1 Sterkfontein Project: Coal Resource Statement March 2010» powering up
2 Coal Resource Statement GeoCoal Services ( Geocoal ) was appointed by Keaton Energy Holdings Limited ( Keaton Energy ) to complete a March 2010 Independent Competent Person s Report ( CPR ) on the coal bearing potential of the Sterkfontein Project area. This follows the March 2008 CPR completed by Coffey Mining (Pty) Ltd, on both the Sterkfontein and Delmas project areas. In both instances the Competent Person responsible was Mr David van Wyk. Map showing the relative geographic location of the Sterkfontein Project area Subsequent to the March 2008 CPR, Keaton Energy s 74% held subsidiary Labohlano Trading No. 46 (Pty) Ltd ( Labohlano ) acquired a prospecting right over hectares contiguous to the prospecting rights ( the Labohlano extension ) already held by Keaton Mining (Pty) Ltd, also a 74% held subsidiary of Keaton Energy. The areas under consideration in this Coal Resource Statement for Keaton Energy thus consists of 3 prospecting rights over a total of hectares, held by Keaton Mining and Labohlano in the Bethal district of Mpumalanga, South Africa.» 1» Keaton Energy Coal Resource and Reserve Statements 2010
3 The project area is located 143km east-southeast of the centre of Johannesburg. These properties are referred to collectively as the Sterkfontein Project area and are shown in following diagram. Total Sterkfontein project LEGEND Keaton Mining Keaton Mining Labohlano Pre-2009 campaigns 2009 campaign 0 1km 2010 campaign Subsequent to the acquisition of the Labohlano extension, a 93 hole drill campaign was planned. The first phase of this campaign has been completed, with 30 boreholes having been drilled during The purpose of the CPR is to provide an update on the coal bearing potential of the expanded project area based on the additional information from the first phase of the drilling campaign, combined with the data obtained from the 25 boreholes drilled by previous holders of the Labohlano prospecting right. The classification of the Coal Resources of the Sterkfontein Project is based on the South African Code for Reporting of Mineral Resources and Mineral Reserves ( the SAMREC Code ) prepared by the South African Mineral Resource Committee ( SAMREC ) under the auspices of The South African Institute of Mining and Metallurgy (2007). Under the SAMREC Code particular reference is taken of the South African National Standard (SANS 10320:2004), the South African guide to the systematic evaluation of coal resources. The Coal Resource estimations and classifications for the» 2» Keaton Energy Coal Resource and Reserve Statements 2010
4 Sterkfontein Project areas were prepared by Mr David van Wyk, a registered natural scientist with the South African Council for Natural Scientific Professions ( SACNASP ) (Reg. No /83), 280 Pretoria Street, Silverton which is a recognised body by SAMREC of which he is a member. Mr van Wyk is a Competent Person as defined in the 2007 edition of the SAMREC Code. Mr van Wyk has more than 25 years experience in the South African Coal industry and is also familiar with and adheres to the new South African Minerals and Petroleum Resources Development Act of 2002 (ACT No. 28 of 2002) ( MPRDA ) and the SAMREC code; namely SANS 10320:2004. Mr van Wyk resides at 26 Croyden Circle, Port Alfred. Mr David van Wyk has given his consent for the public reporting of the Coal Resource Statement. Prospecting rights of the Sterkfontein Project areas held by Keaton Mining and Labohlano Keaton Energy Holdings Limited Sterkfontein Project Summary of Beneficially Held Prospecting Rights Prospecting right Property Area Application Expiry (hectares) number date Sterkfontein Project Area Keaton Mining held Prospecting Rights Palmietfontein 307 IS, Portion 3 Sterkfontein 299 IS, Portion MP/30/5/1/1/2/443PR 18/12/2011 Kaffirskraal 148 IS, RE of Portion 3, Remaining Extent Wildan 577 IS, Remaining Extent Sterkfontein 299 IS, Portion 20, 21, 25, 26, 34 and RE Portion 4 Goedehoop 301 IS, Portion MP/30/5/1/1/2/444PR 09/11/2011 Sterkfontein Project Area Labohlano held Prospecting Rights Kaffirskraal 148 IS, Portion 1, 2, 5, 6, 8, 9, 10, 11, 12 Sterkfontein 299 IS, Portion 3, 5, 6, 8, 9, 10, 11, 12, 13, 15, 16, 17 18, 19, 22, 24, 30, 31, 32 and RE Portion MP/30/5/1/1/2/1720PR 05/05/2011 Keaton Mining and Labohlano have incurred exploration expenditure of R2.5 million and R13.85 million respectively to date at the Sterkfontein Project area. Keaton Mining and Labohlano intend to drill an additional 56 boreholes to further