1 CDA 2009 Annual Conference Congrès annuel 2009 de l ACB CANADIAN DAM ASSOCIATION Whistler, BC, Canada ASSOCIATION CANADIENNE DES BARRAGES 2009 Oct 3-8 HIGH RESOLUTION 3D HYDRAULIC NUMERICAL MODELING FOR WEP ENVIRONMENTAL APPROVAL AND ENGINEERING David B. Fissel, ASL Environmental Sciences Inc., Sidney, BC, Canada Jianhua Jiang, ASL Environmental Sciences Inc., Sidney, BC, Canada ABSTRACT: The Waneta Expansion Project, a partnership of Columbia Power Corp. and Columbia Basin Trust, involves the construction of a second powerhouse at the Waneta Dam on the Pend d'oreille River just upstream of its confluence with the Columbia River. During the WEP environmental review process, a key issue was the sub-population of white sturgeon in the confluence waters. Extensive biophysical analyses were carried out to examine potential effects, using a hydraulic 3- D numerical model developed specifically for this reach of the two rivers. The model had a very high resolution of 3 m by 3 m in the horizontal and 10 vertical layers for a total of 92,000 grid elements. It was calibrated and validated using data obtained from field surveys of river velocities, water levels and temperatures for a variety of flow conditions. Using the model, the pre- and post-project river velocities and temperatures were computed and compared, specifically regarding effects in the deepwater habitat of the Waneta Eddy, in the near-bottom velocities in the egg deposition areas and in the late summer water temperatures. These analyses, along with fisheries biological interpretations, were used in the comprehensive review by the BC Environmental Assessment Office and Federal Government Departments, particularly the Dept. of Fisheries and Oceans. The Project received its Environmental Approval Certificate in November The 3-D numerical model was also used for input to engineering issues on the water levels immediately downstream of the Waneta expansion plant and water velocities in the headpond with the plant in operation. RÉSUMÉ: Le Projet d'expansion de la Waneta, un partenariat entre la Columbia Power Corp. et le Columbia Basin Trust, vise la construction d'une deuxième centrale électrique au barrage de Waneta sur la rivière Pend d' Oreille juste en amont du confluent avec la rivière Columbia. Le processus d études environnementales (WEP) touche principalement la population d esturgeon blanc dans les eaux du confluent. Des analyses biophysiques approfondis ont été effectuées pour examiner les effets possibles sur la dite population en utilisant un modèle hydraulique numérique à trios dimensions développé spécifiquement pour la région des deux rivières. Le modèle a une résolution fine de 3 m par 3 m en vue de plan et 10 couches horizontales en profondeur pour un total de éléments pour l ensemble de la grille. Le modèle a été calibré et validé en utilisant des données obtenues lors de mesures des champs de vitesse de l eau, des niveaux d'eau et des températures pour une série de conditions de débit. En utilisant le modèle, les vitesses et les températures prise avant et après le projet ont été calculées et compares; particulièrement, les effets sur l habitat en eau profonde des eaux tournantes de cette région (Waneta Eddy), sur les vitesses du fond dans les secteurs de dépôt d'œufs et sur les températures de l'eau vers la fin de l'été ont été comparées. En incluant des interprétations biologiques de pêche, ces analyses ont été employées dans la revue complète par le bureau d'évaluation environnementale du C.B. et les services gouvernementaux fédéraux, en particulier Pêches et Océans Canada. Le projet a reçu son certificat d'approbation environnementale en novembre Le modèle numérique à trois dimensions a également été employé lors de l évaluation des contraintes hydrauliques immédiatement en avale du Projet et en qui concerne le champ de vitesse en amont de la prise d eau de la nouvelle centrale durant son opération.

2 1. INTRODUCTION The Waneta Expansion Project (WEP), a partnership of Columbia Power Corporation and Columbia Basin Trust, involves the construction of a second powerhouse at the Waneta Dam on the right bank of the Pend d'oreille River just upstream of its confluence with the Columbia River (Figure 1). The expansion project may have potential effects on the flow and circulation patterns in the area of the confluence of the Columbia and Pend d Oreille rivers. During the WEP environmental review process, a key issue was the sub-population of white sturgeon in the confluence waters. Previous studies revealed that this confluence area has some significant morphological and circulation features, which are important for white sturgeon such as the deepwater low-speed Waneta Eddy for sturgeon rearing and feeding and the jet-like, high-speed Pend d Oreille River outflow for sturgeon spawning and egg deposition (Hildebrand and Fissel, 1997; Hildebrand, 2001). Figure 1: Study area showing geometry, model domain and boundaries. The confluence of the Columbia and Pend d Oreille rivers is located about 500 m north of the Canada and USA border (Figure 1), where flows from the upstream Columbia River and the Pend d Oreille River join together before passing into the United States. The center of the confluence is a region of a large embayment with a water depth up to 18 m or more, much deeper than the surrounding areas. The flows in this area appear comparatively weak, typically less than 0.5 m/s, and usually rotate in counter-clockwise direction, known as the Waneta Eddy. On the northern side of the Waneta Eddy, the main channel of the Columbia River features large flows through typical water depths of 2 to 6 m relative to chart datum at 394 m above mean sea level (MSL). Just upstream of the confluence of the two rivers, a large gravel bar extends out from the eastern shore which confines the main flows of the Columbia River to a comparatively narrow channel along the western shore. Immediately to the 2

3 south of the Eddy is the strong jet-like outflow from the Pend d Oreille River into the Columbia River. The flows under the road and rail bridges, where the Pend d Oreille waters enter the Columbia River, are normally turbulent due to the shallow and narrow Pend d Oreille passageway. This discharge zone is characterized by large standing waves indicative of a supercritical flow regime. The highly turbulent, standing wave area extends downstream as far as the southeast corner of the deep portion of the Waneta Eddy. Extensive biophysical analyses were carried out to examine potential effects, using a hydraulic 3-D numerical model COCIRM developed specifically for this reach of the two rivers. The model had a very high resolution of 3 m by 3 m in the horizontal and 10 vertical layers for a total of 92,000 grid elements. It was calibrated and validated using data obtained from field surveys of river velocities, water levels and temperatures for a variety of flow conditions. Using the model, the pre- and post-project river velocities and temperatures were computed and compared, specifically regarding effects in the deepwater habitat of the Waneta Eddy, in the near-bottom velocities in the egg deposition areas and in the late summer water temperatures. These analyses, along with fisheries biological interpretations, were used in the comprehensive review by the BC Environmental Assessment Office and Federal Government Departments, particularly the Dept. of Fisheries and Oceans. The Project received its Environmental Approval Certificate in November The 3-D numerical model was also used for input to engineering issues on the water levels immediately downstream of the WEP plant and water velocities in the headpond with the plant in operation. 2. IMPLEMENT OF 3D COCIRM 2.1 Brief description of the 3D model In this study, a high resolution 3D numerical model, COCIRM, is applied to simulate the flows in and around the confluence of the Columbia and Pend d Oreille rivers as well as in the Waneta headpond. The COCIRM model, developed over the past several years, represents a computational fluid dynamics approach to the study of river, estuarine and coastal circulation regimes. The model explicitly simulates such natural forces as pressure heads, buoyancy or density differences, wind stress and drag arising from the shoreline and the river bottom. The model applies the fully three-dimensional basic equations of motion combined with a second order turbulence closure model, then solves for the time-dependent, three-dimensional velocities (u, v, w), turbulence kinetic energy (q), water surface elevation (), water temperature (T) and salinity (s) (Jiang, 1999; Jiang et al, 2003; Fissel and Jiang, 2008). The model is capable of representing discharge outfalls and intakes in a realistic manner. A semi-implicit finite difference method was applied in the COCIRM model. This numerical solution method has the advantages of a minimal degree of implicitness, good stability and consistency, and high computational efficiency at a low computational cost. The horizontal grid element sizes are typically in the range of 5 to 100 m. The vertical sigma-grid or z-grid may be distributed unevenly, with typically layers. This COCIRM model operated on two separated domains, respectively the confluence model downstream of Waneta Dam and the headpond model upstream of Waneta Dam. The bathymetry data used in both model areas have the resolution of 3 m or better. The confluence model extends approximately 1260 m upstream from the Waneta Eddy and 1050 m downstream to an area just south of the Canada and US border. The model runs on a grid with 3 m by 3 m horizontal grid cell size and 10 equally-spaced sigma layers. The inflow discharges from the upstream boundaries at the upstream Columbia River, existing Waneta Dam and proposed WEP tailrace were given and represented in a realistic manner in the model (Jiang and Fissel, 2002). The boundary conditions for the downstream portion of the Columbia River were specified through a modified form of Sommerfeld radiation approach introduced in Orlanski (1976). The headpond model includes the proposed WEP diversion channel and a portion of Waneta Dam headpond extending approximately 1.5 km upstream from the dam. The model runs on a horizontal grid of size 3 m by 3 m and 15 vertical sigma-layers with higher resolution near the bottom in order to appropriately represent nearbottom turbulence boundary layer and sediment processes. The outflow discharges from the spillway, existing 3

