1 1 Blackout probabilistic risk assessment and thermal effects: impacts of changes in generation Pierre Henneaux, Student Member, IEEE, Pierre-Etienne Labeau, and Jean-Claude Maun, Member, IEEE Abstract Renewable energy integration and deregulation imply that the electric grid will be operated near its limits in the future, and that the variability of cross-border flows will increase. Therefore, it is becoming more and more crucial to study the impact of these changes on the risk of cascading failures leading to blackout. We propose in this paper to emphasize important factors leading to blackouts, to review methodologies which were developed to simulate cascading failure mechanisms and to study specifically the impact of thermal effects on the risk of blackout for several changes in generation (variations in cross-border flows, wind farms penetration, shut-down of power plants). This is studied by applying to a test system the first level of a dynamic probabilistic blackout risk assessment developed previously. We show that taking into account thermal effects in cascading failures is important not only to have a good estimation of the risk of blackout in different grid configurations, but also to determine if a specific change in generation has a positive or a negative impact on the blackout risk. Index Terms Blackout, Power system reliability, Power system security, Monte Carlo methods, Risk analysis I. INTRODUCTION NOWADAYS, power systems are strongly changing all over the world, due to two main factors. First, a transition from fossil and nuclear energy sources to renewable sources (wind and photovoltaic) for electricity generation entails a transition from dispatchable generation to non-dispatchable generation. Moreover, a large penetration of renewable sources increases the variability of cross-border flows. Secondly, the liberalization of the electricity market increases also the crossborder flows due to the market rules and the search of the economic optimum by electrical producers. The impact of these changes on the reliability of the grid has been studied from several years mainly through quasi-static reliability methods: the different states (or configurations) of the system are analyzed in a static way with an Optimal Power Flow (OPF) to evaluate load shedding (complete enumeration of the states, selective enumeration, non-sequential Monte Carlo (MC) simulation or sequential MC simulation) [1], [2]. However, these methods cannot deal with the specific problems of cascading outages leading to blackouts. Previous blackouts showed that, despite their low occurrence, their contributions to mean reliability indices are very important. For example, in Italy, the Average Interruption Time (AIT) and the Energy Not Supplied (ENS) are, on average on the period , respectively 0.73 min/year and 460 MWh/year [3]. The targets are maximum 1.00 min/year and 550 MWh/year. As P. Henneaux, P.E. Labeau and J.C. Maun are with the École polytechnique de Bruxelles, Université Libre de Bruxelles, Brussels, Belgium. P. Henneaux is F.R.S.-FNRS Research Fellow ( Aspirant F.R.S.-FNRS ) and corresponding author ( pierre.henneaux@ulb.ac.be). a comparison, the 2003 blackout in Italy caused an AIT of several hundreds of minutes (50% of the load was re-supplied after 6.5 hours and 99% after 15 hours) and estimated ENS of 177 GWh [4]. Therefore, it is also crucial in reliability studies to study the impact of actual changes in generation on the risk of blackout. This paper aims to demonstrate how a relevant approach to blackout Probabilistic Risk Assessment (PRA) allows to conduct such studies. A special attention will be paid to the impact on the blackout risk of cross-border power flows, of the installed wind power, of power plants definitive shut-down and of power plants maintenance. The paper is organized as follows. First, Section II recalls the main mechanisms likely to lead to a blackout. Then, Section III reviews and compares different methodologies developed to analyze cascading failures. We will then apply a methodology taking into account thermal dependencies to a test case in order to study these impacts and we will compare the results obtained to a similar methodology neglecting these thermal dependencies. Section IV presents the test case and Section V analyzes the results. Finally, Section VI concludes. II. BLACKOUTS The blackout state is defined by the European Network of Transmission System Operators for Electricity as the interruption of electricity generation, transmission, distribution and consumption processes, when operation of the transmission system or a part thereof is terminated. Blackout state is always qualified as wide [5]. A large variety of mechanisms are involved in cascading outages: common mode failures and hidden failures which cause several initial outages, high static loads after power flow redistribution which can lead to additional thermal failures, no corrective actions or wrong operators actions due to lack of situational awareness, static currents or apparent impedances triggering relays, voltage/smalldisturbance/transient/frequency instabilities,... A blackout is due to a cascading failure, following the occurrence of an initiating event (e.g. line fault or loss of a power plant). However, the N 1 security rule applied by Transmission System Operators (TSOs) is a rule according to which elements remaining in operation after a fault of transmission system element must be capable of accommodating the new operational situation without violating operational security limits [5]. Therefore, only one contingency should not entail a fast collapse of the electrical grid and at least one more contingency is necessary. Obviously, a second event, independent of the first one can occur before any corrective action. But, as the mean time between two independent failures is high (some hours to some days) compared to the operators

2 2 Fig. 1. Event tree after an initiating event. Adapted from [6]. characteristic times (tens of minutes to some hours), the probability of such a succession of independent events is usually very low. Some blackouts can be due to multiple initiating events which the occurrence short-circuits the N 1 security rule. For example, earthquakes, storms, tower failures can be the cause of the simultaneous (or quasi-simultaneous) loss of several elements. For example, the blackout which occurred in November 2009 in Brazil and Paraguay was due to heavy rains and strong winds which caused short-circuits in power transformer, leading to the loss of the Itaipu hydroelectric power plant. We showed in [6] that additional contingencies can be due to thermal effects. Following the occurrence of a first event, the reconfiguration of the power flows in the grid can increase the temperatures of overhead lines, underground cables and transformers (with thermal time constants ranging from tens of minutes to some hours). When the temperature of a line increases, its sag also increases, possibly leading to a short circuit between the line and the vegetation. When the temperature of a cable or a transformer increases, the dielectric strength decreases, possibly leading to a dielectric breakdown. If another element undergoes a thermal failure, the thermal effect on other elements will be reinforced, possibly leading to a cascade. The most famous example of such a thermal and slow cascade is the 2003 blackout in the Northeastern area of the United States and in the Southeastern area of Canada, where about 20 high voltage overhead lines sagged low enough to enter in contact with something below the line between 3 PM and 4 PM [7]. An operator action can also trigger a collapse, as it was the case in the major system perturbation in November 2006 in Europe: based on an incorrect state estimation, a busbar coupling caused a line tripping. As explained in [6], the typical development of a blackout can then be split in three phases (two for the cascading failure itself), as illustrated in Figure 1. Following the occurrence of an initial perturbation, two possibilities arise. If this perturbation causes the simultaneous loss of several elements, the N 1 rule is short-circuited and the system can become electrically unstable. A fast collapse of the electrical grid can then start. But, in several blackouts, thanks to the N 1 rule, the grid stays electrically stable after the initiating event. A competition then starts between operators corrective actions and additional failures, either due to thermal effects or independent. This phase is called slow cascade, because it displays characteristic times between successive events ranging from tens of seconds to hours. The occurrence of additional events during this phase can trigger an electrical instability (violation of protections set points, angular instability, etc.). Then a second phase called fast cascade occurs, ruled by electrical transients, displaying characteristic times between successive events ranging from milliseconds to tens of seconds. This phase is too fast to allow operators to take corrective actions and is characterized by a rapid succession of electrical events (additional failures, protection actions, etc.) whose occurrence order and timing are driven by the power system s dynamic evolution in the course of this transient. After this fast cascade, the electrical grid reaches a stable state: a possible collapse of the power system in some zones, or a major load shedding. The last phase is then the recovery period. Fig. 2. Rate of line and generator trips during the fast cascade of the 2003 US/Canada blackout. From [7]. We should note that events occurring during the slow and the fast cascade can be very different in number and in type. During the slow cascade, only a small number of elements are lost, typically from two to about twenty. There were 4 elements lost before the fast cascade in the major disturbance which occurred in the Western Interconnection (United States) in August 10, There were 22 elements lost before the fast cascade in the 2003 US/Canada blackout. The slow cascade was very short during the 2003 Sweden/Denmark blackout: 3 elements were lost in 5 minutes, the last two simultaneously