expand the Sterkfontein Project area resource base, and to increase confidence levels of the current resource estimates. The expected expenditure for the Sterkfontein Project area for the next 12 months. Sterkfontein Project Coal Exploration Budget 2010 Project area Planned Activity Number of boreholes Cost (R million) Sterkfontein Exploration and infill drilling Keaton Energy, to the best of its knowledge, is unaware of any land claims over any parts of the project areas and is unaware of any outstanding legal proceedings that could prevent any prospecting and mining activities planned on the properties listed above. Labohlano has agreed with the Govan Mbeki Municipality to apply to the Department of Mineral Resources to amend prospecting right MP/30/5/1/1/2/1720PR to exclude a small portion of the prospecting right adjacent to Extension 6 of the Mzinoni Township. This amendment does not affect the resource blocks identified in this Resource Statement.» 3» Keaton Energy Coal Resource and Reserve Statements 2010
5 COAL RESOURCES The geological investigation is at advanced exploration stage with about 50% of the resources drilled to a measured resource. The resource would be suitable for export quality coal or to supply the Eskom power stations in the vicinity. One hundred and ninety two boreholes have been drilled to date, with 176 having full analyses. All boreholes were drilled vertically by means of diamond drilling using TNW (60mm) or NQ (47.6mm) core size. Core recoveries were good and the quality of the drilling was acceptable. There were a number of minor data discrepancies which could not be rectified, however these discrepancies were not material to the overall conclusion of the report. Coal samples were analysed at Inspectorate M&L. In the Sterkfontein Project area the No. 4 Seam is the only coal seam of economic interest. The No. 5 Seam is present in most of the holes at an average depth of 132m and forms a thin (usually less than 30cm) dull coal seam, which is a prominent marker horizon, between 15m to 60m above the No. 4 Seam. The No. 4 Seam occurs as a composite seam with a number of different coal zones identified. In places the No. 4 Seam is split by a sandstone or siltstone parting, creating No. 4 Upper and No. 4 Lower Seam. Typically the quality of the No. 4 Lower Seam is better than that of the No. 4 Upper Seam. The No. 4 Seam is on average 1.9m thick across the property. In the south the No. 4 Seam is thicker with an average width of 3.0m. Intra-seam partings are common, although are mostly of insignificant widths (<0.30cm) except for in the southeast of where the parting reaches a maximum thickness of 2.5m. The drilling status for the area where the 4L seam width is greater than 60 cm Area (sq m) Volume (cu m) Raw RD GTIS Boreholes Hectares Ha/bh 48,125,067 75,622, ,484, , As at March 2010, the Gross Tonnes In Situ (GTIS) of 82 million tonnes for the No. 4 Seam in the 3 resource blocks identified on Sterkfontein Project area was estimated using 1.40m as a minimum seam width. Geological losses ranging from 10% to 20% were assumed depending on the density of geological data and a Mineable Tonnes In Situ (MTIS) Coal Resource of 69 million tonnes has been estimated. No material risk factors have been identified that could impact on the Coal Resource Statement. The Coal Resource Statement was prepared using SANS 10320ED South African guide to the systematic evaluation of coal resources and coal reserves section 6 and the definitions from section 3.» 4» Keaton Energy Coal Resource and Reserve Statements 2010
6 The coal resources of the Sterkfontein Project area Block Area Volume Ave RD GTIS Geological MTIS SAMREC (sq m) (cu m) width (m) (g/cc) Loss Classification North 01 3,070,006 7,974, ,645,274 20% 10,116,219 Indicated South 01 10,855,009 22,380, ,868,823 20% 28,695,058 Indicated South 02 9,055,022 21,448, ,499,169 10% 30,149,252 Measured Total 22,980,037 51,803,998 82,013,266 68,960,529 Modifying factors: Minimum seam width 1.4 meters Minimum dry ash free volatiles 26% Geological losses 10% to 20% Maximum raw uncontaminated ash of 50% The weighted average theoretical borehole yield for the three resource blocks is 44.22% for an export 27 CV (MJ/kg) product and 35.29% for a 19.5 CV (MJ/kg) Eskom type product. The diagram below shows the limits of the 3 resource blocks identified on Sterkfontein Project area Limits of the 3 resource blocks indentified on Sterkfontein Project area LEGEND North 01 10Mt MTIS South 01 28Mt MTIS South 02 30Mt MTIS Pre-2009 campaigns 2009 campaign 0 1km 2010 campaign 40000» 5» Keaton Energy Coal Resource and Reserve Statements 2010
