understand "below ground"

More information

POLICY ISSUE (INFORMATION)

POLICY ISSUE (INFORMATION) POLICY ISSUE (INFORMATION) August 12, 2011 SECY-11-0112 FOR: FROM: SUBJECT: The Commissioners Michael R. Johnson, Director /RA/ Office of New Reactors STAFF ASSESSMENT OF SELECTED SMALL MODULAR REACTOR

More information

TXWARN Tabletop Exercise: Hurricane Helen

TXWARN Tabletop Exercise: Hurricane Helen TXWARN Tabletop Exercise: Hurricane Helen July 31, 2015 Administrative Details In-studio participants and remote participants Situation manual Evaluations Training hours 1 In Studio: Welcome and Introductions

More information

WHAT HAPPENS WHEN A TORNADO STRIKES THE COMMUNITY? Carroll County Sheriff s Office Emergency Management

WHAT HAPPENS WHEN A TORNADO STRIKES THE COMMUNITY? Carroll County Sheriff s Office Emergency Management WHAT HAPPENS WHEN A TORNADO STRIKES THE COMMUNITY? Carroll County Sheriff s Office Emergency Management WHAT IS EMERGENCY MANAGEMENT? Carroll County Sheriff s Office Emergency Management Agency is responsible

More information

Title: Storm of the Century: Documenting the 1993 Superstorm

Title: Storm of the Century: Documenting the 1993 Superstorm A. PAIIF 2011 Cover Page Title: Storm of the Century: Documenting the 1993 Superstorm Point of Contact: Name: Alex Granger Email: alex.granger@noaa.gov Phone Number: 571-555-9278 Mailing Address: Research

More information

The purpose of this report is to recommend a Geographic Information System (GIS) Strategy for the Town of Richmond Hill.

The purpose of this report is to recommend a Geographic Information System (GIS) Strategy for the Town of Richmond Hill. Staff Report for Committee of the Whole Meeting Department: Division: Subject: Office of the Chief Administrative Officer Strategic Initiatives SRCAO.18.12 GIS Strategy Purpose: The purpose of this report

More information

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s

More information

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart)

Table G - 6. Mitigation Actions Identified for Implementation by the City of Kent ( ) (From Wilkin County Master Mitigation Action Chart) Table G - 6. Actions Identified by the () (From Master Action Chart) Multi-Hazard Plan, 2017 Action Comments 5 All-Hazards Local Planning & Regulations Update the Operations Plan on an annual basis. Work

More information

Vegetation Related Transmission Outage Report

Vegetation Related Transmission Outage Report Vegetation Related Transmission Outage Report Third 2013 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com Executive Summary The NERC Board of Trustees Compliance

More information

Tippecanoe County ARES Net Formats NET 1-4. Net Formats

Tippecanoe County ARES Net Formats NET 1-4. Net Formats 1. Introduction Net Formats To provide a basis for carrying out the mission of the Tippecanoe County, Indiana, Amateur Radio Emergency Service (ARES ), guidelines must be in place to meet the communications

More information

City of Punta Gorda Community Emergency Management Plan 2013

City of Punta Gorda Community Emergency Management Plan 2013 City of Punta Gorda Community Emergency Management Plan 2013 Hurricane Andrew- August 24, 1992 Category 5 hurricane. The second-most-destructive hurricane in U.S. history. The first named storm of the

More information

Complete Weather Intelligence for Public Safety from DTN

Complete Weather Intelligence for Public Safety from DTN Complete Weather Intelligence for Public Safety from DTN September 2017 White Paper www.dtn.com / 1.800.610.0777 From flooding to tornados to severe winter storms, the threats to public safety from weather-related

More information

Baldwin County, Alabama

Baldwin County, Alabama 2015 Baldwin County, Alabama Multi-Hazard Mitigation Plan I. Comprehensive Plan A multi-jurisdiction plan City of Bay Minette City of Daphne Town of Elberta City of Fairhope City of Foley City of Gulf

More information

ICE STORM! a mini tabletop exercise for home care agencies

ICE STORM! a mini tabletop exercise for home care agencies 1 ICE STORM! a mini tabletop exercise for home care agencies HCA Education and Research Winter 2010 2011 2 What is a tabletop exercise? People come together to review and discuss a hypothetical emergency