3 3 (double busbar fault due to a disconnector damage). Only 2 elements were lost during the slow cascade of the blackout which occurred in September 2003 in Italy. The fast cascade was triggered by 3 events in the major system perturbation in November 2006 in Europe. On the contrary, as the overall network collapses during a fast cascade leading to a blackout, several hundreds of elements can be lost. This is illustrated in Figure 2 for the 2003 US/Canada blackout (the fast cascade began at 16:06). Elements trip mainly due to failures during the slow cascade. On the contrary, elements trip mainly because electrical variables crossed their protections setpoints without additional fault during the fast cascade. A. Introduction III. CASCADING FAILURES ANALYSIS Most of power systems reliability studies are quasi-static and are based on the analysis of situations: for each run, an initial set of contingencies is sampled and consequences analysis is based on an OPF. These studies cannot deal with cascades of events because they do not account for the constraints imposed to the grid elements in the course of a transient. Various methodologies have been developed to simulate cascading failure mechanisms. We propose in this section to review and analyze some of them. A additional review, analysis and classification can be found in [8]. B. Methodologies 1) OPA model: Carreras et al. proposed in [9] a model able to take into account outages due to overloads and the reconfiguration of the power flows in the grid after the loss of one or several elements. For different load patterns, the steady-state of the grid is computed through a DC OPF. An overloaded line has then a probability p to suffer an outage. If an outage occurs, the steady-state of the grid is recomputed through a DC OPF, etc. This model can give the probability distribution of total load shed. Failure of lines caused by heating (tree flashover) are included in OPA model explicitly in [10] through the time evolution of line temperature, of its sag and the vegetation height: a line is trip when the sag and the vegetation are such that a tree flashover occurs. 2) TRELSS model: One of the most well-known industrial reliability analysis programs is the Transmission Reliability Evaluation of Large-Scale Systems (TRELSS) software developed for the EPRI [11]. The simulation approach included in this software package was developed to deal with cascading outages. After an initiating event, the steady-state is computed by solving load-flow (LF) equations. Then, if a load bus voltage, a generator voltage or a circuit power flow is outside the limits, the corresponding component is tripped, the steadystate is re-computed, etc. If no threshold is exceeded, the procedure is restarted with the next initiating event. 3) Manchester model: An AC power blackout model was developed at the University of Manchester during the early 2000s in order to represent a range of interactions occurring in cascading failures leading to a blackout (cascade and sympathetic tripping of transmission lines, generator instability, load shedding, post-contingency redispatch of active and reactive resources, etc.) [12]. The analysis is based on a MC simulation. For each MC run, an initial disturbance is created by simulating random outages of system components. If some of the faults which are the cause of these outages induce transient instability of one or more generators, the latter are disconnected. The impact of hidden failures in the protection system, which cause intact equipment to be unnecessarily disconnected following a fault on a neighboring component (sympathetic tripping), is then simulated: the tripping or not of each component whose the vulnerability region contains the original faulted element is sampled. After restoring the generation-load balance if necessary, the new steady-state of the system is calculated by solving LF equations. In case of voltage instability, the iterations do not converge and the model assumes that operators shed specific load blocks to arrest this voltage collapse. This load shedding is repeated until convergence of the load flow iterations. The tripping of overloaded lines is then sampled. As there is a competition between operators attempts to eliminate the overload and the thermal transient, the probability that the operator is unable to eliminate the overload before the protection operates can be modeled as a function of the overload. If there is a trip, the LF equations are solved (with further load shedding if needed), etc. Once there is no more contingency, the ENS is then computed. Several extensions and variations of the Manchester model actually exist, based on two main modifications. First, if the frequency deviation is outside a specific range after the restoration of the generation-load balance, the simulation algorithm considers that the system is collapsed. Secondly, in order to take into account operators corrective actions modeling, an OPF can be used to minimize the load shedding when the steady-state of the system is calculated, instead of shed specific load blocks. Thirdly, DC LF and/or DC OPF can be used to accelerate calculations, according to the importance given to voltage stability. 4) Stochastic model: The first try to model in details the competition between operators corrective actions and additional failures seems to appear in [13]. Random line failures are modeled through constant failure rates, overloaded-line failures occur when the temperature (computed through a time-dependent equation) reaches the equilibrium temperature corresponding to a power flow equal to the line rating for reference weather conditions, line restoration is modeled (constant repair rate after a constant time delay), such as a simple model for the utility response. The same model is used to cover all the cascading failure. 5) Three-level dynamic PRA model: According to the analysis of previous blackouts and the typical blackout development, we proposed in [6] a methodology for blackout PRA based on dynamic PRA. The main idea of dynamic PRA is to describe the electrical grid not only by discrete states, but also by a set of process variables (like temperatures, currents, voltages, etc.). This allows to consider the mutual interaction between system states and process variables. The PRA is decomposed in three levels. Level-I is the assessment of the slow cascade: it starts with an initiating event and ends when the system becomes electrically unstable. In this

4 4 level, we have to take into account the competition between operators corrective actions and additional failures, either due to thermal effects or independent. Level-II is the assessment of the fast cascade: it starts when the system becomes electrically unstable and finishes when the system reaches an electrically stable state (blackout state or operational state with load shedding). In this level, we have to take into account the competition between protections and relays, according to the actual evolution of electrical variable, protections setpoints and possible failures. Level-III is the assessment of the restoration. Therefore, level-i reveals the vulnerability paths of an electrical grid (successive failures that could trigger an electrical instability), level-ii gives the magnitude of possible blackouts (in terms of loss of supplied power) and level-iii the consequences (in terms of ENS). We developed in [6] mainly the level-i and we proposed a simulation algorithm for the slow cascade, given in Figure 3. Initial conditions and the initiating event(s) are sampled. After the restoration of the generation-load balance if necessary, the electrical steady state is computed and the electrical stability is evaluated. If the system becomes electrically unstable, the current MC run is dangerous, the slow cascade simulation is stopped and the fast cascade simulation should be started. In the opposite, the thermal stability is then evaluated, through the competition between operators corrective actions and thermal transients. If a new failure occurs (system thermally unstable), the simulation continues with this new contingency: the electrical steady state is computed and electrical stability is assessed, etc. In the opposite, the slow cascade simulation is stopped and the MC run is labeled as safe (non-dangerous). Details about thermal failure models can be found in Appendix A. C. Discussion All models presented are probabilistic simulations, but with different levels of details and different mechanisms taken into account. The OPA model can be viewed as the simplest model where the lines loadings are computed at each step through a DC OPF. The TRELSS model considers also the tripping of overloaded lines, but the steady-state is computed at each step through a classical power flow and loads/generators whose voltage is outside limits are disconnected. The Manchester model is able to deal with a lot of phenomena occurring in cascading failures leading to blackouts. In particular, the tripping of overloaded lines can be done in a probabilistic way, in order to model the competition between operators corrective actions and the thermal transient. The aim of the dynamic PRA is to propose a general framework in order to consider in a realistic way the mechanisms of cascades. In particular, the analysis of the cascading failure itself is separated in two levels, because phenomena are very different in each of them. Indeed, only one subset 1 of mechanisms involved in blackout can be considered during the slow cascade and only one different subset 2 during the fast cascade, while 1 Common mode failures (storm, earthquake,...), hidden failures, thermal failures, operators actions. 2 Relays which trip elements when electrical variables crossed setpoints, voltage collapse, angular instability (small-disturbance and/or transient), frequency instability. Fig. 3. Simulation flowchart of dynamic PRA model - level-i. From [6]. keeping a satisfactory modeling of cascading failures. However, even if these mechanisms can be split into two different disjoint sets, several challenges must be overcome for each level in such a dynamic PRA approach. For the level-i, one of the biggest challenges is to model in a realistic way operators actions. Simple but robust criteria must be defined for the transition between level-i and level-ii. For the level- II, the main challenge is the development of a fast dynamic electrical simulation algorithm taking into account significant protections actions and their possible failures. Moreover, this approach has the disadvantage to require numerous parameters. For the level-i analysis, not only the electrical parameters are needed, but also thermal and mechanical properties. Even if electrical data are well-known and available for each real network in corresponding TSO s databases, thermal and mechanical data could be more difficult to estimate, as they are not gathered in a database. In particular, the statistical distribution of the vegetation height below overhead line must be estimated with a satisfying accuracy. A good estimation of the weather conditions endured by each line is also needed. The problem of bulk parameters estimation for methodologies using a probability that an overloaded line trips before corrective actions are carried out is also important but quite different. Indeed, such a probability is difficult to estimate because it depends on the actual corrective scheme to eliminate overloads and the competition between operators and the thermal transient, but it is a key point to estimate frequencies of dangerous scenarios. Nedic showed in [14] that the parameters used in the probability function giving the tripping probability as a function of load can significantly change the risk and the

5 5 ranking of scenarios. If such a function giving the tripping probability as a function of load relies on a small number of parameters 3, the latter can be estimated through statistics of observed blackouts by data fitting. This method should give a good estimation, but it needs in general data from several networks (to reach a satisfactory statistical precision) and neglects specificities of different networks. Moreover, correlations between the load, wind and solar generation and the cooling of the lines (influenced by weather conditions) can strongly influence the risk of blackout. It can be crucial to consider these correlations in order to solve specific questions, for example when a unit should be maintained to limit the risk of blackout (see further) and this cannot be done based on this probability. The biggest limitations of models based on a one-level PRA are due to the confusion between the two phases of a cascading failure leading to a blackout. Indeed, either the system is electrically stable and the operators can react to the situation, or the system is electrically unstable and the operators cannot do anything before the fast cascade ends, so both cannot be mixed. In particular, performing a consequence analysis through an OPF when the system becomes electrically unstable does not seem to reflect the behavior of past blackouts. Consequently, even if the dynamic PRA method requires more parameters than others, important amounts of computations and it is not yet a complete and finished methodology, it proposes a general framework which should allow a probabilistic assessment of dangerous cascading scenarios leading to blackout in a realistic way. In the last part of this paper, we use a simplified level-i of this modeling in order to study the impact of generation changes on the risk of blackout. A. Blackout test system IV. TEST CASE To apply the methodology proposed, we need a complete test system with electrical parameters for each machine and electrical, geometrical and thermal properties for each link. Initial states have also to be N 1 secure to respect TSO s actual requirements. To have such a blackout test system, we adapted a classical test system which is a reduced-order equivalent of the interconnected New England Test System (NETS) and New York Power System (NYPS) with three other neighboring regions, in order to have a 69-bus test system. The purpose of the adaptation is not only to have all parameters needed (electrical parameters for each machine and electrical, geometrical and thermal properties for each link), but also to have coherency between these properties (geometrical and material properties determine electrical and thermal properties). Initial states have also to be N 1 secure to respect TSO s actual requirements. Each power plant in NETS and NYPS has two identical units, except the power plant 1 which has only one unit. We also implemented two wind farms of 150 MW and seven wind farms of 200 MW. The modified network is shown in Figure 4 and is available on phenneau/. Fig. 4. Blackout Test System with two critical area. B. Weather conditions In a modern power system, weather conditions are important for two main reasons: wind generation depends on the wind speed and temperatures of overhead lines depend on the wind speed and angle, air temperature,... Parameters describing random variables for wind speeds and temperatures are computed on the basis of data provided by the KNMI. The ambient temperature is modeled by a normal random variable whose parameters depend on the moment of the season and hour. The mean ambient temperature and mean wind speed as a function of the hour for the four seasons are shown in Figures 5 and 6, respectively. To consider the correlation between production in different wind farms, the joint normal distribution method is used to sample wind speeds [15], so the rank correlations are kept. The main idea of this algorithm is to sample standard normal dependent variables and to apply a transformation to get samples distributed according to the desired marginals. The sampling of dependent wind speeds is then done in four steps: the sampling of normal independent variables, the transformation of the sample into a sample of dependent variables through the correlation matrix, the transformation of the previous sample into a sample distributed along uniform laws (through standard normal cdf), and then transformation into a sample distributed along the desired marginals (through desired inverse cdf s). To extrapolate the wind speed at wind power plant height, we use the logarithmic wind profile. 3 For example, a tripping probability equal to p 1 when the current is less than its nominal value and equal to p 2 in the opposite, or with an exponential increase for currents greater than the nominal value,... Fig. 5. Mean ambient temperature.

