U.S. Army Corps of Engineers Detroit District. Sediment Trap Assessment Saginaw River, Michigan

Size: px
Start display at page:

Download "U.S. Army Corps of Engineers Detroit District. Sediment Trap Assessment Saginaw River, Michigan"

Transcription

1 U.S. Army Corps of Engineers Detroit District December 2001 December 2001

2 This report has been prepared for USACE, Detroit District by: W.F. BAIRD & ASSOCIATES LTD YARMOUTH GREENWAY MADISON, WISCONSIN For further information please contact James Selegean, (313) , Dr. Rob Nairn, (905) USACE

3 TABLE OF CONTENTS 1. INTRODUCTION INCOMING SEDIMENT SEDIMENT TRAP SITES AND SIZES Sediment Trap Sites Trap Dimensions THEORETICAL ANALYSIS HEC-6 MODELLING CONCLUSIONS...11 REFERENCES...13 USACE Table of Contents

4 1. INTRODUCTION This report describes the assessment of sediment traps along the Saginaw River, MI, using existing numerical models and theoretical analysis. Two models were developed in previous studies: HEC-6 was used to model the Saginaw River (Baird 1999); and Mike 21 was used for modeling Saginaw Bay (Baird 2000). The studies indicated that most of the clay and silt from upstream passes through the federal channel and settles in Saginaw Bay, while most of sand settles in the river over the entire length of the channel. The construction of a sediment trap is suggested to catch a considerable fraction of the transported sand. A theoretical analysis of sediment dynamics was developed to evaluate the trap locations and sizes and to roughly assess trap efficiencies. A previously developed HEC-6 model was used to further evaluate the efficiency of the sediment traps. The study results are presented in five parts: incoming sediment analysis; sediment trap sites and sizes; theoretical analysis; HEC-6 modeling; and conclusions. USACE 1

5 2. INCOMING SEDIMENT The previous HEC-6 model studies provided useful sediment data, such as total sediment load, grain size distribution of suspended sediment and flow discharge. These data as well as the HEC-6 modeling results were used to choose sediment trap sites and dimensions. The relationship of total sediment load (TSL) and discharge was established in the previous studies for discharges varying from 50 cfs to 15,000 cfs. The USGS data indicate the recorded discharge varies from 500 cfs to 35,000 cfs. Therefore, it was necessary to extend this relationship using extrapolation. Figure 1 shows the relationship of sediment load and discharge extending up to 35,000 cfs. The corresponding grain size distribution is shown in Figure 2. It clearly shows that there is a higher percentage of clay for both high and low flows. It should be noted that there is no grain size data available for the flow discharges larger than 15,000 cfs. Based on the HEC-6 model results that were calibrated by dredging records, a constant grain size distribution was assumed for all discharges larger than 15,000 cfs. The extrapolation for TSL and grain size distribution was verified with the incoming TSL results of HEC-6 model. Table 1 lists incoming TSL calculated using the extrapolation and from HEC-6 model results. Table 1. Comparison of the Calculated TSL and GSD with HEC-6 Model Results Calculated HEC-6 Incoming TSL and Grain Size Distribution Total Clay Silt Sand (ton/yr) (%) 100% 56% 33% 11% (ton/yr) (%) 100% 57% 33% 10% The calculated TSL using this approach is slightly larger than the HEC-6 model results but the gain size distribution is the same. This is because the HEC-6 model uses input discharges that were developed from daily discharges and doesn t account for sediment load at peak flow. In order to understand the distribution of incoming sediment loads with discharge, a frequency analysis of flow discharge was performed using the 9-year discharge data at the USGS gage, as shown in Figure 3. The sediment load for each flow was calculated using the relationship of sediment load and discharge and is shown in Figure 4. Using the grain size distribution corresponding to that flow, the total sediment loads can be divided into the loads of clay, silt and sand, as shown in Figures 5a, 5b and 5c. It was found that the maximum sediment loads occur at flow discharges from 5,500 to 7,000 cfs for clay and silt and about 14,500 cfs for sand though the latter has no obvious peak load. The absence USACE 2

6 of a peak in the distribution for sand (Figure 5c) may be attributed to the fact that sand transport rates are highest at high flows and these high flows occur infrequently. The total sediment load delivered by the Saginaw River is estimated to be 280,525 tons each year, consisting of 56% clay, 34% silt, and 10% sand. The accumulated frequencies of sediment loads for clay, silt and sand are shown in Figure SEDIMENT TRAP SITES AND SIZES 3.1 Sediment Trap Sites Four sediment trap sites were selected based on previous HEC-6 model results. Figure 7 shows the sediment deposition distribution along the river. Four locations were proposed based on heavy sediment deposition and where dredging is not prohibited (e.g., by the presence of underground cables). Figure 8 shows the locations of the proposed sediment traps. The corresponding river miles for these traps are listed in Table 2. Trap D is expected to capture sand while the others are expected to capture coarse silt as well as sand. Table 2. Locations of the Proposed Sediment Traps Sediment Trap River Miles from Mouth Description A 1 Between Buoy 4 and Buoy 8 B 3 Upstream Buoy 20, Rupp Oil Co. C 4.8 Around Buoy 27, Bay City Marina D 12.5 Between Buoy 70 and Buoy Trap Dimensions Flow velocity and shear stress are key parameters to determine the deposition of sediments. For a given discharge, the flow velocity is inversely proportional to crosssectional area. Sediment starts settling when flow velocity is less than the critical flow velocity. In other words, by increasing the cross-sectional area, the flow velocity decreases allowing more sediment to settle to the riverbed. It is assumed that the local maximum river width can be used in the analysis for each of the four traps. Drege depths of 5, 10 and 15ft below the existing depth were selected and used for both the analysis and the model investigation. The required length can be determined by the ratio of flow velocity and sediment settling velocity and water depth. Capturing small particles requires a longer trap because their USACE 3

7 settling velocities are small. In this assessment, three trap lengths of 300, 600 and 1200 ft were used for the HEC-6 modeling and the theoretical analysis. 4. THEORETICAL ANALYSIS Bottom shear stress is usually used to describe the hydrodynamic force acting on the sediment bed. Sediment deposition and erosion is determined by the relative states of bottom shear stress and critical shear stress. Bed sediments are resuspended when the bottom shear stress is larger than the critical shear stress. Otherwise, the suspended sediments are deposited. Therefore, the relationship between flow discharge and bottom shear stress should be established to determine the states of sediment deposition and erosion. Bottom shear stress can be determined by the following formula: U n U n Q τ b = ρg = ρg = ρg (1) C h B h where τ b --- bottom shear stress (N/m 2 ) ρ --- water density (kg/m 3 ), g --- gravity acceleration (m/s 2 ), U --- averaged velocity (m/s), Q --- flow discharge (m 3 /s), h --- water depth (m), B --- river width (m), 1 6 C --- Chezy s coefficient h 1 C =, n n --- Manning s coefficient. By replacing the bottom shear stress with critical shear stress, the critical discharge can be calculated as follows: 7 6 τ cr Bh Qcr = (2) ρg n where τ cr is the critical shear stress and Q cr is the critical discharge. Sediment starts settling when discharge is less than the critical discharge. The critical shear stress can be calculated according to van Rijn s formulae which was developed based on Shield s curve: USACE 4