4 Waneta Dam turbines, and proposed WEP turbines are represented in a realistic manner in the model. The open boundary conditions at the upstream end were specified by water levels (Jiang and Fissel, 2008). 2.2 Model calibration and validation In the confluence area, the flow patterns and the outflow standing waves, etc., appear to be dynamic and vary considerably with different flow combinations of the Columbia and Pend d Oreille rivers. To evaluate the model performance and validate it as a reliable tool for the environmental assessment, the flow combinations of the two rivers in all model calibration and validation cases must span a substantial range of discharges to represent various flow features for which the in situ observed current data are available. Since 1994, extensive field measurements of currents in this region, mostly in the confluence area, have been carried out by ASL Environmental Sciences Inc. and R.L. & L. Environmental Services Ltd., using ship-borne ADCP (Birch, 1994; Birch, 1996; Hildebrand and Fissel, 1997; Birch and Boubnov, 2001; Birch and English, 2001). These data allow for the extensive model calibration and validation cases realized in this study. In total, two calibration cases (C1 and C2) and seven validation cases (V1 V7) were selected and carried out. These cases are believed to be sufficient for the model validation requirements (Table 1). In the headpond model, one calibration case and one validation case (Table 1) were conducted to optimize the major hydrodynamic parameters to give the best fit between the modeled and in-situ observed velocity vertical profiles and flow patterns measured in the field survey by ADCP in 2008 (Fissel et al., 2008) Model area Confluence Headpond Model case Cali. Validation Table 1: Summary of model calibration and validation cases. Discharge (m 3 /s) Temperature () Upper Pend d Oreille River Upper Pend Columbia Exsiting Columbia d Oreille Spillway Total River Power house River River Observation taken C1 1, Aug. 31, 94 C2 2, Feb. 08, 96 V1 1, Aug. 30, 94 V Jul. 15, 01 V3 1, Oct. 20, 01 V4 1, Oct. 20, 01 V Jul. 15, 01 V6 2, Oct. 06, 96 V7 2, , May 18, 94 Calibration Apr. 9, 08 Validation Apr. 8 9, 08 The model was initially tested and operated in calibration runs. Various physical parameters, mainly bottom drag coefficient and horizontal and vertical eddy diffusivity coefficients, were repetitively adjusted to achieve optimal agreement with the observations. The vertical diffusivity for the model, as derived from the second order turbulence closure model (Mellor and Yamada, 1982), was found to be robust. Some adjustments of the horizontal diffusivity were made through the user-specified calibration parameter in Smagorinsky s formula (Smagorinsky, 1963). The bottom drag coefficients were the most important parameter for the purpose of model calibration. Once reasonable agreement is attained in the calibration runs (as seen in Figure 2 for the C1 model case), the model was next operated in validations runs using the previously optimized physical parameters and compared with different observation data sets. The agreement between the model outputs and the observations is used to assess the capabilities of the model. Following the methods of Murphy and Winkler (1987), the results of the validation model runs were compiled and analysed in detail. The resulting modelling validation report (Fissel and Jiang, 2002) was the basis for a favourable peer review of the model conducted anonymously a DFO numerical modelling scientist. 4

5 Figure 2: C1 model results for the Waneta Eddy area at 2.2 m (upper panel) and 8.2 m (lower panel) water depths, with comparisons to observations from Aug. 31,

6 2.3 Dynamic Confluence Circulation Patterns The confluence circulation patterns vary dynamically with the variations of discharges from upper Columbia River and Pend d Oreille River. At extremely low Pend d Oreille River flow, such as the speed-no-load flow of 34 m 3 /s in the validation case V6, the entire embayment area from the gravel bar to the southern shore is occupied by a large counter-clockwise eddy (labeled as C in Figure 3), driven by the shears of the main Columbia River flow. The weak Pend d Oreille River flow joins the eddy along the eastern bank. As the Pend d Oreille River discharge increases, the outflow gains more and more momentum to break through the big eddy. In these cases, the actual circulation patterns are dependent not only on the Pend d Oreille River flow, Q, but also on the Columbia River discharge level, Q. For moderate to high levels of Q ( 1,300 m 3 /s), the outflow gradually shifts southward towards to southern shore as the Q increases. At the same time, the clockwise eddy (labeled as P infigure 3, which is driven by the shear of the Pend d Oreille outflow, gradually shrinks and the counter-clockwise eddy C becomes dominant. During this process, a third eddy appears near the southern shore, namely south shore eddy (labeled as S in Error! Reference source not found.), driven by the shears from both Columbia main flow and the Pend d Oreille outflow, and disappears at high level of Q. For the low flow level ( Q < 1,300 m 3 /s), the gravel bar acts as a weir or dam with little or no water passing over it. As a result, the deep water area is dominated by the clockwise eddy P if the Pend d Oreille River discharges are at low to modereate levels ( m 3 /s). At the high flow level ( Q > 500 m 3 /s), the water elevation at the confluence increases and the gravel bar is submerged with a considerable amount of water passing over it. Consequently, the counter-clockwise eddy C becomes dominant again. Figure 3: Schematic diagram of the circulation patterns in the confluence area. 3. MODEL RESULTS SUPPORTING WEP ENVIRONMENTAL APPROVAL 3.1 Productive Habitat Area 6

7 Following completion of WEP, the Canadian Pend d Oreille hydroelectric system daily flows will be reshaped to maximize electricity generation values. This will result in post-project operations increasing daily variations in water levels below Waneta Dam, and consequently, potential loss of fish habitat in the confluence area downstream of Waneta. As a key parameter for the WEP environmental approval, the productive habitat area within the varial zone was estimated based on the 3-D model results. The varial zone is the area that lies between the upper and lower annual water levels that occurs in each reach. The productive capacity of the littoral zone associated with the confluence area was modelled over time with the assumption that wetted area had a benthic recovery time of 20 days. In the modelling effort, this was simulated by assuming no habitat value for the first 10 days after being re-wetted, followed by immediate full recovery after day 10. This value was selected based on literature reviews of periphyton and benthic macro-invertebrate recovery times of de-watered habitat. To examine the changes in productive habitat below Waneta Dam between pre- and post-project conditions, an empirical model was developed to compute habitat availability of the littoral zone in the river reference area. Because of the complexity in flow patterns, the model was separated into four sub-regions in order to facilitate the derivation of appropriate relationships. These four sub-regions are respectively Columbia downstream of confluence, center of confluence, Columbia upstream of confluence, and Pend d Oreille River. The river reference area in the first sub-regions is primarily dependent on the Columbia River discharge, and the river reference area in the last sub-regions is primarily dependent on the Pend d Oreille River discharges. In the other two sub-regions, the river reference areas are dependent on both Columbia and Pend d Oreille river discharges. The empirical model is derived as a least square fit of the 3-D numerical model derived wetted area (A), applied separately to each of the four sub-regions, as a function of the Columbia and Pend d Oreille river discharge values ( Q and Q ) A Q Q Q 1 Q (1) Where α, β, γ, δ and ε are the coefficients derived from the least square fit. The empirical model wetted area values are in very good agreement with the wetted area reference data, as obtained from the 3-D numerical model for over 40 combinations of river flows. Correlation coefficients exceeding were attained for all four sub-regions. The changes in daily productive habitat area downstream of the Waneta Dam, resulting from the operation of WEP, was computed by individual years from 1991 to 1999, inclusive, and for the average values for the period (as seen in Figure 4). The computations were with the present enhancement version (WSFAP-1998) and the Post-Project Enhancement version (WSFAP-PPE) of the White Sturgeon Flow Augmentation Program, which has been accepted by the appropriate regulatory agencies. In summary, the daily average reduction in productive habitat area relative to Pre-Project conditions as computed over the full year based on the nine year average values is 0.37 hectares for Post-Project with WSFAP-PPE as compared to 0.34 hectares for Post-Project with WSFAP The difference between 0.37 and 0.34 is very small being well within the normal daily variability of productive habitat area. 3.2 Low Velocity Habitat Area The low velocity area affected by the Waneta Eddy relevant flows represents another important white sturgeon habitat in the Pend d Oreille/Columbia confluence, as per the WEP environmental approval requirement. The 3- D model results provide detailed insight into the potential impact of the WEP regarding this habitat issue. A total of five representative flow discharge combinations were carefully selected for modelling, based on the simulation of the Pend d Oreille discharges for the average 1991 to 1999 conditions at different times of the year, along with the average Columbia River discharges for the same dates. Well-established environmental 7