6 6 TABLE I CROSS-BORDER POWER FLOWS Power flow (MW) Mean Min Max Std NETS NYPS NYPS NYPS TABLE II MOST FREQUENT DANGEROUS SCENARIOS (BASE CASE) Fig. 6. Mean wind speed. C. Main modeling assumptions A unique vegetation height is used for all lines and all MC runs, such that the probability of having a short circuit with the ground in all normal situations (no contingency) is Only voltage and frequency instabilities are considered for the electrical instability of the system. We consider the system thermally stable if there is no new contingency during 60 minutes. V. RESULTS Results obtained with the dynamic PRA level-i method are each time compared to a so-called independent method, based on the same simulation scheme, but neglecting thermal effects. This means neglecting the impact that a failure has on the failure rates of other elements (failures are sampled independently on the previous events on the basis of average failure rates). Results are expressed in terms of frequency of dangerous scenarios. As previously stated, a so-called dangerous scenario is a scenario leading to an electrical instability and thus possibly leading to a major system disturbance or a blackout, depending on the fast cascade. The frequency is the inverse of the expected time between two dangerous scenarios: if the frequency is 10 2 /year, a dangerous scenario is expected every 100 years in average. If scenarios are grouped according to the sequence of occurring events, several different situations (different timings, different load/generation patterns, different climatic conditions) are behind each sequence. A large variety of loss of power supplied could be revealed by a level-ii analysis for the same sequence of events identified during the level-i analysis, depending on the load/generation pattern. Moreover, a level-i scenario whose frequency is lower than another one could induce a bigger loss of supplied power and thus a greater risk. Consequently, level-i results give a first indication of vulnerability paths, but the level-ii analysis is important to estimate the risk induces by each vulnerability path. The computing time required per MC run is approximately 4.7 ms for this network. Since we use an analog MC simulation to estimate rare events, a huge amount of MC runs is necessarily to reach a satisfactory precision. This poor efficiency is the current limiting factor for an application to real-size grids. To improve efficiency, special biaising techniques to Initiating Event Event Event Level-I PRA Ind. method event freq. (/yr) freq. (/yr) E-03 <1E E-04 <1E E-04 <1E E-04 <1E E E E E E E E E-04 force the occurrence of cascading failures should be developed and applied, as explained in [16]. This work is under progress. A. Base case We give in this Subsection detailed results obtained by applying our methodology to the base case (100 million MC runs), in order to identify the vulnerabilities of the blackout test system. Similar results were also presented in [6], [17], but with a slightly different vegetation height. Mean cross-border power flows between the five areas in normal conditions are given in Table I. The variability in load and wind generation induces variability in power flows. 1) Dangerous scenarios: The estimation of the total frequency of dangerous scenarios is /year (with a good precision: the standard deviation is given by σ = 1.2%) by the dynamic PRA level-i method and /year (σ = 1.7%) by the independent method. Table II lists dangerous scenarios whose events correspond to the trip of the line i j and compares their frequencies ranked according to both dynamic PRA level-i estimation and the independent estimation (σ is between 2 and 10% for dynamic PRA level-i). The distribution of lines outages for the dynamic PRA level-i method is shown in Figure 7. All cascading failures have at least 2 events during the slow cascade (N 1 security rule). Most cascades comprise 2 to 4 events. It can be surprising to have short cascades of few events. However, the aim of the level-i analysis is to model the slow cascade: a level- I scenario indicates how the system can reach an electrical instable state. These numbers of events are in concordance with those observed in recorded slow cascades (see Section II). 2) Criticality of links: The Vesely-Fussel factor of diagnosis VF i is the probability that element i is failed, knowing that the scenario is dangerous. Table III compares Vesely-Fussel

7 7 Fig. 7. Distribution of lines outages during dynamic PRA level-i cascades. TABLE III VESELY-FUSSEL FACTORS Link VF i (%) Independent VF i (%) < < < TABLE IV LAMBERT FACTORS Link C i (%) Independent C i (%) < factors of links, ranked according to dynamic PRA level-i estimation. The Lambert factor of critical importance C i is the probability that element i causes the electrical instability, knowing that the scenario is dangerous. Table IV compares Lambert factors of links, ranked according to dynamic PRA level-i estimation. 3) Importance of weather conditions: The total frequency of dangerous scenarios as a function of the ambient temperature and as a function of the mean wind speed are represented in Figures 8 and 9, respectively. Fig. 8. Total frequency of dangerous scenarios as a function of ambient the temperature. 4) Discussion: Results given either by a dynamic PRA level-i simulation or an independent simulation are very dif- Fig. 9. Total frequency of dangerous scenarios as a function of the mean wind speed. TABLE V SEASONS IMPORTANCE Season Level-I PRA Ind. method Mean load freq. (/year) freq. (/year) (% of annual peak) Winter 5.8E E Spring 5.2E E Summer 1.6E E Fall 5.0E E ferent. Indeed, the impact of thermal effects influences not only the value of the frequency of most dangerous scenarios but also their ranking and the critical lines. In particular, the dynamic PRA level-i simulation reveals a critical area, located approximately between buses 2, 3 and 56, as shown in Figure 4. The importance of thermal effects is higher in summer, when the temperature is high and the mean wind speed low, even if the load is less than in winter, as Table V shows it. B. Cross-border power flows The total frequency of dangerous scenarios for different mean cross-border power flows from NETS to NYPS is shown in Figure 10 (40 millions MC runs for each point, which means that σ is less than 2% for each point). Cross-border power flows are modified by decreasing the generation in one zone (the power of each unit is decreased proportionally to its peak power in the base case) and increasing it in the other (in the same way) by the same amount. The independent method does not reveal a sensitivity of frequency to cross-border power flows. In the opposite, the dynamic PRA level-i method reveals an important sensitivity when the power flow goes from NETS to NYPS, but not when the power flow goes from NYPS to NETS. This can be explained by two factors. First, the superposition between local power flows and cross-border power flows induces a non-symmetrical behavior for crossborder power flows: a flow from NYPS to NETS is opposed to local flows and, consequently, it decreases the frequency of dangerous cascading scenarios in this region when the flow from NYPS to NETS increases (until the two are equal and opposite). On the contrary, when the mean power flow from NETS to NYPS grows, the frequency of dangerous scenarios in the critical region revealed by the base case increases, as shown in Table VI. Secondly, a second critical area appears between buses 30, 33 and 36 (NYPS), as the power flow from