8 θ where cr cr ( s ) ( s 1) g D* for 1 < D* D* for 4 < D* θ cr = 0.04D* for 10 < D* 20 (3) D 20 < 150 * for D* for D* > 150 = τ ρ ρ gd, is the critical Shields parameter; D* = d 2 50 ν d 50 is the median grain size (m); ρ s is the sediment density (kg/m 3 ); ρ is the water density (kg/m 3 ); ν is the kinematic viscosity (m 2 /s); g is the gravity acceleration (m/s 2 ); s = ρ s /ρ., particle parameter; Then total incoming sediment load under the critical discharge can be calculated from Section 2. The amount of sediment that will settle in the trap depends on the flow velocity, trap length and original water depth. If the trap is shorter, more of the sediment passes through the trap and cannot settle down to the bed. As the depth gets larger, the flow velocity decreases, thereby increasing the amount of sediment deposited in the trap. The percentage of sediment that settles down to the trap is calculated by β = αlω s /UH (4) where β is percentage of sediment captured by the trap, L is the trap length, H is the water depth before dredging, U is the flow velocity, ω s is the settling velocity, and α is a coefficient adjusted for non-uniform distribution of concentration in the vertical, which depends on the suspension parameter or the ratio of settling velocity and shear velocity. If sediment concentration is uniformly distributed vertically, α should be one. In most cases, α should be larger than one, which means that sediment concentration at the river bottom is larger than that at the surface. In this assessment, based on averaged grain size and averaged velocity, α was set as two. The 9-year discharge data recorded at the USGS gage and the sediment loads developed in Section 2 were used for the theoretical calculation. The following steps were carried out: 1. Calculate critical shear stress for each sediment class using Eq. (3); 2. Calculate critical discharge using Eq. (2) based on trap dimensions. The Manning s coefficient is 0.025, which was used in the HEC-6 model; USACE 5

9 3. Calculate total sediment load when flow discharge is below the critical discharge for each class. This amount of sediment may settle down to the river bed; 4. Calculate the percentage of sediment which is captured by the trap using Eq. (4); 5. Calculate total sediment settling in the trap as the product of the total sediment load calculated in step 3 and the percentage of captured sediment calculated in step 4. All sediment loads and sediment volume deposited in the traps were converted to annually averaged values for comparison. Table 3 lists annually averaged incoming sediment, sediment volume deposited in the traps, and trap efficiency for clay, silt and sand. The dredging depth is the additional depth to be dredged for the sediment trap (i.e. below the existing river bed). The percentage of sediment presents the percentage of the total captured sediments in relation to the total incoming sediment load. The percentages of the three classes represent the percentages of the captured clay, silt and sand relating to total incoming clay, silt and sand loads, respectively. It was found that almost all of the incoming clay passes through the traps. It is hard to capture clay because of its small settling velocity and ease of suspension. Conversely, it is easy to capture sand due to its large settling velocity. Almost all sands carried by flows which are less than the critical discharge are successfully captured. In other words, increasing the dredging depth, hence decreasing flow velocity, can more efficiently capture sands rather than increasing the trap length. For example, 31% of sand is captured by Trap A with a dredged depth of 5ft for all trap lengths, 48% of sand is captured with a dredged depth of 10 ft and 62% of incoming sand is captured for a dredged depth of 15ft. However, the trap performance for silt is quite different. Since silt has a smaller settling velocity, it requires more time to settle to the riverbed. Trap length has a significant effect on the settling of silt. Increasing the trap length can improve the trap efficiency for silt. Trap A can capture about 10% of incoming silt with a 300 ft long trap and up to 22% with a 1200 ft long trap. River width has significant effects on trap efficiency as well. Increasing the trap width can increase the amount of captured sediment. Note that the impacts of decreasing trap depth due to deposition on the flow are not considered in the calculation. In other words, it was assumed that all sediment deposited in the trap was removed frequently to keep the trap of depth the same. Trap design will require an assessment of trap capacity and required frequency of maintenance dredging. An analysis tool using Microsoft Excel was developed. It allows users to adjust trap depth, trap length and location to evaluate trap efficiency quickly and easily. USACE 6

10 Table 3. Annual Captured Sediment and Trap Efficiency Through Theoretical Incoming Sediment (ton) Analysis Total Clay Silt Sand Trap Efficiency (%) River Trap Dimensions (ft) Mile Width Dredged Length Depth Captured Sediment (ton) Total Clay Silt Sand % 0% 10% 31% % 1% 15% 31% % 1% 22% 31% A % 0% 13% 48% % 1% 19% 48% % 0% 15% 62% % 1% 21% 62% % 0% 9% 28% % 0% 13% 28% B % 0% 12% 43% % 1% 17% 43% % 0% 13% 56% % 1% 19% 56% % 0% 8% 23% % 0% 12% 23% C % 0% 11% 36% % 1% 15% 36% % 0% 12% 49% % 1% 18% 49% % 0% 5% 12% % 0% 8% 12% D % 0% 8% 19% % 0% 11% 19% % 0% 10% 30% % 0% 14% 30% USACE 7

11 5. HEC-6 MODELLING Based on the analysis described above, eleven proposed sediment traps were simulated using the HEC-6 model (see Table 4). The HEC-6 model of the Saginaw River developed in the previous studies was used for this assessment. In order to eliminate the effect of lake level fluctuation on the assessment, a 10 year simulation was carried at for each trap. Cross-sections around the traps were modified based on the trap dimensions as described in Table 4. All other conditions, such as incoming sediment, discharge, and lake level were kept the same. Table 5 lists the amount of captured sediment and trap efficiency. Because there is no function for outputting trap efficiency of a reach in the HEC-6 model, the trap efficiency was calculated by Qs, in Qs, out p = 100% (5) Q s, in where Q s,in is the total sediment passing through the upstream edge of a trap; Q s,out is the total sediment passing through the downstream edge of a trap, and p is the percentage of captured sediment. Note that incoming sediment load at the upstream boundary was not used to calculate the trap efficiency because sediment erosion occurred in the upstream reaches of the river. Table 4. HEC-6 Model Run Parameters HEC-6 Model Trap Site Dredged Depth (ft) Length (ft) Run1 A Run2 A Run3 A Run4 A Run5 A Run6 B Run7 B Run8 B Run9 D Run10 D Run11 D Table 5 lists sediment deposition in the traps and trap efficiency estimated by the HEC-6 modeling. It is seen that almost all of the clay passes through the traps. Most of the USACE 8