8 habitat flow parameters specified by the project s fisheries consultant were computed and mapped for the selected cases. Figure 4: Average decreases in productive habitat area resulting from the operation of WEP for the period. The model results (as seen in Figure 5 for Case 1) show that changes in the low velocity areas affected by the Eddy relevant flows at various times throughout the year can be either positive or negative. In all but one case (not shown), these area changes are very small. The low velocity habitat area change in the one exception (Case 5), which shows a reduction of 28% in low velocity area during light load hours on one average day in early November, is well within the range of low flow area reductions that occur at other times under pre-project conditions. In all five cases considered, the physical effect of the project on Eddy near-bottom temperature changes are found to be much smaller than 1.5 C, generally considered by fisheries biologists as a threshold level for discernible biological effects. 3.3 Near-Bottom Velocities at Different Locations of Egg Mats Extensive historical surveys have shown that the strong flow areas along the south shore of the Columbia/Pend d Oreille confluence are important white sturgeon spawning and incubation habitat in the June to July spawning period. As one of the key issues for the WEP environmental approval, the 3-D model results were used to estimate the potential effect of WEP operations on the near-bottom velocities at a total of nine locations of egg mats, which were identified from recorded data of incubating eggs in the spawning area (Figure 6). An empirical model was developed to examine the changes in the near-bottom velocities at these locations between pre- and post-project conditions. The empirical model is derived as a least square fit of the 3-D numerical model derived near-bottom velocity (V b ), applied separately to each of the nine locations of egg mats, as a function of the Columbia and Pend d Oreille river discharge values V b Q Q Q 1 Q Q Q Q Q Q Q (2) Where,,,,,,,,, and are the coefficients derived from the least square fit. 8

9 UTM Northing (m) Case 1 - Eddy Relevant - Light Load Hours Bathymetry - measured 15 meters: below datum below surface pre-project below surface post-project pre-project <0.5 m/s post-project <0.5 m/s pre- and post-project <0.5 m/s Eddy Low Velocity Flow < 0.5 m/s (0.5 m above bottom) CASE 1 - LLH PRE-PROJECT POST-PROJECT DAILY AVERAGES Hourly Flows Blue Green Columbia (m 3 /s) 1252 WAN (m 3 /s) Pend d'oreille (m 3 /s) 756 WEP (m 3 /s) 0 0 Columbia ( o C) 5.4 Spill (m 3 /s) 0 0 Pend d'oreille ( o C) UTM Easting (m) UTM Northing (m) Case 1 - Eddy Relevant - Light Load Hours Bathymetry - measured 15 meters: below datum below surface pre-project below surface post-project pre-project <0.5 m/s post-project <0.5 m/s pre- and post-project <0.5 m/s Eddy Low Velocity Flow < 0.5 m/s (0.5 m above bottom) CASE 1 - LLH PRE-PROJECT POST-PROJECT DAILY AVERAGES Hourly Flows Blue Green Columbia (m 3 /s) 1252 WAN (m 3 /s) Pend d'oreille (m 3 /s) 756 WEP (m 3 /s) 0 0 Columbia ( o C) 5.4 Spill (m 3 /s) 0 0 Pend d'oreille ( o C) UTM Easting (m) Figure 5: Case 1 model results of the low velocity habitat areas for light load hours (upper panel) and heavy load hours (lower panel). The empirical model near-bottom velocity values are in very good agreement with the near-bottom velocity data, as obtained from the 3-D numerical model for over 40 combinations of river flows. Correlation coefficients exceeding 0.95 were attained for all nine locations. 9

10 The changes in the near-bottom velocities at the selected nine sites, resulting from the operation of WEP, were computed for a total of eight years, respectively 1996, 1998 and , when the white sturgeon incubations were monitored. Reduced flow velocities can result in increased egg predation reducing recruitment of white sturgeon. The flow histograms (not shown) indicate that the near-bottom velocities are generally 1.0 to > 2.4 m/s at most of the egg mat sites (sites C4, D1, E1 E1.5 and M1; locations shown in Figure 6) for seven of the eight years. In 2001, a year having the lowest discharges in past 40 years, the velocities are generally less than 1.0 m/s. The near-bottom velocities at site C1, and to a lesser degree at site C3, are noticeably reduced by comparison to the mat locations in the mainstem of the Columbia River flows. At site C1, the velocities are generally about m/s in June and m/s in July. The egg mat velocities were also modelled using hourly flows for the Pend d Oreille River which would occur under post project conditions indicating only small differences from pre-project conditions. These modelling data supports the conclusion of no significant negative effects of past Pend d Oreille flows or future project related flow changes on white sturgeon egg spawning/incubation. Figure 6: Map showing white sturgeon egg mat locations. 4. MODEL RESULTS SUPPORTING WEP ENGINEERING 4.1 Water Levels Downstream of Waneta Dam After successful WEP Environmental Certificate application, the developed 3-D model was used to support the WEP engineering. One of the WEP engineering issues is the water elevations in Pend d Oreille River. The model was applied to derive water elevations in Pend d Oreille River downstream of Waneta Dam for various combinations of the flow rates from the Columbia river, existing Waneta Dam and WEP turbines as well as for several flow conditions under the effect of WEP rock fill workpad. These model results (not shown) provided detailed information of the water elevations at the WEP and existing Waneta Dam tailraces and the water level profiles along the Pend d Oreille River outflow for WEP engineering design. 10

11 Before the applications, the model water elevations were calibrated and validated using the measured water elevations along left and right river banks at the Pend d Oreille outflow region in Figure 7 shows the comparisons between modeled and observed water elevations for three flow conditions. It is seen that the model results are in good agreement with the observations in terms of the shapes of the water surface profiles and the big water drop under the bridges. Some discrepancies between the model results and data exist. The model water elevations are lower than the observations by around 0.15 m downstream of the bridges and by around 0.3 m upstream of the bridges. It is believed that these discrepancies are mainly caused by insufficient/inaccurate bathymetry input. It is also suggested that further refinement of the model parameters, especially bottom drag coefficient, is necessary to further improve the model performance. 4.2 Flows in Waneta Headpond Figure 7: Modeled and observed water surface elevations in the outflow area. Another WEP engineering issue is the potential effect of WEP diversion channel (Figure 1) on the ambient nearbottom currents and consequently on the resuspension of the bottom sediments in the Waneta headpond area. These changes may lead to either positive or negative impact on contaminants releasing in the bottom sediments to downstream of Waneta Dam, which may have accumulated over many years in the past from deposition of Pend d Oreille River sediments as they entered the comparatively large depths of the headpond where the velocities are reduced and sediments settle out of the water umn onto the riverbed. To examine any possible changes to the near-bottom velocities, caused by the WEP operations, the 3-D model was applied to the headpond area with a horizontal resolution of 3 m by 3 m and 15 vertical sigma-layers having higher resolution near the bottom (Jiang and Fissel, 2008). The model, at first, was calibrated and validated using the ADCP surveys of water velocities in the headpond area conducted in 2008 (Table 1). Figure 8 shows velocity vertical profile comparisons at three sites A C (see Figure 9) for the calibration case. It is observed that the model velocity profiles at sites A and B are in good agreement with the observations. At site C, the model under-predicted the flow speed by about 3 cm/s compared to the observations. 11

12 The modeled headpond flow patterns were compared with observations at three vertical levels, respectively 2.5 m, 7.5 m and 12.5 m depths from the surface. Figure 9 shows the comparisons at 12.5 m depth respectively for the calibration and validation cases. Overall, the modeled headpond flow patterns are in good agreement with the observations. From these results, it is found that the flow patterns in the headpond are very analogous to those induced by basins with restricted outlets, such as sinks. In general, the flows appear to gradually converge and meanwhile become stronger towards the turbine intakes. At the southern corner upstream of the spillway, a welldeveloped, counter-clockwise eddy appears both in the model and observations with a size of around 100 m in diameter. In the proposed WEP diversion channel approach area, the velocities appear to follow shoreline and gradually turn from WNW to WSW before converging into the intakes. The typical flow speeds in this region range from 0.1 m/s to 0.3 m/s with weaker velocities near the shore. Figure 8: Calibration case modeled (solid lines) and in-situ observed (open circles) velocity vertical profiles at sites A C. Figure 9: Modeled and observed results of the headpond velocities at 12.5 m depth for the calibration case (left panel) and the validation case (right panel). After validation, the model was then applied to simulate the velocities in the headpond area for various combinations of discharges rates through the existing Waneta and WEP turbines, and the spillway. Figure 10 shows the model headpond velocities at 1 m above bottom for a case with an existing Waneta turbine discharge of 852 m 3 /s and a WEP turbine discharge of 620 m 3 /s. From these model results, it is found that that when WEP 12