8 8 TABLE VI MOST FREQUENT DANGEROUS SCENARIOS FOR A MEAN POWER FLOW FROM NETS TO NYPS OF 398 MW E0 E1 E2 E3 Freq. (/yr) E E E E-04 TABLE VII MOST FREQUENT DANGEROUS SCENARIOS FOR A MEAN POWER FLOW FROM NYPS TO NETS OF 195 MW E0 E1 E2 E3 E5 Freq. (/yr) E E-04 NYPS to NETS increases, leading to the emergence of new dangerous scenarios, as shown in Table VII and in Figure 4. As the two effects balance each other, the total frequency of dangerous scenarios is nearly constant. Fig. 11. Influence of total installed wind power on the total frequency of dangerous scenarios. the shutdown of this power plant decreases the production and consequently decreases the thermal cascading failure. This is confirmed by Table VIII: most frequent dangerous scenarios which were in the critical area in the base case disappear from the top of the ranking. On the contrary, the shutdown of power plants 5, 7, 8, 10 and 12 increases significantly the frequency when the lost power is compensated by the NETS. Indeed, the frequency of dangerous scenarios in the critical area increases in these cases, as shown in Table IX. To summarize the output of the Figure 12, we can say that, in the dynamic level-i approach, situations increasing the congestion in the critical area lead to a significant rise of the total frequency of dangerous scenarios, and vice-versa. In the independent approach, variations can be significant when the lost power is compensated only by one area, but does not have the same behavior as in the dynamic level-i approach. Fig. 10. Influence of cross-border power flows on the total frequency of dangerous scenarios. C. Installed wind power The total frequency of dangerous scenarios for different installed wind powers is shown in Figure 11 (40 million MC runs for each point). Above 2000 MW, frequencies of dangerous scenarios slightly increase. The absolute variation rate is nearly the same for both methods. These increases are not due to specific scenarios, but are due to a global increase of all scenarios. D. Definitive shut-down We study here a definitive shutdown of all units of the same power plant. The lost power can be compensated either in the same area, or by the other developed area (NETS or NYPS), or by all areas. Figures 12 and 13 give the relative augmentation of the total frequency of dangerous scenarios (40 million MC runs for each power plant). Surprisingly, in the dynamic PRA level-i approach, the shutdown of the power plant 2 decreases this frequency. It can be explained by the congestion revealed by the base case in the critical area between buses 2, 3 and 56: Fig. 12. Impact of the definitive shutdown of some power plants in the NETS (2,5,7,8) and in the NYPS (10,12) on the total frequency of dangerous scenarios - Dynamic PRA level-i. E. Maintenance This Subsection studies the impact of power plants maintenance on the risk of blackout. Figures 14 and 15 give the relative augmentation of the total frequency of dangerous scenarios for a 4-week maintenance of one unit in each NETS power plant, according to the season in which the power plant is maintained (40 million MC runs for each power plant). The lost power is compensated in the same area. In the dynamic

9 9 Fig. 13. Impact of the definitive shutdown of some power plants in the NETS (2,5,7,8) and in the NYPS (10,12) on the total frequency of dangerous scenarios - Independent method. Fig. 14. Impact of a four-week maintenance of one unit for each NETS power plant on the total frequency of dangerous scenarios - Dynamic PRA level-i. TABLE VIII MOST FREQUENT DANGEROUS SCENARIOS AFTER THE SHUTDOWN OF THE POWER PLANT 2 (NETS) WHEN THE LOST POWER IS COMPENSATED BY ALL AREAS. E0 E1 Freq. (/yr) E E E E E-04 TABLE IX MOST FREQUENT DANGEROUS SCENARIOS AFTER THE SHUTDOWN OF THE POWER PLANT 12 (NYPS) WHEN THE LOST POWER IS COMPENSATED BY THE NETS. E0 E1 E2 E3 Freq. (/yr) E E E E-04 PRA level-i approach, for the majority of them, a maintenance in the summer increases significantly the frequency of dangerous scenarios and a maintenance in another season increases it slightly. However, the maintenance of a power plant 2 or 3 unit decreases this frequency. As previously, it can be explained by the congestion in the critical area between buses 2, 3 and 56: the maintenance decreases the production and consequently decreases the thermal cascading failure. In the independent approach, variations are not significant. VI. CONCLUSIONS Several methodologies have been developed to simulate cascading failure mechanisms, but they use in general an unique model for the two phases which occurred in a typical cascading outage leading to a blackout. A two-level dynamic PRA method for the cascade itself is proposed as a general framework in order to consider the mechanisms of cascades, accounting for these two different phases. However, several challenges are still to be solved in such an approach. We applied in this paper a simplified dynamic PRA level-i method- Fig. 15. Impact of a four-week maintenance of one unit for each NETS power plan on the total frequency of dangerous scenarios - Independent method. ology to a test system in order to study the impact of several changes in the electric grid, such as variation of cross-border power flows, wind generation penetration, maintenance and shut-down of power plants. Even if the modeling adopted for the vegetation height does not reflect perfectly the reality, we showed that thermal effects can play an important role in cascading failure, during the first phase (the slow cascade). It was well-known that only dependencies between events could explain statistical properties of blackouts which occurred regularly, and we showed in this paper an approach to simulating and estimating the impact of dependent thermal failures. A comparison with a methodology neglecting these thermal failures showed that not only the overall frequency of level-i dangerous scenarios is not the same if thermal effects are taken into account or not, but also their ranking according to their respective frequencies. Moreover, conclusions on the impact of changes in the electric grid on the risk of blackout can be strongly different according to an independent analysis or to a dynamic PRA level-i analysis. APPENDIX A THERMAL MODELS FOR DYNAMIC PRA LEVEL-I This Appendix briefly explains thermal models used in dynamic level-i PRA. More details can be found in [6].

10 10 A. Thermal failure models 1) Overhead lines: If S(T) is the sag of the line at temperaturet,h L is the height of the suspension point,h V is the height of vegetation, E D is the breakdown electric field of ambient air and V is the phase-to-ground voltage of the line, the trip of the line occurs when S(T) = H L H V V/E D. 2) Underground cables: The main failure mode for cables is dielectric breakdown. The dielectric strength reduces temporarily when temperature increases for extruded isolation cables. For slow temperature transients, the failure rate at time t and temperature T can be derived as λ(t, T) = λ ref [τ(t)] ( E 0(T ref ) E 0(T) ) b dτ dt (t,t), where λ ref[τ(t)] is the failure rate at the reference temperature T ref and the age τ(t), b is a constant depending on material and cable dimensions, and E 0 is the stress leading to a nominal breakdown probability. 3) Power transformers: The dielectric strength reduces temporarily when temperature increases due to thermally induced gas bubbles. If dielectric stress and transformer withstand voltage are normal random variables, respectively V S N(µ S,σ S ) and V R N(µ R (T),σ R ), the dielectric failure rate of an overloaded transformer can be calculated 1 φ[ µr ] (T) µ S σ by λ d (T) = λ d (T ref ) 2 S +σ2 R ] where T is the µr (T 1 φ[ ref ) µ S σ 2 S +σ2 R hottest spot temperature, T ref is the hottest spot temperature in reference conditions, and φ(x) is the normal cumulative distribution function. B. Temperature evolution 1) Overhead lines: The evolution of a line temperature is ruled by a heat balance depending on convective and radiation heat losses, heat gain from sun and Joule losses: q c + q r + dt mc p dt = q s +I 2 r(t), where q c is the convective heat loss rate,q r the radiation heat loss rate,mc p the total heat capacity of conductor, q s the heat gain rate from sun, r(t) the AC resistance of conductor at temperature T, and I the current. 2) Underground cables: A two-layer thermal model with a mean dielectric temperature leading to a set of two first-order differential equations depending on thermal capacities, thermal resistances and Joule losses is used. 3) Power transformers: The hottest spot temperature is the sum of the ambient temperature, the top-oil temperature rise over ambient temperature and the hottest-spot conductor rise over top oil temperature. The ultimate steady-state topoil temperature rise T u, over ambient temperature T a is ( computed as T u, = T K ) 2 +1 n, u,rl R+1 where Tu,rl is the transformer top oil temperature rise over ambient temperature at rated load, K the ratio of load to rated load, R the ratio of loss at rated load to no-load loss, and n the exponential power of loss versus top-oil temperature rise. The evolution of top-oil temperature rise T u (t) is ruled by τ u T u dt (t) = T u, T u (t) where τ u is the oil s thermal time constant. The hottest spot temperature rise above oil temperature rise T h is given by T h = T h,rl K 2m, where T h,rl is the hottest-spot conductor rise over top oil temperature at rated load and m the exponential power of winding loss versus winding gradient. REFERENCES [1] R. Billinton and R. N. Allan, Reliability evaluation of power systems. Plenum Press, [2] R. Billinton and D. Huang, Incorporating wind power in generating capacity reliability evaluation using different models, IEEE Transactions on Power Systems, vol. 26, no. 4, pp , [3] Terna, Annual reports , [4] Investigation Committee of UCTE, Final report of the investigation committee on the 28 September 2003 blackout in Italy, UCTE, Tech. Rep., [5] ENTSO-E, Draft Network Code for Operational Security, [6] P. Henneaux, P.-E. Labeau, and J.-C. Maun, A level-1 probabilistic risk assessment to blackout hazard in transmission power systems, Reliability Engineering & System Safety, vol. 102, no. 0, pp , [7] U.S.-Canada Power System Outage Task Force, Final report on the August 14, 2003 blackout in the United States and Canada, Tech. Rep., [8] M. Vaiman, K. Bell, Y. Chen, B. Chowdhury, I. Dobson, P. Hines, M. Papic, S. Miller, and P. Zhang, Risk assessment of cascading outages: Methodologies and challenges, IEEE Transactions on Power Systems, vol. 27, no. 2, pp , [9] B. Carreras, V. Lynch, I. Dobson, and D. Newman, Critical points and transitions in an electric power transmission model for cascading failure blackouts, Chaos, vol. 12, no. 4, pp , [10] J. Qi, S. Mei, and F. Liu, Blackout model considering slow process, Power Systems, IEEE Transactions on, vol. PP, no. 99, pp. 1 1, [11] EPRI, TRELSS Application Manual: For Cascading Failure, Reliability and Deterministic Analysis, 2003, Palo Alto, CA, [12] M. A. Rios, D. S. Kirschen, D. Jayaweera, D. P. Nedic, and R. N. Allan, Value of security: Modeling time-dependent phenomena and weather conditions, IEEE Transactions on Power Systems, vol. 17, no. 3, pp , [13] M. Anghel, K. Werley, and A. Motter, Stochastic model for power grid dynamics, in Proceedings of the 40th Annual Hawaii International Conference on System Sciences (HICSS 07). Washington, DC, USA: IEEE Computer Society, 2007, p [14] D. P. Nedic, Simulation of large system disturbances, Ph.D. dissertation, University of Manchester Institute for Science and Technology, [15] G. Papaefthymiou, Integration of stochastic generation in power systems, Ph.D. dissertation, Technische Universiteit Delft, [16] P. Labeau and E. Zio, Procedures of monte carlo transport simulation for applications in system engineering, Reliability Engineering & System Safety, vol. 77, no. 3, pp , [17] P. Henneaux, P.-E. Labeau, and J.-C. Maun, Blackout pra based identification of critical initial conditions and contingencies, in 12th International Conference on Probabilistic Methods Applied to Power Systems (PMAPS 2012), Istanbul, Turkey, Jun. 2012, pp Pierre Henneaux received his M.Sc. degree in Physics Engineering in 2009 from the Université Libre de Bruxelles (ULB). He is pursuing his Ph.D. degree in ULB as F.R.S-FNRS Research Fellow. His research fields are the reliability of electrical grids and blackout risk analysis. Pierre-Etienne Labeau was graduated as Physics Engineer in 1992 and obtained his PhD in Applied Sciences in 1996, both from ULB. He is currently professor in reliability engineering and nuclear engineering. His research interests are PRA methodology, and system reliability and maintenance modeling. Jean-Claude Maun received the M.Sc. in Mechanical and Electrical Engineering in 1976 and PhD degree in Applied Sciences in 1981, both from ULB. He is currently full professor in electrical engineering. His research includes all aspects of power system protection, power quality monitoring and event analysis, as well as the dynamics and control of synchronous machines.