SESE MEASURED RESOURCE EXCEEDS 650MT COAL
For electronic distribution 15 th August 2012 SESE MEASURED RESOURCE EXCEEDS 650MT COAL Highlights: Initial Measured Resource at Sese calculated at 651Mt coal. Sese Coal & Power Project: Resource Summary
More informationJV PROJECT UPDATE JORC COAL RESOURCE
29 May 2012 ASX Announcement JV PROJECT UPDATE JORC COAL RESOURCE Dynasty Metals Australia (ASX:DMA) holds a minority interest of approximately 8.65 in a joint venture company with a subsidiary of Tiaro
More informationFor personal use only
ASX ANNOUNCEMENT 13 August 2012 INFERRED RESOURCE UPGRADE AT TAKATOKWANE IN BOTSWANA 2.6 BILLION TONNES ADDITIONAL INFERRED RESOURCE DEFINED Key Points: 2.6 Billion Tonnes classified over the initial Phase
More informationNCONDEZI COAL COMPANY LTD ("Ncondezi" or the "Company") Ncondezi Project South Block Resource Update
Ncondezi Coal Company Limited No 1 le Truchot St Peter Port Guernsey Channel Islands GY1 3JX Tel: +44 (0) 1481 810102, Fax: +44 (0) 1481 810120 December 21, 2011 NCONDEZI COAL COMPANY LTD ("Ncondezi" or
More informationFor personal use only
1.74 Billion Tonne JORC Resource 17 th September 2012 East Energy Resources are pleased to announce updated JORC Resource of 1.74Bt East Energy Resources Limited (ASX:EER) is pleased to announce their
More informationFor personal use only
MOZAMBI COAL LTD (ASX: MOZ, Company or Mozambi ) ASX RELEASE 7 SEPTEMBER 2011 EXPLORATION PROGRAMME UPDATE is pleased to announce an update on exploration activities in Mozambique including the results
More informationFor personal use only
COMPANY ANNOUNCEMENT Coal exploration permit granted and target of up to 155 million tonnes identified Highlights EPC 1992 ( the Etona Coal Project ) has now been granted Independent Geological sign-off
More informationNew High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
ASX/Media Release P. (08) 9368 2722 F. (08) 9367 9043 E. mgl@mutinygold.com.au 18 March 2011 New High Grade Gold-Copper Extensions At Mutiny s Deflector Deposit Highlight Project s Significant Growth Potential
More informationFor personal use only
29 March 2011 ASSAYS CONFIRM COKING COAL AT BERENICE The Board of Directors of Universal Coal plc ("Universal Coal" or Company ) is pleased to provide an update on its Coking Coal Projects: The first phase
More informationFor personal use only
ASX Code: HDG Fully paid s hares: 74,854,029 Announcement to the Australian Stock Exchange 7 th June 2011 Unlisted options: 7,000,000 Increased Exploration Target of 1.4 to 1.6 Billion Tonnes of Coal for
More informationKATINGAN RIA COAL RESOURCE UPGRADE
Company Announcements ASX Limited Exchange Plaza 2 The Esplanade PERTH WA 6000 By Electronic Lodgement 14 February 2013 Dear Sir/Madam KATINGAN RIA COAL RESOURCE UPGRADE Fivefold increase in Measured and
More informationDeep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia
ASX Announcement ASX Code: DYL 29 October 2010 Deep Yellow Revises Resource Estimate at INCA Uranium Deposit in Namibia HIGHLIGHTS Deep Yellow received a Mineral Resource estimate for the INCA uranium
More informationFor personal use only
ASX RELEASE 15 March 2013 CELSIUS ESTABLISHES MAIDEN 255 MILLION TONNES JORC RESOURCE AT UZGEN BASIN COKING COAL PROJECT HIGHLIGHTS Maiden total Inferred JORC Code Resource of 255 million tonnes of coal
More informationFor personal use only
ASX announcement 1 July 2015 Stanmore acquires the Wotonga coking coal deposit in the Bowen Basin Highlights Stanmore has acquired the Wotonga coking coal deposit contained within Mineral Development Licence
More informationSTRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS
National Stock Exchange of Australia Company Announcements Level 2, 117 Scott Street Newcastle NSW 2300 25 th January 2013 STRONG GOLD IN SOIL ANOMALY OUTLINED AT MARY HARRISON PROJECT HIGHLIGHTS 100m
More informationMAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL MILLION TONNES
ASX ANNOUNCEMENT ASX CODE: MMX 3 September 2009 MAJOR EXPLORATION SUCCESS AT JACK HILLS IRON ORE PROJECT EXPLORATION TARGET OF ADDITIONAL 400-1000 MILLION TONNES Murchison Metals Limited (Murchison) is
More informationFor personal use only
ASX RELEASE 4 May 2012 Injune Thermal Coal Project Maiden Resource Statement Highlights: Maiden Resource Statement for the Injune Thermal Coal Project with the following JORC classification: A total Resource
More informationThe coal resource and coal reserve definitions have been extracted from the SAMREC CODE.