13 is in operation, the near-bottom velocities within the diversion channel attain speeds of up to 1.4 m/s or greater. At the entrance to the diversion channel approach within the existing headpond, where excavation will be required in building the approach to the WEP intake, the near-bottom flow speeds are of particular interest. The near-bottom velocities in this area (bounded by 5,428,170 and 5,428,193 UTM North coordinates and by 455,260 and 455,330 UTM East coordinates) range from 0.06 to 1.01 m/s, with median values of 0.20 m/s 0.50 m/s. Figure 10: Model results of the headpond velocities at 1 m above bottom for a case with an existing Waneta turbine discharge of 852 m 3 /s and a WEP turbine discharge of 620 m 3 /s. 5. SUMMARY AND CONCLUSIONS The high resolution, 3-D coastal circulation numerical model COCIRM was successfully adapted and optimized through extensive calibration and validation processes in supporting the WEP environmental approval and engineering. A key issue of the WEP environmental assessments is the potential effects of the WEP operations on the flows in the confluence area of the Columbia and Pend d Oreille rivers, which provide important habitats for white sturgeon, such as the deep water, low-speed Waneta Eddy for sturgeon rearing and feeding and the jetlike high-speed Pend d Oreille River outflow for sturgeon spawning and egg deposition. In 2003, the 3-D model COCIRM was accepted as an acceptable basis for the WEP environmental assessment purposes by the Canadian regulatory agencies and First Nation groups based on a favourable peer review of the model by an anonymous numerical modeller of the Department of Fisheries and Oceans, Canada. The potential impacts of the WEP on 13

14 the flows in the confluence area were examined using extensive model predictions with numerous flow combinations from the Columbia River, the existing Waneta Dam and the WEP. These predicted results show either positive or minor negative impacts of the WEP operations on the fishery habitats in the confluence area. Based in part on these numerical model studies, environmental approval for the WEP was granted in In supporting the WEP engineering, the developed 3-D model was used to simulate the water elevations in Pend d Oreille River and the near-bottom velocities in the Waneta headpond area under the impact of the WEP operations. The model was validated for both applications using the field survey data. It is found that the 3-D model is a useful tool for the WEP engineering issues in terms of good agreements between modeled and observed water elevations in Pend d Oreille outflow, and velocities in the headpond area. In Pend d Oreille River, the model results provide detailed information of water elevations at the existing and WEP tailraces as well as water surface profiles in the outflow area, which are essential for appropriate WEP tailrace design and construction. In the headpond area, the model provides detailed predictions of the changes in the near-bottom velocities resulting from the WEP operations. These predictions serve as a useful guide for the WEP diversion channel design, excavation, and necessary measures to prevent the bottom sediment contaminants from being resuspended during the construction of the WEP diversion channel and at the new flow conditions when the WEP is in operation. 6. ACKNOWLEDGEMENTS We wish to express our appreciation to the Columbia Power Corporation for the opportunity to undertake this study, especially Bill Freeman, Victor Jameff, Elroy Switlishoff, Robert Teichroew, Wally Penner, Wally Malkinson and Theodora Borissov. We would also like to thank John Nunnm Radmila Krzman and Robin Fitzgerald of Klohn Crippen Berger Ltd. for providing the model inputs and overall direction, and Larry Hildebrand of Golder Associates Ltd. (formerly R.L. & L. Environmental Services Ltd.) for insights and advise related to the fisheries and biological issues. Thanks also extend to our leagues Rick Birch, Dave Billenness, Vincent Lee, Dave English, Keath Borg, Rob Bowen and Bernadette Fissel for providing detailed field data, and graphic, mapping and administrative assistance. 7. REFERENCES Birch, R., Current Velocity and Temperature Structure of the Waneta Eddy February 8-10, March 1996 Report for Cominco Ltd., ASL Environmental Sciences Inc., Sidney B.C. Canada. 33 p. + appendices. Birch, R., Current Velocity and Temperature Structure of the Waneta Eddy, Junction of the Columbia and Pend d Oreille Rivers, B.C. May & Aug 30-31, March 1995 Report for B.C. Hydro, by ASL Environmental Sciences, Sidney, B.C., Canada, Sidney, B.C., Canada, 22 p. + appendices. Birch, R. and P. Boubnov, Current Velocity Structure of the Waneta Eddy, July 14-15, August 2001 Report for Cominco Ltd. and Columbia Power Corporation, by ASL Environmental Sciences Inc., Sidney, B.C., Canada, 28 p. + appendices. Birch, R. and D. English, Data Report: Current Measurements in the Pend d Oreille River. October 2001 Report for Columbia Power Corporation and Cominco Ltd., by ASL Environmental Sciences Inc., Sidney, B.C., Canada, 29 p. Casulli, V. and R.T. Cheng, Semi-implicit finite-difference method for three-dimensional shallow water flow. International Journal for Numerical Methods in Fluids, 15, Fissel, D.B. and J. Jiang, D Numerical modeling of flows at the confluence of the Columbia and Pend d Oreille Rivers: examination and evaluation of performance. Report for Columbia Power Corporation by ASL Environmental Sciences Inc., Sidney BC, Canada, xi + 78 p. + Appendices. Fissel, D.B., J. Jiang, D. Billenness, K. Borg and J. Lawrence, D Numerical Modeling of Flows and Sediment Transport in the Waneta Dam Headpond: Model Development and Field Survey. Unpublished Report for Columbia Power Corporation, Castlegar B.C., by ASL Environmental Sciences Inc., Sidney, B.C., Canada, vii + 43 p. Fissel, D.B. and J. Jiang, D Numerical modeling of flows at the confluence of the Columbia and Pend d Oreille rivers. In: Estuarine and Coastal Modeling: proceedings of the eighth international conference, ed. M.L. Spaulding. American Society of Civil Engineers,

15 Hildebrand, L White Sturgeon Spawning at Waneta 2001 Investigations and Historical Data Summary. Report for Columbia Power Corporation by R.L. & L. Environmental Services Ltd., Castlegar, B.C., Canada. Hildebrand, L. and D.B. Fissel, Measurement of Low Velocity Habitat in Waneta Eddy (Columbia River). Report for Cominco Ltd. by R.L. & L. Environmental Services Ltd., Castlegar, B.C., Canada. Jiang, J., An Examination of Estuarine Lutocline Dynamics. Ph. D. Thesis, University of Florida, Gainesville, Florida, 226 p. Jiang J. and D.B. Fissel, Numerical modeling of flows at the confluence of the Columbia and Pend d Oreille Rivers: Phase 2 report for the proposed Waneta Expansion Project. Report for Columbia Power Corporation by ASL Environmental Sciences Inc., Sidney BC, Canada, xviii p. + unnumbered Appendices (on CD). Jiang, J. and D. Fissel, D Numerical Modeling of Velocities in the Waneta Dam Headpond. Unpublished Report for Columbia Power Corporation, Castlegar B.C., by ASL Environmental Sciences Inc., Sidney, B.C., Canada, 40p. Jiang, J., Fissel, D.B. and Topham, D D numerical modeling of circulations associated with a submerged buoyant jet in a shallow coastal environment. Estuarine, Coastal and Shelf Science, 58, Mellor, G.L. and T. Yamada, Development of a turbulence closure model for geographical fluid problems. Review of Geophysics, 20(4), Millero, F.J. and A. Poisson, Density of seawater and the new International Equation of State of Seawater. IMS Newsletter, Number 30, g. Wright, ed., Special Issue , UNESCO, Paris, France, page 3. Murphy, A. H. and R. L. Winkler, A general framework for forecast validation. Monthly Waether Review, 115, Orlanski, I.A A simple boundary condition for unbounded hyperbolic flows. Journal of Computational Physics, 21, Smagorinsky, J General circulation experiments with the primitive equations: I. the basic experiment. Monthly Weather Review, 91,

Applications of 3D Coastal Circulation Numerical Model in Assessing Potential locations of Installing Underwater Turbines 1

Applications of 3D Coastal Circulation Numerical Model in Assessing Potential locations of Installing Underwater Turbines 1 Applications of 3D Coastal Circulation Numerical Model in Assessing Potential locations of Installing Underwater Turbines 1 Jianhua Jiang, David B. Fissel 1 Abstract The three-dimensional, coastal circulation

More information

Assessing the Site Potential for Underwater Turbines in Tidal Channels Using Numerical Modeling and Advanced Ocean Current Measurements

Assessing the Site Potential for Underwater Turbines in Tidal Channels Using Numerical Modeling and Advanced Ocean Current Measurements Assessing the Site Potential for Underwater Turbines in Tidal Channels Using Numerical Modeling and Advanced Ocean Current Measurements David B. Fissel, Jianhua Jiang, Rick Birch, Jan Buermans and David