12 sediment captured by the traps was sand. The modeling results showed that 47% to 87% of sand and about 10% of silt was captured by Trap A. The total sediment captured by Trap A was from 15% to 26%, depending on the trap dimensions. It was also found that increasing the trap depth significantly increases the trap efficiency for sand but extending the trap length may not increase trap efficiency. This finding is consistent with the theoretical analysis as described in the previous section. The modeling results indicate that increasing both trap depth and length can improve trap efficiency for silt as well. It is noted that these findings regarding the role of trap depth and length apply to the range of depths and lengths considered. For example, there will be a critical trap length (less than 300 ft) where further reductions in trap length begin to reduce the efficiency of the trap. Comparing the model results with the theoretical analysis, it was found that the trap efficiency estimated using the theoretical analysis (called theoretical efficiency below) was generally close to that estimated using the HEC-6 model (called modeling efficiency below). However, the theoretical efficiency of total sediment is less than modeling efficiency. This probably results from different incoming sediment data used in the theoretical analysis and the HEC-6 modeling. The theoretical analysis was based on the total incoming sediment load at the upstream boundary of the HEC-6 model, which is significantly less than the sediment load passing through the upstream edge of the traps in the model because sediment erosion occurs in the upstream reach of the river and more sediment is carried downstream. In addition, bed load was not considered in the theoretical analysis, which may have resulted in an underprediction of the theoretical efficiency. On the other hand, the impacts of trap deposition in turn decreasing trap depth (that are considered in HEC-6) are not considered in the theoretical analysis, which may result in an overprediction of the theoretical efficiency. It was also found that the theoretical efficiency was larger than the modeling efficiency for the silt class but less for the sand class. This may result from the constant coefficient used for α in Eq. (4). The coefficient α presents non-uniform distribution of concentration in the water column. In reality the vertical distribution of concentration depends on grain size. The smaller the grain size, the more uniform the vertical concentration distribution. The coefficient α for sand should be larger than that for silt. Averaged grain size was used to determine the coefficient α, which may be smaller than that for sand and larger than that for silt. Another factor is the bed sediment load which is mostly composed of coarse sand. The bed load is not considered in the theoretical analysis. It should be pointed out that the theoretical analysis disregards the trap locations. This means that the same incoming sediment loads are applied for all traps. However, the HEC-6 model analysis used local sediment load and accounted for the sediment load change along the river. USACE 9

13 Table 5. Sediment Deposition and Trap Efficiency Estimated Using HEC-6 Modeling Trap Dimensions (ft) Captured Sediment (ton/yr) Trap Efficiency (%) Trap Dredged Total Width Depth Length Clay Silt Sand Total Clay Silt Sand % 0.8% 10.3% 47.2% % 0.8% 10.7% 48.5% A % 0.9% 11.5% 50.1% % 0.8% 11.6% 72.7% % 0.8% 12.3% 87.7% % 0.3% 4.3% 45.5% B % 0.3% 4.9% 63.1% % 0.3% 5.0% 74.0% % 0.3% 4.1% 8.7% D % 0.3% 4.8% 24.0% % 0.3% 5.2% 42.3% USACE 10

14 6. CONCLUSIONS The trap efficiencies were evaluated using both theoretical analysis and HEC-6 modeling. The key findings of the assessment were as follows: Based on our theoretical analysis: 1. The various sediment trap configurations considered can capture between 3% to 14% of the total incoming sediment, or between 12% to 62% of the total incoming sand, and 5% to 22% of the total incoming silt, depending on the trap location, depth and length. This doesn t take into account the bed load (which would increase the efficiencies); 2. Downstream sediment traps can capture more incoming sediment than upstream traps. Downstream sediment traps are more likely to capture silt; 3. The sediment traps can capture a greater fraction of coarser sediment such as sand and coarse silt. Almost all clay passes through the traps; 4. Increasing the trap depth will result in capturing more sand. But increasing the trap length beyond the maximum deposition length has no significant effect on the trapping of sand. These findings apply to the range of trap lengths and depths considered here; 5. Increasing both trap length and depth can improve the trap efficiency for silt. 6. The developed tool for theoretical analysis which has been calibrated with the HEC-6 model can be used to quickly assess trap efficiency. Based on our HEC-6 modeling analysis: 1. The various sediment trap configurations considered capture between 4% to 26% of total sediment load, or between 9% to 88% of total sand load and 4% to 12% of total silt load passing through the traps, depending on the location and size of the trap. 2. Captured sediments are mostly sand and some silt. Almost all clay passes through and is deposited in Saginaw Bay; USACE 11

15 3. Increasing the trap depth can significantly improve the trap efficiency for sand. However, increasing trap length more than 300 ft does not improve the trap capacity as much as increasing trap depth; 4. Increasing both the trap depth and length can improve the trap efficiency to some degree. 5. Using a wider river segment for the sediment trap can increase trap efficiency, as demonstrated with Trap A. In summary, the proposed sediment traps capture incoming sediment with varying degrees of success depending on the trap dimensions and incoming grain sizes. These traps are located in the river segment where there is a sediment deposition environment. The developed theoretical analysis and HEC-6 modeling can be used for sediment trap design and assessment of trap efficiency. The theoretical analysis approach was verified by the HEC-6 modeling results and can be used to quickly and roughly assess trap efficiency. The HEC-6 model requires more effort to prepare the input data and process output data and can be used to assess the trap efficiency for final design. In order to capture as much sediment as possible, it is recommended to use Trap A and Trap D together. Trap D is most effective at capturing sand and Trap A is more effective at capturing coarse and medium silt. There is a marsh beside Trap D, which could be used to extend the trap width. This may significantly improve the efficiency of Trap D. There is still large portion of incoming sediment delivered to the lake and deposited in the outer channels and the surrounding area (i.e. passes through the proposed traps). The previous MIKE 21 model study shows that the most of silt and sand is deposited in the outer channel and clay disperses to the surrounding water. This silt and sand could be captured by a sediment trap located at the river mouth. A theoretical analysis and model study could be performed to assess the feasibility of sediment traps in the outer channel in Saginaw Bay. USACE 12

16 REFERENCES Baird & Associates (1999), on Sheboygan River and Harbor, Wiscosin, Baird & Associates Technical Report; Baird & Associates (2000), Sediment Transport Modelling: Saginaw Bay, Saginaw River Basin, Baird & Associates Technical Report, USACE, HEC-6 User Manual, U.S. Army Corps of Engineers, Hydrologic Engineering Center. Van Rijn, (L.C.) (1989), Handbook for Sediment Transport by Currents and Waves, Delft Hydraulic USACE 13

17 Total Sediment Load (T/d) Discharge (cfs) Figure 1 Relationship of Total Sediment Load and Discharge 70% 60% Clay Sand Silt 50% Percentage (%) 40% 30% 20% 10% 0% Discharge (cfs) Figure 2 Suspended Sediment Grain Size Distribution USACE 14