Reliability of Bulk Power Systems (cont d)

Reliability of Bulk Power Systems (cont d) Reliability of Bulk Power Systems (cont d) Important requirements of a reliable electric power service Voltage and frequency must be held within close tolerances Synchronous generators must be kept running

More information

Cascading Outages in Power Systems. Rui Yao

Cascading Outages in Power Systems. Rui Yao Cascading Outages in Power Systems Rui Yao yaorui.thu@gmail.com Outline Understanding cascading outages Characteristics of cascading outages Mitigation of cascading outages Understanding cascading outages

More information

Criticality in a cascading failure blackout model

Criticality in a cascading failure blackout model Electrical Power and Energy Systems 28 (2006) 627 633 www.elsevier.com/locate/ijepes Criticality in a cascading failure blackout model Dusko P. Nedic a, Ian Dobson b, *, Daniel S. Kirschen a, Benjamin

More information

The Impact of Distributed Generation on Power Transmission Grid Dynamics

The Impact of Distributed Generation on Power Transmission Grid Dynamics The Impact of Distributed Generation on Power Transmission Grid Dynamics D. E. Newman B. A. Carreras M. Kirchner I. Dobson Physics Dept. University of Alaska Fairbanks AK 99775 Depart. Fisica Universidad

More information

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc.

elgian energ imports are managed using forecasting software to increase overall network e 칁 cienc. Elia linemen install Ampacimon real time sensors that will communicate with the dynamic thermal ratings software to control energy import levels over this transmission line. OV RH AD TRAN MI ION D namic

More information

Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives

Module 6 : Preventive, Emergency and Restorative Control. Lecture 27 : Normal and Alert State in a Power System. Objectives Module 6 : Preventive, Emergency and Restorative Control Lecture 27 : Normal and Alert State in a Power System Objectives In this lecture you will learn the following Different states in a power system

More information

Estimating Failure Propagation in Models of Cascading Blackouts

Estimating Failure Propagation in Models of Cascading Blackouts 8th International Conference on Probability Methods Applied to Power Systems, Ames Iowa, September 2004 Estimating Failure Propagation in Models of Cascading Blackouts Ian Dobson Benjamin A. Carreras Vickie

More information

11.1 Power System Stability Overview

11.1 Power System Stability Overview 11.1 Power System Stability Overview This introductory section provides a general description of the power system stability phenomena including fundamental concepts, classification, and definition of associated

More information

EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY

EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY EVALUATION OF WIND ENERGY SOURCES INFLUENCE ON COMPOSITE GENERATION AND TRANSMISSION SYSTEMS RELIABILITY Carmen Lucia Tancredo Borges João Paulo Galvão carmen@dee.ufrj.br joaopaulo@mercados.com.br Federal

More information

Identifying Plausible Harmful N-k Contingencies: A Practical Approach based on Dynamic Simulations

Identifying Plausible Harmful N-k Contingencies: A Practical Approach based on Dynamic Simulations Identifying Plausible Harmful N-k Contingencies: A Practical Approach based on Dynamic Simulations Tilman Weckesser Center for Electric Power and Energy (CEE) Technical University of Denmark (DTU) Lyngby,

More information

PMU-Based Power System Real-Time Stability Monitoring. Chen-Ching Liu Boeing Distinguished Professor Director, ESI Center

PMU-Based Power System Real-Time Stability Monitoring. Chen-Ching Liu Boeing Distinguished Professor Director, ESI Center PMU-Based Power System Real-Time Stability Monitoring Chen-Ching Liu Boeing Distinguished Professor Director, ESI Center Dec. 2015 Real-Time Monitoring of System Dynamics EMS Real-Time Data Server Ethernet

More information

Blackouts in electric power transmission systems

Blackouts in electric power transmission systems University of Sunderland From the SelectedWorks of John P. Karamitsos 27 Blackouts in electric power transmission systems Ioannis Karamitsos Konstadinos Orfanidis Available at: https://works.bepress.com/john_karamitsos/9/

More information

Power System Security. S. Chakrabarti

Power System Security. S. Chakrabarti Power System Security S. Chakrabarti Outline Introduction Major components of security assessment On-line security assessment Tools for contingency analysis DC power flow Linear sensitivity factors Line

More information

SINGLE OBJECTIVE RISK- BASED TRANSMISSION EXPANSION

SINGLE OBJECTIVE RISK- BASED TRANSMISSION EXPANSION Vol.2, Issue.1, Jan-Feb 2012 pp-424-430 ISSN: 2249-6645 SINGLE OBJECTIVE RISK- BASED TRANSMISSION EXPANSION V.Sumadeepthi 1, K.Sarada 2 1 (Student, Department of Electrical and Electronics Engineering,

More information

Evaluating the Impact of Modeling Assumptions for Cascading Failure Simulation

Evaluating the Impact of Modeling Assumptions for Cascading Failure Simulation 1 Evaluating the Impact of Modeling Assumptions for Cascading Failure Simulation Ronan Fitzmaurice, Member, IEEE, Eduardo Cotilla-Sanchez, Graduate Student Member, IEEE, and Paul Hines, Member, IEEE Abstract

More information

Development of Multi-Unit Dependency Evaluation Model Using Markov Process and Monte Carlo Method

Development of Multi-Unit Dependency Evaluation Model Using Markov Process and Monte Carlo Method Development of Multi-Unit Dependency Evaluation Model Using Markov Process and Monte Carlo Method Sunghyon Jang, and Akira Yamaguchi Department of Nuclear Engineering and Management, The University of

More information

EE 451 Power System Stability

EE 451 Power System Stability EE 451 Power System Stability Power system operates in synchronous mode Power system is subjected to a wide range of disturbances (small and large) - Loads and generation changes - Network changes - Faults

More information

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory

The Study of Overhead Line Fault Probability Model Based on Fuzzy Theory Energy and Power Engineering, 2013, 5, 625-629 doi:10.4236/epe.2013.54b121 Published Online July 2013 (http://www.scirp.org/journal/epe) The Study of Overhead Line Fault Probability Model Based on Fuzzy

More information

Sample average approximation and cascading failures of power grids. Daniel Bienstock, Guy Grebla, Tingjun Chen, Columbia University GraphEx 15

Sample average approximation and cascading failures of power grids. Daniel Bienstock, Guy Grebla, Tingjun Chen, Columbia University GraphEx 15 Sample average approximation and cascading failures of power grids Daniel Bienstock, Guy Grebla, Tingjun Chen, Columbia University GraphEx 15 August 14 2003 Approximately 50 million people affected Other

More information

Power System Stability and Control. Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India

Power System Stability and Control. Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India Power System Stability and Control Dr. B. Kalyan Kumar, Department of Electrical Engineering, Indian Institute of Technology Madras, Chennai, India Contents Chapter 1 Introduction to Power System Stability

More information

Risk-Based Composite Power System Vulnerability Evaluation to Cascading Failures Using Importance Sampling

Risk-Based Composite Power System Vulnerability Evaluation to Cascading Failures Using Importance Sampling 1 Risk-Based Composite Power System Vulnerability Evaluation to Cascading Failures Using Importance Sampling Quan Chen, Student Member, IEEE and Lamine Mili, Senior Member, IEEE Abstract Large-scale blackouts

More information

Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon, Canada

Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon, Canada Abstract Failure Bunching Phenomena in Electric Power Transmission Systems Roy Billinton Gagan Singh Janak Acharya Power System Research Group Electrical Engineering Dept., University of Saskatchewan Saskatoon,

More information

1. Introduction. Keywords Transient Stability Analysis, Power System, Swing Equation, Three-Phase Fault, Fault Clearing Time

1. Introduction. Keywords Transient Stability Analysis, Power System, Swing Equation, Three-Phase Fault, Fault Clearing Time Energy and Power 17, 7(1): -36 DOI: 1.593/j.ep.1771.3 Numerical Simulations for Transient Stability Analysis of Two-Machine Power System Considering Three-Phase Fault under Different Fault Clearing Times

More information

A New Approach to Constructing Seasonal Nomograms in Planning and Operations Environments at Idaho Power Co.