More information

Three-Dimensional Numerical Modeling of Sediment Transport For Coastal Engineering Projects in British Columbia, Canada

Three-Dimensional Numerical Modeling of Sediment Transport For Coastal Engineering Projects in British Columbia, Canada Three-Dimensional Numerical Modeling of Sediment Transport For Coastal Engineering Projects in British Columbia, Canada David B. Fissel ASL Environmental Sciences Inc. Victoria, BC, V8M 1Z5, Canada, dfissel@aslenv.com

More information

Jianhua Jiang 1, David B. Fissel 1 and Keath Borg 1. Presented at ECM

Jianhua Jiang 1, David B. Fissel 1 and Keath Borg 1. Presented at ECM Sediment Plume and Deposition Modeling of Removal and Installation of Underwater Electrical Cables on Roberts Bank, Strait of Georgia, British Columbia, Canada Jianhua Jiang 1, David B. Fissel 1 and Keath

More information

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling

B-1. Attachment B-1. Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling Attachment B-1 Evaluation of AdH Model Simplifications in Conowingo Reservoir Sediment Transport Modeling 1 October 2012 Lower Susquehanna River Watershed Assessment Evaluation of AdH Model Simplifications

More information

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility

Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Appendix G.19 Hatch Report Pacific NorthWest LNG Lelu Island LNG Maintenance Dredging at the Materials Offloading Facility Project Memo H345670 To: Capt. David Kyle From: O. Sayao/L. Absalonsen December

More information

WQMAP (Water Quality Mapping and Analysis Program) is a proprietary. modeling system developed by Applied Science Associates, Inc.

WQMAP (Water Quality Mapping and Analysis Program) is a proprietary. modeling system developed by Applied Science Associates, Inc. Appendix A. ASA s WQMAP WQMAP (Water Quality Mapping and Analysis Program) is a proprietary modeling system developed by Applied Science Associates, Inc. and the University of Rhode Island for water quality

More information

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY

3.0 ROBERTS BANK TIDAL FLAT MORPHOLOGY Vancouver Port Authority Northwest Hydraulic Consultants Ltd. /Triton Consultants Ltd. Roberts Bank Container Expansion File: 33863 Coastal Geomorphology Study - 19 - November 2004 3.0 ROBERTS BANK TIDAL

More information

Annual transport rates at two locations on the fore-slope.

Annual transport rates at two locations on the fore-slope. Sediment Transport by Currents Fore-slope Sediment transport rates and sediment concentrations were computed from the hydrodynamic model runs as well as from direct measurements of current velocities at

More information

APPENDIX O. Sediment Modeling of Dredging off Lelu Island, Prince Rupert, BC Canada, and Disposal of Dredgate at Brown Passage

APPENDIX O. Sediment Modeling of Dredging off Lelu Island, Prince Rupert, BC Canada, and Disposal of Dredgate at Brown Passage APPENDIX O Sediment Modeling of Dredging off Lelu Island, Prince Rupert, BC Canada, and Disposal of Dredgate at Brown Passage Sediment Modeling of Dredging off Lelu Island, Prince Rupert, BC Canada, and

More information

Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative

Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative Kootenai Basin Water Supply Update and Sturgeon Flow Augmentation Kootenai Valley Resource Initiative Greg Hoffman Fishery Biologist / Kootenai River Basin Flood Engineer Libby Dam 15 May 2017 US Army

More information

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation

Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Appendix G.18 Hatch Report Pacific NorthWest LNG Lelu Island LNG Potential Impacts of the Marine Structures on the Hydrodynamics and Sedimentation Patterns Project Memo H345670 To: Capt. David Kyle From:

More information

Columbia River Project Water Use Plan

Columbia River Project Water Use Plan Columbia River Project Water Use Plan Lower Columbia River Fish Management Plan Implementation Year 1 Reference: CLBMON-47 Lower Columbia River: Whitefish Spawning Ground Topographic Survey: Year 1 Summary

More information

Modeling the Transport and Fate of Sediments Released from Dredging Projects in the Coastal Waters of British Columbia, Canada

Modeling the Transport and Fate of Sediments Released from Dredging Projects in the Coastal Waters of British Columbia, Canada WEDA Dredging Summit & Expo 18 Modeling the Transport and Fate of Sediments Released from Dredging Projects in the Coastal Waters of British Columbia, Canada David B. Fissel, Yuehua (Andy) Lin and Todd

More information

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream

Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream River Flow 2014 Schleiss et al. (Eds) 2014 Taylor & Francis Group, London, ISBN 978-1-138-02674-2 Reactivation of Klingnau reservoir sidearm: Numerical simulation of sediment release downstream A. Amini

More information

Modeling Sediment Disposal in Inshore Waterways of British Columbia, Canada

Modeling Sediment Disposal in Inshore Waterways of British Columbia, Canada Modeling Sediment Disposal in Inshore Waterways of British Columbia, Canada Jianhua Jiang 1 and David B. Fissel 1 Abstract In support of the environmental assessment and regulatory approval process and

More information

St. Clair River Conveyance Change 2007 to 2012

St. Clair River Conveyance Change 2007 to 2012 St. Clair River Conveyance Change 2007 to 2012 Morphologic Change in the St. Clair River 2007 2012 Conveyance Change Report U.S. Army Corps of Engineers, Detroit District Great Lakes Hydraulics and Hydrology

More information

CFD Modeling for Structure Designs in Environmental Impacts Mitigation

CFD Modeling for Structure Designs in Environmental Impacts Mitigation CFD Modeling for Structure Designs in Environmental Impacts Mitigation June 05 Navid Nekouee, Hugo Rodriguez and Steven Davie Environmental Impact Mitigation Design Savannah Harbor Expansion Project (SHEP)

More information

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam

Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Folsom Dam Water Control Manual Update Joint Federal Project, Folsom Dam Public Workshop May 25, 2016 Sacramento Library Galleria 828 I Street, Sacramento, CA US Army Corps of Engineers BUILDING STRONG

More information

A Study on Residual Flow in the Gulf of Tongking

A Study on Residual Flow in the Gulf of Tongking Journal of Oceanography, Vol. 56, pp. 59 to 68. 2000 A Study on Residual Flow in the Gulf of Tongking DINH-VAN MANH 1 and TETSUO YANAGI 2 1 Department of Civil and Environmental Engineering, Ehime University,

More information

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES

PRELIMINARY DRAFT FOR DISCUSSION PURPOSES Memorandum To: David Thompson From: John Haapala CC: Dan McDonald Bob Montgomery Date: February 24, 2003 File #: 1003551 Re: Lake Wenatchee Historic Water Levels, Operation Model, and Flood Operation This

More information

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake

A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake A Report on a Statistical Model to Forecast Seasonal Inflows to Cowichan Lake Prepared by: Allan Chapman, MSc, PGeo Hydrologist, Chapman Geoscience Ltd., and Former Head, BC River Forecast Centre Victoria

More information

Prepared by the North American Ice Service. 4 December Seasonal Outlook Great Lakes Winter

Prepared by the North American Ice Service. 4 December Seasonal Outlook Great Lakes Winter Prepared by the North American Ice Service A collaboration of the Canadian Ice Service and the National/Naval Ice Center 4 December 2008 Seasonal Outlook Great Lakes Winter 2008-2009 - 1 - Table of contents

More information

Water Supply Conditions and Outlook October 1, 2018

Water Supply Conditions and Outlook October 1, 2018 Water Supply Conditions and Outlook October 1, 2018 Flow Forecasting & Operations Planning Water Security Agency Overview Water supply conditions across Saskatchewan remain near normal, with most reservoirs

More information

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS

Strategies for managing sediment in dams. Iwona Conlan Consultant to IKMP, MRCS Strategies for managing sediment in dams Iwona Conlan Consultant to IKMP, MRCS 1 Sediment trapping by dams Active storage capacity Dead storage coarse material (bed load) Fine materials (suspension) Francis

More information

ANALYSIS OF THE 2010 AMERICAN SHAD RADIO TELEMETRY ANIMATIONS RSP 3.5 CONOWINGO HYDROELECTRIC PROJECT FERC PROJECT NUMBER 405

ANALYSIS OF THE 2010 AMERICAN SHAD RADIO TELEMETRY ANIMATIONS RSP 3.5 CONOWINGO HYDROELECTRIC PROJECT FERC PROJECT NUMBER 405 ANALYSIS OF THE 2010 AMERICAN SHAD RADIO TELEMETRY ANIMATIONS RSP 3.5 CONOWINGO HYDROELECTRIC PROJECT FERC PROJECT NUMBER 405 Prepared for: Prepared by: Normandeau Associates, Inc. Gomez and Sullivan Engineers,