18 1.8% 1.6% 1.4% Percentage 1.2% 1.0% 0.8% 0.6% % 0.2% 0.0% Discharge (cfs) Figure 3 - Frequency of Flow Discharge Recorded at USGS Gage # (interval 100 cfs) Total Sediment Load (T) Discharge (cfs) Figure 4 - Total Incoming Sediment Load Distribution Over Discharge from 1988 to 1998 (Interval 100 cfs) USACE 15

19 Clay Sediment Load Silt Sediment Load Sand Sediment Load 1.4E E E E E E E E E E E E E E E E E+00 3.E+03 2.E+03 2.E+03 1.E+03 5.E+02 0.E Q (cfs) Q (cfs) Silt Clay Sand Q (cfs) Figure 5 Incoming Sediment Load Distribution Over Discharge (note: sediment load scales differ) USACE 16

20 Percentage (%) 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Clay Silt Sand Q (cfs) Figure 6 Accumulated Incoming Sediment Load Trap A Trap C Trap D Clay Silt Sand Total Sediment Deposited (cu.yds) Trap B River Mile (mi) Figure 7 Sediment Deposition Distribution Along the River USACE 17

21 A B C D Figure 8 Selected Sediment Trap Sites USACE 18

Sediment Traps. CAG Meeting May 21, 2012

Sediment Traps. CAG Meeting May 21, 2012 Sediment Traps CAG Meeting May 21, 2012 Agenda Background Fundamentals of Sediment Transport Sediment Trap Existing Information Next Steps 2 The Site Saginaw River 22 mile river beginning at confluence

More information

Remaining Capacity in Great Lakes Reservoirs

Remaining Capacity in Great Lakes Reservoirs US Army Corps of Engineers Detroit District Remaining Capacity in Great Lakes Reservoirs Storage Capacity Behind Great Lakes Dams Field Data and Modeling Motivation for project Project overview Data and

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

EXAMPLES (SEDIMENT TRANSPORT) AUTUMN 2018

EXAMPLES (SEDIMENT TRANSPORT) AUTUMN 2018 EXAMPLES (SEDIMENT TRANSPORT) AUTUMN 2018 Q1. Using Cheng s formula estimate the settling velocity of a sand particle of diameter 1 mm in: (a) air; (b) water. Q2. Find the critical Shields parameter diameter

More information

Technical Memorandum No

Technical Memorandum No Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.10 Task: Evaluation of Four Watershed Conditions - Sediment To: PRWFPA Staff Working Group Prepared by: Gregory Morris and

More information

Sediment transport and river bed evolution

Sediment transport and river bed evolution 1 Chapter 1 Sediment transport and river bed evolution 1.1 What is the sediment transport? What is the river bed evolution? System of the interaction between flow and river beds Rivers transport a variety

More information

Modeling of long-term sedimentation in the Osijek port basin

Modeling of long-term sedimentation in the Osijek port basin Water Management and Hydraulic Engineering 2015 Litera Brno, ISBN 978-80-214-5230-5, ISSN 2410-5910 Modeling of long-term sedimentation in the Osijek port basin G. Gilja, N. Kuspilić (Faculty of civil

More information

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream River Flow 2014 Schleiss et al. (Eds) 2014 Taylor & Francis Group, London, ISBN 978-1-138-02674-2 Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream A. Amini

More information

Geomorphology 5. Stream Sediment Stream Sediment

Geomorphology 5. Stream Sediment Stream Sediment Geomorphology 5. Stream Sediment 1 Name 47 Points LEARNING OUTCOMES 5. Stream Sediment By the end of this assignment you should be able to: Describe the relationship between particle size and critical

More information

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle

HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin. Mike Langland and Ed Koerkle HEC-RAS Reservoir Transport Simulation of Three Reservoirs in the Lower Susquehanna River Basin Mike Langland and Ed Koerkle Topics Background / Project Objectives Data Selection - Sediment and Geometric

More information

Numerical modeling of sediment flushing from Lewis and Clark Lake

Numerical modeling of sediment flushing from Lewis and Clark Lake University of Nebraska - Lincoln DigitalCommons@University of Nebraska - Lincoln US Army Research U.S. Department of Defense 2013 Numerical modeling of sediment flushing from Lewis and Clark Lake Jungkyu

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Walnut Creek Sedimentation Study

Walnut Creek Sedimentation Study Walnut Creek Sedimentation Study January 10, 2012 Prepared for: U.S. Army Corps of Engineer Sacramento District 1325 J Street Sacramento, CA 95814-2922 Prepared by: Ronald R. Copeland, Ph.D., P.E. Mobile

More information

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December

More information

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project,

Summary of Hydraulic and Sediment-transport. Analysis of Residual Sediment: Alternatives for the San Clemente Dam Removal/Retrofit Project, Appendix N SUMMARY OF HYDRAULIC AND SEDIMENT-TRANSPORT ANALYSIS OF RESIDUAL SEDIMENT: ALTERNATIVES FOR THE SAN CLEMENTE DAM REMOVAL/RETROFIT PROJECT, CALIFORNIA the San Clemente Dam Removal/Retrofit Project,

More information

State Water Survey Division SURFACE WATER SECTION

State Water Survey Division SURFACE WATER SECTION State Water Survey Division SURFACE WATER SECTION AT THE UNIVERSITY OF ILLINOIS Illinois Department of Energy and Natural Resources SWS Miscellaneous Publication 88 SEDIMENTATION OF POOL 19 ON THE MISSISSIPPI

More information

Lower Susquehanna River Reservoir System Proposed Modeling Enhancements

Lower Susquehanna River Reservoir System Proposed Modeling Enhancements Lower Susquehanna River Reservoir System Proposed Modeling Enhancements Presented at the Chesapeake Bay Program Scientific and Technical Advisory Committee (STAC) Workshop January 13, 2016 Overview Due

More information

Module 2. The Science of Surface and Ground Water. Version 2 CE IIT, Kharagpur

Module 2. The Science of Surface and Ground Water. Version 2 CE IIT, Kharagpur Module The Science of Surface and Ground Water Lesson Sediment Dynamics in Alluvial Rivers and Channels Instructional Objectives On completion of this lesson, the student shall be able to learn the following:.