More information

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT:

RESOLUTION NOW, THEREFORE, BE IT RESOLVED BY THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT: RESOLUTION 2017-08 A RESOLUTION OF THE BOARD OF SUPERVISORS OF THE CORKSCREW FARMS COMMUNITY DEVELOPMENT DISTRICT APPROVING PROPOSED BUDGET(S) FOR FISCAL YEAR 2017/2018 AND SETTING A PUBLIC HEARING THEREON

More information

VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016

VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016 VISIT MISSISSIPPI GULF COAST CRISIS COMMUNICATION MANUAL 2016 This manual was prepared for Visit Mississippi Gulf Coast staff in the event of a crisis, and will help to distinguish the appropriate course

More information

JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # GIS Coordinator AD Grid Level 6(c) # 420

JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # GIS Coordinator AD Grid Level 6(c) # 420 COUNTY OF GRANDE PRAIRIE JOB DESCRIPTION JOB TITLE: CURRENT CLASSIFICATION/GRID POSITION # GIS Coordinator AD Grid Level 6(c) # 420 NOC CODE: 2255 STANDARD HOURS: 35 hours/week (non-management) JOB TITLE

More information

Risk Management of Storm Damage to Overhead Power Lines

Risk Management of Storm Damage to Overhead Power Lines Risk Management of Storm Damage to Overhead Power Lines David Wanik, Jichao He, Brian Hartman, and Emmanouil Anagnostou Departments of Statistics, Mathematics, and Environmental and Civil Engineering University

More information

NC Emergency Management A View from the Counties

NC Emergency Management A View from the Counties NC Emergency Management A View from the Counties Amy Bason, NCACC Rocky Hyder, Henderson County Jeff Batten, Durham County Norman Bryson, Onslow County PARTNERSHIP Emergency Management efforts require

More information

Hurricane Readiness for Coastal Communities

Hurricane Readiness for Coastal Communities Hurricane Readiness for Participant Guide Developed for: Federal Emergency Management Agency Emergency Management Institute 16825 South Seton Avenue Emmitsburg, MD 21727-8998 Developed by: C² Technologies,

More information

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions

The Use of Geographic Information Systems (GIS) by Local Governments. Giving municipal decision-makers the power to make better decisions The Use of Geographic Information Systems (GIS) by Local Governments Giving municipal decision-makers the power to make better decisions Case Study: Examples of GIS Usage by Local Governments in North

More information

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM

MUNICIPALITY OF ANCHORAGE PUBLIC TRANSPORTATION DEPARTMENT AnchorRIDES TRANSPORTATION SYSTEM Purpose: The Public Transportation Department and contracted provider will provide safe transportation for AnchorRIDES customers and employees during severe weather or emergency conditions. AnchorRIDES

More information

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE

DE PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE DE 05-142 PUBLIC SERVICE COMPANY OF NEW HAMPSHIRE Petition for License to Construct and Maintain Electric Lines Over and Across the Public Waters of the Nashua River in the City of Nashua, New Hampshire

More information

Circuit Reliability Review

Circuit Reliability Review Circuit Reliability Review Marina Del Rey January 2018 Building a Smarter Grid for Southern California Southern California Edison is developing an electric grid to support California s transition to a

More information

GIS Geographical Information Systems. GIS Management

GIS Geographical Information Systems. GIS Management GIS Geographical Information Systems GIS Management Difficulties on establishing a GIS Funding GIS Determining Project Standards Data Gathering Map Development Recruiting GIS Professionals Educating Staff

More information

Southern California Edison ESRB-8 Report Regarding Pro-Active De-Energization Event December 29 to January 1, 2019

Southern California Edison ESRB-8 Report Regarding Pro-Active De-Energization Event December 29 to January 1, 2019 Southern California Edison Submitted to: California Public Utilities Commission Director of the Safety and Enforcement Division January 15, 2019 Southern California Edison (SCE) submits the following report

More information

National Weather Service 1

National Weather Service 1 National Weather Service 1 National Weather Service Source: FEMA 2 The Need for a Robust/Diverse Severe Weather Plan Presidential Disaster Declarations 2015 Kentucky Disaster Declarations DR-4216 (Feb