More information

June 2018 Sediments and Dredging at GBR Ports

June 2018 Sediments and Dredging at GBR Ports June 2018 Sediments and Dredging at GBR Ports Reef 2050 Long Term Sustainability Plan The Great Barrier Reef is over 2000 km long and covers an area of approximately 350,000 square kilometres. It is a

More information

U.S. ARMY CORPS OF ENGINEERS

U.S. ARMY CORPS OF ENGINEERS CORPS FACTS Regulating Mississippi River Navigation Pools U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG Historical Background Federal improvements in the interest of navigation on the Mississippi River

More information

APPENDIX B PHYSICAL BASELINE STUDY: NORTHEAST BAFFIN BAY 1

APPENDIX B PHYSICAL BASELINE STUDY: NORTHEAST BAFFIN BAY 1 APPENDIX B PHYSICAL BASELINE STUDY: NORTHEAST BAFFIN BAY 1 1 By David B. Fissel, Mar Martínez de Saavedra Álvarez, and Randy C. Kerr, ASL Environmental Sciences Inc. (Feb. 2012) West Greenland Seismic

More information

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap

Investigation on Dynamics of Sediment and Water Flow in a Sand Trap Investigation on Dynamics of Sediment and Water Flow in a Sand Trap M. R. Mustafa Department of Civil Engineering Universiti Teknologi Petronas 31750 Tronoh, Perak, Malaysia R. B. Rezaur Water Resources

More information

Sessom Creek Sand Bar Removal HCP Task 5.4.6

Sessom Creek Sand Bar Removal HCP Task 5.4.6 Sessom Creek Sand Bar Removal HCP Task 5.4.6 Prepared by: Dr. Thomas Hardy Texas State University Dr. Nolan Raphelt Texas Water Development Board January 6, 2013 DRAFT 1 Introduction The confluence of

More information

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River

Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River Decline of Lake Michigan-Huron Levels Caused by Erosion of the St. Clair River W.F. & Associates Coastal Engineers (in association with Frank Quinn) April 13, 2005 Outline Problem Definition Understanding

More information

List of Tables. Jacques Whitford 2006 PROJECT ABC50541 October i

List of Tables. Jacques Whitford 2006 PROJECT ABC50541 October i 4.6 Surface Water Hydrology and Groundwater...4-72 4.6.1 Boundaries...4-72 4.6.1.1 Spatial Boundaries...4-72 4.6.1.2 Regional Spatial Boundary...4-72 4.6.1.3 Local Spatial Boundary...4-74 4.6.1.4 Temporal

More information

Summary Results from Horizontal ADCP tests in the Indiana Harbor Canal and the White River

Summary Results from Horizontal ADCP tests in the Indiana Harbor Canal and the White River Summary Results from Horizontal ADCP tests in the Indiana Harbor Canal and the White River This report summarizes results of tests of horizontally deployed ADCPs in the Indiana Harbor Canal and the White

More information

Sediment Traps. CAG Meeting May 21, 2012

Sediment Traps. CAG Meeting May 21, 2012 Sediment Traps CAG Meeting May 21, 2012 Agenda Background Fundamentals of Sediment Transport Sediment Trap Existing Information Next Steps 2 The Site Saginaw River 22 mile river beginning at confluence

More information

Dynamics of the Ems Estuary

Dynamics of the Ems Estuary Dynamics of the Ems Estuary Physics of coastal systems Jerker Menninga 0439738 Utrecht University Institute for Marine and Atmospheric research Utrecht Lecturer: Prof. dr. H.E. de Swart Abstract During

More information

Summary of the 2017 Spring Flood

Summary of the 2017 Spring Flood Ottawa River Regulation Planning Board Commission de planification de la régularisation de la rivière des Outaouais The main cause of the exceptional 2017 spring flooding can be described easily in just

More information

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins

Attachment B to Technical Memorandum No.2. Operations Plan of Ross Valley Detention Basins Attachment B to Technical Memorandum No.2 Operations Plan of Ross Valley Detention Basins Operations Plan of Ross Valley Detention Basins Stetson Engineers Inc. January 26, 2011 1.0 Introduction Achieving

More information

Dynamique des rivières. res

Dynamique des rivières. res Dynamique des rivières res 1 Rivers are enormously diverse size: varies by many orders of magnitude geometry: highly variable substrate: bedrock or sediment sediment type: sediment size ranges from mud

More information

U-Shaped Sediment Traps

U-Shaped Sediment Traps U-Shaped Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System Concentrated Flow Clayey Soils [1] Type 3 System Supplementary Trap Dispersive Soils [1] Generally

More information

Appendix O. Sediment Transport Modelling Technical Memorandum

Appendix O. Sediment Transport Modelling Technical Memorandum Appendix O Sediment Transport Modelling Technical Memorandum w w w. b a i r d. c o m Baird o c e a n s engineering l a k e s design r i v e r s science w a t e r s h e d s construction Final Report Don

More information

Ed Ross 1, David Fissel 1, Humfrey Melling 2. ASL Environmental Sciences Inc. Victoria, British Columbia V8M 1Z5

Ed Ross 1, David Fissel 1, Humfrey Melling 2. ASL Environmental Sciences Inc. Victoria, British Columbia V8M 1Z5 Spatial Variability of Sea Ice Drafts in the Continental Margin of the Canadian Beaufort Sea from a Dense Array of Moored Upward Looking Sonar Instruments Ed Ross 1, David Fissel 1, Humfrey Melling 2 1

More information

Bishopville Prong Study

Bishopville Prong Study Bathymetric and Sediment Assessment in the Bishopville Prong of St. Martin River Darlene V. Wells, Richard A. Ortt, Jr., and Stephen Van Ryswick Funded by MCBP 2011-2012 Implementation Grant Objectives

More information

Tarbela Dam in Pakistan. Case study of reservoir sedimentation

Tarbela Dam in Pakistan. Case study of reservoir sedimentation Tarbela Dam in Pakistan. HR Wallingford, Wallingford, UK Published in the proceedings of River Flow 2012, 5-7 September 2012 Abstract Reservoir sedimentation is a main concern in the Tarbela reservoir

More information

17-20 November 2007 Incidental Take Monitoring Methodology and Results

17-20 November 2007 Incidental Take Monitoring Methodology and Results Sample Site Selection Protocol 17-20 November 2007 Incidental Take Monitoring Methodology and Results On 16 November 2007, the U.S. Fish and Wildlife Service (USFWS) provided the USACE Mobile District

More information

REDWOOD VALLEY SUBAREA

REDWOOD VALLEY SUBAREA Independent Science Review Panel Conceptual Model of Watershed Hydrology, Surface Water and Groundwater Interactions and Stream Ecology for the Russian River Watershed Appendices A-1 APPENDIX A A-2 REDWOOD

More information

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams

RESERVOIR DRAWDOWN RATES/RESERVOIR DRAWDOWN TEST Iron Gate, Copco (I & II), and JC Boyle Dams TECHNICAL MEMORANDUM No. 1 TO: Michael Bowen California Coastal Conservancy Geotechnical & Earthquake Engineering Consultants CC: Eric Ginney Philip Williams & Associates PREPARED BY: Paul Grant SUBJECT:

More information

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC

Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC Chiang Rai Province CC Threat overview AAS1109 Mekong ARCC This threat overview relies on projections of future climate change in the Mekong Basin for the period 2045-2069 compared to a baseline of 1980-2005.

More information

Missouri River Basin Water Management

Missouri River Basin Water Management Missouri River Basin Water Management US Army Corps of Engineers Missouri River Navigator s Meeting February 12, 2014 Bill Doan, P.E. Missouri River Basin Water Management US Army Corps of Engineers BUILDING

More information

Flow estimations through spillways under submerged tidal conditions

Flow estimations through spillways under submerged tidal conditions Computational Methods and Experimental Measurements XIII 137 Flow estimations through spillways under submerged tidal conditions P. D. Scarlatos 1, M. Ansar 2 & Z. Chen 2 1 Department of Civil Engineering

More information

PART 2:! FLUVIAL HYDRAULICS" HYDROEUROPE

PART 2:! FLUVIAL HYDRAULICS HYDROEUROPE PART 2:! FLUVIAL HYDRAULICS" HYDROEUROPE 2009 1 HYDROEUROPE 2009 2 About shear stress!! Extremely complex concept, can not be measured directly!! Computation is based on very primitive hypotheses that

More information

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast

Material Workshop. Galveston District 2012 Beneficial Use of Dredged. Material Workshop. Custodians of the Coast Galveston District 2012 Beneficial Use of Dredged Material Workshop Galveston District 2012 Beneficial Use of Dredged Material Workshop US Army Corps of Engineers BUILDING STRONG Welcome Opening Remarks