More information

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth

Technical Memorandum. To: From: Copies: Date: 10/19/2017. Subject: Project No.: Greg Laird, Courtney Moore. Kevin Pilgrim and Travis Stroth Technical Memorandum To: From: Greg Laird, Courtney Moore Kevin Pilgrim and Travis Stroth 5777 Central Avenue Suite 228 Boulder, CO 80301 www.otak.com Copies: [Electronic submittal] Date: 10/19/2017 Subject:

More information

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NESTUCCA RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Quantifying i the GLRI Metric for Annual Sediment Deposition in Great Lakes Harbors:

Quantifying i the GLRI Metric for Annual Sediment Deposition in Great Lakes Harbors: USACE 516(e) Annual Meeting Ann Arbor, MI (May 15, 2013) Quantifying i the GLRI Metric for Annual Sediment Deposition in Great Lakes Harbors: A Pilot Evaluation for Toledo Harbor Todd Redder Joe DePinto

More information

15. Physics of Sediment Transport William Wilcock

15. Physics of Sediment Transport William Wilcock 15. Physics of Sediment Transport William Wilcock (based in part on lectures by Jeff Parsons) OCEAN/ESS 410 Lecture/Lab Learning Goals Know how sediments are characteried (sie and shape) Know the definitions

More information

Assessment of Water and Sediment Patterns within Prado Basin

Assessment of Water and Sediment Patterns within Prado Basin APPENDIX A Assessment of Water and Sediment Patterns within Prado Basin APPENDIX A Submitted To: Orange County Water District 18700 Ward Street Fountain Valley, California 92708 USA Submitted By: Golder

More information

Swift Creek Sediment Management Action Plan (SCSMAP)

Swift Creek Sediment Management Action Plan (SCSMAP) Swift Creek Sediment Management Action Plan (SCSMAP) PHASE 2 PROJECT PLAN PROPOSAL Whatcom County Public Works Department 322 N. Commercial Street, Suite 210 Bellingham, WA 98225 (360) 676-6692 June 2013

More information

MEMORANDUM. Scott Pickard, CELRB-TD-EH Michael Asquith, CELRB-PM-PM. From: Paul R. Schroeder, Ph.D., PE Earl Hayter, Ph.D. Date: 14 March 2016

MEMORANDUM. Scott Pickard, CELRB-TD-EH Michael Asquith, CELRB-PM-PM. From: Paul R. Schroeder, Ph.D., PE Earl Hayter, Ph.D. Date: 14 March 2016 DEPARTMENT OF THE ARMY ENGINEER RESEARCH AND DEVELOPMENT CENTER, CORPS OF ENGINEERS ENVIRONMENTAL LABORATORY WATERWAYS EXPERIMENT STATION, 3909 HALLS FERRY ROAD VICKSBURG, MISSISSIPPI 39180-6199 29 November

More information

River Model (Delft3D)

River Model (Delft3D) A Short River Model (Delft3D) & DIVERSION ANALYSIS presented by Nina J. Reins, PE, PhD, PMP State of the Coast May 30-June 1, 2018 Overview of Presentation Problem Statement & Background Analysis Key Findings

More information

Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program

Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program Lower Susquehanna River Integrated Sediment & Nutrient Monitoring Program Presented at the Chesapeake Bay Program Scientific and Technical Advisory Committee (STAC) Workshop January 13, 2016 Background

More information

Final Report. Prepared for. American Rivers, California Trout, Friends of the River and Trout Unlimited

Final Report. Prepared for. American Rivers, California Trout, Friends of the River and Trout Unlimited A of the Potential Downstream Sediment Deposition Following the Removal of Iron Gate, Copco, and J.C. Boyle Dams, Klamath River, CA Final Report Prepared for American Rivers, California Trout, Friends

More information

Mississippi River West Bay Diversion Geomorphic Assessment and 1-D Modeling Plan

Mississippi River West Bay Diversion Geomorphic Assessment and 1-D Modeling Plan Mississippi River West Bay Diversion Geomorphic Assessment and 1-D Modeling Plan Freddie Pinkard and Charlie Little Research Hydraulic Engineers ERDC-CHL-River Engineering Branch 27 February 2009 Lane

More information

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA

A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA A STUDY OF LOCAL SCOUR AT BRIDGE PIERS OF EL-MINIA Dr. Gamal A. Sallam 1 and Dr. Medhat Aziz 2 ABSTRACT Bridges are critical structures that require a substantial investment to construct and serve an important

More information

MENOMONEE RIVER SEDIMENT TRANSPORT MODELING SYSTEM FINAL REPORT

MENOMONEE RIVER SEDIMENT TRANSPORT MODELING SYSTEM FINAL REPORT MENOMONEE RIVER SEDIMENT TRANSPORT MODELING SYSTEM FINAL REPORT Prepared for: U.S. ARMY CORPS OF ENGINEERS DETROIT DISTRICT BOX 127 DETROIT, MICHIGAN 48231 Prepared by: W.F. BAIRD & ASSOCIATES, LTD. 2981

More information

ESTIMATION OF MORPHOLOGICAL IMPACT OF GROYNE LENGTHENING I. RÁTKY, ÉVA RÁTKY

ESTIMATION OF MORPHOLOGICAL IMPACT OF GROYNE LENGTHENING I. RÁTKY, ÉVA RÁTKY ESTIMATION OF MORPHOLOGICAL IMPACT OF GROYNE LENGTHENING I. RÁTKY, ÉVA RÁTKY Abstract. Hydraulic-morphological calculations in open channel flows still cause problems for modellers, partially because of

More information

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Available online at   ScienceDirect. Procedia Engineering 154 (2016 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 154 (2016 ) 574 581 12th International Conference on Hydroinformatics, HIC 2016 Research on the Strength and Space-time Distribution

More information

Overview of fluvial and geotechnical processes for TMDL assessment

Overview of fluvial and geotechnical processes for TMDL assessment Overview of fluvial and geotechnical processes for TMDL assessment Christian F Lenhart, Assistant Prof, MSU Research Assoc., U of M Biosystems Engineering Fluvial processes in a glaciated landscape Martin

More information

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON

LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON LOMR SUBMITTAL LOWER NEHALEM RIVER TILLAMOOK COUNTY, OREGON Prepared for: TILLAMOOK COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 1510-B THIRD STREET TILLAMOOK, OR 97141 Prepared by: 10300 SW GREENBURG ROAD,

More information

Big Wood River. General Information

Big Wood River. General Information General Information The flows out of the southern portion of the Sawtooth National Recreation Area in central Idaho. The study reach is about a,200 ft length of river about.5 miles upstream from the discontinued

More information

Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly.

Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly. Sediment Transport Analysis for Stream Restoration Design: The Good, the Bad, and the Ugly. Brett Jordan Phd, PE HydroGeo Designs LLC. Land and Water Services Inc. THE GOOD THE BAD THE UGLY THE GOOD THE

More information

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE

A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE A TIPPING-BUCKET SEDIMENT TRAP FOR CONTINUOUS MONITORING OF SEDIMENT DEPOSITION RATE YASUO NIHEI AND YUICHI IMASHIMIZU Department of Civil Eng., Tokyo University of Science, 2641 Yamazaki, Noda-shi 278-851,

More information

Great Lakes Update. Volume 194: 2015 Annual Summary

Great Lakes Update. Volume 194: 2015 Annual Summary Great Lakes Update Volume 194: 2015 Annual Summary Background The U.S. Army Corps of Engineers (USACE) tracks and forecasts the water levels of each of the Great Lakes. This report summarizes the hydrologic

More information

3 Theoretical Basis for SAM.sed Calculations

3 Theoretical Basis for SAM.sed Calculations 3 Theoretical Basis for SAM.sed Calculations Purpose Sediment transport functions can be used to calculate the bed material portion of the sediment discharge rating curve. This rating curve can then be

More information

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River

Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River Development and application of demonstration MIKE 21C morphological model for a bend in Mekong River September 2015 0 Table of Contents 1. Introduction... 2 2. Data collection... 3 2.1 Additional data...