ANNEXURE A KEATON ENERGY HOLDINGS LIMITED SUMMARY COAL RESOURCE AND COAL RESERVE HOLDINGS AS AT 31 MARCH 2014 Introduction The Keaton Energy Group Coal Resource and Coal Reserve estimates have been compiled
More informationFor personal use only
11 MAY 2011 ASX : NAE ASX ANNOUNCEMENT Acquisition of Coal Concessions in Cesar Basin, Colombia New Age Exploration Limited ( NAE ) announces that it has entered into binding agreements to acquire two
More information2017 as at 30 June 2017 Project Tonnes HM HM SL OS HM Assemblage Tonnes HM HM SL OS HM Assemblage
ASX, AIM and Media Release 8 October Mineral Resources and Ore Reserves Statement SUMMARY The recently acquired Toliara Project has an estimated Mineral Resource of 857 million tonnes at 6.2% Heavy Mineral
More informationFor personal use only
ASX Announcement Moorlands Project Concept Mining Study Update Concept Mining Study confirms the proposed South Pit as initial mining focus at the Moorlands Project with: Strip ratios of 2 to 4 bcm/tonne,
More informationSHUMBA COAL UPGRADES GROSS IN-SITU TONNES COAL TO 1.14BT AT SECHABA
31 st January, 2014 BSE ANNOUNCEMENT BSE: SHU SHUMBA COAL UPGRADES GROSS IN-SITU TONNES COAL TO 1.14BT AT SECHABA Following the completion of a 4,000m drill programme at Sechaba focused on delineating
More informationP ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT
2 September 2013 ASX Release ASX Code: CXX P ROJ EC T UPDATE PANDA HILL NIOBIUM PROJ ECT Highlights Project is on schedule, with completion of the preliminary economic assessment study on target for Quarter
More informationMINERAL RESOURCES AND RESERVES CONTINUED
MINERAL RESOURCES AND RESERVES STATEMENT CONTENTS 1. EXECUTIVE SUMMARY 3 2. GEOLOGICAL SETTING 3 3. MINERAL RIGHTS 4 4. MINERAL RESO URCE MANAGEMENT 5 5. RESOURCE CONFIDENCE 11 6. RISK MANAGEMENT MINERAL
More informationAnnual Report Amended Additional Information
ASX Announcement 13 October 2017 Annual Report Amended Additional Information ASX Code: VKA Viking Mines Ltd (Viking or the Company) hereby releases amended commentary to relevant sections of its annual
More informationCarrapateena Mineral Resources Explanatory Notes April OZ Minerals Limited. Carrapateena Mineral Resources Statement April
OZ Minerals Limited Carrapateena Mineral Resources Statement April 14 2011 CARRAPATEENA MINERAL RESOURCE STATEMENT April 14, 2011 The Carrapateena Resource Statement relates to an upgrading to an Inferred
More informationTable 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition)
DINGO (PEARL CREEK) PROJECT JORC RESOURCE Table 1 - Checklist of Assessment and Reporting Criteria (The JORC Code, 2012 Edition) The following table provides a summary of important assessment and reporting
More informationFor personal use only
ENERGY to GROW Second project expands South Pentland by more than 50% to 3.6 5.0 Bt thermal coal JORC Exploration Target October 8, 2012 ASX: BWD Level 8 102 Adelaide Street Brisbane, QLD, 4000 T: +61
More informationPetra Diamonds Limited Resource Statement
Petra Limited 2016 Resource Statement Petra Limited ( Petra or the Company or the Group ) manages one of the world s largest diamond resources of over 300 million carats ( Mcts ). This major resource implies
More informationNew Drilling Program Commences at Mutiny s Deflector Deposit
New Drilling Program Commences at Mutiny s Deflector Deposit Drilling Program Highlights 12,000 metre RC and diamond drilling program underway New drilling program targets strike extensions in the Northern
More informationBass Metals records further positive drill results & progress at 3 prospects.
16 March 2011 Bass Metals records further positive drill results & progress at 3 prospects. HIGHLIGHTS: New high-grade drilling intercept confirms Switchback potential; Drilling commences at Lake Margaret
More informationFor personal use only
ASX Announcement Monday, 5 December 2011 ASX Code: MOU MODUN ANNOUNCES 489 MILLION TONNE MAIDEN JORC REPORTABLE COAL RESOURCE AT NUURST PROJECT IN MONGOLIA Highlights: Maiden JORC Reportable Coal Resource
More informationNimrodel Resources Limited Takatokwane Project Resource Estimation J_1265
Nimrodel Resources Limited Takatokwane Project Resource Estimation J_1265 Principal Author: Ian Blayden PhD, MBA, BSc, MAusIMM, MMICA, MAIG, MGSA Principal Reviewer: Christine Standing BSc Hons, MAusIMM,
More informationNCONDEZI COAL COMPANY LTD. ("Ncondezi" or the "Company") Provisional Ncondezi Project Resource Update
Ncondezi Coal Company Limited No 1 le Truchot St Peter Port Guernsey Channel Islands GY1 3JX Tel: +44 (0) 1481 810102, Fax: +44 (0) 1481 810120 December 12, 2011 NCONDEZI COAL COMPANY LTD ("Ncondezi" or
More informationVISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT
ASX ANNOUNCEMENT November 10, 2010 Highlights: VISTA COAL PROJECT RESOURCE INCREASES BY 297.1MT TOTAL COAL RESOURCE INCREASES TO 1.37BT Coal Resource on the flagship Vista Coal Project increases by 297.1Mt
More informationThe Company was admitted to the Official List on 12 November 2010 and its shares commenced trading
ASX ANNOUNCEMENT ST GEORGE MINING LIMITED ASX: SGQ ACN 139 308 973 Level 1, 115 Cambridge Street PO Box 1305, West Leederville WA 6007 www.stgeorgemining.com.au Phone +618 9322 6600 Facsimile +618 9322
More informationAcquisition agreement to move to 100% ownership of the Ashford Coking Coal Project
Level 9, Waterfront Place, 1 Eagle St, Brisbane QLD 4000 GPO Box 1164, Brisbane QLD 4001 Telephone: 07 3108 3500 Fax: 07 3108 3501 Email: admin@lanewayresources.com.au www.lanewayresources.com.au ASX ANNOUNCEMENT
More informationDiversification into the exciting South Africa Platinum Industry
MORNING STAR HOLDINGS (AUSTRALIA) LTD ASX/Media Release 18 November 2009 Key Points Diversification into the exciting South Africa Platinum Industry The company is completing the acquisition of three platinum
More informationFor personal use only
CLASSIC CONTINUES HUNT FOR HIGH GRADE GOLD WITH COMMENCEMENT OF RC DRILLING PROGRAM Highlights: ~3000m of RC drilling underway at Kat Gap, Lady Lila, Lady Magdalene and Van Uden West Assay results expected
More information8.1Mt Maiden JORC Coal Resource estimate at Titiribi Project
Perth Office: Ascot Resources Ltd 512 Hay Street Subiaco WA 6008 T: + 61 8 9381 4534 F: + 61 8 9380 6440 E: info@ascotresources.com W: www.ascotresourcs.com ASX ANNOUNCEMENT 11 July 2013 The Manager Company
More informationOvoot Coking Coal Project (100%)
NEW MAJOR MONGOLIAN COAL RESOURCE Ovoot Coking Coal Project (100%) ASX Announcement 13/10/2010 14/10/2010 ASPIRE MINING LIMITED ABN 46 122 417 243 Unit 2, 454 Roberts Road Subiaco, WA, 6008 P.O. Box 1918
More informationDiamond Drilling confirms depth potential for mineralisation at Mrima Hill.
TSX VENTURE EXCHANGE: TSXV-PAW Diamond Drilling confirms depth potential for mineralisation at Mrima Hill. December 22 nd, 2011 News Release #2011-28 Vancouver, BC, Canada: Pacific Wildcat Resources Corp.
More informationAusgold awarded EIS grant for Jinkas deep drilling
ASX Release 21 June 2018 Ausgold awarded EIS grant for Jinkas deep drilling Highlights: EIS grant will support drilling at the Katanning Gold Project to a value of $150,000 Grant will partly fund four
More informationMARKET UPDATE ON URANIUM AND GOLD PROJECTS
ASX Announcement 1 March 2011 MARKET UPDATE ON URANIUM AND GOLD PROJECTS HIGHLIGHTS 5,000 metre drilling programme to commence at Rio Puerco uranium project within the next two weeks. Drilling to commence
More informationFor personal use only
ABN 79 106 879 690 7 October 2011 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (6 pages by email) Dear Madam, Multiple zones intersected including 123 metres at 0.61 g/t Gold and
More informationFor personal use only
ASX:LEG 10 July 2014 Fraser Range Aeromagnetic Survey Identifies Targets Seven priority targets considered prospective for nickel-copper Targets interpreted to relate to intrusive mafic/ultramafic bodies
More informationMINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES
Gold Corporation 2014 Annual Mineral Reserve and Resource Statement Proven and Probable Mineral Reserves PROVEN AND PROBABLE MINERAL RESERVES (1,3,4,5,6,8, 10) Fort Knox Area USA 100.0% 67,855 0.40 872
More informationMINERAL RESERVE AND MINERAL RESOURCE STATEMENT
MINERAL RESERVE AND MINERAL RESOURCE STATEMENT PROVEN AND PROBABLE MINERAL RESERVES Gold Proven and Probable Mineral Reserves (1,3,4,5,6,8,9,10,11,12) Gold Corporation s Share at December 31, 2013 Proven
More informationMAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT MARIOLA COAL PROJECT, POLAND
Level 1, 350 Hay Street, Subiaco, WA 6008 ABN 84 061 219 985 P: +61 8 6365 4519 F: +61 8 9388 6040 E:enquiries@balamara.com.au 15 October 2014 MAIDEN JORC RESOURCE CONFIRMS SIGNIFICANT COAL DEPOSIT AT
More informationFor personal use only
ASX RELEASE 3 May 2012 For personal use only Wilpeena PCI Coal Project Maiden Resource Statement Highlights: Maiden Resource Statement for the Wilpeena PCI Coal Project with the following JORC classification:
More informationFor personal use only
29 April 2011 HIGHLIGHTS QUARTERLY ACTIVITIES REPORT MARCH 2011 Strategic farm-in transaction completed over the Cygnus coking coal project containing an existing JORC-compliant Inferred resource of 95.5Mt.