A New Approach to Constructing Seasonal Nomograms in Planning and Operations Environments at Idaho Power Co. Paper # 485 1 A New Approach to Constructing Seasonal Nomograms in Planning and Operations Environments at Idaho Power Co. M. Papic 1, Senior Member, IEEE, M. Y. Vaiman 2, Member, IEEE, M. M. Vaiman 2,

More information

WIDE AREA CONTROL THROUGH AGGREGATION OF POWER SYSTEMS

WIDE AREA CONTROL THROUGH AGGREGATION OF POWER SYSTEMS WIDE AREA CONTROL THROUGH AGGREGATION OF POWER SYSTEMS Arash Vahidnia B.Sc, M.Sc in Electrical Engineering A Thesis submitted in partial fulfilment of the requirements for the degree of Doctor of Philosophy

More information

Selecting the current rating for equipment

Selecting the current rating for equipment Selecting the current rating for equipment 1. Rated current: the maximum continuous load current. Short-time withstand current: thermal withstand current term term is given for 1s or 3s short circuit current

More information

2015 IEEE. Digital Object Identifier: /PTC

2015 IEEE. Digital Object Identifier: /PTC 2015 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other users, including reprinting/ republishing this material for advertising or promotional purposes,

More information

DYNAMIC RESPONSE OF A GROUP OF SYNCHRONOUS GENERATORS FOLLOWING DISTURBANCES IN DISTRIBUTION GRID

DYNAMIC RESPONSE OF A GROUP OF SYNCHRONOUS GENERATORS FOLLOWING DISTURBANCES IN DISTRIBUTION GRID Engineering Review Vol. 36 Issue 2 8-86 206. 8 DYNAMIC RESPONSE OF A GROUP OF SYNCHRONOUS GENERATORS FOLLOWING DISTURBANCES IN DISTRIBUTION GRID Samir Avdaković * Alija Jusić 2 BiH Electrical Utility Company

More information

Evaluation of the risk of failure due to switching overvoltages of a phase to phase insulation

Evaluation of the risk of failure due to switching overvoltages of a phase to phase insulation Evaluation of the risk of failure due to switching overvoltages of a phase to phase insulation A. Xemard, J. Michaud, A. Guerrier, I. Uglesic, G. Levacic, M. Mesic Abstract-- The upgrade of an overhead

More information

Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources

Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Proper Security Criteria Determination in a Power System with High Penetration of Renewable Resources Mojgan Hedayati, Kory Hedman, and Junshan Zhang School of Electrical, Computer, and Energy Engineering

More information

Power Engineering II. Fundamental terms and definitions

Power Engineering II. Fundamental terms and definitions Fundamental terms and definitions Power engineering A scientific discipline that focuses on: Generation of electrical energy (EE) Transmission and distribution of EE Consumption of EE Power grid operation

More information

Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian Institute of Technology, Kharagpur

Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian Institute of Technology, Kharagpur Power System Analysis Prof. A. K. Sinha Department of Electrical Engineering Indian Institute of Technology, Kharagpur Lecture - 9 Transmission Line Steady State Operation Welcome to lesson 9, in Power

More information

A STATIC AND DYNAMIC TECHNIQUE CONTINGENCY RANKING ANALYSIS IN VOLTAGE STABILITY ASSESSMENT

A STATIC AND DYNAMIC TECHNIQUE CONTINGENCY RANKING ANALYSIS IN VOLTAGE STABILITY ASSESSMENT A STATIC AND DYNAMIC TECHNIQUE CONTINGENCY RANKING ANALYSIS IN VOLTAGE STABILITY ASSESSMENT Muhammad Nizam Engineering Faculty Sebelas Maret University (Ph.D Student of Electrical, Electronic and System

More information

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9

PUB NLH 185 Island Interconnected System Supply Issues and Power Outages Page 1 of 9 PUB NLH 1 Page 1 of 1 Q. Provide Hydro s list of outage cause codes and indicate how troublemen are managed and trained to properly use the codes. Explain the method used to report outage causes. A. Hydro

More information

Role of Synchronized Measurements In Operation of Smart Grids

Role of Synchronized Measurements In Operation of Smart Grids Role of Synchronized Measurements In Operation of Smart Grids Ali Abur Electrical and Computer Engineering Department Northeastern University Boston, Massachusetts Boston University CISE Seminar November

More information

Lambda-gaga: Toward a New Metric for the Complex System State of the Electrical Grid

Lambda-gaga: Toward a New Metric for the Complex System State of the Electrical Grid 2015 48th Hawaii International Conference on System Sciences Lambda-gaga: Toward a New Metric for the Complex System State of the Electrical Grid B. A. Carreras D. E. Newman I. Dobson Depart. Fisica Universidad

More information

Stochastic Model for Power Grid Dynamics

Stochastic Model for Power Grid Dynamics [Fortieth Hawaii International Conference on System Sciences, January 3-6, 2007, Big Island, Hawaii] Stochastic Model for Power Grid Dynamics Marian Anghel Los Alamos National Laboratory Los Alamos, New

More information

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2015

NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 2015 NORDIC AND BALTIC GRID DISTURBANCE STATISTICS 23.01.2017 REGIONAL GROUP NORDIC 1 INTRODUCTION... 4 1.1 DESCRIPTION OF THE REPORT... 4 1.2 CONTACT PERSONS... 5 1.3 VOLTAGE LEVELS IN THE NORDIC AND BALTIC

More information

Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation

Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation Time-varying failure rate for system reliability analysis in large-scale railway risk assessment simulation H. Zhang, E. Cutright & T. Giras Center of Rail Safety-Critical Excellence, University of Virginia,

More information

ECE 422/522 Power System Operations & Planning/ Power Systems Analysis II 3 Load Modeling

ECE 422/522 Power System Operations & Planning/ Power Systems Analysis II 3 Load Modeling ECE 422/522 Power System Operations & Planning/ Power Systems Analysis II 3 Load Modeling Spring 2014 Instructor: Kai Sun 1 References 1. Load Performance for Dynamic Performance Analysis, IEEE Committee

More information

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers

Section 5. TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Section 5 TADS Data Reporting Instruction Manual DRAFT Section 5 and Associated Appendices With Proposed Event Type Numbers Rev. 5/10/2010 1 Section 5 Form for Event ID and Event Type Number Data TO s

More information

UNIVERSIDAD DE CASTILLA-LA MANCHA

UNIVERSIDAD DE CASTILLA-LA MANCHA UNIVERSIDAD DE CASTILLA-LA MANCHA DEPARTAMENTO DE INGENIERÍA ELÉCTRICA, ELECTRÓNICA, AUTOMÁTICA Y COMUNICACIONES OPTIMAL POWER FLOW WITH STABILITY CONSTRAINTS TESIS DOCTORAL AUTOR: RAFAEL ZÁRATE MIÑANO

More information

Critical Points and Transitions in an Electric Power Transmission Model for Cascading Failure Blackouts

Critical Points and Transitions in an Electric Power Transmission Model for Cascading Failure Blackouts The submitted manuscript has been authored by a contractor of the U.S. Government under Contract No. DE-AC05-00OR22725. Accordingly, the U.S. Government retains a nonexclusive royalty-free license to publish

More information

EXPECTATIONS FOR LOSS OF SUPPLY IN THE NEW ZEALAND POWER SYSTEM

EXPECTATIONS FOR LOSS OF SUPPLY IN THE NEW ZEALAND POWER SYSTEM EXPECTATIONS FOR LOSS OF SUPPLY IN THE NEW ZEALAND POWER SYSTEM Claire Jordan, Henning Rasmussen and Ratneesh Suri Abstract Predicting when, and how much, power may be lost on any given power grid is a

More information

SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID POWER SYSTEM INCLUDING A.G.

SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID POWER SYSTEM INCLUDING A.G. Proc. of the 5th WSEAS/IASME Int. Conf. on Electric Power Systems, High Voltages, Electric Machines, Tenerife, Spain, December 16-18, 25 (pp59-514) SYNCHRONOUS GENERATOR s ROTOR INVESTIGATION OF A HYBRID

More information

Risk and Safety in Civil, Surveying and Environmental Engineering

Risk and Safety in Civil, Surveying and Environmental Engineering Risk and Safety in Civil, Surveying and Environmental Engineering Prof. Dr. Michael Havbro Faber ETH Zurich, Switzerland Contents of Today's Lecture Introduction to structural systems reliability General

More information

Mitigation of Distributed Generation Impact on Protective Devices in a Distribution Network by Superconducting Fault Current Limiter *

Mitigation of Distributed Generation Impact on Protective Devices in a Distribution Network by Superconducting Fault Current Limiter * Energy and Power Engineering, 2013, 5, 258-263 doi:10.4236/epe.2013.54b050 Published Online July 2013 (http://www.scirp.org/journal/epe) Mitigation of Distributed Generation Impact on Protective Devices

More information

Increasing Transmission Capacities with Dynamic Monitoring Systems

Increasing Transmission Capacities with Dynamic Monitoring Systems INL/MIS-11-22167 Increasing Transmission Capacities with Dynamic Monitoring Systems Kurt S. Myers Jake P. Gentle www.inl.gov March 22, 2012 Concurrent Cooling Background Project supported with funding

More information

Adaptive Distance Relaying Scheme for Power Swing Tripping Prevention

Adaptive Distance Relaying Scheme for Power Swing Tripping Prevention Adaptive Distance Relaying Scheme for Power Swing Tripping Prevention 1 NOR ZULAILY MOHAMAD, AHMAD FARID ABIDIN, 3 ISMAIL MUSIRIN Centre of Electrical Power Engineering Studies Universiti Teknologi MARA

More information

Modeling of Power System Components During Electromagnetic Transients

Modeling of Power System Components During Electromagnetic Transients Modeling of Power System Components During Electromagnetic Transients 1 Paweł Sowa, 2 Rafał Kumala and 3 Katarzyna Łuszcz 1, 2,3 Faculty of Electrical Engineering, Silesian University of Technology/ Institute

More information

Test Case: Power System Voltage Stability

Test Case: Power System Voltage Stability Test Case: Power System Voltage Stability Mats Larsson Corporate Research Mats Larsson / 2002-02-18 / 1 2002 Corporate Research Ltd, Baden, Switzerland Preview The People from Characteristics of Power

More information

Software Tools: Congestion Management

Software Tools: Congestion Management Software Tools: Congestion Management Tom Qi Zhang, PhD CompuSharp Inc. (408) 910-3698 Email: zhangqi@ieee.org October 16, 2004 IEEE PES-SF Workshop on Congestion Management Contents Congestion Management

More information

However, reliability analysis is not limited to calculation of the probability of failure.

However, reliability analysis is not limited to calculation of the probability of failure. Probabilistic Analysis probabilistic analysis methods, including the first and second-order reliability methods, Monte Carlo simulation, Importance sampling, Latin Hypercube sampling, and stochastic expansions

More information

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 29, NO. 4, JULY Stochastic Analysis of Cascading-Failure Dynamics in Power Grids

IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 29, NO. 4, JULY Stochastic Analysis of Cascading-Failure Dynamics in Power Grids IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 29, NO. 4, JULY 2014 1767 Stochastic Analysis of Cascading-Failure Dynamics in Power Grids Mahshid Rahnamay-Naeini, Student Member, IEEE, Zhuoyao Wang, Nasir Ghani,

More information

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology

Chapter 2. Planning Criteria. Turaj Amraee. Fall 2012 K.N.Toosi University of Technology Chapter 2 Planning Criteria By Turaj Amraee Fall 2012 K.N.Toosi University of Technology Outline 1- Introduction 2- System Adequacy and Security 3- Planning Purposes 4- Planning Standards 5- Reliability

More information

New criteria for Voltage Stability evaluation in interconnected power system

New criteria for Voltage Stability evaluation in interconnected power system New criteria for Stability evaluation in interconnected power system Lavanya Neerugattu Dr.G.S Raju MTech Student, Dept.Of EEE Former Director IT, BHU Email: nlr37@gmail.com Visiting Professor VNR Vignana

More information

IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 18, NO. 4, OCTOBER

IEEE TRANSACTIONS ON POWER DELIVERY, VOL. 18, NO. 4, OCTOBER TRANSACTIONS ON POWER DELIVERY, VOL. 18, NO. 4, OCTOBER 2003 1 A New Method for the Calculation of the Hot-Spot Temperature in Power Transformers With ONAN Cooling Zoran Radakovic and Kurt Feser, Fellow,

More information

Critical clearing time evaluation of Nigerian 330kV transmission system

Critical clearing time evaluation of Nigerian 330kV transmission system American Journal of Electrical Power and Energy Systems 2013; 2(6): 123-128 Published online October 20, 2013 (http://www.sciencepublishinggroup.com/j/epes) doi: 10.11648/j.epes.20130206.11 Critical clearing

More information

Power Grid State Estimation after a Cyber-Physical Attack under the AC Power Flow Model

Power Grid State Estimation after a Cyber-Physical Attack under the AC Power Flow Model Power Grid State Estimation after a Cyber-Physical Attack under the AC Power Flow Model Saleh Soltan, Gil Zussman Department of Electrical Engineering Columbia University, New York, NY Email: {saleh,gil}@ee.columbia.edu

More information

Modern Power Systems Analysis

Modern Power Systems Analysis Modern Power Systems Analysis Xi-Fan Wang l Yonghua Song l Malcolm Irving Modern Power Systems Analysis 123 Xi-Fan Wang Xi an Jiaotong University Xi an People s Republic of China Yonghua Song The University

More information

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II : 8 - Voltage Stability

ECE 422/522 Power System Operations & Planning/Power Systems Analysis II : 8 - Voltage Stability ECE 422/522 Power System Operations & Planning/Power Systems Analysis II : 8 - Voltage Stability Spring 2014 Instructor: Kai Sun 1 Voltage Stability Voltage stability is concerned with the ability of a

More information

A Unified Framework for Defining and Measuring Flexibility in Power System

A Unified Framework for Defining and Measuring Flexibility in Power System J A N 1 1, 2 0 1 6, A Unified Framework for Defining and Measuring Flexibility in Power System Optimization and Equilibrium in Energy Economics Workshop Jinye Zhao, Tongxin Zheng, Eugene Litvinov Outline

More information

Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration Photovoltaics (Part 2)

Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration Photovoltaics (Part 2) Journal of Mechanics Engineering and Automation 5 (2015) 401-406 doi: 10.17265/2159-5275/2015.07.003 D DAVID PUBLISHING Transient Stability Assessment of Synchronous Generator in Power System with High-Penetration

More information

CONTROL OF POWER SYSTEMS WITH FACTS DEVICES CONSIDERING DIFFERENT LOAD CHARACTERISTICS

CONTROL OF POWER SYSTEMS WITH FACTS DEVICES CONSIDERING DIFFERENT LOAD CHARACTERISTICS CONTROL OF POWER SYSTEMS WITH FACTS DEVICES CONSIDERING DIFFERENT LOAD CHARACTERISTICS Ingo Winzenick *, Michael Fette **, Joachim Horn * * Helmut-Schmidt-University / University of the Federal Armed Forces

More information

Adaptive under frequency load shedding using synchrophasor measurement

Adaptive under frequency load shedding using synchrophasor measurement Adaptive under load shedding using synchrophasor measurement Abstract - The imbalance between the generation and the demand is the major factor that causes instability in a power system. Conventional Under

More information

Outage Coordination and Business Practices

Outage Coordination and Business Practices Outage Coordination and Business Practices 1 2007 Objectives What drove the need for developing a planning/coordination process. Why outage planning/coordination is crucial and important. Determining what

More information

On-Line TSA and Control at EMS Control Centers for Large Power Grids

On-Line TSA and Control at EMS Control Centers for Large Power Grids On-Line TSA and Control at EMS Control Centers for Large Power Grids Dr. Hsiao-Dong Chiang (i) Prof. of School of Electrical and Computer Engineering, Cornell University, Ithaca, NY (ii) President of BSI,

More information

TRANSIENT STABILITY ANALYSIS ON AHTS VESSEL ELECTRICAL SYSTEM USING DYNAMIC POSITIONING SYSTEM

TRANSIENT STABILITY ANALYSIS ON AHTS VESSEL ELECTRICAL SYSTEM USING DYNAMIC POSITIONING SYSTEM International Journal of Mechanical Engineering and Technology (IJMET) Volume 10, Issue 02, February 2019, pp. 461-475, Article ID: IJMET_10_02_048 Available online at http://www.iaeme.com/ijmet/issues.asp?jtype=ijmet&vtype=10&itype=2

More information

Estimation for Expected Energy Not Served of Power Systems Using the Screening Methodology of Cascading Outages in South Korea

Estimation for Expected Energy Not Served of Power Systems Using the Screening Methodology of Cascading Outages in South Korea energies Article Estimation for Expected Energy Not Served of Power Systems Using the Screening Methodology of Cascading Outages in South Korea Bokyung Goo and Jin Hur * ID Department of Electrical Engineering,

More information

A Comprehensive Approach for Bulk Power System Reliability Assessment

A Comprehensive Approach for Bulk Power System Reliability Assessment PAPER D: #44 1 A Comprehensive Approach for Bulk Power System Reliability Assessment Fang Yang, Student Member, EEE, A. P. Sakis Meliopoulos, Fellow, EEE, George J. Cokkinides, Member, EEE, and George

More information

Power grid vulnerability analysis

Power grid vulnerability analysis Power grid vulnerability analysis Daniel Bienstock Columbia University Dimacs 2010 Daniel Bienstock (Columbia University) Power grid vulnerability analysis Dimacs 2010 1 Background: a power grid is three

More information

Deep Thunder. Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility)

Deep Thunder. Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility) 1 Deep Thunder Local Area Precision Forecasting for Weather-Sensitive Business Operations (e.g. Electric Utility) Dipl. Ing. Helmut Ludwar Chief Technologist Wien, im Oktober 2010 Forecasts for Weather-Sensitive

More information

CLIMATE CHANGE ASSESSMENT. A. Climate Change Risk Assessment and Adaptation Measures