More information

BED LOAD SEDIMENT TRANSPORT

BED LOAD SEDIMENT TRANSPORT BED LOAD SEDIMENT TRANSPORT Kamal EL KADI ABDERREZZAK EDF-R&D, Laboratoire National d Hydraulique et Environnement (LNHE) 1 17-19 September 2009 UNL, Santa Fe, Argentina OUTLINE I. Bed load II. Settling

More information

U.S. Army Corps of Engineers Detroit District. Boardman River SIAM Modeling Base-case Scenario

U.S. Army Corps of Engineers Detroit District. Boardman River SIAM Modeling Base-case Scenario U.S. Army Corps of Engineers Detroit District Boardman River SIAM Modeling Base-case Scenario May 2009 Boardman River SIAM Modeling Base-case Scenario Report Prepared for U.S. Army Corps of Engineers

More information

Sediment and Erosion Design Guide

Sediment and Erosion Design Guide Sediment and Erosion Design Guide Sediment Transport & Bulking Factors Goals of this Session Review key principals Review basic relationships and available tools Review bulking factor relationships Purposes

More information

Detroit 516 Activities

Detroit 516 Activities Detroit 516 Activities Dam Capacity Study Sediment Workshop in Traverse City START 2.0 Saginaw River Study Dam Capacity Study A progress report Outline Study Objective (Why are we doing this?) Reservoir

More information

Final Report for TWDB Contract No

Final Report for TWDB Contract No Final Report for TWDB Contract No. 1004831127 Sediment Transport Modeling of Channel Scale Geomorphic Processes J.K. Haschenburger University of Texas at San Antonio July 31, 2012 1 Introduction This study

More information

Two-Dimensional Simulation of Truckee River Hydrodynamics

Two-Dimensional Simulation of Truckee River Hydrodynamics Two-Dimensional Simulation of Truckee River Hydrodynamics by Stephen H. Scott PURPOSE: The purpose of this Coastal and Hydraulics Engineering Technical Note (CHETN) is to demonstrate the use of multidimensional

More information

Sediment and Nutrient Mass Balance Model of ConowingoPool

Sediment and Nutrient Mass Balance Model of ConowingoPool Sediment and Nutrient Mass Balance Model of ConowingoPool Mark Velleux and Jim Fitzpatrick HDR Engineering Chesapeake Bay Program Modeling Quarterly Review: August 10, 2016 Model Grid and Spatial Resolution

More information

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS - Vol. I - Hydraulics of Two-Phase Flow: Water and Sediment - G R Basson

HYDRAULIC STRUCTURES, EQUIPMENT AND WATER DATA ACQUISITION SYSTEMS - Vol. I - Hydraulics of Two-Phase Flow: Water and Sediment - G R Basson HYDRAULICS OF TWO-PHASE FLOWS: WATER AND SEDIMENT G R Basson Dept. of Civil Engineering, University of Stellenbosch, South Africa. Keywords: sediment, sediment transport, turbulence, river regime, stream

More information

Sedimentation Scour Model Gengsheng Wei, James Brethour, Markus Grünzner and Jeff Burnham August 2014; Revised October 2014

Sedimentation Scour Model Gengsheng Wei, James Brethour, Markus Grünzner and Jeff Burnham August 2014; Revised October 2014 Flow Science Report 03-14 Sedimentation Scour Model Gengsheng Wei, James Brethour, Markus Grünzner and Jeff Burnham August 2014; Revised October 2014 1. Introduction The three-dimensional sediment scour

More information

Squaw Creek. General Information

Squaw Creek. General Information General Information is a tributary to the Salmon River. It enters the north side of the river about 0 miles downstream of North Fork, Idaho. The study reach is about a 30 ft length of stream about 2 miles

More information

(3) Sediment Movement Classes of sediment transported

(3) Sediment Movement Classes of sediment transported (3) Sediment Movement Classes of sediment transported Dissolved load Suspended (and wash load ) Important for scouring algae Bedload (5-10% total load Moves along bed during floods Source of crushing for

More information

Colorado River sediment transport 1. Natural sediment supply limitation and the influence of Glen Canyon Dam

Colorado River sediment transport 1. Natural sediment supply limitation and the influence of Glen Canyon Dam WATER RESOURCES RESEARCH, VOL. 36, NO. 2, PAGES 515 542, FEBRUARY 2000 Colorado River sediment transport 1. Natural sediment supply limitation and the influence of Glen Canyon Dam David J. Topping U.S.

More information

Calculation of Stream Discharge Required to Move Bed Material

Calculation of Stream Discharge Required to Move Bed Material Calculation of Stream Discharge Required to Move Bed Material Objective: Students will map two sections of a stream and calculate the depth, velocity, and discharge of flows required to move the stream

More information

What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash?

What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash? Gregory Indivero 31 October 2011 What discharge (cfs) is required to entrain the D 84 (84 th percentile of sediment size distribution) in Red Canyon Wash? What discharge was required to deposit observed

More information

International Journal for Management Science And Technology (IJMST)

International Journal for Management Science And Technology (IJMST) ISSN: 2320-8848 (Online) ISSN: 2321-0362 (Print) International Journal for Management Science And Technology (IJMST) Volume 3; Issue 6 Manuscript- 1 SUSPENDED SEDIMENT TRANSPORT FORMULA FOR THE UPSTREAM

More information

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Tarbela Dam in Pakistan. Case study of reservoir sedimentation Tarbela Dam in Pakistan. HR Wallingford, Wallingford, UK Published in the proceedings of River Flow 2012, 5-7 September 2012 Abstract Reservoir sedimentation is a main concern in the Tarbela reservoir

More information

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap Investigation on Dynamics of Sediment and Water Flow in a Sand Trap M. R. Mustafa Department of Civil Engineering Universiti Teknologi Petronas 31750 Tronoh, Perak, Malaysia R. B. Rezaur Water Resources

More information

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California

Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California Upper Truckee River Restoration Lake Tahoe, California Presented by Brendan Belby Sacramento, California Mike Rudd (Project Manager), Charley Miller & Chad Krofta Declines in Tahoe s Water Clarity The

More information

Modelling of flow and sediment transport in rivers and freshwater deltas Peggy Zinke

Modelling of flow and sediment transport in rivers and freshwater deltas Peggy Zinke 1 Modelling of flow and sediment transport in rivers and freshwater deltas Peggy Zinke with contributions from Norwegian and international project partners 2 Outline 1. Introduction 2. Basic ideas of flow

More information

Susitna-Watana Hydroelectric Project (FERC No )

Susitna-Watana Hydroelectric Project (FERC No ) (FERC No. 14241) Development of Sediment-Transport Relationships and an Initial Sediment Balance for the Middle and Lower Susitna River Segments Prepared for Prepared by Tetra Tech February 2013 REPORT

More information

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology

Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology Technical Review of Pak Beng Hydropower Project (1) Hydrology & Hydraulics and (2) Sediment Transport & River Morphology The 2 nd Regional Stakeholder Forum The Pak Beng Hydropower Project 5 th May 2017

More information

How to predict the sedimentological impacts of reservoir operations?