More information

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin

HyMet Company. Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Company Streamflow and Energy Generation Forecasting Model Columbia River Basin HyMet Inc. Courthouse Square 19001 Vashon Hwy SW Suite 201 Vashon Island, WA 98070 Phone: 206-463-1610 Columbia River

More information

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine

Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine University of Southern Maine USM Digital Commons Publications Casco Bay Estuary Partnership (CBEP) 2015 Estimated Sediment Volume: Bridge Street Dam Impoundment, Royal River, Yarmouth, Maine Stantec Follow

More information

Comparison between vertical shear mixing and surface wave-induced mixing in the global ocean

Comparison between vertical shear mixing and surface wave-induced mixing in the global ocean Comparison between vertical shear mixing and surface wave-induced mixing in the global ocean Fangli Qiao and Chuanjiang Huang Key Laboratory of Marine Science and Numerical Modeling First Institute of

More information

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS

SCOPE OF PRESENTATION STREAM DYNAMICS, CHANNEL RESTORATION PLANS, & SEDIMENT TRANSPORT ANALYSES IN RELATION TO RESTORATION PLANS DESIGN METHODS B: SEDIMENT TRANSPORT PROCESSES FOR STREAM RESTORATION DESIGN PETER KLINGEMAN OREGON STATE UNIVERSITY CIVIL ENGINEERING DEPT., CORVALLIS 2 ND ANNUAL NORTHWEST STREAM RESTORATION DESIGN SYMPOSIUM

More information

Water Stratification under Wave Influence in the Gulf of Thailand

Water Stratification under Wave Influence in the Gulf of Thailand Water Stratification under Wave Influence in the Gulf of Thailand Pongdanai Pithayamaythakul and Pramot Sojisuporn Department of Marine Science, Faculty of Science, Chulalongkorn University, Bangkok, Thailand

More information

MUDMAP TM. Software Description

MUDMAP TM. Software Description ASA Applied Science Associates, Inc. 70 Dean Knauss Drive Narragansett, RI 02882-1143 U.S.A. Tel: 401-789-6224 Fax: 401-789-1932 asa@asascience.com www.asascience.com MUDMAP TM Software Description MUDMAP

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

CASE STUDY BINGA, PHILIPPINES

CASE STUDY BINGA, PHILIPPINES SEDIMENT MANAGEMENT CASE STUDY BINGA, PHILIPPINES Key project features Name: Binga Country: Philippines Category: modify operating rule (focus or redistribute sediment); adaptive strategies Binga hydropower

More information

Lessons Learned from Fish Spawning Reef Restoration in the St. Clair Detroit River System. Photo Credit: Adam Lintz

Lessons Learned from Fish Spawning Reef Restoration in the St. Clair Detroit River System. Photo Credit: Adam Lintz Lessons Learned from Fish Spawning Reef Restoration in the St. Clair Detroit River System Photo Credit: Adam Lintz Outline and Presenters Jennifer Read, University of Michigan Water Center Introduction

More information

2015 Fall Conditions Report

2015 Fall Conditions Report 2015 Fall Conditions Report Prepared by: Hydrologic Forecast Centre Date: December 21 st, 2015 Table of Contents Table of Figures... ii EXECUTIVE SUMMARY... 1 BACKGROUND... 2 SUMMER AND FALL PRECIPITATION...

More information

Influence of dam removal and past sediment mining on river morphology and biology: example of the Vienne River (France)

Influence of dam removal and past sediment mining on river morphology and biology: example of the Vienne River (France) Université François Rabelais de Tours, CNRS/INSU - UMR 6113 CETU Elmis Influence of dam removal and past sediment mining on river morphology and biology: example of the Vienne River (France) S. Rodrigues,

More information

Modeling of long-term sedimentation in the Osijek port basin

Modeling of long-term sedimentation in the Osijek port basin Water Management and Hydraulic Engineering 2015 Litera Brno, ISBN 978-80-214-5230-5, ISSN 2410-5910 Modeling of long-term sedimentation in the Osijek port basin G. Gilja, N. Kuspilić (Faculty of civil

More information

Great Lakes Update. Volume 194: 2015 Annual Summary

Great Lakes Update. Volume 194: 2015 Annual Summary Great Lakes Update Volume 194: 2015 Annual Summary Background The U.S. Army Corps of Engineers (USACE) tracks and forecasts the water levels of each of the Great Lakes. This report summarizes the hydrologic

More information

Water Supply Conditions and Outlook June 4, 2018

Water Supply Conditions and Outlook June 4, 2018 Water Supply Conditions and Outlook June 4, 2018 Flow Forecasting & Operations Planning Water Security Agency Overview Water supply conditions across Saskatchewan are generally good with most reservoir

More information

CERTAIN ASPECTS OF THE NUMERICAL SIMULATION OF CIRCULATION IN THE BAY OF BENGAL AND THE ARABIAN SEA

CERTAIN ASPECTS OF THE NUMERICAL SIMULATION OF CIRCULATION IN THE BAY OF BENGAL AND THE ARABIAN SEA CERTAIN ASPECTS OF THE NUMERICAL SIMULATION OF CIRCULATION IN THE BAY OF BENGAL AND THE ARABIAN SEA by INDU JAIN A THESIS SUBMITTED IN FULFILMENT OF THE REQUIREMENTS FOR THE DEGREE OF DOCTOR OF PHILOSOPHY

More information

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Available online at   ScienceDirect. Procedia Engineering 154 (2016 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 154 (2016 ) 574 581 12th International Conference on Hydroinformatics, HIC 2016 Research on the Strength and Space-time Distribution

More information

Oceanographic Conditions in the Gulf of St. Lawrence during 1999

Oceanographic Conditions in the Gulf of St. Lawrence during 1999 Fisheries and Oceans Science Pêches et Océans Sciences DFO Science Laurentian Region Stock Status Report G4-01 (2000) Researh vessel CCGS Martha L. Black Oceanographic Conditions in the Gulf of St. Lawrence

More information

Applying Gerris to Mixing and Sedimentation in Estuaries

Applying Gerris to Mixing and Sedimentation in Estuaries Applying Gerris to Mixing and Sedimentation in Estuaries Timothy R. Keen U.S. Naval Research Laboratory Stennis Space Center, Mississippi, U.S.A. 4 July 2011 Université Pierre et Marie Curie Paris, France

More information

Modeling the Circulation in Penobscot Bay, Maine

Modeling the Circulation in Penobscot Bay, Maine Modeling the Circulation in Penobscot Bay, Maine Huijie Xue 1, Yu Xu 1, David Brooks 2, Neal Pettigrew 1, John Wallinga 1 1. School of Marine Sciences, University of Maine, Orono, ME 4469-5741. 2. Department

More information

Forecast of Nearshore Wave Parameters Using MIKE-21 Spectral Wave Model

Forecast of Nearshore Wave Parameters Using MIKE-21 Spectral Wave Model Forecast of Nearshore Wave Parameters Using MIKE-21 Spectral Wave Model Felix Jose 1 and Gregory W. Stone 2 1 Coastal Studies Institute, Louisiana State University, Baton Rouge, LA 70803 2 Coastal Studies

More information

Hydraulic and Sediment Transport Modeling Strategy

Hydraulic and Sediment Transport Modeling Strategy Appendix B Hydraulic and Sediment Transport Modeling Strategy May 2014 Technical Memorandum Channel Capacity Report January 2015 San Joaquin River Restoration Program Hydraulic and Sediment Transport Modeling

More information

Illinois State Water Survey Division

Illinois State Water Survey Division Illinois State Water Survey Division SURFACE WATER SECTION SWS Miscellaneous Publication 108 SEDIMENT YIELD AND ACCUMULATION IN THE LOWER CACHE RIVER by Misganaw Demissie Champaign, Illinois June 1989

More information

THE 2006 SUMMER WATER TEMPERATURE AND FLOW MANAGEMENT PROJECT

THE 2006 SUMMER WATER TEMPERATURE AND FLOW MANAGEMENT PROJECT THE 2006 SUMMER WATER TEMPERATURE AND FLOW MANAGEMENT PROJECT NECHAKO FISHERIES CONSERVATION PROGRAM Technical Report No. RM06-1 Prepared by: Triton Environmental Consultants Ltd. Draft: December 2006

More information

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick

Terms of Reference for the Comparative Environmental Review (CER) of. Options for the Mactaquac Project, Mactaquac, New Brunswick Terms of Reference for the Comparative Environmental Review (CER) of Options for the Mactaquac Project, Mactaquac, New Brunswick Preamble The New Brunswick Power Corporation ( NB Power ) operates the Mactaquac

More information

Technical Memorandum No Sediment Model

Technical Memorandum No Sediment Model Pajaro River Watershed Study in association with Technical Memorandum No. 1.2.9 Sediment Model Task: Development of Sediment Model To: PRWFPA Staff Working Group Prepared by: Gregory Morris and Elsie Parrilla

More information

Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report

Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report Hydrodynamic model of St. Clair River with Telemac-2D Phase 2 report Controlled Technical Report CHC-CTR-084 revision 1 March 2009 NRC-CHC has prepared this report for the International Joint Commission

More information

How to predict the sedimentological impacts of reservoir operations?