More informationFor personal use only
ASX ANNOUNCEMENT 16 th January 2012 BLACKHAM CONFIRMS MATILDA RESOURCES Blackham completes review of existing Matilda Project Resources 601,000oz inferred resources contained within 6 deposits Includes
More informationSTEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE AT SYNDICATED S 100% BARBARA SOUTH LODE
November 5th 2009 Manager Announcements Companies Announcements Office Australian Securities Exchange Limited Level 4, 20 Bridge Street Sydney NSW 2000 STEP-OUT DRILLING EXTENDS HIGH GRADE COPPER ZONE
More informationFor personal use only
ASX RELEASE 31 May 2011 Eagle Downs Hard Coking Coal Project Study Results Highlights: The Manager of the Eagle Downs Hard Coking Coal Project (the Project ) has released a Study detailing the outcomes
More informationINTRODUCTION STATEMENT BY COMPETENT PERSON DEFINITIONS
INTRODUCTION The purpose of this report is to document the mineral resources and mineral reserves of Merafe Resources (Merafe) in accordance with the requirements of the SAMREC Code (The South African
More informationA summary of the review s findings for the six areas, listed in Table 1, is given below.
11 February 2010 Company Announcements Office Australian Stock Exchange 20 Bridge Street SYDNEY NSW 2000 RESULTS OF COAL PROJECT REVIEW Pacific Enviromin Limited (PEV) is pleased to release the main findings
More informationMerger Presentation April 2009
Chalice Gold Mines Limited Sub-Sahara Sahara Resources NL Merger Presentation April 2009 www.chalicegold.com www.subsahara.com.au Disclaimer The material used in this presentation is intended to be a summary
More informationVictory plans gravity survey for Bonaparte after encouraging rock-chip results
ASX ANNOUNCEMENT 18 September 2017 Victory plans gravity survey for Bonaparte after encouraging rock-chip results Highlights Rock-chip sampling program at Bonaparte Project returns highly encouraging results
More informationFor personal use only
Quarterly Activities Report September 2013 Equus Mining Limited (ASX: EQE) is pleased to report on its exploration activities in Chile, South America, and corporate developments for the quarter ended 30
More informationGOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag
GOLDEN MINERALS DISCOVERS ADDITIONAL HIGH GRADE VEINS AT SANTA MARIA RESULTS UP TO 1.88 g/t Au and 648 g/t Ag Golden, Colorado /Globe Newswire/ July 12, 2018 Golden Minerals Company (NYSE American and
More informationFor personal use only
FeOre Limited 62/F, Thee Center 99 Queens Road Central Hong Kong Tel: +8522 3960 6518 www.feore.com ASX ANNOUNCEMENT 14 th February 2013 UPDATED MINERAL RESOURCE ESTIMATE FeOre Limited (ASX: FEO) is pleased
More informationBoseto Near Mine Exploration Update. North East Plutus, South West Petra and Nexus Propsects
12 March 2010 Discovery Metals Limited ( Discovery Metals or the Company ) (AIM: DME) (ASX/BSE: DML) Boseto Near Mine Exploration Update North East Plutus, South West Petra and Nexus Propsects Highlights:
More informationKIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE
KIRKLAND LAKE GOLD ANNOUNCES 120 METRE DOWN-PLUNGE EXTENSION OF SWAN ZONE High-grade, visible-gold mineralization intersected 120 metres ( m ) down-plunge of Swan Zone Inferred Mineral Resource and 210
More informationAGM Geology Presentation. 30th November 2016
AGM Geology Presentation 30th November 2016 2 Disclaimer Disclaimer This presentation contains forward looking statements that are subject to risk factors associated with the exploration and mining industry.