CLIMATE CHANGE ASSESSMENT. A. Climate Change Risk Assessment and Adaptation Measures Solar Transmission Sector Project (RRP IND 49214) CLIMATE CHANGE ASSESSMENT I. Transmission System at Bhadla, Rajasthan A. Climate Change Risk Assessment and Adaptation Measures High temperature Risk is

More information

Chapter 3 AUTOMATIC VOLTAGE CONTROL

Chapter 3 AUTOMATIC VOLTAGE CONTROL Chapter 3 AUTOMATIC VOLTAGE CONTROL . INTRODUCTION TO EXCITATION SYSTEM The basic function of an excitation system is to provide direct current to the field winding of the synchronous generator. The excitation

More information

Power Grid Vulnerability to Geographically Correlated Failures - Analysis and Control Implications

Power Grid Vulnerability to Geographically Correlated Failures - Analysis and Control Implications Power Grid Vulnerability to Geographically Correlated Failures - Analysis and Control Implications Andrey Bernstein 1, Daniel Bienstock 2, David Hay 3, Meric Uzunoglu 4, Gil Zussman 5 1 Computer and Communication

More information

Composite System Reliability Evaluation using State Space Pruning

Composite System Reliability Evaluation using State Space Pruning Composite System Reliability Evaluation using State Space Pruning C. Singh, Fellow, IEEE J. Mitra, Student Member, IEEE Department of Electrical Engineering Texas A & M University College Station, Texas

More information

A possible notion of short-term value-based reliability

A possible notion of short-term value-based reliability Energy Laboratory MIT EL 1-13 WP Massachusetts Institute of Technology A possible notion of short-term value-based reliability August 21 A possible notion of short-term value-based reliability Yong TYoon,

More information

A PROBABILISTIC MODEL FOR POWER GENERATION ADEQUACY EVALUATION

A PROBABILISTIC MODEL FOR POWER GENERATION ADEQUACY EVALUATION A PROBABILISTIC MODEL FOR POWER GENERATION ADEQUACY EVALUATION CIPRIAN NEMEŞ, FLORIN MUNTEANU Key words: Power generating system, Interference model, Monte Carlo simulation. The basic function of a modern

More information

THE technical infrastructure is of crucial importance

THE technical infrastructure is of crucial importance MODELLING OF ICE STORMS FOR POWER TRANSMISSION RELIABILITY CALCULATIONS Elin Broström KTH Stockholm, Sweden elin.brostrom@ets.kth.se Lennart Söder KTH Stockholm, Sweden lennart.soder@ets.kth.se Abstract

More information

Managing Uncertainty and Security in Power System Operations: Chance-Constrained Optimal Power Flow

Managing Uncertainty and Security in Power System Operations: Chance-Constrained Optimal Power Flow Managing Uncertainty and Security in Power System Operations: Chance-Constrained Optimal Power Flow Line Roald, November 4 th 2016 Line Roald 09.11.2016 1 Outline Introduction Chance-Constrained Optimal

More information

Estimation of Current Transformer Insulation Life with an Effect of Environmental Variables

Estimation of Current Transformer Insulation Life with an Effect of Environmental Variables Estimation of Current Transformer Insulation Life with an Effect of Environmental Variables Priti N. Bawankule 1, Dr. A. G. Thosar 2, P. S. Swami 3 PG Student [EPS], Dept. of EE, Government College of

More information

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015

Wind power and management of the electric system. EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 Wind power and management of the electric system EWEA Wind Power Forecasting 2015 Leuven, BELGIUM - 02/10/2015 HOW WIND ENERGY IS TAKEN INTO ACCOUNT WHEN MANAGING ELECTRICITY TRANSMISSION SYSTEM IN FRANCE?

More information

Stochastic Unit Commitment with Topology Control Recourse for Renewables Integration

Stochastic Unit Commitment with Topology Control Recourse for Renewables Integration 1 Stochastic Unit Commitment with Topology Control Recourse for Renewables Integration Jiaying Shi and Shmuel Oren University of California, Berkeley IPAM, January 2016 33% RPS - Cumulative expected VERs

More information

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur

1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-cur 1. Explain the various methods of methods of grounding. In power system, grounding or earthing means connecting frame of electrical equipment (non-current carrying part) or some electrical part of the

More information

6. The August 14 Blackout Compared With Previous Major North American Outages

6. The August 14 Blackout Compared With Previous Major North American Outages 6. The August 14 Blackout Compared With Previous Major North American Outages Incidence and Characteristics of Power System Outages Short, localized outages occur on power systems fairly frequently. System-wide

More information

Security Monitoring and Assessment of an Electric Power System

Security Monitoring and Assessment of an Electric Power System International Journal of Performability Engineering Vol. 10, No. 3, May, 2014, pp. 273-280. RAMS Consultants Printed in India Security Monitoring and Assessment of an Electric Power System PUROBI PATOWARY

More information

A Computer Application for Power System Control Studies

A Computer Application for Power System Control Studies A Computer Application for Power System Control Studies Dinis C. A. Bucho Student nº55262 of Instituto Superior Técnico Technical University of Lisbon Lisbon, Portugal Abstract - This thesis presents studies

More information

Vedant V. Sonar 1, H. D. Mehta 2. Abstract

Vedant V. Sonar 1, H. D. Mehta 2. Abstract Load Shedding Optimization in Power System Using Swarm Intelligence-Based Optimization Techniques Vedant V. Sonar 1, H. D. Mehta 2 1 Electrical Engineering Department, L.D. College of Engineering Ahmedabad,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Interconnection for Wind Energy ) Docket No. RM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Interconnection for Wind Energy ) Docket No. RM05-4-000 REQUEST FOR REHEARING OF THE NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL

More information

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK

DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK DEPARTMENT OF ELECTRICAL AND ELECTRONICS ENGINEERING QUESTION BANK SUBJECT CODE & NAME: EE 2303 - TRANSMISSION & DISTRIBUTION YEAR / SEM: III/V UNIT-I TRANSMISSION SYSTEM INTRODUCTION PART-A 1. What is

More information

Experiment for Justification the Reliability of Passive Safety System in NPP

Experiment for Justification the Reliability of Passive Safety System in NPP XIII International Youth Scientific and Practical Conference FUTURE OF ATOMIC ENERGY - AtomFuture 2017 Volume 2017 Conference Paper Experiment for Justification the Reliability of Passive Safety System

More information

Economic Operation of Power Systems

Economic Operation of Power Systems Economic Operation of Power Systems Section I: Economic Operation Of Power System Economic Distribution of Loads between the Units of a Plant Generating Limits Economic Sharing of Loads between Different

More information

Research on the Effect of Substation Main Wiring on the Power System Reliability Yuxin Zhao 1, a, Tao Liu 2,b and Yanxin Shi 3,c

Research on the Effect of Substation Main Wiring on the Power System Reliability Yuxin Zhao 1, a, Tao Liu 2,b and Yanxin Shi 3,c International Power, Electronics and aterials Engineering Conference (IPEEC 2015) esearch on the Effect of ubstation ain Wiring on the Power ystem eliability Yuxin Zhao 1, a, Tao Liu 2,b and Yanxin hi

More information

Generalized Injection Shift Factors and Application to Estimation of Power Flow Transients

Generalized Injection Shift Factors and Application to Estimation of Power Flow Transients Generalized Injection Shift Factors and Application to Estimation of Power Flow Transients Yu Christine Chen, Alejandro D. Domínguez-García, and Peter W. Sauer Department of Electrical and Computer Engineering

More information

Ice Storm Impact on Power System Reliability

Ice Storm Impact on Power System Reliability Ice Storm Impact on Power System Reliability Tech. Lic. E. Broström and Dr. L. Söder Royal Institute of Technology, Electric Power Systems Teknikringen 33, SE-10044 Stockholm, Sweden, elin.brostrom@ee.kth.se

More information

Dynamic Voltage Stability Enhancement of a Microgrid with Static and Dynamic Loads Using Microgrid Voltage Stabilizer

Dynamic Voltage Stability Enhancement of a Microgrid with Static and Dynamic Loads Using Microgrid Voltage Stabilizer Dynamic Voltage Stability Enhancement of a Microgrid with Static and Dynamic Loads Using Microgrid Voltage Stabilizer Kenan Hatipoglu 1, Ismail Fidan 2, Ghadir Radman 3 1 Electrical and Computer Engineering

More information

PowerApps Optimal Power Flow Formulation

PowerApps Optimal Power Flow Formulation PowerApps Optimal Power Flow Formulation Page1 Table of Contents 1 OPF Problem Statement... 3 1.1 Vector u... 3 1.1.1 Costs Associated with Vector [u] for Economic Dispatch... 4 1.1.2 Costs Associated

More information

Transient Stability Analysis with PowerWorld Simulator

Transient Stability Analysis with PowerWorld Simulator Transient Stability Analysis with PowerWorld Simulator T1: Transient Stability Overview, Models and Relationships 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

New Formulations of the Optimal Power Flow Problem

New Formulations of the Optimal Power Flow Problem New Formulations of the Optimal Power Flow Problem Prof. Daniel Kirschen The University of Manchester 2010 D. Kirschen and The University of Manchester 1 2010 D. Kirschen and The University of Manchester

More information

Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems

Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems Monte Carlo Simulation for Reliability Analysis of Emergency and Standby Power Systems Chanan Singh, Fellow, IEEE Joydeep Mitra, Student Member, IEEE Department of Electrical Engineering Texas A & M University

More information