How to predict the sedimentological impacts of reservoir operations? ICSE 212 How to predict the sedimentological impacts of reservoir operations? E. Valette EDF CIH eric.valette@edf.fr M. Jodeau EDF R&D LNHE magali.jodeau@edf.fr Presentation of the numerical code Courlis

More information

Geomorphological Modelling in Coastal Waters

Geomorphological Modelling in Coastal Waters Abstract Geomorphological Modelling in Coastal Waters Morteza Kolahdoozan 1, Roger A. Falconer 2 (Fellow), Yiping Chen 3 Details are given herein of the development and application of a three dimensional

More information

Coarse Sediment Traps

Coarse Sediment Traps Coarse Sediment Traps SEDIMENT CONTROL TECHNIQUE Type 1 System Sheet Flow Sandy Soils Type 2 System [1] Concentrated Flow Clayey Soils [2] Type 3 System Supplementary Trap Dispersive Soils [1] Though primarily

More information

Characterizing the Physical Oceanography of Coastal Waters Off Rhode Island

Characterizing the Physical Oceanography of Coastal Waters Off Rhode Island Characterizing the Physical Oceanography of Coastal Waters Off Rhode Island Dan Codiga and Dave Ullman Graduate School of Oceanography University of Rhode Island RI OSAMP Stakeholder Meeting January 5,

More information

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY

NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY NUMERICAL MODELLING IN ENVIRONMENTAL IMPACT ASSESSMENT OF CONSTRUCTION WORKS WITHIN RIVER BAYS - A CASE STUDY M. Jovanović 1, R. Kapor, B. Zindović University of Belgrade Faculty of Civil Engineering E-mail:

More information

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria

Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria Birecik Dam & HEPP Downstream River Arrangement R. Naderer, G. Scharler Verbundplan GmbH, 5021 Salzburg, Austria e-mail: scharlerg@verbund.co.at Abstract Birecik Dam & HEPP on the Euphrates river in Turkey

More information

EFFECTS OF ICE ON THE HYDRAULICS OF INNER MONGOLIA REACH OF THE YELLOW RIVER

EFFECTS OF ICE ON THE HYDRAULICS OF INNER MONGOLIA REACH OF THE YELLOW RIVER Ice in the Environment: Proceedings of the 16th IAHR International Symposium on Ice Dunedin, New Zealand, 2nd 6th December 2002 International Association of Hydraulic Engineering and Research EFFECTS OF

More information

MICHAEL W. STACEY. Department of Physics, Royal Military College of Canada, Kingston, Ontario, Canada S. POND

MICHAEL W. STACEY. Department of Physics, Royal Military College of Canada, Kingston, Ontario, Canada S. POND 2366 JOURNAL OF PHYSICAL OCEANOGRAPHY Dependence of Currents and Density on the Spring Neap Cycle and the Diurnal Inequality in Burrard Inlet, British Columbia: Simulations and Observations MICHAEL W.

More information

WIND EFFECTS ON CHEMICAL SPILL IN ST ANDREW BAY SYSTEM

WIND EFFECTS ON CHEMICAL SPILL IN ST ANDREW BAY SYSTEM WIND EFFECTS ON CHEMICAL SPILL IN ST ANDREW BAY SYSTEM PETER C. CHU, PATRICE PAULY Naval Postgraduate School, Monterey, CA93943 STEVEN D. HAEGER Naval Oceanographic Office, Stennis Space Center MATHEW

More information

Regional Sediment Management at East Rockaway Inlet, NY, Utilizing the USACE Coastal Modeling System

Regional Sediment Management at East Rockaway Inlet, NY, Utilizing the USACE Coastal Modeling System Regional Sediment Management at East Rockaway Inlet, NY, Utilizing the USACE Coastal Modeling System by US Army Engineer District, New York PURPOSE: This Coastal and Hydraulics Engineering Technical Note

More information

A HYDROLOGIC AND MORPHOLOGIC ANALYSIS OF THE BLACK LAKE, ALASKA

A HYDROLOGIC AND MORPHOLOGIC ANALYSIS OF THE BLACK LAKE, ALASKA A HYDROLOGIC AND MORPHOLOGIC ANALYSIS OF THE BLACK LAKE, ALASKA Submitted to: Chignik Regional Aquaculture Association 2731 Meridian Street, Suite B Bellingham, WA 98225 Submitted by: Prof. A. Papanicolaou,

More information

THE 2008 SUMMER WATER TEMPERATURE AND FLOW MANAGEMENT PROJECT

THE 2008 SUMMER WATER TEMPERATURE AND FLOW MANAGEMENT PROJECT THE 2008 SUMMER WATER TEMPERATURE AND FLOW MANAGEMENT PROJECT NECHAKO FISHERIES CONSERVATION PROGRAM Technical Report No. RM08-1 Prepared by: Triton Environmental Consultants Ltd. Draft: November 2008

More information

Sediment Transport, Numerical Modeling and Reservoir Management some Concepts and Applications

Sediment Transport, Numerical Modeling and Reservoir Management some Concepts and Applications Sediment Transport, Numerical Modeling and Reservoir Management some Concepts and Applications CEMRACS 2013 August 6 th Magali Jodeau EDF R&D LNHE magali.jodeau@edf.fr Overview of the presentation What

More information

Main issues of Deltas

Main issues of Deltas Global sediment supply to coastal seas and oceans; location of major river deltas RIVER DELTAS Depositional processes - Course Coastal Morphodynamics GEO3-436; lecture 4 Nile Delta, Egypt Solo Delta, Java,

More information

3.0 TECHNICAL FEASIBILITY

3.0 TECHNICAL FEASIBILITY 3.0 TECHNICAL FEASIBILITY 3.1 INTRODUCTION To enable seasonal storage and release of water from Lake Wenatchee, an impoundment structure would need to be constructed on the lake outlet channel. The structure

More information

Sediment and Nutrient Mass Balance Model of ConowingoPool

Sediment and Nutrient Mass Balance Model of ConowingoPool Sediment and Nutrient Mass Balance Model of ConowingoPool Mark Velleux and Jim Fitzpatrick HDR Engineering Chesapeake Bay Program Modeling Quarterly Review: August 10, 2016 Model Grid and Spatial Resolution

More information

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013

APPENDIX E. GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2013 APPENDIX E GEOMORPHOLOGICAL MONTORING REPORT Prepared by Steve Vrooman, Keystone Restoration Ecology September 2 Introduction Keystone Restoration Ecology (KRE) conducted geomorphological monitoring in

More information

Evaporation Duct Height Climatology for Norwegian Waters Using Hindcast Data

Evaporation Duct Height Climatology for Norwegian Waters Using Hindcast Data Evaporation Duct Height Climatology for Norwegian Waters Using Hindcast Data Petter Østenstad Norwegian Defence Research Establishment (FFI) Horten NORWAY Petter.Ostenstad@ffi.no Marthe Marie Meltzer Norwegian

More information

Willamette River Basin Temperature TMDL Modeling Study

Willamette River Basin Temperature TMDL Modeling Study Willamette River Basin Temperature TMDL Modeling Study Scott A. Wells, Chris J. Berger, Robert L. Annear Jr, Michael McKillip, Sher Jamal Department of Civil and Environmental Engineering Portland State

More information

Appendix E: Cowardin Classification Coding System

Appendix E: Cowardin Classification Coding System Appendix E: Cowardin Classification Coding System The following summarizes the Cowardin classification coding system and the letters and numbers used to define the USFWS NWI wetland types and subtypes:

More information

Modelling the Channel and the Bay of Biscay using the MARS model. Contributions: Dyneco Physed / Pelagos / Benthos EMH

Modelling the Channel and the Bay of Biscay using the MARS model. Contributions: Dyneco Physed / Pelagos / Benthos EMH Modelling the Channel and the Bay of Biscay using the MARS model Contributions: Dyneco Physed / Pelagos / Benthos EMH Overview 1. The MANGA Configuration 2. Model validation: Sea Surface Temperature 3.

More information

3. MARINE HABITAT RESTORATION

3. MARINE HABITAT RESTORATION Feasibility Study for Restoration of Titlow Lagoon Fish Passage South Puget Sound Salmon Enhancement Group 3. MARINE HABITAT RESTORATION Marine habitat restoration at Titlow Park could include restoration

More information