More information

Unit 5: NWS Hazardous Weather Products. Hazardous Weather and Flooding Preparedness

Unit 5: NWS Hazardous Weather Products. Hazardous Weather and Flooding Preparedness Unit 5: NWS Hazardous Weather Products Objectives Describe the mission of the NWS Describe the basic organizational structure of the NWS Explain the purpose of various NWS products Explain how Probability

More information

Geospatial natural disaster management

Geospatial natural disaster management Geospatial natural disaster management disasters happen. are you ready? Natural disasters can strike almost anywhere at any time, with no regard to a municipality s financial resources. These extraordinarily

More information

Smart Grid Opportunities Being Pursued. Stephanie Hamilton Brookhaven National Laboratory June 5, 2013

Smart Grid Opportunities Being Pursued. Stephanie Hamilton Brookhaven National Laboratory June 5, 2013 Smart Grid Opportunities Being Pursued Stephanie Hamilton Brookhaven National Laboratory June 5, 2013 OUR DREAM!! BNL s Smarter Electric Grid Research, Innovation, Development. Demonstration, Deployment

More information

Enterprise GIS: Realizing a Return on Investment. EGUG Coeur D Alene, ID Tuesday, October 15, 2002

Enterprise GIS: Realizing a Return on Investment. EGUG Coeur D Alene, ID Tuesday, October 15, 2002 Enterprise GIS: Realizing a Return on Investment EGUG 2002 - Coeur D Alene, ID Tuesday, October 15, 2002 Technology Technology is great fun, but we can drown in our technology. The fog of information can

More information

Tornado Drill Exercise Plan (EXPLAN)

Tornado Drill Exercise Plan (EXPLAN) Tornado Drill Exercise Plan (EXPLAN) As part of the National Weather Service s (NWS) Severe Weather Preparedness Week in Indiana Purdue University March 19, 2019 As of Feb 19, 2019 TABLE OF CONTENTS Introduction...

More information

GIS Needs Assessment. for. The City of East Lansing

GIS Needs Assessment. for. The City of East Lansing GIS Needs Assessment for The City of East Lansing Prepared by: Jessica Moy and Richard Groop Center for Remote Sensing and GIS, Michigan State University February 24, 2000 Executive Summary At the request

More information

Establishment of Space Weather Information Service

Establishment of Space Weather Information Service Establishment of Space Weather Information Service For International Air Navigation Raul Romero Technical Officer MET ICAO Headquarters, Montreal NAM/CAR/SAM Seminar on Space Weather and ICAO Weather Information

More information

Bridge Risk Modeling

Bridge Risk Modeling time good Bridge Risk Modeling Current Florida DOT Research condition bad Paul D. Thompson, Consultant Background Research team Florida State University John Sobanjo (PI) Paul D. Thompson (co-pi) Florida

More information

2006 & 2007 Pre-Hurricane Scenario Analyses

2006 & 2007 Pre-Hurricane Scenario Analyses 2006 & 2007 Pre-Hurricane Scenario Analyses Executive Summary May 2007 Page 1 OF X FOR OFFICIAL USE ONLY 4 Public Availability to be Determined Under 5 U.S.C. 552 NOTE: Limited Distribution. Release of

More information

Protecting Your Business This Winter Weather Season

Protecting Your Business This Winter Weather Season Protecting Your Business This Winter Weather Season Fred Schmude, StormWatch Manager, ImpactWeather Mark Norton, Senior Continuity Manager, Agility Recovery Today s session will be recorded. Links to the

More information

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan

Town of Barnstable. Department of Public Work. Snow and Ice Control Operations Plan Town of Barnstable Department of Public Work Snow and Ice Control Operations Plan I. Mission: The mission of the Department of Public Works is to remove accumulations of snow and ice from town, county

More information

Ice Storm Outages Lessons Learned

Ice Storm Outages Lessons Learned Contents Message from Gaëtan Thomas, President and CEO of NB Power...3 1. INTRODUCTION...4 1.1 Purpose...4 1.2 Scope...4 1.3 Contributors to this report...4 2. EXECUTIVE SUMMARY...5 2.1 Strengths...5 2.2