More informationFor personal use only
11 June 2014 Market Announcements Platform ASX Limited Exchange Centre 20 Bridge Street Sydney NSW 2000 Auroch Consolidates Mozambique Ground Highlights - Binding agreement to acquire 340km 2 of highly
More informationFor personal use only
ASX Announcement 2 April 2012 Substantial Upgrade to Underground Coal Resource at Doyles Creek Highlights: Infill drilling has increased Measured Resources by 248% to 23.1Mt from 9.3Mt. Measured and Indicated
More informationMERAFE RESOURCES. Mineral Resource and Mineral Reserve Report 31 December 2016
MERAFE RESOURCES Mineral Resource and Mineral Reserve Report 31 December 2016 P-J Gräbe January 2016 MINERAL RESOURCE AND MINERAL RESERVE STATEMENT INTRODUCTION The purpose of this report is to document
More informationFor personal use only
Tuesday, 1 March 2011 Companies Announcement Office Australian Securities Exchange Limited Level 6, 20 Bridge Street Sydney NSW 2000 Via E-lodgement Re-commencement of Fe Resource definition drilling at
More informationThe Manager Companies ASX Limited 20 Bridge Street
ABN 79 106 879 690 10 July 2012 The Manager Companies ASX Limited 20 Bridge Street SYDNEY NSW 2000 (5 pages by email) Dear Madam, 1.54 Moz Gold Equivalent Maiden Gold/Copper Resource at Wonogiri The Directors
More informationGLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006
GLOUCESTER COAL LTD 2006 Annual Results Media Presentation 25 August 2006 Our Business Agenda The Gloucester Coal 3 Ticks Rule Operations Profitability Growth Gloucester Coal delivers record profit, sales
More informationFor personal use only
ASX Announcement 7 February 2017 ASX Code: VKA High grade soil and rock chip anomaly identified at Khao Soon Tungsten Project, Thailand 24 soil samples averaging 1300ppm or 0.13% WO3. 9 soil samples average
More informationFor personal use only
ORION METALS LIMITED (ASX: ORM) ACTIVITIES REPORT FOR QUARTER ENDING 28 TH FEBRUARY 2014. EXPLORATION ACTIVITIES Following senior management changes late 2013, a new highly experienced exploration team
More informationRare Earth project update
22 June 2011 ASX Release By e-lodgement Rare Earth project update HIGHLIGHTS Work advanced on Rare Earth Elements ( REE ) project in Arizona, USA 5,120 metre, 195 hole drilling programme completed Early
More informationNEW DISCOVERIES AT THE RED OCTOBER MINE
23 July 2013 ASX & MEDIA RELEASE NEW DISCOVERIES AT THE RED OCTOBER MINE The Directors of Saracen Mineral Holdings Limited (the Company ) are pleased to provide an update on the Red October underground
More informationFor personal use only
21 December 2017 MASSIVE SULPHIDES INTERSECTED IN DRILLING 15 hole, 2270m diamond drill program completed at Midrim Thick zones of massive sulphides intersected Core being logged and sampled with assays
More informationFor personal use only
ASX ANNOUNCEMENT Date: 21 June 2012 2012 exploration programme at Bulman, with focus at targets identified by the 2011 airborne survey The Board of Admiralty Resources NL ( Admiralty ) is pleased to announce
More informationBrakfontein Coal Resource Competent Person s Report. Coal of Africa Limited & Peel Hunt LLP
Brakfontein Coal Competent Person s Report Report Prepared for: Coal of Africa Limited & Peel Hunt LLP Report Prepared by: Gemecs (Pty) Ltd Sentinel House 37 Walter Sisulu Street Middelburg Republic of
More informationMineral Resource Estimate Comparison at 3 g/t Au cut-off
HARTE GOLD CORP. 8 King Street East, Suite 1700 Toronto, Ontario, M5C 1B5 Tel: 416-368-0999 Fax: 416-368-5146 Harte Gold Announces 2018 Drilling Increases Indicated Mineral Resources by 55% Overall Resource
More informationCOMPLETION OF PHASE 1 DRILLING AT TITIRIBI PROJECT IDENTIFIES ADDITIONAL SIGNIFICANT COAL INTERCEPTS
Perth Office 512 Hay Street Subiaco, WA, 6008 T: +61 8 9381 4534 F: +61 8 9380 6440 E: admin@ascotresources.com W: www.ascotresources.com ASX ANNOUNCEMENT 4 June 2013 The Manager Company Announcements
More informationBlox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project.
Blox, Inc. Announces New Drilling Target Defined at Mansounia Gold Project. Vancouver, British Columbia, July 6, 2018 Blox, Inc. (OTCQB: BLXX), ( Blox or the Company ) is pleased to announce that a new
More informationFORM F3 MATERIAL CHANGE REPORT
FORM 51-102F3 MATERIAL CHANGE REPORT Item 1 Name and Address of Company Ivanhoe Mines Ltd. ( Ivanhoe Mines, Ivanhoe or the Company ) Suite 654, 999 Canada Place Vancouver, British Columbia Canada, V6C
More informationG V M M E T A L S L I M I T E D A B N
G V M M E T A L S L I M I T E D A B N 9 8 0 0 8 9 0 5 3 8 8 Le vel 1, Old Swan Bre we ry, 17 3 Mounts Bay Road, Pe rth WA 600 0 Austra lia Telephone: +61 8 932 2 6 776 Facsimile: +61 8 9322 6778 Website:
More informationGoviEx completes acquisition of African Energy s Zambian uranium assets