How to predict the sedimentological impacts of reservoir operations? ICSE 212 How to predict the sedimentological impacts of reservoir operations? E. Valette EDF CIH eric.valette@edf.fr M. Jodeau EDF R&D LNHE magali.jodeau@edf.fr Presentation of the numerical code Courlis

More information

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River W.F. & Associates Coastal Engineers (in association with Frank Quinn) April 13, 2005 Outline Problem Definition Understanding

More information

Cohesive sediment erosion and the Vectrino II. Peter J. Rusello DeFrees Hydraulics Laboratory Cornell University (also with NortekUSA)

Cohesive sediment erosion and the Vectrino II. Peter J. Rusello DeFrees Hydraulics Laboratory Cornell University (also with NortekUSA) Cohesive sediment erosion and the Vectrino II Peter J. Rusello DeFrees Hydraulics Laboratory Cornell University (also with NortekUSA) http://www.flickr.com/photos/rabbit75/5191473522/ Images taken from

More information

7.3 Sediment Delivery Analysis

7.3 Sediment Delivery Analysis 7.3 Sediment Delivery Analysis In order to evaluate potential changes in sedimentation patterns that could occur due to impacts from the FCP and LPP alignments, sediment assessment models were constructed

More information

Numerical Simulation Of Sediment Transport And Bedmorphology Around A Hydraulic Structure On A River

Numerical Simulation Of Sediment Transport And Bedmorphology Around A Hydraulic Structure On A River City University of New York (CUNY) CUNY Academic Works International Conference on Hydroinformatics 8-1-2014 Numerical Simulation Of Sediment Transport And Bedmorphology Around A Hydraulic Structure On

More information

Identification of Erosion Potential in an Urban River in North Australia Using GIS and Hydrodynamic Model

Identification of Erosion Potential in an Urban River in North Australia Using GIS and Hydrodynamic Model Identification of Erosion Potential in an Urban River in North Australia Using GIS and Hydrodynamic Model L Adair a and A Rahman b a Gold Coast City Council, Gold Coast, Australia b School of Engineering

More information

Securing Manoeuverability of a Deep Draft Ship in a Sediment loaded Tidal River Berth

Securing Manoeuverability of a Deep Draft Ship in a Sediment loaded Tidal River Berth Securing Manoeuverability of a Deep Draft Ship in a Sediment loaded Tidal River Berth O. Stoschek 1, A. Matheja 1 & C. Zimmermann 1 1 Franzius-Institute for Hydraulic, Waterways and Coastal Engineering,

More information

(3) Sediment Movement Classes of sediment transported

(3) Sediment Movement Classes of sediment transported 9/17/15 (3) Sediment Movement Classes of sediment transported Dissolved load Suspended load Important for scouring algae Bedload (5-10% total load) Moves along bed during floods Source of crushing for

More information

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Sessom Creek Sand Bar Removal HCP Task 5.4.6 Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of

More information

Dunes Growth Estimation for Coastal Protection

Dunes Growth Estimation for Coastal Protection Dunes Growth Estimation for Coastal Protection Muhammad Zikra Department of Ocean Engineering, Faculty of Marine Technology, ITS, Kampus ITS Keputih Sukolilo, Surabaya 60111 Abstract: This paper describes

More information

Stickney Avenue Depositional Zone (SADZ) Investigation

Stickney Avenue Depositional Zone (SADZ) Investigation The Ottawa River: A Report to the Community Stickney Avenue Depositional Zone (SADZ) Investigation May 22, 2007 Presented by: Scott Bell, P.E., BCEE (LimnoTech) Kelly Bensman (Hull & Associates) SADZ Location

More information

APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS

APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS Studia Geotechnica et Mechanica, Vol. XXXIV, No. 2, 2012 DOI: 105277/sgm021206 APPLICATION OF HEC-RAS MODEL FOR ESTIMATING CHANGES IN WATERCOURSE GEOMETRY DURING FLOODS JOANNA MARKOWSKA Department of Environmental

More information

The Hydrologic Cycle STREAM SYSTEMS. Earth s Water and the Hydrologic Cycle. The Hydrologic Cycle. Hydrologic Cycle

The Hydrologic Cycle STREAM SYSTEMS. Earth s Water and the Hydrologic Cycle. The Hydrologic Cycle. Hydrologic Cycle STREAM SYSTEMS Earth Science: Chapter 5 Reading pages 114-124 The Hydrologic Cycle Oceans not filling up Evaporation = precipitation System is balanced Earth s Water and the Hydrologic Cycle Earth s Water

More information

STUDY PERFORMANCE REPORT

STUDY PERFORMANCE REPORT STUDY PERFORMANCE REPORT State: Michigan Project No.: F-80-R-8 Study No.: 230702 Title: Effects of sediment traps on Michigan river channels Period Covered: October 1, 2006 to September 30, 2007 Study

More information

WATER INJECTION DREDGING by L.C. van Rijn

WATER INJECTION DREDGING by L.C. van Rijn WATER INJECTION DREDGING by L.C. van Rijn (info@leovanrijn-sediment.com) Description of method Almost all harbour basins suffer from the problem of siltation of sediments. Usually, the deposited materials

More information

Island Design. UMRS EMP Regional Workshop. Presentation for the

Island Design. UMRS EMP Regional Workshop. Presentation for the Island Design Presentation for the UMRS EMP Regional Workshop by Jon Hendrickson Hydraulic Engineer Regional Technical Specialist, Water Quality and Habitat Restoration August 17 19, 2005 Project Delivery

More information

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS

Probabilistic Evaluation of a Meandering Low-Flow Channel. February 24 th, UMSRS Probabilistic Evaluation of a Meandering Low-Flow Channel February 24 th, 2014 2014 UMSRS 1 2 acknowledgments Low- Flow Channel (LFC) overview Proposed Diversion Channel collects runoff from: The Rush

More information

Summary. Streams and Drainage Systems

Summary. Streams and Drainage Systems Streams and Drainage Systems Summary Streams are part of the hydrologic cycle and the chief means by which water returns from the land to the sea. They help shape the Earth s surface and transport sediment