More information

NEWS RELEASE. Province boosts winter highway safety measures

NEWS RELEASE. Province boosts winter highway safety measures For Immediate Release 2018TRAN0045-000567 April 4, 2018 NEWS RELEASE Province boosts winter highway safety measures VICTORIA Following an intense winter, the is undertaking several improvements to make

More information

2018 VACO Achievement Awards Nomination Summary York County, Virginia. In 2017, the York County Department of Fire and Life Safety/Office of

2018 VACO Achievement Awards Nomination Summary York County, Virginia. In 2017, the York County Department of Fire and Life Safety/Office of 2018 VACO Achievement Awards Nomination Summary York County, Virginia Program Title: Significant Event Briefing Dashboard Program Category: Criminal Justice & Public Safety Program Overview: In 2017, the

More information

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available

Using Operating Experience to Prevent or Mitigate Nuclear Events. What Is, Was and Will Be Available Using Operating Experience to Prevent or Mitigate Nuclear Events What Is, Was and Will Be Available Introduction Remember, it is by understanding the lessons learned from past events that we can adequately

More information

Network Quality and Reliability of Supply

Network Quality and Reliability of Supply Network Quality and Reliability of Supply Performance Report 2010/11 Prepared by: Operations Asset & Works Audited by: Qualeng Left blank intentionally DMS 3444560 2 CONTENTS Horizon Power service area

More information

Mitigation planning in Epirus- The case of frost and snowfalls. Thematic seminar Epirus September 2011

Mitigation planning in Epirus- The case of frost and snowfalls. Thematic seminar Epirus September 2011 Mitigation planning in Epirus- The case of frost and snowfalls Thematic seminar Epirus September 2011 1 Structure of Mitigation Planning in Greece First Level: General Plan for Civil Protection Ksenokratis

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS 10782 Wattsburg Road Erie, PA 16509 The WATTSBURG AREA SCHOOL DISTRICT invites qualified vendors to submit proposals for CONTRACTED SNOW REMOVAL MANDATORY PRE-SUBMISSION MEETING All

More information

State of Georgia Snow and Ice Plan

State of Georgia Snow and Ice Plan State of Georgia Snow and Ice Plan Annex to: Georgia Emergency Operations Plan 2013 The State of Georgia Snow and Ice Plan contains information needed by local and state planners and response personnel.

More information

OPALCO Outage Analysis. December 2017 Board Meeting

OPALCO Outage Analysis. December 2017 Board Meeting OPALCO Outage Analysis December 217 Board Meeting What causes power outages in the islands? Wind Rain Major outages happen most often during wind storms - when winds are blowing above 3 miles per hour.

More information

GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION

GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION GIS ADMINISTRATOR / WEB DEVELOPER EVANSVILLE-VANDERBURGH COUNTY AREA PLAN COMMISSION SALARY RANGE INITIATION $43,277 SIX MONTHS $45,367 POSITION GRADE PAT VI The Evansville-Vanderburgh County Area Plan

More information

CHAPTER 22 GEOGRAPHIC INFORMATION SYSTEMS

CHAPTER 22 GEOGRAPHIC INFORMATION SYSTEMS CHAPTER 22 GEOGRAPHIC INFORMATION SYSTEMS PURPOSE: This chapter establishes the administration and use of to improve the quality and accessibility of Department s spatial information and support graphical

More information

Geographic Information Systems(GIS)

Geographic Information Systems(GIS) Geographic Information Systems(GIS) Threat Analysis Techniques Overview What is GIS? Functional capabilities of GIS BCM Process and GIS How to leverage GIS in threat/risk analysis Ron Brown, CBCP Managing

More information

Network Quality and Reliability of Supply Code

Network Quality and Reliability of Supply Code Network Quality and Reliability of Supply Code 2017/18 Performance Report Prepared by: Asset Services Left blank intentionally DM#10417247 2017/18 Page 2 of 22 Contents 1. INTRODUCTION 5 2. AUDIT REQUIREMENTS

More information

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division

CITY OF HAMILTON. PUBLIC WORKS DEPARTMENT Operations Division CITY OF HAMILTON PUBLIC WORKS DEPARTMENT Operations Division TO: Chair and Members Public Works Committee WARD(S) AFFECTED: CITY WIDE COMMITTEE DATE: December 2, 2013 SUBJECT/REPORT NO: Winter Control

More information