October 30, 2017 GoviEx completes acquisition of African Energy s Zambian uranium assets VANCOUVER, CANADA GoviEx Uranium Inc. (TSX-V: GXU; OTCQB: GVXXF) ( GoviEx ) announced today the completion of its
More information24 October Dear Shareholders, 2014 ANNUAL REPORT
Azumah Resources Limited ABN 72 112 320 251 Suite 2, 11 Ventnor Avenue West Perth WA 6005 PO Box 1073 West Perth WA 6872 P +618 9486 7911 F +618 9481 4417 W www.azumahresources.com.au E info@azumahresources.com.au
More informationASX ANNOUNCEMENT 21 MARCH 2011
ASX ANNOUNCEMENT 21 MARCH 2011 Sihayo Pungkut Gold Project New JORC Compliant Estimate Sihayo Resource increases 43% to 1.30 Million ounces, total project resources grow to 1.4 million ounces Highlights
More informationFor personal use only
DIRECTORS Mr Martin Blakeman Executive Chairman Mr Winton Willesee Non-Executive Director Mr Eric de Mori Non-Executive Director COMPANY SECRETARY Mr Winton Willesee ASX Release 28 August 2012 Newera Commences
More informationAn ASX listed Perth-based gold explorer focused on Ghana in West Africa
An ASX listed Perth-based gold explorer focused on Ghana in West Africa Africa Down Under Conference August 2012 www.vikingashanti.com Disclaimer and Competent Person s Statement This presentation has
More informationLOCHINVAR COKING COAL PROJECT. LOI-001 Raw Coal Analysis ASX RELEASE. 18 February 2013 ASX RELEASE. 11 April 2013
LOCHINVAR COKING COAL PROJECT Exploration Target - 330 Mt 410 Mt high volatile coking coal - 13 historic drill holes and 100km of seismic lines Drilling Program - Phase 1a drill program underway - 6 drill
More informationDisclaimer. Forward-Looking Statements. Competent Person s Statement
Ulysses: Genesis of a significant new underground gold mine near Leonora, WA Michael Fowler, Managing Director Resources Rising Stars, May 29-30 2018 Disclaimer Forward-Looking Statements Some statements
More informationFor personal use only
ASX Announcement 15 March 2017 HIGHLIGHTS Drill contractors have been engaged with drilling to commence April 2017 pending access approvals Two mineralised lodes within the oxide volcanogenic massive sulphide
More informationHigh Grade Gold Drill Results Extend Buccaneer
ASX ANNOUNCEMENT / MEDIA RELEASE ASX:ABU 14 June, 2012 High Grade Gold Drill Results Extend 31 metres averaging 3.68g/t gold including 14 metres averaging 7.56g/t gold ABM Resources NL ( ABM or The Company
More informationFor personal use only
PACIFIC AMERICAN COAL LIMITED (Formerly Metals Finance Limited) MAIDEN 257.5 MILLION TONNES JORC RESOURCE CONFIRMS COKING COAL QUALITY AT ELKO, BRITISH COLUMBIA Initial exploration confirms 257.5 million
More informationDMT Consulting Limited Technical Memorandum
DMT Consulting Limited International Mining Consultants From: To: Date: 4 th June 2018 Project Number: 2067 6813 Document Number DMT Consulting Limited Technical Memorandum Tim Horner Principal Geologist
More informationFor personal use only
30 May 2012 Potential 500 to 800 million tonne magnetite target zone( * see note below) identified from geophysical data modelling of HELITEM survey at Gabanintha. ASX [YRR]. Web page: www.yellowrock.com.au
More informationJune 2017 Quarterly Report
ASX ANNOUNCEMENT Date: 31 July 2017 June 2017 Quarterly Report Victory Mines Limited (ASX:VIC) ( Victory or the Company ) provides a review of its activities during the June 2017 quarter. Exploration Western
More informationDRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE
INVESTOR UPDATE DRIVING NICKEL AND COPPER SULPHIDE DISCOVERY ON THE FRASER RANGE JUNE 2014 Disclaimer The information in this presentation is published to inform you about Classic Minerals Limited and
More informationFor personal use only
6 February 2012 Australian Securities Exchange Exchange Centre 20 Bridge Street Sydney NSW 2000 SIGNIFICANT MAIDEN JORC COMPLIANT RESOURCE FOR EUCLA WEST MINERAL SANDS PROJECT Forge Resources Ltd (ASX:FRG,
More informationSepola Project Area in Mali Extended
ASX Release 4 June 2009 Golden Rim Resources Ltd ABN 39 006 710 774 www.goldenrim.com.au Head Office Level 2 10 Outram Street WEST PERTH WA 6872 AUSTRALIA T: + 61 8 9481 5758 F: + 61 8 9481 5759 Exploration
More informationGoldsource Completes Winter Drill Program At Border; 34 Holes Contain Aggregate Coal Intercepts Ranging From 10 to 100 Meters
Goldsource Completes Winter Drill Program At Border; 34 s Contain Coal Intercepts Ranging 10 to 100 Meters TSX-V: GXS For Immediate Release VANCOUVER, B.C. April 7, 2009 Goldsource Mines Inc. ( Goldsource
More information3 AUGUST 2011 ASX: NAE ASX ANNOUNCEMENT Second Successful Coking Coal Acquisition in Colombia
3 AUGUST 2011 ASX: NAE ASX ANNOUNCEMENT Second Successful Coking Coal Acquisition in Colombia New Age Exploration Limited ( NAE or the Company ) is pleased to announce that it has entered into a binding
More information