More information

Bishopville Prong Study

Bishopville Prong Study Bathymetric and Sediment Assessment in the Bishopville Prong of St. Martin River Darlene V. Wells, Richard A. Ortt, Jr., and Stephen Van Ryswick Funded by MCBP 2011-2012 Implementation Grant Objectives

More information

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Patterns Project Memo H345670 To: Capt. David Kyle From:

More information

SEDIMENTATION AND ITS COUNTERMEASURE AT THE OFF-TAKE AREA OF NEW DHALESWARI RIVER

SEDIMENTATION AND ITS COUNTERMEASURE AT THE OFF-TAKE AREA OF NEW DHALESWARI RIVER SEDIMENTATION AND ITS COUNTERMEASURE AT THE OFF-TAKE AREA OF NEW DHALESWARI RIVER Tanjir Saif AHMED* MEE15634 Supervisors: Prof. EGASHIRA Shinji** Assoc. Prof. YOROZUYA Atsuhiro*** ABSTRACT Present study

More information

Annex 29. Sediment Transport with the Danube River Flow and Sedimentation Rates along the Danube- Black Sea Navigation Route

Annex 29. Sediment Transport with the Danube River Flow and Sedimentation Rates along the Danube- Black Sea Navigation Route Annex 29 Sediment Transport with the Danube River Flow and Sedimentation Rates along the Danube- Black Sea Navigation Route The transport of sediments with the Danube River flow is the key factor shaping

More information

An Adaptive Assessment of the Flushing Flow Needs of the Lower Poudre River, Colorado: First Evaluation

An Adaptive Assessment of the Flushing Flow Needs of the Lower Poudre River, Colorado: First Evaluation Hydrology Days 29 An Adaptive Assessment of the Flushing Flow Needs of the Lower Poudre River, Colorado: First Evaluation 1 Robert T Milhous Hydrologist. Fort Collins, Colorado 8526 Abstract. Adaptive

More information

Assessment of the Hood River Delta Hood River, Oregon

Assessment of the Hood River Delta Hood River, Oregon Assessment of the Hood River Delta Hood River, Oregon Pacific Northwest Waterways Association Annual Meeting October 13, 2010 Michael McElwee, Executive Director Port of Hood River Overview U.S. Army Corps

More information

Prediction of bed form height in straight and meandering compound channels

Prediction of bed form height in straight and meandering compound channels Water Resources Management III 311 Prediction of bed form height in straight and meandering compound channels R. D. Karamisheva, J. F. Lyness, W. R. C. Myers, J. O Sullivan & J. B. C. Cassells School of

More information

Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report

Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report Controlled Technical Report CHC-CTR-084 revision 1 March 2009 NRC-CHC has prepared this report for the International Joint Commission

More information

* Chapter 9 Sediment Transport Mechanics

* Chapter 9 Sediment Transport Mechanics Chapter 9 Sediment Transport Mechanics Section I Introduction 9-1. Definition Sedimentation embodies the processes of erosion, entrainment, transportation, deposition, and compaction of sediment. These

More information

Earth Science Chapter 6 Section 2 Review

Earth Science Chapter 6 Section 2 Review Name: Class: Date: Earth Science Chapter 6 Section Review Multiple Choice Identify the choice that best completes the statement or answers the question. 1. Most streams carry the largest part of their

More information

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT

YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT YELLOWSTONE RIVER FLOOD STUDY REPORT TEXT TECHNICAL REPORT Prepared for: City of Livingston 411 East Callender Livingston, MT 59047 Prepared by: Clear Creek Hydrology, Inc. 1627 West Main Street, #294

More information

Growing and decaying processes and resistance of sand waves in the vicinity of the Tone River mouth

Growing and decaying processes and resistance of sand waves in the vicinity of the Tone River mouth Advances in River Sediment Research Fukuoka et al. (eds) 2013 Taylor & Francis Group, London, ISBN 978-1-138-00062-9 Growing and decaying processes and resistance of sand waves in the vicinity of the Tone

More information

Applying 1D Sediment Models to Reservoir Flushing Studies: Measuring, Monitoring, and Modeling the Spencer Dam Sediment Flush with HEC-RAS

Applying 1D Sediment Models to Reservoir Flushing Studies: Measuring, Monitoring, and Modeling the Spencer Dam Sediment Flush with HEC-RAS Applying 1D Sediment Models to Reservoir Flushing Studies: Measuring, Monitoring, and Modeling the Spencer Dam Sediment Flush with HEC-RAS by Paul Boyd and Stanford Gibson PURPOSE: The purposes of this

More information

ECOHYDRAULICS. Introduction to 2D Modeling

ECOHYDRAULICS. Introduction to 2D Modeling Introduction to 2D Modeling No one believes a model, except the person who wrote it; Everyone believes data, except the person who collected it. unknown wise scientist Two dimensional (depth averaged)

More information

Erosion Rate is a Function of Erodibility and Excess Shear Stress = k ( o - c ) From Relation between Shear Stress and Erosion We Calculate c and

Erosion Rate is a Function of Erodibility and Excess Shear Stress = k ( o - c ) From Relation between Shear Stress and Erosion We Calculate c and Equilibrium, Shear Stress, Stream Power and Trends of Vertical Adjustment Andrew Simon USDA-ARS, Oxford, MS asimon@msa-oxford.ars.usda.gov Non-Cohesive versus Cohesive Materials Non-cohesive: sands and

More information

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26

Geomorphology Geology 450/750 Spring Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26 Geomorphology Geology 450/750 Spring 2004 Fluvial Processes Project Analysis of Redwood Creek Field Data Due Wednesday, May 26 This exercise is intended to give you experience using field data you collected

More information

Mississippi River (Pool 2) 2-D ADH Model Development

Mississippi River (Pool 2) 2-D ADH Model Development Appendix E: Mississippi River (Pool 2) 2-D ADH Model Development (PREPARED BY WEST CONSULTANTS, 2011) Lower Pool 2 Channel Management Study: Boulanger Bend to Lock and Dam No. 2 US Army Corps of Engineers

More information

A Calculator for Sediment Transport in Microchannels Based on the Rouse Number. L. Pekker Fuji Film Dimatix Inc., Lebanon NH USA.

A Calculator for Sediment Transport in Microchannels Based on the Rouse Number. L. Pekker Fuji Film Dimatix Inc., Lebanon NH USA. A Calculator for Sediment Transport in Microchannels Based on the Rouse Number L. Pekker Fuji Film Dimatix Inc., Lebanon NH 03766 USA Abstract The Rouse number is commonly used to estimate the mode of

More information

Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods

Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods Quantification of Bed-Load Transport on the Upper Mississippi River Using Multibeam Survey Data and Traditional Methods by David D. Abraham and Thad Pratt PURPOSE: This Coastal and Hydraulics Engineering

More information